north wave floor plan brochure

32

Upload: william-chui

Post on 20-Mar-2017

45 views

Category:

Real Estate


0 download

TRANSCRIPT

F L O O R P L A N S

Notes to Specifications:

1) Marble/ Compressed Marble/ Limestone/ Granite/ Stone Marble/ compressed marble/ limestone/ granite/ stone are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the marble/ compressed marble/ limestone/ granite as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite, being a much harder material than marble, cannot be re-polished after installation. Hence, some differences may be felt at the joints. Subject to clause 14.3, the tonality and pattern of the marble, limestone or granite selected and installed shall be subject to availability.

2) Timber strips Timber strips are natural materials containing veins and tonal differences. Thus, it is not possible to achieve total consistency of colour and grain in their selection and installation. Timber strips are also subject to thermal expansion and contraction beyond the control of the builder and the Vendor. Natural timber that is used outdoors will become bleached due to sunlight and rain. Thus, the cycle of maintenance on staining will need to be increased as required. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.

3) Laminated FlooringLaminated flooring is manufactured material which contains tonality differences to match natural wood finish. Thus, it is not possible to achieve total consistency of colour and grain in its selection and installation. Laminated floors are installed in modular planks and are subject to thermal expansion and contraction beyond the control of the builder and vendor. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.

4) Air-conditioning system To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned on a regular basis by the Purchaser. This includes the cleaning of filters, clearing of condensate pipes and charging of gas. The Purchaser is advised to engage his own contractor to service the air-conditioning system regularly.

5) Television and/or Internet AccessThe Purchaser is liable to pay annual fee, subscription fee and such other fees to the television and/or internet service providers or any other relevant party or any relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective channels and/or internet access.

6) Materials, Fittings, Equipment, Finishes, Installations and AppliancesSubject to clause 14.3, the brand, colour and model as specified for all materials, fittings, equipment, finishes, installations and appliances to be supplied shall be provided subject to the Architect’s selection and market availability.

7) Layout/Location of Fan Coil Units, Electrical Points, Television Points, Telecommunication Points, Telephony System, Door Swing Positions and Plaster Ceiling BoardsLayout/Location of fan coil units, electrical points, television points, telecommunication points, telephony system, door swing positions and plaster ceiling boards are subject to the Architect’s final decision and design.

8) WarrantiesWhere warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor will assign to the Purchaser such warranties at the time when vacant possession of the Unit is delivered to the Purchaser. Notwithstanding this assignment, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.

9) False CeilingThe false ceiling space provision allows for the optimal function and installation of M&E services. Access panels are allocated for ease of maintenance access to concealed M&E equipment for regular cleaning purposes. Where removal of equipment is needed, ceiling works will be required. Location of false ceiling is subject to the Architect’s sole discretion and final design.

10) GlassGlass is manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by all manufacturers. The Purchaser is recommended to take up home insurance covering glass breakage to cover this possible event. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.

11) Mechanical Ventilation SystemMechanical ventilation fans and ductings are provided to toilets which are not naturally ventilated.

To ensure good working condition of the mechanical ventilation system, the mechanical ventilation system for the exhaust system within internal toilets (where applicable) is to be maintained by the Purchaser on a regular basis.

12) Pre-Fabricated ToiletsCertain bathroom and W.C may be prefabricated construction and all penetrations are sealed at manufacturer’s factory prior to installation on site. Any subsequent penetrations are not recommended as they will compromise the waterproofing warranty.

13) PlantersPlanters are designed to take the loading of potted plants only. No soil material or turf / plants will be provided in the planters.

Details of building specifications:

Refer to specifications given.

PROPOSED ERECTION OF 6 BLOCKS OF 16-STOREY EXECUTIVE CONDOMINIUM (TOTAL 358 UNITS) WITH LANDSCAPE DECK, SWIMMING POOL AND COMMUNAL FACILITIES ON LOT 06166A MK13 AT WOODLANDS AVENUE 12 /WOODLANDS VIEW (WOODLANDS PLANNING AREA)

358 residential units

Total number of units in each class:

Description of common property:Basement car park, swimming pool, external landscape, communal facilities, lift lobbies, common corridor spaces and all other areas outside the units which are not part of the strata area.

Total number of Parking spaces: 362 Car park lots and 60 Bicycle lots

Description of Car Parking spaces: Basement car park - 362 car park lots including 4 handicap lots and 60 bicycle lots will be provided

Purpose of Housing Project and restrictions as to use: Residential development

GENERAL DESCRIPTION OF HOUSING PROJECT

No. of Rooms Unit Type Units

2 BR B1, B1pB2, B2p 47

3 BR C1, C1aC2, C2p, C2(m), C2(m)p, C2aC3, C3pC4, C4pC5, C5p, C5a, C5a-p, C5a(m), C5a(m)pC6, C6p, C6(m), C6(m)p, C6a, C6a-p 259

4 BR D1, D1p 31

5 BR E1, E1p 15

4 BR+1 (PH) PH 1, PH 2, PH 2(m) 4

5 BR (PH) PH 3, PH 4 2

TOTAL 358

Developer : Hao Yuan (Woodlands) Pte Ltd • Developer’s License No : C1191 • Tenure of Land : 99 years commencing on 25th May 2015 • Mukim/Lot No.: 6166A MK 13 at Woodlands Ave 12 / Woodlands View • Building Plan Approval No.: A1378-01501-2015-BP01 dated 21 Mar 2016 • Planning Approval No.: 081015-10Z1-Z000 dated 02 Nov 2015 • Encumbrances on the Land: (1) Mortgage IE/211398R dated 7 January 2016 in favour of Malayan Banking Berhad; (2)Mortgage IE/211258Q dated 7 January 2016 in favour of Lonpac Insurance Berhad. • Expected Date of Vacant Possession: 31 May 2019 • Expected Date of Legal Completion: 31 May 2022

Developer:

14) WallAll wall finishes shall be terminated at the false ceiling level. There will be no tiles/stone works behind kitchen cabinets/vanity cabinets/mirrors.

15) Cable Services The Vendor shall endeavour to procure a service provider for cable television and/or internet services (the “Cable Services”) to provide the necessary cabling or connection from its network to the Unit and/or the Housing Project (or any part or parts thereof), so as to enable the Unit and/or the Housing Project to receive the Cable Services. In the event, despite reasonable efforts being made by the Vendor, the Vendor is unable to procure any service provider to provide the said cabling or connection, thereby resulting in there being no Cable Services available in the Unit and/or Housing Project, the Vendor shall not be liable to the Purchaser for any compensation or for any damages costs fees expenses or losses whatsoever, or howsoever incurred, by virtue of the Purchaser being unable to obtain the Cable Services in the Unit and/or the Housing Project.

16) TilesSelected tile sizes and tile surface flatness cannot be perfect and are subject to acceptable range described in the relevant Singapore Standards.

c) Gas Water Heater• Hot water supply shall be provided to all Bathrooms (Except WC, Kitchen, Wet

Kitchen)

d) Security System• Telephony System to Apartment Units.• Card Access system to the side gates, basement and 1st storey lift lobbies• Carpark Barrier System at main entrance near Guardhouse.• Closed Circuit Television System (CCTV) general surveillance to Basement

and first storey lift lobby and designated common areas.

e) Gas Supply• Town gas is supplied to Kitchen and gas heater

f) Balcony / PES• Metal railing and/or gate with latch where applicable.

g) Air-conditioners• Wall mounted fan coil unit air-conditioning system to Living/Dining, Family,

Study and Bedrooms.

h) Laundry Hanger in Yard • For Type D1, D1p, E1, E1p, PH1, PH2, PH2(m), PH3, PH4