Page 1: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Wide Masterplan

December 13, 2010

Page 2: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Mission Statement:

"The mission of the North Scott Community School District, a unique blend of rural and metropolitan opportunities, is to produce graduates with the capacity to be successful in a changing world, by incorporating abundant resources and offering a broad-based curriculum in a respectful, safe environment."

Masterplan Process:

The North Scott Community School District is currently faced with several challenges. With continued growth of community populations, there is need for expansion or redirection of the current district facilities. The Masterplanning process has included input of District administration, building administrators, staff and school board. It was determined that Long Term growth would consist of building need in a period of ten or more years from present day. The focus group took on the challenge of reviewing current and future needs for long term growth. Through review of the needs assessment results and comments, this group structured a document that would consider all of the long term requirements for each school facility. This was treated as a “wish” list for the school facilities. In addition, the existing school facilities and property were tabulated for analysis. “Wish” list need includes both building spaces and outdoor spaces or concerns.

Page 3: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Senior High School

•Currently Grades 9-12•Constructed 1957•Numerous expansion, renovation, and remodeling projects•Building Population 967 students•206,000 square feet in size

Junior High School

•Currently Grades 7-8•Ed White sixth graders currently in this building•Constructed 1974•Expanded in 200 and 2008•Building Population 450 students•104,000 square feet in size

Page 4: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Ed White Elementary

•Currently Grades K-5, serving Eldridge•White sixth graders currently at Junior High School•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 458 students•44,500 square feet in size

John Glenn Elementary

•Currently Grades K-6, serving Donahue and portion of Eldridge•Glenn houses preschool programs for the District•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 233 students•30,700 square feet in size

Page 5: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Alan Shepard Elementary

•Currently Grades K-6, serving Long Grove and a portion of Eldridge•Shepard houses state based 4-yr old preschool program•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 310 students•43,700 square feet in size

Neil Armstrong Elementary

•Currently Grades K-6, serving Park View•Constructed 1975•Expanded in 2000 and renovated in 2005 and 2006•Building Population 321 students•40,900 square feet in size

Page 6: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Virgil Grissom Elementary

•Currently Grades K-6, serving Princeton•Grissom houses preschool programs for the District•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 229 students•29,850 square feet in size

District Administration

•Constructed in 1978•6 Private Offices•6 Workstations•Board Room•Conference room/break room•Superintendent currently in board room

Page 7: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Vehicle Maintenance

•Pre-engineered metal building constructed in 1978•Three maintenance bays•Communications system•Transportation office•Buses stored in parking lot

District Maintenance, Grounds and Print Shop

•Constructed in 1979 and repaired in 2005•Wood frame structure•Houses print shop, maintenance offices, maintenance storage, grounds department operations and grounds storage.

Page 8: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

District Facilities:

Lancer Stadium

•Football field, track and grandstands reconstructed in 2009•Visitor bleachers•Ticket booths, rest rooms, storage and concessions

Sports Complex

•Soccer Field•Baseball Field•12 Tennis Courts•Softball field is located on High School grounds

Page 9: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Masterplanning Goal:

•Plan for all facilities for use throughout the entire school district. •Masterplan to serve as Blueprint for facilities for next 10-15 years.

Page 10: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Long Term and Short Term Goals:

•Attract and accommodate population.•Elementary sites as community center. These buildings will have continued changing use.•Update the exterior appearance of facilities. Improve aesthetic of public appearance.•Update technology in all facilities.•Provide opportunities for multiple activities.•Educational facilities to adapt with changes in curriculum, technology, pathways, etc.•Desire to provide best educational space possible.•Desire to be environmentally friendly.

Page 11: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs of Facilities:

•Safe planning of parking and access considerations (traffic flow). Separation of cars, busses and pedestrians for safety on site.

•Green space: Maintain or provide adequate green space for aesthetic as well ascurriculum based needs.

•Provision for adequate technology. Buildings and rooms shall be capable of housing the needed technology which is required by the changing curriculum.•Improve the appearance of each building and the district for visitors. Improved entrances

and exteriors. Possibly clean up or modify the area between the District Administration and the Senior High School.•Accessibility at all facilities within the district.•Rooms to allow easier implementation of co-teaching and interactivity. Adjoining doors or proximity of classroom doors to be considered.

Page 12: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs at Elementary School Facilities:White, Shepard and Armstrong:

•These facilities potentially to serve as three section buildings.•All purpose room - Flexible space to be used for educational, meeting and other group functions. Possible to serve as cafeteria for these buildings.•Staff work/conference space - Provision for a meeting and work/task area for teachers and

staff within each building.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Adequate parking, safety of building access.

Page 13: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs at Elementary School Facilities:Glenn and Grissom:

•These facilities potentially to serve as two section buildings.•All purpose room - Flexible space to be used for educational, meeting and other group functions.•Staff work space - Provision for a meeting and work/task area for teachers and staff within each building.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Adequate parking, safety of building access.

Page 14: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs at Elementary School Facilities:Junior High School:

•Band/Orchestra/Choir rooms not meeting needs of the program. Need to define the programmatic needs of these spaces to determine changes required.•Concerns with PA system.•Staff work space - Provision for work/task area for teachers and staff.•Update of restroom spaces, and inclusion of faculty rest room.•Update/expand main office area.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team meeting room and teacher work space as a combined space.•Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom.

Page 15: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs at Elementary School Facilities:Senior High School:

•Staff work space - Provision for work/task area for teachers and staff.•Update/expand main office area.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team

meeting room and teacher work space as a combined space.•Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom.•Need for storage space - need to define what is to be stored.•Update/expand main building entrance and activities entrance. Update and expand main activities rest rooms and concessions areas.•Continued improvement of classrooms and building spaces - flooring, ceilings, lighting

Page 16: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Programmatic Needs at Elementary School Facilities:Long Term Facility Spaces:

•Swimming Pool•Possible new Pilot Elementary School Facility - K-6•Grounds department building expansion - or possible re-location of grounds and transportation

department facilities.•Sports complex concession stand and restrooms, ticket booths•Football storage garage•Bleachers/press box at soccer fields•Administration building expansion/remodeling.•Wind/solar power generation - building specific to each site•Reconstruct baseball field•Field house facility•Remove “Silver Bullet” building to improve “front door” appearance to district. Relocate storage

to different area.•Repair or replace visitor bleachers, and expand home bleachers, at Lancer Stadium.

Page 17: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Long Term Needs Assessment

Page 18: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Senior High School

1. Administrative and Support Spaces:

a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

Rework/update existing central office areas Rework/expand existing main school entrance area Rework/expand existing main events entrance area (see item d) main office/secretary office area principal’s office assistant principal’s office counselor office with adjoining room for student observation nurse office and first aid and speech therapist file document storage room work room/copy room supply storage room faculty rest rooms

b. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf

Large meeting/multi purpose room: possible to be divided into 2 smallerconferencing rooms (400 sf)

sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be

removed from classroom (1,200 sf)

c. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 450 sf Existing

remodel existing main men/boys and women/girls handicapped accessible rest room capacity per plumbing code drinking fountains

d. Events Ticketing and Concessions: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

Remodel existing ticket booth and concessions stand areas Remodel/expand events entrance area handicapped accessible roll-up security doors sink, power, services for concessions

d. Events Ticketing and Concessions: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

Remodel existing ticket booth and concessions stand areas Remodel/expand events entrance area handicapped accessible roll-up security doors sink, power, services for concessions

e. Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

PE/athletic storage Large equipment storage Chair/table storage Band shell and riser storage Drama storage

1. Instructional Areas:

a. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11,300 sf Existing

Remodel and update existing Library/Media Center ? LF of bookshelves, low shelves (42" to 48" high) checkout desk lounge seating/café style setting for reading coffee bar operated by students study tables/work space for 60 students AV storage/computer charging area librarian’s office/library work room near or easy access to main entry of building

b. Computer/Media Lab: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf Existing

• 1 - Tech work lab• 1 - Video production lab• 1 - Small lab for 8-10 students

c. Wrestling Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf

• Remodel and expand wrestling room or convert existing wrestling roominto storage and construct new wrestling room (80'x40')

Page 19: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

d. Locker Rooms:

Boys athletic locker room. . . . . . . . . . . . . . . . . . . 2,500 sf ExistingIncrease/utilize space from PE lockers for ? students shower/drying area rest rooms coach’s office storageBoys PE locker room . . . . . . . . . . . . . . . . . . . . . . 1,800 sf ExistingReduce/redistribute space to athletic1. lockers for ? students shower/drying area rest rooms PE instructor office

SUBTOTAL NEW SPACES . . . . . . . . . . . . . . . . . . . . . . . . 7,100 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . . 1,420 sf

NEW PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . 8,520 sf

SUBTOTAL REMODELED SPACES . . . . . . . . . . . . . . . 17,250 sf

TOTAL ALL SPACES. . . . . . . . . . . . . . . . 25,770 sf

Page 20: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE New Senior High School

1. Administrative and Support Spaces:

a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf

principal’s office assistant principal’s office counselor office with adjoining room for student observation secretary central office area with waiting area nurse office and first aid and speech therapist conference room student observations area (in-school supervision) file document storage room work room/copy room supply storage room faculty/staff rest rooms

b. Main Entrance : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf

Main building entry Display area Gallery Weather lobby

c. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf

Large meeting/multi purpose room: possible to be divided into 2 smallerconferencing rooms (800 sf)

sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be

removed from classroom (1,200 sf)

d. Building Services: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

boiler room washer and dryer area repair work area storage utilities room janitorial closets

e. Cafeteria:

commons area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7,500 sf seating for ? serving lines kitchen food preparation area . . . . . . . . . . . . . . . . . . . . . . . . 4,000 sf food/supplies storage area cooler/freezer dishwasher/cleaning rest room - kitchen staff

f. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf

boys/mens and girls/womens handicapped accessible capacity per plumbing code drinking fountains

g. Circulation:

visible hallways handicapped accessible ? quantity of student lockers display cabinets

1. Instructional Areas:

a. General Purpose Classrooms: . . . . 33 classrooms @ 900 sf per room = 29,700 sf

? math for ? students each ? social studies for ? students each ? language arts for ? students each ? foreign language for ? students each

Page 21: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

? special education for ? students each teachers closet, clock, PA, phone, computer access storage closet

a. Science Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . 6 @ 1,400 sf each = 8,400 sf

biology, physics, chemistry, earth science room for ? students each water/two sinks in room general science application teacher demonstration area with water, gas and electricity student project areas plain lab tables in center, ? tables, ? students per table storage - general and prep . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf storage - chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 sf

c. Art Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

room for ? students ? activity/work areas painting/drawing studio supply room adjacent project supply area project storage area ceramics studio kiln area in adjacent room ? sink/clean-up areas

d. Band Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5,500 sf

band/orchestra room - seating ? students instrument storage uniform storage 4 practice rooms jazz band 2 small group rooms 2 band office marching band listening lab computer lab music library

e. Chorus Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,800 sf

seating ? students music storage uniform storage 4 practice rooms 2 small group rooms 2 chorus office vocal library

a. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,000 sf

? LF of bookshelves, low shelves (42" to 48" high) checkout desk lounge seating/café style setting for reading coffee bar operated by students study tables/work space for 60 students AV storage/computer charging area librarian’s office/library work room near or easy access to main entry of building

g. Computer/Media Lab: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf

• 1 - Tech work lab• 1 - Video production lab• 1 - Small lab for 8-10 students

h. Gymnasium: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9,000 sf

regulation high school floor bleacher seating for ? storage athletic offices

i. Practice Gym: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11,000 sf

• (2) regulation high school courts• storage

j. Swimming Pool: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,000 sf

• ? lanes• diving• whirlpool

Page 22: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

a. Wrestling Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,000 sf

• mat storage• temperature control/ventilation

l. Fitness Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf

m. Locker Rooms:

Boys athletic locker room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf lockers for ? students shower/drying area rest rooms coach’s office storage

Boys PE locker room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,900 sf1. lockers for ? students shower/drying area rest rooms PE instructor office

Girls athletic locker room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf2. lockers for ? students shower/drying area rest rooms coach’s office storage

Girls PE locker rom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,700 sf3. lockers for ? students shower/drying area rest rooms PE instructor office

n. Drama Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf

• platform/portable stage• seating ? students• drama office• storage

o. Industrial Arts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf

wood working metal working

drafting (computer aided?) classroom office storage of various types

p. Agricultural Technologies:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf

equipment repair classroom laboratory

q. Photography: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

dark room chemical storage

r. At-Risk Student Tutoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350 sf

s. Study Hall: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

t. Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

PE/athletic storage Large equipment storage Chair/table storage Band shell and riser storage Drama storage

SUBTOTAL ALL SPACES . . . . . . . . . . . . . . . . . . . . . . . 141,200 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . 28,240 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . 169,440 sf

3. Site:

a. Parking: . . . . . . . . . . . . . . . . . . . 450 vehicles @ 450 sf per vehicle = 202,500 sf

• off-street parking for teachers, staff, students, and visitors • access/exit on two streets

b. Bus Zone: . . . . . . . . . . . . . . . . . . . . . . . . . . 20 buses @ 600 sf per bus = 12,000 sf

• off-street school bus loading and unloading • separate from automobile traffic

Page 23: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

a. Automobile: . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 cars @ 450 sf per car = 6,750 sf

• on-street loading and unloading of private automobiles will be atcurb

• service vehicles (supplies, garbage, etc.) • separated from school bus traffic• handicapped accessible

b. Outdoor Activity Areas: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100,000 sf

• outdoor teaching and learning centers• playfields, paved and grass• athletic practice field• physical education

e. Future Development:

• size of site allows for future expansion of building with purchaseof adjacent properties

f. Accessibility to Site:

g. Landscaping:

SUBTOTAL ALL PAVED AREAS. . . . . . . . . . . . . . . . . 221,250 sfSUBTOTAL UNPAVED AREAS . . . . . . . . . . . . . . . . . 100,000 sf20 % for future growth/expansion . . . . . . . . . . . . . . . . . . 45,000 sfOUTDOOR SPACES TOTAL . . . . . . . . . . . . . . . . . . . . . 366,250 sf

Summary of Total Project Area (building and property) . . . . . . . . . . . . . . . . . 535,690 sf (12.3 acres)

Page 24: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Junior High School

1. Administrative and Support Spaces:

a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf

rework/expand central office and main entrance area main office/secretary office area - increase to provide space for students principal’s office - increase to allow for meeting space offices are currently small - expand to allow for meeting space nurse office/first aid - possible to relocate elsewher file document storage room work room/copy room supply storage room faculty rest rooms

b. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf

Large meeting/multi purpose room - team meeting space: possible to bedivided into 2 smaller conferencing rooms

Lecture/task tables to seat ? sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be

removed from classroom (1,200 sf)

c. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (existing)

remodel existing men/boys and women/girls (3 total) handicapped accessible rest room capacity per plumbing code drinking fountains

1. Instructional Areas:

a. Music Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,425 sf

Need for new Choir room (30' x 40') Existing Band and Music Rooms to remain: existing tiered platform,

instrument storage, music storage - in need of additional storage (15' x 15') Music office

b. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (existing)

Improve access and control. Currently multiple doorways in/out Better access/visibility from main building entry Existing size of space serves needs Improve access to computer lab

c. Book Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf

• Secured storage for language arts, text books, etc

d. Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,800 sf

• Tow general purpose classrooms, one for each grade level at 900 sf each

SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,025 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 1,205 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 7,230 sf

Page 25: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINEEd White, Alan Shepard and Neil Armstrong Elementary Schools

1. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf

seating for 130 - 150 serving lines for lunch kitchen food service area stage or presentation area rest room or close proximity to existing rest rooms at or near main entry to building

2. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf

Conference table to seat 20 (possibility of two separate rooms of equal size)

sink and counter area, cabinets white board, screen, smart board vending area or other equipment? Faculty rest room

3. Library: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf

? LF of bookshelves checkout desk story/group activity area - with smart board, and riser/seating area study tables for 30 students ? computer work stations for Internet research and automated library access AV storage librarian’s office/library work room near main entry to building

SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,700 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 940 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 5,640 sf

PROGRAM OUTLINEJohn Glenn and Virgil Grissom Elementary Schools

1. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf

seating for 85 - 95 serving lines for lunch kitchen food service area stage or presentation area rest room or close proximity to existing rest rooms at or near main entry to building

2. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf

Conference table to seat 20 sink and counter area, cabinets white board, screen, smart board vending area or other equipment?

3. Library: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf

? LF of bookshelves checkout desk story/group activity area - with smart board, and risers for seating study tables for 30 students ? computer work stations for Internet research and automated library access AV storage librarian’s office/library work room near main entry to building

SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,700 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . . 740 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 4,440 sf

Note: Glenn Elementary would require one additional classroom to serve as full 2-section facilityGeneral purpose classroom. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 900 sf

Page 26: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Pilot/Prototype Elementary School

1. Administrative and Support Spaces:

a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf

central office/secretary area with waiting area principal’s office counselor office with adjoining room for student observation nurse office and first aid conference room file document storage room work room/copy room curriculum storage room supply storage room book storage room faculty rest rooms

b. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf

seating for 150 serving lines for lunch kitchen food service area rest rooms or near building rest rooms stage or presentation area at or near main entry to building

c. Faculty Work/Meeting Room:: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf

Conference table to seat 20 sink and counter area, cabinets white board, screen, smart board vending area or other equipment? Faculty rest room

a. Building Services: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

boiler/mechanical room washer and dryer area repair work area storage utilities room janitorial closets

e. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

men/boys and women/girls handicapped accessible capacity per plumbing code drinking fountains

f. Circulation:

visible hallways handicapped accessible student lockers for 3rd grade and above display cabinets

1. Instructional Areas:

a. General Purpose Classrooms:

2- preschool with adjoining rest rooms. . . . . . . . . . . . . . . . . . . . . . . 2,000 sf 3- kindergarten with adjoining rest rooms . . . . . . . . . . . . . . . . . . . . 3,000 sf 3- 1st grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 2nd grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 3rd grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 4th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 5th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 6th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 2 special education for 15 or more depending on space requirements of the

individual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf reading interventionist - 2 small room for up to 6 students each . . . . 500 sf specialist/consultants - 2 small rooms for up to 6 students each . . . . 500 sf storage closet, teachers closet, clock,

PA, phone, network server/hub. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 sf

Page 27: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

a. Science Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf

1 rooms for 30 students water/two sinks general science application teacher demonstration area with water, gas and electricity student project areas/lab tables, 8 tables, 4 students per table storage

c. Art Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf

1 room for 30 students activity/work areas supply room adjacent project supply area project storage area kiln area in adjacent room sink/clean-up area

d. Music Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf

1 music room for 30 students

e. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf

? LF of bookshelves checkout desk story/group activity area study tables for 30 students ? computer work stations for Internet research and automated library

access AV storage librarian’s office/library work room near main entry to building

f. Gymnasium: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5,500 sf

elementary or junior high sized floor storage also to serve as multi-purpose room adaptive space for special needs p/e instruction

g. Language Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 900 sf

• classroom for English language programs

SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42,050 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . 8,410 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . 50,460 sf

Page 28: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Transportation Department

1. Vehicle Storage and Maintenance:

a. Bus Storage:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19,400 sf

30 busses total one way - drive through operation

b. District Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,300 sf

20 vehicles total

c. Maintenance: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf

three bays total overhead door access vehicle lifts

2. Office and Operations Areas:

a. Dispatch office: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120 sf

b. Mechanics office:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120 sf

c. Break room/training room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

d. Rest rooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350 sf

• Men and women’s rest rooms

a. Mechanical room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 300 sf

f. Loft storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf

3. Other facilities and features:

a. Vehicle Wash Bay: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf

b. Other features:

1. 10,000 gallon diesel fuel storage - card access system2. 1,000 gallon gasoline storage - card access system3. Staff parking for 40 cars4. Radiant heat in storage and maintenance areas5. Six foot high security fencing and gates6. Trench drains

SUBTOTAL ALL AREAS. . . . . . . . . . . . . . . . . . . 37,490 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 7,498 sf

PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . 44,988 sf

Page 29: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Lancer Stadium, Athletic Fields and School Properties

1. Stadium:

a. Home Bleachers:

• Potential to expand home field bleachers to increaseseating capacity

b. Ticket Booths: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400 sf

two new ticket booths, one at each stadium entrance

c. Football Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400 sf

2. School Properties:

a. Remove existing “Silver Bullet” building and providedistrict storage in new location

b. Improve “Front Door” view of district, in areas between HighSchool and District Administration

Page 30: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

PROGRAM OUTLINE Possible Field House Facility

Gymnasium:

regulation high school basketball floor vollyball court bleacher seating for ? storage athletic offices

Practice Gym:

• regulation high school floor• storage

Swimming Pool:

• ? lanes• diving• whirlpool• zero depth• water plan activities

Wrestling Room:

• mat storage• temperature control/ventilation

Other courts/activities:

• racquet ball• indoor track• fitness room/fitness equipment• dance, aerobics,

Locker Rooms:

2 locker rooms, mens and womens lockers for ? students each shower/drying area rest rooms storage

Offices/administration:

• ? Private offices• Control desk• Work/copy room

Page 31: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Options for Plan of Action

Page 32: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

List of Possible Masterplan Options

Option 1:

•Construct new Senior High School facility (10-12)•Existing Senior High to be remodeled and repurposed into Junior High Facility (7-9)•Existing Junior High facility to be repurposed into Elementary school•Existing Elementary schools to receive programmatic additions or be reorganized

Option 2:

•Selective demolition and reconstruction of portions of the existing Senior High School facility (10-12)•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to receive programmatic additions or be reorganized•Construct new Elementary school facility

Option 3:

•Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to receive programmatic additions or be reorganized•Construct new Elementary school facility

Page 33: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

List of Possible Masterplan Options

Option 4:

•Construct New Senior High school facility (10-12)•Selective demolition and reconstruction of existing High School building for use as events and activities center and supplemental programs•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to be reorganized or reclassified: K-2 or 3-6

Option 5:

•District to continue current path:*Continue maintenance program for each building in district

*Work towards pre-planned wish list items and long term goal items as developed through planning process *Needed expansion and remodeling of existing facilities sequentially

Page 34: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Option 1

Page 35: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

1. Senior High School

Existing Senior High school facility to be remodeled and re-purposed into a Junior High School facility for grades 7 through 9. Selective demolition and remodeling of existing building to accommodate junior high curriculum requirements.

PHASE I

PHASE II r emoveand

r econs t r uctr emove

andr econs t r uct

Page 36: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

new j unior highs chool cons t r uct ion

exis t ingcons t r uct ion

t o r emain

exis t ingcons t r uct ion

t o r emain

exis t ingcons t r uct ion

t o r emain

Page 37: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

2. Junior High School

Existing Junior High school to be remodeled and re-purposed into a new three section Elementary school. Selective remodeling of existing building to accommodate elementary school curriculum requirements.

Page 38: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

3. Existing Elementary Schools

Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.

Ed White

Page 39: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Alan Shepard

LOT 1

LOT 1

Page 40: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Neil Armstrong

Page 41: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Virgil Grissom

John Glenn

Page 42: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

4. New Senior High School

Construct new senior high school for grades 10 through 12 within the Eldridge city limits.

5. Transportation Department

Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

meN

w omeN

COFFEEBAR

offi ce

offi ce

CONFERENCEmechanica l

br eak r oom

WASH BAY1200 SF

VEHICLE STORAGE ANDMAINTENANCE FACILITY

35,200 SF

PARK ING LOT30 VEHICLES

Page 43: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

7. Lancer Stadium

Expand existing home bleachers. Construct new ticket booths and athletic storage.

Ticket Boothsfor Lancer Stadium

Lancer Stadium

Page 44: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Option 2

Page 45: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

1. Senior High School

Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as senior high facility serving grades 10 through 12.

PHASE I

PHASE II r emoveand

r econs t r uctr emove

andr econs t r uct

Page 46: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

new s enior highs chool cons t r uct ion

exis t ingcons t r uct ion

t o r emain

exis t ingcons t r uct ion

t o r emain

exis t ingcons t r uct ion

t o r emain

Page 47: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

2. Junior High School

Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.

Page 48: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

3. Existing Elementary Schools

Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.

Ed White

Page 49: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Alan Shepard

LOT 1

LOT 1

Page 50: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Neil Armstrong

Page 51: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Virgil Grissom

John Glenn

Page 52: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

4. New Elementary School

Construct new elementary school as K-5 facility within the Eldridge city limits.

5. Transportation Department

Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

meN

w omeN

COFFEEBAR

offi ce

offi ce

CONFERENCEmechanica l

br eak r oom

WASH BAY1200 SF

VEHICLE STORAGE ANDMAINTENANCE FACILITY

35,200 SF

PARK ING LOT30 VEHICLES

Page 53: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

7. Lancer Stadium

Expand existing home bleachers. Construct new ticket booths and athletic storage.

Ticket Boothsfor Lancer Stadium

Lancer Stadium

Page 54: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Option 3

Page 55: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 3

1. Senior High School

Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.

exis t ings enior high

s chool

Page 56: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 3

2. Junior High School

Existing Junior High school to be expanded for additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.

Page 57: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 3

3. Existing Elementary Schools

Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.

Ed White

Page 58: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Alan Shepard

LOT 1

LOT 1

Page 59: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Neil Armstrong

Page 60: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Virgil Grissom

John Glenn

Page 61: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 3

4. New Elementary School

Construct new elementary school as K-5 facility within the Eldridge city limits.

5. Transportation Department

Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

meN

w omeN

COFFEEBAR

offi ce

offi ce

CONFERENCEmechanica l

br eak r oom

WASH BAY1200 SF

VEHICLE STORAGE ANDMAINTENANCE FACILITY

35,200 SF

PARK ING LOT30 VEHICLES

Page 62: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN – OPTION 3

7. Lancer Stadium

Expand existing home bleachers. Construct new ticket booths and athletic storage.

Ticket Boothsfor Lancer Stadium

Lancer Stadium

Page 63: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Option 4

Page 64: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 4

1. Senior High School

Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as events and activities center. Re-purposed building would house athletic programs as well as arts and sciences programs.

PHASE I

PHASE II r emoveand

r econs t r uctr emove

andr econs t r uct

Page 65: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

new event sat hl et ics and communit y

cons t r uct ion

exis t ingar t s and

per f or mance

exis t ingar t s ands ciences

exis t ingevent s

andat hl et ics

Page 66: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 4

2. Junior High School

Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.

Page 67: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 4

3. Existing Elementary Schools

Consider potential re-alignment of building grade level organizations. Existing buildings to be reorganized into either K-2 or 3-6 facilities.

Ed White

Page 68: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Alan Shepard

LOT 1

LOT 1

Page 69: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Neil Armstrong

Page 70: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Virgil Grissom

John Glenn

Page 71: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 4

4. New Senior High School

Construct new senior high school for grades 10 through 12 within the Eldridge city limits.

5. Transportation Department

Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

meN

w omeN

COFFEEBAR

offi ce

offi ce

CONFERENCEmechanica l

br eak r oom

WASH BAY1200 SF

VEHICLE STORAGE ANDMAINTENANCE FACILITY

35,200 SF

PARK ING LOT30 VEHICLES

Page 72: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 4

7. Lancer Stadium

Expand existing home bleachers. Construct new ticket booths and athletic storage.

Ticket Boothsfor Lancer Stadium

Lancer Stadium

Page 73: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Option 5

Page 74: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 5

1. Senior High School

Existing Senior High school facility to be remain.Long term sequential remodeling and expansion to accommodate long term needs, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.

exis t ings enior high

s chool

Page 75: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 5

2. Junior High School

Existing Junior High school to remain.Long term sequential remodeling and expansion to accommodate long term needs, including: additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.

Page 76: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 5

3. Existing Elementary Schools

Existing elementary school buildings to remain.Long term sequential remodeling and expansion to accommodate long term needs, including: Remodeling and expansion of existing building for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.

Ed White

Page 77: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Alan Shepard

LOT 1

LOT 1

Page 78: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Neil Armstrong

Page 79: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Virgil Grissom

John Glenn

Page 80: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 5

4. New Elementary School

Construct new elementary school as K-5 facility within the Eldridge city limits.

5. Transportation Department

Future construction of new vehicle maintenance and storage facility within Eldridge city limits.Existing vehicle maintenance building to be used by District Grounds Department

meN

w omeN

COFFEEBAR

offi ce

offi ce

CONFERENCEmechanica l

br eak r oom

WASH BAY1200 SF

VEHICLE STORAGE ANDMAINTENANCE FACILITY

35,200 SF

PARK ING LOT30 VEHICLES

Page 81: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 5

7. Lancer Stadium

Future expansion existing home bleachers. Future construction new ticket booths and athletic storage.

Ticket Boothsfor Lancer Stadium

Lancer Stadium

Page 82: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

Opinion of Probable CostConsideration for Options 1, 2 & 3

Page 83: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 1

PRELIMINARY OPINION OF PROBABLE COST

Existing Senior High SchoolSelective demolition of existing seniorhigh school facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 350,000Construction of New Junior High Schooladditions at existing senior high school; approx 50,000 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . $ 7,500,000

Existing Junior High SchoolExisting facility to be re-purposed into newelementary school facility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 500,000

Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000

New Senior High SchoolNew facility construction; 169,440 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 29,652,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 885,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000

Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000

Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000

Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 46,227,000

Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 4,622,700

PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50,849,700

Page 84: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 2

PRELIMINARY OPINION OF PROBABLE COST

Existing Senior High SchoolSelective demolition of existing seniorhigh school facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 350,000Construction of New Senior High Schooladditions at for grades 10 - 12; approx 80,000 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 12,000,000

Existing Junior High SchoolExisting facility to be expanded toaccommodate grade 9; 18,000 sf @ $150/sf. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,700,000Remodeling of rest rooms/offices; 3,200 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 336,000

Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000

New Elementary SchoolNew facility construction; 50,460 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 8,830,500Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300,000

Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000

Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000

Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $32,096,500

Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3,209,650

PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 35,306,150

Page 85: North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

North Scott Community School DistrictDistrict Wide Masterplan

BRACKE . HAYES . MILLER . MAHON , ARCHITECTS

MASTERPLAN - OPTION 3

PRELIMINARY OPINION OF PROBABLE COST

Existing Senior High SchoolRemodeling of portions of existing building;17,250 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . $ 1,811,250Construction of new additions to existing building; 8,520 sf @ $150/sf . . . . . . . . . . . . . . . . . . . $ 1,278,000

Existing Junior High SchoolExisting facility to be expanded to accommodate music room, classrooms and expansion of main offices; 5,825 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . $ 873,750Remodeling of rest rooms/offices; 3,200 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 336,000

Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000

New Elementary SchoolNew facility construction; 50,460 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 8,830,500Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300,000

Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000

Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000

Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 21,009,500

Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,950

PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 23,110,450