nondestructive examination and special inspection of seismic welding

18
MAYES TESTING ENGINEERS, INC. Nondestructive Examination and Special Inspection of Seismic Welding NASCC Steel Conference April 2 and 3, 2008 MAYES TESTING ENGINEERS, INC. Michael J. Mayes, P.E. Welding Engineer NDE Level III AWS D1.1 Code Committee AISC D1.8 Seismic Subcommittee Special Inspection Agency Owner MAYES TESTING ENGINEERS, INC. Seismic Critical Welding Special Inspection Approved Fabricators Nondestructive Examination Topics MAYES TESTING ENGINEERS, INC. Northridge Damage MAYES TESTING ENGINEERS, INC. What Happened? Workmanship Inspection Design Assumptions Material Issues MAYES TESTING ENGINEERS, INC. FEMA AISC Revised Seismic Provisions (341-05) Develop New Seismic Design Recommendations Collect Research and Future Test Data Pre-qualified Connections (358-05)

Upload: jack

Post on 18-Dec-2015

40 views

Category:

Documents


2 download

DESCRIPTION

welding seismic

TRANSCRIPT

  • 1MAYES TESTING ENGINEERS, INC.

    Nondestructive Examination and Special Inspection of Seismic Welding

    NASCC Steel Conference

    April 2 and 3, 2008

    MAYES TESTING ENGINEERS, INC.

    Michael J. Mayes, P.E.

    Welding Engineer

    NDE Level III

    AWS D1.1 Code Committee

    AISC D1.8 Seismic Subcommittee

    Special Inspection Agency Owner

    MAYES TESTING ENGINEERS, INC.

    Seismic Critical Welding

    Special Inspection

    Approved Fabricators

    Nondestructive Examination

    Topics

    MAYES TESTING ENGINEERS, INC.

    Northridge Damage

    MAYES TESTING ENGINEERS, INC.

    What Happened?

    Workmanship

    Inspection

    Design Assumptions

    Material Issues

    MAYES TESTING ENGINEERS, INC.

    FEMA AISC Revised Seismic Provisions (341-05)

    Develop New Seismic Design Recommendations

    Collect Research and Future Test Data

    Pre-qualified Connections (358-05)

  • 2MAYES TESTING ENGINEERS, INC.

    FEMA AWS New D1 Subcommittee Seismic

    New Seismic Welding Code D1.8

    MAYES TESTING ENGINEERS, INC.

    Weld Toughness

    FCAW Wires

    Control Deposition Rates

    Pre-qualified Procedures

    Limits on Heat Input

    Varies by Brand and Diameter

    Toughness Cannot be Determined Nondestructively

    MAYES TESTING ENGINEERS, INC.

    AWS D1.8 Lot Testing

    Alternative to Lot Test

    Outside Audit of Supplier QC

    3 Initial Lot Tests

    1 Lot Every 3 Years

    MAYES TESTING ENGINEERS, INC.

    Filler Metal Toughness

    MAYES TESTING ENGINEERS, INC.

    Filler Metal Toughness

    Heat Input = Voltage * Current * 60

    Travel Speed * 1000

    = 27 V * 350 A * 60

    12 inch/min * 1000

    = 47 kJ/inch

    MAYES TESTING ENGINEERS, INC.

    Seismic Welding Procedures

    Obtain High/Low HI Certifications

    Adjust Parameters (Amps, Volts, T.S.)

    Set-up Machines

    Measure Output

    Make Sure It Works!

  • 3MAYES TESTING ENGINEERS, INC.

    Mixing Filler Metals

    Field Welds Over Shop Welds

    Repair Welds

    FCAW Self Shielded Electrodes Only

    MAYES TESTING ENGINEERS, INC.

    Mixing Filler Metals

    MAYES TESTING ENGINEERS, INC.

    Electrode Moisture Pick-up: SMAW

    Rod Ovens on Site

    Monitor Exposure Times

    MAYES TESTING ENGINEERS, INC.

    FCAW Wire Storage and Exposure

    Testing of FCAW Wire to Establish Storage and Exposure Limits for Diffusible Hydrogen Level of H16

    Protective Packaging

    MAYES TESTING ENGINEERS, INC.

    FCAW Storage Oven

    MAYES TESTING ENGINEERS, INC.

    Backing Bar Issues

    Remove From Critical Welds

    Better Inspection Without Backing

    Control of Tack Welds

  • 4MAYES TESTING ENGINEERS, INC.

    Backing Bar Issues

    Remove backing barBackgougeMT VisualBackweld5/16 (+) reinforcing filletMT FEMA 353 - 4.1.2

    MAYES TESTING ENGINEERS, INC.

    Backing Bar IssuesNo top reinforcing weld required

    Fillet weld beneath backing bar

    FEMA 350 Figure 3-8

    5/16"

    MAYES TESTING ENGINEERS, INC.

    Ceramic Backing Bars

    Fit-up Issues

    Root Gap

    Welder Qualification

    MAYES TESTING ENGINEERS, INC.

    Copper Backing Bars

    MAYES TESTING ENGINEERS, INC.

    Copper Backing Bars

    MAYES TESTING ENGINEERS, INC.

    Copper Backing Bars

    Qualify Procedures

    Control Fit-up

    Welder Skill

    Copper Pick-up

    Welder Qualification

  • 5MAYES TESTING ENGINEERS, INC.

    Weld Tabs

    Use!

    Remove

    No End Dams

    MAYES TESTING ENGINEERS, INC.

    Weld Tabs

    MAYES TESTING ENGINEERS, INC.

    Weld Tabs

    MAYES TESTING ENGINEERS, INC.

    End Dams

    MAYES TESTING ENGINEERS, INC.

    End Dams

    MAYES TESTING ENGINEERS, INC.

    Weld Tab Removal

    Grind Smooth

    500 Micro-inches

    Smooth Transition to Adjacent Surfaces

  • 6MAYES TESTING ENGINEERS, INC.

    Weld Tab Removal

    MAYES TESTING ENGINEERS, INC.

    Weld Access Holes

    MAYES TESTING ENGINEERS, INC.

    Weld Access Holes

    MAYES TESTING ENGINEERS, INC.

    Weld Access Holes

    MAYES TESTING ENGINEERS, INC.

    Welder Qualifications

    AWS D1.8

    Welder Mock-up

    Highest Deposition Rates

    Increase Qualification Period to 36 Months

    Use Same Backing (steel, copper, ceramic, etc.)

    MAYES TESTING ENGINEERS, INC.

    Seismic Welder Mock-up

  • 7MAYES TESTING ENGINEERS, INC.

    Seismic Welder Test

    MAYES TESTING ENGINEERS, INC.

    New Design Concept

    Plastic Hinges/Weak Lines

    Lower Stress at Weld Joint

    MAYES TESTING ENGINEERS, INC.

    Why Moment Frames?

    Resist Lateral Earthquake Loads

    Architectural Issues Brace Frames Concrete Shear Walls

    MAYES TESTING ENGINEERS, INC.

    Full Scale Connection Testing

    MAYES TESTING ENGINEERS, INC.

    Reduced Beam Sections (RBS)

    MAYES TESTING ENGINEERS, INC.

    Bolted End-Plate Connections

  • 8MAYES TESTING ENGINEERS, INC.

    Side Plate Connection

    MAYES TESTING ENGINEERS, INC.

    Slotted Web Connection

    MAYES TESTING ENGINEERS, INC.

    Welded Attachments in Protected Zone

    MAYES TESTING ENGINEERS, INC.

    Welded Attachments in Protected Zone

    MAYES TESTING ENGINEERS, INC.

    Hole Drilled in Protected Zone

    MAYES TESTING ENGINEERS, INC.

    Pins Shot Into Protected Zone

  • 9MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    K-Area

    Poor Properties at Flange-Web Intersection

    Avoid Welds in K-Area

    Additional NDE

    MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    K-Area

  • 10

    MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    K-Area

    MAYES TESTING ENGINEERS, INC.

    Tack Welds

    Tack Inside Weld Groove

    All Tack Welds Removed or Consumed

    MAYES TESTING ENGINEERS, INC.

    Backing Bar Welds

    MAYES TESTING ENGINEERS, INC.

    Welding Sequence

    MAYES TESTING ENGINEERS, INC.

    Welding Sequence

    5 4 3 2 1

    10 9 8 7 6Backing Bar

    WeldTab

    WeldTab

  • 11

    MAYES TESTING ENGINEERS, INC.

    Welding Sequence

    Alternate Through Access Hole

    Overlap Ends of Passes

    MAYES TESTING ENGINEERS, INC.

    Welding Sequence

    9 108 75 64 31 2 Backing Bar

    WeldTab

    WeldTab

    MAYES TESTING ENGINEERS, INC.

    Welder Access

    MAYES TESTING ENGINEERS, INC.

    Inspector Access

    MAYES TESTING ENGINEERS, INC.

    Welding Procedures

    Submit Prior to Welding

    Engineer Approves

    Inspector and Welder Has a Copy

    Measure Variables

    MAYES TESTING ENGINEERS, INC.

    QA/QC Checklist

  • 12

    MAYES TESTING ENGINEERS, INC.

    Other Seismic Inspection Issues

    Welder I.D.

    48 Hour Delay Before Inspection (only for K-Area)

    Lamellar Testing

    MAYES TESTING ENGINEERS, INC.

    Contract Documents

    Identify Seismic Critical Welds

    Specify AISC Seismic Provisions (AISC 341-05) Appendix Q

    Specify AWS D1.1 and AWS D1.8

    MAYES TESTING ENGINEERS, INC.

    Engineer Must Define Seismic Critical Welds

    SMRF

    OMRF

    EBF

    Lateral Systems

    MAYES TESTING ENGINEERS, INC.

    Engineer Responsibilities

    Use Pre-qualified Connections

    Review Welding Procedures

    Project QA/QC Plan

    MAYES TESTING ENGINEERS, INC.

    Fabricator/Erector Issues

    Submittals QC Plans Welding Procedure Specifications (WPS)

    Preconstruction Meetings

    MAYES TESTING ENGINEERS, INC.

    Cost Impacts?

    Welder Training

    Welder Qualifications

    Slower Production Rates

    Hold Points

    Increased NDE

  • 13

    MAYES TESTING ENGINEERS, INC.

    Inspector Qualifications - QC

    Fabricators Inspector Qualifications / Duties per QC Manual AWS-CWI

    Erectors Inspector?

    MAYES TESTING ENGINEERS, INC.

    Inspector Qualifications - QA

    Special Inspector Represents Owner Represents Building Department

    MAYES TESTING ENGINEERS, INC.

    Special Inspector Qualifications

    International Building Code (IBC) IBC 1704.1 The special inspector shall

    be a qualified person who shall demonstrate competence, to the satisfaction of the building official

    MAYES TESTING ENGINEERS, INC.

    Special Inspector Qualifications

    Vary Between Jurisdictions

    WABO and OBOA ICC Exams, Documented Experience,

    Interview

    Portland, Las Vegas, Los Angeles, San Francisco

    CWI Required by AISC Seismic

    MAYES TESTING ENGINEERS, INC.

    Inspection Requirements

    IBC Requirements 100% Visual Inspection Shop and

    Field Continuous vs. Periodic Inspection

    AISC Seismic Additional NDE Requirements

    MAYES TESTING ENGINEERS, INC.

    Inspection Requirements

    Periodic Inspection Allowed For: Single Pass Fillet Welds Deck Welding Welded Studs Cold Formed Steel Welding Stairs and Railing Approved Fabricators

  • 14

    MAYES TESTING ENGINEERS, INC.

    Approved Fabricators

    IBC 1704.2.2 Approval (by Building Official) based on: Review of QC Procedures Periodic Audits by Approved Special

    Inspector

    AISC Certified Fabricators?

    MAYES TESTING ENGINEERS, INC.

    Fabrication Inspection

    Same Inspector/Agency as Erection?

    Demand Competence!

    Shop Inspection Typically Required for Seismic

    MAYES TESTING ENGINEERS, INC.

    Tubular Joints - TKY

    Not Covered by Bridge Code

    Nonstandard Testing

    Require Mock-ups

    MAYES TESTING ENGINEERS, INC.

    Tubular Mockups

    MAYES TESTING ENGINEERS, INC.

    NDE Requirements

    No Requirements Per IBC

    No Requirements Per AWS D1.1

    Contract Documents

    Tubular Requirements

    AISC Seismic Provisions

    Understand and Clarify!

    MAYES TESTING ENGINEERS, INC.

    AISC Seismic NDE Requirements

    MT of K-Area

    UT of CJP Welds

    MT (25%) of CJP Welds

    UT for Lamellar Tearing and Lamination

    MT or PT For Beam Cope and Access Holes

    MT for Tab Removal Sites

    MT for RBS Repairs

  • 15

    MAYES TESTING ENGINEERS, INC.

    Owner Responsible for All Costs Including: Handling Surface Prep NDT Repair of Defects Delays

    Exception: Attempt of Defraud or Gross Nonconformance

    AWS D1.1 6.6.5Non Specified NDT

    MAYES TESTING ENGINEERS, INC.

    Methods of InspectionNon-destructive Examination (NDE)

    Visual

    Liquid Pene

    trant

    Magnetic Partic

    le

    Ultrasonic

    Radiography

    Microwave

    Acoustic Emission

    Thermography

    Laser Interferometry

    Replication

    Flux Leakage

    Acoustic Microscopy

    Magnetic

    Measure

    ments

    Tap Testing

    Eddy Current

    MAYES TESTING ENGINEERS, INC.

    Non-destructive Examination Structural Welding

    Radiography Bridge Girder Splices Not Practical for Buildings UT and RT Should Not be Used

    Together!

    MAYES TESTING ENGINEERS, INC.

    Non-destructive Examination Structural Welding

    Dye Penetrant Testing Wont Work With Rough Surfaces Not Practical for Buildings

    MAYES TESTING ENGINEERS, INC.

    Non-destructive Examination Structural Welding

    Magnetic Particle Testing (MT)

    Ultrasonic Testing (UT) Limitations Technician Qualifications Flaw Detection Flaw Sizing AWS D1.1 Appendix K

    MAYES TESTING ENGINEERS, INC.

    Magnetic Particle Testing (MT)

  • 16

    MAYES TESTING ENGINEERS, INC.

    Magnetic Particle Testing (MT)

    MAYES TESTING ENGINEERS, INC.

    Magnetic Particle Testing (MT)

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Inspection (Pulse-Echo)

    plate

    crack

    0 2 4 6 8 10

    initial pulse

    crackecho

    back surfaceecho

    Oscilloscope, or flaw detector screen

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Testing (UT)

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Testing (UT)

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Testing (UT)

  • 17

    MAYES TESTING ENGINEERS, INC.

    Inspection Issues

    Transducer

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Limitations

    Operator Skill/Training

    Does Inspector Ever Find Flaws?

    Flaw Orientation

    Access to Weld

    Dont Use for Partial Penetration Welds

    MAYES TESTING ENGINEERS, INC.

    UT Technician Qualifications

    Varies from Company to Company

    Check Personnel on Real Samples

    AWS D1.8 Annex E

    MAYES TESTING ENGINEERS, INC.

    UT Flaw Detection

    Should Be Very Accurate

    Use Confirming Sound Paths

    Welder Should Find Flaws

    Remove Backing Bars

    MAYES TESTING ENGINEERS, INC.

    UT Flaw Sizing

    Unique Skills Required

    Amplitude Techniques Wont Work

    AWS is Conservative

    MAYES TESTING ENGINEERS, INC.

    Ultrasonic Testing

  • 18

    MAYES TESTING ENGINEERS, INC.

    Questions?