8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 1/30 Nokia MetroSite Base Station User Manual User Manual 468953A DN00187365 © Nokia Networks Oy 1 (30) Issue 1-0 en Nokia Proprietary and Confidential Field Upgrade

Upload: omidianno

Post on 01-Jun-2018

230 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 1/30

Nokia MetroSite Base Station User Manual

User Manual

468953A

DN00187365 © Nokia Networks Oy 1 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Field Upgrade

Page 2: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 2/30

Field Upgrade

2 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

The information in this document is subject to change without notice and describes only theproduct defined in the introduction of this documentation. This document is intended for theuse of Nokia Networks' customers only for the purposes of the agreement under which thedocument is submitted, and no part of it may be reproduced or transmitted in any form ormeans without the prior written permission of Nokia Networks. The document has beenprepared to be used by professional and properly trained personnel, and the customerassumes full responsibility when using it. Nokia Networks welcomes customer comments aspart of the process of continuous development and improvement of the documentation.

The information or statements given in this document concerning the suitability, capacity, orperformance of the mentioned hardware or software products cannot be considered bindingbut shall be defined in the agreement made between Nokia Networks and the customer.However, Nokia Networks has made all reasonable efforts to ensure that the instructionscontained in the document are adequate and free of material errors and omissions. NokiaNetworks will, if necessary, explain issues which may not be covered by the document.

Nokia Networks' liability for any errors in the document is limited to the documentary correctionof errors. Nokia Networks WILL NOT BE RESPONSIBLE IN ANY EVENT FOR ERRORS INTHIS DOCUMENT OR FOR ANY DAMAGES, INCIDENTAL OR CONSEQUENTIAL(INCLUDING MONETARY LOSSES), that might arise from the use of this document or theinformation in it.

This document and the product it describes are considered protected by copyright according tothe applicable laws.

NOKIA logo is a registered trademark of Nokia Corporation.

Other product names mentioned in this document may be trademarks of their respectivecompanies, and they are mentioned for identification purposes only.

Copyright © Nokia Networks Oy 2000. All rights reserved.

Page 3: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 3/30

DN00187365 © Nokia Networks Oy 3 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Contents

Contents 3

1 Introduction 51.1 Warnings and cautions 51.2 Recycling of units 5

2 Preparation 72.1 Items Required 72.2 Upgrade procedure 7

3 Removing units from the cabinet 93.1 Removal procedures 103.1.1 Cabinet cover and cables 11

3.1.2 PSU 133.1.3 TRX 143.1.4 Cooling fan assembly 15

4 Downloading procedure 17

5 Installing units into the cabinet 195.1 Installation procedures 195.1.1 High capacity cooling fan assembly 195.1.2 TRX Installation procedure 235.1.3 PSU installation 245.1.4 Cabinet cover and cable cover installation procedure 25

Index 29

Page 4: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 4/30

Field Upgrade

4 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Page 5: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 5/30

Introduction

DN00187365 © Nokia Networks Oy 5 (30)

Issue 1-0 en Nokia Proprietary and Confidential

1 Introduction

This document provides instructions for upgrading an existing MetroSite GSMBTS installation from a 1W TRX to a 5W TRX configuration.

Refer also to Nokia MetroSite GSM Base Station: Warnings and Cautions, Nokia MetroSite GSM Base Station: Commissioning, and Nokia MetroSite GSM BaseStation: Installation.

1.1 Warnings and cautions

The warnings and cautions applicable to the MetroSite GSM BTS are detailed inWarnings and Cautions [1]. Please read them carefully and implement wherenecessary.

1.2 Recycling of unitsIn case you need to dispose of the units or the whole BTS, contact NokiaProfessional Services for information on recycling. An environmental datapackage, including disassembly instructions and a material balance document isalso available via Nokia Professional Services.

Page 6: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 6/30

Field Upgrade

6 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Page 7: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 7/30

Page 8: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 8/30

Field Upgrade

8 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Note

a. Unpack the replacement units.

b. Inspect the units visually. Check for completeness of delivery andfor possible damage.

2. Removal procedure:

If the BTS contains more than one TRX, then the transmission data can bedownloaded to one of the new 5W TRX. See Downloading Procedure 4.

a. Remove the cabinet cover.

b. Disconnect all cable connectors.

c. Remove the units to be replaced (PSU, TRX/s, fan).

3. Installation procedure:

a. Insert the new HP units.

b. Replace all connecting cables.

4. Finishing procedure:

a. Power-up the BTS.

b. Commission the BTS as specified in Commissioning [2].

c. Replace the BTS cabinet cover.

Page 9: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 9/30

Removing units from the cabinet

DN00187365 © Nokia Networks Oy 9 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Caution

Caution

3 Removing units from the cabinet

In case of precipitation (rain, snow, or sleet), the site must be weather-guardedduring the upgrading procedure.

Some units in the MetroSite GSM BTS contain electrostatic sensitive devices.The BTS is labelled with an electrostatic sensitive device (ESD) symbol as shownin Figure 1.

Always use an anti-static wrist strap connected to the cabinet ESD stud, wheneverhandling electrostatic sensitive units. The wrist strap and connection stud isshown in Figure 2.

Figure 1. Electrostatic Sensitive Device symbol

Page 10: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 10/30

Field Upgrade

10 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Note

Figure 2. Connecting the antistatic wrist strap

3.1 Removal procedures

When the BTS is fitted with more than one TRX, then the transmission data canbe downloaded from the master TRX to one of the new 5W TRX. If this is thecase, proceed to the downloading procedure in Chapter 4.

When removing the units, it is recommended that you remove theunits and assemblies in the following order:

1. BTS cabinet cover.

2. Cable cover and cable cover support.

3. PSU.

ESD stud

to ESD studWrist strap

Page 11: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 11/30

Removing units from the cabinet

DN00187365 © Nokia Networks Oy 11 (30)

Issue 1-0 en Nokia Proprietary and Confidential

WARNING

4. TRXs (in the order: TRX 3, 4, 1, 2 see Figure 3).

5. Cooling fan assembly.

Figure 3. TRX slot order

3.1.1 Cabinet cover and cables

HIGH VOLTAGE. Before removing the BTS cabinet cover, remove theinput power to the BTS by switching OFF the external disconnect device.

Remove the cabinet and cables as follows:

1. Switch OFF the external disconnect device.

2. Unlock the cabinet.

3. Remove the cabinet cover  by sliding it upwards and pulling it away fromthe cabinet.

TRX3

TRX4

T

RX1

T

RX2

Page 12: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 12/30

Field Upgrade

12 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Note

4. Switch OFF the PSU.

5. Unclip and slide the cables cover  towards you.

6. Disengage and remove the cables cover support plate.

7. Remove all connecting cables to the units.

All connecting cables must be removed to replace the cooling fan outer sealinggasket.

8. Drop the outer sealing gasket at the point where it covers the cables entryblock, see (A) in Figure 4.

9. Remove the two 4mm (0.157in) Allen screws on the cable entry block, see(B) in Figure 4.

10. Open the cable entry block at the point where the cables are routed.

11. Disengage the cables from the cable entry block.

Figure 4. Opening the cable entry block

A

Sealing strip

Allen screwsM6Allen key 4 mm

Page 13: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 13/30

Removing units from the cabinet

DN00187365 © Nokia Networks Oy 13 (30)

Issue 1-0 en Nokia Proprietary and Confidential

3.1.2 PSU

PSU removal procedure (see Figure 5):

1. Open the connector shield and remove the power supply connector.

2. Loosen the unit's upper and lower retaining screws using a T10 Torxscrewdriver.

3. Slide the PSU unit out until it comes to a stop, then tilt the unit from the topand remove it (see Figure 6).

Figure 5. Power supply unit

Upper mounting bracket

Main power switch

Power connector cover

Power cable seal

Power cable

Lower mounting bracket

Retaining screws

Page 14: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 14/30

Page 15: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 15/30

Removing units from the cabinet

DN00187365 © Nokia Networks Oy 15 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Note

3. Slide the TRX unit so as to disengage it from the backplane connector andremove the unit by pulling on the handle at the front panel (see Figure 6).

3.1.4 Cooling fan assembly

Cooling fan assembly removal procedure:

1. Remove and retain the fan assembly holding screws (refer to :

a. Three T10 Torx screws on the R/H side of the assembly.

b. One T25 Torx screw on the front of the assembly.

2. Remove the cooling fan assembly:

a. Disengage the assembly from the backplane connector and twoguides by sliding it to the right.

b. Lower the assembly,thread all the connectingcables through the fanouter sealing gasket, and remove the assembly.

3. Remove and retain the fan outer sealing gasket.

4. Remove and retainthethree T10 Torxcablesentry blockinternalmountingscrews.

You may have to remove the fan in order to reach the cables entry block mountingscrews. If this is the case, then:

a. Remove the T10 Torx fan holding screw.

b. Slide the fan sideways until the guides of the fan reach the guideslots (see (A) in Figure 8).

c. Remove the fan.

5. Remove and retain the cables entry block.

Page 16: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 16/30

Field Upgrade

16 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Figure 7. Low capacity cooling fan assembly and mounting screws

Figure 8. Removing the low power fan

T10T25

Torx T10

Guideslots

A

B

Guide

Page 17: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 17/30

Downloading procedure

DN00187365 © Nokia Networks Oy 17 (30)

Issue 1-0 en Nokia Proprietary and Confidential

4 Downloading procedure

If the BTS is fitted with more than one TRX, then the transmission data can bedownloaded from the master TRX to one of the new 5W TRX.

Downloading procedure:

1. Remove the cabinet cover.

2. Connect the BTS Manager PC to the LMP socket and check alarms.

3. Turn OFF the PSU.

4. Turn OFF the external circuit breaker.

5. Choose a TRX location, e.g. TRX 3 would be the easiest one (refer toFigure 3).

6. Remove the chosen 1W TRX.

Refer to the TRX removal procedure in 3.1.3.

7. Insert the 5W TRX.

Refer to the TRX installation procedure in 5.1.2.

8. Switch ON the circuit breaker.

9. Switch ON the PSU.

10. Wait until Site Supervisory (all units must show green LEDs).

The 5W TRX now holds the transmission data and can be used as themaster TRX when the site has been upgraded.

11. Switch OFF the PSU.

12. Switch OFF the circuit breaker.

Page 18: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 18/30

Field Upgrade

18 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

13. Remove the 5W TRX and mark it appropriately.

14. Continue with the removal procedures as listed in 3.1.

Page 19: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 19/30

Installing units into the cabinet

DN00187365 © Nokia Networks Oy 19 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Note

5 Installing units into the cabinet

5.1 Installation procedures

Install the units in the following order:

1. Cooling fan assembly.

2. TRX unit(s).

3. PSU.

4. Cable cover and support plate.

5. BTS cabinet cover.

5.1.1 High capacity cooling fan assembly

Before fitting the fan assembly, the cable entry block, the fan assembly mountingscrews, and the outer fan sealing gasket must be refitted from the old unit.

Page 20: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 20/30

Field Upgrade

20 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Note

Cooling fan installation procedure:

1. Refit the previously removed cables entry block by means of the three T10Torx mounting screws previously removed (see 3.1.2).

It may be necessary to remove the high capacity fan from the assembly in orderto reach the cables entry block mounting screws, if that is the case, refer to Figure11.

2. Refit the previously removed outer fan sealing gasket (see 3.1.2).

3. Refit the previously removed four Torx fan assembly mounting screws inthe respective slots (see 9:

a. 3 x T10 on the R/H side of the assembly.

b. One T25 at the front of the assembly.

4. Align the guides and backplane connector at the side of the fan assemblywith the guide slots on the backplane.

5. Slide the unit home into the backplane connector.

6. Refit all connecting cables:

a. Drop the outer fan sealing gasket.

b. Open the cablesentry block and rethreadall cables throughthe outerfan sealing gasket

c. Reconnect all cables.

d. Place the cables into their respective slot of the cables entry block (see. Figure 10).

7. Refit and tighten the two 4mm (0.157in) Allen screws on the cables entryblock (see Figure 4).

8. Refit the outer fan sealing gasket.

Page 21: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 21/30

Installing units into the cabinet

DN00187365 © Nokia Networks Oy 21 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Figure 9. High capacity cooling fan assembly

Figure 10. Cable entry block

T10T25

Antennafeeders

Power supply cable

Extension cables

- Grounding cable, 1 pc- Transmission cables, max 8 pcs- External alarms and controls

Page 22: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 22/30

Field Upgrade

22 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Figure 11. High capacity cooling fan assembly construction

Page 23: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 23/30

Installing units into the cabinet

DN00187365 © Nokia Networks Oy 23 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Note

Note

5.1.2 TRX Installation procedure

In order to tighten the antenna connectors with a torque spanner, it is necessary toinstall the TRX units in the following order:

• TRX 4, 3, 2, 1

Install the TRX unit as follows (see Figure 12):

Remember to fit the previously downloaded TRX in position 1 therebyconfiguring it as the master TRX.

1. Slide the unit into the appropriate slot.

2. Press the units carefully against the backplane and engage the backplaneconnector. Do not use excessive force.

3. Fix and tighten the unit retaining screws. Use a T10 Torx screwdriver.

4. Repeat the procedure for each unit.

5. Refit the antenna connection.

6. Refit the diversity cables if applicable.

Page 24: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 24/30

Field Upgrade

24 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Figure 12. TRX unit

5.1.3 PSU installation

Install the PSU as follows (refer to Figure 5):

1. Slide the unit into the appropriate slot.

2. Place the PSU into the bottom runner then push the top of the unit forwardinto the clearance slots provided in the top runners.

3. Slide the PSU to the left until the guidesandbackplane connector click intoplace.

4. Tighten the two T10 Torx PSU mounting screws.

5. Loosen the two T10 Torx screws on the connector shield and open theconnector shield.

6. Connect the power supply connector into the PSU power input socket.

Antenna connector

Diversity out

Diversity in

Page 25: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 25/30

Installing units into the cabinet

DN00187365 © Nokia Networks Oy 25 (30)

Issue 1-0 en Nokia Proprietary and Confidential

WARNING

7. Tighten the T10 Torx screws of the connector shield.

5.1.4 Cabinet cover and cable cover installation procedure

GROUNDING. Before refitting the cabinet cover, make sure that thegrounding cable has been reconnected to the BTS cabinet.

Cabinet installation procedure:

1. Fit the cable cover (see Figure 13):

a. Place the cable cover support onto the hook at the end of theperforated plastic panel.

b. Press the cable cover against the cable cover support until it locks.

Page 26: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 26/30

Field Upgrade

26 (30) © Nokia Networks Oy DN00187365

Nokia Proprietary and Confidential Issue1-0en

Figure 13. Routing the cables and fitting the cable cover

2. Refit the cabinet cover (see Figure 14):

a. Attach the safety strap to the fixing point on the top of the cabinet.

b. Hang the cover on the hook at the side of the cabinet. Make sure thatthe cover engages on the top runner of the cabinet.

3. Switch ON the external disconnect device.

4. Switch ON the PSU power switch.

A

B

Cable cover Cable coversupport

Page 27: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 27/30

Installing units into the cabinet

DN00187365 © Nokia Networks Oy 27 (30)

Issue 1-0 en Nokia Proprietary and Confidential

5. Commission as required.

6. Refit the cabinet cover on the BTS cabinet.

7. Lock the cabinet.

Figure 14. Hanging the BTS cover

Fixing pointfor safety strapunder thecover top

Page 28: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 28/30

Page 29: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 29/30

DN00187365 © Nokia Networks Oy 29 (30)

Issue 1-0 en Nokia Proprietary and Confidential

Index

A

antistatic wrist strap 9

G

grounding 25

I

installation

cabinet cover 25

cable cover 25

high capacity cooling fan 19

PSU 24

TRX 23

P

procedures

downloading 17

installation 19

removal 10

R

removal

cabinet cover 11

cables 11cooling fan assembly 15

PSU 13

TRX 14

Page 30: Nokia MetroSite Base Station User Manual - Field Upgrade

8/9/2019 Nokia MetroSite Base Station User Manual - Field Upgrade

http://slidepdf.com/reader/full/nokia-metrosite-base-station-user-manual-field-upgrade 30/30

Field Upgrade