Page 1: No Way Out? Breaking Lock-In in the Energy System

No way out? – Analysing policy options to

alleviate lock-in in the energy system

Jérôme Dangerman

IIASA / Radboud University Nijmegen

&

Andreas Größler

Radboud University Nijmegen

E-Mail: [email protected]; [email protected]

Page 2: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

IEA, 2010

Page 3: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Traditional fuels (brown), coal (grey), and modern energy forms (oil/gas and renewables/nuclear, red) in

percent of world primary energy (Grübler, 2008).

Page 4: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Page 5: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Success-to-the-sucessful archetype (after Senge, 1990)

Page 6: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

A stylized system dynamics model

AvailableCapital

Capital ConventionalEnergy-Technology

Capital AlternativeEnergy-Technology investing in

alternative energyinvesting in

conventional energy

depreciationconventional

depreciationalternative

+ +

DEMAND

:=1000

desired capitalenergy-technology

discrepancy betweendesired and actual capital

energy-technology

+

+

- -

++

inclination to investconventional

+-

- +

:=300 :=500

Page 7: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Base run

1,000

750

500

250

0

22

22

22 2 2 2 2 2 2 2 2

1

1

11

11 1 1 1 1 1 1 1 1 1

0 10 20 30 40 50 60 70 80 90 100

Time (Year)

Eu

ro

"Capital Conventional Energy-Technology" : Success-to-the-Successful 1 1 1 1 1 1 1"Capital Alternative Energy-Technology" : Success-to-the-Successful 2 2 2 2 2 2 2 2

Page 8: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Variation of demand, over-proportional reward on

existing capital

2,000

1,500

1,000

500

00 25 50 75 100

400

300

200

100

00 25 50 75 100

Capital Alternative Energy-TechnologyCapital Conventional Energy-Technology

Time (Year)

Base run

Time (Year)

Demand was varied between 500 and 1500 [1000], 200 simulation runs

50% 75% 95% 100% of all simulation runs

Page 9: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Variation of resources, demand exceeds capacity,

over-proportional reward on existing capital

Capital Alternative Energy-Technology400

300

200

100

00 25 50 75 100

Time (Year)

Base run

Capital Conventional Energy-Technology1,000

750

500

250

00 25 50 75 100

Time (Year)

inflow capital was varied between 0 and 100 [100], 200 simulation runs

50% 75% 95% 100% of all simulation runs

Page 10: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Variation of depreciation time, demand exceeds

capacity, over-proportional reward on existing capital

1,000

750

500

250

00 25 50 75 100

400

300

200

100

00 25 50 75 100

Capital Alternative Energy-TechnologyCapital Conventional Energy-Technology

Time (Year)

Base run

Time (Year)

depreciation time conventional was varied between 10 and 50 [30], 200 simulation runs

50% 75% 95% 100% of all simulation runs

Page 11: No Way Out? Breaking Lock-In in the Energy System

Lock-in in the Energy System

Variation of building time, demand exceeds capacity,

over-proportional reward on existing capital

1,000

750

500

250

00 25 50 75 100

1,000

750

500

250

00 25 50 75 100

Capital Alternative Energy-TechnologyCapital Conventional Energy-Technology

Time (Year)

Base run

50% 75% 95% 100% of all simulation runs

Time (Year)

building time alternative was varied between 1 and 10 [5], 200 simulation runs