3/21/2014 1 © 2013 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. NFPA 70 & 99 How Recent Code Changes Effect Healthcare Facilities Sam C. Terry, P.E. Application Engineer Eaton Corporation (713)849-1646 [email protected] 2 2 NFPA 99 – 2012 Edition Review Replaced the 2005 Edition MAJOR overhaul of the document by NFPA Postponed Scheduled for 2010 Postponed / Returned to Committee Went through 2 Complete Code Cycles NFPA 99 - Standard for Health Care Facilities is Makes this an “adoptable” and “enforceable” Code

Upload: others

Post on 11-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

1

© 2013 Eaton Corporation. All rights reserved.

This is a photographic template – yourphotograph should fit precisely within this rectangle.

NFPA 70 & 99How Recent Code ChangesEffect Healthcare Facilities

Sam C. Terry, P.E.Application Engineer

Eaton Corporation

(713)849-1646

[email protected]

22

NFPA 99 – 2012 Edition Review

• Replaced the 2005 Edition

• MAJOR overhaul of the document by NFPA

• Postponed

• Scheduled for 2010

• Postponed / Returned to Committee

• Went through 2 Complete Code Cycles

NFPA 99 - Standard for Health Care Facilities

is

• Makes this an “adoptable” and “enforceable” Code

Page 2: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

2

33

NFPA 99 - 2012 EditionMajor Structural Revision

• Document organization changed from Facility- baseddocument to a Risk-based document• Eliminates existing Chapters 13 – 19 that covered different

types of facilities (i.e. hospital, nursing home, birthing center, etc.)

• Requirements for systems are now based on the risk to the patient / staff involved

• Several Contentious Electrical Issues1. Wet Procedure Locations

2. Selective Coordination

3. Application to Existing Systems

4. Performance vs Installation

44

NFPA 99 - 2012 EditionRisk Categories

• NFPA recognized that the basic facility “type” did not necessary reflect the type of procedures done or risk to patient / staff• Existing Chapters 13 – 18 of 2005 Edition

• Lots of “blurring of the lines” has occurred on the types of procedures that are performed in different types of the health care facilities

• Risk to the patient / staff doesn’t change for a given procedure

• New document requires a risk assessment is to be done to determine the Category of risk

• Determination of the risk Category determines the requirements for all Chapters of the document

Page 3: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

3

55

NFPA 99 - 2012 EditionRisk Categories

Chapter 4 – Fundamentals (New Chapter)• Building System Categories – Applied to rooms or areas witin the

facility• Category 1

• Facility systems in which failure of such equipment or system is likely to cause major injury or death of patients or caregivers…

• Category 2• Facility systems in which failure of such equipment or system is likely to cause minor

injury to patients or caregivers…

• Category 3• Facility systems in which failure of such equipment or system is not likely to cause injury

to the patients or caregivers, but may cause patient discomfort…

• Category 4• Facility systems in which failure of such equipment or system would have no impact on

patient care…

• The Category of the area being served determines the requirements of the Essential Electrical System (EES)

• Critical Care Room = Category 1 Space = Type 1 EES• General Care Rooms = Category 2 Space = Type 2 EES• Basic Care Room = Category 3 Space = No EES requirement• Non-Patient Care Rooms = Category 4 Space = No EES requirement

66

NFPA 99 – 2012 EditionOther Document Changes

• Electrical Systems – moved from Chapter 4 to 6

• NEW! Information Technology and Communications Systems for Health Care Facilities – Chapter 7

• NEW! Plumbing – Chapter 8

• NEW! Heating, Ventilation, and Air Conditioning (HVAC) – Chapter 9

• NEW! Security Management – Chapter 13

• NEW! Features of Fire Protection – Chapter 15

• Eliminated - Occupancy Chapters 13 – 18, 21

Page 4: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

4

77

NFPA 99 – 2012 EditionKey Electrical Changes – Chapter 6

• Chapter applies to new health care facilities…primarily (renovations?)

• Some changes will apply retroactively to existing facilities (must meet 1999 NFPA 99 3-3.3.2&3

• 6.1.2 Lists the sections that apply to new and existing facilities• Receptacles must have a grounding pole

• Tamper resistant receptacles or tamper-resistant receptacle cover required in Pediatric locations

• Receptacles, fixed electrical equipment, and corded equipment must be tested after damage, after repair, or at least every 6 months

• OR’s defined as wet procedure locations shall have IPS or GFCI

• Receptacle covers for life safety and critical branches shall have distinctive markings in Type 3 EES

• Maintenance, Testing, Recordkeeping, and Administration requirements as in previous editions

88

NFPA 99 - 2012 EditionKey Electrical Changes – Chapter 6

• Eliminated term “Emergency System” from NFPA 99• In 2005 edition, Emergency System is the name given to the Life Safety

and Critical Branches of the Essential Electrical System

• Not the same “Emergency System” as Article 700 of the NEC

• Helps remove the scope confusion between Health Care facilities and Article 700 (i.e. 100% Selective Coordination, generator sizing, etc.)

• Essential Electrical System now consists of (3) separate branches1. Life Safety Branch

2. Critical Branch

3. Equipment Branch

• Division of the branches occurs at the transfer switch where more than one transfer switch is required• Eliminates challenges with separation of branches all the way back to the

Generator or Emergency Switchgear.

Page 5: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

5

99

6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces

6.4.2.2.1.2 The division between the branches shall occur at the transfer switches where more than one transfer switch is required.

6.4.2.2.2 Feeders from Alternate Source.

(A) A single feeder supplied by a local or remote alternate source shall be permitted to supply the essential electrical system to the point at which the life safety, critical, and equipment branches are separated.

(B) Installation of the transfer equipment shall be permitted at other than the location of the alternate source.

NFPA 99 - 2012 EditionKey Electrical Changes – Chapter 6

1010

6.3.2.2.6.2 Minimum Number of Receptacles• General Care Areas (Category 2) – 8 receptacles

• Critical Care Areas (Category 1) – 14 receptacles

• Operating Rooms (Category 1) – 36 receptacles

6.3.2.2.7.1 Isolated Ground Receptacles• Isolated ground receptacle not allowed in patient care vicinity

6.3.2.2.8 Wet Procedure Location

6.3.2.2.8.4 All Operating Rooms are considered to be wet procedure locations, unless a risk assessment determines otherwise

• Wet procedure locations require either GFCI or Isolated Power Systems

• No preference is given to either type of protection

• This issue created much debate in the TC and several motions

NFPA 99 - 2012 EditionKey Electrical Changes – Chapter 6

Page 6: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

6

1111

NFPA 99 - 2012 EditionKey Electrical Changes – Chapter 6

• Essential Electrical System Changes• 6.4.2.2.3.3 Alarms and alerting systems (except fire alarm system) can

be on either life safety or critical branch

• 6.4.2.2.3.4 All generator support equipment required to be on Life Safety Branch (formerly part of the equipment branch)

• 6.4.4.1.1.2 10-second criterion does not apply for monthly testing.

Must be proved annually.

• Allows the use of closed transition ATS that may take more time to sync between two live sources

1212

NFPA 99 - 2012 Edition Selective Coordination

• Selective Coordination requirement added for Type 1, 2, and 3 EES

• 6.4.2.1.2, 6.5.2.1.1, 6.6.2.1.1

• “Overcurrent protective devices serving the essential electrical system shall selectively coordinate for the period of time that a fault’s duration extends beyond 0.1 second.” More on this later

• Included the same exceptions from Art. 700 for:

• Transformer primary and secondary

• OCPD’s of the same size in series

Page 7: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

7

131313

Selective Coordination Discussion – Protective Devices

1414

NFPA 99 - 2012 Edition Selective Coordination

• Highly contentious issue in the NEC and in NFPA 99

• Numerous Motions and Appeals from NEFA (National Electric Fuse Association), IBEW, and NECA challenging the new NFPA 99 requirements

• All were defeated…numerous times!

• Highlighted the need to differentiate between performancerequirements and installation requirements

• NFPA 99 Health Care Facilities Code

• 1.1 Scope• 1.1.4.1 Electrical Systems

• 1.1.4.1 Chapter 6 covers the performance, maintenance, and testing of electrical systems (both normal and essential) in health care facilities.

Page 8: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

8

1515

Performance vs Installation Requirements

• Technical Correlating Committee formed a Task Group on Inner-committee Coordination on Emergency Electrical Systems

• Performance Requirement – A specification of the manner in which equipment or a system is intended to function or operate.

• Installation Requirement – A specification of the material and process associated with putting equipment in place and making it ready for use in accordance with performance requirements.

• Standards Council clarification to Technical Committees - if the scope of their document is performance, they can only write performance requirements. If scope is installation, then can only write installation requirements.

• A recent example related to the 2014 NEC:• CMP-15 (Art. 517) added a requirement that all Life Safety and Critical branch

outlets must “have an illuminated face or an indicator light to indicate there is power to the receptacle.”

• Overturned by the Standards Council as it was determined to be a performance requirement (NFPA 99), and not an installation requirement (NFPA 70).

1616

NFPA 99 - 2012 Edition Proposals for 2014 NEC

• As a result of the Standards Council’s Decision, coordination is needed between NFPA 99 2012 and Article 517 of the NEC• Intercommittee coordination task group created

• NEC and NFPA 99 are on different Code Cycles

• Proposals were made by Walt Vernon, NFPA 99 – ELS -Technical Committee Chair• Mostly “clerical” to harmonize the terminology

• “rooms” vs “areas”

• “branches” vs “systems”

• Minimum number of receps

• Etc.

• All proposals were accepted exactly as proposed with the exception of Selective Coordination…more to follow…

Page 9: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

9

© 2013 Eaton Corporation. All rights reserved.

This is a photographic template – yourphotograph should fit precisely within this rectangle.

Selective Coordination

1818

Selective Coordination Simplified

During an overcurrent event, the goal is to keep the number of devices that open to a minimum.

Page 10: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

10

1919

What devices are required to Selectively Coordinate?

U T IL IT Y A

M A I N A

M SG -A

M S G -T I E

U T I L IT Y B

M A IN B

M S G -B

A TS -E Q N O RM A T S-C R N O RM A T S- L S N O R MC H IL L E R F D R

G E N # 1 M A I N

G E N S W G R

A T S- E Q E M E R A TS -C R EM E R A T S -L S E M E R

G E N # 1

G E N # 2 M A I N

G E N # 2

EN

A T S- E Q

EN

A T S -C R

EN

A T S -L S

C B L-A T S EQ N C BL -A T S C R N C BL -A TS L S N C BL -0 00 5 C B L-0 0 06 C BL - 00 0 7

C B L -E Q 4 80 V P N L C BL -C R 4 8 0V PN L C BL -L S 4 80 V P N L

E Q 4 80 V P N L

E Q X F M R P R I

C B L -E Q X F M R P R I

S

P

E Q X F M R

C B L -E Q 2 08 V P N L

E Q 2 0 8V P N L M A IN

E Q 2 08 V P N L

E Q 2 0 8V B R A N CH

C R 4 8 0V PN L

C R X FM R P R I

C BL -C R X F M R P R I

S

P

C R X FM R

C BL -C R 2 0 8V PN L

C R 20 8 V P N L M AIN

C R 2 0 8V PN L

C R 20 8 V BR A N C H

LS 4 80 V P N L

L S X FM R P R I

C BL -L S X F M R PR I

S

P

L S X F M R

C BL -L S 2 08 V P N L

L S 2 0 8V PN L M A IN

LS 2 08 V P N L

L S 2 0 8V BR A N C H

C H ILL E R

C BL - C H IL L E R

D IS T R P N L FD R

C BL - D IST R P N L

D IS T R P N L

4 80 V LT G P N L F D R

C BL- 48 0V LT G P N L

48 0 V LT G P N L

L T G BR A N C H

4 80 V L R G S T

1. Load side of any Emergency System ATS

2. Emergency source to the line side ATS

3. Normal source to the line side of the ATS???

2020

U T IL IT Y A

M A I N A

M SG -A

M S G -T I E

U T I L IT Y B

M A IN B

M S G -B

A TS -E Q N O RM A T S-C R N O RM A T S- L S N O R MC H IL L E R F D R

G E N # 1 M A I N

G E N S W G R

A T S- E Q E M E R A TS -C R EM E R A T S -L S E M E R

G E N # 1

G E N # 2 M A I N

G E N # 2

EN

A T S- E Q

EN

A T S -C R

EN

A T S -L S

C B L-A T S EQ N C BL -A T S C R N C BL -A TS L S N C BL -0 00 5 C B L-0 0 06 C BL - 00 0 7

C B L -E Q 4 80 V P N L C BL -C R 4 8 0V PN L C BL -L S 4 80 V P N L

E Q 4 80 V P N L

E Q X F M R P R I

C B L -E Q X F M R P R I

S

P

E Q X F M R

C B L -E Q 2 08 V P N L

E Q 2 0 8V P N L M A IN

E Q 2 08 V P N L

E Q 2 0 8V B R A N CH

C R 4 8 0V PN L

C R X FM R P R I

C BL -C R X F M R P R I

S

P

C R X FM R

C BL -C R 2 0 8V PN L

C R 20 8 V P N L M AIN

C R 2 0 8V PN L

C R 20 8 V BR A N C H

LS 4 80 V P N L

L S X FM R P R I

C BL -L S X F M R PR I

S

P

L S X F M R

C BL -L S 2 08 V P N L

L S 2 0 8V PN L M A IN

LS 2 08 V P N L

L S 2 0 8V BR A N C H

C H ILL E R

C BL - C H IL L E R

D IS T R P N L FD R

C BL - D IST R P N L

D IS T R P N L

4 80 V LT G P N L F D R

C BL- 48 0V LT G P N L

48 0 V LT G P N L

L T G BR A N C H

4 80 V L R G S T

What devices are required to Selectively Coordinate?

3. Normal source to the line side of the ATS???

Is this Zone importantfor continuity of service?

This bus sees an unnecessary outage. ATS transfers into a fault. Gen feeds a fault. Normal ATS breaker must be reset for ATS to transfer back

Page 11: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

11

2121

NFPA Comment“Although the emergency systems of a hospital are designated as the life safety branch and the critical branch (see 517.30 (B)(2)), Section 517.26 requires that the essential electrical system meet the requirements of Article 700. Therefore, since the essential electrical system in accordance with 517.30 (B)(1) includes the equipment system the provisions of Section 700.27 are also applicable to the equipment system as follows: Section 700.27 requires all emergency system overcurrent devices to be selectively coordinated with all upstream overcurrent protective devices. The phrase “selectively coordinated with all supply side overcurrent protective devices” does not limit the requirement to only those that are installed in series with the alternate supply source for the emergency system and includes coordination with the normal side providing the normal side supplies the essential circuits during normal operation. Section 700.27 is silent on overcurrent devices that are not in series with essential system overcurrent protective devices. Although the scope of Article 700 does not include supplies other than emergency, 700.27 is specific in that all the emergency system overcurrent devices must be selectively cooridinated with all supply side devices which would include those on the normal side unless the exceptions to 700.27 apply. Note: See ROP15-68, associated comments and the 2011 NEC draft for changes to 517.26 for future reference.”

Mark CloutierNFPA Senior Electrical Engineer

Important notice! This correspondence is not a Formal Interpretation issued pursuant to NFPA Regulations. Any opinion expressed is the personal opinion of the author, and does not necessarily represent the official position of the NFPA or its Technical Committees. In addition, this correspondence is neither intended, nor should be relied upon, to provide professional consultation or services.

2222

Page 12: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

12

2323

What devices are required to Selectively Coordinate? What about GF Protection?

• What about coordination with required GF protection?

• Required on 1st 2-levels for Health Care applications• Max GF pick-up = 1200 Amps

• Max GF delay = 0.5 sec

• Won’t coordinate with even small downstream breakers

• Not addressed in the Code or by the CMP-13

• Are more levels of GF needed? 0.5 1

1

10

10

100

100

1K1K

10K

10K

0.01 0.01

0.10 0.10

1 1

10 10

100 100

1000 1000

CURRENT IN AMPERES

TIME IN SECONDS

ATS-EQ NORM CUTLER-HAMMER Magnum DS, DT 520 Trip 800.0 APlug 800.0 ASettings Phase GFPU, (0.25 - 1 x In) 1 (800A) GFD, (0.1 - 0.5s) 0.3 (I^2t Out)

EQ XFMR PRI CUTLER-HAMMER FD Trip 200.0 ASettings Phase Fixed

MAIN B CUTLER-HAMMER Magnum DS, DT 1150/1150i Trip 3000.0 APlug 3000.0 ASettings Phase GFPU, (1150, 0.25 - 1) 0.4 (1200A) GFD, (0.1 - 0.5s) 0.5 (I^2t Out)

ATS-EQ NORM CUTLER-HAMMER Magnum DS, DT 520 Trip 800.0 APlug 800.0 ASettings Phase GFPU, (0.25 - 1 x In) 1 (800A) GFD, (0.1 - 0.5s) 0.3 (I^2t Out)

EQ XFMR PRI CUTLER-HAMMER FD Trip 200.0 ASettings Phase Fixed

MAIN B CUTLER-HAMMER Magnum DS, DT 1150/1150i Trip 3000.0 APlug 3000.0 ASettings Phase GFPU, (1150, 0.25 - 1) 0.4 (1200A) GFD, (0.1 - 0.5s) 0.5 (I^2t Out)

2424

2014 NEC / 2015 NFPA 99

• There has been significant effort since 2012 NFPA 99 was released to correlate between it and Article 517 of the NEC

• A series of proposals from the NFPA 99 Technical Committee were submitted for Article 517 and accepted to harmonize language

Page 13: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

13

2525

2015 NFPA 99 Key Changes

• 2014 NEC (CMP-13) changes the definition of Coordination (Selective)

• 100. Coordination (Selective). Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the choiceselection and installation of overcurrent protective devices and their ratings or settings for the full range of available over-currents, from overload to the maximum available fault current, and for the full range of overcurrent protective device opening times associated with those over-currents.

2626

2015 NFPA 99 Key Changes

• 2014 NEC (CMP-15) then moved away from the term Coordination (Selective)

• 517.30 (F) Coordination. Overcurrent protective devices serving the essential electrical system shall be coordinated for the period of time that a fault’s duration extends beyond 0.1 second.

• Informational Note: The terms “Coordination” and “Coordinated” as used in this section do not cover the full range of overcurrent conditions.

Page 14: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

14

2727

2015 NFPA 99 Key Changes

• Clarifies that the Health care requirement for Coordination at 0.1 sec. & above is different than the requirement for Coordination (Selective) in Sections 620.62, 700.27, 701.27, and 708.54.

• 2015 NFPA 99 will correlate with Art. 517 of the 2014 NEC

• Adopted same language and added the Informational Note to the Annex material

282828

Selective Coordination Discussion – Protective Devices

Page 15: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

15

2929

Optional slide

The next slide will only be used if additional detail is required on .1 second or equipment ratings.

This slide and next are hidden.

303030

Selective Coordination Discussion – Protective Devices

CLASS L FUSES

WILL TYPICALLY COORDINATE TO 13,000A

IN ADDITION TO THE INCREASED SPACE AND 1ST COSTS

THE ONLY ADVANTAGE OF CASE 2B IS TOTAL COORDINATION IN A BOLTED FAULT

ARC FLASH HAZARD HAS BEENINCREASED

WILL TYPICALLY PROVIDEGOOD REAL WORLD PROTECTION(PARTIAL PROTECTION)

Page 16: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

16

3131

2015 NFPA 99 Key Changes

• Most other NFPA 99 2015 changes are related to “clean up” efforts• Still have a ways to go on organization of Chapter 6

• GFCI used in Operating Rooms• Where GFCI protection is used in an operating room:

• Each receptacle shall be a GFCI device, or

• Each receptacle shall be individually protected by a single GFCI device

• “Room” vs “Area” vs “Space” • The term “space” is replacing “area” or “room”

• Example:

• Category 1 space (in lieu of Critical Care Area, or Category 1 room)

3232

2015 NFPA 99 Key Changes

• Only the life safety branch must comply with Art 700 (Emergency Systems) of the NEC• Additionally, several of the Art. 700 provisions do

not apply• Generator sizing – on demand load, not connected load

• 1 hour fire rated cabling vs 2 hour fire rated cabling

• Battery backed lights allowed on the life safety branch

• 700.27 - Coordination (Selective)

Page 17: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

17

3333

2015 NFPA 99 Key Changes

• Type 3 Essential Electrical System removed• There are no risk Categories that call for a Type 3

EES

• Receptacle, cord connected, and fixed electrical equipment• Eliminated testing interval of every 6 months

3434

2015 NFPA 99 Key Changes

• Fuel Cells allowed as an alternate power source• Must have N+1 capacity

• Restore power in 10 seconds or less

• Sufficient fuel supply with onsite storage for EES type

• Must include a connection for portable diesel generator to supply life safety and critical branches

Page 18: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between

3/21/2014

18

3535

2015 NFPA 99 Key Changes

• Fuel Cells allowed as an alternate power source• Must have N+1 capacity

• Restore power in 10 seconds or less

• Sufficient fuel supply with onsite storage for EES type

• Must include a connection for portable diesel generator to supply life safety and critical branches

3636

NFPA 70E 2012 as supported by NFPA 70 (N.E.C) Key Changes

• Section 130.3 Arc Flash Hazard Analysis (must review)

The arc flash hazard analysis shall be updated when a major modification or renovation takes place. It shall be reviewed periodically, not to exceed five years, to account for changes in the electrical distribution system that could affect the results of the arc flash hazard analysis.

• Section 130.5 Arc Flash Labeling (increased requirements)(1) At least one of the following:

a. Available incident energy and the corresponding working distanceb. Minimum arc rating of clothingc. Required level of PPEd. Highest Hazard/Risk Category (HRC) for the equipment

(2) Nominal system voltage(3) Arc flash boundaryException: Labels applied prior to September 30, 2011, are acceptable if they contain the available incident energy or required level of PPE.

Page 19: NFPA 70 & 99 Interlink Update3/21/2014 5 9 9 6.3.2.2.1.3 Access – Overcurrent devices service Category 1 and 2 rooms not permitted in public spaces 6.4.2.2.1.2 The division between