newfield - utah

111
0 O NEWFIELD Route #3 Box 3630 Myton, Utah 84052 (435) 646-4825, FAX: (435) 646-3031 January 29, 2008 State of Utah Division of Oil, Gas & Mining Attn: Diana Mason 1594 West North Temple - Suite 1210 P.O. Box 145801 Salt Lake City, Utah 84114-5801 RE: Application for Permit to Drill Monument Butte State P-36-8-16 Dear Diana: Enclosed find an APD on the above referenced well. This is for a Federal Surface/State Mineral 20 acre infill location. Our Land Department will send you the required Directional Drill Letter. If you have any questions, feel free to give either Dave Allred or myself a call. Mandie Crozier Regulatory Specialist mc enclosures RECEIVED JAN 31 2008 DIV.0FOIL, GAS &

Upload: others

Post on 16-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEWFIELD - Utah

0 O

NEWFIELD

Route #3 Box 3630Myton, Utah 84052

(435) 646-4825, FAX: (435) 646-3031

January 29, 2008

State of UtahDivision of Oil, Gas & MiningAttn: Diana Mason1594 West North Temple - Suite 1210P.O. Box 145801Salt Lake City, Utah 84114-5801

RE: Application for Permit to DrillMonument Butte State P-36-8-16

Dear Diana:

Enclosed find an APD on the above referenced well. This is for a Federal Surface/StateMineral 20 acre infill location. Our Land Department will send you the requiredDirectional Drill Letter. If you have any questions, feel free to give either Dave Allred ormyself a call.

Mandie CrozierRegulatory Specialist

mcenclosures

RECEIVEDJAN3 1 2008

DIV.0FOIL,GAS&

Page 2: NEWFIELD - Utah

FORM3

STATE OF UT

DIVISION OF OIL, S AND MINING 5,LEASEDESIGNATIONANDSERIALNO.ML-22061

6. IF INDIAN, ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL, DEEPEN N/Ala.TYPEOFÑÔËK DRILL lx |DEEPEN I | 7.UNITAGREEMENTNAME

lb. TYPE OF WELL Monument ButteSINGLE MULTIPLE 8. FARM OR LEASE NAME

ØiL | X | GAS | | OTHER ZONE X ZONE | | NA2. NAME OF ÓPERATOR 9. WELL NO.

Newfield Production Company Monument Butte State P-36-8-163 ADDRESS AND TELEPHONE NUMBER: 10. FIELD AND POOL OR WILDCAT

Route #3 Box 3630, Myton, UT 84052 Phone: (435) 646-3721 Monument Butte4 LOCATIONOF WELL (FOOTAGE) 11. QTR/QTR. SECTION, TOWNSHIP, RANGE, MERIDIAN:

At surface NE/SE 2073' FSL 646' FEL Sec. 35, TSS, R16EAt próposed Producing Zone 1319' FSL 0' FWL Sec. 36, TSS, R16E

Sec. 3¶, T8S, R16E14. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12. County 13. $TATE

Approximately 13.3 miles southwest of Myton, UT Duchesne UT15. DISTANCE FRÒMgO,P SED* LOCATION TO NEAREST PROPERTY 16. NO. OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

OR LEASE LINEih.(Also to nearest drig.tmit line, ifany)

Approx. 0' f1lse line and 1321' flunit line 640.00 2018 DISTANCE FROM PRÖPOSED LOCATION* TO NEAREST WELL, 19. PROPOSED DEPTH 20. ROTARY OR CABLE TOOLS

I C , OR APPLIED FOR ON THIS LEASE, FT.

pproximately 1431' wW RotaryIÔ Slow whether ÒF, RT, GR, etc.) 22. APPROX. DATE WORK WILL START*

5520' GL 2 nd Quarter200823 PROPOSED CASING AND CEMENTING PROGRAMŠÝZEsOF HOfE . SIZE OF CASING WEIGHT/FOOT SETTING DEPTH QUANTITY OF CEMENT

12 1/4. 8 5/8 24# 290' 155 sx +/- 10%7 7/8 5 1/2 15.5# TD 275 sx lead followed by 450 sx tail

See Detail Below

DESCRIBE PROPOSED PROGRAM: If proposal is to deepen, give date on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on

subsurface locations and measured and true vertical depths. Give blowout preventer program, if any.*The actual cement volumes will be calculated off of the open hole logs, plus 15% excess:

$ÙRFA E PIPÈ- 155 sx Class G Cement +/I 10%, w/ 2% CaCl2 & 1/4#/sk Cello-flakeWeight: 15,8 PPG YIELD: 1.17 Cu Ft/sk H2O Req: 5 gal/sk

Lead: Premium Lite II Cement + 31bs/sk BA-90 + 3% KCl + .25 lbs/sk Cello Flake + 2 lbs/sk Kol Seal +

10% Bentonite + .5% Sodium MetasilicateWeight: 11,0 PPG YIELD: 3.43 Cu Ft/sk H2O Req: 21.04 gal/sk

Tail: 50-50 Poz-Class G Cement + 3% KCl +.25 lbs/sk Cello Flake + 2% Bentonite +

.3% Sodium Metasilicate

Weight. 14.2 PPG YIELD: 1.59 Cu Ft/sk H2O Req: 7.88 gal/sk

Regulatory Specialist Date: Î/ÍÊÍ ÛÛÊ

Approvodby tho(This space for State use only)

Utah DivisionofAPI Number Assigned APPROVAL: Oil, Gas and Mining

DIV.0F OIL,GAS&MINING*See Instructions On Reverse

Page 3: NEWFIELD - Utah

T8S, Ri6 E, S. L.B. JcM. Nimzo Pacoucriar coxPar

WELL LOCATION, MONUMENT BUTTES89 56'W - 80.04 (G.L.O.) NB9°59'W - 79.96 (G.L.O.) P-36-8-16, LOCATED AS SHOWN IN THE

NE 1/4 SE 1/4 OF SECTION 35, T8S,R16E, S.L.B.&M. DUCHESNE COUNTY, UTAH.

O -

^o

o o

WELLLOCARON: BAR SCALEMOHUMENT BUTTE P- J6-8-16ELEV EX/ST GRADED GROUND = 5520'

Ntato _i Note:Brass cop 2 2. The bottom of hole footages are35 36 1319 FSL & 0 FWL of Section 36.

Top ofHo/e

646'

THIS IS TO CERTlFY THA Agg WASDR/HING PREPARED FROM FIELD F.A RVEYSW/NDOW MADE BY ME OR UN THAT

THE SAME ARE TRU RRECT T TH T OFMY KNOWLEDGEAN I .No.189377

oSTACY W.

1970

TE D NL

E OFBrass Cap

SB9°59'1J"E- 2639.39' (Meas.) Bross CoP S89°57'E (G.L.O.) TRI STATELANDSURVEYING& CONSULTINGS89 57'E (G.L.O.)

180 NORTH VERNAL AVE. - VERNAL, UTAH 84078(435) 781-2501

MONUMENTBUTTE P-J6-8-16 DATE SU RVEYED:= SECTION CORNERS LOCATED (Surface Location) NAD BJ 09-26-07 SURVEYED BY: T.H.

LA T/7UDE =40° 04' 22.18" DATE DRAWN:

BASIS OF ELEV; LONG/TUDE =110° 04' 46.30" 10-24-07 DRAWN BY: F.T.M.

U.S.G.S. 7-1/2 min QUAD (MYTON SE) REVlSED: SCALE: 1" =

Page 4: NEWFIELD - Utah

0 0NEWFIELD PRODUCTION COMPANY

MONUMENT BUTTE STATE # P-36-8-16AT SURFACE: NE/SE SECTION 35, T8S, Rl6E

DUCHESNE COUNTY, UTAH

TEN POINT DRILLING PROGRAM

l. GEOLOGIC SURFACE FORMATION:

Uinta formation of Upper Eocene Age

2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:

Uinta 0 - 1665'Green River 1665'Wasatch 6375'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:

Green River Formation 1665' - 6375' - Oil

4. PROPOSED CASING PROGRAM:

Surface Casing: 8-5/8" J-55 24# w/ST&C collars; set at 290' (New)Production Casing:5-l/2" J-55, 15.5# w/LT&C collars; set at TD (New or used, inspected).

5. MINIMUM SPECIFICATIONS FOR PRESSURE CONTROL:

The operator's minimum specifications for pressure control equipment are as follows:

An 8" Double Ram Hydraulic unit with a closing unit will be utilized. Function test of BOP's willbe check daily.

Refer to Exhibit C for a diagram of BOP equipment that will be used on this well.

6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:

The well will be drilled with a fresh water/polymer system will be utilized. If necessary, tocontrol formation fluids, the system will be weighted with the addition of bentonite gel, and ifconditions warrant, barite. This fresh water system typically will contain Total Dissolved Solids(TDS) of less than 3000 PPM. Neither potassium chloride nor chromates will be utilized in thefluid system. The anticipated mud weight is 8.4 ppg and weighted as necessary for gas control.

MUD PROGRAM MUD TYPESurface - 3200' fresh water3200' - TD' fresh water system

From about surface to TD, a fresh water system will be utilized. Clay inhibition and hole stabilitywill be achieved with a KCL substitute additive. This fresh water system will typically containTotal DissolvedSolids (TDS) of less than 3000 PPM. Anticipated mud weight is 8.4 lbs/gal. Ifnecessary to control formation fluids or pressure, the system will be weighted with the addition ofbentonite gel, and if pressure conditions warrant, with barite. No chromate additives will be usedin the mud

Page 5: NEWFIELD - Utah

0 O7. AUXILIARY SAFETY EQUIPMENT TO BE USED:

Auxiliary safety equipment will be a Kelly Cock, bit float, and a TIW valve with drill pipethreads.

8. TESTING, LOGGING AND CORING PROGRAMS:

The logging program will consist of a Dual Induction, GammaRay and Caliper log from TD tobase of surface casing @290' +/-, and a Compensated Neutron-Formation Density Log from TDto 3500' +-. A cement bond log will be run from PBTD to cement top. No drill stem testing orcoring is planned for this well.

9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:

The anticipated maximum bottom hole pressure is 2000 psi. It is not anticipated that abnormaltemperatures will be encountered; or that any other abnormal hazards such as H2S will beencountered in this area.

10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:

It is anticipated that the drilling operations will commence the first quarter of 2008, and takeapproximately seven (7) days from spud to rig

Page 6: NEWFIELD - Utah

Pro ce. DMocnhemenneCoune- 6-8-16 Wfield Exploration Co.

Well: Monument Butte P-36-8-16

ScientificDrillina Wellbore: OH y" Design: Plan #1 M Azimuths to True NorthRocky Mountain Operations Magnetic North: 11.75

WELL DETAILS:Monument Butte P-36-8-16 Magnetic FieldStrength: 52645.8snl

GL 5520' & RKB 12'@5532.00ft (NDSI 2) 5520.00 Dip Angle: 65.91+N/-S +El-W Northing i asting Latitude Longitude Date: 2008-01-07

0.00 0.00 7198422.20 2037907.90 40° 4' 22.180 N 110° 4' 46.300 W Model: IGRF2005-10

0---- - -- --

750

-250------

1500

1875

-625---------- - -- ----- ----

2250

-750-------- -- ------- - -- --

Mcr ment Butte P-3 8 i6 Taro - Illill

3000

0 125 250 375 500 625 750 875West(-)/East(+) (250 ft/in)

4125 Plan: Plan #1 (Monument Butte P-36-8-16/OH)

Created By: Julie Cruse Date: 2008-01-07

4500PROJECT DETAILS: Duchesne County, UT

Geodetic System: US State Plane 1983Datum: North American Datum 1983

Ellipsoid: GRS 198040 '5 Zone: Utah Central Zone

Location: Sec 35 TSS R16ESystem Datum: Mean Sea Level

Local North: True North5250-

- Monument Butte P-36-8-16 TaSECTION DETAILS

MD Inc Azi TVD +N/-S +El-W DLeg TFace VSec Target5325 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

00.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.0093.32 13.40 138.88 1485.19 -78.34 68.38 1.50 138.88 103.9814.88 13.40 138.88 5300.00 -763.00 666.00 0.00 0.00 1012.78 Monument Butte P-36-8-16 Tar

coco 19.96 13.40 138.88 8375.00 -955.94 834.41 0.00 0.00 1268.88

I I l''''I'-375 0 375 750 1125 1500

Vertical Section at 138.88° (750

Page 7: NEWFIELD - Utah

0 O

Newfield Exploration Co.Duchesne County, UTMonument Butte P-36-8-16Monument Butte P-36-8-16OH

Plan: Plan #1

Standard Planning Report07 January,

Page 8: NEWFIELD - Utah

Scientific DrillingPlanning Report

Database: EDM 2003.16 Multi-User Db Local Co·ordinate Reference: Well Monument Butte P-36-8-16

Company: Newfield Exploration Co. TVD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Project: Duchesne County, UT MD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Site: Monument Butte P-36-8-16 North Reference: TrueWell: Monument Butte P-36-8-16 Survey Calculation Method: Minimum CurvatureWellbore: OHDesign: Plan #1

Project Duchesne County, UT

Map System: US State Plane 1983 System Datum: Mean Sea LevelGeo Datum: North American Datum 1983Map Zone: Utah Central Zone

Site Monument Butte P-36-8-16, Sec 35 TSS R16E

Site Position: Northing: 7,198,422.20ft Latitude: 40°4'22.180 NFrom: Lat/Long Easting: 2,037,907.90ft Longitude: 110° 4' 46.300 WPosition Uncertainty: 0.00 ft Slot Radius: in Grid Convergence: 0.91 °

Well Monument Butte P-36-8-16, 2073' FSL 646' FEL Sec 35 TSS R16E

Well Position +NI-S 0.00 ft Northing: 7,198,422.20 ft Latitude: 40° 4' 22.180 N+El-W 0.00 ft Easting: 2,037,907.90 ft Longitude: 110° 4' 46.300 W

Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 5,520.00ft

Wellbore OH

Magnetics ModelName Sample Date Declination Dip Angle Field Strength(*) (*) (nT)

IGRF2005-10 2008-01-07 11.75 65.91 52,646

Design Plan #1

Audit Notes:

Version: Phase: PROTOTYPE Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W DImetlon(ft) (ft) (R) (*)

5,300.00 0.00 0.00 138.88

Plan Sections

Measured Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Rate Rate Rate TFO

(ft) (*) (*) (R) (ft) (ft) (*Ii00ft) (*/10011) (*Il00ft) (*) Target

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00

1,493.32 13.40 138.88 1,485.19 -78.34 68.38 1.50 1.50 0.00 138.88

5,414.88 13.40 138.88 5,300.00 -763.00 666.00 0.00 0.00 0.00 0.00 Monument Butte P-36

6,519.96 13.40 138.88 6,375.00 -955.94 834.41 0.00 0.00 0.00 0.00

2008-01-07 4 49 17PM Page 2 COMPASS 2003 16 Build

Page 9: NEWFIELD - Utah

Scientific DrillingPlanning Report

Database: EDM 2003.16 Multi-User Db Local Co·ordinate Reference: Well Monument Butte P-36-8-16

Company: Newrield Exploration Co. TVD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Project: Duchesne County, UT MD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Site: Monument Butte P-36-8-16 North Reference: TrueWell: Monument Butte P-36-8-16 Survey Calculation Method: Minimum CurvatureWelibere: OHDesign: Plan #1

Planned Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(R) (*) (*) (A) (ft) (it) (it) (*Ii00ft) (*I100ft) (*l100ft)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00700.00 1.50 138.88 699.99 -0.99 0.86 1.31 1.50 1.50 0.00800.00 3.00 138.88 799.91 -3.94 3.44 5.23 1.50 1.50 0.00900.00 4.50 138.88 899.69 -8.87 7.74 11.77 1.50 1.50 0.00

1,000.00 6.00 138.88 999.27 -15.76 13.76 20.92 1.50 1.50 0.001,100.00 7.50 138.88 1,098.57 -24.62 21.49 32.68 1.50 1.50 0.001,200.00 9.00 138.88 1,197.54 -35.43 30.92 47.03 1.50 1.50 0.001,300.00 10.50 138.88 1,296.09 -48.19 42.06 63.96 1.50 1.50 0.001,400.00 12.00 138.88 1,394.16 -62.88 54.89 83.47 1.50 1.50 0.00

1,493.32 13.40 138.88 1,485.19 -78.34 68.38 103.98 1.50 1.50 0.001,500.00 13.40 138.88 1,491.70 -79.51 69.40 105.53 0.00 0.00 0.001,600.00 13.40 138.88 1,588.97 -96.96 84.64 128.71 0.00 0.00 0.001,700.00 13.40 138.88 1,686.25 -114.42 99.88 151.88 0.00 0.00 0.001,800.00 13.40 138.88 1,783.53 -131.88 115.12 175.06 0.00 0.00 0.00

1,900.00 13.40 138.88 1,880.81 -149.34 130.36 198.23 0.00 0.00 0.002,000.00 13.40 138.88 1,978.09 -166.80 145.60 221.41 0.00 0.00 0.002,100.00 13.40 138.88 2,075.36 -184.26 160.83 244.58 0.00 0.00 0.002,200.00 13.40 138.88 2,172.64 -201.72 176.07 267.75 0.00 0.00 0.002,300.00 13.40 138.88 2,269.92 -219.18 191.31 290.93 0.00 0.00 0.00

2,400.00 13.40 138.88 2,367.20 -236.64 206.55 314.10 0.00 0.00 0.002,500.00 13.40 138.88 2,464.47 -254.09 221.79 337.28 0.00 0.00 0.002,600.00 13.40 138.88 2,561.75 -271.55 237.03 360.45 0.00 0.00 0.002,700.00 13.40 138.88 2,659.03 -289.01 252.27 383.63 0.00 0.00 0.002,800.00 13.40 138.88 2,756.31 -306.47 267.51 406.80 0.00 0.00 0.00

2,900.00 13.40 138.88 2,853.58 -323.93 282.75 429.97 0.00 0.00 0.003,000.00 13.40 138.88 2,950.86 -341.39 297.99 453.15 0.00 0.00 0.003,100.00 13.40 138.88 3,048.14 -358.85 313.23 476.32 0.00 0.00 0.003,200.00 13.40 138.88 3,145.42 -376.31 328.47 499.50 0.00 0.00 0.003,300.00 13.40 138.88 3,242.70 -393.77 343.71 522.67 0.00 0.00 0.00

3,400.00 13.40 138.88 3,339.97 -411.22 358.95 545.85 0.00 0.00 0.003,500.00 13.40 138.88 3,437.25 -428.68 374.19 569.02 0.00 0.00 0.003,600.00 13.40 138.88 3,534,53 -446.14 389.42 592.19 0.00 0.00 0.003,700.00 13.40 138.88 3,631.81 -463.60 404.66 615.37 0.00 0.00 0.003,800.00 13.40 138.88 3,729,08 -481.06 419.90 638.54 0.00 0.00 0.00

3,900.00 13.40 138.88 3,826.36 -498.52 435.14 661.72 0.00 0.00 0.004,000.00 13.40 138.88 3,923.64 -515.98 450.38 684.89 0.00 0.00 0.004,100.00 13.40 138.88 4,020.92 -533.44 465.62 708.07 0.00 0.00 0.004,200.00 13.40 138.88 4,118.19 -550.90 480.86 731.24 0.00 0.00 0.004,300.00 13.40 138.88 4,215.47 -568.35 496.10 754.42 0.00 0.00 0.00

4,400.00 13.40 138.88 4,312.75 -585.81 511.34 777.59 0.00 0.00 0.004,500.00 13.40 138.88 4,410.03 -603.27 526.58 800.76 0.00 0.00 0.004,600.00 13.40 138.88 4,507.31 -620.73 541.82 823.94 0.00 0.00 0.004,700.00 13.40 138.88 4,604.58 -638.19 557.06 847.11 0.00 0.00 0.004,800.00 13.40 138.88 4,701.86 -655.65 572.30 870.29 0.00 0.00 0.00

4,900.00 13.40 138.88 4,799.14 -673.11 587.54 893.46 0.00 0.00 0.005,000.00 13.40 138.88 4,896.42 -690.57 602.78 916.64 0.00 0.00 0.005,100.00 13.40 138.88 4,993.69 -708.03 618.01 939.81 0.00 0.00 0.005,200.00 13.40 138.88 5,090.97 -725.48 633.25 962.98 0.00 0.00 0.00

2008-01-07 4:49:17PM Page 3 COMPASS 2003.16 Build

Page 10: NEWFIELD - Utah

Scientific DrillingPlanning Report

Database: EDM 2003.16 Multi-User Db Local Co-ordinate Reference: Well Monument Butte P-36-8-16

Company: Newfield Exploration Co. TVD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Project: Duchesne County, UT MD Reference: GL 5520' & RKB 12' @5532.00ft (NDSI 2)Site: Monument Butte P-36-8-16 North Reference: TrueWell: Monument Butte P-36-8-16 Survey Calculation Method: Minimum CurvatureWellbore: OHDesign: Plan #1

Planned Survey

Measured Vertical Vertical Dogleg Build TurnDepth incIlnation Azimuth Depth +N/-S +E/-W Section Rate Rate Rate

( (*) (*) ( (ft) (ft) (ft) (*/100ft) (°Ii00R) (*/100¾)

5,300.00 13.40 138.88 5,188,25 -742.94 648.49 986.16 0.00 0.00 0.00

5,400.00 13.40 138.88 5,285.53 -760.40 663.73 1,009.33 0.00 0.00 0.005,414.88 13.40 138.88 5,300.00 -763.00 666.00 1,012.78 0.00 0.00 0.005,500.00 13.40 138.88 5,382.80 -777.86 678.97 1,032.51 0.00 0.00 0.005,600.00 13.40 138.88 5,480.08 -795.32 694.21 1,055.68 0.00 0.00 0.005,700.00 13.40 138.88 5,577.36 -812.78 709.45 1,078.86 0.00 0.00 0.00

5,800.00 13.40 138.88 5,674.64 -830.24 724.69 1,102.03 0.00 0.00 0.005,900.00 13.40 138.88 5,771.92 -847.70 739.93 1,125.20 0.00 0.00 0.006,000.00 13.40 138.88 5,869.19 -865.16 755.17 1,148.38 0.00 0.00 0.006,100.00 13.40 138.88 5,966.47 -882.61 770.41 1,171.55 0.00 0.00 0.006,200.00 13.40 138.88 6,063.75 -900.07 785.65 1,194.73 0.00 0.00 0.00

6,300.00 13.40 138.88 6,161.03 -917.53 800.89 1,217.90 0.00 0.00 0.006,400.00 13.40 138.88 6,258.30 -934.99 816.13 1,241.08 0.00 0.00 0.006,500.00 13.40 138.88 6,355.58 -952.45 831.37 1,264.25 0.00 0.00 0.006,519.96 13.40 138.88 6,375.00 -955.94 834.41 1,288.88 0.00 0.00 0.00

Targets

Target Name- hitimiss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting-Shape (*) (*) (R) (ft) (ft) (ft) (it) Latitude Longitude

Monument Butte P-36-8- 0.00 0.00 5,300.00 -763.00 666.00 7,197,669.87 2,038,585.93 40° 4' 14.639 N 110° 4' 37.733 W- plan hits target center- Circle (radius 75.00)

2008-01-07 4 49 17PM Page 4 COMPASS 2003 16 Build

Page 11: NEWFIELD - Utah

O ONEWFIELD PRODUCTION COMPANY

MON. BUTTE STATE #P-36-8-16AT SURFACE: NE/SE SECTION 35, TSS, R16E

DUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI-POINT SURFACE USE & OPERATIONS PLAN

1. EXISTING ROADS

See attached Topographic Map "A"

To reach Newfield Production Company well location site Monument Butte State #P-36-8-16located in the NE 1/4 SE 1/4 Section 35, T8S, Rl6E, Duchesne County, Utah:

Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed southeasterly - 9.2 miles ± to it's junctionwith an existingdirt road to the southwest; proceed southwesterly - 2.7 miles ± to it's junctionwith the beginningof the access road to the existing Federal 2-35-8-16 well leoation.

2. PLANNED ACCESS ROAD

There is no proposed access road for this location. The proposed well will be drilled directionallyoff of the existing Federal 2-35-8-16 well pad. See attached Topographic Map "B".

3. LOCATION OF EXISTING WELLS

Refer to Exhibit "B".

4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

The proposed well will be drilled directionally off of the Federal 2-35-8-16 well pad. There willbe a pumping unit and a short flow line added to the tank battery for the proposed Monument ButteState P-36-8-16. All permanent surface equipment will be painted Carlsbad Canyon.

Please refer to the Monument Butte Field Standard Operating Procedure (SOP).

S. LOCATION AND TYPE OF WATER SUPPLY

Newfield Production will transport water by truck for drilling purposes from the following watersources:

Johnson Water DistrictWater Right: 43-10136

Neil Moon PondWater Right: 43-11787

Maurice Harvey PondWater Right: 47-1358

Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).

Page 12: NEWFIELD - Utah

g OPlease refer to le Monument Butte Field SOP. See Exhibit "A".

6. SOURCE OF CONSTRUCTION MATERL4LS

The proposed Monument Butte State P-36-8-16 will be drilled off of the existing Federal 2-35-8-16 well pad. No additional surface disturbance will be required for this location.

7. METHODS FOR HANDLING WASTE DISPOSAL

Please refer to the Monument Butte Field SOP.

8. ANCILLARY FACILITIES

Please refer to the Monument Butte Field SOP.

9. WELL SITE LAYOUT

See attached Location Layout Diagram.

10. PLANS FOR RESTORATION OF SURFACE

Please refer to the Monument Butte Field SOP.

11. SURFA CE OWNERSHIP - Bureau Of Land Management (Proposed location and access roadsleading to).

12. OTHER ADDITIONAL INFORMATION

Water DisposalImmediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.

Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRI9E) or at State of Utah approved surface disposal facilities.

Threatened, Endangered, And Other Sensitive SpeciesNone for the proposed Monument Butte State P-36-8-16.

Reserve Pit LinerA 16 mil liner with felt is required. Please refer to the Monument Butte Field SOP.

Location and Reserve Pit ReclamationPlease refer to the Monument Butte Field SOP.

The following seed mixture will be used on the topsoil stockpile, to the recontoured surface of thereserve pit, and for final reclamation: (All poundages are in pure live seed)

Squirrell Tail Elymus Elymoides 5 lbs/acreCrested Wheatgrass Agropyron Cristatum 5 lbs/acreGardner Saltbush Atriplex Gardneri 0.5 lbs/acreShadscale Atriplex Confertifolia 0.5 lbs/acreForage Kochia Kochia Prostrata 0.25 lbs/acre

Details of the On-Site Inspection

Page 13: NEWFIELD - Utah

The propose onument Butte State P-36-8-16 was on-sited on 12/18/07. The following werepresent; Dave Allred (Newfield Production), Michael Cutler (Bureau of Land Management), andBrandon McDonald (Bureau of Land Management).. Weather conditions were clear and groundcover was open.

13. LESSEE'S OR OPERATORS REPRESENTATIVE AND CERTIFICATIONRe resentativeP

Name: Dave AllredAddress:Route #3 Box 3630

Myton, UT 84052Telephone: (435) 646-3721

Certification

Please be advised that NEWFIELD PRODUCTION COMPANY is considered to be theoperator of well #P-36-8-16 NE/SE Section 35, Township 8S, Range 16E: Lease ML-22061Duchesne County, Utah: and is responsible under the terms and conditions of the lease for theoperations conducted upon the leased lands. Bond coverage is provided by, Federal Bond#WYBOOO493.

I hereby certify that the proposed drillsite and access route have been inspected, and Iam familiar with the conditions which currently exist; that the statements made in this plan are trueand correct to the best of my knowledge; and that the work associated with the operationsproposed here will be performed by Newfield Production Company and its contractors andsubcontractors in conformity with this plan and the terms and conditions under which it isapproved. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.

1/14/08Date Mandie Crozier

Regulatory SpecialistNewfield Production Company

Page 14: NEWFIELD - Utah

WELL PAD INTERFERENCE PLATMONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Pad Location: NESE Section 35, TBS, Ri6E, S.L.R &M.N

Future Pit

2-35-8-16 (EX/S17NG)

15, P-36-8-16 (PROPOSED)

ExistingAccess

Edge ofExistingPad

Existing Road

TOP HOLE EOOTAGES o,P-36-8-16 (PROPOSED)207J' ESL & 646' EEL BOTTOM HOLE FOOTAGES o,

P-- 36-8-16 (PROPOSED)1319' ESL & O' FWL

Note:Bearings are based onGLO information.

LATITUDE & LONGITUDERELATIVE COORDINATES Surfa,ce position of Wells (NAD 83)

From top hole to bottom hole WELL LATITUDE LONGITUDEWELL NORTH EAST P-36-8-16 40° 04' 22.18" 110° 04' 46.30"

P-36-8-16 -754' 647 2-35-8-16 40° 04' 22.35" 110° 04' 46.47"

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 ri State (4J5) 781-2501

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 Land Surveying, Inc.SCALE: 1" = 50' REVISED: > 180 NORTH VERNAL AVE. VERNAL,UTAH

Page 15: NEWFIELD - Utah

MONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2--35-8-16 (Existing Well)

Pad Location: NESE Section 35, TBS, Ri6E, S.L.B.&M.

ExistingAccess

STA. 2+90--

P/T TÒþS0/L

E/0. 4

STA. 2+10 f.Ñi Edge of Toe of

Existing - F/// S/ope

ueter -

Existing Well Shed (111' 2-35-8-16 29' ¯ f.Ñ

STA. 1+56

GRADENote:

WELL HEAD.EX/S7/NG GRADED be /ocated atGROUND = 5520' XCERASL /east 80' frorn

we// hood.

ExistingStock P//e

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 i State (435) 781-2501

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 Land Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNALAVE. VERNAL, UTAH

Page 16: NEWFIELD - Utah

CROSS SECTIONSMONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

1 so' SM. 2+90

1" = 50' SM. 2+10

EX/ST/NG E/N/SHEDGRADE GRADE

1 = so' SM. 1+56

1" = so' SM. 0+20 ESTIMATED EARTHWORKQUANTITIES(No Shrink or swell adjustments have been used)

(E×pressed in Cubic Yards)

1TEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 140 140 ToPsoil is 0UNLESS OTHERWISE not included

PIT 400 0 in Pad Cut 400NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 540 140 130 400

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 i State t'362'"'-23°'

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 17: NEWFIELD - Utah

U)

OU

)¯O

C3>

3>-O

r¯<

xist

ing

Roo

d

PAR

TSH

OU

SE

DO

GH

OU

SEW

ATE

RTA

NK

-Li

ght

Plan

t

CA

TWA

LKR

IGB

AŠE

Fuel

Line

156'

PIPE

TUB

-U

fPI

PETU

B,

iJD

TAN

K14

1PI

PETU

B15

UD

PUM

PT

HM

eter

YEL

LOW

DO

GSh

ed5

°

L/

¯¯¯'

¯¯¯'

°'¯¯

DA

TAL.

Illso

llll

10'

W/D

EB

ENC

H

roo'

N

00 oà

00

Page 18: NEWFIELD - Utah

ewfield Production Comgyroposed Site Facility Diagram

Monument Butte State P-36-8-16

From the 2-35-8-16 Location

NE/SE Sec. 35 TSS, R16E

Duchesne County, UtahUTU-16535

Well Head

Well Head i

Pumping Unit Site Security Plan is held at the PleasantValley Office, Duchesne County, UtahP-36-8-16 Pumping Unit

AProduction Phase:2-35-8-16

1) Valves 1,3, and 4 sealed closed

2) Valves 2, 5, and 6 sealed open

Heater Treater

Sales Phase:I

1) Valves 1, 2, 4, 5, and 6 sealed closedGasSales Mete - - - - - E · - -3

2) Valve 3 open-· --· 6 Water Tank

200 bbl

Draining Phase:I

1) Valves 1 and 6 openIII 2

Load Rack - - - - - - - - - - - - - -Production Tank 4

I 400 bbl-L.-.-. ILegend

5Diked Section ,

i Emulsion Line -·-·-· ··· - ··

li Load Rack ¯¯¯¯¯¯¯¯¯¯¯

l i- , 2 Water Line -·--·-- - -·

I I Production Tank· '------ 4 GasSales - '--··¯¯ ·\ 3 400 bblI._.-.-. I

Page 19: NEWFIELD - Utah

l

I

ch

pLSA

.Monument Butte P-36 (Proposed Well)Monument Butte 2-35 (Existing Well)

£EF

22.7 ml.

e ecc

Legend' $df/# - Existing Road

\ (435) 781-2501r 180 Nord1 Wmel he Wmsl, Ulah 84078

Monument Butte P-36-8-16 (Proposed Well) . .. . . . .

Monument Butte 2-35-8-16 (Existing Well)Pad Location: NESE SEC.35, TES, R16E, S.L.B.&M.

, ,,

Page 20: NEWFIELD - Utah

Monument Butte P-36 (Proposed Well)Monument Butte 2-38 (Existing Well)

I

\ (435)781·2501100 Nortti Vernal Ave, M, Utah 64070

Monument Butte P-3641-16 (Proposed Well)Monument Butte 2-35-8-16 (Existing Well) ,. .

Pad Locadon: NESE SEC. 35, TSS, R16E, S.L.B.&M.e i ;

Page 21: NEWFIELD - Utah

r

Monument Butte P-38 (Proposed Wed)Monument Butte 2.35 (Existing Well)

ExistingGas Plpeline

Leget d?«v-Sfgg Ex

Ja5.-µ., fa\ (435)781-2501

iso mm vemsAs wmai,utanstoreMonument Butte P-36-8-16 (Proposed Well)Monument Butte 2-35-8-16 (Existing Well)

, ..

Pad Location: NESE SEC. 35, TBS,Ri6E, S.L.B.&M.5 I i

Page 22: NEWFIELD - Utah

Ia a , , . . a a r • s 4 a r i e n • s a i NewlleidWein

LumienBaniss ipud

s'eliitiegialiltsetlustia755191149 wmmtiocm¢esw.»,.aneg oiwa

1-.1 H -bH I .< i• Pre*Apo..mm:aas/ watertimmenwel

15 16 14 11 li 11 li 15 14 7 19 17 18 ti 14 11 18 17 in ty 14 9:

Termormeral.ne..e

i ,,,

- -a u..namser armtki

21 12 23 M 10 W 21 27 21 $s rå ct 21 21 21 24 1123 14

diN b - 11 N

. .. . . -- H resseena

n rr a aas

la an tusiendres

a, y•A . ab VA 3 st si il aa

a su a e3

-----" I SS 16E

w a As si .3 sÍnd.3,sh

S .

'-9.7 . "/. • s ·« · (, ars.• A " 4•s

--* / / r .4

• •Al

¢., ' la a y A 28' A d A .3 A Ar

Af ?A A / g , AAAA AA AA AAAA •A ,

Es '.g N tÊtÔÐ 1 6Ë6 b 1 i

/sts y

4e g+h ' h " A / A t.A AAAAAAAAAAAAA.E- A %%5494 rÚ¾AA/ AAÇ,AAAAA/ * n i 1 sti .g m. A 9As k A9 'Assi- A./,A:£ J.st 4,,¢.95.A f•, 4.

. • / /•• • r ·7· • 79 +

ni 444 m ,rbraa sa L LAs.L sk 95J..5. to / sh J

• ap asah A 4 T Aso 44, * ry h/N a ½.rail a pguk 49 gdt 10 N 21 N g W H D

k• • on 21 sh 41

rA sin as tr ae rÌ. a m ro m ar n a is . x/a n n u n

- 21 El 36 M il 12 23 M 30 3& 11 N 31 11

NEWPIELD

MOckt UNwNS

I | Ill

ip 11 12 ) i & TI

IW'J.i. L

Page 23: NEWFIELD - Utah

1114 1 16 -l

i TI 9339 i 13DHNe a

I F L

rL em

lonument Initeilonumeni utte ( nat

Monument Butte P-36 (Proposed Well)Monument Butte 2-35 (Existing Well)

61I 1 43J

111 117)

39

MI 2

-7733N

150 North Wrnal Aue Wrnet Utall 84076Monument Butte P-30-8-iG (Proposed Well)Monument Butte 2-35-8-16 (Existing Well) ,..

- Exhibit "B'Pad Location: NESE SEC. 35, TES, R16E, S.L.B.&M.i i

Page 24: NEWFIELD - Utah

2-M SYSTEMBlowout Prevention Equipment Systems

II

I

II I

EXHIBIT

Page 25: NEWFIELD - Utah

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 01/31/2008 API NO. ASSIGNED: 43-013-33894

WELL NAME: MON BUTTE ST P-36-8-16

OPERATOR: NEWFIELD PRODUCTION ( N2695 ) PHONE NUMBER: 435-646-3721

CONTACT: MANDIE CROZIER

PROPOSED LOCATION: INSPECT LOCATN BY: / /

NESE 35 OSOS 160E Tech Review Initials DateSURFACE: 2073 FSL 0646 FEL

BOTTOM: 1319 FSL 0000 FWLie SU Engineering

COUNTY: DUCHESNE GeologyLATITUDE: 40.07282 LONGITUDE: -110.0788

UTM SURF EASTINGS:578554 NORTHINGS: 4436036 Surface

FIELD NAME: MONUMENT BUTTE ( 105 )

LEASE TYPE: 3 - State

LEASE NUMBER: ML-22061 PROPOSED FORMATION: GRRV

SURFACE OWNER: 1 - Federal COALBED METHANE WELL? NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[] Ind[] Sta[] Fee[]Unit: MONUMENT BUTTE (GR D)

(No. B001834 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception

(No. 43-10136 ) /Drilling Unit

RDCC Review (Y/N)Board Cause No: 2/3 6(Date:Eff Date: jp

Fee Surf Agreement (Y/N) Siting:

LAR Intent to Commingle (Y/N) /' R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS:

Page 26: NEWFIELD - Utah

MON BUTIE NE FE3

I

MON BIrril MON BR MON BUTIEFEDNE 13 26 FED NE 14-26

MON BirrIE - MAMONIIME BOLLWEEV11 FEDII-26ABUTTEffD 16 e FED 26 24

MONUMENT

TES R E _ __ _ _ --- - - - -MBST

ALMON FED

FEDERALMONumNT

IA 35 A BUTTI 4 361¾ A FED3A-39

MONUMENTBUTTE FED4A-35R

BHL HL - - - - -MONUMENT BUTTE (GR "D") LINIT Iss '6*'

MON BUTTE MON BUTIE ETATE 5-36

FEDM-35-814 FEDERAL FEDK-35-8-16 AFEDERALG35 g_gg&

MONUMENT I 35 A MONUMENT FED 8 35FED 8 34• MONUMENTFED8 35

BHL

BHLN-3 16

MONLDIENT M 5 8 16

L 5 16

5 8-16O3581G BilTYEAN3551G

MON BUTTESTP368E6%AL 135 A

MON FED 9 34MON BUTTE MB FED 0358 16 MONUMENTFED O 35 8 16 FEDERAL 12 15 BLITTE ET

MONUMENT FEDERAL +35 FEDERAL ID 35N-36 8 16

FED 9 34 MON StiTTE MO N SUTIT ST ATI 12 36

FED N-35-G-16 FED L 35 S-L6

BHL-- ¯ ¯

BHL P 35 8 1635 8-16

MON FED MONUMENT BUTTE FIELDg-35 A CAUSE: 28-1(B) I 10-25-

FEDERAL I-35M UMENIBUTTEUNIT16-H ' +

NUMENT BUTIE FED 16-¾ FEDERAI, MONUMENT14-35 BUTFE FED15-35

PEAK 3LTATE3-1 MONBUTTT STATilA-2 MONU T

A 2 2 9 16 •h

Blif7E FI D 4-1

MON BUTTEIA 2 9 16

I

OPERATOR: NEWFIELD PROD CO (N2695)UTAH

SEC:35 T.8S R.16E DNRFIELD: MONUMENT BUITE (105)

COUNTY: DUCHESNEWeRs Status

CAUSE: 213-1(B) / 10-25-2006 y GAS INJECTIONO GAS STORAGE OIL, GAS & MINING× LOCATION ABANDONED

NEW LOCATION NField Status Unit Status PLUGGED & ABANDONEDABANDONED

(¯ )EXPLORATORY PRODUCING GASACTIVE GAS STORAGE PRODUCING OILNF PP OlL g SHUT-IN GASCOMBINED NF SECONDARY

+ SHUT-IN OIL W EINACTIVE NDING ):( TEMP. ABANDONEDPROPOSED

PP GAS O TEST WELL

RM TED PP GEOTHERML & WATER INJECTION SPP OIL g WATER SUPPLY PREPARED BY:DIANA MASONSECONDARY WATER DISPOSAL DATE:11-FEBRUARY-2008TERMINATED

Page 27: NEWFIELD - Utah

Application for Permit to DStatement of Basis

2/28/2008 Utah Division of Oil, Gas and Mining Page 1

APD No API WellNo Status Well Type Surf Ownr CBM695 43-013-33894-00-00 OW F NoOperator NEWFIELD PRODUCTION COMPANY Surface Owner-APDWell Name MON BUTTE ST P-36-8-16 Unit MONUMENT BUTTE (GR D)Field MONUMENT BUTTE Type of WorkLocation NESE 35 8S 16E S 2073 FSL 646 FEL GPS Coord (UTM) 578554E 4436036N

Geologic Statement of BasisNewfield proposes to set 290' of surface casing at this location. The depth to the base of the moderately salinewater at this location is estimated to be at a depth of 500'. A search of Division of Water Rights records showsno water wells within a 10,000 foot radius of the center of Section 36. The surface formation at this site is theUinta Formation. The Uinta Formation is made up of interbedded shales and sandstones. The sandstones aremostly lenticular and discontinuous and should not be a significant source of useable ground water. Surfacecasing should be extended to the base of the moderately saline ground water.

Brad Hill 2 28/2008APD Evaluator Date / Time

Surface Statement of BasisThe Federal Government is the surface owner at the proposed well site. The operator is responsible forobtaining all required rights-of-way and surface permits from the BLM.

Brad Hill 2/28/2008Onsite Evaluator Date / Time

Conditions of Approval / Application for Permit to DrillCategory Condition

Surface casing shall be extended to

Page 28: NEWFIELD - Utah

2008-02 Newfiek ST P-36 16Casing Scheme

Surface ,

12C @

8-5/8" SurfaceMW 8.4 290. MDFrac 19.3 290. TVD

I

I

I

I

I

I

I

I

I

I

5-1/2" ProductionMW 8.4 6520. MD

6375.

Page 29: NEWFIELD - Utah

BOPE REVIEW

Well Name Newfield Mon Butte ST P-36-8-16 API 43-013-33894

INPUTWell Name Newfield Mon Butte ST P-36-8-16 API 43-013-33894

String 1 String 2 String 3 String 4Casing Size (") 8 5/8 5 1/2Setting Depth (TVD) 290 6375Previous Shoe Setting Depth (TVD) 0 290Max Mud Weight (ppg) 8.4 8.4BOPE Proposed (psi) 0 2000Casing Internal Yield (psi) 2950 4810Operators Max Anticipated Pressure (psi) 1800 5.4 ppg

#NAME?Calculations string1 a sia -

Max BHP [psi] .052*Setting Depth*MW= 127

BOPE Adequate For Drilling And Setting Casing at Depth?MASP (Gas) [psi] Max BHP-(0.12*Setting Depth) = 92 NOMASP (Gas/Mud) [psi] Max BHP-(0.22*Setting Depth) = 63 NO % (le - A e 1

*Can Full Expected Pressure Be Held At Previous Shoe?Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous Shoe Depth) = 63 NORequired Casing/BOPE Test Pressure 290 psi*Max Pressure Allowed g Previous Casing Shoe = 0 psi *Assumes 1psilft frac gradient

Calculations String 2 5 1/2 "

OMax BHP [psi] .052*Setting Depth*MW = 2785

BOPE Adequate For Drilling And Setting Casing at Depth?MASP (Gas) [psi] Max BHP-(0.12*Setting Depth) = 2020 NOMASP (Gas/Mud) [psi] Max BHP-(0.22*Setting Depth) = 1382 YES

*Can Full Expected Pressure Be Held At Previous Shoe?Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous Shoe Depth) = 1446 NO - We Ayes egefed press ± tooop (en - 2T « Msfe esodleeRequired Casing/BoPE Test Pressure 2000 psi )*Max Pressure Allowed g Previous Casing Shoe = *Assumes 1psilft frac

Page 30: NEWFIELD - Utah

O OWell narne: 2008-02 Newfield ST P-36-8-16Operator: Newfield Production CompanyString type: Surface Project ID:

43-013-33894Location: Duchesne County

Design parameters: Minimum design factors: Environment:Collapse Collapse: H2S considered? No

Mud weight: 8.400 ppg Design factor 1.125 Surface temperature: 75 °FDesign is based on evacuated pipe. Bottom hole temperature: 79 °F

Temperature gradient: 1.40 °F/100ftMinimum section length: 290 ft

Burst:Design factor 1.00 Cement top: 43 ft

BurstMax anticipated surface

pressure: 255 psiInternal gradient: 0.120 psilft Tension: Non-directional string.Calculated BHP 290 psi 8 Round STC: 1.80 (J)

8 Round LTC: 1.80 (J)No backup mud specified. Buttress: 1.60 (J)

Premium: 1.50 (J)Body yield: 1.50 (B) Re subsequent strings:

Next setting depth: 6,375 ftTension is based on buoyed weight. Next mud weight: 8.400 ppgNeutral point: 253 ft Next setting BHP: 2,782 psi

Fracture mud wt: 19.250 ppgFracture depth: 290 ftInjection pressure: 290 psi

Run Segment Nominal End True Vert Measured Drift InternalSeq Length Size Weight Grade Finish Depth Depth Diameter Capacity

(ft) (in) (Ibs/ft) (ft) (ft) (in) (ft3)1 290 8.625 24.00 J-55 ST&C 290 290 7.972 103.7

Run Collapse Collapse Collapse Burst Burst Burst Tension Tension TensionSeq Load Strength Design Load Strength Design Load Strength Design

(psi) (psi) Factor (psi) (psi) Factor (Kips) (Kips) Factor1 127 1370 10.826 290 2950 10.17 6 244 40.12 J

Prepared Helen Sadik-Macdonald Phone: 801-538-5357 Date: February 19,2008by: Div of Oil,Gas & Minerals FAX: 801-359-3940 Salt Lake City, Utah

Remarks:Collapse is based on a vertical depth of 290 ft, a mud weight of 8.4 ppg The casing is considered to be evacuated for collapse purposes.Collapse strength is based on the Westcott, Dunlop & Kemler method of biaxial correction for tension.

Burst strength is not adjusted for tension.

Engineering responsíbility for use of this design willbe that of the

Page 31: NEWFIELD - Utah

© 9Well name: 2008-02 Newfield ST P-36-8-16Operator: Newfield Production CompanyString type: Production Project ID:

43-013-33894Location: Duchesne County

Design parameters: Minimum design factors: Environment:Collapse Collapse: H2S considered? No

Mud weight: 8.400 ppg Design factor 1.125 Surface temperature: 75 °FDesign is based on evacuated pipe. Bottom hole temperature: 164 °F

Temperature gradient: 1.40 °F/100ftMinimum section length: 1,500 ft

Burst:Design factor 1.00 Cement top: 123 ft

BurstMax anticipated surface

pressure: 1,379 psiInternal gradient: 0.220 psilft Tension: Directional Info - Build & HoldCalculated BHP 2,782 psi 8 Round STC: 1.80 (J) Kick-off point 700 ft

8 Round LTC: 1.80 (J) Departure at shoe: 1257 ftNo backup mud specified. Buttress: 1.60 (J) Maximum dogleg: 1.5 °/100ft

Premium: 1.50 (J) Inclination at shoe: 13.54 °

Body yield: 1.50 (B)

Tension is based on buoyed weight.Neutral point: 5,687 ft

Run Segment Nominal End True Vert Measured Drift InternalSeq Length Size Weight Grade Finish Depth Depth Diameter Capacity

(ft) (in) (Ibs/ft) (ft) (ft) (in) (ft3)1 6520 5.5 15.50 J-55 LT&C 6375 6520 4.825 871.3

Run Collapse Collapse Collapse Burst Burst Burst Tension Tension TensionSeq Load Strength Design Load Strength Design Load Strength Design

(psi) (psi) Factor (psi) (psi) Factor (Kips) (Kips) Factor1 2782 4040 1.452 2782 4810 1.73 86 217 2.52 J

Prepared Helen Sadik-Macdonald Phone: 801-538-5357 Date: February 19,2008by: Div of Oil,Gas & Minerals FAX: 801-359-3940 Salt Lake City, Utah

Remarks:Collapse is based on a vertical depth of 6375 ft, a mud weight of 8.4 ppg The casing is considered to be evacuated for collapse purposes.Collapse strength is based on the Westcott, Dunlop & Kemler method of biaxial correction for tension.

Burst strength is not adjusted for tension.Collapse strength is (biaxially) derated for doglegs in directional wells by multiplying the tensile stress by the cross section area to calculate a

Engineering responsibility for use of thisdesign willbe that of the

Page 32: NEWFIELD - Utah

S OUnited States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN REPLY REEER TO:3160(UT-922)

February 11, 2008

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Monument Butte Unit,Duchesne County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey Coulthard, Utah State Office, Bureau of LandManagement, the following well is planned for calendar year 2008within the Monument Butte Unit, Duchesne County, Utah.

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-013-33894 Mon Butte St P-36-8-16 Sec 35 TOBS R16E 2073 FSL 0646 FELBHL Sec 36 TO8S R16E 1319 FSL 0000 FWL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Monument Butte UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

Page 33: NEWFIELD - Utah

O ONEWFIELD

ROCKY MOUNTAINS

February 11, 2008

State of Utah, Division of Oil, Gas and MiningATTN: Diana Mason et

PO Box 145801Salt Lake City, UT 84114-5801

RE: Directional DrillingMonument Butte State P-36-8-16Monument Butte UnitUTO80P49-8861680Surface Hole: T8S R16E, Section 35: NE/4SE/4

2073' FSL 646' FELBottom Hole: T8S R16E, Section 36

1319' FSL O' FWLDuchesne County, Utah

Dear Ms. Mason;

Pursuant to the filing of Newfield Production Company's ("NPC") Application for Permit to Drill datedJanuary 14, 2008, a copy of which is attached, for the above referenced well, and in accordance with Oiland Gas Conservation Rule R649-3-11, NPC hereby submits this letter as notice of our intention todirectionally drill this well.

The surface hole location and bottom hole location of this well are both within the boundaries of theMonument Butte Federal Unit UTO80P49-8861680. Newfield certifies that it is the Monument Butte UnitOperator and all lands within 460 feet of the entire directional well bore are within the Monument ButteUnit.

NPC is permitting this well as a directional well in order to minimize surface disturbance. By directionallydrilling from the referenced surface location, NPC will be able to utilize the existing roads and pipelines inthis area.

NPC hereby requests our application for permit to drill be granted pursuant to R649-3-11. If you have anyquestions or require further information, please do not hesitate to contact the undersigned at 303-382-4444or by email at [email protected]. Your consideration of this matter is greatly appreciated.

Sincerely,NEWFIELD PRODUCTION COMPANY

Roxann EvelandLand Associate

FEB19 2008Div.0FOILGZiB!EG

Newfleid ExploratlonCompany 1401 17th Street, Suite 1000 Denver, CO 80202 (303) 893-0102 Fax (303)

Page 34: NEWFIELD - Utah

STATE OF UT

DIVISIONOF OIL, GAS AND MINING 5.LEASEDESIGNATIONANDSERIALNO.ML-22061

6. IF INDIAN,ALLOTTEEOR TRIBENAME

APPlilGATÏONFOR PERMIT TO DRILL,DEEPEN N/Ala T Eoinäib: DRILL | x |DEEPEN i | 7.UNTTAOREFMENTNAME

lb. TYPEOËWEi,L Monument ButteSINGLE MULTIPLE 8. FA.RMOR LEASENAME

op | x | GAS | OTHER ZONE X |ZONE | | NA2. NAME OF ÓPERATOR 9. WELL NO.

ÑewfieldProduction Company Monument Butte State P-36-8-163. ADDRESS AND TÈLEPHONENUMBER: 10.ÈIELD AND POOL OR WILDCAT

Röde #3 Box 3630, Myton, UT 84052 Phone: (435) 646-3721 Monument Butte4 LOCATION OF WELL (FOOTAGE) . n. graigra. SECOON, TOWNSHŒ, MNGE, MEmmAN:

At surace NE/SE 2073' FSL 646' FEL Sec. 35, TSS, RI6EAt pròposed Producing zone 1319' FSL O' FWL Sec. 36, TSS, R16E NE/SE

Sec. 36, TSS, R16E14. DISTANCE IN MILES ANDDIRECTION FROM NEAREST TOWNOR POST OFFICE* 12. Coubty 13. STATE

Approximately 13.3 miles southwest of Myton, UT Duchesne UT15. DISTANCE FRÙ¾pgO OSED*LOCATION TO NEAREST PROPERTY 16.NO. OF ACRES IN LEASE 17 NO. OF ACRES ASSIGNED TO THIS WELL

OR LEASE LINFJ.FT.0Mioto neamst dds.wit line, if any)

Appro(0' f)Ise line and 1321' flunit line 640.00 2018 DISTANCE FROM PROPOSED LOCATION*TO NEAREST WELL, 19. PROPOSED DEPTH 20. ROTARY OR CABLETOOLS

, OR APPLIED FOR ON THIS LEASE, FT.

pproxunately 1431' 6375' RotaryShow whetherbF, RT, GR, etc.) 22. APPROX. DATE WORKWILL START*

5520' GL 2 nd Quarter2008ROPOSED CASING AND CEMENTING PROGRAM

EpËÍIÒ¼ . « SIZE OF CASING WEIGHTIFoDT SETTING DEPTH QUANTITY OF CEMENT

Id 1/4. . 8 5/8 24# 290' 155 sx +Ï-10%77/ 5 1/2 15.5# TD 275 sx fead followed by 450 sx tail

See Detail Below

DESCRIBE PROPOSED PROGRAM: if proposal is to deepen, give date on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on

subsurfacefocations and measured and true vertical depths. Give blowout preventer program, if any.*Tine actual cement volumes will be calculated off of the open hole logs, plus 15% excess:

ÜÉPAËE IPÈ - ISS sx Class G Cement +/I 10%, w/ 2% CaCl2 & 1/4#/sk Cello-flakeWeight: 15.8 PPG YIELD: 1.17 Cu Ft/sk H2O Req: 5 gallsk

Lead: Premium Lite H Cement+ 31bs/sk BA-90 + 3% KCI +.25 lbs/sk Cello Flake + 2 lbs/sk Kol Seal +

10% Bentonite + .5% Sodium MetasilicateeÏght: 11.0 PPG YIELD: 3.43 Cu Ft/sk H2O Req: 21.04 gallsk

Tail: 50-50 Poz-Class G Cement + 3% KCl + .25 Ibs/sk Cello Flake + 2% Bentonite + .3% Sodium Metasilicate

Weight. 14.2 PPG YIELD: 1.59 Cu Ft/sk H2O Req: 7.88 gal/sk

Regulatory Specialist one: 1/14/2008M$ndie trozier

space for State use only)

I N Ier Assigned: APPROVAL:

FEB19 2008*See Instructions On Reverse Sicle D FO!L

Page 35: NEWFIELD - Utah

e

T8S, Ri6 E. S. L.B.&M. xifrizzoPsauverlor comwr '

WELLLOCATION,MONUMENTBUTTES8956'W - 80.04 (G.L.O.) N8959'W - 79.96 (G.L.O.) P-36-8-16, LOCATED AS SHOWN IN THENE 1/4 SE 1/4 OF SECTION 35, TSS,R16E, S.L.B.&M. DUCHESNE COUNTY, UTAH.

o o oo o- o- ---- --

-- -- -- - - ---- -- -- --. - o

WELLLOCAMON:MONUMENTBUTTEP-J6-8-16 B A R SC A LE

ELEV EX/SK GRADED GROUND = 5520'

Nrass Cap Note:

2. The bottom of hole footages are1319 FSL & O FWL of Section 36.

Ho/e

THIS IS TO CERTIFYTHA Ag WASDR/was PREPARED FROM FIELD OF A RVEYSzwoDW MADE BY ME OR UN THAT

THE SAME ARE TRU RRECT T T T OFof Ho/e MY KNOWLEDGEAN gl .No.189377

STACY W.

Isto

R STE D NL

E OFBrass Cap

SB9°59'1J"E- 26J9.JO' (Meas.) Brass CP S89°57'E (G.L.O.) TRI STATELANDSURVEYING& CONSULTING$89 57'E (G.L.O.)

180 NORTH VERNALAVE. - VERNAL,UTAH 84078(435) 781-2501

IMONUMENTÐUTTEP-J6-8-16 DATE SURVEYED'= SECTION CORNERS LOCATED (Surface Location) NADBJ 09-26-07 SURVEYEDBY: T.H.

LAT/7UDE =40° 04' 22,18" DATE DRAWN:

BASIS OF ELEV; LONG/TUDE=110° 04' 46.30" 10-24-07 DRAWNBY: F.T.M.

U.S.G.S. 7-1/2 min QUAD (MYTON SE) REVISED: SCALE: 1" =

Page 36: NEWFIELD - Utah

State UtahDEPARTMENT OF NATURAL RESOURCES

MICHAEL R. STYLERExecutiveDirector

JON M. HUNTSMAN, JR.DIVISiOn of Oil Gas and Mining

Governor JOHN R. BAZADivision Director

GARY R. HERBERTLieutenant Governor

February 25, 2008

Newfield Production CompanyRt. #3, Box 3630Myton, UT 84052

Re: Monument Butte State P-36-8-16 Well, 2073' FSL, 646' FEL, NE SE, Sec. 35,T. 8 South, R. 16 East, Bottom Location 1319' FSL, 00' FWL, SW SW, Sec. 36,T. 8 South, R. 16 East, Duchesne County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq., UtahAdministrative Code R649-3-1 et seq., and the attached Conditions of Approval, approval to drillthe referenced well is granted.

This approval shall expire one year from the above date unless substantial and continuousoperation is underway, or a request for extension is made prior to the expiration date. The APIidentification number assigned to this well is 43-013-33894.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Duchesne County AssessorBureau of Land Management, Vernal OfficeSITLA

UTAH

DNR

1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone (801) 538-5340 • facsimile (801) 359-3940 • TTY (801) 538-7458 • wwwogm.utah.gov OIL, GAS &

Page 37: NEWFIELD - Utah

O OOperator: Newfield Production CompanyWell Name & Number Monument Butte State P-36-8-16

API Number: 43-013-33894Lease: ML-22061

Location: NE SE Sec.1 T. 8 South R. 16 EastBottom Location: SW SW Sec. 36 T. 8 South R. 16 East

Conditions of Approval1. General

Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsThe operator is required to notify the Division of Oil, Gas and Mining of the followingaction during drilling of this well:

• 24 hours prior to cementing or testing casing - contact Dan Jarvis• 24 hours prior to testing blowout prevention equipment - contact Dan Jarvis• 24 hours prior to spudding the well - contact Carol Daniels• Within 24 hours of any emergency changes made to the approved drilling

program - contact Dustin Doucet• Prior to commencing operations to plug and abandon the well - contact Dan

Jarvis

The operator is required to get approval from the Division of Oil, Gas and Mining beforeperforming any of the following actions during the drilling of this well:

• Plugging and abandonment or significant plug back of this well - contact DustinDoucet

• Any changes to the approved drilling plan - contact Dustin Doucet

The following are Division of Oil, Gas and Mining contacts and their telephone numbers(please leave a voice mail message if the person is not available to take the call):

• Dan Jarvis at: (801) 538-5338 office (801) 942-0871 home• Carol Daniels at: (801) 538-5284 office• Dustin Doucet at: (801) 538-5281 office (801) 733-0983 home

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational

Page 38: NEWFIELD - Utah

O OPage 243-013-33894February 25, 2008

4. Compliance with the State of Utah Antiquities Act forbids disturbance of archeological,historical, or paleontological remains. Should archeological, historical or paleontologicalremains be encountered during your operations, you are required to immediately suspendall operations and immediately inform the Trust Lands Administration and the Divisionof State History of the discovery of such remains.

5. Compliance with the Conditions of Approval/Application for Permit to Drill outlined inthe Statement of Basis. (Copy Attached)

6. In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shallsubmit a complete angular deviation and directional survey report to the Division within30 days following completion of the well.

7. State approval of this well does not supersede the required federal approval, which mustbe obtained prior to

Page 39: NEWFIELD - Utah

NE WFIELD

Route #3 Box 3630Myton, Utah 84052

(435) 646-4825, FAX: (435) 646-3031

March 26, 2008

Bureau of Land ManagementAttn: Phyllis Phillips170 South 500 EastVernal, Utah 84078-2799

RE: Notice of APD Deficiencies.South Wells Draw Fed. X-4-9-16Mon. Butte State P-36-8-16

Dear Phyllis:

Enclosed find the correct plats (in triplicate) as per your request. Also included is the topform page for all of the APD's with the amended downhole footages. These footagesshould match what was submitted on the proposed directional drill plans. Everything elsein the APD's will remain the same. If you have any questions, feel free to give eitherDave Allred or myself a call.

Mandie CrozierRegulatory Specialist

meenclosures

cc:~ State of UtahDivision of Oil, Gas & Mililèg

RECEIVEDMAR27 2008

DIV.0FOIL,GAS&

Page 40: NEWFIELD - Utah

FORM 3

STATE OF UTAH

DIVISION OF OIL, GAS AND MINING 5.LEASEDESIGNATIONANDSERIALNO.ML-22061

6. IF INDIAN, ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL, DEEPEN N/Ala.TYPEOFWORK DRILL | x |DEEPEN I I 7.UNITAGREEMENTNAME

lb. TYPE OF WELL Monument ButteSINGLE MULTIPLE 8. FARM OR LEASE NAME

OIL | X | GAS | OTHER ZONE X ZONE NA2. NAME OF OPERATOR 9. WELL NO.Newfield Production Company Monument Butte State P-36-8-163. ADDRESS AND TELEPHONE NUMBER: 10. FIELD AND POOL OR WILDCAT

Route #3 Box 3630, Myton, UT 84052 Phone: (435) 646-3721 Monument Butte4. LOCATION OF WELL (FOOTAGE) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:

At Surface NE/SE 2073' FSL 646' FEL Sec. 35, TSS, R16EAt proposed Producing Zone 1117' FSL 188' FWL Sec. 36, T8S, R16E Sec. 36, T8S, R16E

14. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12. County 13. STATE

Approximately 13.3 miles southwest of Myton, UT Duchesne UT15. DISTANCE FROM PROPOSED* LOCATION TO NEAREST PROPERTY 16. NO. OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

OR LEASE LINE, FT.(Also to nearest drlg. unit line, ifany)

Approx. 188' f/lse line and 1132' flunit line 640.00 2018. DISTANCE FROM PROPOSED LOCATION* TO NEAREST WELL, 19.PROPOSED DEPTH 20. ROTARY OR CABLE TOOLS

DRILLING, COMPLETED, OR APPLIED FOR ON THIS LEASE, FT.

Approximately 1431' 6375' Rotary21. ELEVATIONS (Show whether DF, RT, GR, etc.) 22. APPROX. DATE WORK WILL START*

5520' GL 2 nd Quarter200823. PROPOSED CASING AND CEMENTING PROGRAMSIZE OF HOLE SIZE OF CASING WEIGHT/FOOT SETTING DEPTH QUANTITY OF CEMENT

12 1/4 8 5/8 24# 290' 155 sx +/- 10%7 7/8 5 1/2 15.5# TD 275 sx lead followed by 450 sx tail

See Detail Below

DESCRIBE PROPOSED PROGRAM: If proposal is to deepen, give date on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on

subsurface locations and measured and true verticaldepths. Give blowout preventer program, if any.*The actual cement volumes will be calculated off of the open hole logs, plus 15% excess:

SURFACE PIPE - 155 sx Class G Cement +/I 10%, w/ 2% CaCl2 & 1/4#/sk Cello-flakeWeight: 15.8 PPG YIELD: 1.17 Cu Ft/sk H2O Req: 5 gal/sk

LONG STRING - Lead: Premium Lite II Cement + 3lbs/sk BA-90 + 3% KCl + .25 lbs/sk Cello Flake + 2 lbs/sk Kol Seal +

10% Bentonite +.5% Sodium Metasilicate

Weight: 11.0 PPG YIELD: 3.43 Cu Ft/sk H2O Req: 21.04 gal/sk

Tail: 50-50 Poz-Class G Cement + 3% KCl +.25 lbs/sk Cello Flake + 2% Bentonite +

.3% Sodium MetasilicateWeight .2 PPG YIELD: 1.59 Cu Ft/sk H2O Req: 7.88 gal/sk

2N

e & Signat itle: Regulatory Specialist Date: 3/25/2008

(This space for State use only)

API Number Assigned of 33 29 tj Appmvedby theUtahDivisionof ' - TGOR-Auk

Oil,Gas and Mining Date: #2 i- 2A>¶Initiais: y RECEIVED

f 9 i 0 y Date: (')9 m MM27 2008LP/3f711Ÿ By•

..e DIXOFOlL,GAS&MINING|-/Û0 7 OI Ñ *See Instructi n Reverse

Page 41: NEWFIELD - Utah

IR)1 KSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 01/31/2008 API NO. ASSIGNED: 43-013-33894

WELL NAME: MON BUTTE ST P-36-8-16

OPERATOR: NEWFIELD PRODUCTION ( N2695 ) PHONE NUMBER: 435-646-3721

CONTACT: MANDIE CROZIER

PROPOSED LOCATION: INSPECT LOCATN BY: / /NESE 35 080S 160E Tech Review Initials DateSURFACE: 2073 FSL 0646 FEL

BOTTOM: 1117 FSL 0188 FWL Engineering

COUNTY: DUCHESNEGeology

LATITUDE: 40.07282 LONGITUDE: -110.0788

UTM SURF EASTINGS:578554 NORTHINGS: 4436036 Surface

FIELD NAME: MONUMENT BUTTE ( 105 )

LEASE TYPE: 3 - State

LEASE NUMBER: ML-22061 PROPOSED FORMATION: GRRV

SURFACE OWNER: 1 - Federal COALBED METHANE WELL? NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[] Ind[] Sta[] Fee[]Unit: MONUMENT BUTTE (GR D)

(No. BOOl834 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception

(No. 43-10136 )Drilling Unit

RDCC Review (Y/N)Board Cause No:(Date: ) Eff Date:

Fee Surf Agreement (Y/N) Siting:

Intent to Commingle (Y/N) R649-3-11. Directional Drill

COMMENTS:

Page 42: NEWFIELD - Utah

HAWKtxt (GKþ UNII ami BHL Q* Û R-25-8-16

O255m

MB NE FED R 2E B $6BOL1.WEEVILFET) 26 24 MON StfT11 MON BUTIT NE MON BUTTE FED15 25

MN BR FED 15-26 &

FED NE 1+26 MONUMENTBUly? FEDa 29

TSS Ri6EMBST F 3€r8 isMONUMENT

MB FED ggyyMONIIMENT NON BUTET MONUMEMY

BRITE 3A 35M MON FED lA45

4 8 16 MON 80SF 1A-36

STATE L &MONUMEN1FED3A 35 BHL

s.E BHLI-35-B-iG F $

FEDERAL 6 55 MON BUTIE FED K 351 Mi ETATE 5 36 MONUMENT MON BUTTE EST.

E MONN A BUTTE 6 3G MON MO BMON BLTITE FEDMIESM

BHL BHLN-¼ S is [ 8 16

MONUMENTL 8-36

ES Ric: TATE1BRITE 7N-35 5 E6 K 15 a is E 5 RECH IVERNMENT 3 (2)

MON BLTT115TP 36 8 16 MONUMENT StfIll STATE1 M MONUMEWEFEDERA1 1-35 ST N 36 8 16 a gyyyy gy gg.gg MON B TIE E

MON BUTTE FED N 35-8 16 ST $ Mri-t6 gFEDERAL+35 STATE [2 m MONUMEN

BHL3GB IS

MON FED LE1E CAtJSE 113 1 / 8-14 1987

Bis $1ATE 36MOND FTE MONUMENT

MONUMENT a A BUTTE ST 16 36RMONUMENT A BWFIIgr 1+¾ SFATE 15 ¼

FEDERAL BUTTEFED 15 35 FEDER AI. 1 15 ggggggy14-35 * BWTIE57 14 36

MONUMENT BUTTE (GR "D") UNITMONUMENT BUTTE FIFLP

ISS Ri6E

MATE3-2 MON BWTTI ETATE LA 2 MONUMFEDERAL E-I MONUMENT

A 2 2-9 36 e & BUTIT (ED +1 a FED 3LU FEDML 2 i

JONAH FED ll 9

JONAH (GR) UNIT

MONUMENT BUTTE UNIT

OPERATOR: NEWFIELD PROD CO (N2695)UTAH

SEC: 36 T.8S R.16E

FIELD: MONUMENT BUTTE (105)

COUNTY: DUCHESNEWells Status

CAUSI: 213-1 / 1&1987 GAS IN]ECilONO GAS STORAGE OIL, GAS & MININGx LOCATION ABANDONED

NEW LOCATION NField Status Unit Status PLUGGED & ABANDONEDABANDONED EXPLORATORY PRODUCING GASACTIVE GAS STORAGE e PRODUCING OILNF PP OIL

-g- SHUT-IN GASCOMBINED NF SECONDARY -e- SHUT-IN OIL W EINACTIVE PENDING

p( TEMP. ABANDONEDPROPOSED PI IL

o TEST WELLO

TED G THERML WATER INJECTION SPP OIL g WATER SUPPLY PREPARED BY: DIANA MASONSECONDARY WATER DISPOSAL DATE: 27-MARCH-2006TERMINATED

Page 43: NEWFIELD - Utah

T8S, Ri6E, S.L.B.&M. NEIVFIELDPRODUCTIONCOMPMY

WELL LOCATION, MONUMENT BUTTES89 56'W - 80.04 (G.L.O.) N89 59'W - 79.96 (G.L.O.) P-36-8-16, LOCATED AS SHOWN IN THENE 1/4 SE 1/4 OF SECTION 35, T8S,R16E, S.L.B.&M. DUCHESNE COUNTY, UTAH.

^o

-

^o

o o oO O - o

WELLLOCA710N:BAR SCALEMONUMENTBUT7E P- J6-8-16

ELEV EX/SE GRADED GROUND = 5520'

Nteto Note:

35scoss cop

2. The bottom of hole footages are1117 FSL & 188' FWL of Section 36,

Top of T8S, R16E, S.L.B.&M.Ho/e

THIS IS TO CERTIFY THA WASDmwNG PREPARED FROM FIELD RVEYS

i wisoow MADE BY ME OR UN THATTHE SAME ARE TRU RRECT T TH T OFMY KNOWLEDGE AN I .No.189377

o i oSTACY W.

R RAD LA

1910ST TE OF G OFBross Cop

S89°59'13"E - 2639.39' (Meas.) * Brass Cop S89°57E (G.L.O.) TRI STATELANDSURVEYING& CONSULTINGS89 57E (G.L.O.) 180 NORTH VERNAL AVE. - VERNAL, UTAH 84078

(435) 781-2501

IMONUMENTBU7TE P-J6-8-16 DATE SURVEYED:= SECTION CORNERS LOCATED (Surface Location) NAD SJ 09-26-07 SURVEYEDBY: T.H.

LAT/TUDE =40° 04' 22.18" DATE DRAWN:

DRAWN BY: F.T.MBASIS OF ELEV; LONG/TUDE =110° 04' 46.30" 10-24-07

U.S.G.S. 7-1/2 min QUAD (MYTON SE) REVISED: SCALE: 1" = 1000'03-04-08

Page 44: NEWFIELD - Utah

NEWFIELD PRODUCTION COMPANYWELL PAD INTERFERENCE PLAT

MONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Pad Location: NESE Section 35, TBS, Ri6E, S.L.B.&M.N

Future Pit

2-35-8-16 (EX/ST/NG)

/S, P-36-8-16 (PROPOSED)

ExistingAccess

Edge ofExisting

Existing Road

TOP HOLE FOOTAGESP-J6-8-16 (PROPOSED)2073' ESL & 646' FEL BOTTOMHOLE FOOTAGES

P-36-8-76 (PROPOSED)1117' ESL & 188' EWL

Note:Bearings are based onGLO Information.

LATITUDE & LONGITUDERELATIVE COORDINATES Surface position of Wells (NAD 83)

From top hole to bottom hole WELL LATITUDE LONGITUDE

WELL NORTH EAST P-36-8-16 40 04' 22.18" 110° 04' 46.30"P-36-8-16 -956' 835' 2-35-8-16 40 04' 22.35" 110' 04' 46.47"

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 (435) 781--2501

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 Land Surveying, Inc.SCALE: 1" = 50' REVISED: L.C.S. 03-04-08 \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 45: NEWFIELD - Utah

NEWFIELD PRODUCTION COMPANYMONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Pad Location: NESE Section 35, TBS, R16E, S.L.B.&M.

ExistingAccess

STA. 2+9 -

P/T TÒËS0/Ls7DcgRii.E

E/0. 44J'

STA. 2+10 - f.ÑEdge of Toe ofExisting - F/// S/opePad

MeterShed

STA. 1+56

P-36-8-16

GRADE Note:

WELL HEAD: F/ore p/t is toEX/ST/NG GRADED be /ocated of

GROUND = 5520'MAXc ASL /eost 80' frorri

we// head.

STA. 0+20

L

ExistingStock P//e

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 ri State 6362 '"'-2

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 Land Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 46: NEWFIELD - Utah

NEWFIELD PRODUCTION COMPANYCROSS SECTIONS

MONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35--8-18 (Existing Well)

1" = 50' SM. 2+90

1" = so' S M. 2+10

EX/S T/NG F/N/SHEDGRADE GRADE

1" = 50' SM. 1+56

1" = so' SM. 0+20 ESTIMATEDEARTHWORKQUANTITIES(No Shrink or swell ad justments have been used)

(Expressed in Cubic Yards)

1TEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 140 140 ToPsoil is 0UNLESS OTHERWISE not included

PIT 400 0 in Pad Cut 400NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 540 140 130 400

SURVEYEDBY: T.H. DATE SURVEYED: 09-26-07 ri State 6"'> ""' 26°'

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 47: NEWFIELD - Utah

mO

U)

]>J>

¯O

zm

xist

ing

Roa

d

PAR

TSH

OU

SE

DO

GH

OU

SEW

ATE

RTA

NK

Ligh

tPl

ant

CA

TWA

LKR

IGB

ASE

Fuel

Line

156'

JDTA

NK

141

PIPE

TUB

15M

UD

PUM

PT

H

YEL

LOW

DO

DA

TA

Wat

erLi

ne

IllIs

o-II

II10

'W

/DEB

ENC

H

100'

N

Page 48: NEWFIELD - Utah

O OUnited States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN FŒPLY REEER TO:3160(UT-922)

March 31, 2008

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Monument Butte Unit,Duchesne County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey Coulthard, Utah State Office, Bureau of LandManagement, the following well's bottom hole location has changed(please see our memo dated February 11, 2008). The well is

planned for calendar year 2008 within the Monument Butte Unit,Duchesne County, Utah.

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-013-33894 Mon. St P-36-8-16 Sec 35 TOBS R16E 2073 FSL 0646 FELBHL Sec 36 TOSS R16E 1117 FSL 0188 FWL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Monument Butte UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

Page 49: NEWFIELD - Utah

O ONEWFIELD

ROCKY MOUNTAINS

April 14, 2008

State of Utah, Division of Oil, Gas and MiningATTN: Diana MasonPO Box 145801Salt Lake City, UT 84114-5801

RE: Directional DrillingMonument Butte State P-36-8-16Monument Butte UnitUTO80P49-8861680Surface Hole: T8S R16E, Section 35: NE/4SE/4

2073' FSL 646' FELBottom Hole: T8S RI6E, Section 36

1117' FSL 188' FWLDuchesne County, Utah

Dear Ms. Mason;

Pursuant to the filing of Newfield Production Company's ("NPC") Application for Permit to Drill datedMarch 25, 2008, a copy of which is attached, for the above referenced well, and in accordance with Oil andGas Conservation Rule R649-3-11, NPC hereby submits this letter as notice of our intention todirectionally drill this well.

The surface hole location and bottom hole location of this well are both within the boundaries of theMonument Butte Federal Unit UTO80P49-8861680. Newfield certifies that it is the Monument Butte UnitOperator and all lands within 460 feet of the entire directional well bore are within the Monument ButteUnit.

NPC is permitting this well as a directional well in order to minimize surface disturbance. By directionallydrilling from the referenced surface location, NPC will be able to utilize the existing roads and pipelines inthis area.

NPC hereby requests our application for permit to drill be granted pursuant to R649-3-11. If you have anyquestions or require further information, please do not hesitate to contact the undersigned at 303-382-4444or by email at [email protected]. Your consideration of this matter is greatly appreciated.

Sincerely,NEWFIELD PRODUCTION COMPANY

Roxann EvelandLand Associate

RECEIVED

APR18 2008

DIV.0FOlL,GAS&MINING

Newfield Exploration Company 1401 17th Street, Suite 1000 Denver, CO 80202 (303) 893-0102 Fax (303)

Page 50: NEWFIELD - Utah

STATE OF'DIVISIONOF OIL AS AND MINING S.LEASEDESIGNATIONANDSERIALNO.

ML-220616. IF INDIAN,ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL, DEEPEN N/Ala.TYPEOFWORK DRILL x DEEPEN 7.UNITAGREEMENTNAMElb.TYPEOFWELL Moritainent Butte

SINGLE MULTIPLE 8. FARMOR LEASE NAMEort x | GAS ( OTHER ZONE X ZONE | | NA2. NAME OF OPERATOR

9. WßLL NO.Newfield Production Company Monument Butte State P-36-8-163. ADDRESS AND TELEPHONENUMBER: 10. FIELD AND POOL OR WILDCATRoute #3 Box 3630, Myton, UT 84052 Phone: (435) 646-3721 Monument Butte4. LOCATION OF WELL(FOOTAGE) 1L QTR/QTR, SECTION, TOWNSIW, RANGE,MER1DIANAt surface NE/SE 2073' FSL 646' FEL Sec. 35, TSS, RI6E

At proposed ProducingZone 1117 FSL 188' FWL Sec. 36, TSS, RI6E Sec. 36, TSS, R16E14. DISTÄhTÒEIN MÙES & DIRECTION FROM NEAREST TOWN OR POST OFFICE*

12. County 13. STATEApprogmately 13.3 miles southwest of Myton, UT Duchesne UT15. DISTANCE FROM PROPOSED*LOCATION TO NEARESTPROPERTY 16. NO. OF ACRES IN LEASE 17.NO. OF ACRES ASSIGNEDTO TIUS WELLOR LEASE LINE, FT.(Alsoto nearest drlg. unit line, if any)

Approx. 188' f/Ise fine and 1132' flunit line 640.00 2018. DISTANCE FROMPROPOSED LOCATION* TO NEAREST WELL, 19.PROPOSED DEPTlf 20. ROTARY OR CABLETOOLS

DRELLING,COMPLETED, OR APPLIED FOR ON THIS LEASE, FT.

Approximately 1431' 6375' Rotary21. ELEVATIONS (Show whether DF, RT, GR, etc) 22. APPROX. DATE WORKWlLL START*

5520' GL 2 nd Quarter 200823. PROPOSED CASING AND CEMENTING PROGRAMSlZE OF HOLE SIZE OF SING WEIGHT/POOT SETTDfG DEPTH QUANTJlTYOF CEMENT12 1/4 8 5/8 24# 290' 155 81+/- 10%7 7/8 5 1/2 15.5# TD 275 sx lead followed by90 sx tail

See Detail BelowDESCRIBE PROPOSED PROGRAM: If proposal is to deepen, give date on present productive zone and proposed new productive zone. Ifproposal is to drill or deepen directionally, give pertinent data onsubsurface locations and measured and true vertical depths. Give blowout preventer program, if any.*The actual cement volumes will be calculated off of the open hole logs, plus 15% excess:

SURFACE PIPE - 155sx Class G Cement +/I 10%,w/ 2% CaCl2 & 1/4#/sk Cello-flakeWeight: 15.8 PPG YIELD: 1.17 Cu Ft/sk H2O Req: 5 gal/sk

LONG STRING - Lead: Premium Lite H Cement + 3lbs/sk BA-90 + 3% KCl + .25 lbs/sk Cello Flake + 2 lbs/sk Kol Seal +10% Bentonite + .5% Sodium MetasilicateWeight: 11.0 PPG YIELD: 3.43 Cu Ft/sk H2O Req: 21.04 gal/sk

Tail: 50-50 Poz-Class G Cement + 3% KCI +.25 lbs/sk Cello Flake + 2% Bentonite +

.3% Sodium MetasilicateWeight .2 PPG YIELD: 1.59 Cu Ft/sk H2O Req: 7.88 gallsk

N e&Signatu itle- Regulatory Specialist oate: 3/25/2008Mandie Crozier /

(This space for State use only)

API Number Assigned: APPROVAL:

RECEIVEDAPR18 2003*See Instructions On Reverse Side

DIV.0FOIL,GAS&

Page 51: NEWFIELD - Utah

T8S, Ri6 E, S. L.B.&M. NEWPINIAPRŒf/CFONCO¥PMYWELL LOCATION, MONUMENT BUTTES89 56'W - 80.04 (G.L.O.) N89°59'W

- 79.96 (G.L.O.) P-36-8-16, LOCATED AS SHOWN IN THENE 1/4 SE 1/4 OF SECTION 35, T8S,Rl6E, S.L.B.&M. DUCHESNE COUNTY, UTAH.

o -

^o

o o oo O - oo

I L LOCAMON:MONUMEHTBUTTE P-J6-8-16 B A R SC A LE

ELER EX/ST GRADED GROUNO= 5520'

Ntsio J Note:Brass Cop\ 2, 2. The bottorn of hole footages are35 38 1117 FSL & 188' FWL of Section 36,Top of - T8S, R16E, S.L.B.&M.Hole

646' z

THIS IS TO CERTIFY THA A WASPREPARED FROM FIELD Q, O RVEYSmvoor MADEBY ME OR UN W THATTHE SAME ARE TRU RRECT T H T OFMY KNOWLEDGEAN gi .No.189377

STAC¥ W.R STE D LA ÀŸ

1910

RSTA'TSETROAN .

Brass Cap

SB9'59'13"E - 2639.J9' (Meas.) , 1 erass cP S89'57'E (G.L.O.) TRI STATELANDSURVEYING& CONSULTING389 57E (G.L.O.)180 NORTH VERNAL AVE. - VERNAL, UTAH 84078

(435) 781-2501

IMONUMENTÐUTTEP-JS-8-16 DATE SURVEYED= SECTION CORNERS LOCATED (Surface Locat/on) NAD SJ 09-26-07 SURVEYED BY: T.H.

LAT/7UDE = 40' 04' 22.18" DATE DRAWN:DRAWN BY: F.T.MBASIS OF ELEV; LONGITUDE= 110' 04' 46.30" 10-24-07

U.S.G.S. 7-1/2 min QUAD (MYTON SE) REVISED:SCALE: 1" = 1000'03-04-08 L

Page 52: NEWFIELD - Utah

FORM 3160-¿, UNITED STATES FORM APPROVED

(Juni 1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: March 31, 1993

O 5. Lease Designation and Serial No.

SUNDRY NOTICES AND REPORTS ON WELLS ML-22061

Do not use this form for proposals to drill or to deepen or reentry a different reservoir. 6.IfIndian, AllotteeorTribeName

Use "APPLICATION FOR PERM1T -" for such proposals NA

7. If Unit or CA, Agreement Designation

SUBMIT IN TRIPLICATE MONUMENT BUTTEI. Type of Well

Oil Gas 8. Well Name and No.XWell Well Other MON BUTTE STATE P-36-8-16

9. API Well No.2. Name of Operator 43-013-33894

NEWFIELD PRODUCTION COMPANY 10. Field and Pool, or Exploratory Area

3. Address and Telephone No. . MONUMENT BUTTERt. 3 Box 3630, Myton Utah, 84052 435-646-3721 11. County or Parish, State

4. Location of Well (Footage, Sec., T., R., m., or Survey Description)

2073 FSL 646 FEL NE/SE Section 35, TSS R16E DUCHESNE COUNTY, UT.

12. CHECK APPROPRIATE BOX(s) TO INDICATE NATURE OF NOTICE, REPORT, R OTHER DATATYPE OF SUEiMISSION TYPE OF ACTION

X Notice of Intent Abandonment Change of Plans

Recompletion New ConstructionSubsequent Report Plugging Back Non-Routine Fracturing

Casing Repair Water Shut-Off

Final Abandonment Notice Altering Casing Conversion to Injection

X Other Permit Extension Dispose water(Note: Report results of multiple completion on Well

Completion or Recompletion Report and Log form.)

13. Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is direction-

ally drilled, give subsurface locations and measured and true vertical depths for all markers and zones pertinent to this work.)*

Newfield Production Company requests to extend the Permit to Drill this well for one year.

Approved by theUtah Division of

Oil,Gas and Mining

Dat -

COPYSENTTOOPERATOR RECEIVEDDate: FEBO4 2009initials: ŸÚ

DIV.0FOlL,GAS&MININGI4. I hereby certify that the for s true an

oSigned yy Title Regulatory Specialist Date 2/2/2009

ManËlieCrozierCC: UTAH DOGM

(This space for Federal or State office use)

Approved by Title Date

C6nditions of approval, if any:

CC: Utah DOGM

Title 18 U.S.C. Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency ofthe United States any false, fictitious

or fradulent statements or representations as to any matter within its jurisdiction.

Page 53: NEWFIELD - Utah

Application for Permit to DrillRequest for Permit Extension

Validation(thisform should accompany the Sundry Notice requesting permit extension)

API: 00 ššš¾iWell Name: Monument Butte State P-36-8-16

Location: NE/SE Section 35,T8S R16ECompany Permit Issued to: Newfield Production CompanyDate Original Permit Issued: 2/25/2008

The undersigned as owner with legal rights to drillon the property as permittedabove, hereby verifies that the information as submitted in the previouslyapproved application to drill, remains valid and does not require revision.

Followinq is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownership changed, if so, has the surfaceagreement been updated? YesONolZl

Have any wells been drilled in the vicinityof the proposed well which would affectthe spacing or siting requirements for this location? YesO NolZI

Has there been any unit or other agreements put in place that could affect thepermitting or operation of thisproposed well?

YesE¯\No1Zl

Have there been any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesE¯\

No IZl

Has the approved source of water for drillingchanged? YesO NolZl

Have therebeen any physical changes to the surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? Yes O No1Zl

ls bonding still in place, which covers this proposed well? YeslZINoO

2/2/2009

Signature Date

Title: Regulatory Specialist

Representing: Newfield Production Company RECEIVED

DIV.OFOlL,GAS&

Page 54: NEWFIELD - Utah

STATE OF UTAH

DIVISION OF OIL, GAS AND MINING'

S.l£ASEDESIONATIONANDSERRI,NO.FEB- 4 2008 ML-22061

6. IP INDIAN,ALLOTTEEOR TRIBBNAME

APPLICATION FOR PERMIT TO DRILL, DEEPEN N/A

la.TYPEorwoaK DRILL DEEPEN 7.UNITAGREElmTNAME .lb.TYPEOF WELL

Monument ButteSINCLE MULTIPLE s.FARM OR LEASENAME

OIL GAS 1 i OTHER ZONE X ZONk NA

2. NAME OF OPERATOR 9. WELL NO.

Newfield Production Company Monument Butte State P-36-8-163. ADDRESSAND TELEPHONE NUMBER: ' 10 FIELD ANDPOOLOR WILDCAT

Route #3 Box 3630, Myton, UT 84052 Phone: (435) 646-3721 Monument Butte4. LOCATION OF WELL (FOOTAGE) u, QTRIQTR.SECHON.TOWNSUP, RANGB,mRHMME

At Surface NE/SE 2073' FSL 646' FEL Sec. 35, TSS, R16E 35-Atproposed ProducingZone 1117 FSL 188' FWL Sec. 36, TSS, R16E Sec. TSS, R16E

[4. DISTANCE IN MILES AND DIRECITON FROMNBARESTTOWNOAPOST OFFICE 11 County 13.STATE

Approximately 13.3 miles southwest of Myton, UT Duchesne . UT

15. DISTANCE PROMPROPOSED* LOCATIONTO NBAREST PROPERTY 16.NO. OF ACRES IN LF.ASE 17. NO. OF ACRES ASSIGNEDTO THIS WELL

OR LEASE LINE, FT.(Also to nearest ddg.unit line,ifany)

Approx. 188' f/Ise line and 1132' f/unit line 640,00 20I8. DISTANCE FAOMPROPOSED LOCATION*TO NEARESTWELL, 19.PROPOSED DEPTH 20. ROTARY OR CABLETOOLS

DRILLING, COMPLETED, OR APPLIEDFOR ON THISLEASE, Fr.

Approximately 1431' 6375' Rotary21. ELEVATIONS (Show whether DP, RT, GR, etc) 22. APPROX.DATE WORK WILL START*

5520' GL , 2 ad Quarter2008

a. PROPOSED CASING AND CEMENTING PROGRAMSIZE OF HOLE SIZE OF CASING WEIGirlFOOT SETTETG DEPTH QUANTITY OF CEMENT

12 1/4 8 5/8 24# 290' 155 sx +/- 10%

7 7/8 5 1/2 15.5# TD 275 sx lead followed by 450 sx tailSee Detail Below

DESCRIBE PROPOSED PROGRAM: if proposal is todeepen, give date on present productive zone and proposed inw productive zone. [fproposal is to drill or deepen directionally, give pertinent data on

subsurface locations and measured and toe vertical depths. Give blowout pmventer program,if any.*The actual cement volumes will be calculated off of the open hole logs, plus 15% excess:

SURFACE PIPE - 155 ax Class G Cement +/I 10%,w/ 2% CaCl2 & 1/4#/skCello-flake

Weight: 15.8 PPG YIELD: 1.17 Cu Ft/sk H2O Req: 5 gallsk

LONG STRING - Lead: Premium Lite II Cement + 31bs/sk BA-90 + 3% KCI + .25 lbs/skCello Flake + 2 lbs/sk Kol Seal +

10% Bentonite + .5% Sodium MetasilicateWeight: 11.0 PPG YIELD: 3.43 Cu Ft/sk H2O Reg: 21.04 gallsk

Tail: 50-50 Poz-Class G Cement+ 3% KCI + .25 lbs/skCello Flake + 2% Bentonite + .3% Sodium Metasilicate

Weigh W.2 PPG YIELD: 1.59 Cu Ft/sk H2O Req: 7.88 gallsk

m.a sis., ai.: Regulatory Specialist o.te: 3/25/2008

Mandie Crozier(This space for Statouse only)

API Number Assigned: APPROVAL:

RECEIVED ACCEPTEDBYBLMFORFEBi 8 2009 UNITPURPOSESONLY

DIV.0FOIL,GAS&MINING EEB 9 2009*See Instructions On Reverse Side

Page 55: NEWFIELD - Utah

UNiTED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 {435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Newfield Production Company Location: NESE, Sec. 35, T8S, R16E (S)SWSW, Sec.36,T8S, R16E (B)

Well No: Monument Butte State P-36-8-16 Lease No: ML-22061API No: 43-013-33894 Agreement: Monument Butte Unit

Title Name Office Phone Number Cell Phone NumberPetroleum Engineer: Matt Baker (435) 781-4490 (435) 828-4470Petroleum Engineer: Michael Lee (435) 781-4432 (435) 828-7875Petroleum Engineer: Ryan Angus (435) 781-4430 (435) 828-7368Supervisory Petroleum Technician: Jamie Sparger (435) 781-4502 (435) 828-3913Supervisory NRS: Karl Wright (435) 781-4484NRS/Enviro Scientist: Holly Villa (435) 781-4404 (435) 828-3544NRS/Enviro Scientist: James Hereford (435) 781-3412 (435) 828-3546NRS/Enviro Scientist: Chuck Macdonald (435) 781-4441 (435) 828-7481NRS/Enviro Scientist: Dan Emmett (435) 781-3414 (435) 828-4029NRS/Enviro Scientist: Paul Percival (435) 781-4493 (435) 828-7381NRS/Enviro Scientist: Anna Figueroa (435) 781-3407 (435) 828-3548NRS/Enviro Scientist: Verlyn Pindell (435) 781-3402 (435) 828-3547NRS/Enviro Scientist: Nathan Packer (435) 781-3405 (435) 828-3545NRS/Enviro Scientist: David Gordon (435) 781-4424NRS/Enviro Scientist: Christine Cimiluca (435) 781-4475NRS/Enviro Scientist: Lori Ford (435) 781-4406

Fax: (435) 781-3420

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance is made with theapplicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill includingSurface and Downhole Conditions of Approval. The operator is considered fully responsible for the actions of hissubcontractors. A copy of the approved APD must be on location during construction, drilling, and completionoperations. This permit is approved for a two (2) year period, or until lease expiration, whichever occursfirst. An additional extension, up to two (2) years, may be applied for by sundry notice prior to expiration.

NOTIFICATION REQUIRERLocation Construction - Forty-Eight (48) hours prior to construction of location and(Notify Environmental Scientist) access roads.Location Completion - Prior to moving on the drilling rig.(Notify Environmental Scientist)Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify Petroleum Engineer)Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Supv. Petroleum Tech.) all casing strings.BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Supv. Petroleum Tech.)First Production Notice - Within Five (5) business days after new well begins or(Notify Petroleum Engineer) production resumes after well has been off production for more

than ninety (90)

Page 56: NEWFIELD - Utah

Page 2 of 8Well: XXXXXXXX

2/9/2009

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

• If there is an active Gilsonite mining operation within 2 miles of the well location, operator shallnotify the Gilsonite operator at least 48 hours prior to any blasting during construction.

• If paleontological materials are uncovered during construction, the operator is to immediatelystop work and contact the Authorized Officer (AO). A determination will be made by the AO asto what mitigation may be necessary for the discovered paleontologic material beforeconstruction can continue.

SITE SPECIFIC COAs:

NEPA Document number: DOI-BLM-UT-2008-0695-EACompany/Operator: Newfield Production CompanyWellName & Number: Travis Federal G-34-8-16, Monument Butte State P-36-8-16, and MonumentButte Federal 1-34-8-16, Monument Butte Federal N-35-8-16, Wells Draw Federal P-34-8-16,Monument Butte Federal I-35-8-16, Monument Butte Federal 0-35-8-16, and Monument Butte FederalJ-34-8-16Surface Ownership: BLM

CONDITIONS OF APPROVAL:

Within 90 calendar days of the approval date for this Application for Permit to Drill (APD), theoperator/lessee shall submit to the Authorized Officer (AO), on Sundry Notice Form 3160-5, anInterim/Final Surface Reclamation Plan for surface disturbance on well pads, access roads, andpipelines. At a minimum, this will include the reshaping of the pad to the original contour to the extentpossible; the re-spreading of the top soil up to the rig anchor points; and, the area reseeded usingappropriate reclamation methods. The AO will provide written approval or concurrence within 30calendar days of receipt.

Interim and Final Reclamation

Reclamation Immediately upon well completion, the location and surrounding area will be cleared of allunused tubing, equipment, debris, materials, and trash. Any hydrocarbons in the pit will be removed inaccordance with 43 CFR 3162.7-1. The reserve pit and the portion of the well not needed for productionfacilities/operations will be re-contoured to the approximate natural contours. The reserve pit will bereclaimed within 120 days from the date of well completion, or as soon as environmental conditionsallow. The stockpiled pit topsoil will then be spread over the pit area. Seeding shall be implemented inthe fall only, between August 15 and December 15. The seed shall be drilled wherever possible. If theseed is aerially broadcasted, then the seed shall be covered immediately (crimped into the topsoil with abulldozer or other heavy equipment). Forage Kochia shall be applied to the surface and not covered. Ifinitial seeding is not successful, reseeding may be

Page 57: NEWFIELD - Utah

Page 3 of 8Well: XXXXXXXX

2/9/2009

Interim and Final Seed mix:

Common name Latin name Ibslacre Recommendedseed plantingdepth

Sandberg Poa secunda 2.0 ¼ - ½"bluegrassShadscale saltbush Atriplex confertifolia 0.50 ½"Four-wing saltbush Atriplex canescens 0.50 ½"Scarlet Sphaeralcea 0.10 ¼ -- ¼"globemallow coccineaWestern Pascopyrum smithii 2.0 ½"wheatgrassEphraim Crested Agropyron 2.0 ½"Wheatgrass cristatum var.

EphraimLadak Alfalfa Medicago sativa 1.0 ½"

var. Ladak

• All pounds are pure live seed.• All seed and mulch will be certified weed free.• Rates are set for drill seeding; double rate if broadcasting.• Reseeding may be required if initial seeding is not successful.

Final reclamation:Once the location is plugged and abandoned, the well location, access, and any disturbed areas shall bere-contoured to natural topography, topsoil shall be re-spread, and the entire location shall be seededfollowing guidelines in the seed mix bullet statement above. Final seed mix: same as interim unlessotherwise

Page 58: NEWFIELD - Utah

API Well No: 43013338940000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: ML-22061

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)

1. TYPE OF WELL Oil Well

8. WELL NAME and NUMBER: MON BUTTE ST P-36-8-16

2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY

9. API NUMBER: 43013338940000

3. ADDRESS OF OPERATOR: Rt 3 Box 3630 , Myton, UT, 84052

9. FIELD and POOL or WILDCAT: MONUMENT BUTTE

4. LOCATION OF WELL FOOTAGES AT SURFACE: 2073 FSL 0646 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NESE Section: 35 Township: 08.0S Range: 16.0E Meridian: S

COUNTY: DUCHESNE

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

2/1/2010

SUBSEQUENT REPORTDate of Work Completion:

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Newfield proposes to extend the permit to drill this well for one more year.

NAME (PLEASE PRINT) Mandie Crozier

TITLE Regulatory Tech

SIGNATURE N/A

DATE 2/1/2010

PHONE NUMBER:435 646-4825 Ext

PHONE NUMBER435 646-4825

February 01, 2010

February 01, 2010

iPI Well No: 43013338940000

FORM 9STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCESDIVISION OF OIL, GAS, AND MINING "MLLEA22E6DESIGNATION AND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals. GMBU (GRRV)

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well MON BUTTE ST P-36-8-16

2.NAMEOFOPERATOR: 9.APINUMBER:NEWFIELD PRODUCTION COMPANY 43013338940000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext MONUMENT BUTTE

4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE

2073 FSL 0646 FELQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr: NESE Section: 35 Township: 08.05 Range: 16.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

/ NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

2/1/2010CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

O SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Newfield proposes to extend the permit to drill this well for one more year.Approved by theUtah Division of

Oil, Gas and Mining

Date: February 01, 2010

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech

SIGNATURE DATEN/A 2/1/2010

RECEIVED February 01,

Page 59: NEWFIELD - Utah

The Utah Division of Oil, Gas, and Mining

- State of Utah- Department of Natural Resources

Electronic Permitting System - Sundry Notices

Request for Permit Extension Validation Well Number 43013338940000

API: 43013338940000Well Name: MON BUTTE ST P-36-8-16

Location: 2073 FSL 0646 FEL QTR NESE SEC 35 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY

Date Original Permit Issued: 2/25/2008

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? Yes No

Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? Yes No

Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? Yes No

Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? Yes No

Has the approved source of water for drilling changed? Yes No

Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? Yes No

Is bonding still in place, which covers this proposed well? Yes No

Signature: Mandie Crozier Date: 2/1/2010

Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY

February 01, 2010

February 01, 2010

UTAH

[ The Utah Division of Oil, Gas, and Mining- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices

OTI GAS & MINTNG

Request for Permit Extension Validation Well Number 43013338940000

API: 43013338940000Well Name: MON BUTTE ST P-36-8-16

Location: 2073 FSL 0646 FEL QTR NESE SEC 35 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY

Date Original Permit Issued: 2/25/2008

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

• If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? I Yes I:g) No

• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? I i Yes i i No

• Has there been any unit or other_agreements put in place that could affect the permitting or operationof this proposed well?

_

I Yes igi No

•Have there been any changes to_the access route including ownership, or rightof- way, which couldaffect the proposed location? I:_ I Yes I:gl No

• Has the approved source of water for drilling changed? I Yes I:¾) No

• Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? I i Yes i No

Approved by the•Is bonding still in place, which covers this proposed well? I i Yes .

I No Utah Division ofOil, Gas and Mining

Signature: Mandie Crozier Date: 2/1/2010Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY Date: February 01, 2010

By:

RECEIVED February 01,

Page 60: NEWFIELD - Utah

API Well No: 43013338940000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: ML-22061

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)

1. TYPE OF WELL Oil Well

8. WELL NAME and NUMBER: MON BUTTE ST P-36-8-16

2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY

9. API NUMBER: 43013338940000

3. ADDRESS OF OPERATOR: Rt 3 Box 3630 , Myton, UT, 84052

9. FIELD and POOL or WILDCAT: MONUMENT BUTTE

4. LOCATION OF WELL FOOTAGES AT SURFACE: 2073 FSL 0646 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NESE Section: 35 Township: 08.0S Range: 16.0E Meridian: S

COUNTY: DUCHESNE

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

7/21/2010

SUBSEQUENT REPORTDate of Work Completion:

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

As per the request of the BLM, the mineral lease number for the abovementioned well needs to be amended to be UTU-16535. We would also like torequest at this time that the well name be changed to be Greater MonumentButte P-36-8-16. Attached is a complete amended APD package reflecting

those changes.

NAME (PLEASE PRINT) Mandie Crozier

TITLE Regulatory Tech

SIGNATURE N/A

DATE 7/21/2010

PHONE NUMBER:435 646-4825 Ext

APD Amendment

PHONE NUMBER435 646-4825

July 27, 2010

iPI Well No: 43013338940000

FORM 9STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCESDIVISION OF OIL, GAS, AND MINING "MLLEA22E6DESIGNATION AND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS 6.IFINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals. GMBU (GRRV)

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well MON BUTTE ST P-36-8-16

2.NAMEOFOPERATOR: 9.APINUMBER:NEWFIELD PRODUCTION COMPANY 43013338940000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext MONUMENT BUTTE

4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE

2073 FSL 0646 FELQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr: NESE Section: 35 Township: 08.05 Range: 16.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

/ NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

7/21/2010CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

O SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCAT WELL DETERMINATION OTHER OTHER: APD Amendment

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

As per the request of the BLM, the mineral lease number for the abovementioned well needs to be amended to be UTU-16535. We would also like tAccepted by therequest at this time that the well name be changed to be Greater MonumentUtah Division of

Butte P-36-8-16. Attached is a complete amended APD package reflectin il, Gas and Miningthose changes· FOR REÇgogNLY

NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech

SIGNATURE DATEN/A

Page 61: NEWFIELD - Utah

July 21, 2010July 21, 2010

Fomi3160-3 FORMAPPRovED(August2007) OMBNo 1004-0137

ExpiresJuly31,2010UNITED STATESDEPARTMENT OF THE INTERIOR 5. LeaseSerialNo.BUREAU OF LAND MANAGEMENT UTU-16535

6. If Indian,Alloteeor TribeNameAPPLICATION FOR PERMIT TO DRILL OR REENTER NA

O O 2 If Unitor CAAgreement,NameandNo.la. Typeof work: / DRILL REENTERGreater Monument Butte

8. Lease Nameand WellNo.Ib. Typeof Well: Oil Well GasWellOother Os dezoneO MultipleZone Greater Monument Butte P-36-8-162. Nameof Operator Newfield Production Company 9. API WellNo.

3a. Address Route #3 Box 3630, MytonUT 84052 3b. PhoneNa (mchnie area auk) 10.FieldandPool,orExploratory(435) 646-3721 MonumentButte

4. Locationof WelI (Report locationclearly and in accordancewill; œry State requirements.*) I1.Sec.,T. R. M. or Blk.andSurveyor AreaAt surface NE/SE 2073' FSL 646' FEL Sec. 35, TSS R16E (UTU-16535) Sec. 35, T8S R16EAt proposedprod.zone SW/SW 1117' FSL 188' FWL Sec. 36, T8S R16E (ML-22061)

14. Distancein milesand directionfromnearesttownor postomo* 12.CountyorParish 13.StateApproximately 13.3 miles southwest of Myton, UT' Duchesne UT

15. Distancefromproposed* 16. No.of acmsinlease 17. SpacingUnitdedicatedtothiswelllocationtonearestpropertyor lease line,ft. Approx. 188' f/Ise, NA' flunit 920.00(Alsotonearestdrig.unit line,if any) 20 Acres

18. Distancefromp osedlocation* 19 ProposedDepth 20. BLM/BIABondNo.on fileappnl

e for o thisleng, mpleted' Approx. 1431' 6,520' WYB000493

21. Elevations(ShowwhetherDF,KDB, RT,GL, etc.) 21 Approximaledatework willstati* 23. Estimatedduration5520' GL SN- (7) days from SPUD to rig release

24. AttachmentsThefollowing,completedin accordancewith therequirements of OnshoreOiland Gas OrderNo.1,must beattached to this fonn:

1. Wellplatcertifiedbya registeredsurveyor, i Bondtocover the operations unless coveredby anexistingbondon file (see1 A DrillingPlan. Item20 above).3. A SurfaceUse Plan (if the locationis on National Forest SystemLands, the 5. Operatorcertification

SUPO mustbe filedwith theappropriateForestServiceOffice) 6. Suchother site specificinformationand/or plansas may be required by the

TitleMandieCrozier C

Regulatory SpecialistApprovedby(Signature) Name(Printeflpped) Date

Title Office

Applicationapprovaldoesnot warrantor certifythattheapplicantholds legalorequitable titletothoserights inthesubjectleasewhichwouldentitletheapplicanttoconductoperationsthereon.Conditionsof approval,ifany,are attached.

Title 18U.S.C.Section1001andTitle43 U.S.C.Section1212,makeit a crime foranypersonknowinglyand willfullytomaketo any departmentor agencyofthe UnitedStatesany false,fictitiousor fraudulentstatementsor representationsas toanymatterwithinitsjurisdiction.

(Continued on page 2) *(Instructions on page 2)

RECEIVED July 21,

Page 62: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD PRODUCTION COMPANYGREATER MONUMENT BUTTE P-36-8-16

AT SURFACE: NE/SE SECTION 35, TSS, R16EDUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

DRILLING PROGRAM

1. GEOLOGIC SURFACE FORMATION:

Uinta formation of Upper Eocene Age

2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:

Uinta 0' - 1665'Green River 1665'Wasatch 6375'Proposed TD 6520'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:

Green River Formation 1665' - 6520' - Oil

4. PROPOSED CASING PROGRAM

Please refer to the Monument Butte Field Standard Operation Procedure (SOP).

5. MINIMUM SPECIFICATIONS FOR PRESSURE CONTROL:

Please refer to the Monument Butte Field SOP. See Exhibit "C".

6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:

Please refer to the Monument Butte Field SOP.

7. AUXILIARYSAFETY EQUIPMENT TO BE USED:

Please refer to the Monument Butte Field SOP.

8. TESTING, LOGGING AND CORING PROGRAMS:

Please refer to the Monument Butte Field SOP.

9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:

No abnormal temperatures or pressures are anticipated. No hydrogen sulfide has been encounteredor is known to exist from previous drilling in the area at this depth. Maximum anticipatedbottomhole pressure will approximately equal total depth in feet multiplied by a 0.433 psi/footgradient.

RECEIVED July 21,

Page 63: NEWFIELD - Utah

July 21, 2010July 21, 2010

10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:

Please refer to the Monument Butte Field SOP.

2

RECEIVED July 21,

Page 64: NEWFIELD - Utah

July 21, 2010July 21, 2010

2-M SYSTEMBlowout Prevention Equipment Systems

&

I I

i9ii

EXHIBlT C

RECEIVED July 21,

Page 65: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD

NEWFIELD EXPLORATIONUSGS Myton SW (UT)SECTION 35 T8S, R 16EP-36-8-16

Wellbore #1

Plan: Design #1

Standard Planning Report19 July, 2010

HATH YBBRNHAMDIRKTIONAL&MWDSERVllESg

RECEIVED July 21,

Page 66: NEWFIELD - Utah

July 21, 2010July 21, 2010

HATHAWAY BURNHAMNEWFIELD yt

Planning Report rrr

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well P-36-8-16Company: NEWFIELDEXPLORATION TVD Reference: P-36-8-16 @5532.0ft (NEWFIELD)

Project: USGS Myton SW (UT) MD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Site: SECTION 35 T8S, R 16E North Reference: TrueWell: P-36-8-16 Survey Calculation Method: Minimum CurvatureWellbore: Wellbare #1Design: Design #1

Project USGS Myton SW (UT), DUCHESNE COUNTY,UT, USA

Map System: US State Plane 1983 System Datum: Mean Sea Level

Geo Datum: North American Datum 1983Map Zone: Utah Central Zone

Site SECTION 35 T8S, R 16E, SEC 35 TBS, R16E

Site Position: Northing: 7,198,099.76ft Latitude:40° 4' 19.740 N

From: Lat/Long Easting: 2,034,036.30ft Longitude:110°5'36.110W

Position Uncertainty: 0.0 ft Slot Radius: " Grid Convergence: 0.90 °

Well P-36-8-16, SHL LAT:40 04 22.18, LONG: -110 04 46.30

Well Position +NI-S 246.6 ft Northing: 7,198,407.80 ft Latitude:40° 4' 22.160 N

+El-W 3,871.9ft Easting: 2,037,903.82ft Longitude: 110°4'46.300W

Position Uncertainty 0.0 ft Wellhead Elevation: 5,532.Oft Ground Level: 5,520.0ft

Wellbore Wellbore #1

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(*) (*) (nT)

IGRF2010 2010/07/19 11.44 65.84 52,373

Design Design #1

Audit Notes:

Version: Phase: PROTOTYPE Tie On Depth: 0.0

Vertical Section: Depth From (IVD) +NI-S +El-W Direction(ft) (ft) (ft) (°)

0.0 0.0 0.0 138.87

Plan Sections

Measured Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Rate Rate Rate TFO

(ft) (°) (°) (ft) (ft) (ft) (*Ii00ft) (°Ii00ft) (°I100ft) (•) Target

0.0 0.00 0.00 0.0 0.0 0.0 0.00 0.00 0.00 0.00600.0 0 00 0.00 600.0 0.0 0.0 0.00 0.00 0.00 0.00

1,494.0 13 41 138.87 1,485.9 -78.4 68.5 1.50 1.50 0.00 138.875,415.0 13 41 138.87 5,300.0 -763.4 666.7 0.00 0.00 0.00 0.00 P-36-8-16 TGT6,520.2 13.41 138.87 6,375.0 -956.4 835.2 0.00 0.00 0.00 0.00

2010/07/19 2:40 54PM Page 2 COMPASS 2003.21 Build 25

RECEIVED July 21,

Page 67: NEWFIELD - Utah

July 21, 2010July 21, 2010

HATHAWAYBURNHAMNEWFIELDPlanning Report

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well P-36-8-16Company: NEWFIELD EXPLORATION TVD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Project: USGS Myton SW (UT) MD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Site: SECTION 35 T8S, R 16E North Reference: TrueWell: P-36-8-16 Survey Calculation Method: MinimumCurvatureWellbore: Wellbore #1Design: Design #1

Planned Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (*) (ft) (ft) (ft) (ft) (°l100ft) (°l100ft) (°liCOft)

0.0 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.00 0.00100.0 0.00 0.00 100.0 0.0 0.0 0.0 0.00 0.00 0.00200.0 0 00 0.00 200.0 0.0 0.0 0.0 0.00 0.00 0.00300.0 0.00 0.00 300.0 0.0 0.0 0.0 0.00 0.00 0.00400.0 0 00 0.00 400.0 0.0 0.0 0.0 0.00 0.00 0.00

500.0 0.00 0.00 500.0 0.0 0.0 0.0 0.00 0.00 0.00600.0 0 00 0.00 600.0 0.0 0.0 0.0 0.00 0.00 0.00700.0 1 50 138.87 700.0 -1.0 0.9 1.3 1.50 1.50 0.00800.0 3 00 138.87 799.9 -3.9 3.4 5.2 1.50 1.50 0.00900.0 4 50 138.87 899.7 -8.9 7.7 11.8 1.50 1.50 0.00

1,000.0 6 00 138.87 999.3 -15.8 13.8 20.9 1.50 1.50 0.001,100.0 7 50 138.87 1,098.6 -24.6 21.5 32.7 1.50 1.50 0.001,200.0 9 00 138.87 1,197.5 -35.4 30.9 47.0 1.50 1.50 0.001,300.0 10.50 138.87 1,296.1 -48.2 42.1 64.0 1.50 1.50 0.001,400.0 12 00 138.87 1,394.2 -62.9 54.9 83.5 1,50 1.50 0.00

1,494.0 13.41 138.87 1,485.9 -78.4 68.5 104.1 1.50 1.50 0.001,500.0 13.41 138.87 1,491.7 -79.5 69.4 105.5 0.00 0.00 0.001,600.0 13.41 138.87 1,589.0 -97.0 84.7 128.7 0.00 0.00 0.001,700.0 13.41 138.87 1,686.2 -114.4 99.9 151.9 0.00 0.00 0.001,800.0 13.41 138.87 1,783.5 -131.9 115.2 175.1 0.00 0.00 0.00

1,900.0 13 41 138.87 1,880.8 -149.4 130.4 198.3 0.00 0.00 0.002,000.0 13 41 138.87 1,978.1 -166.8 145.7 221.5 0.00 0.00 0.002,100.0 13.41 138.87 2,075.3 -184.3 160.9 244.7 0.00 0.00 0.002,200.0 13 41 138.87 2,172.6 -201.8 176.2 267.9 0.00 0.00 0.002,300.0 13 41 138.87 2,269.9 -219.2 191.5 291.1 0.00 0.00 0.00

2,400.0 13 41 138.87 2,367.2 -236.7 206.7 314.3 0.00 0.00 0.002,500.0 13 41 138.87 2,464.4 -254.2 222.0 337.5 0.00 0.00 0.002,600.0 13 41 138.87 2,561.7 -271.6 237.2 360.6 0.00 0.00 0.002,700.0 13 41 138.87 2,659.0 -289.1 252.5 383.8 0.00 0.00 0.002,800.0 13 41 138.87 2,756.3 -306.6 267.7 407.0 0.00 0.00 0.00

2,900.0 13.41 138.87 2,853.5 -324.1 283.0 430,2 0.00 0.00 0.003,000.0 13 41 138.87 2,950.8 -341.5 298.2 453.4 0.00 0.00 0.003,100.0 13.41 138.87 3,048.1 -359.0 313.5 476.6 0.00 0.00 0.003,200.0 13 41 138.87 3,145.3 -376.5 328.8 499.8 0.00 0.00 0.003,300.0 13 41 138.87 3,242.6 -393.9 344.0 523.0 0.00 0.00 0.00

3,400.0 13 41 138.87 3,339.9 -411.4 359.3 546.2 0.00 0.00 0.003,500.0 13 41 138.87 3,437.2 -428.9 374.5 569.4 0.00 0.00 0.003,600.0 13 41 138.87 3,534.4 -446.3 389.8 592.6 0.00 0.00 0.003,700.0 13 41 138.87 3,631.7 -463.8 405.0 615.8 0.00 0.00 0.003,800.0 13 41 138.87 3,729.0 481.3 420.3 638.9 0.00 0.00 0.00

3,900.0 13 41 138.87 3,826.3 498.7 435.5 662.1 0.00 0.00 0.004,000.0 13 41 138.87 3,923.5 -516.2 450.8 685.3 0.00 0.00 0.004,100.0 13 41 138.87 4,020.8 -533.7 466.0 708.5 0.00 0.00 0.004,200.0 13.41 138.87 4,118.1 -551.1 481.3 731.7 0.00 0.00 0.004,300.0 13 41 138.87 4,215.4 -568.6 496.6 754.9 0.00 0.00 0.00

4,400.0 13.41 138.87 4,312.6 -586.1 511.8 778.1 0.00 0.00 0.004,500.0 13.41 138.87 4,409.9 -603.5 527.1 801.3 0.00 0.00 0.004,600.0 13.41 138.87 4,507.2 -621.0 542.3 824.5 0.00 0.00 0.004,700.0 13.41 138.87 4,604.4 -638.5 557.6 847.7 0.00 0.00 0.004,800.0 13 41 138.87 4,701.7 -656.0 572.8 870.9 0.00 0.00 0.00

4,900.0 13 41 138.87 4,799.0 -673.4 588.1 894.1 0.00 0.00 0.005,000.0 13 41 138.87 4,896.3 -690.9 603.3 917.3 0.00 0.00 0.005,100.0 13 41 138.87 4,993.5 -708.4 618.6 940.4 0.00 0.00 0.005,200 0 13 41 138.87 5,090.8 -725.8 633.9 963.6 0.00 0.00 0.00

2010/07/19 2:40:54PM Page 3 COMPASS 2003.21 Build 25

RECEIVED July 21,

Page 68: NEWFIELD - Utah

July 21, 2010July 21, 2010

HATHAWAYBURNHAMNEWFIELD : . gg |Planning Report i 1 Tlf

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well P-36-8-16Company: NEWFIELD EXPLORATION TVD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Project: USGS Myton SW (UT) MD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Site: SECTION 35 T8S, R 16E North Reference: TrueWell: P-36-8-16 Survey Calculation Method: MinimumCurvatureWellbore: Wellbore #1Design: Design #1

Planned Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (*) (*) (ft) (ft) (ft) (ft) (°l100ft) (*l100ft) (°l100ft)

5,300.0 13.41 138.87 5,188.1 -743.3 649.1 986.8 0.00 0.00 0.00

5,400.0 13 41 138 87 5,285.4 -760.8 664.4 1,010.0 0.00 0.00 0.005,415.0 13 41 138 87 5,300.0 -763.4 666.7 1,013.5 0.00 0.00 0.00

P-36-8-16 TGT5,500.0 13.41 138.87 5,382.6 -778.2 679.6 1,033.2 0.00 0.00 0.005,600.0 13 41 138.87 5,479.9 -795.7 694.9 1,056.4 0.00 0.00 0.005,700.0 13.41 138.87 5,577.2 -813.2 710.1 1,079.6 0.00 0.00 0.00

5,800.0 13.41 138.87 5,674.5 -830.6 725.4 1,102.8 0.00 0.00 0.005,900.0 13.41 138.87 5,771.7 -848.1 740.6 1,126.0 0.00 0.00 0.006,000.0 13.41 138.87 5,869.0 -865.6 755.9 1,149.2 0.00 0.00 0.006,100.0 13 41 138.87 5,966.3 -883.0 771.1 1,172.4 0.00 0.00 0.006,200.0 13.41 138.87 6,063.6 -900.5 786.4 1,195.6 0.00 0.00 0.00

6,300.0 13.41 138.87 6,160.8 -918.0 801.7 1,218.7 0.00 0.00 0.006,400.0 13.41 138.87 6,258.1 -935.5 816.9 1,241.9 0.00 0.00 0.006,500.0 13 41 138.87 6,355.4 -952.9 832.2 1,265.1 0.00 0.00 0.006,520.2 13 41 138.87 6,375.0 -956.4 835.2 1,269.8 0.00 0.00 0.00

Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

P-36-8-16 TGT 0 00 0.00 5,300.0 -763.4 666.7 7,197,655.09 2,038,582.52 40° 4' 14.635 N 110 4' 37.724 W- plan hits target- Circle (radius 75 0)

2010/07/19 2 40 54PM Page 4 COMPASS 2003.21 Build25

RECEIVED July 21,

Page 69: NEWFIELD - Utah

July 21, 2010July 21, 2010

Project: USGS Myton SW (UT) TM Azimuths to True NorthNEW FIELD site: SECTION 35 T8S, R 16E / Magnetic North: 11.44°

Well: P-36-8-16Wellbore: Wellbore #1 Magnetic Field

Desian: Desian #1 Strength: 52372.7snTDipAngle: 65.84°Date: 2010/07/19Model: IGRF2010

600-0-

O

-7- q-eco o l''''I''''I'''' ''''1'

0• -15 -7 0 7 15aco- West(-)/East(+) (15 ftlin)

Start Build 1.501486 104 -

1500-

Start 3921.0 hold at 1494.0 MD

4500-

Start 1105.1 hold at 5415.0 MD5300 1013 - 40

-600-

2 35.8-16/GYRO P-36-8-16 T 6

60006375 1270

TD at 6520.2 -900- P-36-8-16 T

7500-

0 1500 3000

Vertical Section at 138.87° (1500 ftlin) a . . . . , , . . . , , . . . | . . .

0 300 600 900WEU.80RE lARGET DETAILS West(-)/East(+) (300 ft/in)

Name TVD +NI S +El-W ShapeP-36-6-16 TGT 5300 0 -763 4 666.7 Circle (Radius: 75.0) SECTION DETAILS

Sec MD lac Azi TVD +N/-S +El-W DLeg TFace VSec Target1 0.0 0.00 0.00 0.0 0.0 0.0 0.00 0.00 0.02 600.0 0.00 0.00 600.0 0.0 0.0 0.00 0.00 0.03 1494.0 13,41 138.67 1485.9 .78.4 68.5 1.50 138.87 104.14 5415.0 13.41 138,87 5300.0 -763.4 666.7 0.00 0.00 1013.5 P-36•8-16 TGT I5 6520.2 13.41 138.87 6375.0 -956.4 835.2 0.00 0.00 1269.8

II

RECEIVED July 21,

Page 70: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD PRODUCTION COMPANYGREATER MONUMENT BUTTE P-36-8-16

AT SURFACE: NE/SE SECTION 35, T8S, R16EDUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI-POINT SURFACE USE & OPERATIONS PLAN

1. EXISTING ROADS

See attached Topographic Map "A"

To reach Newfield Production Company well location site Greater Monument Butte P-36-8-16

located in the NE 1/4 SE 1/4 Section 35, T8S, Rl6E, Duchesne County,Utah:

Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed southeasterly - 9.2 miles ± to it's junctionwith an existingdirt road to the southwest; proceed southwesterly - 2.7 miles ± to it's junctionwith the beginningof the access road to the existing Federal 2-35-8-16 well leoation.

2. PLANNED ACCESS ROAD

There is no proposed access road for this location. The proposed well will be drilled directionallyoff of the existing Federal 2-35-8-16 well pad. See attached Topographic Map "B".

3. LOCATION OF EXISTING WELLS

Refer to Exhibit "B".

4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

The proposed well will be drilled directionally off of the Federal 2-35-8-16 well pad. There willbe a pumping unit and a short flow line added to the tank battery for the proposed GreaterMonument Butte P-36-8-16. All permanent surface equipment will be painted Carlsbad Canyon.

Please refer to the Monument Butte Field Standard Operating Procedure (SOP).

5. LOCATION AND TYPE OF WATER SUPPLY

Newfield Production will transport water by truck for drilling purposes from the following watersources:

Johnson Water DistrictWater Right: 43-10136

Neil Moon PondWater Right: 43-11787

Maurice Harvey PondWater Right: 47-1358

Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).

2

RECEIVED July 21,

Page 71: NEWFIELD - Utah

July 21, 2010July 21, 2010

Please refer to the Monument Butte Field SOP. See Exhibit "A".

6. SOURCE OF CONSTRUCTION MATERTALS

The proposed Greater Monument Butte P-36-8-16 will be drilled off of the existing Federal 2-35-8-16 well pad. No additional surface disturbance will be required for this location.

7. METHODS FOR HANDLING WASTE DISPOSAL

Please refer to the Monument Butte Field SOP.

8. ANCILLARY FACILITIES

Please refer to the Monument Butte Field SOP.

9. WELL SITE LAYOUT

See attached Location Layout Diagram.

10. PLANS FOR RESTORATION OF SURFACE

Please refer to the Monument Butte Field SOP.

11. SURFA CE OWNERSHIP - Bureau Of Land Management .

12. OTHER ADDITIONAL INFORMATION

Water DisposalImmediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.

Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRl9E) or at State of Utah approved surface disposal facilities.

Threatened, Endangered, And Other Sensitive SpeciesNone for the proposed Greater Monument Butte P-36-8-16.

Reserve Pit LinerA 16 mil liner with felt is required. Please refer to the Monument Butte Field SOP.

Location and Reserve Pit ReclamationPlease refer to the Monument Butte Field SOP and as well as the CastlePeak and Eight Mile FlatReclamation and Weed ManagementPlan.

The followingseed mixture will be used on the topsoil stockpile, to the recontoured surface of thereserve pit, and for final reclamation: (All poundages are in pure live seed)

Squirrell Tail Elymus Elymoides 5 lbs/acreCrested Wheatgrass Agropyron Cristatum 5 lbs/acreGardner Saltbush Atriplex Gardneri 0.5 lbs/acreShadscale Atriplex Confertifolia 0.5 lbs/acreForage Kochia Kochia Prostrata 0.25 lbs/acre

3

RECEIVED July 21,

Page 72: NEWFIELD - Utah

July 21, 2010July 21, 2010

Details of the On-Site InspectionThe proposed Greater Monument Butte P-36-8-16 was on-sited on 12/18/07. The followingwerepresent; Dave Allred (Newfield Production), Michael Cutler (Bureau of Land Management), andBrandon McDonald (Bureau of Land Management).. Weather conditions were clear and groundcover was open.

13. LESSEE'S OR OPERATORS REPRESENTATIVE AND CERTIFICATIONRepresentative

Name: Tim EatonAddress: Route #3 Box 3630

Myton, UT 84052Telephone: (435) 646-3721

Certification

Please be advised that NEWFIELD PRODUCTION COMPANY is considered to be theoperator of well #P-36-8-16 NE/SE Section 35, Township 8S, Range 16E: Lease UTU-16535Duchesne County, Utah: and is responsible under the terms and conditions of the lease for theoperations conducted upon the leased lands. Bond coverage is provided by, Federal Bond#WYBOOO493.

I hereby certify that the proposed drillsite and access route have been inspected, and Iam familiar with the conditions which currently exist; that the statements made in this plan are trueand correct to the best of my knowledge; and that the work associated with the operationsproposed here will be performed by Newfield Production Company and its contractors andsubcontractors in conformity with this plan and the terms and conditions under which it isapproved. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.

7/19/10Date Mandie Crozier

Regulatory SpecialistNewfield Production Company

4

RECEIVED July 21,

Page 73: NEWFIELD - Utah

July 21, 2010July 21, 2010

TBS,

Ri6

E,S.

L.B

.&M

.N

ßmED

PRûÐ

UC

TIO

N CO

XPN

V

WEL

LLO

CA

TIO

N,

MO

NU

MEN

TB

UTT

ES8

956'

W-

80.0

4(G

.L.O

.)N

8959

'W-

79.9

6(G

.L.O

.)p_

_36-

8-16

,LO

CA

TED

AS

SHO

WN

INTH

EN

E1/

4SE

1/4

OF

SEC

TIO

N35

,T8

S,R

16E,

S.L.

B.&

M.

DU

CH

ESN

EC

OU

NTY

,U

TAH

.

II

¯o

-

¯o

II

oo

oo

o-

o

IN

ELLL

OC

AÒ0N

.•B

AR

SCA

LEM

ON

UM

EHT B

UTT

EP-

J6-8

-16

ELEV

EX/S

TG

RA

DED

GR

OU

ND

=55

20'

NB

ross

cap

Not

e:2.

The

botto

mof

hole

foot

ages

are

1117

FSL

&18

8'FW

Lof

Sect

ion

36,

TSS,

R16

E,S.

L.B

.&M

.H

o/e

646

THIS

ISTO

CER

TIFY

THA

AW

AS

miu

.iivc

PREP

AR

EDFR

OM

FIEL

DO

RV

EYS

mvo

owM

AD

EB

YM

EO

RU

NTH

AT

THE

SAM

EA

RE

TRU

RR

ECT

TH

TO

FM

YK

NO

WLE

DG

EA

Ngi

.No.

1893

77

STA

CY

W.

RST

ED

LAR

ISTR

Ao.

gis

toI

STE

OF

SB95

9'13

"E-

2639

.39'

(Meo

s.)B

rass

Cop

S89°

57'E

(G.L

.O.)

TRIS

TATE

LAN

DSU

RV

EYIN

G&C

ON

SULT

ING

S89

57E

(G.L

.O.)

180

NO

RTH

VER

NA

LA

VE.

-

VER

NA

L,U

TAH

8407

8(4

35)

781-

2501

IMO

NU

M£N

T ÐU

T7E

P-J6

-8-1

6D

ATE

SUR

VEY

ED:

=SE

CTI

ON

CO

RN

ERS

LOC

ATE

D(S

urfa

ceLo

cat/o

n)N

AD

BJ

09-2

6-07

SUR

VEY

EDB

Y:

T.H

.

LAT/

TUD

E=

40'0

4°22

.78"

DA

TED

RA

WN

:D

RA

WN

BY

:F.

T.M

BA

SIS

OF

ELEV

;l.0

NG

/TU

DE

=11

004

'46

.30"

10-2

4-07

U.S

.G.S

.7-

1/2

min

QU

AD

(MY

TON

SE)

REV

ISED

:SC

ALE

:1"

=10

00'

03-0

4---

08

Page 74: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD PRODUCTION COMPANYWELL PAD INTERFERENCE PLAT

MONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Pad Location: NESE Section 35, TBS, Ri6E, S.L.B.&M.

Future Pit

2-35-8-16 (EX/ST/NG)

15, P- 38-8-18 (PROPOSED)

ExistingAccess

Edge ofExistingPad

Existing Road

TOP HOLE FOOTAGESP-36-8--16 (PROPOSED)207J' FSL & 646' FEL BOTTOMHOLE TOOTAGES

P-J6-8-16 (PROPOSED)1117' ESL & 188' FWL

Note:Bearings are based onGLO Information. LATITUDE & LONGITUDE

RELATIVE COORDINATES Surfa,ce position of WeL¿s (NAD 83)From top hole to bottom hole WELL LATlTUDE LONGITUDE

WELL NORTH EAST P-36-8-16 40 04' 22.18" 110° 04' 46.30"P-36-8-16 -956° 835' 2-35-8--16 40 04' 22.35" 110° 04' 46.47"

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 (435) 781-2501

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 Land Surveying, Inc.SCALE: 1" = 50' REVISED: L.C.S. 03-04-08 \ 180 NORTHVERNAL AVE. VERNAL, UTAH 84078

RECEIVED July 21,

Page 75: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD PRODUCTION COMPANYMONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Pad Location: NESE Section 35, T8S, Ri6E, S.L.B.&M.

ExistingAccess

TA.590"o o oo viÏ rõÞ¾

stocreil.

F/0. 443'

STA._2_+10

- Toe ofEdge ofFill S/opeExisting

Pad

STA. 1+56Proposed Wet/ Fl.ARE

F/ore pit is toWELL HEAD: be locoted atEX/ST/NGGRADED least 80' fromGROUND= 5520' we// head.

MA.120

STA. 0+00

ExistingStock Pile

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 /Tri State """''-2

DRAWN BY: F.T.M. DATE DRAWN: 10-24-07 / Land Surveying, Inc.SCALE: 1" = 50' REVISED: / 9 180 NORTH VERNAL AVE. VERNAL. UTAH84078

RECEIVED July 21,

Page 76: NEWFIELD - Utah

July 21, 2010July 21, 2010

NEWFIELD PRODUCTION COMPANYCROSS SECTIONS

MONUMENT BUTTE P-36-8-16 (Proposed Well)MONUMENT BUTTE 2-35-8-16 (Existing Well)

Il

1" = 50' SM. 2+90

1" = 50' S7A. 2+10

Ex/ST/NG FIN/SHEDGRADE GRADE

r = so SM. 1+56

II -- ---

1" = so SM. 0+20 ESTlMATEDEARTHWORK QUANTITIES(No Shrink or swell adjustments have been used)

(Expressed in Cubic Yards)

ITEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 140 140 ToPsoil is 0

UNLESS OTHERWISE PIT 400 0 n Pa Ctd

NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 540 140 130 400

SURVEYED BY: T.H. DATE SURVEYED: 09-26-07 Tri State c-as;zer-2so

DRAWNBY: F.T.M. DATE DRAWN: 10-24-07 / La,nd Surveying, Inc.SCALE: 1" = 50' REvisED: / 9 180 NORTH VERNAL AVE. VERNAL,UTAH 84078

RECEIVED July 21,

Page 77: NEWFIELD - Utah

July 21, 2010July 21, 2010

U)

OU

)

xist

ing

Roa

d

P/R

TSH

OU

SE

DO

GH

OU

SEW

ATE

RTA

NK

Ligh

tPl

ant

CA

TWA

LKR

IGB

ASE

Fuel

Line

156'

PIPE

108

--

MU

DPU

MP

7]S'

IPI

DE

TUS

MU

DTA

NK

141'

p15

'M

UD

PUM

PSH

Met

erY

ELLO

WD

OG

Shed

DA

TA

10N

CH

700

N

C

Page 78: NEWFIELD - Utah

July 21, 2010July 21, 2010

Newfield Production CompanyProposed Site Facility Diagram

Greater Monument Butte P-36-8-16

From the 2-35-8-16 Location

NE/SE Sec. 35 TSS, R16E

Duchesne County, Utah

UTU-16535

Site Security Plan is held at the PleasantValley Office, Duchesne County, Utah

wellllea<\ Production Phase:

1) Valves 1, 3, and 4 sealed closedWell Head

0......... 2) Valves 2, 5, and 6 sealed open

Pumpin UnitSales Phase:

Pumping Unit 1) Valves 1, 2, 4, 5, and 6 sealed closedA

2-35-8-16 2) Valve 3 open

Draining Phase:

Heater Treater 1) Valves 1 and 6 openlI

GasSalesMeteg --- -y-·-I

|_ Water Tank-- - 6

400 bblLegend

II Emulsion Line ···

ILoad Rack ---¯¯¯¯¯¯¯¯

2 Water Line --· --· --· -· --·

Production Tank 4 Gas Sales - -'

LoadRack -------- ---- -- )400 bbl Oil Line

I '

i ii

I I 5

i Diked Section I i 2I I Production Tank

Ii ------ 4400 bbl

I.---.-- 1

RECEIVED July 21,

Page 79: NEWFIELD - Utah

July 21, 2010July 21, 2010

1 iceT

Myton

I

oke13orelem

LLEY

Monument Butte P-36 (Proposed Wen)Monument Butte 2.35 (Existing Weil)

22,7 ml.

6tic

---- Legend

if-Ñ/4/4 Exisdng RoadAM.Gw.psy fw.

(435) 781•2501100 elonhWmd Ave, Vermi. Ulah$4070

Monument Butte P-30-8-16 (Proposeci Well)Monument Butte 2-35-8-16 (Existing Well) , . .

Pad Location: NESE SEC. 38, TSS, R16E, S.L.B.SM.

RËL D Hy

Page 80: NEWFIELD - Utah

July 21, 2010July 21, 2010

- - - + -

Monument Butte P-36 (Proposed Well)Monument Butte 2-35 (Existing Well)

fg¢fg- Ex

addn

osd

A (435) 181.2501100 No di vernalAve Vermi, Utah84078

Monument Butte P-36-8-18 (Proposed Well)Monument Butte 2-35-8-18 (Existing Well)

Pad Location: NESE SEC. 35, TBS,RiBE, S.L.B.AM.

RECEIVED July 21,

Page 81: NEWFIELD - Utah

July 21, 2010July 21, 2010

Monument Butte P-30 (ProposedWell)Monument Butte 2.36 (Existing Well)

ExistingGas Pipellne

Legend

'-fg Exisdng Road

\ (435)781.2501

, ONorm vemala. Vema, Umb omo

Monument Butte P-36-8-16 (Proposed Well)Monument Butte 2-35-8-16 (Existing Well)

Pad Location: NESESEC. 35, TSS, Ri6E, S.L.B.&M. I e i ! I

uy

Page 82: NEWFIELD - Utah

July 21, 2010July 21, 2010

'dŠ;244+X•2

I

3 exe4+.5. ·:4. .:.:48

in \x. y .:.:

M -l • •z•i e -r -2 4-24

. 44e .zar.;,

2+3N .>44•P <•M

\!$4 (N +¾M •

\• L •

•IM •í. ·!.

.: si I +. a

c

\A

a -

MNN +

l gri-ja - .w.

.g4

. . .g

- a

244.

.; isì •i 2 ·

14+ ht! (N •hga

x n \24 Mi \I•: Ni•ž

e a a

I

RECEIVED July 21,

Page 83: NEWFIELD - Utah

July 21, 2010July 21, 2010

.I «

0

g i

OMonument Butte P-36 (Proposed Well)Monument Butte 2-35 (Existing Well)

e

e e

e

---ess Legend sm--

|- fggfy O Pad Location@ BottomHole t.ocation

.,

(435) 781.2501 Q One·MIIeRadius180 NorthWmal Ave Vemat. Utah $4018

Monument Butte P-36-8-16 (Proposed Well)Monument Butte 2-35-8-18 (Existing We11) ·

- . Exhibit "B"Pad Location: NESESEC. 35, TBS,RiBE,

Page 84: NEWFIELD - Utah

July 21, 2010July 21, 2010

2-M SYSTEMBlowout Prevention Equipment Systems

ii

EXHIBIT C

RECEIVED July 21,

Page 85: NEWFIELD - Utah

BLM- Vernal Field Office - Notification FormOperator Newfield Exploration Rig Name/# Ross #29Submitted By Mitch Benson Phone Number (435) 823-5885Name/Numer GREATERMONUMENTBUTTEP-36-8-16Qtr/QrtNE/SE Section 39 Township 8S Range 16ELease Serial Number UTU-16535API Number 43-013-33894

Spud Notice - Spud is the initial spudding of the well, not drillingout below a casing string.

Date/Time 10/13/2010 8:00:00 AM

Casinq - Please report time casing run starts, not cementingtimes.

x surfacecasingIntermediateProduction CasingLinerOther

Date/Time 10/13/2010 2:00:00 PM

Page 86: NEWFIELD - Utah

Form3160-3 FORM APPROVED(August2007) OMBNo.1004-0137

ExpiresJttly31,2010UNITED STATESDEPARTMENT OF THE IN Í 5. LeaseSerialNo.

UTU-16535BUREAUOFLANDMANAGEMENT6. IfIndian,Alloteeor TribeNameAPPLICATION FOR PERMIT 9 1 NA

O O 2 IfUnitor CAAgreement,NameandNo.la. Typeof work: / DRILL REENTERGreater Monument Butte

8. Lease NameandWellNo.Ib. Typeof Well: OilWell GasWell Other SingleZone MultipleZone Greater Monument Butte P-36-8-162. Nameof0perator Newfield Production Company 9. API WellNo.

3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo.(include area code) 10.FieldandPool,or Exploratory(435) 646-3721 Monument Butte

4. Locationof Well (Report locationclearly and in accordancewith anyState requirements.*) 11.Sec.,T. R.M. or Blk.andSurveyorAreaAt surface NE/SE 2073' FSL 646' FEL Sec. 35, T8S R16E . (UTU-16535) Sec. 35, T8S R16EAt proposedprod.zone SWISW 1117' FSL 188' FWL Sec. 36, T8S R16E (ML-22061)

14. Distancein miles anddirectionfromnearesttownor postoñice* 12.Countyor Parish 13. StateApproximately 13.3 miles southwest of Mytort, UT Duchesne UT

15. Distancefromproposed* 16. No.of acresin lease 17. SpacingUnitdedicatedtothiswelllocationtonearestpropertyorleaseline,ft. Approx. 188' fllse, NA' flunit 920.00(Alsoto nearest drig.unit line,if any) 20 Acres

18. Distancefromproposedlocation* 19.ProposedDepth 20. BLM/BIABondNo.onfileappnldator

o thisling,e mpleted' Approx. 1431' 6,520' WYBOOO493

21. Elevations(ShowwhetherDF,KDB, RT, GL,etc.) 22 Approximatedatework will start* 23. Estimatedduration5520' GL È - (7) days from SPUD to rig release

24. AttachmentsThefollowing,completedinaccordancewith the requirements of OnshoreOilandGasOrderNo.1, must be attachedto this form:

1. Wellplatcertifiedbya registeredsurveyor. 4. Bondtocover the operationsunlesscoveredbyan existingbondon file (see2. A DrillingPlan. Item20 above).3. A SurfaceUsePlan (if the location is on National Forest SystemLands, the 5. Operatorcertification

SUPO mustbe filedwiththe appropriateForestServiceOffice). 6. Suchothersitespecificinformationand/orplansas maybe requiredbytheBLM.

25. S NMaamne(ePrint Terped) Da

TitleRegulatory Specialist

Approvedby(Si re Nameda OS H. Sparger ciaeaiTit / t FieldManager office

Applicationapprovaldoesnot warrantoc fthRa arpop

cant holdslegaloc°o"addictonpse opnpsrovheoniy,

are attached. CONDITIONSOFAPPROVALATTACHEDTitle 18U.S.C.Section1001andTitle43 U.S.C.Section1212,makeita crime foranypersonknowinglyand willfullytomaketoany departmentor agencyofthe UnitedStatesanyfalse,fictitiousor fraudulent statementsor representationsas to any matter withinitsjurisdiction.

(Continued on page 2) *(Instructions on page 2)

NOTICEOFAPPROVALNOSM°

RECENED AFMSS#¾0CT'i 9 2010

OlV.0FOlL,GAS&

Page 87: NEWFIELD - Utah

UNITED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Newfield Production Company Location: NESE, Sec. 35, T8S, R16EWell No: Greater Monument Butte P-36-8-16 Lease No: UTU-16535API No: 43-013-33894 Agreement: Greater Monument Butte (GR)

OFFICE NUMBER: (435) 781-4400

OFFICE FAX NUMBER: (435) 781-3420

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance is made with the applicablelaws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill including Surface andDownhole Conditions of Approval. The operator is considered fully responsible for the actions of his subcontractors.A copy of the approved APD must be on location during construction, drilling, and completion operations. Thispermit is approved for a two (2) year period, or until lease expiration, whichever occurs first. An additionalextension, up to two (2) years, may be applied for by sundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Environmental Scientist) access roads.

Location Completion - Prior to moving on the drilling rig.(Notify Environmental Scientist)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify Petroleum Engineer)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and(Notify Supv. Petroleum Tech.) cementing all casing strings to: ut vn [email protected].

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Supv. Petroleum Tech.)

First Production Notice - Within Five (5) business days after new well begins or(Notify Petroleum Engineer) production resumes after well has been off production for

more than ninety (90)

Page 88: NEWFIELD - Utah

Page 2 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

· All new and replacement internal combustion gas field engines of less than or equal to 300 design-rated horsepower must not emit more than 2 gms of NOx per horsepower-hour. This requirementdoes not apply to gas field engines of less than or equal to 40 design-rated horsepower.

• All and replacement internal combustion gas field engines of greater than 300 design ratedhorsepower must not emit more than 1.0 gms of NOx per horsepower-hour.

• Ifthere is an active Gilsonite miningoperation within 2 miles of the well location, operator shallnotifythe Gilsonite operator at least 48 hours prior to any blasting during construction.

• If paleontological materials are uncovered during construction, the operator is to immediately stopwork and contact the Authorized Officer (AO). A determination will be made by the AO as to whatmitigationmay be necessary for the discovered paleontologic material before construction cancontinue.

• All permanent surface equipment (meaning on site for six months or longer) will be painted CovertGreen to match the surrounding landscape color unless otherwise authorized. This would include allfacilities except those required to comply with Occupational Safety and Health Act (OSHA)regulations.

• Prior to construction, an invasive plants/noxious weeds inventory will be completed for all areaswhere surface disturbance willoccur, and a completed Weed Inventory Form will be submitted tothe BLMAuthorized Officer.

Reclamation

• Reclamation will be completed in accordance with the Newfield Exploration Company Castle Peakand Eight Mile Flat Reclamation Plan on file with the Vernal Field Office of the BLM.

Seed Mix (Interim and Final Reclamation)

Latin name Ibslacre RecommendedCommon name seed planting

depthSquirreltail grass Elymus elymoides 2.0 ¼ - ½"Bluebunch Pseudoroegneria 1.0 ½"wheatgrass spicataShadscale saltbush Atriplex confertifolia 2.0 ½"Four-wing saltbush Atriplex canescens 3.0 ½"Gardner's saltbush Atriplex gardneri 1.0 ½"Scarlet globemallow Sphaeralcea 1.0 ½ - ¼"

COGCÍn68

= All pounds are pure live seed.• All seed and mulch will be certifiedweed free.• Rates are set for drill seeding; double rate if

Page 89: NEWFIELD - Utah

Page 3 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

Monitoring and Reporting

• The operator shall submit a Sundry Notice (Form 3160-5) to the BLMAuthorized Officer (AO)that designates the proposed site-specific monitoring and reference sites chosen for thelocation. A description of the proposed sites shall be included, as well as a map showing thelocations of the proposed sites.

• The operator shall submit a Sundry Notice (Form 3160-5) to the BLMAuthorized Officer (AO) 3growing seasons after reclamation efforts have occurred evaluating the status of the reclaimedareas in order to determine whether the BLMstandards set forth in the Green River DistrictReclamation Guidelines have been met (30% or greater basal

Page 90: NEWFIELD - Utah

Page 4 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)

SITE SPECIFIC DOWNHOLE COAs:

Site Specific Drilling COA

• Newfield Production Co. shall adhere to all referenced requirements in the SOP (yersion: June 24,2008) ) along with all Oil and Gas rules and requirements listed in the Code of Federal Regulationsand all Federal Onshore Oil and Gas Orders.

AII provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictly adheredto. The following items are emphasized:

DRILLINGICOMPLETIONIPRODUCING OPERATING STANDARDS

• The spud date and timeshall be reported orally to Vernal Field Office within 24 hours of spudding.

• Notify Vernal Field Office Supervisory Petroleum Engineerinq Technician at least 24 hours inadvance of casinq cementinq operations and BOPE & casinq pressure tests.

• AIIrequirements listed in Onshore Order #2 III.E. Special Drilling Operations are applicable for airdrilling of surface hole.

• Blowout prevention equipment (BOPE) shall remain in use untilthe well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.

• All BOPE components shall be inspected daily and those inspections shall be recorded in the dailydrilling report. Components shall be operated and tested as required by Onshore Oil & Gas OrderNo. 2 to insure good mechanical working order. All BOPE pressure tests shall be performed by atest pump with a chart recorder and i by the rig pumps. Test shall be reported in the driller'slog.

• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out from underthe surface casing and weekly thereafteras specified in Onshore Oil & Gas Order No. 2.

• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

• No aggressivelfresh hard-banded drill pipe shall be used within casing.

• Cement baskets shall not be run on surface casing.

• The operator must report all shows of water or water-bearing sands to the BLM. Ifflowingwater isencountered it must be sampled, analyzed, and a copy of the analyses submitted to the BLMVernalField Office.

• The operator must report encounters of all non oil& gas mineral resources (such as Gilsonite, tarsands, oilshale, trona,etc.) to the Vernal Field Office, in writing,within5 workingdays of

Page 91: NEWFIELD - Utah

Page 5 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

encounter. Each report shall include the well namelnumber, well location, date and depth (from KBor GL) of encounter, vertical footage of the encounter and, the name of the person making thereport (along with a telephonenumber) should the BLMneed to obtain additional information.

• A complete set of angular deviation and directional surveys of a directional wellwill be submitted tothe Vernal BLMoffice engineer within 30 days of the completion of the well.

• While activelydrilling, chronologic drilling progress reports shall be filed directly with the BLM,Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

• A cement bond log (CBL) will be run from the production casing shoe to the top of cement and shallbe utilizedto determine the bond quality for the production casing. Submit a field copy of the CBLto this office.

• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement for submittalof paper logs to the BLM.

• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operation musthave prior approval from the BLMVernal Field

Page 92: NEWFIELD - Utah

Page 6 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

OPERATING REQUIREMENT REMINDERS:

• All wells, whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, lease serialnumber, well number, and surveyed description of the well.

• In accordance with 43 CFR 3162.4-3, thiswell shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in which operationscommence and continue each month untilthe well is physically plugged and abandoned. Thisreport shall be filed in duplicate, directly with the Minerals Management Service, P.O. Box 17110,Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

• Should the well be successfully completed for production, the BLMVernal Field office must benotifiedwhen it is placed in a producing status. Such notificationwillbe by written communicationand must be received in this office by not later than the fifth business day following the date onwhich the well is placed on production. The notification shall provide, as a minimum,the followinginformational items:

o Operator name, address, and telephonenumber.

o Well name and number.

o Well location (¼¼,Sec., Twn, Rng, and P.M.).

o Date wellwas placed in a producing status (date of first production for which royalty will bepaid).

o The nature of the well's production, (i.e., crude oil,or crude oiland casing head gas, ornatural gas and entrained liquid hydrocarbons).

o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i e., State or private.

o Unit agreement and/or participating area name and number, if applicable.

o Communitization agreement number, if applicable.

• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLMVernal Field Office.

• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A will bereported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall be reportedverbally within 24 hours, followed by a written report within 15 days. "Other than Major Events" willbe reported in writing within 15 days. "Minor Events" will be reported on the Monthly Report ofOperations and Production.

• Whether the well is completed as a dry hole or as a producer, "Well Completion and RecompletionReport and Log" (BLM Form 3160-4) shall be submitted not later than 30 days after completion ofthe wellor after completion of operations being performed, in accordance with43 CFR 3162.4-1.Two copies of all logs run, core descriptions, and all other surveys or data obtained and compiledduring the drilling, workover, and/or completion operations, shall be filed on BLM Form

Page 93: NEWFIELD - Utah

Page 7 of 7Well: Greater Monument Butte P-36-8-16

9/29/2010

Submit with the well completion report a geologic report including, at a minimum, formation tops,and a summary and conclusions. Also include deviation surveys, sample descriptions, strip logs,core data, drill stem test data, and results of production tests if performed. Samples (cuttings, fluid,and/or gas) shall be submitted onlywhen requested by the BLM,Vernal Field Office.

• All off-lease storage, off-lease measurement, or comminglingon-lease or off-lease, shall have priorwritten approval from the BLMVernal Field Office.

• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLMVernal Field OfficePetroleum Engineers will be provided with a date and timefor the initial meter calibration and allfuture meter proving schedules. A copy of the meter calibration reports shall be submitted to theBLMVernal Field Office. All measurement facilities will conform to the APl standards for liquidhydrocarbons and the AGA standards for natural gas measurement. All measurement points shallbe identified as the point of sale or allocation for royalty purposes.

• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submitted tothe BLMVernal Field Office within 30 days of installation or first production, whichever occurs first.AIIsite security regulations as specified in Onshore Oil & Gas Order No. 3 shall be adhered to. AIIproduct lines entering and leaving hydrocarbon storage tanks will be effectively sealed inaccordance with Onshore Oil & Gas Order No. 3.

• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which willresult in the disturbance of new ground, shall require the filing of asuitable plan and need prior approval of the BLMVernal Field Office. Emergency approval may beobtained orally, but such approval does not waive the written report requirement.

• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without prior approvalof the BLMVernal Field Office. If operations are to be suspended for more than 30 days, priorapproval of the BLMVernal Field Officeshall be obtained and notificationgiven before resumptionof operations.

• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of water producedfrom thiswell for a period of 90 days from the date of initial production. A permanent disposalmethod must be approved by this officeand in operation prior to the end of this 90-day period. Inorder to meet this deadline, an application for the proposed permanent disposal method shall besubmitted along with any necessary water analyses, as soon as possible, but no later than 45 daysafter the date of first production. Any method of disposal which has not been approved prior to theend of the authorized 90-day period will be considered as an Incident of Noncompliance and will begrounds for issuing a shut-in order untilan acceptable manner for disposing of said water isprovided and approved by this office.

• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notifiedat least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended or abandoned,all pits must be fenced immediately until they are backfilled. The "Subsequent Report ofAbandonment" (Form BLM3160-5) must be submitted within30 days after the actual plugging ofthe well bore, showing location of plugs, amount of cement in each, and amount of casing left inhole, and the current status of the surface

Page 94: NEWFIELD - Utah

STATEOF UTAH OPERATOR: NEWFIELD PRODUCTION COMPANY OPERATORACCT.No. N2695DMSION OF OIL,GASANOMINING ADDRESS: RT.3 BOX 3630ENT1TYACTION FORM -FORM 6 MYTON, UT 84052

ACilON CURRENT NEW API NUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITY NO. ENT1TYNO. QQ U i W 80 i COUN I Y DATE DATEV' GREATER MON BUTTEB 99999 17400 4301333894 P-36-8-16. NESE 8S 16E DUCHESNE 10/13/2010

WELL 1 COMMENTS:

ACTION CURRENT NEW API NUMBER WELL NAME WELLLOCATION SPUD EFFECTIVECODE ENTITYNO. ENTITYNO. GO SC TP Ì RG ( COUNTY DATE DATE

A 99999 ÜÑËÌ 4304751117 UTE TRIBAL 13-1-4-1E SWSE- 1 4S 1E UINTAH 10/12/2010 /O

GsedACTION CURRENT NEW API NUMBER WEi.LNAME WELLi.OCATION SPUD EFFECT1VECODE ENTITY NO. ENTITY NO. QU W W kb LUUN O DATE

A 99999 Ö $ÂR 4304751120 UTE TRIBAL 4904754420- NENE 10 4S 1E UINTAH 10/12/2010 /

ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCAT10N SPUD EFFECTIVECODE ENTlTYNO. I ENTITYNO. , QQ SC TP RG COUNTY DATE DATEId14o /E 39999- 17740 4301350294 STEWART 3-24-4-2 NENW 24 4S 2W DUCHESNE 8/10/2010 / /DChange formation Fl GRRV to GR-WS

ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCATION SPUD EFFECTIVECODE ENTITYNO. ENTlTYNO. QQ SC Í TP RG [ COUNTY DATE DATE

WELL 5 COMMENTS:

ACTION CURRENT NEW APlNUMBER WELI.NAME WELLLOCATION SPUD EFFECTIVECODE ENTITYNO. ENT1TYNO. QQ SC TP RG COUNTY DATE DATE

WELL5 COMMENTS|

ACTIONCODES (See instmcilonson backofform)A- inewentityfornowwoll(singlowelloaly)

B- •wolliooxistingentKy(grouporunitwo11) RECEIVED aans easc - romone existingentityto anothero×1slinsentity atureD - wellfromone exl:tingentitytoa nowentityE- thor(explainincommentasootion) ÛÛT19 2Û$Û on C k 10/19/10

NOTE:UseCOMMENTsectiontoexplainwhyeachActionCodewasselected.

DIV.OFOIL,GAS&

Page 95: NEWFIELD - Utah

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

5. LEASE DESIGNATIONAND SERIAL NUMBER:DIVISION OF OlL, GAS AND MINING USA UTU-16535

6. IF INDIAN, ALLOTTEE OR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS7. UNITor CA AGREEMENT NAMEDo not use this form for proposals to drill new wells, significantly deepenexisting wells below current bottom-holedepth, reenter plugged

wells, or to drill horizontallaterals. Use APPLICATION FOR PERMIT TO DRILL formfor such proposals. GMBUl. TYPE OF WELL: 8. WELL NAME and NUMBER:

OIL WELL GAS WELL 0 OTHER GREATER MB P-36-8-16

2. NAME OF OPERATOR: 9. API NUMBER:

NEWFIELD PRODUCTION COMPANY 43013338943. ADDRESSOF OPERATOR; PHONE NUMBER 10. FIELD AND POOL, OR WILDCAT:

Route 3 Box 3630 CITY Myton STATE UT ZIP 84052 435.646.3721 GREATER MB UNIT4. LOCATION OF WELL:

FOOTAGESAT SURFACE: 2073 FSL 646 FEL COUNTY: DUCHESNE

OTRioTR. SECTION. TOWNSHIP. RANGE. MERIDIAN: NESE, 3 8S, R16E STATE: UT

u. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONO NOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date workwill CASING REPAIR NEW CONSTRUCTION O TEMPORARITLY ABANDON

O CHANGE TO PREVIOUSPLANS OPERATOR CHANGE TUBING REPAIR

O CHANGE TUBING PLUGAND ABANDON VENT OR FLAIR

SUBSEOUENT REPORT Q CHANGE WELLNAME PLUGBACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/STOP) WATER SHUT-OFFDate of Work Completion: O COMMINGLE PRODUCING FORMATIONS RECLAMATION OF WELL SITE OTHER: - Weekly Status Report

11/19/2010 CONVERTWELL TYPE RECOMPLETE- DIFFERENT FORMAT[ON

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS.Clearly show all pertinent details includingdates, depths, volumes, etc.

The above subject well was completed on 11-19-10, attached is a daily completion status report.

NAME (PLEEASE PRIN cy av TDATLEE miniStratiVB ASSiStant

I i

(This space forStateuse only) RECEIVEDNOV23 2010

DIV.0FOIL,GAS&

Page 96: NEWFIELD - Utah

Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For Sundry

MON BT P-36-8-169/1/2010 To 1/30/2011

11/2/2010 Day: 1 Completion

Rigless on 11/2/2010 - Run CBL & perforate stg #1 - Install Sm frac head. NU 6" 5K CameronBOP. RU H/O truck & pressure test casing, blind rams, frac head, csg & casing valves to 4500psi. RU Perforators LLC WLT w/ mast & run CBL under pressure. WLTD © 6401' & cement top@ 70'. Perforate stage #1, CP5 sds @ (6283'-86') w/ 3 1/8" Port plug guns ( 11 gram .36" EH16.82" pen) w/ 3 spf for total of 9 shots. CP5 sds @ (6267'-71') w/ 3 1/8" Port plug guns ( 11gram .36" EH 16.82" pen) w/ 3 spf for total of 12 shots. RD H/O truck & The Perforators WLT& mast. Wait on frac crew EWTR 153 BBLSDaily Cost: $0Cumulative Cost: $12,485

11/11/2010 Day: 2 Completion

Nabors #809 on 11/11/2010 - Frac first 3 stages. Got stuck in grease tubes w/ WL. Splice line& POOH w/ perf gun. - Frac the first 3 stages as detailed. Wireline got hung up in their greasetubes and got stuck @ 4646'. First we didn't know if it was the plug or not so we set the plug.Still couldn't move so we bled the pressure off well & lifted the lubricator & found the wirelinestuck. Cut WL, spliced together & POOH w/ perf gun. MIRUSU. NU pipe rams. RU rig floor.Daily Cost: $0Cumulative Cost: $21,966

11/12/2010 Day: 3 Completion

Nabors #809 on 11/12/2010 - Talley & PU tbg. Drill out plug @ 4646'. PU tbg & push plugremains to ne×t plug. TOOH w/ tbg & ready to frac in AM. - Check pressure on well, 100 psi.NU wash head. Talley & PU 4 3/4" chomp bit, bit sub & 149- jts 2 7/8" 6.5# 8rd EUE tbg. Tagplug @ 4646'. Ru drill equipment. Drill out plug in 14 min. Circulate well clean. RD powerswivel. PU 33- jts tbg to push plug remains down to sand @ 5664'. TOH w/ 182- jts tbg &BHA. RD rig floor. ND wash head & pipe rams. Drain pump & pump lines. SWIFN. 850 BWTR.Daily Cost: $0Cumulative Cost: $34,204

11/13/2010 Day: 4 Completion

Nabors #809 on 11/13/2010 - Frac remaining 3 stages & flow back - Frac remaining 3 stagesas detailed. Open for immediate flowback @ approx 3 BPM. Well flowed for 5 hours & turnedto oil & gas. 1750 BWTR.Daily Cost: $0Cumulative Cost: $181,308

11/16/2010 Day: 5 Completion

Nabors #809 on 11/16/2010 - Set kill plug. ND Cameron BOP. NU Schaeffer BOP. RIH w/ tbg.Tag CBP. SWIFN. - RU The PSI wireline. Set composite kill plug @ 4490'. Bleed off well. NDCameron BOP & Sm frac head. NU 3m production head & Schaeffer BOP. RIH w/ 4 3/4" chomp

http://www.inewfld.com/denver/SumActRpt.asp?RC=219395&API=4301333894&MinD...

Page 97: NEWFIELD - Utah

Summary Rig Activity Page 2 of 2

bit, bit sub & new 2 7/8" tbg. from pipe racks (tallying & drifting). Tag CBP @ 4490'. Pull up to445T. SWIFN.Daily Cost: $0Cumulative Cost: $189,950

11/17/2010 Day: 6 Completion

Nabors #809 on 11/17/2010 - DU CBPs. C/O to PBTD. - RIH w/ tbg. Tag CBP @ 4490'. RUpowerswivel. DU CBP in 35 min. Cont. RIH w/ tbg. Tag CBP @ 4715'. DU CBP in 15 min. Cont.RIH w/ tbg. Tag fill @ 5160'. C/O to CBP @ 5170'. DU CBP in 13 min. Cont. RIH w/ tbg. Tagfill @ 5275'. C/O to CBP @ 5310'. DU CBP in 20 min. Cont. RIH w/ tbg. Tag fill @ 5625'. C/Oto CBP @ 5720'. DU CBP in 18 min. Cont. RIH w/ tbg. Tag fill @ 5890'. C/O to CBP @ 6020'.DU CBP in 25 min. Cont. RIH w/ tbg. Tag fill @ 6295'. C/O to PBTD @ 6435'. Circulate welldean. Pull up to 6320'. SWIFN. 1700 BWTR.Daily Cost: $0Cumulative Cost: $196,522

11/18/2010 Day: 7 Completion

Nabors #809 on 11/18/2010 - Flow well. Kill well. POOH w/ tbg. RIH w/ production tbg.SWIFN. - Csg. @ 600 psi, tbg. @ 425 psi. Open well to flat tank. Flow well for 3 hrs.Recovered 185 bb\s. Trace of oil. No show of sand. Kill tbg. w/ 20 bbis water. RIH w/ tbg. Tagfill @ 6380'. C/O to PBTD @ 6435'. Circulate well clean w/ 10# brine. POOH w/ tbg. LD BHA.RIH w/ 2 7/8" notched collar, 2 jts 2 7/8" tbg., PSN, 1 jt 2 7/8" tbg., 5 1/2" TAC & 199 jts 27/8" tbg. SWIFN. 1515 BWTR.Daily Cost: $0Cumulative Cost: $207,026

11/19/2010 Day: 8 Completion

Nabors #809 on 11/19/2010 - ND BOP. RIH w/ rods. RU pumping unit. Hang off rods. Stroketest to 800 psi. Good pump action. PWOP @ 4:30 p.m. 144" stroke length, 4.5 spm. FinalReport. 1575 BWTR. - Csg. @ 400 psi, tbg. @ 50 psi. Bleed off well. Pump 170 bbls 10# downcsg. ND BOP. Set TAC @ 6233' w/ 18,000# tension. NU wellhead. X-over for rods. RIH w/Central Hydraulic 2 1/2" x 1 3/4" x 20' x 24' RHAC rod pump, 4- 1 1/2" weight bars, 244- 7/8"guided rods (8 per), 1- 4', 1- 2' x 7/8" pony subs, 1 1/2" x 30' polished rod. Seat pump. RUpumping unit. Hang off rods. Stroke test to 800 psi. Good pump action. PWOP @ 4:30 p.m.144" stroke, 4.5 SPM. Final Report. 1575 BWTR, FinalizedDaily Cost: $0Cumulative Cost: $245,094

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=219395&API=4301333894&MinD...

Page 98: NEWFIELD - Utah

Form 3160-4(August 200

UNITED STATESFORM APPROVEDDEPARTMENT OF THE INTERIOR OMB NO. 1004-0137

BUREAU OF LAND MANAGEMENT Expires:July 31,2010

WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.UTU-16535

la. Type of Well Oil Well Gas Well Dry Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion: 2 New Well Work Over Deepen Plug Back Diff. Resvr.,

7. Unitor CA Agreement Name and No.Other: GMBU2. Name of Operator 8. Lease Name and WellNo.NEWFIELD EXPLORATION COMPANY GREATER MONUMENT BT P-36-8-163. Address 3a. Phone No. (include area code) 9. AFI Well No.

1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-338944. Location of Well (Report location clearly and in accordance with Federal requirements)*

, j 10. Field and Pool or Exploratory$dL DA,UtfD3fu GREATER MB UNITAt surface 2073' FSL &646' FEL (NE/SE) SEC. 35, T8S, R16E (UTU-16535) gg 11. Sec., T., R., M., on Block and

Surveyor AreaSEC. 35. TSS, R16E

At top prod. interval reported below 1438' FSL & 91' FEL (NE/SE) SEC. 35, T8S, R16E (UTU-16535) 12. County or Parish 13. State

At total depth 1137' FSL &170' FWL (SWlSW) SEC. 3, T8S, R16E (ML-22061) DUCHESNE UT14. Date Spudded 15. Date T.D. Reached 16. Date Completed 11/18/2010 17. Elevations (DF, RKB, RT, GL)*10/13/2010 10/26/2010 D & A Ready to Prod. 5520' GL 5532' KB

18. Total Depth: MD 6490• 19. Plug Back T.D.: MD 6435' 20. Depth Bridge PlugSet: MDTVD 6352' TVD t.729 TVD

21. Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? No Yes (Submit analysis)DUAL IND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMTBOND WasDSTrun? No Yes (Submitreport)

Directional Survey? No O Yes (Submit copy)23. Casingend LinerRecord (Report all strings set in well)

Stage Cementer No. of Sks. & Slurry VolHole Size Size/Grade Wt. (#/ft) Top (MD) Bottom (MD) Depth Type of Cement (BBL) Cement Top* AmountPulled

12-1/4" 8-5/8" J-55 24# 0 354' 180 CLASS G7-7/8" 5-1/2" J-55 15.5# 0 6480' 300 PRIMLITE 70'

430 50/50 POZ

24. Tubing TecordSize Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD)

2-7/8" |EOT@ 6332' |TA@6234'25. Producing Intervals 26. Perforation Record

Formation Top Bottom Perforated Interval Size No. Holes Perf. StatusA) Green River 4540' 6286' 6267-6286'

.36" 214540-5949'

.34" 118C)D)

27. Acid, Fracture, Treatment, CementSqueeze, etc.Depth Interval Amountand Typeof Material

4540-6286' Frac wl 190,430#'s 20/40 sand in 1,389 bbis of Lightning 17 fluid in 6 stages

28. Production - Interval ADate First fest Date Hours Test 3il Gas Water Gil Gravity 3as . Production MethodProduced Tested Production BBL MCF BBL Corr.API 3ravity 2-1/2"x 1-3/4" x 20' x 24' RHAC Pump11/12/10 11/28/10 24 10 14 16

Choke Tbg. Press. Osg. 24 Hr. 3il Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio PRODUCING

SI

NED28a. Production - Interval BDate First fest Date Hours Test 3il Gas Water 3il Gravity 3as Production MethodProduced Tested Production BBL MCF BBL Corr.API 3ravity

Choke fbg. Press.Osg. 24 Hr. 3il Gas Water Gas/Oil WellStatusSize F1wg. Press. Rate BBL MCF BBL Ratio

SI

*(Seeinstructions and spaces for additional data on page

Page 99: NEWFIELD - Utah

28b. Production - Interval CDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr.API Gravity

Choke Tbg. Press. Csg. 24 Hr 3il Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio

SI

28c. Production - Interval DDate First Test Date Hours Test Oil Gas Water OilGravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity

Choke Tbg. Press. Osg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio

SI

29. Disposition of Gas (Solid, used forfuel,vented, etc.)

USED FORFUEL

30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers

Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSincluding depth interval tested, cushion used, time toolopen, flowing and shut-in pressures andrecoveries.

TopFormation Top Bottom Descriptions, Contents,etc. Name

Meas. Depth

GREEN RIVER 4540' 6286' GARDEN GULCH MRK 4016'GARDEN GULCH 1 4230'

GARDEN GULCH 2 4352'POINT 3 4627'

XMRKR 4882'YMRKR 4914'

DOUGALS CREEK MRK 5040'BI CARBONATE MRK 5300'

B LIMESTON MRK 5435'CASTLE PEAK 5914'

BASAL CARBONATE 6347WASATCH 6478'

32. Additional remarks (include plugging procedure):

33. Indicate which items have been attached by placing a check in the appropriate boxes:

O Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey

O Sundry Notice for plugging and cement verification Core Analysis Other: Drilling Daily Activity

34. I hereby certify that the foregoing and attached informationis complete and correct as determined from all available records (see attached instructions)*

Name (please pring Lucy Chavez-Naupoto Title Administrative Assistant

Signature Date 12/03/2010

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States anyfalse, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.(Continuedon page 3) (Form 3160-4, page

Page 100: NEWFIELD - Utah

NEWFIELD

NEWFIELD EXPLORATIONUSGS Myton SW (UT)SECTION 35 T8S, R 16EP-36-8-16

Wellbore #1

Design: Actual

Standard Survey Report29 October,

Page 101: NEWFIELD - Utah

NEWFIELD PayZone Directional Services, LLC.Survey Report

Company: NEWFIELDEXPLORATION Local Co-ordinate Reference: Well P-36-8-16Project USGS Myton SW (UT) TVDReference: P-36-8-16 @ 5532.0ft (NEWFIELD)Site: SECTION 35 TSS, R 16E MDReference: P-36-8-16 @ 5532.0ft (NEWFlELD)Well: P-38-8-16 North Reference: TrueWellbore: Wellbore #1 Survey Calculation Method: Minimum CuNature

Design: Actual Database: EDM2003.21 Single User Db

Project USGS Myton SW(UT), DUCHESNE COUNTY,UT, USA

Map System: US State Plane 1983 System Datum: Mean Sea LevelGeo Datum: North American Datum 1983

Map Zone: Utah Central Zone

Site SECTION 35 TSS, R 16E, SEC 35 TSS, R16E

Site Position: Northing: 7,198,099.76 ft Latitude: 40° 4' 19.740 NFrom: Lat/Lang Easting: 2,034,036.30 ft Longitude: 110° 5' 36.110 WPosition Uncertainty: 0.0 ft Slot Radius: " Grid Convergence: 0.90 °

Well P-36-8-16, SHL LAT:40 04 22.18, LONG: -110 04 46.30

Well Position +NI-S 0.0 ft Northing: 7,198,407.80 ft Latitude: 40° 4' 22.180 N+El-W 0.0 ft Easting: 2,037,903.82 ft Longitude: 110° 4° 46.300 W

Position Uncertainty 0.0 ft Wellhead Elevation: 5,532.0 ft Ground Level: 5,520.0 ft

Wellbore Wellbore #1

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)IGRF2010 2010/07/19 11.44 65.84 52,373

Design Actual

Audit Notes:

Version: 1.0 Phase: ACTUAL Tie On Depth: 0.0

Vertical Section: Depth From (TVD) +NI-S +El-W Direction(R) (R) (ft) (*)0.0 0.0 0.0 138.94

Suivey Program Date 2010/10/29

From To(ft) (R) Survey (Wellbore) Tool Name Description

389.0 6.490.0 Survey #1 (Wellbore #1) MWD MWD- Standard

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(A) (°) (°) (A) (A) (ft) (ft) (°Ii00ft) (°/1004) (°I100R)

0.0 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.00 0.00389.0 0.97 154.21 389.0 -3.0 1.4 3.2 0.25 0.25 0.00450.0 1.07 147.93 450.0 -3.9 2.0 4.2 0.25 0.16 -10.30

511.0 1.14 145.65 511.0 -4.9 2.6 5.4 0.14 0.11 -3.74

542.0 1.34 146.80 542.0 -5.5 3.0 6.1 0.65 0.65 3.71

572.0 1.50 142.90 571.9 -6.1 3.4 6.8 0.62 0.53 -13.00

603.0 1.80 137.10 602.9 -6.7 4.0 7.7 1.11 0.97 -18,71

634.0 2.00 139.10 633.9 -7.5 4.7 8.7 0.68 0.65 6.45664.0 2.30 141.30 663.9 -8.4 5.4 9.9 1.04 1.00 7.33695.0 2.60 141.50 694.9 -9.4 6.2 11.2 0.97 0.97 0.65

725.0 2.80 142.00 724.8 -10.5 7.1 12.6 0.67 0.67 1.67756.0 3.20 142.70 755.8 -11.8 8.1 14.2 1.30 1.29 2.26787.0 3.40 138.90 786.7 -13.2 9.2 16.0 0.96 0.65 -12.26

2010/10/29 7:34:04AM Page 2 COMPASS 2003.21 Build

Page 102: NEWFIELD - Utah

NEWFIELD PayZone Directional Services, LLC.

gg Survey Report

Company: NEWFlELD EXPLORATION Local Co-ordinate Reference: Well P-36-8-16

Project USGS Myton SW (UT) TVDReference: P-36-8-16 @5532.0ft (NEWFIELD)Site: SECTION 35 TSS, R 16E MDReference: P-36-8-18 @ 5532.0ft (NEWFIELD)Well: P-36-8-16 North Reference: TrueWellbore: Wellbore #1 Survey Calculation Method: Minimum CurvatureDesign: Actual Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +Nt-S +El-W Section Rate Rate Rate

(II) (°) (*) (II) (it) (it) (ft) (°I100ft) (°iiC0ft) (°Ii00ft)

817.0 3.80 139.00 816.7 -14.6 10.4 17.9 1.33 1.33 0.33848.0 4.20 139.70 847.6 -16.2 11.9 20.0 1.30 1.29 2.26

879.0 4.70 139.30 878.5 -18.1 13.4 22.4 1.62 1.61 -1.29

910.0 5.40 139.60 909.4 -20.1 15.2 25.2 2.26 2.26 0.97942.0 5.80 138.70 941.2 -22.5 17.2 28.3 1,28 1.25 -2.81

974.0 6.20 138.80 973.1 -25.0 19.4 31.6 1.25 1.25 0.311,006.0 6.90 140.50 1,004.9 -27.8 21.8 35.3 2.27 2.19 5.31

1,037.0 7.40 140.90 1,035.6 -30.8 24.2 39.1 1.62 1.61 1.291,069.0 8.00 142.00 1,067.3 -34.1 26.9 43.4 1.93 1.88 3.441,101.0 8.50 142.20 1,099.0 -37.8 29.7 48.0 1.57 1.56 0.631,132.0 9.10 138.70 1,129.6 -41.4 32.8 52.7 2.59 1.94 -11.29

1,164.0 9.50 139.70 1,161.2 -45.3 36.1 57.9 1.35 1.25 3.13

1,195.0 10.00 139.50 1,191.8 -49.3 39.5 63.2 1.62 1.61 -0.65

1,227.0 10.30 139.20 1,223.3 -53.6 43.2 88.8 0.95 0.94 -0.94

1,259.0 10.80 138.80 1,254.7 -58.0 47.1 74.7 1.58 1.56 -1.25

1,290.0 11.30 138.50 1,285.1 -62.5 51.0 80.6 1.62 1.61 -0.97

1,322.0 11.80 138.00 1,316.5 -67.3 55.2 87.0 1.59 1.56 -1,56

1,354.0 12.20 137.50 1,3478 -72.2 59.7 93.7 1.29 1.25 -1.56

1,386.0 12.50 137.20 1,379.1 -77.2 64.4 100.5 0.96 0.94 -0.94

1,418.0 12.80 137.10 1,410.3 -82.4 69.1 107.5 0.94 0.94 -0.31

1,449.0 13.32 137.39 1,440.5 -87.5 73.9 114.5 1.69 1.68 0.941,480.0 13.70 138.40 1,470.6 -92.9 78.7 121.8 1.44 1.23 3.26

1,512.0 13.94 138.94 1,501.7 -98.6 83.8 129.4 0.85 0.75 1.691,544.0 14.02 138.49 1,532.7 -104.4 88.9 137.1 0.42 0.25 -1.41

1,576.0 14.28 138.49 1,563.8 -110.3 94.1 145.0 0.81 0.81 0.001.607.0 14.50 138.53 1,593.8 -116.1 99.2 152.7 0.71 0.71 0.131,639.0 14.77 139.01 1,624.8 -122.1 104.5 160.7 0.92 0.84 1.50

1,671.0 14.90 138.90 1,655.7 -128.3 109.9 168.9 0.42 0.41 -0.34

1,703.0 14.94 138.84 1,686.6 -134.5 115.3 177.2 0.13 0.13 -0.19

1,734.0 14.88 139.01 1,716.6 -140.5 120.5 185.1 0.24 -0.19 0.551,765.0 14.80 138.70 1,746,5 -146.5 125.8 193.1 0.36 -0.26 -1.00

1,798.0 14.85 137.83 1,778.4 -152.8 131.4 201.5 0.69 0.15 -2.64

1,830.0 14.80 137.80 1,809.4 -158.9 136.9 209.7 0.16 -0.16 -0.09

1,862.0 14.10 137.21 1,840.4 -164.8 142.3 217.7 2.24 -2.19 -1.84

1,894.0 13.40 136.50 1,871.4 -170.3 147.5 225.3 2.25 -2.19 -2.22

1,925.0 13.00 137.20 1,901.6 -175.5 152.3 232.4 1.39 -1.29 2.261,956.0 12.90 138.70 1,931.8 -180.7 157.0 239.3 1.13 -0.32 4.84

1,988.0 12.70 139.20 1,963.0 -186.0 161.6 246.4 0.71 -0.63 1.562,020.0 12.50 138.40 1,994.3 -191.3 166.2 253.4 0.83 -0.63 -2.50

2,051.0 12.50 138.70 2,024.5 -196.3 170.7 260.1 0.21 0.00 0.972,083.0 12.30 139.10 2,055.8 -201.5 175.2 267.0 0.68 -0.63 1.252,115.0 12.00 138.70 2,087.1 -206.5 179.6 273.7 0.97 -0.94 -1.25

2,146.0 12.00 138.10 2,117.4 -211.4 183.9 280.2 0.40 0.00 -1.94

2,178.0 12.20 138.60 2,148.7 -216.4 188.3 286.9 0.71 0.63 1.562,209.0 12.50 138.40 2,179.0 -221.3 192.7 293.5 0.98 0.97 -0.65

2,242.0 12.80 138.00 2,211.2 -226.7 197.6 300.7 0.95 0.91 -1.21

2,273.0 12.80 138.60 2,241.4 -231.8 202.1 307.6 0.43 0.00 1.94

2,305.0 12.50 138.00 2,272.6 -237.1 206.8 314.6 1.02 -0.94 -1.88

2,337.0 12.40 140.60 2,303.9 -242.3 211.3 321.5 1.78 -0.31 8.132,368.0 12.40 141.40 2,334.1 -247.5 215.5 328.1 0.55 0.00 2.582,400.0 12.80 141.70 2,365.4 -252.9 219.8 335.1 1,27 1.25 0.942,432.0 13.10 140.70 2,396.6 -258.5 224.3 342.3 1.17 0.94 -3.13

2,464.0 13.20 138.20 2,427.7 -264.1 229.0 349.6 1.80 0.31 -7.81

2,495.0 13.35 138.00 2,457.9 -269.4 233.8 356.7 0.51 0.48 -0.65

2010/10/29 7:34 04AM Page 3 COMPASS 2003.21 Build

Page 103: NEWFIELD - Utah

NEWFIELD PayZone Directional Services, LLC.Survey Report

Company: NEWFIELDEXPLORATlON Local Co-ordinate Reference: Well P-36-8-16

Project USGS Myton SW (UT) TVD Reference: P-36-8-16 @5532.0ft (NEWFIELD)Site: SECTION 35 TBS, R 16E MDReference: P-36-8-16 @5532.0ft (NEWFIELD)Well: P-36-8-16 North Reference: TrueWellbore: Weilbore #1 Survey Calculation Method: MinimumCurvatureDesign: Actual Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (*) ( (ft) (ft) (ft) (°I100ft) (°I100ft) (°Ii00ft)

2,527.0 13.95 137.80 2,489.0 -275.0 238.9 364.2 1.88 1.88 -0.63

2,559.0 14.50 139.00 2,520.0 -280.8 244.1 372.1 1.95 1.72 3.752,591.0 14.80 139.00 2,551.0 -287.0 249.4 380.2 0.94 0.94 0.00

2,622.0 14.90 139.00 2,580.9 -293.0 254.6 388.1 0.32 0.32 0.002,654.0 14.90 137.70 2,611.9 -299.1 260.1 396.4 1.04 0.00 -4.06

2,686.0 14.50 136.60 2,642.8 -305.1 265.6 404.5 1.52 -1.25 -3.44

2,717.0 14.60 136.80 2,672.8 -310.7 270.9 412.3 0.36 0.32 0.652,749.0 13.90 136.20 2,703.8 -316.4 276.4 420.1 2.24 -2.19 -1.88

2,781.0 13.70 135.30 2,734.9 -321.9 281.7 427.7 0.92 -0.63 -2.81

2,813.0 13.60 134.10 2,766.0 -327.2 287.0 435.3 0.94 -0.31 -3.75

2,844.0 13.10 134.40 2,796.2 -332.2 292.2 442.4 1.63 -1.61 0.972,876.0 12.70 136.60 2,827.4 -337.3 297.2 449.5 1.98 -1.25 6.882,908.0 12.70 140.00 2,858.6 -342.6 301.9 456.6 2.34 0.00 10.63

2,939.0 12.70 139.20 2,888.8 -347.7 306.3 463.4 0.57 0.00 -2.58

2,971.0 12.30 141.00 2,920.1 -353.1 310.7 470.3 1.74 -1.25 5.633,003.0 12.90 144.20 2,951.3 -358.6 315.0 477.3 2.88 1.88 10.003,035.0 13.70 145.80 2,982.4 -364.6 319.2 484.8 2.75 2.50 5.003,066.0 14.50 145.30 3,012.5 -370.9 323.4 492.1 2.61 2.58 -1.61

3,097.0 15.00 143.40 3,042.5 -377.3 328.0 499.9 2.24 1.61 -6.133,129.0 15.42 140.88 3,073.3 -383.9 333.2 508.3 2.45 1,31 -7.88

3,161.0 15.70 139.20 3,104.2 -390.5 338.7 516.9 1.66 0.88 -5.25

3,192.0 15.86 139.06 3,134.0 -396.8 344.2 525.3 0.53 0.52 -0.453,224.0 15.90 138.10 3,164.8 -403.4 350.0 534.1 0.83 0.13 -3.00

3,255.0 15.69 137.34 3,194.6 -409.7 355.7 542.5 0.95 -0.68 -2.45

3,287.0 15.42 136.62 3,225.4 -415.9 361.6 551.1 1.04 -0.84 -2.25

3,318.0 15.12 136.51 3,255.4 -421.9 367.2 559.3 0.97 -0.97 -0.35

3,350.0 14.55 135.41 3,286.3 -427.8 372.9 567.4 1.99 -1.78 -3.44

3,382.0 13.20 135.10 3,317.3 -433.2 378.3 575.1 4.23 -4.22 -0.97

3,414.0 12.30 134.80 3,348.6 -438.2 383.3 582.1 2.82 -2.81 -0.94

3,445.0 12.00 135.10 3,378.9 -442.8 387.9 588.7 0.99 -0.97 0.973,477.0 12.10 137.70 3,410.2 -447.6 392.5 595.3 1.72 0.31 8.133,509.0 12.30 139.50 3,441.4 -452.7 397.0 602.1 1.34 0.63 5.633,540.0 12.79 140.49 3,471.7 -457.9 401.3 608.8 1.73 1.58 3.19

3,572.0 12.90 140.10 3,502.9 -463.3 405.8 615.9 0.44 0.34 -1.22

3,604.0 12.70 140.10 3,534.1 -468.8 410.4 623.0 0.63 -0.63 0.003,638.0 12.70 139.00 3,565.3 -474.1 414.9 630.1 0.76 0.00 -3.44

3,667.0 12.90 139.80 3,595.5 -479.3 419.4 636.9 0.86 0.65 2.583,698.0 13.10 139.80 3,625.8 -484.7 423.9 643.9 0.65 0.65 0.00

3,730.0 13.70 140.10 3,656.9 -490.4 428.7 651.3 1.89 1.88 0.943,762.0 13.80 139.80 3,688.0 -496.2 433.6 658.9 0.38 0.31 -0.94

3,794.0 13.58 138.05 3,719.1 -501.9 438.5 666.5 1.47 -0.69 -5.47

3,825.0 13.30 136.70 3,749.2 -507.2 443.4 673.7 1.36 -0.90 -4.35

3,856.0 13.10 135.60 3,779.4 -512.3 448.3 680.8 1.04 -0.ô5 -3.55

3,888.0 12.80 135.40 3,810.6 -517.4 453.4 687.9 0.95 -0.94 -0.63

3,920.0 12.70 136.30 3,841.8 -522.5 458.3 695.0 0.69 -0.31 2.813,951.0 12.60 137.30 3,872.0 -527.4 462.9 701.8 0.78 -0.32 3.233,983.0 12.80 138.80 3,903.3 -532.7 467.6 708.8 1.21 0.63 4.694,015.0 13.00 139.00 3,934.4 -538.0 472.3 715.9 0.64 0.63 0.63

4,046.0 13.00 140.10 3,964.6 -543.3 476.8 722.9 0.80 0.00 3.554,079.0 13.00 140.60 3,996.8 -549.1 481.6 730.3 0.34 0.00 1.524,110.0 13.20 141.40 4,027.0 -554.5 486.0 737.3 0.87 0.65 2.584,142.0 13.70 141.70 4,058.1 -560.3 490.6 744.8 1.58 1.56 0.944,174.0 13.80 142.20 4,089.2 -566.3 495.3 752.4 0.49 0.31 1.56

4,205.0 13.70 142.20 4,119.3 -572.2 499.8 759.7 0.32 -0.32 0.00

2010/10/29 7:34:04AM Page 4 COMPASS 2003.21 Build

Page 104: NEWFIELD - Utah

NEWFIELD PayZone Directional Services, LLC.Survey Report

Company: NEWFlELDEXPLORATION Local Co-ordinate Reference: Well P-36-8-16Project USGS Myton SW(UT) TVDReference: P-36-8-16 @5532.0ft (NEWFlELD)Site: SECTION 35 TSS, R 16E MDReference: P-36-8-16 @5532.0ft (NEWFIELD)Well: P-36-8-16 North Reference: TrueWellbore: Wellbore #1 Sunrey Calculation Method: MinimumCurvatureDesign: Actual Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(A) (°) (*) (A) (ft) (ft) (ft) (°l100ft) (°Ii00ft) (°I100ft)

4,237.0 13.80 140.40 4,150.4 -578.1 504.6 767.3 1.37 0.31 -5.63

4,269.0 14.20 139.60 4,181.4 -584.0 509.6 775.1 1.39 1,25 -2.50

4,301.0 14.50 138.80 4,212.4 -590.0 514.7 783.0 1.12 0.94 -2.50

4,332.0 14.60 138.90 4,242.5 -595.9 519.9 790.8 0.33 0.32 0.32

4,364.0 14.50 138.50 4,273.4 -601.9 525.2 798.8 0.44 -0.31 -1.25

4,396.0 14.10 137.60 4,304.4 -607.8 530.5 806.7 1.43 -1.25 -2.81

4,427.0 13.60 137.30 4,334.5 -613.3 535.5 814.2 1.63 -1.61 -0.97

4,459.0 13.50 138.30 4,365.6 -618.8 540.5 821.6 0.80 -0.31 3.134,491.0 13.40 138.40 4,396.8 -624.4 545.5 829.1 0.32 -0.31 0.31

4.522.0 13.10 137.90 4,426.9 -629.7 550.2 836,2 1.04 -0.97 -1.61

4,554.0 13.30 136.90 4,458.1 -635.14 ) 555.1 843.5 0.95 0.63 -3.13

4,586.0 13.60 136.90 4,489.2 -640.5 560.2 850.9 0.94 0.94 0.004,617.0 13.60 136.40 4,519.3 -645.8 565.2 858.2 0.38 0.00 -1.61

4,649.0 13.50 138.40 4,550.5 -651.3 570.3 865.7 1,50 -0.31 6.25

4,681.0 12.85 138.80 4,581.6 -656.8 575.1 873.0 2.05 -2.03 1.254,712.0 12.35 139.70 4,611.9 -661.9 579.6 879.8 1.73 -1.61 2.904,744.0 12.30 138.50 4,643.1 -667.1 584.0 886.6 0.82 -0.16 -3.75

4,776.0 12.20 137.10 4,674.4 -672.1 588.6 893.4 0.98 -0.31 -4.38

4,808.0 12.20 136.90 4,705.7 -677.0 593.2 900.1 0.13 0.00 -0.63

4,839.0 12.40 136.90 4,736.0 -681.9 597.7 906.7 0.65 0.65 0.004,871.0 12.40 138.90 4,767.2 -687.0 602.3 913.6 1.34 0.00 6.254,903.0 12.40 141.30 4,798.5 -692.2 606.7 920.5 1.61 0.00 7.504,935.0 12.80 141.80 4,829.7 -697.7 611.1 927.5 1.30 1.25 1.564,966.0 13.00 142.10 4,859.9 -703.2 615.3 934.4 0.68 0.65 0.97

4,998.0 12.90 144.90 4,891.1 -708.9 619.6 941.5 1.99 -0.31 8.755,029.0 12.80 145.50 4,921.3 -714.6 623.5 948.4 0.54 -0.32 1.945,061.0 12.90 144.40 4,952.5 -720.4 627.6 955.4 0.83 0.31 -3.44

5,093.0 13.00 142.40 4,983.7 -726.2 631.9 962.6 1.43 0.31 -6.25

5,124.0 13.10 138.70 5,013.9 -731.6 636.3 969.6 2.71 0.32 -11.94

5,156.0 13.10 136.80 5,045.1 -736.9 641.2 976.8 1.35 0.00 -5.94

5,188.0 13.00 135.40 5,076.3 -742.1 646.2 984.1 1.04 -0,31 -4.38

5,219.0 12.90 134.20 5,106.5 -747.0 651.1 991.0 0.93 -0.32 -3.87

5,251.0 13.20 134.10 5,137.6 -752.1 656.3 998.2 0.94 0.94 -0.31

5,283.0 13.30 135.10 5,168.8 -757.2 661.6 1,005.5 0.78 0.31 3.13

5,314.0 13.00 137.60 5,199.0 -762.3 666.4 1,012.5 2.07 -0.97 8.065,346.0 12.50 140.60 5,230.2 -767.6 671.0 1,019.6 2.59 -1.56 9.385,377.0 12.50 143.20 5,260.5 -772.9 675.2 1,026.3 1.82 0.00 8.395,409.0 12.60 143.50 5,291.7 -778.5 679.3 1,033.2 0.37 0.31 0.945,412.8 12.59 143.40 5,295.4 -779.2 679.8 1,034.1 0.65 -0.33 -2.56

P-36-8-16 TGT

5,440.0 12.50 142.70 5,321.9 -783.9 683.4 1,040.0 0.65 -0.32 -2.58

5,472.0 12.30 139.60 5,353.2 -789.2 687.7 1,046.8 2.17 -0.63 -9.69

5,504.0 12.40 137.30 5,384.5 -794.4 692.2 1,053.7 1.57 0.31 -7,19

5,535.0 12.50 138.60 5,414.7 -799.3 696.7 1,060.3 0.96 0.32 4.195,567.0 12.70 140.70 5,446.0 -804.6 701.2 1,067.3 1.56 0.63 8.56

5,599.0 13.00 142.40 5,477.2 -810.2 705.6 1,074.4 1.51 0.94 5.315,631.0 13.40 143.20 5,508.3 -816.0 710.1 1,081.7 1,37 1.25 2.505,663.0 13.20 143.30 5,539.5 -821.9 714.5 1,089.1 0.63 -0.63 0.315,694.0 13.20 141.40 5,569.6 -827.5 718.8 1,096.1 1.40 0.00 -6.13

5,726.0 13.20 139.50 5,600.8 -833.2 723.4 1,103.4 1.36 0.00 -5.94

5,758.0 13.10 138.40 5,632.0 -838.7 728.2 1,110.7 0.84 -0.31 -3,44

5,790.0 12.70 137.50 5,663.1 -844.0 733.0 1,117.9 1,40 -1.25 -2.81

5,822.0 12.15 136.30 5,694.4 -849.0 737.7 1.124.7 1.90 -1.72 -3.75

5,853.0 11.60 135.40 5,724.7 -853.6 742.2 1,131.1 1.87 -1.77 -2.90

2010/10/29 7:34:04AM Page 5 COMPASS 2003.21 Build

Page 105: NEWFIELD - Utah

NEWFIELD PayZone Directional Services, LLC.Survey Report

Company: NEWFIELD EXPLORATlON Local Co-ordinate Reference: Well P-36-8-16

Project: USGS Myton SW(UT) TVD Reference: P-36-8-16 @ 5532.0ft (NEWFIELD)Site: SECTION 35 TSS, R 16E MDReference: P-36-8-18 @5532.0ft (NEWFIELD)Weli: P-36-8-16 North Reference: TrueWellbore: Wellbore #1 Survey Calculation Method: Minimurn CurvatureDesign: Actual Database: EDM2003.21 Single User Db

Survey

Measured Vettical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(Ñ (°) (°) (II) (ft) (ft) (it) (°I100ft) (°I100ft) (°ii00ft)

5,885.0 11.80 136.10 5,756.1 -858.2 746.7 1,137.6 0.77 0.63 2.19

5,917.0 12.30 137.00 5,787.4 -863.1 751.3 1,144.3 1.67 1.56 2.815,948.0 12.60 137.70 5,817.6 -868.0 755.8 1,150.9 1.08 0.97 2.265,980.0 12.60 137.30 5,848.9 -873.1 760.5 1,157.9 0.27 0.00 -1.25

6,012.0 12.30 136.90 5,880.1 -878.2 765.2 1,164.8 0.98 -0.94 -1.256,043.0 11.65 137.30 5,910.4 -882.9 769.6 1,171.2 2.11 -2.10 1.29

6,075.0 10.70 137.40 5,941.8 -887.5 773.8 1,177.4 2.97 -2.97 0.316,107.0 10.65 135.50 5,973.3 -891.8 777.9 1,183.4 1.11 -0.16 -5,94

6,138.0 10.60 136.40 6,003.7 -895.9 781.9 1,189.1 0.56 -0.16 2.906,170.0 10.60 136.10 6,035.2 -900.1 785.9 1,194.9 0.17 0.00 -0.94

6,202.0 10.20 136.40 6,066.7 -904.3 789.9 1,200.7 1.26 -1.25 0.94

6,235.0 9.90 138.20 6,099.2 -908.5 793.8 1,206.5 1.32 -0.91 5.456,266.0 9.54 139.45 6,129.7 -912.5 797.3 1 211.7 1.35 -1.16 4.036,297.0 9.10 140.29 6,160.3 -916.3 800.5 1,216.7 1.49 -1.42 2.716,328.0 8.40 140.29 6,191.0 -919.9 803.5 1,221.4 2.26 -2.26 0.006,360.0 7.73 143.10 6,222.6 -923.4 806.3 1,225.9 2.43 -2.09 8.78

6,391.0 7.16 144.24 6,253.4 -926.7 808.7 1,229.9 1.90 -1.84 3.686,423.0 6.90 143.89 6,285.1 -929.9 811,0 1,233.8 0.82 -0.81 -1.09

6,440.0 6.80 144.80 6,302.0 -931.5 812.2 1,235.8 0.87 -0.59 5.356,480.0 6.80 144.80 6,341.7 -935.4 814.9 1,240.6 0.00 0.00 0.006,490.0 6.80 144.80 6,351.7 -936.3 815.6 1,241.7 0.00 0.00 0.00

Wellbore Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

P-36-8-16 TGT 0.00 0.00 5,300.0 -763.4 666.7 7,197,655.09 2,038,582.52 40° 4' 14.635 N 110° 4' 37.724 W- actual welipath misses by 21.1ft at 5412.8ft MD (5295.4 TVD, -779.2 N, 679.8 E)- Circle (radius 75.0)

Checked By: Approved By: Date:

2010/10/29 7:34:04AM Page 6 COMPASS2003 21 Build

Page 106: NEWFIELD - Utah

Project: USGS Myton SW (UT)Site: SECTION 35 T8S, R 16E M Azimuths to True North

NE WFIE LD Well: P-36-8-16 Magnetic North: 11.44

WeRllbom: AWellbore#1FINAL SURVEY REPORT Stre 523 2.5

Date: 2010/07/19Model: IGRF2010

3

4600 -- - -- - -- --

I

6000-------------------- - P-36-8-16T T

illii ilIIIIIII III|tlill Illllllll II i Ibilli III

0 200 400 en0 1000

7500- - --- - -- - - - - - West(-)/East(+) (200 ift n)

ÑËÊR Y

n

7

ct1)ber

29 2010

KNOWLEDGE ANDIS SUPPORTED BY AC7UAL FIELD DATA.

o isoo sooo DAY70NFVertical Section at 138.94 (1500

Page 107: NEWFIELD - Utah

Summary Rig Activity Page 1 of 2

Daily Activity Report

Eormat for sundryMON BT P-36-8-16

8/1/2010 To 12/30/2010MON BT P-36-8-16 Waiting on CementDate: 10/19/2010Ross #29 at 350. Days Since Spud - .25#/skCelloflake Mi×ed@ 15.8ppg W/1.17yield Returned5bbis to pit - On 10-13-10 Ross #29 Spud the Monument Butte P-36-8-16 Drilled 350' of 121/4" hole - Run 9 jts of 8 5/8" casing ( Guide shoe, shoe joint, Baffle plate and 8jts ) set @353.95 - On 10/19/10 Cement 8 5/8" casing W/ BJ services W/ 180sks Class "G"+2%CalCI+Daily Cost: $0Cumulative Cost: $37,593

MON BT P-36-8-16 Working On PumpsDate: 10/22/2010NDSI #2 at 350. 0 Days Since Spud - On 10/21/10 MIRU Set Surface Equipment W/MarcusLiddell Trucking ( 3 Mile Move From 0-1-9-16) - Notified BLM & State Via Email Rig Move10/21/10 @ 7:00 AM & Bope Test @ 2:00 pm 10/21/10 - R/U B&C QuickTest, Test UpperKelly Valve,Safety Valve,Pipe Rams Blind Rams,Choke Manfoild & Line - To 2000 psi for 10mins,And 8 5/8" Casing to 1500 psi for 30 mins everthing Tested Ok. - Work On Reserve PitPumps - 1x3'Gap Sub,1X2' Index Sub,1x30' Monel - P/U BHA As Follows,Smith 7 7/8"PDC,Hunting Mud Motor 7/8 Lobe,4.8 Stage,.33.Rev,1,50 Deg,1x30 MonelDaily Cost: $0Cumulative Cost: $76,972

MON BT P-36-8-16 Drill 7 7/8" hole with fresh waterDate: 10/23/2010NDSI #2 at 3017. 1 Days Since Spud - Work On Pit Pump. - Drill 7 7/8" Hole From 311' To1086' WOB 15,000,TRPM 168,GPM 344, AVG ROP 116.4 fph - Rig Service, Check Crown-A-Matic,Bop Drill Hands At Stations 1 Min. - Drill 7 7/8" Hole From 1086' To 3017',WOB 20,000lbs,TRPM 168,GPM 344, AVG ROP 117.00 fph - No H2s Reported Last 24 Hrs - No FlowDaily Cost: $0Cumulative Cost: $96,821

MON BT P-36-8-16 Drill 7 7/8" hole with fresh waterDate: 10/24/2010NDSI #2 at 4922. 2 Days Since Spud - No H2s Reported Last 24 Hrs. - Drill 7 7/8" Hole From3017' To 3812',WOB 23,000 lbs, TRPM 168,GPM 344,AVG ROP 99.3 fph - Rig Service , BopDrill, Check Crown-A-Matic - Drill 7 7/8' Hole From 3812' To 4922',WOB 23,000 lbs,TRPM168,GPM 344, AVG ROP 71.6 fph - No Flow @ 4922'Daily Cost: $0Cumulative Cost: $141,170

MON BT P-36-8-16 Drill 7 7/8" hole with fresh waterDate: 10/25/2010NDSI #2 at 6348. 3 Days Since Spud - Drill 7 7/8' Hole From 5429' To 6348',WOB 25,000lbs,TRPM 168,GPM 344,AVG ROP 59.2 fph - Rig Service, Check Crown-A-Matic,Bop Drill HandsIn Place 1 Min. - Drill 7 7/8" Hole From 4922' To 5429'. WOB 23,000 lbs,TRPM 168, GPM344,AVG ROP 63.3 fph - No H2s Reported Last 24 HrsDaily Cost: $0

http://www.inewfld.com/denver/SumActRpt.asp?RC=219395&API=4301333894&MinDa...

Page 108: NEWFIELD - Utah

Summary Rig Activity Page 2 of 2

Cumulative Cost: $180,675

MON BT P-36-8-16 Nipple Down BopeDate: 10/26/2010NDSI #2 at 6490. 4 Days Since Spud - ( 50:50:2 + 3%KCL +0.5%EC-1 +.25# +.05#SF+.3SMS +FP-6L) Displaced W/153.2 bbis.Returned 30 bbis To - Pit. Bumped Plug To.2300 psi

- R/U BJ Services,Test Lines To 4000 psi. Pump 300 SKs Lead Cement @ 11.0 ppg W/ 3.53yield - Circ Casing - @ 6434'. 5 jt Transferred To X-26-8-16 - R/U Marcus Liddells CasingCrew, Run 153 jts 5.5" J-55 15.5# LLT&C Casing.Shoe @ 6478',Float Collar - Wait OnTester,R/U B & C QuickTest,Test 5 1/2" Pipe Rams To 2000 psi Tested OK. -

DSN/SDL/GR/CAL Suite From 6486' To 3000' - R/U Phoenix Surveys Log Well WithDISGL/SP/GR Suite From Lggers TD 6486' To Surface Casing And - LDDP & BHA - Pump 260bbis 10# Brine - LDDP To 4000' - Circ Hole For Laydown & Logs - Drill 7 7/8" Hole From 6348'To 6490',WOB 25,000,Trpm 168, GPM 344, AVG ROP 71 fph - ( PL-II+ 3% KCL + 5# CSE+0.5#CF +5#KOL +.5SMS +FP SF ) Then 430 sks Tail @ 14.4 ppg & 1.24 yieldDaily Cost: $0Cumulative Cost: $328,012

MON BT P-36-8-16 Nipple Down BopeDate: 10/27/2010NDSI #2 at 6490. 5 Days Since Spud - Clean Mud Pits - Nipple Down Bop's Set Slips W/100,000 Tension. - Released Rig @ 10:30 AM 10/26/10 DB FinalizedDaily Cost: $0Cumulative Cost: $346,284

Pertinent Files: Go to File L.ist

http://www.inewfld.com/denver/SumActRpt.asp?RC=219395&API-4301333894&MinDa...

Page 109: NEWFIELD - Utah

Division of Oil, Gas and Mining

Operator Change/Name Change Worksheet-for State use only

Effective Date : 112412020 -, FORMER OPERATOR: NEW OPERA TOR: Newfield Production Company Ovintiv Production, Inc.

Groups: Greater MOIIUIDeIIlBulle , ~:<,

WELL INFORMATION: WeU Name See Attached List

Total Well Count: OPERATOR CHANGES DOCUMENTATION: I. Sundry or legal documentation was received from the FORMER operator on : 2. Sundry or legal documentation was received from the NEW operator on: 3. New operator Division of Corporations Business Number:

REVIEW: Receipt of Acceptance of Drilling Procedures for APD on: Reports current for Production/Disposition & Sundries: OPS/SIIT A well(s) reviewed for fuU cost bonding: Approved by Dustin

UIC5 on all disposaVinjection/storage well(s) Approved on: Approved by Dayne Surface Facility(s) included in operator change: State 11-32 Pipetine

Monument Butte St 10-36 GB Fed 13-20-8-17 Call1l8Sback Fed 1-22-8-17 Ashley Fed 8-14-9-15 PIpeline

NEW OPERATOR BOND VERIFICATION: State/fee well(s) covered by Bond Number(s):

DATA ENTRY: Well(s) update in the RBDMS on: Group(s) update in RDBMS on: Surface Facilities update in RBDMS on: Entities Updated in RBDMS on:

COMMENTS:

west Iateral4C SIus Catcher (2-5-3-3) West latent Phase 5 Slug Catcher Bar F SIua Catcher Dart SIui CetdIer Mullins SIu& CatdIer Temporary PnIducecI Water Conditioning Site

Dart Temporary Produced w.rter FacUity EariT ra waterJreatment aclllty

1/1412021 111412021 1/1412021

755627-0143

3/1612020 ____ .... 3/1612020

.--=-=:-__ 91212020 111412021 1212112020 312512020

I

I

Status

2/23/2021

Page 110: NEWFIELD - Utah

STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS AND MINING

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this lonn lor proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontsl lstersls. Use APPLICA nON FOR PERMIT TO DRILL form for such proposals.

1. TYPE OF WELl. OIL WELL 0 GAS WELL 0 OTHER ______________________ __

2 . NAM E OF OPERATOR:

Newfield Production Company 3. ADDRESS OF OPERATOR:

4 Waterway Square Place Sl CIT'! The Woodlands SiME TX 21P 77380 4. LOCATION OF WELL

FOOTAGES AT SURFACE:

QTR/OTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:

FORM 9

5. LEASE DESIGNATION AND SERIAL NUMBER'

see attached list 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

see attached 7 UNIT or CA AGREEMENT NAME'

8. 'Mi:LL NAME and NUMBER '

see attached 9 API NUMBER:

attached 10. FIELD AND POOL, OR WILDCAT:

attached

COUNTY'

STATE:

UTAH

11 . CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Q] 0 ACIDIZE 0 DEEPEN 0 REPERFORATE CURRENT FORMATION NOTICE OF INTENT

(Submit in fluplir.ate) 0 ALTER CASING 0 fRACTURE TREAT 0 SIDETRACK 1'0 REPAIR WELL

ApproxllTlatA cjijte wOlk Will staft 0 CASING REPAIR 0 NEW CONSTRUCTION 0 TEMPORARIL Y ABANDON

D CHANGE TO PREVIOUS f'LANS fZl OPERATOR CHANGE 0 fUSING Rt:PAIf<

0 CHANGE TUBING 0 PLUG AND ABANDON 0 VENT OR FI.ARE

[ J SUBSEQUENT REPORT 0 GrIANGE WELL NAME 0 PLUG SACK 0 WATER DISPOSAL (Submit Original Form Only)

0 0 0 CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHIJT -OFF Datn of work completion

0 0 0 COMMINGLE PRODUCING FORMATIONS RECLAMATION OF WELL SITE OTHER

0 CONVERT WELL TYPE 0 RECOMPLETE - DIFFERENT FORMATION

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS, Clearly show all pertinent details including dates , depths, VOlumes, etc,

This sundry is serve as notification of the formal corporate name change of Newfield Production Company to Ovintiv Production Inc, Attached is a list of all wells wells that will be operated under Ovintiv Production Inc effective January 24, 2020,

PREVIOUS NAME: Newfield Producion Company 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825

(This space ror State U5. only)

(ti/2000)

NEW NAME: Ovintiv Production Inc, 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825

flT l E Regulatory Manager, Rockies

DATE 3/16/2020

Page 111: NEWFIELD - Utah

STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS AND MINING

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form lor proposals 10 drill new wells. significantly deepen existing wells below current bottom-hal. depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILL form for such proposals.

1. TYPE OF WEll. OIL WELL 0 GAS WELL 0 OTHER ______________________ __

2. NAME OF OPERATOR:

Newfield Production Company 3. ADDRESS OF OPERATOR:

4 Waterway Square Place SL CIT" The Woodlands smE TX 2iP 77380 4. LOCATION OF WELL

FOOTAGES AT SURFACE:

OTR/OTR. SECTION, TOWNSHIP, RANGE, MERIDIAN:

FORM 9

5. LEASE DESIGNATION AND SERIAL NUMBER

see attached list 6. IF INDIAN. ALLOTTEE OR TRIBE NAME:

see attached 7 UNIT or CA AGREEMENT NAME'

8. V',ELL NAME and NUMBER'

see attached 9 API NUMBER:

attached 10. FIELD AND POOL, OR 'M'-DCAT:

attached

COUNTY'

STATE: UTAH

11 . CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

121 0 ACIDIZE 0 DEEPEN 0 REPERFORATE CURRENT FORMATION NOTICE OF INTENT

(Submit in Duplicate) 0 ALTER CASING 0 FRACTURE TREAT 0 SIDETRACK 1'0 REPAIR WELL

ApproXimate elale work will start: 0 CASING REPAIR 0 NEW CONSTRUCTION 0 TEMPORARIL Y ABANDON

0 CHANGE TO PREVIOUS PLANS 121 OPF.RATOR CHANGE 0 rUSING REPAlil

0 CHANGE TUBING [J PUJG AND ABANDON D VENT OR FLARE

[J SUBSEQUENT REPORT D OIANGE WELL NAME 0 PLUG BACK 0 WATER DISPOSAL (Submit Original Form Only)

D D 0 CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHtH .oF" Of:lln of work completion

0 0 0 COMMINGLE PRODUCING FORMATIONS RECLAMATION OF WEl.L SITE OTHER.

0 CONVERT WELL TYPE 0 RECOMPLETE· DIFFERENT FORMATION

t2 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

This sundry is serve as notification of the formal corporate name change of Newfield Production Company to Ovintiv Production Inc. Attached is a list of all wells wells that will be operated under Ovintiv Production Inc effective January 24, 2020.

PREVIOUS NAME: Newfield Producion Company 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825

(This space 1M State us. only)

(tiI2000)

NEW NAME: Ovintiv Production Inc. 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825

TITLE Regulatory Manager, Rockies

DArE 3/16/2020