new york state standard sheets...eb 10-004 05/06/10 eb 10-004 05/06/10 wire rope rock catchment...
TRANSCRIPT
-
CHT-EKT
x xx
T@U@R@NO@N
R@E@D
N@O
park
NEW YORK LAW
SEAT BELT USE
REQUIRED
school
JET-EKT
ENGINEERING DIVISION, OFFICE OF DESIGN
ADOPTED AS OF THE DATE SHOWN ON THIS COVER.
OR PROPOSAL. THIS ENTIRE SET OF 4 BOOKS IS OFFICIALLY FINALIZED AND
CONTRACT BY REFERENCE TO THE SHEET NUMBER IN THE PROJECT PLANS
NOTE: INDIVIDUAL STANDARD SHEETS IN THIS BOOK BECOME PART OF A
U.S. CUSTOMARY UNITS
MAY 01, 2020
NEW YORK STATE STANDARD SHEETSBOOK 1 of 4
SHEETS 203-01 THRU 605-01
-
203-05 EB 16-020 09/01/16PLATE PIPE AND PIPE ARCHES
INSTALLATION DETAILS FOR CORRUGATED AND STRUCTURAL
204-01 EB 08-036 01/08/09
REINFORCED CONCRETE AND OTHER "RIGID" PIPES
PIPES, STRUCTURAL PLATE PIPES AND PIPE-ARCHES, AND
DETAILS FOR CIRCULAR AND ELLIPTICAL CORRUGATED METAL
CONTROLLED LOW STRENGTH MATERIAL (CLSM) INSTALLATION
209-02
209-01 EB 09-036 09/02/10LINEAR MEASURES
CHECK DAMS (SHEET 2 OF 2)
209-03(SHEET 1 OF 2)
DRAINAGE STRUCTURE INLET PROTECTION
(SHEET 2 OF 2)
DRAINAGE STRUCTURE INLET PROTECTION
209-04 PIPE SLOPE DRAIN
PIPE INLET/OUTLET PROTECTION
209-05 CONSTRUCTION ENTRANCES
209-07 EB 09-036SEDIMENT TRAPS
402-01 EB 08-036 01/08/09TERMINATION DETAIL)
HOT MIX ASPHALT OVERLAY SPLICE (PAVEMENT
502-01 EB 08-036 01/08/09
502-02 EB 08-036 01/08/09
502-03 EB 08-036 01/08/09
502-04 EB 08-036 01/08/09
502-05 EB 08-036 01/08/09
METAL REINFORCEMENT FOR CONCRETE PAVEMENT
TYPICAL PLAN, CROSS SECTION AND JOINT LAYOUT
LONGITUDINAL JOINTS
LONGITUDINAL JOINT TIES
LONGITUDINAL JOINT SAWING AND SEALING
502-06 EB 08-036 01/08/09
502-07 EB 08-036 01/08/09
502-08 EB 08-036 01/08/09
502-09 EB 08-036 01/08/09
502-10 EB 08-036 01/08/09
502-11 NON-TELESCOPING MANHOLE CASTING LAYOUT EB 08-036 01/08/09
502-12 EB 08-036 01/08/09
502-13 EB 08-036 01/08/09
502-14 EB 08-036 01/08/09
502-15 EB 08-036 01/08/09
603-01 EB 08-036 01/08/09
TRANSVERSE JOINTS
TRANSVERSE JOINT SAWING AND SEALING
UTILITY ISOLATION AND JOINT LAYOUT GENERAL NOTES
UTILITY ISOLATION GUIDELINES
TELESCOPING MANHOLE CASTING LAYOUT
SHALLOW STRUCTURE ISOLATION
DRAINAGE STRUCTURE ISOLATION
DRAINAGE STRUCTURE ISOLATION NEAR MANHOLE CASTINGS
MULTIPLE UTILITIES ISOLATION
603-02 EB 08-036 01/08/09CORRUGATED PIPE AND PIPE-ARCH
ALUMINUM AND STEEL END SECTIONS FOR
603-03 EB 08-036 01/08/09
603-04 EB 11-013 01/12/12
CATTLE PASS
CUT-OFF WALLS FOR END SECTIONS
603-05 EB 08-036 01/08/09CULVERT-END SAFETY GRATE
604-01 EB 08-036 01/08/09
604-02
DRAINAGE STRUCTURE DETAILS (SHEET 1 OF 4)
DRAINAGE STRUCTURE DETAILS (SHEET 2 OF 4)
DRAINAGE STRUCTURE DETAILS (SHEET 3 OF 4)
DRAINAGE STRUCTURE DETAILS (SHEET 4 OF 4)
605-01 EB 08-036 01/08/09POROUS CONCRETE PIPE UNDERDRAIN
EB 08-036 01/08/09
EB 08-036 01/08/09
EB 12-044 05/02/13
EB 08-036 01/08/09
203-01EXCAVATION AND BACKFILL
CONSTRUCTION DETAILS UNSUITABLE MATERIALEB 08-036 01/08/09
203-02 EB 08-036 01/08/09
01/08/09EB 08-036203-03PROTECTION
INSTALLATION DETAILS FOR GRANULAR FILL-SLOPE
203-04 EB 13-038 01/09/14
SUBJECTSHEET NO. ISSUED BY EFFECTIVE
CONCRETE COLLARS
REINFORCED CONCRETE PIPE END SECTIONS AND
212-01
EB 10-004 05/06/10
05/06/10EB 10-004
EB 10-004 05/06/10WIRE ROPE ROCK CATCHMENT FENCE (SHEET 3 OF 3)
WIRE ROPE ROCK CATCHMENT FENCE (SHEET 1 OF 3)
WIRE ROPE ROCK CATCHMENT FENCE (SHEET 2 OF 3)
212-02EB 10-004 05/06/10
EB 10-004 05/06/10
CHAIN LINK ROCK CATCHMENT FENCE (SHEET 1 OF 2)
CHAIN LINK ROCK CATCHMENT FENCE (SHEET 2 OF 2)
212-03EB 10-004 05/06/10
EB 10-004 05/06/10WIRE MESH SLOPE PROTECTION (SHEET 2 OF 2)
WIRE MESH SLOPE PROTECTION (SHEET 1 OF 2)
212-04EB 10-004 05/06/10
WIRE MESH DRAPE
212-05EB 10-004 05/06/10
EB 10-004 05/06/10
TEMPORARY ROCK CATCHMENT BARRIER (SHEET 1 OF 2)
TEMPORARY ROCK CATCHMENT BARRIER (SHEET 2 OF 2)
EB 09-036
EB 09-036
EB 09-036
EB 09-036
EB 09-036
EB 09-036
09/02/10
09/02/10
09/02/10
09/02/10
09/02/10
09/02/10
09/02/10
209-06 EB 09-036 09/02/10TURBIDITY CURTAIN
554-01
EB 10-041 05/05/11
EB 10-041 05/05/11
EB 10-041 05/05/11
EB 10-041 05/05/11
EB 10-041 05/05/11
TYP. SECTIONS FOR MECH. STABILIZED EARTH SYSTEMS
PROPRIETARY FILL TYPE RETAINING WALLS - SHEET 3 OF 5
TYP. SECTIONS FOR MECH. STABILIZED WALL SYSTEMS
PROPRIETARY FILL TYPE RETAINING WALLS - SHEET 4 OF 5
TYP. SECTIONS FOR PREFABRICATED WALL SYSTEMS
PROPRIETARY FILL TYPE RETAINING WALLS - SHEET 5 OF 5
GENERAL NOTES
PROPRIETARY FILL TYPE RETAINING WALLS - SHEET 1 OF 5
GENERAL DETAILS
PROPRIETARY FILL TYPE RETAINING WALLS - SHEET 2 OF 5
554-02
EB 10-041 05/05/11
05/05/11EB 10-041
EB 10-041 05/05/11SHEET 1 OF 6 - WALLS - GENERAL NOTES AND DETAILS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMS
SHEET 2 OF 6 - WALLS - TYPICAL SECTIONS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMS
SHEET 3 OF 6 - SLOPES - GENERAL NOTES AND DETAILS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMS
SUBJECTSHEET NO. ISSUED BY EFFECTIVE
EB 10-041 05/05/11
05/05/11EB 10-041SHEET 4 OF 6 - SLOPES - TYPICAL SECTIONS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMS
SHEET 5 OF 6 - FACING DETAILS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMS
SHEET 6 OF 6 - FACING DETAILS
GEOSYNTHETICALLY REINFORCED SOIL SYSTEMSEB 10-041 05/05/11
601-01 EB 12-009 09/06/12PRECAST CONCRETE STREET PAVING LAYOUT DETAILS
CHECK DAMS (SHEET 1 OF 2)
(ERRATA ISSUED BY EB 13-042)
(ERRATA ISSUED BY EB 13-042)
(ERRATA ISSUED BY EB 13-042)
INSTALLATION DETAILS FOR REINFORCED CONCRETE PIPES
(ERRATA ISSUED BY EB 14-025)
EARTHWORK TRANSITION AND BENCHING DETAILS
(ERRATA ISSUED BY EB 14-025)
PRE-CAST CONCRETE TRANSVERSE DRAINAGE INTERCEPTOR
BOOK 1 of 4
U.S. CUSTOMARY STANDARD SHEET
(THIS BOOK)
BOOK 1
(LATEST CHANGES HIGHLIGHTED)
05/01/2020
INDEX OF SHEETS EFFECTIVE
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
606-24
U.S. CUSTOMARY STANDARD SHEET
BOOK 2
(LATEST CHANGES HIGHLIGHTED)
05/01/2020
INDEX OF SHEETS EFFECTIVE
606-01CABLE GUIDE RAILING (SHEET 2 OF 3)
CABLE GUIDE RAILING (SHEET 3 OF 3)
EB 12-003 09/06/12
EB 12-003 09/06/12
EB 12-003 09/06/12
606-29
606-31 EB 08-036 01/08/09TRANSITION: WIDE - NORMAL WIDTH SINGLE SLOPE MEDIAN
606-33
EB 08-036 01/08/09
01/08/09EB 08-036
(MAINTENANCE SUPPORT)
W-BEAM GUIDE RAILING (SHEET 1 OF 2)
606-35 EB 08-036 01/08/09(MAINTENANCE SUPPORT)
CONCRETE BARRIER (CAST-IN-PLACE)
606-36 EB 19-049PRECAST CONCRETE BARRIER
606-37 EB 19-049MACHINE FORMED CONCRETE BARRIER
606-38 EB 08-036 01/08/09(MAINTENANCE SUPPORT)
TRANSITION: BOX BEAM - W-BEAM
606-40 EB 08-036 01/08/09(MAINTENANCE SUPPORT)
TRANSITION: HPBO - JERSEY SHAPE
01/08/09EB 08-036606-41(MAINTENANCE SUPPORT)
TRANSITION: CONCRETE WALL - JERSEY MEDIAN
606-42 EB 08-036 01/08/09STANDARD (NJ) AND SINGLE SLOPE CONCRETE SHAPES
TRANSITION: CONCRETE BARRIER BETWEEN
606-08 EB 11-013 01/12/12
606-09
606-10
606-11
606-13 SINGLE-SLOPE CONCRETE HALF SECTION BARRIER
606-14EB 19-049
SINGLE-SLOPE CONCRETE WIDE BARRIER
SINGLE-SLOPE CONCRETE MEDIAN BARRIER AND
606-15 EB 19-049SECTION - RAMPED TERMINAL
SINGLE-SLOPE CONCRETE BARRIER TERMINAL
606-19 EB 12-003 09/06/12
606-20
606-21
TRANSITION: BOX - CABLE
606-22
EB 08-036 01/08/09
01/08/09EB 08-036
EB 13-028 05/08/14
TRANSITION: BOX - SINGLE SLOPE (SHEET 1 OF 3)
TRANSITION: BOX - SINGLE SLOPE (SHEET 3 OF 3)
EB 19-049
(SHEET 1 OF 3)
TRANSITION: BOX MEDIAN - SINGLE SLOPE MEDIAN
(SHEET 2 OF 3)
TRANSITION: BOX MEDIAN - SINGLE SLOPE MEDIAN
(SHEET 3 OF 3)
TRANSITION: BOX MEDIAN - SINGLE SLOPE MEDIAN
606-25
EB 08-036 01/08/09
EB 08-036 01/08/09
EB 19-049
05/08/14
606-02
CABLE MEDIAN BARRIER (SHEET 3 OF 3)
606-04
EB 11-013
EB 19-049
01/12/12
606-05 EB 08-036 01/08/09BOX BEAM MEDIAN BARRIER
606-06 01/07/10EB 09-025GRADING, PAYMENT, AND LAYOUT DETAILS
BOX BEAM END ASSEMBLY TYPE III
EB 12-003 09/06/12
EB 12-003 09/06/12
EB 12-003 09/06/12
606-07
EB 13-028 05/08/14
EB 19-049BOX BEAM GUIDE RAIL (SHEET 3 OF 5)
EB 19-041 01/01/20
EFFECTIVEISSUED BYSUBJECTSHEET NO.
606-27 05/08/14EB 13-028
(ERRATA ISSUED BY EB 13-042)
EB 19-049
EB 13-028 05/08/14
EB 13-028 05/08/14
EB 13-028 05/08/14
EB 13-028 05/08/14
EB 13-028 05/08/14
EB 19-049
GRADING DETAILS FOR PROPRIETARY HPBO (MOD.) TERMINALS
EB 19-049
(SHEET 1 OF 3)
TRANSITION: HPBO (MOD.) - SINGLE SLOPE HALF SECTION
(SHEET 2 OF 3)
TRANSITION: HPBO (MOD.) - SINGLE SLOPE HALF SECTION
(SHEET 3 OF 3)
TRANSITION: HPBO (MOD.) - SINGLE SLOPE HALF SECTION
05/08/14EB 13-028
EB 13-028
05/08/14EB 13-028
EB 13-028 05/08/14
EB 13-028 05/08/14
606-43
606-44
EB 13-028 05/08/14
EB 13-028 05/08/14
606-32 EB 13-049 05/08/14SINGLE SLOPE CONCRETE BARRIER
TRANSITION: HALF-SECTION TO FULL-SECTION
(SHEET 3 OF 3)
TRANSITION: HPBO (MOD.) MEDIAN - SINGLE SLOPE MEDIAN
607-01 EB 08-036 01/08/09R.O.W. FENCING
607-04EB 08-036 01/08/09
CHAIN LINK FENCE WITH TOP RAIL
607-05EB 08-036 01/08/09
607-06 EB 08-036 01/08/09
CHAIN LINK FENCE WITH TOP TENSION WIRE
GATES AND CHAIN LINK FENCE ADJACENT TO GATES
(ERRATA ISSUED BY EB 13-042)
(ERRATA ISSUED BY EB 13-042)
SHEET NO. SUBJECT ISSUED BY EFFECTIVE
BOOK 2 of 4
(ERRATA ISSUED BY EB 18-003)
CABLE GUIDE RAIL (SHEET 1 OF 3)
(ERRATA ISSUED BY EB 18-003)
CABLE MEDIAN BARRIER (SHEET 1 OF 2)
(ERRATA ISSUED BY EB 18-003)
CABLE MEDIAN BARRIER (SHEET 2 OF 2)
(ERRATA ISSUED BY EB 14-025 & EB 18-003)
WEAK POST CORRUGATED-BEAM GUIDE RAILING SHEET 1 OF 3
(ERRATA ISSUED BY EB 14-025 & EB 18-003)
WEAK POST CORRUGATED-BEAM GUIDE RAILING SHEET 3 OF 3
(ERRATA ISSUED BY EB 14-025 & EB 18-003)
WEAK POST W-BEAM MEDIAN BARRIER
(ERRATA ISSUED BY EB 18-003)
CORRUGATED-BEAM MEDIAN BARRIER
HEAVY POST BLOCKED-OUT (MOD.)
EB 19-049
EB 19-049
(ERRATA ISSUED BY EB 14-025 & EB 18-003)
TRANSITION: BOX - SINGLE SLOPE (SHEET 2 OF 3)
05/08/14EB 13-028
(ERRATA ISSUED BY EB 16-008 & EB 18-023)
CORRUGATED-BEAM GUIDE RAILING (SHEET 1 OF 2)
HEAVY POST BLOCKED-OUT (MOD.)
(ERRATA ISSUED BY EB 14-025)
CORRUGATED-BEAM GUIDE RAILING (SHEET 2 OF 2)
HEAVY POST BLOCKED-OUT (MOD.)
(ERRATA ISSUED BY EB 18-023)
GUIDE RAIL AND MEDIAN BARRIER
TRANSITION: WEAK POST - HPBO (MOD.)
(ERRATA ISSUED BY EB 14-025 & EB 18-023)
(SHEET 1 OF 3)
TRANSITION: HPBO (MOD.) MEDIAN - SINGLE SLOPE MEDIAN
(SHEET 2 OF 3) (ERRATA ISSUED BY EB 18-023)
TRANSITION: HPBO (MOD.) MEDIAN - SINGLE SLOPE MEDIAN
(MAINTENANCE SUPPORT) (ERRATA ISSUED BY EB 18-023)
W-BEAM GUIDE RAILING (SHEET 2 OF 2)
(MAINTENANCE SUPPORT) (ERRATA ISSUED BY EB 18-023)
HPBO GUIDE RAILING AND TRANSITIONS (8 SHEETS)
(MAINTENANCE SUPPORT) (ERRATA ISSUED BY EB 18-023)
HPBO MEDIAN BARRIER AND TRANSITIONS (5 SHEETS)
EB 11-013 01/12/12BOX BEAM GUIDE RAIL (SHEET 4 OF 5)
(ERRATA ISSUED BY EB 19-041)
BOX BEAM GUIDE RAIL (SHEET 1 OF 5)
BOX BEAM GUIDE RAIL (SHEET 5 OF 5) PEDESTRIAN BREAK
05/01/2020
05/01/2020
606-18 EB 19-047SINGLE OR DOUBLE BOX BEAM GUIDE RAIL
TRANSITION: BOX BEAM MEDIAN BARRIER AND
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
05/01/2020
BOX BEAM GUIDE RAIL (SHEET 2 OF 5)
WEAK POST CORRUGATED-BEAM GUIDE RAILING SHEET 2 OF 3
TRANSITION: BOX - W-BEAM (MOD.)
TRANSITION: BOX - HPBO (MOD.)
HPBO (MOD.) MEDIAN (SHEET 1 OF 2)
TRANSITION: BOX MEDIAN - WEAK POST AND
HPBO (MOD.) MEDIAN (SHEET 2 OF 2)
TRANSITION: BOX MEDIAN - WEAK POST AND
606-28
(ERRATA ISSUED BY EB 12-026)
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
U.S. CUSTOMARY STANDARD SHEET
BOOK 3
(LATEST CHANGES HIGHLIGHTED)
05/01/2020
INDEX OF SHEETS EFFECTIVE
608-02 EB 16-012 05/01/16DISABILITIES DETAILS
ACCESSIBLE PARKING FOR PERSONS WITH
EB 16-012 05/01/16
609-02 EB 13-007 01/09/14
609-01 EB 16-019 09/01/16STONE CURB AND GRANITE CURB
MISCELLANEOUS CURB DETAILS
609-03 EB 08-036 01/08/09ASPHALT CURB
CONCRETE CURB, CURB AND GUTTER, AND HOT MIX
EB 12-011 09/06/12
608-01
05/01/20EI 20-005
LANDSCAPE PLANTING DETAILS (SHEET 1 OF 2)
EB 12-011 09/06/12
619-01
619-02EB 08-036
EB 08-036 01/08/09
01/08/09
TYPE III CONSTRUCTION BARRICADES (SHEET 1 OF 2)
619-04 EB 08-036 01/08/09PORTABLE TEMPORARY WOODEN SIGN SUPPORT
619-10 EB 08-036 01/08/09
619-11 EB 08-036 01/08/09WORK ZONE TRAFFIC CONTROL LEGENDS AND NOTES
WORK ZONE TRAFFIC CONTROL GENERAL NOTES
619-12EB 12-010
EB 12-010 05/03/12
SIGN TABLE (SHEET 1 OF 2)
SIGN TABLE (SHEET 2 OF 2)
619-20 EB 09-025 01/07/102-LANE 2-WAY ROADWAY
SHOULDER CLOSURE
619-21 EB 09-025 01/07/102-LANE 2-WAY ROADWAY MULTIPLE WORK LOCATIONS
SHOULDER CLOSURE
619-22 EB 08-036 01/08/09
619-23 EB 08-036 01/08/09
619-24 EB 09-025 01/07/10
619-30 EB 08-036 01/08/09
EXPRESSWAY / FREEWAY
SHOULDER CLOSURE
EXPRESSWAY / FREEWAY RAMP APPROACH
SHOULDER CLOSURE
EXPRESSWAY / FREEWAY
PARTIAL EXIT RAMP CLOSURE
MULTI LANE HIGHWAY
SINGLE LANE CLOSURE
619-63 EB 08-036 01/08/092-LANE 2-WAY ROADWAY WITH CENTER TURN LANE
SINGLE LANE SHIFT
619-64 EB 08-036 01/08/09
619-65 EB 08-036 01/08/09
619-66 EB 08-036 01/08/09
2-LANE 2-WAY ROADWAY WITH CENTER TURN LANE
CENTER TURN LANE CLOSURE
EXPRESSWAY / FREEWAY
MULTI LANE SHIFT
2-LANE 2-WAY ROADWAY
ROAD CLOSURE WITH OFF SITE DETOUR
624-01 EB 11-013 01/12/12CONCRETE GUTTER
625-01 EB 17-047 05/01/18R.O.W. AND SURVEY MARKERS
630-01 EB 08-036 01/08/09HIGHWAY BARRIER AND HIGHWAY-RAILROAD BARRICADE
632-01EB 08-036
EB 08-036 01/08/09
01/08/09PRECAST MODULAR WALLS (SHEET 1 OF 2)
PRECAST MODULAR WALLS (SHEET 2 OF 2)
619-31 EB 08-036 01/08/09MULTI LANE DIVIDED HIGHWAY
SINGLE LANE CLOSURE
619-32 EB 08-036 01/08/09
619-33 EB 09-025 01/07/10
619-34 EB 09-025 01/07/10
619-40 EB 08-036 01/08/09
MULTI LANE HIGHWAY / EXPRESSWAY / FREEWAY
SINGLE LANE CLOSURE
NEAR ENTRANCE RAMP EXPRESSWAY / FREEWAY
SINGLE LANE CLOSURE
NEAR EXIT RAMP EXPRESSWAY / FREEWAY
SINGLE LANE CLOSURE
EXPRESSWAY / FREEWAY
DOUBLE LANE CLOSURE
619-41 EB 08-036 01/08/09MULTI LANE HIGHWAY
DOUBLE INTERIOR LANE CLOSURE
619-50 EB 09-025 01/07/10SIDEWALK DETOUR OR DIVERSION
619-51 EB 08-036 01/08/09CROSSWALK CLOSURE AND PEDESTRIAN DETOUR
619-60 EB 09-025 01/07/102-LANE 2-WAY ROADWAY
FLAGGING OPERATION
619-61 EB 08-036 01/08/092-LANE 2-WAY ROADWAY INTERSECTION
FLAGGING OPERATION
619-62 EB 08-036 01/08/092-LANE 2-WAY ROADWAY
TEMPORARY TRAFFIC SIGNAL
TYPE III CONSTRUCTION BARRICADES (SHEET 2 OF 2)
05/03/12
(ERRATA ISSUED BY EB 13-042)
609-04 EB 13-007GRANITE SLOPED CURB DETAILS, TYPE S 01/09/14
608-07 EB 16-012 05/01/16
EB 16-012 05/01/16
EB 16-012 05/01/16RAISED CROSSWALK DETAILS (SHEET 1 OF 3)
RAISED CROSSWALK DETAILS (SHEET 2 OF 3)
RAISED CROSSWALK DETAILS (SHEET 3 OF 3)
SHEET NO. SUBJECT ISSUED BY EFFECTIVE SHEET NO. SUBJECT ISSUED BY EFFECTIVE
EB 16-012 05/01/16
EB 16-012 05/01/16
EB 16-012 05/01/16
SIDEWALK CURB RAMP DETAILS (SHEET 5 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 2 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 3 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 4 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 6 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 7 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 8 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 9 OF 12)
EI 20-005 05/01/20608-03
EB 16-012 05/01/16
EB 16-012 05/01/16
EB 16-012 05/01/16
EB 16-012 05/01/16RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 9 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 8 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 7 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 6 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 5 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 4 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 3 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 2 OF 9)
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS
(SHEET 1 OF 9)
BOOK 3 of 4
EB 19-049TEMPORARY CONCRETE BARRIER 05/01/2020
SIDEWALK CURB RAMP DETAILS (SHEET 1 OF 12)
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
EI 20-005 05/01/20
SIDEWALK CURB RAMP DETAILS (SHEET 10 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 11 OF 12)
SIDEWALK CURB RAMP DETAILS (SHEET 12 OF 12)
611-01LANDSCAPE PLANTING DETAILS (SHEET 2 OF 2)
(ERRATA ISSUED BY EB 17-041)
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
645-10EB 19-052SIGN POSTS
MULTIPLE POST SIGN INSTALLATION USING TYPE B
655-08 EB 08-036 01/08/09TELESCOPING MANHOLE CASTING AND RING
05/01/2020
U.S. CUSTOMARY STANDARD SHEET
BOOK4
(LATEST CHANGES HIGHLIGHTED)
05/01/2020
INDEX OF SHEETS EFFECTIVE
645-01
EB 09-025
EB 09-025 01/07/10
01/07/10
645-02 EB 19-052ROUTE MARKER ASSEMBLIES
645-03EB 09-025
EB 09-025 01/07/10
01/07/10
POSITIONING OF TRAFFIC SIGNS (SHEET 1 OF 2)
POSITIONING OF TRAFFIC SIGNS (SHEET 2 OF 2)
645-05
EB 09-025
EB 09-025 01/07/10
01/07/10
(SHEET 1 OF 2)
TOURIST, BUSINESS, AND RAMP SERVICE SIGNS
(SHEET 2 OF 2)
TOURIST, BUSINESS, AND RAMP SERVICE SIGNS
645-06EB 09-025 01/07/10
01/07/10EB 09-025
TOURIST ORIENTED BUSINESS SIGNS (SHEET 1 OF 2)
TOURIST ORIENTED BUSINESS SIGNS (SHEET 2 OF 2)
645-07
01/08/09
01/07/10EB 09-025
EB 08-036
SPECIFIC SERVICES SIGNS (SHEET 1 OF 2)
SPECIFIC SERVICES SIGNS (SHEET 2 OF 2)
645-09EB 12-040 05/02/13
645-11 EB 19-052
645-12 EB 19-052ASSEMBLY
OMNI-DIRECTIONAL BREAKAWAY BASE AND HINGE
663-02 EB 11-025 05/03/12WATER MAIN HORIZONTAL THRUST RESTRAINT DETAILS
663-03 EB 11-025 05/03/12WATER MAIN THRUST RESTRAINT DETAILS
663-04 EB 08-036 01/08/09WATER MAIN UTILITY CROSSING RELOCATION DETAILS
663-05 EB 08-036 01/08/09
663-06 EB 08-036 01/08/09
663-07 EB 08-036 01/08/09
WATER MAIN HYDRANT AND VALVE DETAILS
WATER MAIN HYDRANT FENDER DETAILS
WATER MAIN SERVICE CONNECTION DETAILS
670-01 EB 08-036 01/08/09LAMPPOST FOUNDATIONS
670-02 EB 08-036 01/08/09LIGHT STANDARD DETAILS
670-03 EB 08-036 01/08/09FOUNDATIONS
DAVIT ARM, WOOD POLE BRACKET ARM AND DEEP
OTHER SIGNS
SIGN PANEL DETAILS FOR GUIDE, INFORMATION, AND
645-14 EB 08-045 05/07/09
664-01 EB 13-038 01/09/14
655-01 EB 08-036 01/08/09RECTANGULAR GRATES
655-02 EB 08-049 05/07/09
655-06 EB 08-036 01/08/09
655-07
646-11 EB 11-006
646-12 EB 10-020
646-13 EB 10-020 01/06/11
646-14 EB 10-020 01/06/11
646-15 EB 11-006 09/01/11
646-16 EB 10-020 01/06/11
01/06/11
STANDARD AND LARGE DELINEATOR PANEL DETAILS
STANDARD DELINEATOR BRACKET AND FASTENER DETAILS
AND EXPRESSWAYS
SUPPLEMENTARY SNOWPLOWING MARKER LAYOUT ON FREEWAYS
REFERENCE MARKER LARGE DELINEATOR SNOWPLOWING AND
BARRIER DETAILS
DELINEATOR MOUNTING ON CONCRETE MEDIAN
09/01/11
(ERRATA ISSUED BY EB 12-026)
(ERRATA ISSUED BY EB 12-026)
EB 08-049 05/07/09
649-02 EB 13-040 01/09/14
649-04 EB 16-030 01/01/17
MILLED-INAUDIBLE ROADWAY DELINEATORS
SHEET NO. SUBJECT ISSUED BY EFFECTIVE
POLE MOUNTED SIGNS (ERRATA ISSUED BY EB 14-025)
(ERRATA ISSUED BY EB 14-025)
PARALLEL BAR FRAMES AND GRATES
(ERRATA ISSUED BY EB 14-025)
FRAMES, GRATES AND COVERS
PROOF LOADED CAST STEEL OR IRON MANHOLE
649-03 EB 13-040 01/09/14CENTERLINE AUDIBLE ROADWAY DELINEATORS
SECONDARY HIGHWAY AUDIBLE ROADWAY DELINEATORS
BOOK 4 of 4
SHEET NO. SUBJECT ISSUED BY EFFECTIVE
ERRATA ISSUED BY EB 18-003
STANDARD SIGN BLANK DETAILS (SHEET 1 OF 2)
ERRATA ISSUED BY EB 18-003
STANDARD SIGN BLANK DETAILS (SHEET 2 OF 2)
655-04 EB 12-031 01/10/13(ERRATA ISSUED BY EB 16-008 & EB 18-003)
RETICULINE GRATES
663-01 EB 13-038 01/09/14(ERRATA ISSUED BY EB 18-003)
WATER MAIN PIPE INSTALLATION DETAILS
(ERRATA ISSUED BY EB 18-003)
SANITARY SEWER MAIN PIPE INSTALLATION DETAILS
(ERRATA ISSUED BY EB 13-042 & 18-023)
IRON FRAMES AND CURB BOXES
WELDED FRAMES AND PROOF LOADED CAST STEEL OR
(ERRATA ISSUED BY EB 16-008 & 18-023)
AND EB 19-023)
REFERENCE MARKER DETAILS (ERRATA ISSUED BY EB 14-025
(ERRATA ISSUED BY EB 19-041)
SNOWPLOWING MARKER DETAILS AND NOTES
DELINEATOR SNOWPLOWING MARKER AND SUPPLEMENTARY
05/01/2020
05/01/2020
05/01/2020
ASSEMBLY (ERRATA ISSUED BY EB 20-014)
BI-DIRECTIONAL BREAKAWAY BASE AND HINGE
680-01 01/01/18
680-02 EB 11-013 01/12/12FRAMES AND COVERS
PRECAST STANDARD RECTANGULAR PULLBOXES,
680-03 EB 11-013 01/12/12
680-04 EB 18-041 01/01/18
FRAMES AND COVERS
STANDARD CIRCULAR PULLBOXES,
DETAILS
PULLBOX, CONDUIT AND GROUND ROD INSTALLATION
680-06EB 08-036 01/08/09
01/08/09EB 08-036STANDARD TRAFFIC SIGNAL POLES (SHEET 1 OF 2)
STANDARD TRAFFIC SIGNAL POLES (SHEET 2 OF 2)
680-08 EB 18-041 01/01/18
680-10 EB 08-036 01/08/09
680-11 EB 13-045 05/08/14SIGNAL HEAD ASSEMBLY DETAILS
680-12 EB 18-041 01/01/18DETAILS
SINGLE SPAN WIRE MOUNTED SIGN INSTALLATION
INSTALLATION DETAILS
MAST ARM AND POLE MOUNTED TRAFFIC SIGNAL
05/08/14EB 13-045DETAILS
SPAN WIRE MOUNTED TRAFFIC SIGNAL INSTALLATION680-07
EB 17-027
680-13 EB 18-041 01/01/18
680-14 EB 18-041 01/01/18
680-15 EB 18-041 01/01/18
DETAILS
DUAL SPAN WIRE AND MAST ARM SIGN INSTALLATION
EB 12-036
EB 12-036
EB 12-036
EB 12-036 05/03/13
05/03/13
05/03/13
05/03/13
EB 12-036 05/03/13
DETAILS
INDUCTANCE LOOP VEHICLE DETECTOR INSTALLATION
MAGNETIC VEHICLE DETECTOR INSTALLATION DETAILS
PAVEMENT MARKING DETAILS (SHEET 1 OF 9)
PAVEMENT MARKING DETAILS (SHEET 2 OF 9)
PAVEMENT MARKING DETAILS (SHEET 3 OF 9)
PAVEMENT MARKING DETAILS (SHEET 4 OF 9)
PAVEMENT MARKING DETAILS (SHEET 5 OF 9)
EB 12-036 05/03/13685-01
(ERRATA ISSUED BY EB XX-XXX)
TRAFFIC SIGNAL POLE FOUNDATIONS
INSTALLATION DETAILS (ERRATA ISSUED BY EB XX-XXX)
PEDESTRIAN SIGNALS AND FLASHING BEACON
680-05DETAILS
BASE - AND POLE - MOUNTED CABINET INSTALLATION
680-16 EB 18-041 01/01/18
EB 18-041 01/01/18680-17 UTILITY CLEARANCES TO0 TRAFFIC SIGNALS
EB 12-036
EB 12-036 05/03/13
05/03/13
EB 12-036 05/03/13
PAVEMENT MARKING DETAILS (SHEET 7 OF 9)
PAVEMENT MARKING DETAILS (SHEET 8 OF 9)
PAVEMENT MARKING DETAILS (SHEET 6 OF 9)
(ERRATA ISSUED BY EB 13-042)
(ERRATA ISSUED BY EB 13-041)
EB 18-041 01/01/18
PAVEMENT MARKING DETAILS (SHEET 9 OF 9) (ERRATA 1
ISSUED BY EB 13-041) (ERRATA 2 ISSUED BY EB XX-XXX)
WOOD POLE DETAILS
(DISAPPROVED)
(ERRATA ISSUED BY EB 17-041)
(ERRATA ISSUED BY EB 17-041)
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
UNSUITABLE MATERIAL
TYPICAL TRANSVERSE SECTION
UNSUITABLE MATERIAL
EXCAVATION PAYMENT LINES
BOTTOM OF EXCAVATION
BOTTOM OF EXCAVATION
1
2
BOTTOM OF EXCAVATION
EXCAVATION LIMITS - ADJACENT ROADWAYS
UNSUITABLE MATERIAL
LONGITUDINAL SECTION
CONSTRUCTION PROCEDURE REQUIREMENTS
DIRECTION OF EXCAVATION
AND BACKFILL OPERATIONS
ACCEPTABLE UNDERWATER
BACKFILL MATERIAL
WATER
SURFACE
SUITABLE
MATERIAL
W - DISTANCE BETWEEN ADJACENT LATERAL LIMITS OF EXCAVATION
D - DEPTH OF UNSUITABLE MATERIAL REMOVAL
FILL SLOPE
1
2
FILL SLOPE
EXISTING GROUND
c
ROADWAY
c
ROADWAY
c
UNSUITABLE MATERIAL
(SEE NOTE 3)
(SEE NOTE 4)
1.
2.
3.
4.
5.
6.
(SEE NOTE 4)
GENERAL NOTES:
THESE TYPICAL SECTIONS SHALL APPLY TO THE EXCAVATION OF ALL UNSUITABLE
MATERIAL DEPOSITS THAT AVERAGE 10’ OR LESS IN DEPTH AND AT NO LOCATION
EXCEEDING 20’ IN DEPTH.
ALL SLOUGHED MATERIAL SHALL BE REMOVED FROM WITHIN THE EXCAVATION PAYMENT
LINES. THE COST OF SUCH REMOVAL SHALL BE INCLUDED IN THE PRICE BID FOR
EXCAVATION.
WHERE THE REMOVAL OF UNSUITABLE MATERIAL IS REQUIRED IN ADJACENT AREAS
AND THE ADJACENT LATERAL LIMITS OF EXCAVATION ARE EITHER CLOSER THAN THE
DEPTH OF EXCAVATION, OR LESS THAN 10’ APART, THE LATERAL LIMITS OF
EXCAVATION AND BACKFILL SHALL BE EXTENDED TO INCLUDE THE MATERIAL BETWEEN
THE ADJACENT EXCAVATIONS.
THE UPPER PAYMENT LINES FOR ACCEPTABLE UNDERWATER BACKFILL MATERIAL SHALL
BE 2’ ABOVE THE WATER LEVEL EXISTING IN THE EXCAVATION AT THE TIME OF
BACKFILLING, UNLESS OTHERWISE SHOWN ON THE PLANS.
AREA "A" IS DEFINED AS THE AREA BETWEEN THE ONE ON TWO SLOPE, WHICH LOCATES
THE LATERAL LIMITS OF THE EXCAVATION, AND THE FILL SLOPE. COMPACTION AND
LIFT THICKNESS REQUIREMENTS OF SECTION 203 EXCAVATION AND EMBANKMENT
SHALL NOT APPLY TO THE MATERIAL IN AREA "A".
LIMITS OF UNSUITABLE MATERIAL EXCAVATION AND BACKFILL SHALL BE EXTENDED
10’ OUTSIDE THE PLAN DIMENSIONS OF ANY CULVERT OR STRUCTURE.
AREA "A"
(SEE NOTE 5)
AREA "A"
(SEE NOTE 5)
UNDERWATER BACKFILL
MATERIAL PAYMENT LINES
W
ROADWAY
20’ MIN.
D
/S/ ROBERT L. SACK, P.E.
20
-NO
V-2
00
8 1
4:0
1
FIL
E N
AM
E =
DA
TE
/TIM
E =
US
ER
=jturley
IP
_P
WP
:d0109553\2
03-01.d
gn
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 08-036
U.S. CUSTOMARY STANDARD SHEET
APPROVED OCTOBER 01, 2008
CONSTRUCTION DETAILS
UNSUITABLE MATERIAL
EXCAVATION AND BACKFILL
203-01
EFFECTIVE DATE: 01/08/09DEPUTY CHIEF ENGINEER
(TECHNICAL SERVICES)
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
TRANSVERSE - TRANSITIONS
SLOPE STEEPER THAN 1 ON 3
LONGITUDINAL - TRANSITIONS
ORIGINAL GROUND SURFACE
ROCK CUT
ROCK SURFACE
EARTH CUT
EARTH OR ROCK CUT
ORIGINAL GROUND SURFACE
SUBGRADE SURFACE
DETAILS
SEE BENCHING
3 DEG. OR MORE
ORIGINAL GROUND SURFACE
SUBGRADE SURFACE
EMBANKMENT
SEE BENCHING DETAILS
EARTH SLOPE
EARTH OR ROCK CUT
ROCK CUT
ORIGINAL GROUND SURFACE
ROCK SURFACE
EARTH CUT
THEORETICAL GRADE LINE
ORIGINAL GROUND SURFACE
SUBGRADE SURFACE
EARTH SLOPE
EARTH BENCHING DETAILS
(SEE NOTES 8 AND 9)
(SEE NOTE 2)
(SEE NOTE 4)
(SEE NOTE 4)
(SEE NOTE 4)
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 6)
(SEE NOTE 4)
COMPACTED PARALLEL TO THE BENCHES
STAGE ALONG WITH THE BENCHING AND
EMBANKMENT SHALL BE BROUGHT UP BY
u4’
u4’
VARIES
ROADWAY
c
ROCK SLOPE
ROADWAY
c
(SEE NOTE 2)
9.
8.
7.
6.
5.
4.
3.
2.
1.
40’
40’ 40’
HEORETICAL GRADE LINET
THE ENGINEER WITH THE APPROVAL OF THE REGIONAL GEOTECHNICAL ENGINEER.
BENCHES SHALL BE CONSTRUCTED AS DESIGNED EXCEPT AS MODIFIED BY
APPROPRIATE ITEMS FOR BOTH EXCAVATION AND BACKFILL.
THE WIDTH OF THE BENCH. PAYMENT SHALL BE MADE UNDER THE
MULTIPLIED BY THE MEASURED LENGTH OF THE BENCH REGARDLESS OF
USING A FIXED VOLUME OF 0.6 CUBIC YARDS PER LINEAR FOOT OF BENCH
THE QUANTITY OF BENCHING TO BE PAID FOR SHALL BE DETERMINED BY
OR A LINE CONNECTING THE DITCH INVERTS, WHICHEVER IS HIGHER.
THE DEPTH IS DETERMINED BY A LINE 4’ BELOW THE EDGES OF PAVEMENT
UNDER THE APPROPRIATE PAY ITEMS.
(A.O.B.E.). THE CONFIGURATION SHALL BE A.O.B.E. AND PAYMENT SHALL BE MADE
THE UNDERDRAIN INSTALLATION IS OPTIONAL AS ORDERED BY THE ENGINEER
PAYMENT LINES FOR EXCAVATION.
THE LOWER LIMITS OF THE HATCHED AREAS IN CUT ARE THE LOWER
UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE PROPOSAL.
THE TRANSITION AREAS SHALL BE BACKFILLED WITH THE SUBGRADE AREA MATERIAL
THE HATCHED AREA DOES NOT NECESSARILY COINCIDE WITH THE SUBGRADE AREA.
A PLANE 4’ BELOW THE PAVEMENT ELEVATION AT THE EDGES OF PAVEMENT.
AND MATERIAL BOTH TRANSVERSELY AND LONGITUDINALLY.
THE INTENT OF THE TRANSITIONS IS TO OBTAIN UNIFORM BEARING
GENERAL NOTES:
ERRATA 1 EFF. 09/04/2014
ISSUED WITH EB 14-025
(RESEARCH)
DEPUTY CHIEF ENGINEER
06-
AU
G-2014 13:3
6
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=jturley
203-02e1.d
gn
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 08-036
U.S. CUSTOMARY STANDARD SHEET
APPROVED JULY 31, 2014
BENCHING DETAILS
AND
EARTHWORK TRANSITION
203-02
EFFECTIVE DATE: 01/08/09
/S/ ROBERT L. SACK, P.E.
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
4
1
1
1
PERVIOUS MATERIAL
IMPERVIOUS MATERIAL
DESIGN SLOPE
PAYMENT LINE
SELECT GRANULAR FILL,
SLOPE PROTECTION
PAYMENT LINE
UNCLASSIFIED EXCAVATION
AND DISPOSAL
LEVEL
PIPE UNDERDRAIN
UNDERDRAIN FILTER
TRENCH AND CULVERT EXCAVATION
1
1
LEVELDESIGN SLOPE
UNDERDRAIN FILTER
PIPE UNDERDRAIN
13
STABLE MATERIAL
SEEPAGE PLANE
DESIGN SLOPEPERVIOUS MATERIAL
IMPERVIOUS MATERIAL
PAYMENT LINE
SELECT GRANULAR FILL,
SLOPE PROTECTION
DITCH WITH NO
UNDERDRAIN INSTALLATION
PAYMENT LINE
SELECT GRANULAR FILL,
SLOPE PROTECTION
PAYMENT LINE
SELECT GRANULAR FILL,
SLOPE PROTECTION
MIN.
6"
MIN.
MIN.
MIN.
UNDERDRAIN FILTER
2’
MIN.
2’ MIN.
UNDERDRAIN FILTER
PIPE UNDERDRAIN
4"
4"
DETAIL "A"
1’
SEE DETAIL "A"
SLOPE PROTECTION - PIPE DRAIN
SLOUGHING UNSTABLE MATERIAL
CURBED SECTION
STABLE MATERIAL
2’ MIN.
SEEPAGE PLANE
PIPE UNDERDRAIN
4’ MIN
1
1
SLOPE PROTECTION - BLANKET
STABLE MATERIAL
SLOUGHING UNSTABLE MATERIAL
STABLE MATERIAL
GENERAL NOTES:
THE PLANS WILL SHOW THE LOCATIONS WHERE SELECT GRANULAR
FILL, SLOPE PROTECTION - TYPE A IS REQUIRED. OTHER
LOCATIONS WILL BE DETERMINED IN THE FIELD BY THE
ENGINEER-IN-CHARGE BASED UPON THE RECOMMENDATIONS
OF THE REGIONAL GEOTECHNICAL ENGINEER AND PAYMENT
WILL BE MADE UNDER SELECT GRANULAR FILL, SLOPE
PROTECTION - TYPE B FOR THESE LOCATIONS.
SELECT GRANULAR FILL, SLOPE PROTECTION INSTALLED AS PART
OF A SLOPE PROTECTION PIPE DRAIN SHALL BE TYPE A IF
THE LOCATION OF THE WORK IS SHOWN ON THE PLANS AND
TYPE B IF NOT SHOWN ON PLANS.
THE BLANKET TYPE OF SLOPE PROTECTION SHALL BE USED IN
AREAS WHERE SLOUGHING OF SLOPES HAS OCCURRED BUT NO
DEFINITE STRATA OF IMPERVIOUS MATERIAL CONTRIBUTING TO
THE SLOUGHING CONDITION CAN BE LOCATED OR WHERE THE
IMPERVIOUS STRATUM IS LOCATED SO LOW ON THE SLOPE
THAT THE USE OF A PIPE DRAIN TYPE OF PROTECTION IS
NOT PRACTICAL OR ECONOMICAL.
TRENCH AND CULVERT
EXCAVATION
PAYMENT LINE
UNCLASSIFIED EXCAVATION
AND DISPOSAL
PAYMENT LINES TRENCH
AND CULVERT EXCAVATION
PAYMENT LINE
UNCLASSIFIED EXCAVATION
AND DISPOSAL
1.
2.
3.
1.
2.
3.
4.
5.
6.
THE PURPOSE OF SLOPE PROTECTION PIPE DRAIN IS TO CONVEY SUBSURFACE WATER
FROM THE SLOPE IN A MANNER WHICH WILL NOT CAUSE DAMAGE TO THE SLOPE.
THE SLOPE PROTECTION PIPE DRAIN TREATMENT SHALL ONLY BE USED AS ORDERED
BY THE ENGINEER (A.O.B.E.) BASED UPON WRITTEN RECOMMENDATION OF THE REGIONAL
GEOTECHNICAL ENGINEER.
THE UNDERDRAIN PIPE MUST BE PLACED BELOW THE SEEPAGE PLANE, IN THE
IMPERVIOUS MATERIAL. GENERALLY, THE LOCATION OF THE SEEPAGE PLANE CAN ONLY
BE DETERMINED AT THE TIME OF CONSTRUCTION.
THE 1 ON 1 EXCAVATION SLOPE FOR THE SYSTEM MAY BE FLATTENED AS ORDERED BY
THE ENGINEER (A.O.B.E.) AND AS DICTATED BY CONDITIONS AT THE TIME OF EXCAVATION. THE
INDICATED DIMENSIONS ARE MINIMUM AND MAY BE INCREASED BY THE ENGINEER IN CHARGE.
THE PIPE UNDERDRAIN SHOULD HAVE A MINIMUM PITCH OF 2%. THE PIPE MUST BE
DESIGNED TO ENSURE THAT THE INTERCEPTED WATER IS CARRIED TO A POSITIVE
DRAINAGE SYSTEM.
TOPSOIL, IF REQUIRED, MAY BE PLACED ON THE FINISHED SLOPE. THE THICKNESS OF
THE TOPSOIL SHALL NOT BE INCLUDED IN THE THICKNESS OF SLOPE PROTECTION PIPE
DRAIN INSTALLATIONS.
c
ROADWAY
DITCH WITH UNDERDRAIN
INSTALLATION
DITCH SECTION
PAYMENT LINE
SELECT GRANULAR FILL,
SLOPE PROTECTION
PAYMENT LINES TRENCH
AND CULVERT EXCAVATION
FOR TYPE A THE SLOPE PROTECTION BLANKET SHALL INCLUDE THE ENTIRE
DISTRESSED AREA. FOR TYPE B THE EXTENT AND LOCATION OF THE SLOPE
PROTECTION BLANKET TREATMENT WILL BE AS ORDERED BY THE ENGINEER
BASED UPON THE RECOMMENDATIONS OF THE REGIONAL GEOTECHNICAL ENGINEER.
THE DIMENSIONS INDICATED ON THESE TYPICAL SECTIONS MAY BE INCREASED AT THE
DISCRETION OF THE ENGINEER IN CHARGE.
PIPE UNDERDRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE APPROPRIATE
STANDARD CONSTRUCTION DETAIL SHEET. HOWEVER, WHERE POSSIBLE, THE PIPE
UNDERDRAIN SHOULD BE KEPT AT LEAST 4’ BELOW THE GROUND SURFACE TO
PREVENT FREEZING. THE SLOPE PROTECTION MATERIAL SHALL BE IN DIRECT CONTACT
WITH THE UNDERDRAIN FILTER.
UNDERDRAINS SHALL BE OMITTED WHEN ORDERED BY THE ENGINEER IN CHARGE BASED
UPON THE RECOMMENDATION OF THE REGIONAL GEOTECHNICAL ENGINEER.
1.
2.
3.
4.
SELECT GRANULAR FILL,
SLOPE PROTECTION
/S/ ROBERT L. SACK, P.E.
20
-NO
V-2
00
8 1
4:0
1
FIL
E N
AM
E =
DA
TE
/TIM
E =
US
ER
=jturley
IP
_P
WP
:d0109553\2
03-03.d
gn
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 08-036
U.S. CUSTOMARY STANDARD SHEET
APPROVED OCTOBER 01, 2008
INSTALLATION DETAILS
FOR
GRANULAR FILL-SLOPE PROTECTION
203-03
EFFECTIVE DATE: 01/08/09
2’ MIN.
4" MIN.
2’ MIN.
4" MIN.
4" MIN.
DEPUTY CHIEF ENGINEER
(TECHNICAL SERVICES)
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
3" 3" 3"
10"
3"
11" 12"
11"
14"
12"
16"
13"
18"
10"
3" 3"
15"
20"
10"
18"
25"
13"
20"
27"
14"
6" 7" 8" 9"
4" 5" 5" 6" 7"
8" 9"
6" 6" 6" 6" 6" 6" 8"
5"
INVERT
(SEE NOTE 3.D)
OUTER BEDDING AREA
BEDDING CONTROL LINE (SEE NOTE 1.D)
MIDDLE BEDDING (SEE NOTE 3.C)
PAYMENT LINES FOR SELECT GRANULAR FILL (SEE NOTE 4.A)
(SEE NOTE 3.D)
OUTER BEDDING AREA
RAMPS IF REQUIRED. (SEE NOTE 5.A)
D.
C.
B.
A.
3. BEDDING NOTES
OUTSIDE THE LIMITS OF INSTALLATION METHOD B-1.
METHOD B-1. NO PAYMENT WILL BE MADE UNDER THIS OPTION FOR SELECT GRANULAR FILL PLACED
FOR THE SELECT GRANULAR FILL AND SUBGRADE AREA MATERIAL AS SHOWN ON INSTALLATION
MATERIAL. THE MINIMUM DIMENSIONS OF THE TRAPEZOID MUST ENCOMPASS THE PAYMENT LINES
SELECT GRANULAR FILL AROUND THE PIPE IN LIEU OF SIMULTANEOUS PLACEMENT WITH SUITABLE
THE CONTRACTOR, WITH THE APPROVAL OF THE ENGINEER, MAY PLACE A TRAPEZOIDAL SECTION OF
203-3.13E OF NYSDOT STANDARD SPECIFICATIONS.y SEE PROOF ROLLING RESTRICTIONS IN
THESE ACTIVITIES MUST BE REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE STATE.
REMOVED AT THE CONTRACTOR’S EXPENSE. ANY PIPE OR STRUCTURE DAMAGED OR DISTURBED BY
ALL RAMPS WHICH CANNOT BE USED AS PART OF THE COMPLETED EMBANKMENT ARE INSTALLED AND
203-3.12 OF NYSDOT STANDARD SPECIFICATIONS.y CONFORMANCE WITH THE REQUIREMENTS OF
INSTALLATION USING RAMPS CONSTRUCTED AS SHOWN IN METHOD B-1 OR B-2 COMPACTED IN
AT THE CONTRACTOR’S RISK, CONSTRUCTION EQUIPMENT MAY BE ALLOWED TO CROSS OVER A PIPE
BE USED IN METHODS A-1, A-2 OR B-2.
OF SECTION 204 OF THE STANDARD SPECIFICATIONS AND APPLICABLE CLSM STANDARD SHEET MAY
CONTROLLED LOW STRENGTH MATERIAL (CLSM) PLACED IN CONFORMANCE WITH THE REQUIREMENTS
203-3.12.y COMPACT IN CONFORMANCE WITH THE REQUIREMENTS OF STANDARD SPECIFICATIONS
203-3.15.y COMPACT IN CONFORMANCE WITH THE REQUIREMENTS OF STANDARD SPECIFICATIONS
(SEE NOTE 1.D)
REFERENCE DIMENSIONS FOR ELLIPTICAL PIPE
VE PIPE HE PIPE
BEFORE EMBANKMENT
INSTALLATION METHOD B-1
PAVEMENTS, AND SURFACE LOADS
TRENCH AREA BENEATH ROADWAYS,
INSTALLATION METHOD A-1
BEDDING THICKNESS TABLE
MINIMUM BEDDING WIDTH TABLE
AFTER EMBANKMENT
INSTALLATION METHOD B-2
TRENCH AREAS NOT SENSITIVE TO SETTLEMENT
TRENCH AREAS NOT SUBJECT TO SURFACE LOADS
INSTALLATION METHOD A-2
BEDDING CONTROL LINE. (SEE NOTE 1.D)
SUFFICIENT DEPTH TO STABILIZE TRENCH BOTTOM
SUPPORT/PROTECTION SYSTEM: DESIGN AS NECESSARY WITH
(SEE NOTE 3.D
OUTER BEDDING AREA(SEE NOTE 4.A)
SUITABLE MATERIAL
(SEE NOTE 1.A)
BENEATH CUT SECTION
OR SUBGRADE SURFACE
GROUND SURFACE
(SEE NOTES 4.A AND 4.C)
SELECT GRANULAR FILL
PAYMENT LINES FOR
(SEE NOTE 3.C)
MIDDLE BEDDING
(SEE NOTE 1.A)
TOP OF EMBANKMENT
(SEE NOTE 2.B)
EXCAVATING FOR PIPE INSTALLATION,
MAXIMUM EMBANKMENT LEVEL BEFORE
Bc IS OUT-TO-OUT SPAN IN INCHES. (SEE NOTE 2.D)
144"l D
132" < D
132"lD
108" < D
108"lD
96" < D
96"lD
84" < D
84"lD
72" < D
72"lD
60" < D
60"lD
48" < D
48"lD
36" < D
36"lD
24" < D
24"l D
12" < D 12"lD
C.
B.
A.
4. BACKFILL NOTES
C.
B.
A.
5. CONSTRUCTION OPERATION NOTES
D.
C.
B.
A.
1. GENERAL NOTES
D.
C.
B.
A.
2. EXCAVATION NOTES
NYSDOT STANDARD SPECIFICATIONS.
203-3.15 OFy COMPACT THE OUTER BEDDING AREAS IN CONFORMANCE WITH THE REQUIREMENTS OF
BEDDING AREA.
LOOSELY PLACE SELECT GRANULAR FILL IN MIDDLE BEDDING AREA (Bc/3). DO NOT COMPACT MIDDLE
MEASURED FROM THE BCL IS 12" AND THE MAXIMUM IS 24".
MATERIAL MAY BE ORDERED BY THE ENGINEER IN CHARGE. THE MINIMUM DEPTH OF UNDERCUT AS
TO ESTABLISH STABLE BEDDING CONDITIONS, AN UNDERCUT BACKFILLED WITH SELECT GRANULAR FILL
BEDDING THICKNESS AS THE DISTANCE FROM INVERT TO BCL MINUS THE PIPE WALL THICKNESS.
LINE (BCL) AND THE MINIMUM BEDDING THICKNESS FOR THE GIVEN PIPE SIZE. COMPUTE THE ACTUAL
USE THE BEDDING THICKNESS TABLE TO DETERMINE THE LOCATION OF THE BEDDING CONTROL
METHOD A-1 AND A-2)
(SEE INSTALLATION
SIDE PAYMENT LINE
Bc
Bc/3
D
T
(SEE NOTE 3.B)
UNDERCUT BACKFILLED WITH SELECT GRANULAR FILL
(SEE NOTES 4.A AND 4.C)
SELECT GRANULAR FILL
PAYMENT LINES FOR
INVERT
(SEE NOTE 3.C)
MIDDLE BEDDING
D
T
Bc
(SEE NOTE 1.A)
GROUND SURFACE
(SEE NOTE 4.A)
SUITABLE MATERIAL
Bc/3
(SEE NOTE 4.A)
SUBGRADE AREA MATERIAL
OR FLATTER
1V ON 5H1.5 X D OR 0.5 X D + 60"
WHICHEVER IS LESS
(SEE NOTE 5.B)
24" MIN.
WHICHEVER IS LESS
SUBGRADE SURFACE
12" MAX. OR TO
(SEE NOTE 5.C)
MATERIALS WILL NOT BE ALLOWED.
OR OTHER MEANS TO SEPARATE
AREA MATERIAL. SHEETING
GRANULAR FILL AND SUBGRADE
MATERIAL IN CONTACT WITH SELECT
SIMULTANEOUSLY PLACE SUITABLE
VERTICAL PAYMENT LINE.
Bc
Bc/3
INVERT
D
0.6Bc
12"12"
0.6Bc
T (SEE NOTE 4.B)
SUITABLE MATERIAL
(SEE BEDDING TABLES AND NOTE 3.A)
BEDDING THICKNESS
(SEE NOTE 4.A)
SUBGRADE AREA MATERIAL
WILL BE BASED ON METHOD B-1.
OTHERWISE ELECTS TO USE METHOD B-2, PAYMENT FOR THE INSTALLATION
DOCUMENTS OR APPROVED BY THE ENGINEER. WHERE THE CONTRACTOR
USE AND PAY FOR METHOD B-2 ONLY WHERE SPECIFIED IN THE CONTRACT
Bc/3
Bc
(SEE NOTE 5.B)
24" MIN.
WHICHEVER IS LESS
SUBGRADE SURFACE
12" MAX. OR TO
T
0.6BcINVERT
D
1.5 X D OR 0.5 X D + 60"
WHICHEVER IS LESS
BcBc
RISE
SPAN
RISE
SPANOUTER RISE OUTER RISE
/S/ ROBERT L. SACK, P.E.
(TECHNICAL SERVICES)
DEPUTY CHIEF ENGINEER
(SEE BEDDING TABLES AND NOTE 3.A)
BEDDING THICKNESS
VARIES
VARIES
MINIMUM WIDTH - SEE BEDDING TABLES MINIMUM WIDTH - SEE BEDDING TABLES
MINIMUM WIDTH - SEE BEDDING TABLES MINIMUM WIDTH - SEE BEDDING TABLES
(SEE NOTES 2.A AND 2.C)
PAYMENT LINES FOR TRENCH AND CULVERT EXCAVATION
VARY WITH PIPE SIZE AND WALL THICKNESS. SEE BEDDING THICKNESS TABLE.
UNDERCUT MATERIAL PLACEMENT. THE LOCATION OF THE BCL AND THE ACTUAL BEDDING THICKNESS
PURPOSES FOR "TRENCH AND CULVERT EXCAVATION" ITEMS, BEDDING MATERIAL PLACEMENT, AND
OF UNDERCUT BACKFILL WHERE REQUIRED. THE BCL IS ALSO USED FOR QUANTITY PAYMENT
REPRESENTS THE BOTTOM ELEVATION FOR BEDDING MATERIAL PLACEMENT AND THE TOP ELEVATION
THE BEDDING CONTROL LINE (BCL) IS A HORIZONTAL LINE LOCATED BELOW THE INVERT WHICH
RECOMMENDATIONS.
INVERT ELEVATION, CONSULT WITH THE REGIONAL GEOTECHNICAL ENGINEER FOR TREATMENT
WHERE UNSUITABLE MATERIAL, NOT ANTICIPATED DURING DESIGN, IS ENCOUNTERED AT OR BELOW
EXPLORATIONS ARE NECESSARY.
ELEVATION, SPECIAL DESIGN FEATURES AND CONSTRUCTION TREATMENTS BASED ON SUBSURFACE
WHERE DESIGN INFORMATION INDICATES UNSUITABLE MATERIAL EXISTS AT OR BELOW THE INVERT
SEE CHAP. 8, APP. A, OF THE HIGHWAY DESIGN MANUAL FOR MAXIMUM ALLOWABLE HEIGHT OF COVER.
MATERIAL (CLSM) IS TO BE USED AS BACKFILL. SEE MINIMUM BEDDING WIDTH TABLE.
THE MINIMUM TRENCH WIDTH MAY BE ADJUSTED TO (Bc+6"), IF CONTROLLED LOW STRENGTH
MATERIAL, SELECT GRANULAR FILL.
EXCAVATION IS THE DEPTH NEEDED TO PLACE THE BEDDING MATERIAL AND THE UNDERCUT BACKFILL
SAME AS SHOWN FOR INSTALLATION METHODS A-1 AND A-2. THE PAYMENT LINE FOR DEPTH OF
FOR PIPE INSTALLED IN A ROCK TRENCH, SIDE PAYMENT LINES FOR TRENCH EXCAVATION ARE THE
THE INSTALLATION ABOVE THE "WORKING PLATFORM" USING METHOD B-1.
FOR INITIATING THE EXCAVATION FOR THE PIPE. IN THIS CASE, COMPLETE THE REMAINDER OF
UNSTABLE SURFACE, THE ENGINEER IN CHARGE MAY SPECIFY A LOWER EMBANKMENT LEVEL
WHERE A STABLE WORKING PLATFORM MUST FIRST BE ESTABLISHED OVER A SUBMERGED OR
SHOWN ON THE PLANS.
EXCAVATION". INSTALL THE CULVERT IN ACCORDANCE WITH DETAILS FOR METHOD B-1 OR B-2 AS
QUANTITY WILL BE DEDUCTED FROM THE RESPECTIVE CONTRACT QUANTITIES FOR "TRENCH AND CULVERT
WITHIN THE LIMITS SHOWN WILL BE PAID AS "UNCLASSIFIED EXCAVATION AND DISPOSAL" AND THIS
BEYOND THE LATERAL AND DEPTH LIMITS INDICATED FOR METHOD A-1 OR A-2, THE EXCAVATION
WHERE A GENERAL EXCAVATION OF UNSUITABLE OR UNSTABLE MATERIAL IS REQUIRED TO EXTEND
19-S
EP-2013 09:3
7
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rlohse
203-04_010914.d
gn
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 13-038
U.S. CUSTOMARY STANDARD SHEET
APPROVED AUGUST 30, 2013
REINFORCED CONCRETE PIPES
FOR
INSTALLATION DETAILS
203-04
EFFECTIVE DATE: 01/09/2014
FOR HORIZONTAL ELLIPTICAL PIPE:
FOR VERTICAL ELLIPTICAL PIPE, AN INCREASE OF ALL TABLE VALUES BY 1" IS REQUIRED.
TABLE VALUES ARE BASED ON WALL B THICKNESS FOR CIRCULAR PIPE.
A DEDUCTION OF 2" FROM TABLE VALUES IS ALLOWED FOR SPANS GREATER THAN 108"
A DEDUCTION OF 1" FROM TABLE VALUES IS ALLOWED FOR SPANS GREATER THAN 48"
TYPE
FOUNDATION
SOIL
ROCK
THICKNESS
MINIMUM
THICKNESS
MINIMUM
OR SPAN (IN)
PIPE DIAMETER
INVERT TO BCL
DISTANCE (IN)
INVERT TO BCL
DISTANCE (IN)
TYPE
FOUNDATION
OR SPAN (IN.)
PIPE DIAMETER "D"WIDTH
24" OR LESS
GREATER THAN 24"
ALL SIZES
Bc + 2*SPAN
Bc + 2*D OR
Bc + 48"
Bc + 24"
SOIL
ROCK
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
D+12"
6"
MATERIAL OR A.O.B.E.
BACKFILL WITH SUITABLE
GROUND SURFACE, OR A.O.B.E.
ROADWAY (WHEN UNDER CUT SECTION),
BOTTOM OF DITCH, OR SUBGRADE OF
PAD OR DRUM TYPE COMPACTOR
TWO PASSES OF A VIBRATING
EACH LIFT COMPACTED BY
PLACED IN 6" LIFTS WITH
UNDERDRAIN FILTER TO BE
AND CULVERT EXCAVATION
PAYMENT LINES TRENCH
FLEXIBLE PIPE UNDERDRAINS
TO ALL APPROVED TYPES OF
* NOTE: THIS DETAIL APPLIES
12"
COMPACTION
FILTER PLACED WITHOUT
LIMITS OF UNDERDRAIN
4" MIN. COMPACTED
DETAILS FOR TRENCH INSTALLATION *
PIPE UNDERDRAIN BEDDING AND BACKFILL
PERFORATED CORRUGATED METAL AND PLASTIC
METHOD 1A METHOD 2A
S
CONTOUR OF PIPE
SHAPED TO FIT TO
BEDDING CAREFULLY
METHOD 1
1 ON 5
OR FLATT
ER
IS LESS
COURSE, WHICHEVER
BOTTOM OF SUBBASE
1 ON 5OR FLATTER
Y
UP TO 48" 24"
36"
DIAMETER
UP TO 72" 36"
48"
DIAMETER
SURFACE
OR PREPARED UNIFORM
BEDDING ON EXISTING
UP THRU 24"S - PIPE ARCHES
D - ROUND PIPE
24"
60"
TABLE 1
BED OF UNDERDRAIN FILTER
LESS THAN 3"
(TANGENT TO INVERT)
EXCAVATION
TRENCH AND CULVERT
BOTTOM PAYMENT LINE
PAYMENT FOR THE INSTALLATION WILL BE BASED ON METHOD B-1.
WHERE THE CONTRACTOR OTHERWISE ELECTS TO USE METHOD B-2,
WHERE SPECIFIED ON THE PLANS OR APPROVED BY THE ENGINEER.
* THE USE OF METHOD B-2 AND PAYMENT THEREFORE SHALL BE
DIAMETER OR SPAN
MINIMUM DISTANCE (X)MINIMUM DISTANCE (Y)
PIPE ARCHES
GROUND SURFACE OR A.O.B.E.
(WHEN UNDER CUT SECTION),
SUBGRADE OF ROADWAY
CIRCULAR PIPE PIPE ARCHES
STABLE FOUNDATION SOIL ROCK FOUNDATION
FOR MIN. HEIGHT OF COVER
DESIGNATED SUBBASE COURSE
SUITABLE MATERIAL OR
STABLE FOUNDATION SOIL
WITH METHODS SHOWN FOR
BEDDING IN ACCORDANCE
SELECT GRANULAR FILL
STABLE FOUNDATION SOIL
WITH METHODS SHOWN FOR
BEDDING IN ACCORDANCE
SELECT GRANULAR FILL
TO STRUCTURE
UNIFORM AND STABLE SUPPORT
INTO PLACE TO FURNISH
PRESHAPED AND COMPACTED
SELECT GRANULAR FILL
PREPARED UNIFORM SURFACE
BEDDING ON EXISTING OR
INSTALLATION METHODS
BEDDING DETAILS
(SEE NOTE 2)
GRANULAR FILL
PAYMENT LINES FOR SELECT
(SEE NOTE 3)
SUITABLE MATERIAL
(SEE NOTE 2)
SELECT GRANULAR FILL.
PAYMENT LINES FOR
(SEE NOTE 10)
RAMPS IF REQUIRED
(SEE NOTE 2)
SELECT GRANULAR FILL
PAYMENT LINES FOR
(SEE NOTE 3)
SUITABLE MATERIAL
(SEE NOTE 3)
SUITABLE MATERIAL
(SEE NOTE 2)
SELECT GRANULAR FILL
PAYMENT LINES FOR
(SEE NOTES 8 AND 10)
(SEE NOTE 10)
RAMPS IF REQUIRED
(SEE NOTE 4)
• SPAN• DIA.
> 72" TO 95"
> 95"
> 48" TO 72"
> 72"
> 24" TO 144"
> 144"
PLANS OR AS APPROVED BY THE ENGINEER.
THE SHEETING ITEM SHALL BE AS SPECIFIED ON THE "C"
D D
SUPPORT TO STRUCTURE
UNIFORM AND STABLE
INTO PLACE TO FURNISH
PRESHAPED AND COMPACTED
SELECT GRANULAR FILL
S
c
ABOUT
SYMMETRICAL
c
ABOUT
SYMMETRICAL
STABLE FOUNDATION SOIL
WITH METHODS SHOWN FOR
BEDDING IN ACCORDANCE
SELECT GRANULAR FILL
TANGENT TO INVERT. (SEE NOTE 2)
AND SELECT GRANULAR FILL BACKFILL. UPPER LIMIT
PAYMENT LINES - TRENCH AND CULVERT EXCAVATION
ABOVE THIS LINE
NO ROCK SHALL PROJECT
FILL
GRANULAR
SELECT
c
ABOUT
SYMMETRICAL
FILL
GRANULAR
SELECT
c
ABOUT
SYMMETRICAL
TANGENT TO INVERT. (SEE NOTE 2)
AND SELECT GRANULAR FILL BACKFILL. UPPER LIMIT
PAYMENT LINES - TRENCH AND CULVERT EXCAVATION
SEE TABLE 1
C
C
SEE TABLE 1
SHAPED TO FIT PIPE
BEDDING CAREFULLY
LESS THAN 3"
c
ABOUT
SYMMETRICAL
CIRCULAR PIPE
c
ABOUT
SYMMETRICAL
EXCAVATION (SEE NOTES 5 AND 6)
SIDE PAYMENT LINES - TRENCH AND CULVERT
12"
AND NOTE 7
SEE BEDDING DETAILS
C
SPECIFIED ON PLANS OR A.O.B.E.
BACKFILL MATERIAL AS
PIPES INSTALLED BELOW GROUND SURFACE
INSTALLATION METHOD A
C
c
ABOUT
SYMMETRICAL
c
ABOUT
SYMMETRICAL
(24" MIN.)
1.5 X DIA.
C
(SEE NOTE 2)
PAYMENT LINES FOR SELECT GRANULAR FILL AND NOTE 7)
(SEE BEDDING DETAILS
PREPARED SURFACE A.O.B.E.
ORIGINAL GROUND OR
C
(24" MIN.)
1.5 X SPAN
1 ON 5
OR FLATT
ER1 ON 5
OR FLATTER
PIPE ARCHESCIRCULAR PIPE
TOP OF EMBANKMENT c
ABOUT
SYMMETRICAL
c
ABOUT
SYMMETRICAL
(SEE NOTES 8 AND 10)
IS LESS
COURSE, WHICHEVER
BOTTOM OF SUBBASE
(24" MIN.)
1.5 X SPAN
(24" MIN.)
1.5 X DIA.
INSTALLATION (SEE NOTE 9)
EXCAVATION FOR PIPE
LEVEL BEFORE MAKING
MAXIMUM EMBANKMENT
C
AND NOTE 7)
(SEE BEDDING DETAILS
PREPARED SURFACE A.O.B.E.
ORIGINAL GROUND OR
(SEE NOTE 11)
SEPARATE THE TWO MATERIALS.
MEANS SHALL NOT BE USED TO
PAYMENT LINE. SHEETING OR OTHER
BOTH SIDES OF THE VERTICAL
SIMULTANEOUSLY IN CONTACT ON
GRANULAR FILL SHALL BE PLACED
SUITABLE MATERIAL AND SELECT
FOR MIN. HEIGHT OF COVER
DESIGNATED SUBBASE COURSE
SUITABLE MATERIAL OR
(SEE NOTE 3)
SUITABLE MATERIAL
INSTALLATION (SEE NOTE 9)
EXCAVATION FOR PIPE
LEVEL BEFORE MAKING
MAXIMUM EMBANKMENT
(SEE NOTE 2)
SELECT GRANULAR FILL
PAYMENT LINES FOR
METHOD A.
ACCORDANCE WITH INSTALLATION
DETAILS SHALL ALSO BE IN
INSTALLATION METHOD A. ALL OTHER
CULVERT EXCAVATION AS FOR
SIDE PAYMENT LINES - TRENCH AND
METHOD A.
ACCORDANCE WITH INSTALLATION
DETAILS SHALL ALSO BE IN
INSTALLATION METHOD A. ALL OTHER
CULVERT EXCAVATION AS FOR
SIDE PAYMENT LINES - TRENCH AND
INSTALLATION METHOD B-1 INSTALLATION METHOD B-2
PIPES INSTALLED AT OR ABOVE GROUND SURFACE
C
CLEARANCE REQUIREMENTS FOR MULTIPLE INSTALLATIONS
X
D D SPAN SPAN
TOP OF EMBANKMENT
12"
12"
0.1 D (MIN.) NOT0.1 D (MIN.) NOT
(SEE NOTE 1) (SEE NOTE 1)
DEPTH OF SHEETING ADEQUATE TO STABILIZE TRENCH.
24" MIN.
12" MAX OR TO
METHOD 2
24" MIN.
12" MAX OR TO
12" 12"
UNSTABLE OR GRADE PROHIBITIVE FOUNDATION SOIL
TO DEPTH NOT EXCEEDING 24"
EXCAVATE SOIL A.O.B.E.
THE TWO MATERIALS. (SEE NOTE 11)
OR OTHER MEANS SHALL NOT BE USED TO SEPARATE
BOTH SIDES OF THE VERTICAL PAYMENT LINE. SHEETING
SHALL BE PLACED SIMULTANEOUSLY IN CONTACT ON
SUITABLE MATERIAL AND SELECT GRANULAR FILL
NOTE: THE DIAMETER OR SPAN FOR PLASTIC PIPES IS MEASURED
AS THE OUTSIDE DIAMETER INCLUDING ANY PROTRUDING CORRUGATIONS.
13.
12.
11.
10.
9.
8.
7.
UNLESS OTHERWISE SHOWN ON THE PLANS.
FOR METHOD B-1 OR B-2 AS DIRECTED BY THE ENGINEER
SHALL THEN BE MADE IN ACCORDANCE WITH THE DETAILS
203.02 RATHER THAN ITEM 206.02. THE PIPE INSTALLATION
AFOREMENTIONED DETAIL SHALL BE PAID FOR UNDER ITEM
THAT EXCAVATION WITHIN THE LIMITS SHOWN IN THE
THE LATERAL AND DEPTH LIMITS INDICATED FOR METHOD A,
UNSTABLE MATERIAL IS REQUIRED TO EXTEND BEYOND
WHERE A GENERAL EXCAVATION OF UNSUITABLE OR
BE AS SHOWN FOR "ROCK FOUNDATION BEDDING DETAILS".
EXCAVATION AND SELECT GRANULAR FILL BEDDING SHALL
METHOD A. THE PAYMENT LINE FOR DEPTH OF
SHALL BE THE SAME AS SHOWN FOR INSTALLATION
PAYMENT LINES FOR EXCAVATION (SIDES OF TRENCH)
FOR A PIPE TO BE INSTALLED IN A ROCK TRENCH, THE
MATERIAL EXISTS. SEE NOTE 7.
ARE NECESSARY IN LOCATIONS WHERE UNSUITABLE
TREATMENT BASED ON SUBSURFACE EXPLORATIONS
SPECIAL DESIGN FEATURES AND CONSTRUCTION
MATERIAL EXISTS AT OR BELOW INVERT ELEVATION.
THIS DETAIL DOES NOT APPLY WHERE UNSUITABLE
WHERE FOUNDATION SOILS PROHIBIT ATTAINING PROPER GRADE.
MATERIAL TO FURNISH STABLE BEDDING CONDITIONS OR
THE FOUNDATION SOIL REQUIRES A LAYER OF GRANULAR
TO BE USED WHERE IN THE OPINION OF THE ENGINEER
203-3.03.C, "COMPACTION".y
COMPACTION REQUIREMENTS SHALL CONFORM TO
203-3.06, "SELECT GRANULAR FILL".y
COMPACTION REQUIREMENTS SHALL CONFORM TO
OF BOTTOM PLATES.
PLATE PIPE-ARCHES SHALL BE BEDDED FOR THE FULL WIDTH
PIPES AND CORRUGATED METAL PIPE-ARCHES. STRUCTURAL
THE MINIMUM DEPTH OF BEDDING SHALL BE 3" FOR PLASTIC
GENERAL NOTES:
6.
5.
4.
3.
2.
1.
SHOWN ON PLANS OR SPECIFIED BY THE ENGINEER.
FLARED METAL END SECTION TO BE USED AT OUTLET OF UNDERDRAIN WHERE
SHOWN HEREON SHALL ALSO APPLY TO THOSE MODIFICATIONS.
WHEN MODIFICATIONS OF THIS SHEET ARE USED IN THE PLANS, THE METHODS
INSTALLATION METHOD B-1.
THIS OPTION FOR SELECT GRANULAR FILL PLACED OUTSIDE THE LIMITS OF
SHOWN ON INSTALLATION METHOD B-1. NO PAYMENT WILL BE MADE UNDER
BE SUCH AS TO ENCOMPASS THE PAYMENT LINES FOR THIS MATERIAL
MINIMUM DIMENSIONS OF THE SELECT GRANULAR FILL TRAPEZOID SHALL
LIEU OF SIMULTANEOUS PLACEMENT WITH SUITABLE MATERIAL. THE
TRAPEZOIDAL SECTION OF SELECT GRANULAR FILL AROUND THE PIPE IN
THE CONTRACTOR, WITH THE APPROVAL OF THE ENGINEER, MAY PLACE A
REPLACED AT NO EXPENSE TO THE STATE, AS DIRECTED BY THE ENGINEER.
CONTRACTOR'S RISK. ANY STRUCTURE DAMAGED OR DISTURBED THEREBY SHALL BE
EQUIPMENT AND OTHER VEHICLES OVER ANY CULVERT PIPE SHALL BE DONE AT THE
AND REMOVED AT THE CONTRACTOR'S EXPENSE. MOVEMENT OF CONSTRUCTION
UTILIZED AS PART OF THE COMPLETED EMBANKMENT SHALL BE INSTALLED
203-3.03.C, "COMPACTION". RAMPS WHICH CANNOT BEyAND COMPACTED UNDER
EMBANKMENT MATERIAL, RAMPS SHALL BE CONSTRUCTED AS SHOWN ABOVE
INSTALLATION BEFORE PLACEMENT OF ADEQUATE PROTECTIVE COVER OF
WHERE CONSTRUCTION EQUIPMENT IS TO BE ALLOWED TO CROSS OVER A PIPE
ABOVE THE "WORKING PLATFORM" SHALL BE IN CONFORMANCE WITH METHOD B-1.
OR YIELDING SURFACE. IN THIS CASE THE REMAINDER OF THE INSTALLATION
PLATFORM" MUST FIRST BE ESTABLISHED OVER A SUBMERGED, UNSTABLE
INITIATING THE EXCAVATION FOR THE PIPE WHERE A STABLE "WORKING
A LOWER EMBANKMENT LEVEL MAY BE SPECIFIED BY THE ENGINEER FOR
EMBANKMENT SECTIONS - EXCEPTIONS".
203-3.03.D4, "PROOF ROLLING INySEE "PROOF ROLLING" RESTRICTIONS UNDER
THE RESULTS OF SUBSURFACE EXCAVATION.
BE A.O.B.E. IN COORDINATION WITH GEOTECHNICAL REPRESENTATIVES BASED ON
AT OR BELOW INVERT ELEVATION, THE TREATMENT OF SUCH CONDITIONS SHALL
WHERE UNSUITABLE MATERIAL NOT ANTICIPATED IN DESIGN IS ENCOUNTERED
09-
MA
Y-2016 12:2
8
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rfoote
DR
AF
T_203-05.d
gn
U.S. CUSTOMARY STANDARD SHEET
ISSUED UNDER EB 16-020
203-05
(TECHNICAL SERVICES)
DEPUTY CHIEF ENGINEER
PIPE, PIPE ARCHES AND PLASTIC PIPES
CORRUGATED AND STRUCTURAL PLATE
INSTALLATION DETAILS FOR
APPROVED APRIL 22, 2016
/S/ ROBERT L. SACK, P.E.
D
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
PREPARED SURFACE A.O.B.E.INVERT
CIRCULAR PIPE PIPE ARCHES
CIRCULAR PIPE PIPE ARCHES
STABLE SOIL AT BOTTOM OF PIPE
ROCK AT BOTTOM OF PIPE
UNSTABLE SOIL AT BOTTOM OF PIPE
CLEARANCE REQUIREMENTS FOR MULTIPLE INSTALLATIONS
BEDDING DETAILS
(SEE NOTE 2)
SIDE PAYMENT LINES - TRENCH AND CULVERT EXCAVATION AS FOR
INSTALLATION METHOD A. ALL OTHER DETAILS SHALL ALSO BE IN
ACCORDANCE WITH INSTALLATION METHOD A.
DIA. SPAN
BOTTOM PAYMENT LINE - TRENCH
AND CULVERT EXCAVATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
MINIMUM DISTANCE (Y)
MINIMUM DISTANCE (X)
12" OR THE LARGEST DIA.
WHICHEVER IS GREATER
12" OR THE LARGEST SPAN
WHICHEVER IS GREATER
DIA. DIA.
SPANSPAN X
Y
PAYMENT LINES - TRENCH AND
CULVERT EXCAVATION
AND CLSM, SELECT GRANULAR
FILL OR CRUSHED STONE
(SEE NOTE 1)
PAYMENT LINES - TRENCH AND
CULVERT EXCAVATION
AND CLSM, SELECT GRANULAR
FILL OR CRUSHED STONE
(SEE NOTE 1)
CIRCULAR PIPE PIPE ARCHES
12
"
24" M
AX
.
A.O
.B.E
.
CLSM, SELECT GRANULAR FILL
OR CRUSHED STONE
PAYMENT LINES - TRENCH AND
CULVERT EXCAVATION
AND CLSM, SELECT GRANULAR
FILL OR CRUSHED STONE
(SEE NOTE 1)
PAYMENT LINES - TRENCH AND
CULVERT EXCAVATION
AND CLSM, SELECT GRANULAR
FILL OR CRUSHED STONE
(SEE NOTE 1)
INSTALLATION METHOD B
PIPES INSTALLED AT OR ABOVE GROUND SURFACE
INSTALLATION METHOD A
PIPES INSTALLED BELOW GROUND SURFACE
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
SYMMETRICAL
ABOUT
c
CIRCULAR PIPE PIPE ARCHES
CIRCULAR PIPE PIPE ARCHES
FINISHED OR ORIGINAL GRADE
SUBGRADE OF ROADWAY
(WHEN UNDER CUT SECTION,
GROUND SURFACE OR A.O.B.E.)
3" MIN.
3" MIN.
3" MIN. 3" MIN.
3" MIN.
3" MIN.
3" MIN.
3" MIN.
STABILIZE TRENCH. THE SHEETING
ITEM SHALL BE AS SPECIFIED ON
THE PLANS OR AS A.O.B.E.
FINISHED OR ORIGINAL GRADE
SUBGRADE OF ROADWAY
(WHEN UNDER CUT SECTION,
GROUND SURFACE OR A.O.B.E.)
BACKFILL MATERIAL AS SPECIFIED
ON PLANS OR A.O.B.E. (SEE NOTE 5)
SIDE PAYMENT LINES - TRENCH AND
CULVERT EXCAVATION. (SEE NOTE 3)
PAYMENT LINES FOR CLSM
EXCAVATION SUPPORT
SYSTEM AS NECESSARY
STABILIZE TRENCH. THE SHEETING
ITEM SHALL BE AS SPECIFIED ON
THE PLANS OR AS A.O.B.E.
PAYMENT LINES FOR CLSM
EXCAVATION SUPPORT
SYSTEM AS NECESSARY
6" M
IN.
SEE
BEDDING
DETAILS
18" M
IN.
18" M
IN.
MAXIMUM EMBANKMENT
LEVEL BEFORE MAKING EXCAVATION
FOR PIPE INSTALLATION. (SEE NOTE 6)
SEE BEDDING DETAILS
(SEE NOTE 4)
SUITABLE MATERIAL OR
DESIGNATED SUBBASE COURSE
1.5 X DIA.
(24" MIN.)
1.5 X SPAN
(24" MIN.)
TOP OF EMBANKMENT
RAMPS IF REQUIRED
(SEE NOTE 7)
1 ON 5
OR FLATTE
R
1 ON 5OR FLATTER
TOP OF EMBANKMENT
RAMPS IF REQUIRED
(SEE NOTE 7)
SUITABLE MATERIAL OR
DESIGNATED SUBBASE COURSE
MAXIMUM EMBANKMENT
LEVEL BEFORE MAKING EXCAVATION
FOR PIPE INSTALLATION. (SEE NOTE 6)
PAYMENT LINES FOR CLSMPAYMENT LINES FOR CLSM
6" M
IN.
SUITABLE MATERIAL SUITABLE MATERIAL
NO ROCK SHALL PROJECT
ABOVE THIS LINE
DEPTH OF SHEETING ADEQUATE TO DEPTH OF SHEETING ADEQUATE TO
(SEE NOTES 11 AND 12) (SEE NOTES 11 AND 12)
NOTES:
COMPACTION REQUIREMENTS FOR SELECT GRANULAR FILL
OR CRUSHED STONE SHALL CONFORM TO y203-3.12, "COMPACTION".
TO BE USED A.O.B.E. WHERE THE FOUNDATION SOIL REQUIRES
A LAYER OF MATERIAL TO FURNISH STABLE BEDDING
CONDITIONS. THIS DETAIL DOES NOT APPLY WHERE
UNSUITABLE MATERIALS EXIST AT OR BELOW INVERT
ELEVATION. SPECIAL DESIGN FEATURES AND CONSTRUCTION
TREATMENT BASED ON SUBSURFACE EXPLORATIONS ARE
NECESSARY IN LOCATIONS WHERE UNSUITABLE MATERIAL EXIST.
WHERE GENERAL EXCAVATION OF UNSUITABLE OR UNSTABLE
MATERIAL IS REQUIRED TO EXTEND BEYOND THE LATERAL AND
DEPTH LIMITS INDICATED FOR METHOD A, PAY FOR THE
EXCAVATION WITHIN THE LIMITS SHOWN UNDER AN UNCLASSIFIED
EXCAVATION ITEM OR IN ACCORDANCE WITH THE DETAILS FOR
METHOD B AND A.O.B.E., UNLESS OTHERWISE SHOWN ON THE PLANS.
DEDUCT THIS QUANTITY FROM SUBSEQUENT TRENCH AND CULVERT
EXCAVATION QUANTITIES.
WHERE UNSUITABLE MATERIAL, NOT ANTICIPATED IN DESIGN, IS
ENCOUNTERED AT OR BELOW INVERT ELEVATION, THE TREATMENT
OF SUCH CONDITIONS SHALL BE A.O.B.E. OR AS RECOMMENDED BY
THE REGIONAL GEOTECHNICAL ENGINEER.
SEE y203-3.13 SUBSECTION E,
"PROOF ROLLING IN EMBANKMENT SECTIONS - EXCEPTIONS".
WHERE A STABLE "WORKING PLATFORM" MUST FIRST BE ESTABLISHED,
THE ENGINEER MAY SPECIFY A LOWER EMBANKMENT LEVEL FOR
INITIATING THE EXCAVATION FOR THE PIPE.
WHERE CONSTRUCTION EQUIPMENT IS TO BE ALLOWED TO CROSS
OVER A PIPE INSTALLATION BEFORE PLACEMENT OF ADEQUATE
PROTECTIVE COVER OF EMBANKMENT MATERIAL, RAMPS SHALL BE
CONSTRUCTED AS SHOWN AND COMPACTED UNDER y203-3.12,
"COMPACTION". RAMPS WHICH CANNOT BE UTILIZED AS PART OF THE
COMPLETED EMBANKMENT SHALL BE INSTALLED AND REMOVED
AT THE CONTRACTORS EXPENSE. MOVEMENT OF CONSTRUCTION
EQUIPMENT AND OTHER VEHICLES OVER ANY CULVERT PIPE SHALL
BE DONE AT THE CONTRACTORS RISK. ANY STRUCTURE DAMAGED
OR DISTURBED THEREBY SHALL BE REPLACED AT NO EXPENSE TO
THE STATE, A.O.B.E.
WHEN MODIFICATIONS OF THIS SHEET ARE USED IN THE PLANS,
THE METHODS SHOWN SHALL ALSO APPLY TO THOSE MODIFICATIONS.
ESTIMATE OF QUANTITIES SHALL BE AS STATED IN
y203-4.08 OR THE APPROPRIATE SPECIAL SPECIFICATIONS.
FOR LIGHTWEIGHT PIPE INSTALLATIONS, IT MAY BE NECESSARY TO
COUNTERACT THE BUOYANCY OF THE PIPE DURING THE CLSM
PLACEMENT. METHODS SUCH AS PARTIALLY FILLING WATERTIGHT
PIPES WITH WATER, OR USING ANCHOR STRAPS OR GRAVEL BAGS
TO HOLD DOWN THE PIPES CAN BE USED TO PREVENT FLOATATION.
WHERE THE DISTANCE BETWEEN THE TOP OF PIPE ELEVATION AND THE
TOP OF SUBGRADE ELEVATION IS LESS THAN 2’, CLSM SHALL BE USED
FOR BACKFILL MATERIAL TO TOP OF SUBGRADE ELEVATION.
WHEN THE TRENCH DEPTH IS LESS THAN 5’ AND THE CLSM HAS SET,
CONVENTIONAL BACKFILL AND COMPACTION OPERATIONS
CAN CONTINUE.
/S/ ROBERT L. SACK, P.E.
20
-N
OV
-2
00
8 1
4:0
2
FIL
E N
AM
E =
DA
TE
/TIM
E =
US
ER
=jturley
IP
_P
WP
:d0
10
95
53
\20
4-0
1.d
gn
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 08-036
U.S. CUSTOMARY STANDARD SHEET
APPROVED OCTOBER 01, 2008
CONTROLLED LOW STRENGTH MATERIAL (CLSM)
INSTALLATION DETAILS FOR CIRCULAR AND
ELLIPTICAL CORRUGATED METAL PIPES,
STRUCTURAL PLATE PIPES AND PIPE-ARCHES, AND
REINFORCED CONCRETE AND OTHER "RIGID" PIPES
204-01
EFFECTIVE DATE: 01/08/09 DEPUTY CHIEF ENGINEER
(TECHNICAL SERVICES)
24" M
IN.
(SE
E N
OT
ES
5,
7,
AN
D 1
1)
12
" M
IN.
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
(DESIGN)
DEPUTY CHIEF ENGINEER
ISSUED WITH EB 17-023
ERRATA 1
APPLICATION NOTES
GENERAL NOTES
C.
B.
A.
VARIES (SEE NOTE 8)
(SEE NOTE 2)
10'
6" MIN.
4"
MIN.
PROTECTION
REQUIRING
RESOURCE
DIRECTION
FLOW
FLOWDIRECTION
100' M
AX. (SEE N
OTE
3)
A
A
BEFORE INSTALLATION
ROTATE POSTS TOGETHER
(SEE NOTE 4)
FOR POST SPACING > 2:1
3:1 TO 2:1
5:1 TO 3:1
10:1 TO 5:1
20:1 TO 10:1
STEEPNESS
> 50%
33-50%
20-33%
10-20%
*5-10%
SLOPE
VARIES (SEE NOTE 10)
(SEE NOTE 2)
10'
PROTECTION
REQUIRING
RESOURCE
DIRECTION
FLOW
SLOPE
TOE OF
SLOPE %DIA. (IN.)
THAN 10' APART
SPACED NO MORE
POSTS SHALL BE
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
(DIAMETER VARIES)
SEDIMENT FILTER LOG
12"
3" TO 4"
GRADE
DISTURBED
DISTURBANCE
PROPOSED
LIMITS OF
TO BE PROTECTED
EDGE OF RESOURCE
SILT FENCE
IF SPECIFIED
MESH REINFORCEMENT
WRAPPING DETAIL
SEE SILT FENCE END
(SEE NOTE 4)
TYPICAL POST
(IF SPECIFIED)
WIRE MESH SUPPORT
GEOTEXTILE
SILT FENCE
EXCAVATED MATERIAL
BACKFILL / COMPACT
BURY FABRIC AND
EXCAVATE TRENCH, GRADE
DISTURBED
SLOPE
TOE OF
GROUND
ABOVE
HEIGHT
18" MIN.
FIRST FENCE
FENCE
SECOND
13-J
UN-2017 06:5
8
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rfoote
209-01_090117.d
gn
U.S. CUSTOMARY STANDARD SHEET
ISSUED UNDER EB 17-001
209-01
LINEAR MEASURES
PROPERTY LINES, OR TO DELINEATE A RESOURCE.
CONCENTRATED FLOW. DO NOT USE SILT FENCE OR SEDIMENT FILTER LOGS AS A PERIMETER CONTROL, TO DEFINE
SILT FENCE OR SEDIMENT FILTER LOGS SHALL NOT BE USED IN OR ACROSS A FLOWING CHANNEL, OR AREAS OF
AND/OR ROLLED EROSION CONTROL FABRIC.
SEDIMENT FILTER LOGS ARE TYPICALLY USED WITH EROSION OR SEDIMENT CONTROL MEASURES, SUCH AS MULCH
FILTER LOG (E.G. WETLANDS, PONDS, WATERWAYS OR ENVIRONMENTALLY SENSITIVE AREAS). SILT FENCE OR
IDENTIFY ONSITE AND OFFSITE RESOURCES THAT NEED TO BE PROTECTED USING THE SILT FENCE OR SEDIMENT
IMPOUNDING WATER BEHIND THE FENCE OR LOG SO THAT SEDIMENT FALLS OUT OF SUSPENSION.
THE PRIMARY PURPOSE OF A SILT FENCE OR SEDIMENT FILTER LOG IS TO INTERCEPT SEDIMENT LADEN RUNOFF BY
TYPICAL POST
TYPICAL POST
FIRST POST SECOND POST
POSTS DRIVEN 18 INCHES INTO THE GROUND.
AGAINST WELDED WIRE MESH WITH ANCHORED STEEL
*** REINFORCED SILT FENCE IS FABRIC PLACED
GROUND.
TO WOODEN POSTS DRIVEN 18 INCHES INTO THE
** STANDARD SILT FENCE IS FABRIC ROLLS STAPLED
ERODIBLE SOILS.
REQUIRED UNLESS IN SENSITIVE AREAS OR HIGHLY
* FOR SLOPES LESS THAN 5% SILT FENCE IS NOT
THE LOG DIAMETER (TYP.)
31OF NO MORE THAN
COMPACTED TO A HEIGHT
ON-SITE MATERIAL
AND SOIL SURFACE WITH
FILL GAPS BETWEEN LOG
(SEE NOTE 4)
TYPICAL POST
SILT FENCE END WRAPPING DETAIL
SILT FENCE - TEMPORARY
SECTION A-A
30" (MIN.)
MESH HEIGHT
18" MIN.
EMBED
SEDIMENT FILTER LOG MAX SLOPE LENGTH (FEET)
24
18
12
350
275
250
2
275
250
225
5
200
150
125
10
130
70
65
20
100
55
50
25
60
45
40
33
35
30
25
50
CONT
OURS (
TYP.)
(SEE NOTE 3)
OR LOG END (TYP)
ANGLED FENCE
SEDIMENT FILTER LOG
SECTION A-A
EXAMPLE LAYOUT OF SILT FENCE OR SEDIMENT FILTER LOG
PLAN
SILT FENCE PLACEMENT
PLAN
(SEE NOTE 8 & 10)
VARIES
SLOPE LENGTH
20
40
60
100
125
STANDARD**
30
70
80
150
250
REINFORCED***
SILT FENCE MAXIMUM SLOPE LENGTH (FEET)
/S/ RICHARD WILDER, P.E.
APPROVED JANUARY 26, 2017
SHALL NOT EXCEED THE FOLLOWING LIMITS:
OVERLAPPED BY 24 INCHES AND STAKED SIDE BY SIDE. THE MAXIMUM SLOPE LENGTH (DISTANCE BETWEEN ROWS)
SEDIMENT FILTER LOG POSTS SHALL BE SPACED NO MORE THAN 10 FEET APART. ENDS OF LOGS SHALL BE
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEM.
INSTALLATION OF SILT FENCE OR SEDIMENT LOG, INCLUDING EXCAVATION, BACKFILL, AND COMPACTION OF SOIL
THE FOLLOWING ARE MAXIMUM SLOPE LENGTHS (DISTANCE BETWEEN ROWS) FOR SILT FENCE INSTALLATION:
BULGES DEVELOP IN THE FABRIC. SEDIMENT SHALL BE DISPOSED OF AS UNSUITABLE MATERIAL.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF OF THE ABOVE GROUND HEIGHT OR WHEN
FOR SILT FENCE END WRAPPING.
PREVENT SEDIMENT BYPASS, OR THE END POSTS OF TWO SECTIONS SHALL BE WRAPPED AS SHOWN IN THE DETAIL
WHERE ENDS OF GEOTEXTILE FABRIC COME TOGETHER, THEY SHALL BE OVERLAPPED AND FOLDED AND STAPLED TO
INSTALLED WITH THE POSTS ON THE DOWNSLOPE SIDE OF THE FABRIC.
THE BOTTOM EDGE OF SILT FENCE SHALL BE BURIED A MINIMUM OF 6" BELOW GROUND. THE FENCE SHALL BE
LENGTH OF FILTER LOG POSTS SHALL BE 16" GREATER THAN THE DIAMETER OF THE LOG.
FENCE POSTS SHALL BE 40 INCHES. WOOD POSTS FOR SEDIMENT FILTER LOGS SHALL BE NOMINAL 2x2. THE
POSTS SHALL BE AS DESIGNATED ON THE DEPARTMENT APPROVED LIST FOR SILT FENCE. THE LENGTH OF SILT
BE "T" OR "U" SHAPE AND 1.33 POUNDS/FEET (MINIMUM) FOR STEEL. SPACING FOR THE PROVIDED SILT FENCE
WOOD POSTS FOR SILT FENCE SHALL HAVE A CROSS-SECTION AREA OF 3.5 SQUARE INCHES OR STEEL POSTS SHALL
SEDIMENT FILTER LOGS SHOULD NOT EXCEED 100 FEET IN LENGTH.
CHANNELIZED FLOW FROM BEING CONVEYED PAST THE ENDS OF THE FENCE. A SECTION OF SILT FENCE OR
THE ENDS OF A ROW OF SILT FENCE OR SEDIMENT FILTER LOGS SHALL BE ANGLED UP SLOPE TO PREVENT
CONTAINMENT AREA.
TO PROVIDE ADEQUATE AREA FOR SEDIMENT STORAGE AND FACILITATE MAINTENANCE OF THE SEDIMENT
SILT FENCE OR SEDIMENT FILTER LOGS SHALL BE PLACED A MINIMUM OF 10 FEET FROM THE TOE OF THE SLOPE,
FOR LOCATIONS THAT WARRANT PLACEMENT OF SILT FENCE OR SEDIMENT FILTER LOGS AT THE BASE OF SLOPES,
MAY BE INSTALLED AT INTERMEDIATE POINTS UP SLOPES AS WELL AS AT THE BOTTOM.
SILT FENCE OR SEDIMENT FILTER LOGS SHALL BE INSTALLED ON A LINE OF EQUAL ELEVATION (CONTOUR). IT
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
(DESIGN)
DEPUTY CHIEF ENGINEER
CROSS SECTION
FLOW
1
2
u4.25 CY
SUFFIX (XX)BOTTOM WIDTH
DITCH
01
02
03
04
0.0' - 3.0'
DITCHc FLOW
FLOW
EQUAL ELEVATION
CROSS SECTION
6
1
61
TEMPORARY CHECK DAM VOLUMES
DITCH SIDE SLOPE
u2.05 CY
DITCH SIDE SLOPE VOLUME (CY)VOLUME (CY)
u1.39 CY
u2.68 CY
u3.96 CY
OF DITCH
BOTTOM
PLAN
(STONE)
CHECK DAM - TEMPORARY
A
PROFILE
PLAN
FLOWDITCHc
DITCH SLOPECHECK DAM
TEMPORARY
10 %
8 %
6 %
5 %
4 %
3 %
2 %
1 %
20'
25'
33'
40'
50'
66'
100'
200'
-
-
16'
20'
25'
33'
50'
100'
u3.45 CY
u5.43 CY
u7.81 CY
> 3.0' - 6.0'
> 6.0' - 10.0'
ITEM SUFFIXES
STONE CHECK DAM
> 10.0'
4"
A
B
B
1.70 CUBIC YARD / YARD OF DITCH WIDTH
FOR TRAPEZOIDAL DITCH, ADD
BASED ON V SHAPED DITCH SECTION
1.61 CUBIC YARD / YARD OF DITCH WIDTH
FOR TRAPEZOIDAL DITCH, ADD
BASED ON V SHAPED DITCH SECTION
13'-0" (TYP.)
18"
12"
6"
W
18"
12"
1'-
0"
12" 12"
6"
CUTOFF TRENCH
GEOTEXTILE BEDDING
LIGHT STONE FILLING
CUTOFF TRENCH
6" MIN.
GEOTEXTILE
ANCHOR
S = CHANNEL SLOPE
H = CHECK DAM HEIGHT
SPACING INTERVAL
I = CHECK DAM
WHERE:
I = H / S
(SEE NOTE F)
BEDDING
GEOTEXTILE
FLOW
EQUAL ELEVATION
1
2
OF DITCH
BOTTOM
PROFILE
DAM TOE
CUTOFF TRENCH
DAM CREST
6" MIN.
GEOTEXTILE
ANCHOR
W
GEOTEXTILE BEDDING
9'-0" (TYP.)
2'-
0" (M
AX.)
CUTOFF TRENCH
*
*
1 : 2
1 : 3
1 : 4
1 : 6
1 : 2
1 : 3
1 : 4
1 : 6
STONE CHECK DAM PLACEMENT INTERVAL
SIDE SLOPE
SECTION A-A
GEOTEXTILE BEDDING
6"
BOTTOM
MATCH DITCH
(MA
X.)
2'-
0"
(MIN.)
9"
30-
MA
Y-2017 08:0
8
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rfoote
209-02_01_090117.d
gn
U.S. CUSTOMARY STANDARD SHEET
ISSUED UNDER EB 17-001
209-02
(SHEET 1 0F 2)
CHECK DAMS
#1 OR #2 STONE (TYP.)
SEE PLACEMENT INTERVAL TABLE (I)
SEE PLACEMENT INTERVAL TABLE (I)
(TYP.)
LIGHT STONE FILLING
#1 OR #2 STONE
LIGHT STONE FILLING
(BASED ON 2' HEIGHT)
INTERVAL (I)
PLACEMENT
(BASED ON 1' HEIGHT)
INTERVAL (I)
PLACEMENT
MAINTAIN DITCH SLOPE
VARIES TO
MAINTAIN DITCH SLOPE
VARIES TO
(STONE)
CHECK DAM - PERMANENT
PERMANENT
CHECK DAM
CHECK DAM - PERMANENT VOLUMES
TRE
NC
H
CUT
OFF
TRE
NC
H
CUT
OFF
EXTENT OF CHECKDAM ON SLOPE / BANKEXTENT OF CHECKDAM ON SLOPE / BANK
BELOW CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONE.
DURING INSPECTIONS ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES
AND EROSION WITH STONE OR LINER AS APPROPRIATE.
THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM SHALL BE PROTECTED FROM SCOUR
REQUIREMENTS OF LIGHT STONE FILLING.
FILLING CORE MATERIAL FOR THE STONE CHECK DAM SHALL MEET THE GRADATION
GRADATION REQUIREMENTS OF SIZE DESIGNATION #1 OR #2 OF TABLE 703-4. STONE
COARSE AGGREGATE FACING MATERIAL FOR THE STONE CHECK DAM SHALL MEET THE
HEIGHT. SEDIMENT SHALL BE DISPOSED OF AS UNSUITABLE MATERIAL.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF OF THE MEASURE
AFTER EACH RUNOFF EVENT. MEASURES SHALL BE CLEANED AND REPAIRED AS REQUIRED.
MEASURES SHALL BE INSPECTED EVERY (7) CALENDAR DAYS AND SHOULD BE INSPECTED
BE 1 ACRE.
ACRES. MAXIMUM DRAINAGE AREA CONTRIBUTING TO STONE CHECK DAM - PERMANENT SHALL
MAXIMUM DRAINAGE AREA CONTRIBUTING TO TEMPORARY STONE CHECK DAM SHALL BE 2
THE UPSTREAM DAM TOE SHALL BE AT EQUAL ELEVATION TO THE DOWN STREAM DAM CREST.
AND 0.5 FEET DEEP AND LINED WITH FILTER FABRIC TO PREVENT SOIL MIGRATION.
CHECK DAMS SHALL BE ANCHORED IN THE CHANNEL BY A CUT OFF TRENCH 1.5 FEET WIDE
SEDIMENT FILTER LOG CHECK DAMS OR PREFABRICATED CHECK DAMS.
AVOID PLACEMENT OF STONE CHECK DAMS WITHIN ROADWAY CLEAR ZONES, INSTEAD CONSIDER
SLOPES EXCEEDING 10% SHALL INCLUDE A CHANNEL PROTECTIVE LINING.
CHECK DAMS ARE NOT INTENDED TO, AND WILL NOT, FILTER SEDIMENT FROM TURBID WATER.
UPSTREAM SIDE OF THE CHECK DAM DUE TO DECREASED VELOCITY.
CHECK DAMS WILL CAPTURE SEDIMENT THAT FALLS OUT OF SUSPENSION BEHIND THE
FLOW VELOCITY IN THE CHANNEL.
THE PRIMARY PURPOSE OF A CHECK DAM IS TO REDUCE EROSION IN A CHANNEL BY REDUCING
6.
5.
4.
3.
2.
1.
GENERAL NOTES:
G.
F.
E.
D.
C.
B.
A.
APPLICATION NOTES:
LIGHT STONE FILLINGDAM CREST
DAM CREST
APPROVED JANUARY 26, 2017
/S/ RICHARD WILDER, P.E.
SIDE SLOPE
SECTION B-B
6"
BOTTOM
MATCH DITCH
GEOTEXTILE BEDDING
(MIN.)
9"
DAM CREST
1'-
0"
DAM CREST
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
GEOTEXTILE APRON
GEOTEXTILE APRON
DETAIL "A"
OF DITCH
BOTTOM
10" (T
YP.)
(DESIGN)
DEPUTY CHIEF ENGINEER
ISSUED WITH EB 17-023
ERRATA 1
DITCHc
FLOW
B
DITCHc FLOW
FLOW
B
A
A
GEOTEXTILE APRON
TRIANGULAR SECTION
STAPLES
BACKFILL TRENCHGEOTEXTILE APRON
DAM TOE
STAPLES
DAM CREST
3" TO 6" TRENCH
W W
GRAVEL BAGS
(GRAVEL BAG)
CHECK DAM - TEMPORARY
PLAN
#1 STONE
#1 STONE
#1 STONE
SECTION B-B
SIDE SLOPE
PROFILE
PROFILE
FLOW1
2
EQUAL ELEVATION
SEE DETAIL "A"
EQUAL ELEVATION
OF DITCH
BOTTOM
SIDE SLOPE
(PREFABRICATED)
CHECK DAM - TEMPORARY
PLAN
DRAINAGE AROUND ENDS
EXTEND TO PREVENT BYPASS
DAM CRESTDAM TOE
WIDTH
STAPLES
#1 STONE
DITCH SLOPE
1%
2%
3%
4%
5%
83'
42'
28'
21'
1:2
1:3
1:4
1:6
u1.5 CY
SUFFIX (XX)BOTTOM WIDTH
DITCH
01
02
03
04
0.0' - 3.0'
DITCH SLOPE
1%
2%
3%
4% 50'
8%
6%
5%
20'10%
200'
100'
66'
40'
33'
25'
S = CHANNEL SLOPE
H = CHECK DAM HEIGHT
I = CHECK DAM SPACING INTERVAL
WHERE:
I = H / S
DITCH SIDE SLOPE
> 3.0' - 6.0'
> 6.0' - 10.0'
> 10.0'
VOLUME (CY)
u3.0 CY
u2.0 CY
u1.0 CY
1 CUBIC YARD / YARD OF DITCH WIDTH
FOR TRAPEZOIDAL DITCH, ADD
BASED ON V SHAPED DITCH SECTION
(BASED ON 2' HEIGHT)
PLACEMENT INTERVAL(BASED ON 10" HEIGHT)
PLACEMENT INTERVAL
16'
PLACEMENT INTERVAL
PREFABRICATED CHECK DAM
2'-
6" (T
YP.)
(MIN.)
9"
BOTTOM
MATCH DITCH
9" (M
IN.)
5.
4.
3.
2.
1.
GENERAL NOTES:
F.
E.
D.
C.
B.
A.
APPLICATION NOTES:
13-J
UN-2017 07:0
9
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rfoote
209-02_02_090117.d
gn
U.S. CUSTOMARY STANDARD SHEET
209-02
(SHEET 2 0F 2)
CHECK DAMS
ITEM SUFFIXES
CHECK DAM
GRAVEL BAGCHECK DAM VOLUMES
GRAVEL BAG
PLACEMENT INTERVAL *
CHECK DAM
GRAVEL BAG
#1 STONE
10" (T
YP.)
SECTION A-A
ISSUED UNDER EB 17-001 APPROVED JANUARY 26, 2017
/S/ RICHARD WILDER, P.E.
SEDIMENT SHALL BE DISPOSED OF AS UNSUITABLE MATERIAL.
SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF OF THE MEASURE HEIGHT.
EACH RUNOFF EVENT. MEASURES SHALL BE REPAIRED AS REQUIRED.
MEASURES SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND SHOULD BE INSPECTED AFTER
WATERCOURSE IF BAGS ARE DAMAGED DURING USE.
FILLED WITH CLEAN STONE, RATHER THAN SAND, TO PREVENT SEDIMENT FROM ENTERING A
BAGS SHALL OVERLAP THE JOINTS BETWEEN THE BAGS IN THE LAYER BELOW. GRAVEL BAGS ARE
GRAVEL BAGS SHALL BE INDIVIDUALLY TIED, DOUBLE BAGGED AND INVERSELY INSERTED.
MAXIMUM DRAINAGE AREA TRIBUTARY TO GRAVEL BAG CHECK DAM SHALL BE 2 ACRES.
MAXIMUM DRAINAGE AREA TRIBUTARY TO PREFABRICATED CHECK DAM SHALL BE • ACRE.
DRAINAGE AREAS:
COST OF EXCAVATION FOR INSTALLATION SHALL BE INCLUDED IN PRICE BID FOR ITEM.
STAPLED AS SHOWN IN DETAIL "A" OR AS RECOMMENDED BY THE MANUFACTURER'S LITERATURE.
THE UPHILL END OF THE APRON FOR THE PREFABRICATED CHECK DAM SHALL BE BURIED AND
BE NOMINAL 2x2 WOOD. INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS.
SEDIMENT FILTER LOGS MAY BE SUBSTITUTED FOR PREFABRICATED CHECK DAMS. POSTS SHALL
BECOMING TURBID.
GRAVEL BAGS SHALL BE FILLED WITH CLEAN STONE TO PREVENT RECEIVING WATERS FROM
PREFABRICATED CHECK DAMS ARE NOT TO BE USED ON SLOPES GREATER THAN 5%.
CHECK DAMS ARE NOT INTENDED TO, AND WILL NOT, FILTER SEDIMENT FROM TURBID WATER.
DUE TO DECREASED VELOCITY.
CHECK DAMS WILL CAPTURE SEDIMENT THAT FALLS OUT OF SUSPENSION BEHIND THE CHECK DAM
FLOW VELOCITY IN THE CHANNEL.
THE PRIMARY PURPOSE OF A CHECK DAM IS TO REDUCE EROSION IN A CHANNEL BY REDUCING
(TY
P.)
2'-
0"
DAM CREST
*
*
STAN
DAR
D S
HEE
TS (U
SC),
MAY
01,
202
0
-
(TY
P.)
(GRAVEL BAG)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
(GRAVEL BAG)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
STRUCTURE WALL
DRAINAGE
PLAN
WOOD FRAME
ATTACHED TO 2X4 NOMINAL
SILT FENCE GEOTEXTILE
GRAVEL BAG
WOOD POST
2X4 NOMINAL
(DESIGN)
DEPUTY CHIEF ENGINEER
ISSUED WITH EB 17-023
ERRATA 1
PLAN
(SILT FENCE)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
CROSS SECTION
(MIN.)
SEE NOTE 2
18"
3'-
0" (M
AX.)
12"
WOOD FRAME
2X4 NOMINAL
(MA
X.)
FILTER LOG
SEDIMENT
PLAN
(SEDIMENT FILTER LOG)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
FRAME (SEE NOTES 1 AND 2)
ATTACHED TO WOOD POST AND
SILT FENCE GEOTEXTILE
13-J
UN-2017 07:1
3
FIL
E
NA
ME
=
DA
TE/
TI
ME
=
US
ER
=rfoote
209-03_01_090117.d
gn
U.S. CUSTOMARY STANDARD SHEET
ISSUED UNDER EB 17-001
209-03
(SHEET 1 0F 2)
DRAINAGE STRUCTURE INLET PROTECTION
12" (MIN.)
(SILT FENCE)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
(SEDIMENT FILTER LOG)
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY
STRUCTURE WALL
DRAINAGE
STRUCTURE WALL
DRAINAGE
APPROVED JANUARY 26, 2017
/S/ RICHARD WILDER, P.E.
F.
E.
D.
C.
B.
A.
MAXIMUM DRAINAGE AREA TO THE PRACTICE SHALL NOT EXCEED ONE ACRE.
CONTROL.
DRAINAGE STRUCTURE INLET PROTECTION SHALL NOT BE USED WITHOUT UPSLOPE EROSION
ALONG THE ACTIVE TRAVEL LANE OR SHOULDER.
DRAINAGE STRUCTURE INLET PROTECTION - TEMPORARY (SILT FENCE) SHALL NOT BE USED
AND NOT BYPASS TO UNPROTECTED RESOURCES.
THE TOP OF THE INLET PROTECTION SHALL BE SET TO ALLOW OVERFLOW INTO THE INLET
DAMAGED DURING USE.
PREVENT SEDIMENT FROM ENTERING A DRAINAGE SYSTEM IF BAGS ARE
GRAVEL BAGS ARE FILLED WITH CLEAN STONE, RATHER THAN SAND, TO
WATER, THEREBY ALLOWING SEDIMENT TO FALL OUT OF SUSPENSION.
PREVENT SEDIMENT FROM ENTERING A DRAINAGE SYSTEM BY TRAPPING
THE PRIMARY PURPOSE OF DRAINAGE STRUCTURE INLET PROTECTION IS TO
APPLICATION NOTES:
6.
5.
4.
3.
2.
1.
CAPACITY). SEDIMENT SHALL BE DISPOSED OF AS UNSUITABLE MATERIALS.
SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE-HALF THE MEASURE HEIGHT (STORAGE
MEASURES SHALL BE INSPECTED AFTER EVERY RUNOFF EVENT AND REPAIRED AS NECESSARY.
RECOMMENDATIONS.
BE FASTENED WITH PLASTIC TIES OR IN ACCORDANCE WITH MANUFACTURER'S
SPACED A MAXIMUM OF 2' APART. WHEN USED ON A PAVED SURFACE, THE LOG ENDS SHALL
SEDIMENT FILTER LOGS SHALL BE SECURED TO THE SOIL SURFACE WITH WOODEN POSTS
BETWEEN THE INLET AND THE PRACTICE.
BAGS SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE GRATE TO MINIMIZE EXPOSED SOIL
GRAVEL BAGS SHALL LAP THE JOINTS