NEW MEXICO STATE UNIVERSITY DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS M:\RR\14-400-029-03\2_DISCIPLINES\MEP\NMSU DHW & HHW\SHEETS\G-001 COVER SHEET.DWG 3/31/15 GENERAL NOTES SHEET INDEX 1. INFORMATION ASSOCIATED WITH EACH KEYNOTE IS LOCATED IN THAT SHEET'S RESPECTIVE NOTE BLOCK. 2. ABBREVIATIONS: REFERENCED FROM THE CONSTRUCTION SPECIFICATION INSTITUTE'S UNIFORM DRAWING SYSTEM TERMS AND ABBREVIATIONS MODULE. 3. ALL WORK ASSOCIATED WITH COCA-COLA BUILDING SHALL BE INCLUDED IN BID LOT #1. 4. ALL WORK ASSOCIATED WITH FIELD HOUSE SHALL BE INCLUDED IN BID LOT #2. MECHANICAL NEW MEXICO STATE UNIVERSITY OWNER P.O. BOX 30001, MSC 3545 LAS CRUCES, NM 88003 (575) 646-5603 CONTACT: DANIEL FERNANDEZ OWNER ENGINEERS WILSON & COMPANY 1700 E. IRON AVENUE SALINA, KS 67401 PH: (785) 820-2641 FAX: (505) 827-5949 CONTACT: MARK WENTZEL 4900 LANG AVE. NE ALBUQUERQUE, NM 87109 PH: (505)348-4014 FAX: (505)348-4072 CONTACT: PHIL SITGES G-001 COVER SHEET M-001 MECHANICAL GENERAL NOTES AND LEGEND MD-101 COCA-COLA BLDG. MECHANICAL DEMO PLAN MD-102 FIELD HOUSE MECHANICAL DEMO PLAN M-101 COCA-COLA BLDG. MECHANICAL PLAN M-102 FIELD HOUSE MECHANICAL PLAN P-101 COCA-COLA BLDG. PLUMBING PLAN P-501 PLUMBING FLOW DIAGRAMS P-502 GAS PIPING RISER DIAGRAMS M-501 MECHANICAL FLOW DIAGRAMS M-502 MECHANICAL SECTIONS M-503 MECHANICAL DETAILS M-504 MECHANICAL ELEVATIONS MP-601 MECHANICAL SCHEDULES E-001 ELECTRICAL GENERAL NOTES AND LEGEND E-101 COCA-COLA BLDG. ELECTRICAL PLAN E-102 FIELD HOUSE ELECTRICAL PLANS STATE MAP VICINITY MAP NEW MEXICO STATE UNIVERSITY COCA-COLA BUILDING AND ATHLETIC FIELD HOUSE DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS PLAN NORTH PLAN NORTH SITE LOCATION SITE LOCATION ELECTRICAL WILSON & COMPANY CODE ANALYSIS: COCA-COLA BUILDING DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS PROJECT ADDRESS: NEW MEXICO STATE UNIVERSITY LAS CRUCES 88003 A. APPLICABLE REGULATORY INFORMATION: 1. 2009 NM COMMERCIAL BUILDING CODE (2009 IBC, AS AMENDED) 2. 2009 NM EXISTING BUILDING CODE 3. 2009 NM PLUMBING CODE (2009 UNIFORM PLUMBING CODE, AS AMENDED) 4. 2009 NM MECHANICAL CODE (2009 UNIFORM MECHANICAL CODE, AS AMENDED) 5. 2008 NM ELECTRICAL CODE (2008 NATIONAL ELECTRICAL CODE, AS AMENDED) 6. 2009 NM ENERGY CONSERVATION CODE (2009 INTERNATIONAL ENERGY CONSERVATION CODE, AS AMENDED) 7. ICC/ANSI A117.1-2003 B. EXSISTING BUILDING CODE - LEVEL OF ALTERATION: LEVEL 1 C. OCCUPANCY GROUP: GROUP B D. CONSTRUCTION TYPE: II-B E. AUTOMATIC SPRINKLER SYSTEM: YES, DUE TO TRAVEL DISTANCE. PROJECT TO INSTALL SPRINKLERS IS PENDING. NOT REQUIRED AS PART OF THIS LEVEL 1 ALTERATION PROJECT. F. ALLOWABLE BUILDING AREA: (GROSS) 23,000 SF (PER TABLE 503, IBC) ACTUAL BUILDING AREA: (GROSS) 18,022 SF (GROSS, AS MEASURED TO EXTERIOR FACE OF WALLS) G. ALLOWABLE HEIGHT: ALLOWABLE: 55 FEET (PER TABLE 503, IBC) APPROXIMATE HEIGHT: 20 FEET H. ALLOWABLE STORIES: ALLOWABLE: 3 STORIES (PER TABLE 503, IBC) ACTUAL STORIES: 1 STORIES I. FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS: 0 HOURS J. CORRIDOR FIRE-RESISTANCE RATING: 0 HOURS K. INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY (TABLE 803.9): 1. OCCUPANCY B: EXIT ENCLOSURES AND EXIT PASSAGEWAYS FLAME SPREAD INDEX: A CORRIDORS FLAME SPREAD INDEX: B ROOMS AND ENCLOSED SPACES FLAME SPREAD INDEX: C L. MINIMUM ROOF COVERING CLASSIFICATION: N/A M. OCCUPANCY SEPARATION: NOT APPLICABLE N. MAXIMUM DISTANCE, COMMON PATH OF EGRESS TRAVEL (SECTION 1014.3, IBC): 200 FT ACTUAL TRAVEL DISTANCE: 125 FT P. OCCUPANT LOAD 13,560 / 100 = 136 OCCUPANTS CODE ANALYSIS: ATHLETIC FIELD HOUSE DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS PROJECT ADDRESS: NEW MEXICO STATE UNIVERSITY LAS CRUCES 88003 A. APPLICABLE REGULATORY INFORMATION: 1. 2009 NM COMMERCIAL BUILDING CODE (2009 IBC, AS AMENDED) 2. 2009 NM EXISTING BUILDING CODE 3. 2009 NM PLUMBING CODE (2009 UNIFORM PLUMBING CODE, AS AMENDED) 4. 2009 NM MECHANICAL CODE (2009 UNIFORM MECHANICAL CODE, AS AMENDED) 5. 2008 NM ELECTRICAL CODE (2008 NATIONAL ELECTRICAL CODE, AS AMENDED) 6. 2009 NM ENERGY CONSERVATION CODE (2009 INTERNATIONAL ENERGY CONSERVATION CODE, AS AMENDED) 7. ICC/ANSI A117.1-2003 B. EXSISTING BUILDING CODE - LEVEL OF ALTERATION: LEVEL 1 C. OCCUPANCY GROUP: GROUP B D. CONSTRUCTION TYPE: II-B E. AUTOMATIC SPRINKLER SYSTEM: NOT REQUIRED F. ALLOWABLE BUILDING AREA: (GROSS) 23,000 SF (PER TABLE 503, IBC) ACTUAL BUILDING AREA: (GROSS) 14,520 SF (GROSS, AS MEASURED TO EXTERIOR FACE OF WALLS) G. ALLOWABLE HEIGHT: ALLOWABLE: 55 FEET (PER TABLE 503, IBC) APPROXIMATE HEIGHT: 22 FEET H. ALLOWABLE STORIES: ALLOWABLE: 3 STORIES (PER TABLE 503, IBC) ACTUAL STORIES: 1 STORIES I. FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS: 0 HOURS J. CORRIDOR FIRE-RESISTANCE RATING: 0 HOURS K. INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY (TABLE 803.9): 1. OCCUPANCY B: EXIT ENCLOSURES AND EXIT PASSAGEWAYS FLAME SPREAD INDEX: A CORRIDORS FLAME SPREAD INDEX: B ROOMS AND ENCLOSED SPACES FLAME SPREAD INDEX: C L. MINIMUM ROOF COVERING CLASSIFICATION: N/A M. OCCUPANCY SEPARATION: NOT APPLICABLE N. MAXIMUM DISTANCE, COMMON PATH OF EGRESS TRAVEL (SECTION 1014.3, IBC): 200 FT ACTUAL TRAVEL DISTANCE: 72 FT P. OCCUPANT LOAD 13,844 / 100 = 139 OCCUPANTS CODE ANALYSIS

Upload: others

Post on 10-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

H H
W \S
H E
E TS
\G -0
01 C
O V
E R
S H
E E
T. D
W G
3/ 31
/1 5
GENERAL NOTES
SHEET INDEX
1. INFORMATION ASSOCIATED WITH EACH KEYNOTE IS LOCATED IN THAT SHEET'S RESPECTIVE NOTE BLOCK.
2. ABBREVIATIONS: REFERENCED FROM THE CONSTRUCTION SPECIFICATION INSTITUTE'S UNIFORM DRAWING SYSTEM TERMS AND ABBREVIATIONS MODULE.
3. ALL WORK ASSOCIATED WITH COCA-COLA BUILDING SHALL BE INCLUDED IN BID LOT #1.
4. ALL WORK ASSOCIATED WITH FIELD HOUSE SHALL BE INCLUDED IN BID LOT #2.
MECHANICALNEW MEXICO STATE UNIVERSITY OWNER P.O. BOX 30001, MSC 3545 LAS CRUCES, NM 88003 (575) 646-5603 CONTACT: DANIEL FERNANDEZ
OWNER ENGINEERS WILSON & COMPANY 1700 E. IRON AVENUE SALINA, KS 67401 PH: (785) 820-2641 FAX: (505) 827-5949 CONTACT: MARK WENTZEL
4900 LANG AVE. NE ALBUQUERQUE, NM 87109 PH: (505)348-4014 FAX: (505)348-4072 CONTACT: PHIL SITGES
G-001 COVER SHEET
M-101 COCA-COLA BLDG. MECHANICAL PLAN
M-102 FIELD HOUSE MECHANICAL PLAN
P-101 COCA-COLA BLDG. PLUMBING PLAN
P-501 PLUMBING FLOW DIAGRAMS
M-501 MECHANICAL FLOW DIAGRAMS
E-101 COCA-COLA BLDG. ELECTRICAL PLAN
E-102 FIELD HOUSE ELECTRICAL PLANS
STATE MAP VICINITY MAP
NEW MEXICO STATE UNIVERSITY COCA-COLA BUILDING AND ATHLETIC FIELD HOUSE
DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS
PLAN NORTH
PLAN NORTH
SITE LOCATION
SITE LOCATION
ELECTRICALWILSON & COMPANY
CODE ANALYSIS: COCA-COLA BUILDING DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS
PROJECT ADDRESS: NEW MEXICO STATE UNIVERSITY LAS CRUCES 88003
A. APPLICABLE REGULATORY INFORMATION: 1. 2009 NM COMMERCIAL BUILDING CODE (2009 IBC, AS AMENDED) 2. 2009 NM EXISTING BUILDING CODE 3. 2009 NM PLUMBING CODE (2009 UNIFORM PLUMBING CODE, AS AMENDED) 4. 2009 NM MECHANICAL CODE (2009 UNIFORM MECHANICAL CODE, AS AMENDED) 5. 2008 NM ELECTRICAL CODE (2008 NATIONAL ELECTRICAL CODE, AS AMENDED) 6. 2009 NM ENERGY CONSERVATION CODE (2009 INTERNATIONAL ENERGY CONSERVATION CODE, AS AMENDED) 7. ICC/ANSI A117.1-2003
B. EXSISTING BUILDING CODE - LEVEL OF ALTERATION: LEVEL 1
C. OCCUPANCY GROUP: GROUP B
D. CONSTRUCTION TYPE: II-B
E. AUTOMATIC SPRINKLER SYSTEM: YES, DUE TO TRAVEL DISTANCE. PROJECT TO INSTALL SPRINKLERS IS PENDING.
NOT REQUIRED AS PART OF THIS LEVEL 1 ALTERATION PROJECT.
F. ALLOWABLE BUILDING AREA: (GROSS) 23,000 SF (PER TABLE 503, IBC) ACTUAL BUILDING AREA: (GROSS) 18,022 SF (GROSS, AS MEASURED TO EXTERIOR FACE OF WALLS)
G. ALLOWABLE HEIGHT: ALLOWABLE: 55 FEET (PER TABLE 503, IBC) APPROXIMATE HEIGHT: 20 FEET
H. ALLOWABLE STORIES: ALLOWABLE: 3 STORIES (PER TABLE 503, IBC) ACTUAL STORIES: 1 STORIES
I. FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS: 0 HOURS
J. CORRIDOR FIRE-RESISTANCE RATING: 0 HOURS
K. INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY (TABLE 803.9): 1. OCCUPANCY B:
EXIT ENCLOSURES AND EXIT PASSAGEWAYS FLAME SPREAD INDEX: A CORRIDORS FLAME SPREAD INDEX: B ROOMS AND ENCLOSED SPACES FLAME SPREAD INDEX: C
L. MINIMUM ROOF COVERING CLASSIFICATION: N/A
M. OCCUPANCY SEPARATION: NOT APPLICABLE
N. MAXIMUM DISTANCE, COMMON PATH OF EGRESS TRAVEL (SECTION 1014.3, IBC): 200 FT
ACTUAL TRAVEL DISTANCE: 125 FT
P. OCCUPANT LOAD 13,560 / 100 = 136 OCCUPANTS
CODE ANALYSIS: ATHLETIC FIELD HOUSE DOMESTIC HOT WATER & HEATING HOT WATER RENOVATIONS
PROJECT ADDRESS: NEW MEXICO STATE UNIVERSITY LAS CRUCES 88003
A. APPLICABLE REGULATORY INFORMATION: 1. 2009 NM COMMERCIAL BUILDING CODE (2009 IBC, AS AMENDED) 2. 2009 NM EXISTING BUILDING CODE 3. 2009 NM PLUMBING CODE (2009 UNIFORM PLUMBING CODE, AS AMENDED) 4. 2009 NM MECHANICAL CODE (2009 UNIFORM MECHANICAL CODE, AS AMENDED) 5. 2008 NM ELECTRICAL CODE (2008 NATIONAL ELECTRICAL CODE, AS AMENDED) 6. 2009 NM ENERGY CONSERVATION CODE (2009 INTERNATIONAL ENERGY CONSERVATION CODE, AS AMENDED) 7. ICC/ANSI A117.1-2003
B. EXSISTING BUILDING CODE - LEVEL OF ALTERATION: LEVEL 1
C. OCCUPANCY GROUP: GROUP B
D. CONSTRUCTION TYPE: II-B
E. AUTOMATIC SPRINKLER SYSTEM: NOT REQUIRED
F. ALLOWABLE BUILDING AREA: (GROSS) 23,000 SF (PER TABLE 503, IBC) ACTUAL BUILDING AREA: (GROSS) 14,520 SF (GROSS, AS MEASURED TO EXTERIOR FACE OF WALLS)
G. ALLOWABLE HEIGHT: ALLOWABLE: 55 FEET (PER TABLE 503, IBC) APPROXIMATE HEIGHT: 22 FEET
H. ALLOWABLE STORIES: ALLOWABLE: 3 STORIES (PER TABLE 503, IBC) ACTUAL STORIES: 1 STORIES
I. FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS: 0 HOURS
J. CORRIDOR FIRE-RESISTANCE RATING: 0 HOURS
K. INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY (TABLE 803.9): 1. OCCUPANCY B:
EXIT ENCLOSURES AND EXIT PASSAGEWAYS FLAME SPREAD INDEX: A CORRIDORS FLAME SPREAD INDEX: B ROOMS AND ENCLOSED SPACES FLAME SPREAD INDEX: C
L. MINIMUM ROOF COVERING CLASSIFICATION: N/A
M. OCCUPANCY SEPARATION: NOT APPLICABLE
N. MAXIMUM DISTANCE, COMMON PATH OF EGRESS TRAVEL (SECTION 1014.3, IBC): 200 FT
ACTUAL TRAVEL DISTANCE: 72 FT
P. OCCUPANT LOAD 13,844 / 100 = 139 OCCUPANTS
CODE ANALYSIS
N E
W M
E X
IC O
S TA
TE U
N IV
E R
S IT
Y D
O M
E S
TI C
H O
T W
A TE
ENGINEER(S): PERSON(S) OR FIRM PROFESSIONALLY QUALIFIED AND DULY LICENSED TO PROVIDE ENGINEERING SERVICES.
CONTRACTOR: PERSON OR ENTITY, INCLUDING SUBCONTRACTORS, RESPONSIBLE FOR PERFORMING THE WORK OF THE CONTRACT DOCUMENTS.
CONTRACT DOCUMENTS: ALL DRAWINGS, SPECIFICATIONS, CONTRACTS, AND ANY DOCUMENT WHICH NECESSITATES THE WORK TO BE PERFORMED.
DRAWINGS, PLANS: THE PORTION OF THE CONTRACT DOCUMENTS THAT GIVES A GRAPHIC AND WRITTEN REPRESENTATION OF THE SCOPE, LOCATION AND ARRANGEMENT OF CONSTRUCTION, MATERIALS, AND EQUIPMENT.
SUBCONTRACTOR: PERSON OR ENTITY WHO HAS A DIRECT CONTRACT WITH THE BUILDER TO PERFORM ANY OF THE WORK OF THE CONTRACT DOCUMENTS.
THE WORK: INCLUDES LABOR, MATERIALS, EQUIPMENT AND SERVICES OF THE BUILDER NECESSARY TO PRODUCE EVERYTHING SHOWN, MENTIONED, OR REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE THE INTENDED RESULTS. THE ONLY THINGS NOT INCLUDED IN THE WORK ARE SPECIFICALLY MARKED "NOT-IN-CONTRACT", "BY OTHERS", "BY OWNER", "FUTURE", OR "EXISTING".
1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND INSTALLATION OF ALL LABOR AND MATERIALS NECESSARY FOR COMPLETE AND OPERATIONAL HVAC AND PLUMBING SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IF ITEMS REQUIRED TO ACHIEVE THIS (I.E. OFFSETS, ISOLATION AND BALANCING DEVICES, MAINTENANCE CLEARANCES, ETC.) ARE NOT SPECIFICALLY SHOWN.
2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED. ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO ACTUAL CONDITIONS AT THE BUILDINGS. THE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND SHALL NOT BE SCALED. HOWEVER, THIS DOES NOT RELIEVE ANY SUB-CONTRACTOR FROM COORDINATING HIS WORK WITH ALL OTHER TRADES AND FROM ADJUSTING HIS WORK AS REQUIRED BY THE ACTUAL CONDITIONS OF THE PROJECT. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING A BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL CONDITIONS OF THE PROJECT.
3. COORDINATE AND ADJUST ALL WORK BETWEEN TRADES AND EXISTING CONDITIONS IN ORDER TO ACCOMPLISH A NEAT, INTEGRATED AND EFFICIENT INSTALLATION. EXAMINE THE CONTRACT DOCUMENTS OF ALL TRADES (I.E. ELECTRICAL AND PLUMBING PLAN, ETC.). COORDINATE NECESSARY EQUIPMENT, DUCTWORK AND PIPING LOCATIONS SO THAT THE FINAL INSTALLATION IS COMPATIBLE WITH THE MATERIALS AND EQUIPMENT OF THE OTHER TRADES. PREPARE SHOP DRAWINGS FOR INSTALLATION OF ALL NEW WORK BEFORE INSTALLATION TO VERIFY COORDINATION OF WORK BETWEEN TRADES.
4. ALL CAPACITIES ARE SCHEDULED AT JOBSITE ALTITUDE OF 3,908 FT.
5. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL CONTRACTOR BEFORE ORDERING ANY MECHANICAL EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS.
6. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY INDICATED OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS TAKE PRECEDENCE.
7. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE ALL AROUND ALL EQUIPMENT REQUIRING SAME.
8. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL AND DISPOSITION OF MATERIALS AND PROTECTION OF PROPERTY WHICH IS TO REMAIN UNDISTURBED.
9. PROVIDE ACCESS DOORS FOR ALL EQUIPMENT, VALVES, ACTUATORS AND CONTROLS WHICH REQUIRE ACCESS FOR ADJUSTMENT OR SERVICING AND WHICH ARE LOCATED IN OTHERWISE UNACCESSIBLE LOCATIONS. FOR EQUIPMENT LOCATED IN "ACCESSIBLE LOCATIONS" SUCH AS LAY-IN CEILINGS: LOCATE EQUIPMENT TO PROVIDE ADEQUATE SERVICE CLEARANCE FOR NORMAL MAINTENANCE WITHOUT REMOVING ARCHITECTURAL, ELECTRICAL OR STRUCTURAL ELEMENTS SUCH AS THE CEILING SUPPORT SYSTEM, ELECTRICAL FIXTURES, ETC. "NORMAL MAINTENANCE" INCLUDES, BUT IS NOT LIMITED TO: FILTER CHANGING; GREASING OF BEARINGS; USING P/T PORTS FOR PRESSURE OR TEMPERATURE MEASUREMENTS; SERVICING CONTROL VALVES AND SERVICING CONTROL PANELS.
10. NO DOMESTIC WATER, HEATING WATER OR CONDENSER WATER LINES SHALL BE LOCATED EXPOSED IN FINISHED SPACES OR BELOW THE BUILDING SLAB UNLESS SHOWN OTHERWISE ON THE DRAWINGS.
11. ALL CURBS, ROOF JACKS, ROOF THIMBLES, ETC. SHALL BE COMPATIBLE WITH ROOFING SYSTEM TO BE PROVIDED. REFERENCE ARCHITECTURAL DIVISION FOR REQUIRED FLASHING DETAILS.
12. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT PROVIDED UNDER DIVISIONS 21, 22 AND 23 HAVE NOT BEEN SPECIFICALLY INDICATED ON THE ELECTRICAL DRAWINGS AND MUST BE FIELD COORDINATED BY THE DIVISION REQUIRING SUCH POWER. SUCH EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO:
(A) TEMPERATURE CONTROL PANELS, AND JUNCTION BOXES FOR 24V CONTROL TRANSFORMERS. REQUIRED CONNECTION ARE INCLUDED IN DIVISIONS 21, 22 AND 23 AND WILL BE SHOWN BY THAT CONTRACTOR'S CONTROL SUBMITTAL DRAWINGS.
(B) CONTRACTOR SHALL PROVIDE POWER TO THESE DEVICES AT NO EXTRA COST TO THE PROJECT. COORDINATE EXACT REQUIREMENTS AND COSTS WITH ENGINEER PRIOR TO SUBMITTING BID.
13. PROVIDE ALL REQUIRED PERMITS, INSPECTIONS AND COORDINATION WITH GOVERNING AUTHORITIES.
14. QUALITY CONTROL: (A) QUALIFICATION OF PRODUCTS: WHEN PRODUCTS ARE SPECIFIED BY MANUFACTURER AND MODEL NUMBER, EQUIVALENT
PRODUCTS BY OTHER MANUFACTURERS LISTED MAY BE PROVIDED. PRODUCT EQUIVALENCY SHALL BE DETERMINED BY ENGINEER.
(B) IF A PRODUCT SUBMITTED AS AN EQUIVALENT IS DEEMED UNACCEPTABLE TO THE ENGINEER, THE SPECIFIED PRODUCT SHALL BE
PROVIDED AT NO EXTRA COST TO THE PROJECT. (C) SUBMITTALS SHALL INCLUDE REVISED AND SUPPLEMENTED CONTROL DIAGRAMS. (D) SUBMIT CUT-SHEETS ON ALL OF THE SPECIFIED EQUIPMENT.
15. CONTRACTOR SHALL CREATE A LOG SHEET FOR REQUIRED TESTS. THE LOG SHEET WILL HAVE A COLUMN FOR REQUIRED TESTS, A COLUMN FOR ACCEPTANCE OF TEST, A COLUMN FOR REMARKS, AND A COLUMN FOR APPROVAL SIGNATURE.
16. CONTRACTOR SHALL CREATE A LOG SHEET OF REQUIRED TRAINING. THE LOG SHEET WILL HAVE A COLUMN FOR THE TRAINED ITEM, A COLUMN FOR THE TIME, DATE AND DURATION OF THE TRAINING, AND A COLUMN FOR ACCEPTANCE OF TRAINING BY OWNER, ARCHITECT, OR ENGINEER.
17. AFTER INSTALLATION OF SYSTEM, PERFORM AN OPERATIONAL TEST IN THE PRESENCE OF THE OWNER, ARCHITECT, OR ENGINEER. THIS TEST WILL CONSIST OF SUCCESSFULLY DEMONSTRATING:
(A) APPEARANCE OF INSTALLATION. (B) FUNCTION OF ALL CONTROLS. (C) THE CONTROLS SHALL BE OPERATED IN THE FOLLOWING MODES IN EACH ZONE: OCCUPIED/UNOCCUPIED. (D) IF THE TEST IS NOT SUCCESSFUL IN THE OPINION OF THE ARCHITECT OR ENGINEER, DEFICIENCIES WILL BE REMEDIED AND THE
SYSTEM WILL BE RE-TESTED UNTIL THE TEST IS SUCCESSFUL. SECOND AND SUBSEQUENT TESTS WILL RESULT IN THE CONTRACTOR'S CONTRACT PAYMENT BEING REDUCED AN AMOUNT EQUAL TO 85 DOLLARS TIMES THE NUMBER OF ADDITIONAL HOURS SPENT BY THE ARCHITECT OR ENGINEER WITNESSING THE TEST. THE OWNER SHALL PAY THIS AMOUNT TO THE ARCHITECT.
18. PIPING: (A) PIPE INSTALLATION: (1) ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE BUILDING STRUCTURE TO PREVENT SAGGING, POCKETING, SWAYING
OR DISPLACEMENT BY MEANS OF HANGERS AND SUPPORTS. PIPING IS NOT TO BE SUPPORTED BY EQUIPMENT. (2) PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR MATERIALS. (3) PROVIDE MANUAL AIR VENTS AND CAPPED HOSE-END DRAINS WITH ISOLATION VALVE AT PIPING HIGH AND LOW POINTS. (4) WELD PIPE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. WELDERS SHALL BE CERTIFIED FOR TYPE OF WELD
BEING PERFORMED. (5) FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFORE PERFORMING PRESSURE TEST. DO NOT USE PIPING SYSTEM
VALVES TO ISOLATE SECTIONS WHERE TEST PRESSURE EXCEEDS VALVE PRESSURE RATING. PRESSURIZE PIPING AT 100 PSIG. IF LEAKAGE IS OBSERVED OR IF TEMPERATURE COMPENSATED PRESSURE DROP EXCEEDS 1% OF TEST PRESSURE, REPAIR LEAKS AND RETEST. DO NOT USE AIR PRESSURE TO TEST PLASTIC PIPE.
(6) PROVIDE SUPPORT UNDER ELBOWS ON PUMP SUCTION AND DISCHARGE LINES. (7) ALL STRAINERS SHALL BE FURNISHED WITH A "ROUGHING" SCREEN AND TWO (2) SCREENS FOR NORMAL OPERATION. INSTALL
STRAINER WITH ROUGHING SCREEN AND OPERATE SYSTEM FOR 24 HOURS MINIMUM (RUN DOMESTIC WATER SYSTEMS AT MAX FLOW FOR A MINIMUM OF ONE HALF (1/2) HOUR. REMOVE ROUGHING SCREEN AND INSTALL NORMAL SCREEN, AFTER TWO WEEK OF NORMAL OPERATION INSTALL NEW NORMAL SCREEN.
19. ALL MATERIALS ABOVE THE CEILINGS WHERE THIS SPACE IS USED AS A RETURN AIR PLENUM MUST BE NON-COMBUSTIBLE. ALL COMMUNICATIONS CABLE MUST BE PLENUM RATED AND ALL ELECTRICAL WIRING MUST BE IN A PLENUM RATED SHEATH OR CONDUIT. ALL PVC PIPING MUST BE ENCASED IN AN APPROVED INSULATION WITH A FLAME AND SMOKE SPREAD RATING OF 25/50.
MECHANICAL ABBREVIATIONS
CFM CUBIC FEET PER MINUTE
DEG F DEGREES FAHRENHEIT
GENERAL REQUIREMENTS (CONTINUED):
20. THESE DRAWINGS ARE ALL INCLUSIVE. WHAT IS REQUIRED OF ONE IS REQUIRED OF ALL. ANY ONE PART OF THE DRAWINGS DOES NOT TAKE PRECEDENCE OVER ANOTHER PART OF THE DRAWINGS. WHERE DISCREPANCIES OCCUR THE MOST STRINGENT REQUIREMENT SHALL GOVERN. THE MOST STRINGENT REQUIREMENT GENERALLY IMPLIES THE MOST COSTLY CONDITION. IF ANY DRAWING IS NOT CLEAR OR IF THERE ARE ANY QUESTIONS ABOUT THESE DRAWINGS, NOTIFY THE ENGINEER(S). IN THE EVENT THE CONTRACTOR DOES NOT NOTIFY THE ENGINEER(S), THE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND EXPENSE FOR ANY REVISIONS NECESSARY.
21. ALL MATERIAL PROVIDED BY CONTRACTOR SHALL BE NEW (UNLESS OTHERWISE NOTED) AND NOT DAMAGED. CONTRACTOR SHALL NOT INSTALL MATERIAL DAMAGED DURING CONSTRUCTION, NEW OR USED, AND SHALL REPLACE DAMAGED MATERIAL AT CONTRACTOR'S EXPENSE.
22. ALL WORK OF THIS PROJECT SHALL CONFORM TO THE REQUIREMENTS IN THE LATEST ADOPTED EDITIONS OF:
NEW MEXICO ADMINSTRATIVE CODE (NMAC) INTERNATIONAL BUILDING CODE (IBC) UNIFORM PLUMBING CODE (UPC) UNIFORM MECHANICAL CODE (UMC) NATIONAL ELECTRIC CODE (NEC) INTERNATIONAL ELECTRIC CODE (IEC) ALL APPLICABLE LOCAL CODES AND ORDINANCES
23. CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT DOCUMENTS WITH EACH OTHER AND WITH INFORMATION FURNISHED BY THE ENGINEER(S). CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND NOTIFY ENGINEER(S) OF ANY DISCREPANCIES OR QUESTIONS PRIOR TO PERFORMING THE WORK. IN THE EVENT THE CONTRACTOR DOES NOT NOTIFY THE ENGINEER(S), THE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND EXPENSE FOR ANY REVISIONS NECESSARY.
24. CONTRACTOR SHALL NOTIFY THE ENGINEER(S) OF ANY PROPOSED REVISIONS TO THE DRAWINGS AND OBTAIN WRITTEN APPROVAL PRIOR TO PERFORMING THE WORK. IN THE EVENT THE CONTRACTOR DOES NOT NOTIFY THE ENGINEER(S), THE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND EXPENSE FOR ANY REVISIONS NECESSARY.
25. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS OF EXISTING CONSTRUCTION AND REPORT ANY INCONSISTENCIES TO THE ENGINEER BEFORE PROCEEDING WITH WORK AFFECTED BY SUCH INCONSISTENCIES. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE INTENT OF THE DESIGN AS SHOWN ON THE PLANS. ACTUAL CONDITIONS SHALL GOVERN OVER WRITTEN DIMENSIONS, WRITTEN DIMENSIONS SHALL GOVERN OVER ACTUAL DRAWING REPRESENTATION. ATTEMPTS TO UTILIZE SCALING OR ELECTRONIC MEANS TO DETERMINE QUANTITY TAKE-OFF MAY BE AFFECTED BY NOT-TO-SCALE ITEMS. THE CONSULTING ENGINEER IS NOT RESPONSIBLE FOR, AND SHALL NOT BE HELD LIABLE FOR THE ACCURACY OF RESULTS OF SUCH TAKE OFFS.
26. ALL WORK ON THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, RULES AND REGULATIONS CONCERNING CONSTRUCTION SAFETY AND HEALTH.
27. THE CONTRACTOR SHALL NOT INSTALL ITEMS AS SHOWN ON THE PLANS WHEN IT IS OBVIOUS THAT FIELD CONDITIONS ARE DIFFERENT THAN SHOWN IN THE DESIGN. SUCH CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. IN THE EVENT THE CONTRACTOR DOES NOT NOTIFY THE ENGINEER, THE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND EXPENSE FOR ANY REVISIONS NECESSARY. THE ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR SHALL THE ENGINEER BE REQUIRED TO SUPERVISE THE CONDUCT OF THE WORK OR THE CONSTRUCTION PROCEDURES AND SAFETY PROCEDURES FOLLOWED BY THE CONTRACTOR OR THE SUBCONTRACTOR OR THEIR RESPECTIVE EMPLOYEES OR BY ANY OTHER PERSON AT THE JOB SITE OTHER THAN THAT OF THE ENGINEER'S EMPLOYEES.
28. CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY 24 HOURS A DAY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, ARCHITECT AND ENGINEER HARMLESS OF ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THE PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, ARCHITECT OR THE ENGINEER.
29. ALL PLANS, SCHEDULES, DRAWINGS AND SPECIFICATIONS SHALL BE EQUALLY CONSIDERED TO BE PART OF THE CONTRACT DOCUMENTS, WITH NO EXCEPTIONS, EXEMPTIONS OR EXCLUSIONS. THERE SHALL BE NO CONSIDERATION OF PRECEDENCE OR PREFERENCE FOR ANY OF THESE COMPONENTS AS BEING EXCLUSIVE OF THE OTHER AND ALL OF THEM SHALL COMPRISE A COMPLETE SET OF CONTRACT DOCUMENTS. EACH OF THESE COMPONENTS OF THE CONTRACT DOCUMENTS SHALL BEAR EQUAL WEIGHT, INFLUENCE AND CONSIDERATION. IF THERE ARE CONFLICTS BETWEEN ANY OF THESE COMPONENTS, THE CONTRACTOR SHALL BRING THESE TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK IN QUESTION.
30. FOLLOW SMACNA GUIDELINES AND ABIDE BY UPC 2009 AND UMC 2009 CODES, WITH MODIFICATIONS AS DICTATED BY NM CID.
31. CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING THE CONTRACTOR'S BEST SKILL AND ATTENTION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT DOCUMENTS UNLESS GIVEN OTHER SPECIFIC INSTRUCTIONS CONCERNING THESE MATTERS.
32. OWNER HAS FIRST RIGHT OF REFUSAL ON ALL EXISTING EQUIPMENT, FIXTURES, MATERIALS, ETC. BEING REMOVED AS PART OF THIS PROJECT.
33. ROOF-MOUNTED APPLIANCES, EQUIPMENT, FANS, OR OTHER COMPONENTS THAT REQUIRE SERVICE: LOCATE A MINIMUM OF 10 FEET FROM ROOF EDGES AND PARAPETS.
MECHANICAL EQUIPMENT TAG
XX 1
GENERAL MECHANICAL & PLUMBING NOTES A. CONTRACTOR TO VERIFY AND COORDINATE W/ ELECTRICAL ENGINEER AND CONTRACTOR FOR WIRING AND
POWER REQUIRED.
C. CONTRACTOR SHALL COORDINATE ALL PROPOSED MECHANICAL EQUIPMENT, WITH OTHER TRADES, TO AVOID CONFLICTS. CONTRACTOR SHALL INSTALL MAINTAIN ADEQUATE EQUIPMENT ACCESS AND SERVICEABILITY TO ALL VALVES AND EQUIPMENT.
D. ALL EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. INSTALLATIONS SHALL BE COORDINATED WITH THE ARCHITECTURAL PLANS AND STRUCTURAL.
E. SEE MP-601 FOR SCHEDULES. SEE M-501, M-502, M-503 AND P-501 SHEETS FOR MECHANICAL DIAGRAMS AND SEQUENCES OF OPERATIONS.
F. COORDINATE LOCATION OF ALL CEILING MOUNTED EQUIPMENT WITH ACTUAL CONDITIONS.
G. ALL PIPING AND CONDUIT ROOF PENETRATIONS TO BE INSTALLED PER DETAILS SHOWN ON M-601. COORDINATE WITH PLUMBING AND ELECTRICAL.
H. ALL PIPING SHALL BE INSTALLED PER DETAILS SHOWN ON M-503.
I. COORDINATE ALL PLUMBING AND PIPING WITH OTHER EQUIPMENT.
J. SEE SHEET MP-601 FOR PLUMBING FIXTURE SCHEDULE. ALL PLUMBING FIXTURE SUBSTITUTION SHALL BE BY ENGINEER APPROVAL.
K. CONTRACTOR TO COORDINATE AND VERIFY SERVICE CONNECTIONS ON ALL FIXTURES.
L. ALL WATER RUNS ARE OVERHEAD AND SHALL BE CONCEALED WHERE EVER POSSIBLE. ANY EXPOSED PIPING SHALL BE COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. SLOPE TO DRAIN.
M. HOT AND COLD WATER PIPING IS TO BE INSTALLED ACCORDING TO LOCAL CODE REQUIREMENTS.
N. PIPE MATERIAL: TYPE L COPPER PIPE FOR DOMESTIC WATER, TYPE L COPPER FOR DRAIN PIPING AND HEATING HOT WATER.
O. ALL AIR VENTS, GAUGES, THERMOMETERS, SHALL BE MOUNTED IN AN ACCESSIBLE LOCATION, OR BEHIND AN ACCESS PANEL, PROVIDED BY CONTRACTOR.
P. UTILITY EXPANSION CHARGES SHALL BE PAID FOR BY OWNER AND ARE NOT TO BE INCLUDED IN THIS CONTRACT.
Q. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE BASE BID WORK AND ADDITIVE ALTERNATE WORK. ANY PROBLEMS OR POTENTIAL FOR FUTURE PROBLEMS SHALL BE REPORTED TO THE ARCHITECT AND ENGINEER FOR DIRECTION.
R. WATER LINES ON EXTERIOR WALLS SHALL BE ROUTED ON INTERIOR SIDE OF INSULATION.
S. ALL POINTS-OF-CONNECTION SHOWN ON PLANS ARE APPROXIMATE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL EXISTING PLUMBING LINES THAT ARE BEING CONNECTED TO.
T. CONTRACTOR SHALL PROTECT BUILDING FROM DAMAGE AND REPAIR OR REPLACE AT THEIR EXPENSE ANY DAMAGES THAT DO OCCUR.
U. ANY AND ALL DISRUPTIVE ACTIVITIES SHALL BE DONE IN A MANNER LEAST INVASIVE TO THE FACILITY. THE OWNER SHALL BE CONTACTED AND COORDINATED WITH ON CONSTRUCTION/DEMOLITION THAT WILL HAVE MAJOR IMPACT ON THE FACILITY AND/OR EMPLOYEES.
HVAC CONTROLS LEGEND MARK DEFINITION
THERMOSTAT
SYMBOL LEGEND GENERAL
AS A MINIMUM, PLUMBING SITE CONSTRUCTION SHALL BE PER NEW MEXICO STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION LATEST EDITION. INCLUDING BUT NOT LIMITED TO SITE WATER AND SEWER LINE TRENCHING AND BACK FILLING, WATER LINES, VALVES AND SEWER LINES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXISTENCE AND LOCATION OF ALL UNDERGROUND OR CONCEALED UTILITIES IN ADVANCE OF ANY CONSTRUCTION.
ALL EXISTING MAINLINE UTILITIES SHALL REMAIN IN PLACE AND SHALL BE PROTECTED DURING DEMOLITION AND CONSTRUCTION. EXISTING UTILITIES THAT MUST BE RELOCATED SHALL BE IDENTIFIED BY THE CONTRACTOR BOTH IN THE FIELD AND ON THE PLANS. RELOCATION WORK SHALL BE COORDINATED WITH THE PROJECT MANAGER AND UTILITY COMPANY.
ANY WORK DONE WITHOUT INSPECTION OR COMPLIANCE TESTING IS SUBJECT TO REMOVAL OR CORRECTION. THE CONTRACTOR SHALL PROVIDE SIGNED DOCUMENTS SHOWING PROOF OF INSPECTION AND/OR TESTING BY QUALIFIED PERSONNEL.
IF APPLICABLE, THE CONTRACTOR SHALL NOTIFY ALL APPLICABLE UTILITY COMPANIES AT THE NEW MEXICO ONE CALL (505-260-1990) TWO (2) WORKING DAYS PRIOR TO ANY DIGGING OR EXCAVATION. ALSO COORDINATE WITH LAS CRUCES PUBLIC WORKS.
COORDINATE ALL PLUMBING AND PIPING WITH OTHER EQUIPMENT.
CONTRACTOR TO COORDINATE AND VERIFY SERVICE CONNECTIONS ON ALL FIXTURES.
CONTRACTOR RESPONSIBLE FOR LOCATING ALL UTILITY LINES.
GENERAL AND PLUMBING CONTRACTOR SHALL READ AND STUDY ALL DRAWINGS TO FAMILIARIZE THEMSELVES WITH PROJECT AND RESPONSIBILITIES PRIOR TO BIDDING.
DEMOLITION
CONTRACTOR SHALL PROTECT THE EXISTING PUBLIC AND PRIVATE UTILITIES, INCLUDING BUT NOT LIMITED TO POWER LINES, STORM DRAINS, IRRIGATION LINES, WATERLINES, NATURAL GAS, AND SANITARY SEWER MAINS ON THE SITE AND IN ADJACENT PUBLIC RIGHT-OF-WAY WHERE FOUND IN THE FIELD AND AS SHOWN ON THE PLANS.
REMOVE AND DISPOSE UTILITY LINES AS SHOWN ON THE PLANS. IF ANY ITEM APPEARS TO BE QUESTIONABLE, THE ARCHITECT, ENGINEER AND CONSTRUCTION MANAGER SHALL BE CONTACTED FOR CONCURRENCE.
UTILITIES
IF ANY UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES ARE SHOWN ON THESE DRAWINGS, THEY ARE SHOWN IN AN APPROXIMATE MANNER ONLY, AND SUCH LINES MAY EXIST WHERE NONE ARE SHOWN. IF ANY SUCH EXISTING LINES ARE SHOWN, THE LOCATION IS BASED UPON INFORMATION PROVIDED TO THE ENGINEER BY OTHERS, AND THE INFORMATION MAY BE INCOMPLETE, OR MAY BE OBSOLETE BY THE TIME CONSTRUCTION COMMENCES. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ANY UTILITY LINE, PIPELINE OR UNDERGROUND UTILITY LINE IN OR NEAR THE AREA OF WORK.
THE EXISTING UTILITIES DEPICTED ON THESE PLANS WERE DERIVED FROM INFORMATION PROVIDED TO THE ENGINEER BY OTHERS. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXCAVATE AS NECESSARY AND VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF PERTINENT UTILITIES. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER SO THAT THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY. CONTRACTOR SHALL EXERCISE DUE CARE TO AVOID DISTURBING ANY EXISTING UNDERGROUND UTILITIES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ANY POTENTIAL DISRUPTIONS IN UTILITY SERVICE WITH THE UTILITY COMPANIES AFFECTED AT LEAST 48 HOURS PRIOR TO THE DISRUPTION.
CONTRACTOR SHALL EXPOSE AND/OR OTHERWISE VERIFY INVERT ELEVATIONS OF ANY RELEVANT PIPING BEFORE SETTING NEW INVERTS. SHOULD INVERTS DIFFER MORE THAN 0.20' FROM THOSE SHOWN ON THE PLANS, THE ENGINEER SHALL BE NOTIFIED TO DETERMINE ANY RESULTING CHANGES IN DESIGN.
ALL NEW AND EXISTING FRAMES, COVERS, VALVE BOXES, ETC. SHALL BE ADJUSTED TO NEW FINISHED GRADE PRIOR TO PLACING OF CONCRETE PAVEMENT OR ASPHALT CONCRETE SURFACE COURSE BY THE CONTRACTOR.
SITE NOTES
FLOW - IN DIRECTION OF ARROW
HOT WATER RECIRCULATOR
VENT THRU ROOF
WATER HAMMER ARRESTOR
GAS COCK, GAS STOP
DOMESTIC HOT WATER
DOMESTIC COLD WATER
POINT OF CONNECTION
GENERAL SHEET NOTES
K. CONTRACTOR TO PATCH, REPAIR AND SEAL ALL ASSOCIATED PENETRATIONS TO ENSURE NO FUTURE LEAKS AND TO PROPERLY MAINTAIN BUILDING INTEGRITY.
SHEET KEY NOTES 1. DECOUPLE EXISTING 3" HOT WATER SUPPLY LINE FROM SYSTEM. CAP AND PROTECT
BOTH SIDES OF LINES (MAIN AND BRANCH) AS THEY WILL BE REUSED IN NEW CONSTRUCTION.
2. DECOUPLE EXISTING 1-1/2" HOT WATER RETURN. CAP AND PROTECT BOTH SIDES OF LINES (MAIN AND BRANCH) AS THEY WILL BE REUSED IN NEW CONSTRUCTION.
3. DECOUPLE EXISTING 1-1/2" HOT WATER SUPPLY. CAP AND PROTECT BOTH SIDES OF LINES (MAIN AND BRANCH) AS THEY WILL BE REUSED IN NEW CONSTRUCTION.
4. DECOUPLE EXISTING 1-1/2" HOT WATER RETURN. CAP AND PROTECT BOTH SIDES OF LINES (MAIN AND BRANCH) AS THEY WILL BE REUSED IN NEW CONSTRUCTION.
5. DECOUPLE EXISTING 1" HOT WATER SUPPLY. PROVIDE TEMPORARY CAP ON HOT WATER. CAP AND ABANDON PIPING TO MECHANICAL ROOM.
6. DECOUPLE EXISTING HOT WATER SUPPLY DOWN STREAM OF EXISTING VALVE. DECOUPLE EXISTING HOT WATER RETURN UP STREAM OF EXISTING VALVE. PROVIDE CAP AND ABANDON PIPE TO EXISTING MECHANICAL ROOM.
7. EXISTING HEATING WATER LINES IN/OUT OF CURRENT MECHANICAL ROOM TO BE ABANDONED IN PLACE. PAINT THE WORDS "ABANDONED - DO NOT USE".
8. DECOUPLE EXISTING HWS FROM MAIN. CAP BRANCH FROM SUPPLY. ABANDONED BRANCH SHALL NOT BE LONGER THEN 12" FROM MAIN.
9. DECOUPLE EXISTING HWR FROM MAIN. CAP BRANCH FROM RETURN. ABANDONED BRANCH SHALL NOT BE LONGER THEN 12" FROM MAIN.
10. PROVIDE TEMPORARY CAP ON HEATING WATER PIPING AT THIS LOCATION.
11. DECOUPLE EXISTING HWS. CAP PIPE AS CLOSE TO EXISTING DROP AS POSSIBLE. ABANDONED LINE SHALL NOT BE LONGER THEN 12" FROM DROP.
12. DECOUPLE EXISTING HWR PIPE. CAP AND ABANDON. PAINT THE WORDS: "ABANDONED - DO NOT USE"
13. EXISTING SHOWER TO BE REMOVED. REMOVE ALL EXISTING PIPING BACK TO SOURCE. ABANDON PIPING ABOVE CEILING. DEAD ENDS SHALL NOT BE LONGER THEN 12" FROM SUPPLY. DEMO SHOWER WALLS, CLOSET WALLS. DEMO CEILING IN ROOM. DEMO EXISTING CONVECTOR. DEMO HWS AND HWR BACK TO MAIN. CAP BRANCH. ABANDONED BRANCH SHALL NOT BE LONGER THEN 12" FROM MAIN. REMOVE EXTRANEOUS MATERIALS FOR INSTALLATION OF GYPSUM BOARD CEILING AT UNDERSIDE OF TRUSSES. REMOVE FLOORING SYSTEMS AND GRIND AWAY ADHESIVE MATERIALS FOR INSTALLATION OF NEW CONCRETE SEALER.
14. REMOVE DOMESTIC COLD WATER BACK TO A BRANCH. CAP BRANCH. ABANDONED BRANCH SHALL NOT BE LONGER THEN 12" FROM MAIN.
15. PIPING TO EXISTING WALL-MOUNTED CONVECTION HEATER.
16. EXISTING FAN COIL UNIT TO REMAIN (TYPICAL).
17. EXISTING PIPING IN CEILING SPACE TO REMAIN.
18. EXISTING WALL-MOUNTED CONVECTION HEATER TO REMAIN, EXCEPT WHERE NOTED (TYPICAL).
19. SEE SHEET P-101 FOR CONTINUATION OF HOT WATER RETURN LINE.
20. REMOVE PIPE AS REQUIRED TO CONNECT NEW HOT WATER SUPPLY. SEE P-101.
21. REMOVE PIPE AS REQUIRED TO INSTALL NEW REDUCED PRESSURE BACKFLOW PREVENTER. SEE M-101.
A6
H TW
R H
W S
H W
HTWR
H W
S H
W S
HWS HWS
H W
S H
W S
5 GENERAL SHEET NOTES
K. CONTRACTOR TO PATCH, REPAIR AND SEAL ALL ASSOCIATED PENETRATIONS TO ENSURE NO FUTURE LEAKS AND TO PROPERLY MAINTAIN BUILDING INTEGRITY.
SHEET KEY NOTES 1. EXISTING 3" HWS/HWR LINES TO BE RECONNECTED TO NEW HWS/HWR LINES AS
SHOWN ON SHEET M-102.
2. DEMOLISH EXISTING PUMPS, ASSOCIATED PIPING, AND CONCRETE PADS. COORDINATE WITH NEW WORK AS SHOWN ON SHEET M-102.
3. DEMOLISH EXISTING HEAT EXCHANGER AND ALL ASSOCIATED PIPING.
4. DEMOLISH EXISTING HOT WATER HEATER AND ASSOCIATED PIPING. COORDINATE WITH NEW WORK AS SHOWN ON SHEET M-102.
5. DEMOLISH EXISTING RECEIVER TANK IN PIT AND ASSOCIATED PIPING.
6. DEMOLISH EXISTING FLASH TANK AND ASSOCIATED PIPING. VERIFY ACTUAL LOCATION.
7. DEMOLISH EXISTING EXPANSION TANK AND ASSOCIATED PIPING. VERIFY EXISTING LOCATION
8. DEMOLISH EXISTING STEAM/CONDENSATE EQUIPMENT AND ASSOCIATED PIPING AND VALVES, NOT SHOWN FOR CLARITY ON THIS PLAN.
9. TYPICAL EXISTING UNIT HEATER TO REMAIN.
10. TYPICAL EXISTING HWS/HWR PIPING TO REMAIN.
11. EXISTING 2" FLUE TO BE MODIFIED DURING DEMOLITION FOR NEW FLUE SIZES AND PROVIDE A ROOF CAP. REFER TO SHEET M-102 FOR NEW WORK ASSOCIATED WITH THESE VENTS.
12. EXISTING UTILITIES IN TUNNEL TO REMAIN.
13. ABANDON EXISTING 1" CW/HW LINES FROM THIS POINT OF CONNECTION TO LAUNDRY FACILITY. VERIFY EXACT LOCATION ON SITE. SEE SHEET M-102 FOR NEW WATER CONNECTIONS TO LAUNDRY FACILITY.
14. CUT AND PERMANENTLY CAP EXISTING STEAM AND CONDENSATE AND ABANDON IN PLACE.
15. EXISTING DOMESTIC HOT WATER LINE TO INDIVIDUAL RESTROOMS/SHOWERS. RETAIN AND CAP PIPE FOR NEW CONNECTION. SEE M-102 FOR NEW WORK.
16. EXISTING DOMESTIC COLD WATER LINE TO INDIVIDUAL RESTROOMS/SHOWERS. RETAIN AND CAP PIPE FOR NEW CONNECTION. SEE M-102 FOR NEW WORK.
17. TEMPORARILY CAP EXISTING LINE AT THIS POINT DURING DEMOLITION. SEE SHEET M-102 FOR NEW HW DIAGRAM AND NEW CONNECTIONS.
18. EXISTING 2" GAS LINE. SEE SHEET M-102 FOR NEW GAS LINE CONNECTION.
19. MAJORITY OF EXISTING PIPING AND EQUIPMENT SHOWN TO BE DEMOLISHED. INFORMATION SHOWN SHALL BE VERIFIED ONSITE BY CONTRACTOR AND IS INCLUDED TO PROVIDE SUPPLEMENTAL INFORMATION ON EXISTING SYSTEMS TO BE REMOVED.
20. PROVIDE TEMPORARY CAP EXISTING ON DCW PIPE. REFER TO M-102.
21. CUT AND PERMANENTLY CAP EXISTING COMPRESSED AIR (CA) PIPING.
22. CUT AND PERMANENTLY CAP EXISTING PUMPED CONDENSATE (PC) PIPING.
23. CUT AND PERMANENTLY CAP EXISTING PUMPED STEAM (PST) PIPING.
24. CUT AND PERMANENTLY CAP EXISTING CONDENSATE (C) PIPING.
25. CUT AND PERMANENTLY CAP EXISTING STEAM (ST) PIPING.
PLAN NORTH
PLAN NORTH
STAND FLEX
HEAT PUMP
HEAT PUMP
HB HBHB
GENERAL SHEET NOTES
SHEET KEY NOTES 1. ROUTE NEW GAS PIPING ON ROOF. SEE SHEET P-101.
2. ABANDON HWS AND HWR IN EXISTING MECHANICAL ROOM. (TYPICAL)
3. CAP EXISTING HWS AND HWR PIPING. DEAD END STUB ON LIVE LINES TO BE NO LONGER THEN 12" FROM MAIN.
4. CONNECT NEW 2" HHWS TO EXISTING HHWS PIPE.
5. CONNECT NEW 2" HHWR TO EXISTING HHWR PIPE.
6. CONNECT NEW 1" HHWS TO EXISTING HHWS PIPE.
7. CONNECT NEW 1" HWR TO EXISTING HWR PIPE.
8. CONNECT NEW 3/4" HWS TO EXISTING HWS PIPE.
9. CONNECT NEW 3/4" HWR TO EXISTING HWR PIPE.
10. CAP EXISTING PIPE. DEAD END STUB ON LIVE LINES TO BE NO LONGER THEN 12" FROM MAIN
11. NEW 4" HIGH CONCRETE EQUIPMENT PAD.
12. EQUIPMENT CLEARANCE AND ACCESS AREA.
13. CONNECT DOMESTIC HWS TO HWR.
14. RECONNECT HW AS SHOWN.
15. EXISTING PIPING TO WALL-MOUNTED CONVECTION HEATER.
16. FUTURE FIRE RISER.
19. SEE P-101 FOR MAKEUP WATER CONNECTION.
20. NEW COMBUSTION AIR DUCT
21. NEW FLUE DUCT
23. NEW AIR SEPARATOR.
24. 2" REDUCED PRESSURE BACKFLOW PREVENTER TO BE INSTALLED IN EXISTING DOMESTIC WATER SERVICE TO BUILDING.
25. NEW ELECTRIC UNIT HEATER UH-1.
26. 4" PVC INDIRECT DRAIN WITH AIRGAP FITTING. PIPE SHALL SLOPE TO DRAIN TO
AND PEST SCREEN AT EXTERIOR OPENING.
27. ROOF-MOUNTED GRAVITY INTAKE AIR HOOD MODEL PR-8 MANUFACTURED BY COOK OR EQUAL. PROVIDE WITH CURB, GRAVITY DAMPER AND PEST SCREEN. CONTRACTOR SHALL FLASH OPENING AND CURB TO BE FREE OF LEAKS AND MAINTAIN ROOF INTEGRITY. INTAKE SHALL BE DUCTED TO CEILING-MOUNTED GRILLE. SEE SCHEDULE MP-601 FOR GRILLE INFORMATION.
28. ROOF-MOUNTED EXHAUST FAN. PROVIDE WITH CURB, FAN SPEED CONTROLLER, GRAVITY DAMPER AND PEST SCREEN. CONTRACTOR SHALL FLASH OPENING AND CURB TO BE FREE OF LEAKS AND MAINTAIN ROOF INTEGRITY. EXHAUST FAN SHALL BE CONTROLLED VIA LINE VOLTAGE THERMOSTAT. COORDINATE REQUIREMENTS WITH ELECTRICAL. EXHAUST SHALL BE DUCTED TO CEILING-MOUNTED GRILLE. SEE SCHEDULE MP-601.
29. NEW MECHANICAL ROOM CEILING: PROVIDE GYPSUM BOARD CEILING FOR 1-HOUR FIRE-RATED CONSTRUCTION. ATTACH GYPSUM BOARD PER SECTION 09 2116 DIRECTLY TO UNDERSIDE OF EXISTING BOTTOM CHORDS (SHIM/ BLOCKING AS REQUIRED). FIRESTOP PENETRATIONS PER SECTION 07 8400. INSTALL AND TAPE/TEXTURE PER SECTION 09 2116. PAINT PER SECTION 09 9000. TYPICAL.
NEW MECHANICAL ROOM FLOOR: CLEAN THOROUGHLY PRIOR TO INSTALLATION OF PENETRATING ACRYLIC CONCRETE SEALER.
30. NEW MECHANICAL ROOM WALLS: PATCH AND REPAIR EXISTING MASONRY AFFECTED BY DEMOLITION. FIRESTOP PENETRATIONS PER SECTION 07 8400. PROVIDE RESILIENT BASE PER SECTION 09 6500. PAINT PER SECTION 09 9000. TYPICAL.
31. NEW MECHANICAL ROOM DOOR: PROVIDE 45-MINUTE FIRE RATED DOOR PER SECTION 08 1113. PROVIDE DOOR HARDWARE PER SECTION 08 7100.
32. CONTRACTOR TO ROUTE BOILER DRAIN LINES/CONDENSATE TO NEAREST DRAIN, SLOPED TO DRAIN WITH A MINIMUM OF 1" AIR GAP. INSTALL INLINE NEUTRALIZER UNIT. SEE SCHEDULE MP-601 FOR MORE INFORMATION.
M-101
1/2"=1'-0"
1/16"=1'-0"
GENERAL SHEET NOTES
SHEET KEY NOTES 1. CONNECT NEW HOT WATER SUPPLY LINE TO EXISTING BRANCH LINES WHERE
DECOUPLED IN DEMOLITION. COORDINATE WITH SHEET MD-102.
2. BOTH PUMPS SHALL BE MOUNTED VERTICALLY, WITH A MINIMUM SPACING OF 8" BETWEEN PUMPS, AT 24" ABOVE FINISHED FLOOR. PUMPS SHALL BE ARRANGED TO ALLOW FOR A MINIMUM OF 24" LONG STRAIGHT PIPE FOR BOTH SUCTION AND DISCHARGE PIPE CONNECTIONS TO THE PUMP, AND FOR EASE OF SERVICE ACCESSIBILITY, AS WELL AS PUMP REPLACEMENT.
3. CONNECT AND ROUTE NEW HHW AND DHW PIPING FROM EXISTING LINES WHERE CAPPED DURING DEMOLITION TO WATER HEATERS. CONNECT PLUMBING PIPING PER DIAGRAM A2/P-501. CONNECT MECHANICAL PIPING PER DIAGRAM A1/M-501.
4. CONNECT NEW 3" COLD WATER SUPPLY LINE TO EXISTING BRANCH LINES RETAINED DURING IN DEMOLITION. COORDINATE WITH SHEET MD-102.
5. 3" FLUE VENT, 3" COMBUSTION AIR FROM NEW WATER HEATERS, ROUTE UP THRU EXISTING ROOF PENETRATION. PROVIDE CONCENTRIC VENT. VERIFY EXACT LOCATION ON ROOF.
6. 4" FLUE VENT, 6" COMBUSTION AIR FROM NEW BOILER, ROUTE UP THRU EXISTING ROOF PENETRATION. VERIFY EXACT LOCATION ON ROOF.
7. CONNECT NEW 1-1/2" GAS LINE TO EXISTING 2" GAS LINE AND ROUTE AS SHOWN INTO MECHANICAL ROOM.
8. ROUTE AND CONNECT 1-1/4" GAS LINE TO WATER HEATER PER SCHEMATIC A2, SHEET P-501.
9. ROUTE AND CONNECT 1" GAS LINE TO BOILER PER SCHEMATIC A1, SHEET M-501.
10. 1-1/2' HWS DOWN TO WATER HEATER. SEE DIAGRAM A2, SHEET P-501.
11. ROUTE ABOVE CEILING AND CONNECT NEW 1-1/2" CW/HW LINES TO EXISTING WASHING MACHINES IN THIS APPROXIMATE LOCATION.
12. NOT USED.
13. PROVIDE 1-1/2" SCH 40 GALVANIZED STEEL SAFETY PIPE RAILING AT MIN. 42" HT AROUND EXISTING PIT. COORDINATE WITH ARCHITECTURAL.
14. 1-1/2" CW SUPPLY DOWN TO WATER HEATER. SEE DIAGRAM A2, SHEET P-501.
15. 1-1/2" HWR DOWN TO WATER HEATER. SEE DIAGRAM A2, SHEET P-501.
16. NEW AIR SEPARATOR.
19. CONNECT TO EXISTING DOMESTIC HOT WATER RETURN.
20. NEW EMERGENCY GAS SHUT OFF SOLENOID VALVE: ASCO SERIES 8042, OR APPROVED EQUAL.
21. 3/4" MAKEUP WATER SUPPLY.
22. 3/4" CW TO BOILER MAKEUP CONNECTION WITH BACKFLOW PREVENTER, PRESSURE REDUCING VALVE.
23. NEW CHEMICAL FEED UNIT.
24. NEW 3-WAY MOTORIZED VALVE.
25. 2" HWS DOWN TO BOILER.
26. 2" HWR DOWN TO BOILER.
27. BOILER EMERGENCY STOP BUTTON. REFER TO ELECTRICAL PLANS.
28. CONTRACTOR TO ROUTE WATER HEATER DRAIN LINES/CONDENSATE TO NEAREST DRAIN, SLOPED TO DRAIN WITH A MINIMUM OF 1" AIR GAP. INSTALL INLINE NEUTRALIZER UNITS ON EACH WATER HEATER. SEE SCHEDULE MP-601 FOR MORE INFORMATION.
29. CONTRACTOR TO ROUTE BOILER DRAIN LINES/CONDENSATE TO NEAREST DRAIN, SLOPED TO DRAIN WITH A MINIMUM OF 1" AIR GAP. INSTALL INLINE NEUTRALIZER UNIT. SEE SCHEDULE MP-601 FOR MORE INFORMATION.
PLAN NORTH
27
13
15 GENERAL SHEET NOTES
SHEET KEY NOTES 1. 3" WASTE UP, 2" VENT DOWN TO FLOOR DRAIN.
2. 2" VENT DOWN WALL TO BELOW GRADE. ROUTE VENT LINE TIGHT TO CEILING.
3. ROUTE NEW 1-1/2" RECIRC LINE INTO NEW MECHANICAL ROOM. PROVIDE FIRE STOPPING ON BOTH SIDES OF PENETRATION.
4. ROUTE 1-1/2" CW SUPPLY LINE INTO NEW MECHANICAL ROOM. PROVIDE FIRESTOPPING ON BOTH SIDES OF PENETRATION.
5. NEW COLD WATER LINE OVER TO NEW MECHANICAL ROOM.
6. INSTALL NEW METER. GAS LOAD OF 1,100 CFH AT 11 IN. WC.
7. ROUTE 3" GAS LINE FROM NEW METER UP ONTO ROOF AND CONTINUE AS SHOWN TO NEW MECHANICAL ROOM.
8. CONNECT TO EXISTING 3" SS. FIELD VERIFY EXISTING FLOW LINE.
9. 3/4" CW TO BOILER MAKEUP CONNECTION WITH BACKFLOW PREVENTER, PRESSURE REDUCING VALVE
10. EXISTING FAN COIL UNIT TO REMAIN. (TYPICAL)
11. EXISTING WALL-MOUNTED CONVECTION UNIT HEATER TO REMAIN. (TYPICAL)
12. FUTURE FIRE RISER. BY OTHERS.
13. PIPING IN CEILING SPACE.
14. 3" GAS DOWN INTO MECHANICAL ROOM.
15. 1-1/2" CW DOWN TO WATER HEATER.
16. 1-1/2" HW DOWN TO WATER HEATER.
17. 2" GAS DOWN TO BOILER. PROVIDE DIRT LEG AND SHUT OFF VALVE. SEE DETAIL SHEET.
18. 1-1/2" GAS DOWN TO WATER HEATER. PROVIDE DIRT LEG AND SHUT OFF VALVE. SEE DETAIL SHEET
19. 3/4" CW DOWN 12" AFF.
20. 3" EMERGENCY GAS SHUT OFF VALVE: ASCO SERIES 8042, OR APPROVED EQUAL.
21. BOILER EMERGENCY STOP BUTTON. REFER TO ELECTRICAL PLANS.
22. 1-1/2" CW TO CONNECT TO EXISTING 2" CW PIPE IN LOCATION SHOWN.
23. 1-1/2" DHWS TO CONNECT TO EXISTING PIPE IN LOCATION SHOWN.
24. 1-1/2" DHWR TO CONNECT TO EXISTING PIPE IN LOCATION SHOWN.
25. CONTRACTOR TO SAW-CUT EXISTING CONCRETE AND REPAIR, REPLACE AND REPOUR AS NECESSARY TO PERFORM WORK.
26. CONTRACTOR TO ROUTE WATER HEATER DRAIN LINES/CONDENSATE TO NEAREST DRAIN, SLOPED TO DRAIN WITH A MINIMUM OF 1" AIR GAP. INSTALL INLINE NEUTRALIZER UNITS ON EACH WATER HEATER. SEE SCHEDULE MP-601 FOR MORE INFORMATION.
PLAN NORTH
1/2"=1'-0"
1/16"=1'-0"
WH 2
1/2"=1'-0"
WH 2
1-1/2"
4" NIPPLE AND DIELECTRIC UNION
PIPE TO DRAIN PER PLANS
SIZE OF GAS SEE DWG. FOR
PIPING
FLEXIBLE IS NOT ALLOWED
RECIRC PUMP
THROUGH ROOF
DIELECTRIC UNION
STEM THERMOMETER
EXPANSION TANK, SUPPORT INDEPENDENTLY FROM WALL
B A
DOMESTIC WATER HEATER
WATER PIPE CONNECTION SHALL BE RIGID PIPE. FLEXIBLE IS NOT ALLOWED, TYP.
CW
CHECK VALVE
PUMP SUPPORTS SHALL BE ISOLATED FROM MOUNTING BRACKET w/MATERIAL TO MINIMIZE TRANSMISSIONS OF NOISE AND VIBRATION TO THE STRUCTURE.
REDUNDANT RECIRC PUMP
4" NIPPLE AND DIELECTRIC UNION
PIPE TO DRAIN PER PLANS
SIZE OF GAS SEE DWG. FOR
PIPING
FLEXIBLE IS NOT ALLOWED
RECIRC PUMP
THROUGH ROOF
DIELECTRIC UNION
STEM THERMOMETER
EXPANSION TANK, SUPPORT INDEPENDENTLY FROM WALL- ET-2
B A
DOMESTIC WATER HEATER
WATER PIPE CONNECTION SHALL BE RIGID PIPE. FLEXIBLE IS NOT ALLOWED, TYP.
CW
CHECK VALVE
PUMP SUPPORTS SHALL BE ISOLATED FROM MOUNTING BRACKET w/MATERIAL TO MINIMIZE TRANSMISSIONS OF NOISE AND VIBRATION TO THE STRUCTURE.
REDUNDANT RECIRC PUMP
REFER TO SHEET MP-102 FOR
CONTINUATION
EXISTING 3" CW
EXISTING 3" CW
CONTINUATION
GENERAL SHEET NOTES
199.9 CFH
375 CFH
199.9 CFH
3/4" TO FLR DRAIN
CHEMICAL FEEDER, NEPTUNE 5 GALLON, INSTALL AS LOW AS POSSIBLE IN ACCESIBLE LOCATION (MAX 36" AFF)
DRAIN LINE TO FLR DRAIN
FILL FUNNEL
T P
AUTO AIR VENT B&G 107A
T&P PLUG
1/2" TEMPERATURE TRANSMITTER WELL
REDUCED PRESSURE BACKFLOW PREVENTER
SLOPE TO FD
REMOVE HANDLE AFTER INSTALLATION, STRAP TO PIPE NEAR VALVE W/ TIE WRAP
PRESSURE RELIEF VALVE (45 PSI)
PRESSURE GAUGE 0-60 PSI
TO FLR DRAIN
CW
LABEL VALVE: 'MANUAL AIR BLEED VALVE' LOCATE ON WALL @ 60" AFF
HWR
2"
HWS
3/4" TO FLR DRAIN
CHEMICAL FEEDER, NEPTUNE 5 GALLON, INSTALL AS LOW AS POSSIBLE IN ACCESIBLE LOCATION (MAX 36" AFF)
DRAIN LINE TO FLR DRAIN
FILL FUNNEL
T P
T&P PLUG
1/2" TEMPERATURE TRANSMITTER WELL
REDUCED PRESSURE BACKFLOW PREVENTER
SLOPE TO FD
REMOVE HANDLE AFTER INSTALLATION, STRAP TO PIPE NEAR VALVE W/ TIE WRAP
PRESSURE RELIEF VALVE (45 PSI)
PRESSURE GAUGE 0-60 PSI
TO FLR DRAIN
LOCATE ON WALL @ 60" AFF
HWR
B 2
WALL SURFACE MOUNTED
FLEX CONN (TYP)
4" OSA FOR BOILER
6" FLUE FOR BOILER
DIFFERENTIAL GAUGE
2" BALL VALVE 2" CHECK VALVE
3/4" MAKEUP WATER CONNECTION. SEE HEATING WATER FLOW DIAGRAM ON SHEET M-501
3/4" BALL VALVE TO EXPANSION TANK
3" FLUE / 3" COMBUSTION AIR PIPE FOR WATER HEATER
DIFFERENTIAL GAUGE
DIFFERENTIAL GAUGE
1-1/2" BALL VALVE
1-1/2" CHECK VALVE
1-1/2" BALL VALVE
SEALANT
1 5/8"x 1 5/8"x 12 GA. STEEL CHANNEL
ROD
SUPPORT FROM ROOF JOIST, SEE DETAIL
INSULATION SADDLE
BOLT & CLAMPING NUT (TYP) STEEL PIPE STRAP
8" MIN.
DRAW BAND
PROVIDE NEW GRAVEL AS NECESSARY TO MATCH EXISTING
SEAL ENDS OF INSULATION WITH PLASTIC CEMENT
TREATED WOOD NAILER, SECURED TO METAL DECK FROM BELOW WITH 4 LAG BOLTS, ONE EACH SIDE
TWO LAYERS 15 LB. FELT, SET IN BEDS OF PLASTIC CEMENT AND EXTENDED MIN. 3" AND 6" BEYOND EDGE OF FLASHING ON EACH SIDE AND MOP INTO EXISTING ROOFING
SECURE FLASHING IN PLACE WITH 8 EVENLY SPACED ROOFING NAILS
SQUARE SHAPED COPPER FLASHING WITH FLANGE BASE, SET IN BED OF PLASTIC CEMENT
ROUND COPPER WEATHER CAP, CAULK THE SEAM BETWEEN THE CAP AND THE ALUMINUM JACKET
SEAL
FAN ASSEMBLY BELT
PREFABRICATED
SYSTEM PIPING
NOTE: EXTERNAL GAUGE TAPS ON PIPES SHALL NOT BE REQUIRED WHEN PUMP IS PROVIDED WITH FLANGE GAUGE CONNECTOR.
PRESSURE GAUGE
IN-LINE PUMP
METAL PANEL WALL CLIP
EXTENDED SILL
CLIP ANGLES
BIRDSCREEN LOUVER
NOTES: 1. CLIP ANGLES AND EXTENDED SILL TO BE PROVIDED BY LOUVER MANUFACTURER. 2. INSTALLATION OF LOUVER TO BE IN ACCORDANCE WITH LOUVER MANUFACTURER'S RECOMMENDATIONS.
G
G
WALL BRACKET
MOUNTING BRACKET
SWIVEL BOLT
ADJUSTABLE LOUVERS
CONCENTRIC ADAPTER
STORM COLLAR
3'-0" ABOVE ROOF OR 2'-0" MIN. ABOVE NEAREST OBJECT WITHIN 10'-0"
ROOF THIMBLE, MAINTAIN MIN. OF 1 1/2" CLEARANCE BETWEEN FLUE AND ROOF.
FLASH & COUNTER FLASH
FLUE CAP
SHUT-OFF VALVE
INSULATED FITTING
SHUT-OFF VALVE
FINISHED GRADE
GAS METER IS PROVIDED
[GM-1]
NOTE: SEISMIC SHUT-OFF VALVES ARE OPTIONAL AND ARE NOT REQUIRED FOR NONESSENTIAL FACILITIES LOCATED WITHIN SEIMIC ZONES 1 OR 2.
SEE SPECS
18" APPROX.
N E
W M
E X
IC O
S TA
TE U
N IV
E R
S IT
Y D
O M
E S
TI C
H O
T W
A TE
2" CIRCUIT SETTER
RETURN HEATING WATER
SUPPLY HEATING WATER
(TYP)
3/4" TO CHEMICAL FEED UNIT CHECK VALVE
BALL VALVE
N E
W M
E X
IC O
S TA
TE U
N IV
E R
S IT
Y D
O M
E S
TI C
H O
T W
A TE
SIZE COMMENTS
(GAL) RISE) MBTU (INCHES)
WH-1, 2 AO SMITH BTH-199A COCA-COLA BLDG. 140 423 199.9 3 1-1/4" NPT A,C,E,F
WH-3, 4, 5 AO SMITH BTH-250 MXI FIELDHOUSE BLDG. 210 786 250.0 3 1-1/4" NPT B,D,E,F
COMMENTS: A. DUAL WATER HEATERS ON MANIFOLD. SEE DIAGRAM ON SHEET P-501 B. TRIPLE WATER HEATERS ON MANIFOLD. SEE DIAGRAM ON SHEET P-501 C. BID LOT #1 D. BID LOT #2 E. PROVIDE CONCENTRIC VENT FLUE WITH CAP. MATCH REQUIREMENT WITH APPLICATION - WALL PENETRATION OR ROOF. F. PROVIDE NEUTRALIZATION KIT, AO SMITH MODEL CN-2 OR EQUAL. INSTALL INLINE ON CONDENSATE.
PUMP SCHEDULE
HEAD (FT) HP VOLT PH COMMENTS
P-1, 2 TACO, 006-B4 WH-1: COCA-COLA BLDG. DHW INLINE 5 19 1/20 115/230 1 A,B,C
P-3, 3A ARMSTRONG, S55 B-1: COCA-COLA BLDG. HHW INLINE 42 29 1 115/230 1 A,C
P-4, 5 ARMSTRONG, S69 B-2: FIELD HOUSE BLDG. HHW INLINE 52 24 1 115/230 1 A,D
P-6, 7 TACO, 006-B4 WH-3: FIELD HOUSE BLDG. DHW INLINE 5 20 1/20 115/230 1 A,B,D
COMMENTS: A. PROVIDE ALL BRONZE CONSTRUCTION (IN-LINE PUMPS). B. RECIRCULATION PUMP SHALL RUN CONTINUOUSLY. REFER TO WATER HEATING PIPING SCHEMATIC. C. BID LOT #1 D. BID LOT # 2
MISCELLANEOUS PLUMBING FIXTURE SCHEDULE
SIZE V
FD FLOOR DRAIN ZURN ZN-415 3" 2" OR COMBO THRU SAS PROVIDE AND INSTALL PROSET TRAP GUARD AND FLOOR DRAIN
PRV PRESSURE REDUCING VALVE WILKINS 500YSBR 1-1/2" - 25 TO 75 PSI SPRING, 65 GPM AT 15 PSI PRESSURE DROP, SET TO DELIVER 65 PSI TO BUILDING.
RPBP REDUCED PRESSURE PRINCIPAL BACKFLOW
PREVENTER WATTS SERIES 009 2" -
FS FLOOR SINK ZURN- Z1940 4" 2" GALVANIZED (12" x 6" x 8") SQUARE TOP, WITH LINE SIZE TRAP PRIMER (1/2" INLET). PRIME-RITE TRAP PRIMER VALVE. ONE HALF GRATE WITH SEDIMENT BUCKET, 8" DEEP
BFP DOUBLE CHECK VALVE WATTS SERIES 007 3/4" - FOR INSTALLATION ON MAKE-UP WATER TO APPLIANCES.
BOILER SCHEDULE (GAS-FIRED)
(GAL.) POWER
GAS CONN. AIR INLET FLUE WEIGHT REMARKS
B-1 CAMUS DYNAFORCE DRH0400 COCA-COLA BLDG. N/A 120V, 60HZ 399,000 375,000 1-1/2" 1" 6" DIA 4" DIA 500 A
B-2 CAMUS DYNAFORCE DRH0500 FIELD HOUSE BLDG. N/A 120V, 60HZ 500,000 470,000 1-1/2" 1" 6" DIA 4" DIA 560 B
GENERAL NOTES: 1. BOILERS HAVE BEEN OVERSIZED FOR FUTURE EXPANSION, AND DERATING FOR 3,908 FEET ALTITUDE ABOVE SEA LEVEL 2. PROVIDE NEUTRALIZATION KIT, AO SMITH MODEL CN-6 OR EQUAL. INSTALL INLINE ON CONDENSATE.
REMARKS NOTES: A. BID LOT #1 B. BID LOT #2
EXPANSION TANK SCHEDULE
(GAL.) ACCEPT
CAP. (GAL.) WEIGHT COMMENTS
ET-1 WATTS, DETA 12 COCA-COLA BLDG - HHW 5 3.1 34 A,B
ET-2 WATTS, DETA 5 COCA-COLA BLDG - DHW 3.5 1.3 34 A,B
ET-3 WATTS, DETA 5 FIELD HOUSE BLDG - HHW 3.5 1.3 34 A,C
ET-4 WATTS, DETA 12 FIELD HOUSE BLDG - DHW 5 3.1 34 A,C
PIPE INSULATION SCHEDULE
VAPOR BARRIER MASTIC
PIPE INSULATION THICKNESS (INCHES) NOMINAL PIPE DIAMETERS (INCHES) REMARKS
1/2" TO 1" 1 1/4" TO 2" 2 1/2" TO 4" 5" & UP DOMESTIC COLD WATER FIBERGLASS ALL SERVICE YES 1 1 1 - DRAIN PIPING (INTERIOR) FIBERGLASS ALL SERVICE YES 3/4 3/4 - - HEATING HOT WATER FIBERGLASS ALL SERVICE YES 1 1 1 -
DOMESTIC HOT WATER FIBERGLASS ALL SERVICE YES 1 1 1
DUCTWORK MATERIAL AND INSULATION SCHEDULE DUCT SYSTEM DUCT MATERIAL DUCT INSULATION
TYPE DUCT INSULATION
THICKNESS REMARKS
EXHAUST GALVANIZED STEEL NONE NONE BOILER AND WATER HEATER FLUES CPVC NONE NONE A
EXHAUST FAN SCHEDULE MARK MANUFACTURER/MODEL NO. SERVICE AREA SERVED TYPE CFM
ESP (IN WC) DRIVE
(MAX) HP VOLT PH
EF-1 COOK, 90R10DL EXHAUST COCA-COLA BLDG. ROOFTOP 200 .1 DIRECT 3.2 1150 1/3 115 1 A,B,C,D,E,F
REMARK NOTES: A. PROVIDE BACKDRAFT DAMPER, AND ALUMINUM BIRDSCREEN. B. INSTALL FAN PER MANUFACTURERS REQUIREMENTS. C. FAN TO COMPLY WITH NFPA-96; WIRE AS SHOWN ON ELECTRICAL PLANS. D. FAN TO BE CONTROLLED BY A LINE VOLTAGE THERMOSTAT. E. PROVIDE WITH FACTORY INSTALLED DISCONNECT SWITCH. F. BID LOT #1
REMARK NOTES: A. INSTALL PER APPLIANCE MANUFACTURER REQUIREMENTS AND CODE REGULATIONS.
GAS FIXTURE SCHEDULE - COCA-COLA BUILDING MARK DESCRIPTION NEW/EXISTING CONNECTION QTY BTUH CFH TOTAL
WH-1 WATER HEATER (N+1) NEW 1-1/2" FLEX 1 199,900 300 300
WH-2 WATER HEATER (N+1) NEW 1-1/2" FLEX 1 199,900 300 300
B-1 BOILER NEW 1-1/2" FLEX 1 399,000 500 500
TOTAL CFH TOTAL BTUH AT REGULATOR
798.8 798,800
MODEL NO. SERVICE SERVICE MODULE SIZE TYPE MATERIAL REMARKS
A KRUEGER S580 EXHAUST & INTAKE
COCA-COLA BLDG. 12x12
MOUNTED ALUMINUM A,B,C,D,E,F
REMARK NOTES: A. SEE HVAC PLANS FOR LOCATIONS AND QUANTITIES OF EACH AIR DEVICE. B. ALL AIR DEVICES SHALL BE TESTED IN ACCORDANCE WITH ASHRAE STANDARD 70-91. C. NC VALUES ARE BASED UPON A 10 Db ROOM ATTENUATION. E. MAX. NC RATINGS MARKED "-" ARE LESS THAN 20 NC. F. PROVIDE OPPOSED BLADE DAMPER WITH EACH AIR DEVICE.
COMMENTS: A. PRESSURIZED EXPANSION TANKS FOR POTABLE HOT WATER, PRE CHARGED TANKS TO 40 PSI, MAXIMUM DESIGN PRESSURE 150 PSI. MAXIMUM DESIGN PRESSURE 240 DEG. F. B. BID LOT #1 C. BID LOT #2
GAS FIXTURE SCHEDULE - FIELD HOUSE BUILDING MARK DESCRIPTION NEW/EXISTING CONNECTION QTY BTUH CFH TOTAL
WH-3 WATER HEATER NEW 1" FLEX 1 250,000 199.9 199.9
WH-4 WATER HEATER NEW 1" FLEX 1 250,000 199.9 199.9
WH-5 WATER HEATER NEW 1" FLEX 1 250,000 199.9 199.9
B-2 BOILER NEW 1-1/2" FLEX 1 500,000 500.0 500.0
TOTAL CFH TOTAL BTUH AT REGULATOR
1,250.0 1,250,000
CODE MANUFACTURER / MODEL NO. AREA SERVED CONFIG CFM KW ELECTRICAL
REMARKS HP VOLT PH AMPS
UH-1 BERKO / HUHAA320 SEE PLANS HORIZONTAL 350 3 1/100 203 1 14.5 A, B GENERAL NOTES 1. EAT= 55 F, LAT= 95 F. REMARK NOTES A. PROVIDE UNIT MOUNTED THERMOSTAT WITH SPEED CONTROL SWITCH. B. PROVIDE UNIT MOUNTED DISCONNECT SWITCH.
GENERAL NOTES: 1. SEE SPECIFICATIONS FOR MORE INFORMATION
N E
W M
E X
IC O
S TA
TE U
N IV
E R
S IT
Y D
O M
E S
TI C
H O
T W
A TE
SM
H H
W \S
H E
E TS
\E -1
01 C
O C
A -C
O LA
B LD
G E
LE C
TR IC
A L
P LA
N .D
W G
3/ 31
/1 5
PLAN NORTH
GENERAL SHEET NOTES A. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING PROPERTY ASSOCIATED WITH
THE DEMOLITION/REMOVAL OF EXISTING EQUIPMENT.
B. CONTRACTOR TO COORDINATE SCHEDULE OF DEMOLITION OF EXISTING EQUIPMENT WITH OWNER PRIOR TO COMMENCING WORK.
C. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT, DEVICES, EXPOSED CONDUITS, WIRE, AND SUPPORTS ASSOCIATED WITH THE ITEMS INDICATED TO BE REMOVED PER THIS SHEET.
D. ANY INTERRUPTION TO EXISTING ELECTRICAL CIRCUITS TO REMAIN SHALL BE COORDINATED WITH THE OWNER, AND IF NECESSARY, REPAIRED AS REQUIRED TO RESTORE THE ORIGINAL FUNCTION.
E. ALL MATERIAL REMOVED DURING DEMOLITION SHALL BE INSPECTED BY THE OWNER, ANY SELECTED ITEMS SHALL REMAIN PROPERTY OF THE OWNER, AND IF NECESSARY, REPAIRED AS REQUIRED TO RESTORE THE ORIGINAL FUNCTION.
F. REFER TO ELECTRICAL LEGEND AND GENERAL NOTES, SHEET E-001 FOR SYMBOLS LEGEND, GENERAL INFORMATION, DETAILS, AND DIAGRAMS.
G. CIRCUIT CALLOUTS ARE BASED ON THE LATEST AVAILABLE INFORMATION PROVIDED. IF THE CIRCUIT CALLED OUT IS CURRENTLY IN USE, MAKE CONNECTION TO THE NEXT AVAILABLE CIRCUIT IN THE PANEL. IF NO MORE CIRCUITS ARE AVAILABLE, CONTRACTOR TO CONTACT ELECTRICAL ENGINEER FOR FURTHER INSTRUCTION.
SHEET KEY NOTES 1. CONTRACTOR TO PROVIDE A MOTOR-RATED SNAP SWITCH FOR LOCAL
DISCONNECTING MEANS OF EXHAUST FAN. COORDINATE LOCATION WITH MECHANICAL.
2. CONTRACTOR TO PROVIDE A 240V, 30A, 1P, NON-FUSED, NEMA 1 DISCONNECT SWITCH FOR LOCAL DISCONNECTING MEANS OF BOILER. COORDINATE LOCATION WITH MECHANICAL. CONTRACTOR TO PROVIDE A MAINTAINED CONTACT EMERGENCY STOP PUSHBUTTON FOR EMERGENCY STOP, SQUARE D TYPE K CLASS 9001 OR EQUAL. PROVIDE NAMEPLATE FOR BOILER EMERGENCY STOP. WIRE NORMALLY CLOSED CONTACT TO INTERRUPT POWER TO BOILER CONTROL PANEL.
3. CONTRACTOR TO PROVIDE A 240V, 30A, 1P, NON-FUSED NEMA 1 DISCONNECT SWITCH FOR LOCAL DISCONNECTING MEANS OF BOILER PUMPS.
4. CONTRACTOR TO PROVIDE A MOTOR-RATED SNAP SWITCH FOR LOCAL DISCONNECTING MEANS OF WATER HEATER PUMPS. COORDINATE LOCATION WITH MECHANICAL.
5. CONTRACTOR TO PROVIDE A DEDICATED RECEPTACLE FOR WATER HEATER, COORDINATE LOCATION WITH MECHANICAL.
6. CONTRACTOR TO REMOVE LIGHTING IN THIS ROOM BACK TO NEAREST JUNCTION BOX. CIRCUIT TO BE REUSED FOR NEW LIGHT.
7. CONTRACTOR TO INSTALL NEW LIGHT FIXTURE USING EXISTING CIRCUIT THAT WAS REMOVED BACK TO NEAREST JUNCTION BOX DURING DEMOLITION. COLUMBIA MODEL #CSR-232-U-EU-EL. COORDINATE INSTALLATION WITH ARCHITECTURAL.
1
2
3
4
NOTE: ITEMS IN BOLD ARE NEW CIRCUITS ADDED TO PANEL.
5
2
FIRE ALARM PANEL
FIRE ALARM PANEL
H H
W \S
H E
E TS
\E -1
02 F
IE LD
H O
U S
E E
LE C
TR IC
A L
P LA
N S
.D W
G 3/
31 /1
5 GENERAL SHEET NOTES A. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING PROPERTY ASSOCIATED WITH THE
DEMOLITION/REMOVAL OF EXISTING EQUIPMENT.
B. CONTRACTOR TO COORDINATE SCHEDULE OF DEMOLITION OF EXISTING EQUIPMENT WITH OWNER PRIOR TO COMMENCING WORK.
C. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT, DEVICES, EXPOSED CONDUITS, WIRE, AND SUPPORTS ASSOCIATED WITH THE ITEMS INDICATED TO BE REMOVED PER THIS SHEET.
D. ANY INTERRUPTION TO EXISTING ELECTRICAL CIRCUITS TO REMAIN SHALL BE COORDINATED WITH THE OWNER, AND IF NECESSARY, REPAIRED AS REQUIRED TO RESTORE THE ORIGINAL FUNCTION.
E. ALL MATERIAL REMOVED DURING DEMOLITION SHALL BE INSPECTED BY THE OWNER, ANY SELECTED ITEMS SHALL REMAIN PROPERTY OF THE OWNER, AND IF NECESSARY, REPAIRED AS REQUIRED TO RESTORE THE ORIGINAL FUNCTION.
F. REFER TO ELECTRICAL LEGEND AND GENERAL NOTES, SHEET E-001 FOR SYMBOLS LEGEND, GENERAL INFORMATION, DETAILS, AND DIAGRAMS.
G. CIRCUIT CALLOUTS ARE BASED ON THE LATEST AVAILABLE INFORMATION PROVIDED. IF THE CIRCUIT CALLED OUT IS CURRENTLY IN USE, MAKE CONNECTION TO THE NEXT AVAILABLE CIRCUIT IN THE PANEL. IF NO MORE CIRCUITS ARE AVAILABLE, CONTRACTOR TO CONTACT ELECTRICAL ENGINEER FOR FURTHER INSTRUCTION.
SHEET KEY NOTES 1. CONTRACTOR TO REMOVE EXISTING THERMAL OVERLOAD SWITCH AND STARTER.
2. CONTRACTOR TO REMOVE EXISTING PUMP STARTER.
3. CONTRACTOR TO REMOVE EXISTING PUMP STARTER.
4. CONTRACTOR TO PROVIDE A 240V, 30A, NON-FUSED, NEMA 1 DISCONNECT SWITCH FOR LOCAL DISCONNECTING MEANS OF BOILER. COORDINATE LOCATION WITH MECHANICAL. CONTRACTOR TO PROVIDE A MAINTAINED CONTACT EMERGENCY STOP PUSHBUTTON FOR EMERGENCY STOP, SQUARE D TYPE K CLASS 9001 OR EQUAL. PROVIDE NAMEPLATE FOR BOILER EMERGENCY STOP. WIRE NORMALLY CLOSED CONTACT TO INTERRUPT POWER TO BOILER CONTROL PANEL.
5. CONTRACTOR TO PROVIDE A 240V, 30A, 1P, NON-FUSED, NEMA 1 DISCONNECT SWITCH FOR LOCAL DISCONNECTING MEANS OF BOILER PUMP. COORDINATE LOCATION WITH MECHANICAL.
6. CONTRACTOR TO PROVIDE A MOTOR-RATED SNAP SWITCH FOR LOCAL DISCONNECTING MEANS OF WATER HEATER PUMPS. CONTRACTOR TO LABEL SWITCHPLATES TO DESIGNATE WHICH PUMP IS CONTROLLED BY EACH SWITCH. COORDINATE LOCATION WITH MECHANICAL.
PLAN NORTH
PLAN NORTH
NOTE: ITEMS IN BOLD ARE NEW CIRCUITS ADDED TO PANEL.
4
M-101-COCA-COLA BLDG. MECHANICAL PLAN
P-101-COCA-COLA BLDG PLUMBING PLAN
P-501 PLUMBING FLOW DIAGRAMS
M-501 MECHANICAL FLOW DIAGRAMS