new 2142-13 advanced conference on seismic risk mitigation and...

61
2142-13 Advanced Conference on Seismic Risk Mitigation and Sustainable Development Zhenming Wang 10 - 14 May 2010 Kentucky Geological Survey University of Kentucky Lexington USA Seismic Hazard and Risk Assessment and Mitigation Policy in USA

Upload: others

Post on 12-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

2142-13

Advanced Conference on Seismic Risk Mitigation and Sustainable Development

Zhenming Wang

10 - 14 May 2010

Kentucky Geological Survey University of Kentucky

Lexington USA

Seismic Hazard and Risk Assessment and Mitigation Policy in USA

Page 2: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Seismic Hazard and Risk Assessment and Mitigation Policy in USA

Zhenming Wang, PhD, PE

Kentucky Geological SurveyUniversity of Kentucky

Lexington, KY 40506, [email protected]

www.uky.edu/KGS/geologichazards/

ICTP Advanced Conference on Seismic Risk Mitigation and Sustainable Development

10 - 14 May 2010

Page 3: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Outline• Introduction

– The NEHRP Provisions – NRC Regulatory Guide 1.208

• Probabilistic Seismic Hazard Analysis (PSHA)

• Alternative Seismic Hazard Assessments – Seismic Hazard Analysis (SHA) – Deterministic Seismic Hazard Analysis (DSHA) – Neo-DSHA or Scenario-Based Hazard Analysis

• Lesson from Wenchuan, China, earthquake

• Summary

Page 4: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Development of Design Ground Motion (Policy)

Seismic Hazard Map(USGS)

Seismic Design Ground Motions(FEMA)

BSSC – engineers,seismologists, and others

State Agencies Other organizationsFederal agencies

Policy

Science

Page 5: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

2009 NEHRP Provisions (Policy)

Figure 22-1 Uniform-hazard (2% in 50-Year) ground motions of 0.2-second spectral response Acceleration (5% of critical damping), Site Class B

Page 6: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

California

The central US

Paducah

San Francisco

Page 7: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

0.2-second spectral response Acceleration (5% of critical damping), Site Class B

1980 Sharpsburg Earthquake (M5.2)

Page 8: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Development of Seismic Ground Motion (policy)

Seismic Hazard Map(USGS)

Seismic Design Ground Motions(FEMA)

BSSC – engineers,seismologists, and others

Impacts on society

Science - Basis

Stakeholders: Scientists/Engineers/Economist, …

Policy

PSHA

Page 9: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Seven-Day Earthquakes

Page 10: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

(Leith and others, 2009)

Page 11: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

GPS results

Page 12: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

NMSZ

Page 13: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Deformation rate: > 30 mm/y

Deformation rate: < 3 mm/y

Page 14: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:
Page 15: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

(Frankel and others, 1996)

NRC RG: 10-4 – 10-5

(annual frequency of exceedance)

10%

in 5

0 Ye

ars

5% in

50

Year

s

2% in

50

Year

s

HAZARD CURVES FOR SELECTED CITIES

0.10000 0.01000 0.00100 0.00010 0.00001

Annual Frequency of Exceedance

0.0

0.1

1.0

10.0

0.2

sec

Spec

tral

Acc

eler

atio

n, %

g

CITIESLos AngelesSan FranciscoSeattleSalt Lake CityNew York CityCharlestonMemphis

Page 16: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Yucca Mountain, NV(Stepp and others, 2001)

Example:100,000,000y RP,11g PGA?

It was concluded in 2008 that “while many of the observations we present here are preliminary, they nevertheless suggest that the 1998 PSHA overstates the true seismic hazard at Yucca Mountain” (Abrahamson and Hanks, 2008)

Page 17: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Development of mitigation policy in US

Seismic Design Ground Motions

Engineers, seismologists, and others

Impact on society

Science - Basis

Stakeholders: Scientists/Engineers/Economist, …

Policy

PSHA

Page 18: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Seismic Hazard versus Seismic Risk

• Seismic Hazard– Quantification:

• Physical measurement (magnitude, PGA, MMI)

• Temporal measurement• Spatial measurement

• Seismic Risk– Quantification:

• Probability• Physical/monetary measurement• Temporal measurement• Spatial measurement

Seismic Risk= Seismic Hazard Θ Vulnerability

References1. Wang, Z., 2009, Seismic hazard vs. seismic risk, Seismological Research

Letters, 80: 673–674. 2. Panza and others (in press), Introduction, Pure and Applied Geophysics,

Special Volume on Advanced Seismic Hazard Assessment

Page 19: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Seismic Hazard vs. Seismic Risk

ConsequenceVulnerability: car and people

Risk = Seismic Hazard Θ Vulnerability

Hazard may or may not be mitigated, but risk can always be reduced

Seismic hazard: rock falls (rockfalls/minute)

(the probability killed by a rockfall during passing through)

Page 20: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Seismic Hazard vs. Seismic Risk

)/exp(1 RItp ���

Page 21: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

Developed by Cornell in 1970 (Cornell, 1968, 1971)

(McGuire, 2004)

dmdrrfmfydyy

vyYvPy RMy

mr

y

y

)()()}(ln]2

)ln(lnexp[

211{)()( 2

ln,

2

ln,0 ����

������ ���

Page 22: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

PSHA end result: a hazard curve of ground motion vs. “frequency” at a site

10%

in 5

0 Ye

ars

5% in

50

Year

s

2% in

50

Year

s

HAZARD CURVES FOR SELECTED CITIES

0.10000 0.01000 0.00100 0.00010 0.00001

Annual Frequency of Exceedance

0.0

0.1

1.0

10.00.

2 se

c Sp

ectr

al A

ccel

erat

ion,

%g

CITIESLos AngelesSan FranciscoSeattleSalt Lake CityNew York CityCharlestonMemphis

Page 23: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Infinite GMA single EQ OutputInput

PSHA

“Model”

Sensitivity Test

Probabilistic Seismic Hazard Analysis – PSHA

d

Site(GM occurrence)

TRP=?

Source(M7.7 occurrence)

TRI =500 years

TRP: 500y to infinity?(Cornell, personal communication, 2004)

Dis. =30km

The return period: “the mean (average) time between occurrences of a seismic hazard, for example, a certain ground motion at a site” (McGuire, 2004, p.8).

Page 24: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

VSAP

New Madrid Seismic Zone

TRI =500 years

TRP=500 years

Page 25: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

What is PSHA?

γ(y): the annual probability of ground motion y being exceeded

It was developed from mathematical statistics (Benjamin and Cornell, 1970; Mendenhall and others, 1986) under four fundamental assumptions (Cornell 1968, 1971):

(a) Constant-in-time average occurrence rate of earthquakes(b) Equal likelihood of earthquake occurrence along a line or over an areal source (single point) (c) Variability of ground motion at a site is independent(d) Poisson (or "memory-less") behavior of earthquake occurrences.

dmdrrfmfydyy

vyYvPy RMy

mr

y

y

)()()}(ln]2

)ln(lnexp[

211{)()( 2

ln,

2

ln,0 ����

������ ���

Page 26: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

GMPE: �� ���� ),(),()ln( RMfRMfY

1. δ distribution depends on σ, but not on ε2. ε is a standardized normal distribution with a zero mean and standard deviation of 1

Page 27: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

GMPE:

According to mathematical statistics (Benjamin and Cornell, 1970; Mendenhall and others, 1986), if and only if M, R, and δare independent random variables, then the exceedance probability P[Y�y] for seismic source j is

�� ���� ),(),()ln( RMfRMfY

Page 28: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

Assumption (a): Constant-in-time average occurrence rate of earthquakes. For G-R relationship

PDF for M

M is independent

Page 29: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

Assumption (b): Equal likelihood of earthquake occurrence along a line or over an areal source (single point)

PDF for R

R is independent

(Cornell, 1968)

Page 30: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

]2

)ln(exp[21)( 2

2

��

��� mryf �

��

�� ���� )ln(),()ln( MRYRMfY

]12

)ln(exp[12

1)( 2

2

��

�� mryf �

PDF for ε

PDF for δ

Assumption (c): Variability of ground motion at a site is independent

Page 31: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHAAssumption (d) Poisson (or "memory-less") behavior of earthquake occurrences

dmdrrfmfydyyyYP jRjMj

mr

j

y

j )()()}(ln]2

)ln(lnexp[2

11{][ ,,2

2

0 ����

���� ���

(page 1590 of Cornell, 1968)

�� ���� ),(),()ln( RMfRMfY

0mj

jjev �� ��

Page 32: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

(page 1590-91 of Cornell, 1968)

Pre-condition (2) Small annual prob. of exc. ≤ 0.05

Pre-condition (1), t ≡ 1 (year)

...!

...!2

12

������nxxxe

nx

Page 33: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

The return period

The annual probability of exceedance – probability of exceedance in ONE year

Pre-condition (1): t ≡ 1 (year) Pre-condition (2): ≤ 0.05

dmdrrfmfydyyvy RMy

mr

y

y

)()()}(ln]2

)ln(lnexp[2

11{)( 2ln,

2

ln,0 ���� �

��� ���

Basic Equation of PSHA (total annual probability of exceedance)

Page 34: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

2) Pre-condition (2) small annual prob. of exc. ≤ 0.05

1) Pre-condition (1) t ≡ 1 (year)

Assumption (d): Poisson (or "memory-less") model

1. If any of the assumptions is not valid, PSHA calculation is NOT valid.2. If any of the pre-conditions is violated, PSHA calculation is NOT valid.3. The annual probability of exceedance is a PROBABILITY of exceedance in ONE year and dimensionless.

dmdrrfmfydyyvy RMy

mr

y

y

)()()}(ln]2

)ln(lnexp[2

11{)( 2ln,

2

ln,0 ���� �

��� ���

Assumption (c): Variability of ground motion at a site is independent

Assumption (b): Single point source

Assumption (a): Constant-in-time average occurrence rate of earthquakes

Page 35: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

Page 36: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Source model: finite fault, not point source

Haiti earthquake

Page 37: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

δ (σ) is not independent

Page 38: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

2) Pre-condition (2) small annual prob. of exc. ≤ 0.05

1) Pre-condition (1) t ≡ 1 (year)

Assumption (d): Poisson (or "memory-less") model - ?

1. PSHA (model) is NOT valid.2. The annual probability of exceedance is a PROBABILITY of exceedance in ONE year and dimensionless - Not “frequency”.

dmdrrfmfydyyvy RMy

mr

y

y

)()()}(ln]2

)ln(lnexp[2

11{)( 2ln,

2

ln,0 ���� �

��� ���

Assumption (c): Variability of ground motion at a site is independent - No

Assumption (b): Single point source – Not valid

Assumption (a): Constant-in-time average occurrence rate of earthquakes ?

Page 39: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Yucca Mountain, NV(Stepp and others, 2001)

Probabilistic Seismic Hazard Analysis – PSHA

PSHA could “create”11g PG with a returnperiod of 100,000,000 years.

Page 40: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Probabilistic Seismic Hazard Analysis – PSHA

Pre-condition (1): t ≡ 1 (time unit) Pre-condition (2): ≤ 0.05

Assumption (d) Poisson (or "memory-less") behavior of earthquake occurrences

Example: tossing a coin

ph=0.5

pt=0.5

The probability of having at least one head in 1 minute5.0

v = 10 (tosses/min.)

Page 41: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Spatial

Temporal

Alternative Seismic Hazard Assessment

(Reiter, 1990)

Page 42: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Spatial

Temporal

1. Seismic Hazard Assessment - Theoretical

��� ),()ln( RMfY

),ln,( �YRgM �

bMaeN

303.2303.21 �����

),ln,(303.2303.21 �� YRbgaeN

����

PGA

Exceedance frequency

(Wang, 2006, 2007)

Median+SD (84%)

Median-SD (16%)

median

Page 43: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

0.0001

0.0010

0.0100

0.1000

1.0000

4.0 5.0 6.0 7.0 8.0

Magnitude (M)

Log

(N)

SHA to DSHA

Ground motion at 30km:0.44g PGA (median) 0.22g PGA (median–SD) 0.88g PGA (median+SD) /RP≡500y

Characteristic earthquake:M7.5/RI=500y

For one characteristicEarthquake:SHA becomes DSHA

Page 44: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Maximum Credible Earthquake

Page 45: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

PGA for Maximum Credible Earthquake

Page 46: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

SHA to DSHA to Neo-DSHA

Neo-DSHA (Panza and others, 2001)

(Macpherson and others, 2009)

Page 47: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

SHA to DSHA to Neo-DSHA

Limitation:<0.5 Hz

Page 48: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

SHA to DSHA to Neo-DSHA

Reelfoot (central) fault rupture

Page 49: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Year A (PGA,g) Rank (m) P

1895 0.001 96 0.888889

1896 0.01 84 0.777778

1897 0.1 29 0.268519

Step 2

(Milne and Davenport, 1969)

Step 3

(ground motion at a site)

Seismic hazard curve: A vs. τ at a site

2. Seismic Hazard Assessment - Empirical

(Historical records)

Step 1

Intensity table (Panza)

Page 50: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

1��

NmP

Step 3

Step 4

(ground motion at a site)

(N is total number ofyears of records)

mN

P11 �

���Seismic hazard curves

Year A (PGA,g) Rank (m) P

1895 0.001 96 0.888889

1896 0.01 84 0.777778

1897 0.1 29 0.268519

2. Seismic Hazard Assessment - Empirical

Page 51: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

(Bozkurt and others, 2007)

Tokyo, Japan(400-year data)

2. Seismic Hazard Assessment - Empirical

Page 52: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Beijing area, China (500 years data)(Xie and others, in press)

Tainjin CityBeijing City

2. Seismic Hazard Assessment - Empirical

Page 53: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Lesson from Wenchuan Earthquake

Magnitude: 8.0 (7.9 USGS) Fault Rupture: ~300 km x 30 kmSurface Displacement: 5m (v), 4.8m (h) Largest Recorded PGA: 0.65gDeath: ~70,000Missing: ~20,000Injured: ~380,000Economic loss: >US$120B

Page 54: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Lesson from Wenchuan Earthquake

Page 55: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

(Li and others, 2008)

Lesson from Wenchuan Earthquake

Page 56: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Wolong

Qingping

Zengjia

Rupture and asperity effects

Lesson from Wenchuan Earthquake

Page 57: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

0.10g

0.15g

0.20g

0.05g

0.12g

0.14g

0.16g

0.18g

0.20g0.65g

Design PGA(10% PE in 50 yrs

0.10g

0.30g

Lesson from Wenchuan Earthquake

Page 58: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Summary• Probabilistic seismic hazard analysis:

PSHA (model) is flaw• Is not based on earthquake science

• Invalid physical models• point source• Poisson distribution

• Invalid mathematics• Mis-interpretation of annual probability of

exceedance or return period• Become a pure numerical “creation”

Page 59: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Summary• Alternative seismic hazard assessment

• The goal of any seismic hazard assessment is to quantify

• Physical measurement (ground motion)• Temporal measurement (when/how often)• Spatial measurement (where)

• Approaches• Theoretical

• SHA• DSHA• Neo-DSHA

• Empirical

Page 60: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude:

Summary• Seismic hazard and risk are different

concepts, and play different roles in policy making

• Earth-scientists, seismologists in particular, must • provide seismic hazard information that is

consistent with modern sciences• also communicate the information in an

understandable way • work with engineers and others to assess seismic

risk

Page 61: New 2142-13 Advanced Conference on Seismic Risk Mitigation and …indico.ictp.it/event/a09145/session/13/contribution/10/... · 2014. 5. 5. · Lesson from Wenchuan Earthquake Magnitude: