Resettlement Plan March 2018 Indonesia: Neighborhood Upgrading and Shelter Project – Phase 2 Prepared by the City of Pekalongan and Directorate General of Human Settlements, Ministry of Public Works and Housing for the Asian Development Bank.

Upload: vancong

Post on 05-Jun-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

Resettlement Plan

March 2018

Indonesia: Neighborhood Upgrading and Shelter

Project – Phase 2

Prepared by the City of Pekalongan and Directorate General of Human Settlements, Ministry of Public Works and Housing for the Asian Development Bank.

Page 2: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

CURRENCY EQUIVALENTS (as of 15 March 2018)

Currency unit – rupiah (Rp)

Rp1.00 = $0.0000725 $1.00 = Rp13,793.00

ABBREVIATIONS

ADB – Asian Development Bank APBD – Anggaran Pendapatan and Belanja Daerah (Regional

Budget Income and Expenditure) DGHS – Directorate of Human Settlements

NOTE

(i) The fiscal year (FY) of the Government of Indonesia and its agencies ends on 31 December. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2011 ends on 31 December 2011.

(ii) In this report, "$" refers to US dollars. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

i | P a g e

Page 4: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

ii | P a g e

TABLE OF CONTENTS

ABBREVIATIONS .................................................................................................................................. iv

LIST OF FIGURES .................................................................................................................................. v

LIST OF TABLES ................................................................................................................................... vi

LIST OF APPENDICES ........................................................................................................................ vii

CHAPTER I .............................................................................................................................................. 1

PROJECT DESCRIPTION .................................................................................................................... 1

A. PROJECT OVERVIEW .............................................................................................................. 1

B. PROJECT DESCRIPTION AT KOTA PEKALONGAN .......................................................... 1

C. PROJECT IMPACT ................................................................................................................. 2

D. RELOCATION OF AFFECTED RESIDENTS ..................................................................... 4

CHAPTER II ............................................................................................................................................. 5

RESETTLEMENT SCOPE .................................................................................................................... 5

A. RESETTLEMENT ........................................................................................................................ 5

B. ACTIVITY IMPACT DESCRIPTION ......................................................................................... 5

CHAPTER III ............................................................................................................................................ 7

INFORMATION AND PROFILE OF SOCIAL ECONOMY ................................................................ 7

A. THE AFFECTED PEOPLE ........................................................................................................ 7

B. LIVELIHOOD AND INCOME ..................................................................................................... 7

C. SOCIAL INFORMATION ........................................................................................................ 8

D. GENDER ISSUE ..................................................................................................................... 8

E. VULNERABLE HOUSEHOLD ................................................................................................... 9

CHAPTER IV.......................................................................................................................................... 10

DISCLOSURE OF INFORMATION, CONSULTATION AND PARTICIPATION ........................ 10

A. SOCIALIZATION ....................................................................................................................... 10

B. ADVANCED CONSULTATION ............................................................................................... 11

C. DISCLOSURE ........................................................................................................................ 12

CHAPTER V ........................................................................................................................................... 13

POLICY FRAMEWORK OF POPULATION RESETTLEMENT ..................................................... 13

A. OBJECTIVE ............................................................................................................................... 13

B. BASIC LEGAL POLICY ............................................................................................................ 13

C. BASIC PRINCIPLES OF PROJECT ...................................................................................... 14

D. MATRIX OF AFFECTED PEOPLE RIGHT ....................................................................... 15

CHAPTER VI.......................................................................................................................................... 17

Page 5: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

iii | P a g e

IMPACT AND COMPENSATION ....................................................................................................... 17

A. REASONABLE REIMBURSEMENT VALUE ........................................................................ 17

B. COMPENSATION ..................................................................................................................... 20

C. GAP ......................................................................................................................................... 20

CHAPTER VII ........................................................................................................................................ 23

RECOVERY OF INCOME AND OR LIVELIHOOD .......................................................................... 23

A. PURPOSE .................................................................................................................................. 23

B. RECOVERY AND REHABILITATION PROGRAMS ........................................................... 23

CHAPTER VIII ....................................................................................................................................... 26

INSTITUTIONAL ARRANGEMENTS ................................................................................................. 26

A. GENERAL ARRANGEMENTS ................................................................................................ 26

B. THE DIVISION OF ROLES ...................................................................................................... 26

C. BUDGET ................................................................................................................................. 27

CHAPTER IX.......................................................................................................................................... 28

MONITORING DAN EVALUATION .................................................................................................... 28

A. PURPOSE .................................................................................................................................. 28

B. MONITORING DAN EVALUATION RESULT ....................................................................... 28

C. RECOMENDATION .............................................................................................................. 29

APPENDIX ............................................................................................................................................. 30

Page 6: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

iv | P a g e

ABBREVIATIONS

ADB : Asian Development Bank

AP : Affected People

APBD : Local Budget

BSPS : Bantuan Stimulan Perumahan Swadaya

CIO : Community Implementing Organization

DDR : Due Diligence Report

DED : Detail Engineering Design

DGHP : Directorate General of Housing Provision

DGHS : Directorate General of Human Settlements

HHs : Households

KIP : Indonesia Smart Card

KIS : Indonesia Health Card

LCO : Local Coordinating Office

NMC : National Management Consultant

NPW : Reasonable Reimbursement Value

NUAP : Neighborhood Upgrading Action Plan

NUSP : Neighborhood Upgrading Shelter Project

PIU : Project Implementation Unit

PDAM : Local Government-owned Water Supply Company

PMU : Project Management Unit

RMC : Regional Management Consultant

RTLH : Renovation of Inadequate House

SATKER : Local Project Working Unit

SIAP : Slum Improvement Action Plan

SPS : Safeguard Policy Statement

Page 7: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

v | P a g e

LIST OF FIGURES

Figure 1 Puddle Water Condition in Kelurahan Pasir Kramat Kraton ................................................... 2

Figure 2 Scope of Handling Map ............................................................................................................. 3

Figure 3 Affected Resident Houses That Classified As Inadequate. ............................................ 28

Figure 4 Houses of affected resident that experiencing economic improvement. ...................... 29

Page 8: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

vi | P a g e

LIST OF TABLES

Table 1 Female Household Profile .......................................................................................................... 7

Table 2 Affected Residents Profile .......................................................................................................... 7

Table 3 Affected Residents Occupation ................................................................................................. 8

Table 4 Average Income Affected Residents ......................................................................................... 8

Table 5 Data of vulnerable age households ........................................................................................... 9

Table 6 Entitlement Matrix ..................................................................................................................... 15

Table 7 Reasonable Reimbursement Value for House Building, Plant and AR Utilities .................... 17

Table 8 Reasonable Reimbursement Value of Loss Income .............................................................. 18

Table 9 Solatium Criteria ....................................................................................................................... 18

Table 10 Calculation of Solatium Against Residential Building & RRV ........................................ 19

Table 11 Total of Reasonable Reimbursement Value ......................................................................... 19

Table 12 GAP value or deviation ........................................................................................................ 21

Table 13 Program Type and Implementation of AR Recovery ...................................................... 24

Table 14 APs Name of Recovery Program Recipient ..................................................................... 25

Table 15 Implementation Schedule .................................................................................................... 27

Page 9: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

vii | P a g e

LIST OF APPENDICES

Appendix 1 List of NUSP-2 target cities / districts ................................................................................ 31

Appendix 2 List of Pekalongan City Slum Area Location ................................................................ 32

Appendix 3 List of Directly Affected Resident ................................................................................... 33

Appendix 4 Vulnerable Age and Poor of APs ................................................................................... 35

Appendix 5 The Reasonable Reimbursement Value of 32 The affected Residents................... 36

Appendix 6 Plant Reasonable Reimbursement Value .................................................................... 37

Appendix 7 Utilities Reasonable Reimbursement Value ................................................................. 38

Appendix 8 Relocation Cost/Kerohiman ............................................................................................... 39

Appendix 9 The Affected Residents Asset Value ................................................................................ 40

Appendix 10 Project Struktur Organization .......................................................................................... 41

Appendix 11 Existing House Condition ................................................................................................ 42

Page 10: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

1 | P a g e

CHAPTER I

PROJECT DESCRIPTION

A. PROJECT OVERVIEW

1. Neighborhood Upgrading And Shelter Project (NUSP-2) is a program initiated by the

Government of Indonesia through the Ministry of Public Works and Housing to support the

achievement of city without slum by 2020 and the provision of housing and settlements in a

sustainable manner in accordance with the mandate of Law No . 1 of 2011 about Housing and

Settlement Area.

2. NUSP-2 will be implemented in 20 districts / cities to improve the quality of slum areas with

facilitation of activities grouped in three main components, namely: 1). Improving the institutional

capacity of local governments; 2). Improving the quality of slum infrastructure; 3). Provision of

new settlements for low-income communities. One of target districts / cities of NUSP-2 are

Local Government of Pekalongan. List of NUSP-2 targeted cities / districts can be seen in

Appendix 1.

3. Improvement the quality of slum infrastructure (component 2) is carried out in two patterns:

implemented by Community Implementing Organization (Badan Keswadayaan Masyarakat) by

community empowerment for infrastructure on an environmental scale and implemented by

contractors for complex activities on a regional scale.

4. NUSP-2 has been started since 2015, starting with the implementation of the environmental

scale activities in 73 Kelurahan spread across 20 cities / districts. Implementation of area-scale

activities began in 2016, including physical implementation in Kota Pekalongan.

B. PROJECT DESCRIPTION AT PEKALONGAN CITY

5. NUSP-2 in Pekalongan city was carried out in 7 slum Kelurahan of 17 slum Kelurahan

determined by the Decree of Mayor of Pekalongan No 601/215 of 2014 as amendment to

Decree of Mayor of Pekalongan No 601/132 Year 2014 About Determination of Urban Slum

Area of Local Government of Pekalongan. List of Slum locations and target locations of NUSP-

2 Local Government of Pekalongan can be seen in Appendix 2.

6. In 2016, Local Government of Pekalongan conducts physical activities consisting of

infrastructure development environmental scale in 7 Kelurahan and 3 package of infrastructure

development area scale. One of them is a package of road construction and drainage activities

along 722 m wide 2 m along Randujajar road in Pasirsari Kelurahan Pasir Kraton Kramat.

7. In accordance with the slum profile of Kelurahan Pasir Kraton Kramat, for road conditions, there

are 30% of areas not covered by road network and 46 areas with poor road surface quality. As

for the drainage conditions, 31% of the area does not have drainage and 57% have drainage

but in bad condition and not functioning optimally. The low level of infrastructure service in

Kelurahan Kraton Kramat Village is caused by almost all areas flooded by ROB1. Based on the

handling scenarios formulated in the SIAP document and referring to the drainage master plan

of Local Government of Pekalongan, it is recommended that secondary drainage development

with pumping system needed. The need for drainage handling is also a proposed community

which is often proposed through the Sub District Development and Planning Consultation

1 ROB is flood cause by sea water rise due to the moon

Page 11: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

2 | P a g e

(Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan meetings at

the time of NUAP drafting in 2015.

8. DED for regional scale packages prepared by consultants recruited by Municipality of Kota

Pekalongan with regional budget. The plan has been socialized to the community around the

location of road and drainage development plans. The socialization was held on September 14,

2015 attended by the Community Implementing Organization, LPM, RW Chairman and

community leaders, and resulted in an agreement to accept and support the community's

rehabilitation / relocation plan.

9. Road and drainage development sites are located along Randujajar road in Kelurahan Pasir

Kratamat. The land status for road construction and drainage is owned by Municipality of Local

Government of Pekalongan. The existing condition of the road is damaged, while the drainage

area of drainage is not working and there are 32 houses standing on it.

10. Displacement of 32 Households on top the drainage can not be avoided because that

settlement interfere the drainage function and it is a landless settlement, no evidence and the

rights of use / ownership of land. Randujajar Road is chosen as the location of drainage

development because this location is adjacent to Bremi River, so the water puddle in the

settlement will be pumped into the river.

11. This Due Diligence Report (DDR) is a social safeguard document for the Area Scale of Quality

Improvement Package of Pasir Kraton Kramat, with road and drainage activities along 722 m

and wide 2 m in Randujajar road in Pasirsari Kelurahan Pasir Kraton Kramat, Sub District West

Pekalongan, Local Government of Pekalongan, Central Java Province. DDR contains policies,

guidelines, resettlement processes and profiles of affected people, compensation and local

government assistance programs.

C. PROJECT IMPACT

12. Quality Improvement of Slum Settlement work in Pasir Kraton Kramat area, in the form of road

and drainage construction along Randujajar road, aims to improve community accessibility and

reduce puddles. Most of the slum target NUSP-2 facing the same problem, which there is water

puddle caused by the ROB. In Kelurahan Pasir Kraton Kramat this puddle reaches a height

between 20-50 cm.

Figure 1 Puddle Water Condition in Kelurahan Pasir Kramat Kraton

Page 12: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

3 | P a g e

13. The economic development of the Kelurahan Pasir Kraton Kramat community has decreased

because difficulty of community accessibility due to the inundation that occurred over the years.

This drainage construction is expected to eliminate puddles and simplify community

accessibility which ultimately will improve the economy of the community.

14. Kelurahan Pasir Kraton Kramat community strongly supports the road and drainage

construction plan on Jl. Randujajar because that construction is expected to solve water puddle

problem that has occurred for many years. In addition, the restoration of Randujajar road is

expected to facilitate socio-cultural and economic accessibility of the community.

15. Slum area of Pasir Kraton Kramat with an area of 17.96 Ha and almost 70% of the area was

inundated due to ROB. The construction of drainage and installation of pumps are expected to

reduce the puddle by 60%.

Figure 2 Scope of Handling Map

Jalan dan drainase yang

dikerjakan

Lokasi genangan

Page 13: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

4 | P a g e

D. RELOCATION OF AFFECTED RESIDENTS

16. The construction of drainage along Randujajar road has had an impact on the destruction

and replacement of 32 buildings located on the existing drainage channel along the road.

The displacement of Kelurahan Pasir Kraton Kramat society that lived atop of the

drainage can not be avoided because that settlement disrupts the drainage function and it

is a non-licensed settlement as well as the land evidence and right of use / ownership.

17. 32 relocated buildings are semi-permanent buildings occupied by 32 Households. Most

condition of the buildings to be relocated is in poor condition.

18. After the socialization and consultation between Municipality of Local Government of

Pekalongan and the Kelurahan Pasir Kraton Kramat community, basically the community

agreed to support the implementation of drainage contruction activities and according to

schedule is willing to carry out the relocation process in January-February 2016.

Page 14: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

5 | P a g e

CHAPTER II

RESETTLEMENT SCOPE

A. RESETTLEMENT

19. Work of Quality Improvement of Slum Areas in Pasir Kraton Kramat area, in the form of road

and drainage construction along Randujajar Road has affected the replacement of 32

Households, with 124 souls.

20. From 32 Households, there are 6 families whose heads of households are female, and there

are 30 Households classified to vulnerable families (including female heads of household).

21. Road and drainage construction plan along Randujajar Road and replacement of 32

households have been agreed by the affected residents and Pasir Kramat Kraton residents

through society meeting and consultation.. Based on resident forum, affected residents have

agreed on the amount of relocation cost (cost of kerohiman) which is Rp. 5.000.000, - for

the cost of destruction the building, transportation cost and rental cost of house for 1 year.

The affected residents are planned to occupy a rental townhouse in Krapyak Lor.

22. The replacement of 32 Households affected the total demolition of 32 buildings and utilities

(electricity and clean water), trees, demolition of mosque wudhu place and the displacement

of electric poles.

23. LCO, the Unit Work of Local Government og Pekalongan and consultant have identified the

affected objects, compiled the missing assets and prepared the assistance facilitation plan to

ensure that the affected people are not encounter degradation in their quality of life.

B. ACTIVITY IMPACT DESCRIPTION

24. House Destructions. The 722 m drainage along Randujajar Road has impacted the

destruction of 32 buildings located above drainage channels along Randujajar Road. 32

buildings are semi permanent buildings owned by 32 families. Most of the buildings are in

poor condition, only 9 buildings are in good condition. Owner name and status of affected

buildings can be seen in Appendix 3 and the photos of affected house can be seen in

Appendix 11. The value of the affected assets as a result of the demolition of the house are:

House Building, calculated based on the type of construction used and valued based on

ReasonableReimbursement Value (FRV)).

Utilities, in the form of installation costs of clean water and electricity.

Land is not part of the affected assets, because the land is owned by Municipality of Kota

Pekalongan.

Plants, when including plants that have economic value. The number of trees were cut

down as much as 7 trees, where 6 trees are type of plant that has economic value, and 1

is not economically valuable tree.

25. Losing Business. Among the 32 buildings that destructed, there are 11 buildings that serve

as a residence and place of business (shop). The business is small business such as

chicken noodle stalls, yarn and sewing tools shop, rice stalls, food stalls. After the

replacement, APs can continue to run their business in a new place. For the affected citizens

who have land / house around the site can rebuild their business or can do business trading

on mobile such as food and chicken noodles. However, for a while affected residents will

Page 15: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

6 | P a g e

experience a decrease in income, so within a certain period of time, support for their

livelihood are needed.

26. Impact on public facilities and utilities. The affected public facilities were the demolition

and relocation of the 6m2 mosque wudhu place that located on the drainage field and the

affected utility was the relocation of 1 pile of electricity. This infrastructure needs to be

relocated because the drainage has widened from 1 m to 2 m.

Page 16: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

7 | P a g e

CHAPTER III

INFORMATION AND PROFILE OF SOCIAL ECONOMY

A. THE AFFECTED PEOPLE

27. There are 32 buildings directly affected by the road and drainage construction activities, and

the function of the affected buildings can be grouped into 2 parts: 21 buildings as residence

and 11 buildings as residence and business (store and shops).

28. 8 Households have 6 - 8 family members, while the other 24 Households have 2 - 5 family

members. From this data indicates that most Households have relatively medium and large

family dependents.

29. Of the 32 Aps there are 6 households (15.6%) whose head of families are female. Female

households profile of affected are as follows :

Table 1 Female Household Profile

No. Name Age Family

Member Occupation

Income (per day)

01. Susilowati 45 2 Labor/ small restaurant

Rp. 25.000,-

02. Duriah 60 1 Labor Rp. 50.000,

03. Pariyah 60 3 Labor Rp. 30.000,

04. Sulami 54 5 Trader Rp. 25.000,

05. Dasmi 63 1 Labor Rp. 50.000,

06. Kholifah 45 4 Labor Rp. 50.000,

Source: Primary Data, processed already, November 2017

30. The number of affected people living in the 32 buildings are 124 peoples, consisting of 50.8%

male (63 people) and 49.2% female (61 people). In terms of productive age, 75.8% (94

persons) were of productive age, while the remaining 24.2% were unproductive ages. In detail,

the profile of affected residents in terms of age and sex can be seen in table 2 below.

Table 2 Affected Residents Profile

No. Age Category Male Female Total

01 0 - 4 0 0 0

02. 5 - 14 3 14 17

03. 15 – 55 53 41 94

04. >55 7 6 13 TOTAL 63 61 124

Source: Primary Data, processed already, November 2017

B. LIVELIHOOD AND INCOME

31. Livelihood. The livelihoods of most affected residents are mostly as labor, which are 62.5%

or 20 families, 21.8% are small-scale traders, and the rest are private sector employees,

drivers, tailors and becak drivers.

Page 17: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

8 | P a g e

Table 3 Affected Residents Occupation

No. Occupation Total %

01. Labor 20 62.5 %

02. Driver 1 3.12 %

03. Becak Driver 1 3.12 %

04. Tailort 1 3.12 %

05. Trader 7 21.8 %

06. Private Sector Employee

2 6.25 %

Source: Primary Data, processed already, November 2017

32. Monthly Income. The average income of 32 households affected residents per month is

Rp. 750,000-Rp. 1.500.000, -. There are 84% of affected people (27 Households) have

monthly income level still below Pekalongan Regional Minimum Wage which is Rp.

1.500.000, - (in 2016) and the remaining 16% (5 Households) already have income above

Pekalongan Regional Minimum Wage. When viewed from the sex composition, female

household (6 households) have income levels below Pekalongan Regional Minimum Wage.

Table 4 Average Income Affected Residents

No. Households Average Income Per Month

<Rp.1 Million Rp. 1 -1,5 Million 1,6-3 Million

01. Male 6 16 5

02. Female 3 2 0

Total 9 18 5

Source: Primary Data, processed already, November 2017

C. SOCIAL INFORMATION

33. Kelurahan Pasir Kraton Kramat community strongly supports the road and drainage

construction plan on Jl. Randujajar, because the construction can solve the problems of

water puddle and accessibility of socio-cultural and economic communities, although they

must be relocated. This is because the 32 affected residents have realized the mistake of

build on a location that does not belong to them, that is above the drainage, thus disrupting

the drainage function.

34. Affected people have close kinship relationships with the surrounding environment, since

most of them are from that region and many close relatives live nearby. Affected people

have good social and cultural relation in work together and cooperation.This is proved by the

many community activities that have been done regularly, such as, arisan, regular pengajian

(praying together), community service, etc..

35. Affected people have easy access to health, education and market centers. They also have

easy access to clean water, sanitation and garbage services.

D. GENDER ISSUE

36. The problems faced by the Kelurahan Pasir Kraton Kramat community, including the

affected people, are water puddle in the settlements. Water puddles in the settlements

become a problem for women who spend most of their time at home.

Page 18: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

9 | P a g e

37. Of the 124 affected people, 61 persons (49.2%) were female, and 67% (41 persons) of them on

productive age. Productive women are involved in the process of implementing NUSP-2, such

as socialization and deliberation for planning, as well as the special consultation of affected

residents, to decide building demolition agreement.

38. Affected people including women have agreed for decision to be relocated because women

and all affected people are aware of their mistakes, occupying government-owned drainage

land as their home location. This decision was agreed together with consideration of the great

benefits to be gained by women (housewives), who have always had their house puddled by

water.

E. VULNERABLE HOUSEHOLD

39. Affected residents if viewed from the age and female households, there are 30 households

who belong to vulnerable households. Details of residents data who classified as vulnerable

can be seen in the table below.

Table 5 Data of vulnerable age households

Source: Primary Data, processed already, November 2017

No NameVulner

able

Female

HouseHoldOccupation Type

Income/

day (IDR)No Land

Poor

HouseHold Vulnerable

01. ANAS Worker 50.000 02. ALWI Worker 50.000 03. KHOLIFAH Worker 50.000 04. RASALIM Worker 50.000 05. SUSILOWATI HouseWife/Worker 25.000 06. DURIYAH 60 Worker 50.000 07. DARYONO Worker 50.000 08. SOBIRIN Worker 50.000 09. SUGIONO Worker 50.000 10. NUR RUZI Worker 50.000 11. SANAWI Driver 50.000 12. SURADI Worker 50.000 13. WAGIYO WARYADI 60 Trader 50.000 14. KARYONO Becak Driver 30.000 15. SARTONO Trader 60.000 16. AHMAD ROJIUN Worker 50.000 17. PARIYAH 60 Worker 30.000 18. A. SAFAWI Driver 60.000 19. SULAMI Trader 50.000 20. DURRAHMAN Worker 25.000 21. ABADI Trader 50.000 22. NUR SLAMET Trader 50.000

23. KAMBALI Trader 25.000 24. SOLICHIN Tailor 50.000 25. HALIFA Worker 50.000 26. DASMI 63 Worker 50.000 27. AHMAD JUNAIDI Worker 50.000 28. EDI SAMBARA 64 Trader 50.000 29. SUROSO Enterpreneur 100.000 30. RUDI HARTONO Trader 60.000

31. DOTO Private Employees 80.000 32. WARYUDIN 63 Worker 50.000

Page 19: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

10 | P a g e

CHAPTER IV

DISCLOSURE OF INFORMATION, CONSULTATION AND PARTICIPATION

A. SOCIALIZATION

40. The initial socialization of NUSP-2 in Kelurahan Pasir Kraton Kramat was conducted on

June 23, 2015. In that socialization, besides providing understanding related to slum

handling through NUSP-2, also discussed the area-scale management plan to solve flood

problem in Kelurahan Pasir Kraton Kramat. Socialization participants strongly supporting

drainage construction plan with pumping system in Pasir Kraton Kramat and Padukuhan

Kraton area. Initial socialization was also conducted specifically for the affected residents to

explain the drainage development plan on Jl. Randujajar which affects the relocation of 32

houses.

41. Socialization was also held to provide information of the demolition and destruction plan of

32 buildings. The socialization was carried out by a team consisting of: DPU, DPPKAD,

BPMP2AKB, Bappeda, Satpol PP, Governance Div., Development Administration Div., Sub-

district, Danramil, Kapolsek, Kasi Tramtib Kecamatan, Lurah, Babinsa and Babinsa

kamtibmas.

42. The socialization was conducted to provide information on complaints handling related to the

displacement of 32 affected people. Complaints may be submitted either directly or in writing

to the RT / RW or, if necessary, to the Kelurahan level even to the municipal level, with the

following mechanism:

Kelurahan side conduct meeting with residents in responding to the complaints, to be

deliberated until the complete, if not completed yet will be brought to the Kecamatan

level.

Kecamatan part conduct mediation until solve, if not solved yet will be brought to

Kabupaten/ PU level.

Kabupaten will conduct research complaint.

The result of the research or investigation will be informed to the Affected Residents no

later than 12 days to be deliberated by a decision that holds the principle of win-win

solution.

The results of problem solving or handling of complaints are disseminated through

available public spaces such as notice boards in the project office, Government Office,

Sub District Office and Kelurahan Office.

43. Coordination meeting discussed handling of Pasir Kraton Kramat slum area implemented on

August 20, 2015. This meeting was attended by the Regional Secretary of Local

Government of Pekalongan, Ass. Governance and Administration Setda, Ass. Ekbang and

Kesra Setda, Head of DPU, Head of DPKAD, Head of BPMP2AKB, Head of Government of

Setda, Head of Administration of Setda Development, Head of Law of Setda, Head of Satpol

PP, Head of West Pekalongan, West Pekalongan Danramil, West Pekalongan Police Head,

Head of Cipta Karya DPU, Spatial DPU, Head of SDA DPU, Lurah Pasir Kraton Kramat,

Kasi Trantib Kec. West Pekalongan, Babinsa Kel. Kramat Kramat Sand, Babinkamtibmas

Kel. Kramat Sand Kramat, BKM Coordinator, LPM Coordinator, Head of RW VI and

community leaders. The results of the coordination meeting resulted in the following

agreements:

Page 20: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

11 | P a g e

1. To handle the Pasirsari slum area caused by water puddles, it is necessary to build

drainage system through Randujajar channel

2. At the top of the channel, there are 32 units of illegal houses, with permanent building

conditions (brick house) and some semi-permanent (board house).

3. To build a good drainage system, the illegal houses must be relocated immediately.

4. The relocation site provided by the government is Rumah Susun Sederhana Sewa

(Rusunawa) Krapyak Lor

5. The cost of relocation for affected residents is proposed in amount:

- Building Destruction Cost Rp. 1.000.000,-

- Moving Transport Cost Rp. 1.000.000,-

- Rusunawa Rental Cost 1 tahun Rp. 3.000.000,- +

- Total Rp. 5.000.000,-

44. The next coordination meeting was held on October 13, 2015 and was attended by the

Regional Secretary of Local Government of Pekalongan, Ass. Governance and

Administration Setda, Ass. Ekbang and Kesra Setda, Head of DPU, Head of DPKAD, Head

of BPMP2AKB, Head of Government of Setda, Head of Administration of Setda

Development, Head of Law of Setda, Head of Satpol PP, Head of West Pekalongan, West

Pekalongan Danramil, West Pekalongan Police Head, Head of Cipta Karya DPU, Spatial

DPU, Head of SDA DPU, Lurah Pasir Kraton Kramat, Kasi Trantib Kec. West Pekalongan,

Babinsa Kelurahan Pasir Kraton Kramat, Babinkamtibmas Kelurahan Pasir Kraton Kramat,

Coordinator BKM, Koord.LPM, Chairman of RW VI and community leaders.

The result of the meeting stipulates the following matters:

1. South part of the mosque building, the priest's chamber, will not be demolished because

the channel that will be normalizedis on the north side of Jl. Samanhudi. The northern

mosque wudhu place in the irrigation channel border if exposed to channel normalization

work will be re-built in that mosque.

2. Drinking water containers in the channel border will not be demolished before any

substitute from DAK PSAB or HID / HIK activities.

3. Decent public toilet will soon be built through the 2017 - 2018 Local Budget.

4. Jalan RanduJajar located in the border area with the district (Tegaldowo) which is

currently severely damaged condition will be repaired through NUSP regional scale work

package.

5. The public road lighting (PJU) works in that region are prioritized on 2016 work.

45. During the construction of road and drainage activities carried out by LCO, Satker and

other relevant agencies, including on-site consultations with affected residents,

community around construction and Community I Organization.

B. ADVANCED CONSULTATION

46. Coordination and monitoring meeting in post-resettlement evaluation framework was

conducted on October 12-13, 2017, held at Local Goverment Pekalongan Bappeda

office. Meeting was attended by ADB, Central Unit Work, NMC, LCO, Unit Work of

Pekalongan, RMC / Coordinator of the City and CIO. From these meetings obtained

some things that need to be followed up as follows:

Page 21: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

12 | P a g e

1. Advanced survey to identify socio-economic data on 32 affected people;

2. Identification of local government programs that can be given as an effort to restore

the lives of affected residents;

3. Acceleration preparation of DDR reports.

47. Coordination meeting in order to identify the local government's regular programs, the

meeting was attended by LCO, Unit Work of Local Government of Pekalongan, RMC,

City Coordinator and CIO on Thursday, November 2, 2017. From the outcome of the

consultation has been agreed on several recovery programs that are intended for

affected residents of 32 households. The agreed recovery programs are as follows:

1. PAMSIMAS program, which will be implemented on FY. 2018 Quarter 1-4. Funds

will be used to finance the program come from Local Budget (APBD).

2. Indonesia Health Card, will be implemented on FY. 2018 Quarter 1 - 4. Funds will

be used to finance the program come from Local Budget (APBD).

3. Training process for agriculture and fishery product, tailor and otomotif, will be

implemented on FY. 2018 Quarter 1. Funds will be use to finance the program

come from Local Budget (APBD).

4. Renovation of Inadequate House, will be implemented on FY. 2018 Quarter 1 - 4.

Funds will be use to finance the program come from BSPS.

5. Integrated Service Post of the Elderly, will be implemented on FY. 2018 Quarter 1 -

4. Funds will be use to finance the program come from Local Budget (APBD).

6. Construction of public toilet, will be implemented on FY. 2018 Quarter 1 - 4. Funds

will be use to finance the program come from Local Budget (APBD).

7. Keluarga Harapan Program, will be implemented on FY. 2018 Quarter 1 - 4. Funds

will be use to finance the program come from Local Budget (APBD).

8. Indonesia Smart Card (KIP), will be implemented on FY. 2018 Quarter 2 and

Quartal 4. Funds will be use to finance the program come from Local Budget

(APBD).

48. LCO and Unit Work of Local Government of Pekalongan will carry out consultations

and coordination regularly with affected residents and various related parties. This

consultation aims to monitoring how is far the purpose of resettlement have been

achieved and to evaluate to ensure that the social and economic conditions of affected

residents are not decreased, and also intended to monitor the implementation of

assistance programs that have been planned. Monitoring and evaluation are expected

to provide input to the government in formulating the future policies and programs.

C. DISCLOSURE

49. For public disclosure, this Due Diligence (DDR) report will be uploaded on the ADB and PWH

Ministry website, as well as on the local Satker’s website. Further, the information about DDR will be summarized in the form of leaflet for easier access to affected residents.

Page 22: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

13 | P a g e

CHAPTER V

POLICY FRAMEWORK OF POPULATION RESETTLEMENT

A. OBJECTIVE

50. The objective of resettlement and compensation is to ensure that the project provides

an opportunity for affected residents to get benefit so it does not become worse during

and after the implementation.

B. BASIC LEGAL POLICY

51. Policy Framework. This RF has been prepared in compliance with ADBs Involuntary

Resettlement Safeguards (SPS, 2009) and Operation Manual Section F1/BP, March

2010, and the Indonesian Government’s law and regulations related to land acquisition that include i) Law No. 2/2012 on Land Acquisition for Development in Public Interests;

ii) Presidential Regulation no. 71/2012 on Implementation of Land Acquisition for the

Development in Public Interest; iii) Regulation of BPN Head No. 5/2012 on the

implementation guideline for Presidetail Regulation No. 71/2012. In addition, the

Ministry of Finance Regulation No. 13/PMK 02/2013 and Ministry of Home Affair

Regulation No. 72/2012 on the guidelines for Law 2/2012 implementation.

1. ADB’s Social Safeguard Policy Requirements

52. The ADB SPS, 2009 consolidated three safeguard policies, i.e. (i) involuntary

resettlement (IR), (ii) indigenous peoples (IP), and (iii) environment. Requirements of

ADB’s 2009 SPS indicates the following principles: (i) involuntary resettlements must be avoided where feasible; (ii) minimize involuntary resettlements by exploring project

and design alternatives; (iii) enhance the livelihoods of all displaced persons in real

terms relative to pre-project levels; and (iv) improve the standards of living of the

displaced poor or other vulnerable groups. The scope of the safeguards include

physical replacement (relocation, loss of residential land, or loss of shelter) and

economic displacement (loss of land, assets, access to assets, income sources, or

means of livelihood as a result of (a) involuntary acquisition of land, or (b) involuntary

restrictions on land use or on access to legally designated parks and protected areas.

It also stipulates whether the losses and involuntary restrictions are full or partial,

permanent or temporary. Annex 1 lists the 12 policy principles required to meet the

resettlement objectives of ADB’s SPS. The project has been categorized as C for IP (no impact on IP), as no IP have been identified residing in the project locations. The

policy on environment is discussed in a separate document.

2. Other ADB’s Crosscutting Policy Themes

53. ADB’s other crosscutting policy themes includes: (i) the Gender and Development (1998), which adopts gender mainstreaming as a key strategy to promote gender

equity and to ensure that men and women participate and that their needs are

addressed in all stages including in the decision-making process of development

activities; (ii) Public Communication Policy (2011) that encourages active participation

of affected people and other stakeholders during project preparation and

implementation; (iii) Accountability Mechanism (2012). It is part ofADB‟ s continued efforts to enhance its capacity in responding to and/or resolving the problems

Page 23: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

14 | P a g e

associated with the implementation of its policies in all programs or projects it assists.

Prescriptions from these crosscutting ADB’s policy themes shall be incorporated and defined in the appropriate sections of the LARPs.

3. Indonesia Government Regulation

54. In 2012, the Government issued Law no. 2 on the procurement of land for

development for Public Interest.The purpose of land acquisition is to provide land for

the implementation of development in order to improve the welfare and prosperity of

the nation, state and society with still maintaining legal interests of the Eligible Party.

Some of the things regulated in this rule are:

The availability of land for development for public interest is guaranteed by the

state;

Land acquisition is conduct by the government;

Land acquisition must be done in accordance with spatial planning and other

related development plans;

Implementation of land acquisition for the public interest pay attention to the

balancing between development and community interest;

Land acquisition for public purposes is carried out by providing Reasonableand

equitable compensation;

Disposal of the right holder shall only be made after payment of compensation is

completed based on a court decision;

The land acquisition process should involve all stakeholders.

4. Analysis Gap and Basic Principles Project

55. The gap was found between ADB's Social Safeguard Policy and Indonesian

Government regulations on land acquisition, such as:

The law provides managed stability between the interests of development and the

interests of the community, but has not yet specifically defined the alignments of

the community (including indigenous peoples, vulnerable groups), and the socio-

economic evaluation of affected communities.

Law has not regulating resettlement clearly, relocation of affected persons and

regulating the use of government land illegally.

C. BASIC PRINCIPLES OF PROJECT

56. Basic Principles The principles to be applied for the project are as follows:

a. Acquisition of land and other assets shall be avoided and minimized as much as possible by exploring project and design alternatives and appropriate social, economic, operational, and engineering solutions that have the least impact on populations in the project area.

b. All affected persons included in the cut-off date are eligible for compensation and rehabilitation assistance, irrespective of tenure status, social or economic standing, and any such factors that may discriminate against achieving the objectives outlined above. Neither lack of legal rights to the assets lost, or tenure status or social or economic status will not be a bar for the APs from entitlements to such compensation and rehabilitation measures.

c. APs who have no recognizable rights or claims to the land that they are occupying, (e.g. informal dwellers/squatters), are entitled to compensation for loss of non-land assets and various options of resettlement assistance.

Page 24: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

15 | P a g e

d. APs shall be fully consulted and informed on the project, their entitlement and resettlement options. As well as the assistance measures. Ensure the APs participation in planning, implementation, and monitoring and evaluation of resettlements programs. Particular attention will be provided to the vulnerable groups and ensure their participation in consultations.

e. The project will not cause physical displacement of APs from housing and/or lose 10% or more of total land owned or productive income. If the proposed infrastructure indicates the need to relocate people, the proposed infrastructure will be dropped from project financing.

f. The living standards of the affected people are not expected to be reduced due to the small scale of the land acquisition. This will be ensured in the LARP.

g. There shall be an effective grievance redress mechanisms to receive and facilitate resolution of the affected persons’ concern during the preparation and implementation of LARPs.

h. Details of the LARPs, including documentation of the consultation process shall be disclosed to APs and any interested groups through public meetings and in the form of summary LARPs or information booklets and leaflets in a language that can be understood by the APs and in an accessible places (such as neighborhood notice board, project and commune offices).

i. Appropriate monitoring shall be carried out to assess land acquisition objectives and their impacts on the standard of living of the APs. The M& E, mechanisms shall be identified and set in place as part of the land acquisition management system. Monitoring reports should be disclosed.

j. Civil works will not be commenced until (a) payment has been fully provided to the APs and rehabilitation measures if any, are in place; (b) already-compensated APs have cleared the area in a timely manner; and (c) the area is free from any encumbrances.

D. MATRIX OF AFFECTED PEOPLE RIGHT

57. The matrix of affected people right in the table below summarizes the rights and

support received by affected residents.

Table 6 Entitlement Matrix

Effect Type Aplication Type & Level of

Impact Compensation Policy

Permanen Effect

Losing the entire structure of the building (Relocation)

Buildings affected overall 32 units and an area of 470 m2

Affected people (according to the family card and ID card)

Compensation will be provided in cash to affected people in accordance with the Reasonable Reimbursement Value for the building (resettlement);

Affected people are entitled of compensation for relocation.

The affected people are entitled to get financing of new electricity and clean water instalation;

Affected people are entitled to livelihood recovery program and opportunities for employment.

LCO and Unit Work of Local Government of Pekalongan prepare truck for hauling demolition.

LCO and Unit Work facilitate the

Page 25: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

16 | P a g e

Effect Type Aplication Type & Level of

Impact Compensation Policy

transfer process to Rusunawa

LCO and Unit Work provide opportunities for the affected residents if they want to work on the project.

LCO and Unit Work will facilitate the development of public infrastructure and facilities such as public toilets, access roads, waste management and water supply channels.

Losing Business The affected people is entitled for Reasonable Reimbursement Value of loss of income for 2 months after resettlement;

Affected people are entitled for moving and transition costs.

Lose some building structures

Mosque wudhu place

Chairman of the mosque group

Renovation of ablution (wudhu)site

LCO and Unit Work provide FRV for rebuilding.

loss of trees commercially valuable tree and one tree is not worth economicaly

Affected People Affected people are entitled for compensation in accordance with FRV.

Right for Vulnerable Households

The 30 APs

Vulnerable groups will get the economic recovery program

Economic recovery program will be carried out continuously

Page 26: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

17 | P a g e

CHAPTER VI

IMPACT AND COMPENSATION

A. REASONABLE REIMBURSEMENT VALUE

58. Reasonable Reimbursement Value; is the value of ownership interest based on

equality with Market Value of the Property, regarding to extraordinary elements of non-

physical loss cause by the right acquisition of the Property (SPI 102 - 3.10.

Reasonable Reimbursement Value (RRV) is defined the same as the value of

compensation as stipulated in Law No. 2 Year 2012. RRV can be generated from a

combination of physical and non-physical losses on an assessment object. This

combination can be described as the sum of the Market Value indication on physical

damages plus an indication of value on the non-physical losses.

59. Land. Land used by affected people belong to Local Government of Pekalongan

Government, so there is no calculation of Reasonable Reimbursement Value (NPW) to

the affected people land.

60. Residential Buildings. The affected house are 32 houses, with a total area of

470m2. All house structures are semi-permanent. House structure building is varied,

some use roof tile and asbestos, building wall using brick and bamboo / board. Age of

the building is estimated between 5-25 years, and most of the buildings have been

damaged.

61. Plant. There are 7 affected plants, namely 6 mango trees and 1 banyan tree. Mango

and banyan trees are 2-3 years old. RRV plant calculated based on the cost of seed

and treatment. Assumed per plant is Rp. 200,000.

62. Utilities (PLN and PDAM). New installations of PLN and PDAM will be allocated for

32 affected people. Reasonable Reimbursement Value is awarded based on the new

instalation fee of PLN and PDAM 2017 that applicable in Pekalongan city.

63. The Reasonable Reimbursement value against the physical losses (buildings, plants

and utilities) affected is calculated as follows:

RRV for house building is calculated by using the unit price of building materials in 2017 set by the mayor. Calculation of unit price per m2 for semi-permanent building is Rp. 970.000, - details of unit price can be seen in appendix 9.

RRV for the plant is calculated based on the market value is Rp. 200.000, - / plant

RRV for utilities of PLN new installations based on 2017 price is Rp. 1.500.000, - / house and Drinking Water new installations based on 2017price is Rp. 800.000, - / house

Table 7 Reasonable Reimbursement Value for House Building, Plant and AR Utilities

No. Item Unit Price Volume Total (Rp)

01. Building 970.000 470 m2 455.900.000

02. Seasonal Plant 200.000 7 Pohon 1.400.000

03. Utilities

- Electriv Instalation 1.500.00 32 HH 37.500.000

- Drinking Water Instalation 800.00 32 HH 20.000.000

Total Reasonable Reimbursement Value (RRV) 514.800.000

Source: Primary Data, processed already, November 2017

Page 27: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

18 | P a g e

Total RRV for 32 affected residents covering buildings, plants and utilities amounted to

Rp. 514.800.000, -. RRV details for each affected residents of buildings, plants and

utilities can be found in appendix 5, 6 and 7.

64. Public Facilities. Public facilities that affected are the demolition and relocation of

mosque ablution area of 6 m2 that located on the drainage field. Assumed the cost of

reconstruction the ablution place is Rp. 2,000,000,-.

65. Loss of business income. Residents relocation will impact their business income,

especially residents who have jobs as traders. From the 32 affected residents, there

are 14 residents who work as traders and their business income was affected.

Meanwhile, residents who work as laborers, drivers and employees, their revenues

were not affected. The RRV for loss income (temporarily) is calculated by assuming

that for 2 months the residents can not trade, so amount of residents monthly income

becomes the unit price of loss income:

Table 8 Reasonable Reimbursement Value of Loss Income

Source: Primary Data, processed already, November 2017

66. Solatium. It is an intangible emotional loss associated with land acquisition used as

residence of the owner. The solatium assessment object is only for residential

buildings. The solatium calculation criteria is carry out by observing the period of stay

that is between 3 up to 30 years. For more details criteria calculation solatium can be

seen in the table. 9 as follows:

Table 9 Solatium Criteria

No. Solatium Criteria RT – 1A RT – 2A RT – 1B RT – 2B

01. Stay Period < 3 year 5% of the physical loss

value

5% of the physical loss

value

5% of the physical loss

value

5% of the physical loss

value

02. Stay Period 4 – 9 year 10% 10% 10% 10%

03. Stay Period 10 – 19 year 15% 15% 15% 15%

04. Stay Period 20 – 29 year 20% 20% 20% 20%

05. Stay Period > 30 year 30% 30% 30% 30%

Source : KPSPI ~ MAPPI

01. KHOLIFAH 45 P Worker 50.000 3.000.000 15.520.000 310.400 3.310.400

02. RASALIM 55 L Worker 50.000 3.000.000 11.640.000 232.800 3.232.800

03. SOBIRIN 46 L Worker 50.000 3.000.000 11.640.000 232.800 3.232.800

04. SANAWI 56 L Driver 50.000 3.000.000 17.460.000 349.200 3.349.200

05. WAGIYO WARYADI 60 L Trader 50.000 3.000.000 11.640.000 232.800 3.232.800

06. SARTONO 50 L Trader 60.000 3.600.000 14.550.000 291.000 3.891.000

07. PARIYAH 60 P Worker 30.000 1.800.000 17.460.000 349.200 2.149.200

08. SULAMI 55 P Trader 50.000 3.000.000 15.520.000 310.400 3.310.400

09. ABADI 60 L Trader 50.000 3.000.000 15.520.000 310.400 3.310.400

10. NUR SLAMET 55 L Trader 50.000 3.000.000 19.400.000 388.000 3.388.000

11. KAMBALI 54 L Trader 25.000 1.500.000 13.580.000 271.600 1.771.600

12. SOLICHIN 59 L Tailor 50.000 3.000.000 15.520.000 310.400 3.310.400

13. EDI SAMBARA 64 L Trader 50.000 3.000.000 11.640.000 232.800 3.232.800

14. RUDI HARTONO 42 L Trader 60.000 3.600.000 15.520.000 310.400 3.910.400

44.632.200

No Name Age Gender Occupation

T O T A L

R R V of

Building

Moving Cost

Assumption

2%

Income Per

Day (IDR)

Total

(IDR)

R R V

(IDR)

Page 28: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

19 | P a g e

67. Calculation of solatium to residential buildings. The calculation of solatium on

residential building was conducted on 32 APs based on the length of stay and / or

occupying the house. The calculation of solatium can be seen in the table. 10 below.

Table 10 Calculation of Solatium Against Residential Building & RRV

68. Total of Reasonable Reimbursement Value. Total of RRV for the 32 affected people

assets are the sum of RRV for buildings, plants, public facilities and loss of income, as

follows:

Table 11 Total of Reasonable Reimbursement Value

NO. A S S E T Value (IDR)

01. Building 536.604.000

02. Utilities (PLN & PDAM) 57.500.000

03. Seasonal Plant 1.400.000

04. Loss of business income (14 Aps) 44.632.200

T O T A L 640.136.200

Source: Primary Data, processed already, November 2017

Length

of Stay

(Year)

Area

(M2)

Unit

Rate/

M2 (IDR)

Building

Asset Value

(IDR)

01. ANAS Worker 20 12 970.000 11.640.000 2.328.000 174.600 14.142.600

02. ALWI Worker 15 14 970.000 13.580.000 1.358.000 203.700 15.141.700

03. KHOLIFAH Worker 10 16 970.000 15.520.000 2.328.000 232.800 18.080.800

04. RASALIM Worker 5 12 970.000 11.640.000 1.164.000 174.600 12.978.600

05. SUSILOWATI HouseWife/Worker 10 14 970.000 13.580.000 2.037.000 203.700 15.820.700

06. DURIYAH Worker 10 16 970.000 15.520.000 2.328.000 232.800 18.080.800

07. DARYONO Worker 5 14 970.000 13.580.000 1.358.000 203.700 15.141.700

08. SOBIRIN Worker 10 12 970.000 11.640.000 1.746.000 174.600 13.560.600

09. SUGIONO Worker 5 12 970.000 11.640.000 1.164.000 174.600 12.978.600

10. NUR RUZI Worker 20 14 970.000 13.580.000 2.716.000 203.700 16.499.700

11. SANAWI Driver 5 18 970.000 17.460.000 1.746.000 261.900 19.467.900

12. SURADI Worker 20 15 970.000 14.550.000 2.910.000 218.250 17.678.250

13. WAGIYO WARYADI Trader 15 12 970.000 11.640.000 1.746.000 174.600 13.560.600

14. KARYONO Becak Driver 10 12 970.000 11.640.000 1.746.000 174.600 13.560.600

15. SARTONO Trader 20 15 970.000 14.550.000 2.910.000 218.250 17.678.250

16. AHMAD ROJIUN Worker 20 16 970.000 15.520.000 3.104.000 232.800 18.856.800

17. PARIYAH Worker 17 18 970.000 17.460.000 2.619.000 261.900 20.340.900

18. A. SAFAWI Driver 20 12 970.000 11.640.000 2.328.000 174.600 14.142.600

19. SULAMI Trader 6 16 970.000 15.520.000 1.552.000 232.800 17.304.800

20. DURRAHMAN Worker 20 12 970.000 11.640.000 2.328.000 174.600 14.142.600

21. ABADI Trader 25 16 970.000 15.520.000 3.104.000 232.800 18.856.800

22. NUR SLAMET Trader 20 20 970.000 19.400.000 3.880.000 291.000 23.571.000

23. KAMBALI Trader 20 14 970.000 13.580.000 2.716.000 203.700 16.499.700

24. SOLICHIN Tailor 17 16 970.000 15.520.000 2.328.000 232.800 18.080.800

25. HALIFA Worker 20 15 970.000 14.550.000 2.910.000 218.250 17.678.250

26. DASMI Worker 20 18 970.000 17.460.000 3.492.000 261.900 21.213.900

27. AHMAD JUNAIDI Worker 15 15 970.000 14.550.000 2.182.500 218.250 16.950.750

28. EDI SAMBARA Trader 15 12 970.000 11.640.000 1.746.000 174.600 13.560.600

29. SUROSO Enterpreneur 10 14 970.000 13.580.000 2.037.000 203.700 15.820.700

30. RUDI HARTONO Trader 12 16 970.000 15.520.000 2.328.000 232.800 18.080.800

31. DOTO Private Employees 20 20 970.000 19.400.000 3.880.000 291.000 23.571.000

32. WARYUDIN Worker 16 12 970.000 11.640.000 1.746.000 174.600 13.560.600

536.604.000

Transaction

1,5 %

R R V

(IDR)Solatium

TOTAL

Type Of

Building

Building

NameNo

Page 29: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

20 | P a g e

B. COMPENSATION

69. Act. No. 2 of 2012 declares that compensation shall be appropriate and fair and

equitable compensation shall be granted to the rightful parties in return for the liberated

land. The 10 principles of fairness in this Act emphasizes that land procurement

guarantees benefits and compensation for eligible parties in order for them to get a

chance for better life.

70. The relocation of 32 households was carried out because the implementation of the

drainage construction project is voluntarily. Deliberation and consultation have been

conducted before the drainage construction begins. The whole affected community is

strongly supportive of the implementation of the project because it will overcome the

inundation problems that have occurred throughout the day for many years.

71. LCO and Unit Work of Pekalongan City provide guarantees to affected people and

other affected objects for assistance and compensation so as to ensure that

ressttlement does not adversely affect the community.

72. Although 32 affected HHs were found to build unlicensed buildings on government

land (above drainage), but the Municipality of Pekalongan City has prepared a

compensation fund whose amount has been agreed upon by affected people. Three

discussion meetings have been held to determine the amount of compensation fund

and the amount of compensation that had been agreed is Rp. 5.000.000, - per HH.

73. The total cost of the compensation that has been given by the Government amounted

Rp.160.000.000, - where each affected resident get Rp. 5.000.000, - for demolition

costs, moving costs and rent for 1 year.

C. GAP

74. GAP; GAP is a measurement method to find out the gap value that occurs during RRV

implementation. There is a relatively high gap compared to the compensation value

provided with the reasonable reimbursement value of 32 APs. The gap is:

Reasonable Reimbursement Value = 640.136.200,- Paid Compensation = 160.000.000,-

Gap 480.136.200,-

Page 30: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

21 | P a g e

Table 12 GAP value or deviation

Source: Primary Data, processed already, November 2017

75. To finalize the GAP value of Rp. 480.136.200.- Pekalongan City Government will provide

assistance in the form of development programs, social and health support and other

assistance. That program will be implemented in 2017 and 2018 Quartal Quartal 4 1 - 4.

The budget that will be used for the implementation of the program comes from BSPS

funds and Pekalongan local budget (APBD).

Building

(IDR)

Plant

(IDR)

Utilities

(IDR)

Loss Income

(IDR)

01. ANAS 48 L HOUSE 20 12 Worker 14.142.600 200.000 2.300.000 16.642.600 5.000.000 (11.642.600)

02. ALWI 54 L HOUSE 15 14 Worker 15.141.700 200.000 2.300.000 17.641.700 5.000.000 (12.641.700)

03. KHOLIFAH 45 P SHOP 10 16 Worker 18.080.800 3.310.400 21.391.200 5.000.000 (16.391.200)

04. RASALIM 55 L HOUSE & SHOP 5 12 Worker 12.978.600 3.232.800 16.211.400 5.000.000 (11.211.400)

05. SUSILOWATI 45 P HOUSE 10 14 HouseWife/Worker 15.820.700 200.000 2.300.000 18.320.700 5.000.000 (13.320.700)

06. DURIYAH 60 P HOUSE 10 16 Worker 18.080.800 2.300.000 20.380.800 5.000.000 (15.380.800)

07. DARYONO 43 L HOUSE 5 14 Worker 15.141.700 2.300.000 17.441.700 5.000.000 (12.441.700)

08. SOBIRIN 46 L HOUSE & SHOP 10 12 Worker 13.560.600 400.000 2.300.000 3.232.800 19.493.400 5.000.000 (14.493.400)

09. SUGIONO 46 L HOUSE 5 12 Worker 12.978.600 12.978.600 5.000.000 (7.978.600)

10. NUR RUZI 27 M HOUSE 20 14 Worker 16.499.700 2.300.000 18.799.700 5.000.000 (13.799.700)

11. SANAWI 56 M HOUSE & SHOP 5 18 Sopir 19.467.900 2.300.000 3.349.200 25.117.100 5.000.000 (20.117.100)

12. SURADI 48 M HOUSE 20 15 Worker 17.678.250 2.300.000 19.978.250 5.000.000 (14.978.250)

13. WAGIYO WARYADI 60 M SHOP 15 12 Trader 13.560.600 3.232.800 16.793.400 5.000.000 (11.793.400)

14. KARYONO 55 M HOUSE 10 12 Becak Driver 13.560.600 2.300.000 15.860.600 5.000.000 (10.860.600)

15. SARTONO 50 M HOUSE 20 15 Trader 17.678.250 2.300.000 3.891.000 23.869.250 5.000.000 (18.869.250)

16. AHMAD ROJIUN 50 M HOUSE 20 16 Worker 18.856.800 2.300.000 21.156.800 5.000.000 (16.156.800)

17. PARIYAH 60 F HOUSE & SHOP 17 18 Worker 20.340.900 400.000 2.300.000 2.149.200 25.190.100 5.000.000 (20.190.100)

18. A. SAFAWI 47 M HOUSE 20 12 Driver 14.142.600 2.300.000 16.442.600 5.000.000 (11.442.600)

19. SULAMI 55 F HOUSE & SHOP 6 16 Pedagang 17.304.800 2.300.000 3.310.400 22.915.200 5.000.000 (17.915.200)

20. DURRAHMAN 47 M HOUSE 20 12 Worker 14.142.600 2.300.000 16.442.600 5.000.000 (11.442.600)

21. ABADI 60 M HOUSE & SHOP 25 16 Trader 18.856.800 2.300.000 3.310.400 24.467.200 5.000.000 (19.467.200)

22. NUR SLAMET 55 M SHOP 20 20 Pedagang 23.571.000 3.388.000 26.959.000 5.000.000 (21.959.000)

23. KAMBALI 54 M HOUSE & SHOP 20 14 Trader 16.499.700 2.300.000 1.771.600 20.571.300 5.000.000 (15.571.300)

24. SOLICHIN 59 M HOUSE 17 16 Tailor 18.080.800 2.300.000 3.310.400 23.691.200 5.000.000 (18.691.200)

25. HALIFA 57 F HOUSE 20 15 Worker 17.678.250 2.300.000 19.978.250 5.000.000 (14.978.250)

26. DASMI 63 F HOUSE 20 18 Worker 21.213.900 2.300.000 23.513.900 5.000.000 (18.513.900)

27. AHMAD JUNAIDI 42 M HOUSE 15 15 Worker 16.950.750 2.300.000 19.250.750 5.000.000 (14.250.750)

28. EDI SAMBARA 64 M HOUSE 15 12 Trader 13.560.600 2.300.000 3.232.800 19.093.400 5.000.000 (14.093.400)

29. SUROSO 35 M HOUSE 10 14 Enterpreneur 15.820.700 2.300.000 18.120.700 5.000.000 (13.120.700)

30. RUDI HARTONO 42 M SHOP 12 16 Trader 18.080.800 3.910.400 21.991.200 5.000.000 (16.991.200)

31. DOTO 46 M HOUSE 20 20 Private Employees 23.571.000 2.300.000 25.871.000 5.000.000 (20.871.000)

32. WARYUDIN 63 M HOUSE 16 12 Worker 13.560.600 13.560.600 5.000.000 (8.560.600)

(480.136.200) T O T A L

Given

CompensationDifferences (IDR)No Name Age Gender

Type Of

Building

Length

of Stay

(Year)

Area

(M2)

Reasonable Reimbursement Value

OccupationTotal

(IDR)

Page 31: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

23 | P a g e

CHAPTER VII

RECOVERY OF INCOME AND OR LIVELIHOOD

A. PURPOSE

76. LCO and Pekalongan City Unit Work guarantee that the affected residents do not

experience a decrease in the quality of livelihood and income by providing facilitation

of income recovery and rehabilitation programs as needed.

B. RECOVERY AND REHABILITATION PROGRAMS

77. Recovery Income. LCO and the Pekalongan City Work Unit ensured that the

displacement of the population would not lead to decrease of income or loss of jobs to

affected people. Nevertheless, the government will continue to provide assistance to ensure

that residents livelihoods are secured with house, food and clothing, and also continue to

support other existing social and economic relief programs. Pekalongan City Government has

planned to provide training for the affected people gradually and continuously, so that in a

given year all the affected residents receive training assistance that can support the

profession and increase their income.

78. Several effort to increase the residents affected income is by providing several

programs as follows:

Sewing Training, will be implemented on TA. 2018 Quarter 2. Funds to be used to

finance the program come from local budget (APBD).

Training of Carpenter, will be implemented in TA. 2017 Quarter 4. Funds to be used

to finance the program come from NSUP (APBN).

The Health Card, will be implemented on TA. 2017 Quarter 4 and TA. 2018 Quarter

1 - 4. Funds to be used to finance the program come from local budget (APBD).

Integrated Service Post of the Elderly, will be implemented on TA. 2017 Quarter 4

and TA. 2018 Quarter 1 to Quarter 4. Funds to be used to finance the program

come from local budget (APBD).

Family Hope Program, will be implemented on TA. 2017 Quarter 4 and TA. 2018

Quarter 1 to Quarter 4. Funds to be used to finance the program come from local

budget (APBD).

Kartu Indonesia Pintar (KIP), will be held on TA. 2018 Quarter 2 and Quartal 4.

Funds to be used to finance the program come from local budget (APBD).

79. Rehabilitation. Due to the tendency of affected residents to move to their old house or

build their own house, the Pekalongan City Government has prepared the program

such as:

PAMSIMAS program, which will be implemented on TA. 2017 Quarter 4 and TA.

2018 Quarter 1 to Quarter 4. Funds to be used to finance the program come from

local budget (APBD).

Construction of Public Lavatory, will be held on TA. 2017 Quarter 4 and TA. 2018

Quarter 1 to Quarter 4. Funds to be used to finance the program come from local

budget (APBD).

Renovation of Inadequate House (RTLH), will be implemented on TA. 2018 Quarter

3 and Quartal 4. Funds to be used to finance the program come from BSPS.

Page 32: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

24 | P a g e

80. Conclusion. Economic recovery program for the 32 Affected People will be implemented by

Pekalongan City Government to comply with the lack of compensation that has been given,

based on the Fair Value Calculation that has been done. The Value Recovery Program

which will be provided to cover the gap will be described below;

The Value Recovery Program = 514.118.600,- Gap = 480.136.200,-

Difference (Excess Compensation) 33.982.400,-

Table 13 Program Type and Implementation of AR Recovery

Source: Primary Data, processed already, November 2017

2017

Q4 Q1 Q2 Q3 Q4

01. Pamsimas 1 HH 240.000 240.000DPU CIPTA

KARYAAPBD

02.Indonesia Health

Card7 HH

25.000/Month

(25.500x13 People)34.953.600

DINAS

KESEHATANAPBD

03. Tranning 15 HH 1.875.000/Person 28.125.000 BLK APBD

04.Inadequate House

Renovation 16 UNIT 15.000.000/Unit 240.000.000

DINAS

PERUMAHAN

DAN

PERMUKIMAN

BSPS

05.Integrated Service

Pos for Elderly11 HH 100.000/Month 81.600.000

DINAS

KESEHATANAPBD

06.Public Toilet

Construction1 HH 4.000.000/HH 4.000.000

DINAS

PERUMAHAN

DAN

PERMUKIMAN

APBD

07.Family Hope

Programme16 HH 200.000/HH/Month 121.600.000 DINAS SOSIAL APBD

08.Indonesia Smart

Card2 HH

I,II,III,IV and V Class

370.500/Year3.600.000

DINAS

PENDIDIKANAPBD

514.118.600Total Cost

2018 to 2037NO. Type of programeNumber of

BeneficiariesUnit Compensation Value TOTAL Value P I C Budgeting

Implementation Schedule

Page 33: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

25 | P a g e

Table 14 APs Name of Recovery Program Recipient

Source: Primary Data, processed already, November 2017

Remarks :

: Implementation FY 2017

Procesing Hasil

Pertanian dan

Perikanan

Sew ing Otomotif

01. ANAS 1.875.000 9.600.000 1.350.000 12.825.000 -11.642.600 1.182.400 2018-2021 Musfiroh (istri)

02. ALWI 15.000.000 15.000.000 -12.641.700 2.358.300 2017-2018 Desy alfiana (anak)

03. KHOLIPAH 1.875.000 15.093.600 16.968.600 -16.391.200 577.400 2018-2037

04. RASALIM 1.875.000 9.600.000 11.475.000 -11.211.400 263.600 2018-2025 SYAMSUDIN

05. SUSILOWATI 1.875.000 2.400.000 5.560.800 4.000.000 13.835.800 -13.320.700 515.100 2018-2024 SUSILOWATI

06. DURIYAH 15.000.000 240.000 1.200.000 16.440.000 -15.380.800 1.059.200 2018

07. DARYONO 15.000.000 15.000.000 -12.441.700 2.558.300 2018

08. SOBIRIN 15.000.000 15.000.000 -14.493.400 506.600 2017

09. SUGIONO 1.875.000 4.800.000 1.588.800 8.263.800 -7.978.600 285.200 2018-2019 SUGIONO

10. NUR RUZI 15.000.000 15.000.000 -13.799.700 1.200.300 2018

11. SANAWI 1.875.000 14.400.000 3.972.000 20.247.000 -20.117.100 129.900 2018-2023 MILATUN

12. SURADI 12.000.000 3.972.000 15.972.000 -14.978.250 993.750 2018-2022

13. WAGIYO WARYADI 6.000.000 6.000.000 12.000.000 -11.793.400 206.600 2018-2022

14. KARYONO 15.000.000 15.000.000 -10.860.600 4.139.400 2017

15. SARTONO 15.000.000 1.875.000 2.250.000 19.125.000 -18.869.250 255.750 2018-2022 Siti muayanah (istri)

16. AHMAD ROJIUN 15.000.000 1.400.000 16.400.000 -16.156.800 243.200 2017-2018

17. PARIYAH 1.875.000 7.200.000 12.000.000 21.075.000 -20.190.100 884.900 2018-202 Slamet Prabowo (34),

18. A. SAFAWI 15.000.000 15.000.000 -11.442.600 3.557.400 2018

19. SULAMI 15.000.000 1.875.000 1.200.000 18.075.000 -17.915.200 159.800 2018 Ferry fajri (anak)

20. SUHARTI 15.000.000 15.000.000 -11.442.600 3.557.400 2018

21. ABADI 15.000.000 1.875.000 3.200.000 20.075.000 -19.467.200 607.800 2018-2019 Khoiron (anak)

22. NUR SLAMET 1.875.000 20.400.000 22.275.000 -21.959.000 316.000 2018-2034 NUR SLAMET

23. SRIAH 15.000.000 1.875.000 16.875.000 -15.571.300 1.303.700 2018 SRIAH

24. SOLICHIN 1.875.000 6.000.000 12.000.000 19.875.000 -18.691.200 1.183.800 2018-2022 SOLICHIN

25. HALIFA 15.000.000 600.000 15.600.000 -14.978.250 621.750 2018-2019

26. DASMI 7.200.000 12.000.000 19.200.000 -18.513.900 686.100 2018-2023

27. AHMAD JUNAIDI 12.000.000 3.177.600 15.177.600 -14.250.750 926.850 2018-2022

28. EDI SAMBARA 4.800.000 9.600.000 14.400.000 (14.093.400) 306.600 2018-2021

29. SUROSO 15.000.000 15.000.000 -13.120.700 1.879.300 2018-2019

30. RUDI HARTONO 1.875.000 15.600.000 17.475.000 -16.991.200 483.800 2018-2030 Juanah (istri)

31. DOTO 15.000.000 4.800.000 1.588.800 21.388.800 -20.871.000 517.800 2018-2019

32. WARYUDIN 1.875.000 2.400.000 4.800.000 9.075.000 -8.560.600 514.400 2018-2020 SOFIA

514.118.600 -480.136.200 33.982.400

NO. Name R R V

(Implementation Schedule Plan) Programme

IDR SurplusImplementation

YearRemark

Aps PAMSIMAS

TOTAL

G A P

PELATIHAN Intgerated

Service Post for

Elderly

PKH KIS KIP Toilet

Page 34: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

26 | P a g e

CHAPTER VIII

INSTITUTIONAL ARRANGEMENTS

A. GENERAL ARRANGEMENTS

81. To support the implementation of NUSP-2, there is a project management organization that

includes government, community and consultants, from the central, district / city level, to

neighbourhood and community level. The organizational structure of the project can be seen

in appendix 11.

82. The Directorate General of Human Settlements is the Executing Agency of NUSP-2, at the

central level of EA assisted by the Project Management Unit (PMU) and the PKPBM Unit

Work as a Project Implementation Unit (PIU) at the central level. While at the city level, there

are Local Coordinating Office (LCO) Pekalongan City and Pekalongan City Work Unit as

Project Implementation Unit at city level. Each unit is assisted by National Management

Consultant (NMC) and Regional Management Consultant (RMC). The Directorate General

of Human Settlements is responsible for the management of LARP compiled by the LCO

and Work Unit with the assistance of TA. The safeguard in RMC with the implementing unit

at the city level will continue monitoring and updating LARP.

B. THE DIVISION OF ROLES

83. PMU and Work Unit, representing DGHS to run the tasks are: 1). Establish planning and

implementation policies program; 2). Coordinate all activities to all relevant agencies; 3).

Conduct recruitment of consultants; 4). Coordinating project financial management; 5).

Coordinating the procurement process of goods and services; 6). Coordinating intensively

with the lender; 7). Consolidating physical and financial reports thoroughly; 8). supporting the

tasks of the LCO and the City Work Unit in carrying out their duties including in implementing

and updating LARP; 9). Conduct control, monitoring and evaluation of all project

implementation.

84. LCO and Work Unit, representing the City Government to carry out the tasks are: 1).

Preparing SIAP; 2). Coordinating all activities to all relevant agencies in the region; 3).

Coordinating actors at the community level; 4). Coordinating NUAP drafting and civil work

planning; 5). Conducting civil work auctions and coordinating procurement at the community

level; 6). Coordinate intensively with PMU and Unit Work at the central level; 7).

Consolidating physical and financial reports at city level; 8). Arranging safeguard reports

including implementing and updating LARP; 9). Controlling, monitoring and evaluation of all

project implementation at city level; 10). Deliver physical and financial reports to the PMU

and the Central Work Unit on a regular basis.

85. Management Consultant, has the duty of assisting PMU, LCO and Work Unit in; 1).

Technical assistance, management and control of all stages of project activities; 2). Develop

concepts, strategies, and training modules covering aspects of gender equality in project

activities; 3). technical assistance and assistance of facilitator and community groups; 4).

Monitoring and evaluating projects; 5). build community awareness and understanding; 6).

facilitating the community in identifying problems and needs of infrastructure development,

evaluating the capacity of community institutions; 7). develop participatory decision-making

and planning mechanisms at the community level; 8). conducting monitoring and evaluation

activities of training activities through field visits, interviews and data collection; 9). Ensure

the fulfillment of gender equality indicators; 10. Monitoring the social, environmental and

economic impacts of project implementation, including data provision and information on

Page 35: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

27 | P a g e

environmental preliminary conditions, and reporting on initial project impact assessments;

11). Controlling, monitoring and evaluation of all project implementation at city level; 12).

Deliver physical and financial reports to PMU, LCO and Work Unit on a regular basis.

86. Resstlement activity begins with initial socialization in 2015 and continued with other

coordination and consultation processes. Implementation of the displacement of affected

people is carried out in early 2016, while the implementation of the drainage development

project commences in mid-2016. The monitoring process of the affected people continues

until now. The complete plan of LAP resstlement and implementation is as follows:

Table 15 Implementation Schedule

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

01. Sosialisasi awal

02. Identifikasi Warga Terdaampak

03. Musyawarah Perencanaan

04. Rapat Koordinasi rencana kompensasi

05. Rapat Koordinasi lanjutan

06. Sosialisasi rencana pemindahan warga

07. Proses pemindahan warga

08. Proses persiapan pelaksanaan fisik

09. Pelaksanaan Fisik

10. Pemantauan warga terdampak

11. Rapat Koordinasi Pasca Pembangunan Fisik

12. Updating DDR

2016Kegiatan No. 2015

Jadwal

2017

C. BUDGET

87. The allocation of asset replacement cost to 32 affected PEOPLE, with a total area of

470m2, came from Local Budget (APBD) Pekalongan City. All house structures are

semi-permanent. The building structure varies, there is use roof tile and asbestos, the

building wall was using brick and bamboo / board. Age of the building is estimated

between 5-25 years, and most of the buildings have been damaged. The asset value

of 32 houses affected based RRV is Rp. 640,136,200, - with estimated asset value of

each house between Rp. 12,978,600, - - Rp. 23.571.000,-.

Page 36: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

28 | P a g e

CHAPTER IX

MONITORING DAN EVALUATION

A. PURPOSE

88. Monitoring and evaluation activities are conducted with the aim of monitoring the

implementation of land acquisition to the relocation of affected people to be carried out in

accordance with the plan and get benefit for all parties involved. Monitoring was conducted

by LCO and Pekalongan City PIP Work Unit, in collaboration with the identification team.

89. The monitoring and evaluation team has a duty; 1). Supervision of action plans (ActionPlan)

implementation starting from socialization, community consultation, land acquisition and

relocation and implementation of efforts to restore the livelihoods of affected residents; 2)

coordinate with relevant stakeholders in municipalities and affected communities; 3). compile

a progress report on LARP implementation.

B. MONITORING DAN EVALUATION RESULT

90. Aps Residences. Affected people who originally planned to occupy Rusunawa

Krapyak Lor, but they prefer to live in their original house or build houses around the

origin site. This is because having a residence around the location, some old locations

just as business place. Another reason is because the Rusunawa location is a bit far

from the workplace, some state it is far away from the long-known neighbors and

family, there is also a reason because they are not used to living in graded house,

especially for the elderly. All affected residents now have a residence with the right

status of land, only 1 household who claimed to stay at his son house.

Figure 3 Affected Resident Houses That Classified As Inadequate.

91. Economic improvement. From 10 peoples surveyed, 7 peoples said their income

increased, 2 peoples said still the same and 1 person stated a decrease due to illness

long enough. For example, there are people who previously sold chicken noodles, after

being relocated change the profession to be chicken sellers, the income increased

significantly. There is also previously only sell sewing threads, after being relocated

can expand the business by renting wedding dress.

Page 37: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

29 | P a g e

Figure 4 Houses of affected resident that experiencing economic improvement.

92. Social Condition. The social relations of the community in the new place have not

changed from the previous place, because most of the residents moved not far from the

original location so that social relations of society remain well established. In fact, they

expressed a more comfortable feeling of staying in a place that was already their

property. For citizens who move at a location farther away, the surrounding residents is

well greeting.

C. RECOMENDATION

93. Recommendations were formulated based on the results of monitoring and evaluation:

Increasing socialization to the community so as not to build a building on the land

owned by the government.

Put up signs prohibiting build on land owned by the government.

Prioritize inadequate house renovation assistance for affected resident.

Providing easier accesso of capital for affected resident who run small businesses

Increase the socialization of PHBS and print transform agents that can socialize in

arisan groups, study groups, and other care environmental community.

Page 38: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

30 | P a g e

APPENDIX

Page 39: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

31 | P a g e

Appendix 1 List of NUSP-2 target cities / districts

No. Province District/City Budget Alocation

01. Sumatera Utara Tanjungbalai City USD 3,5 million

02. Kepulauan Riau Batam City USD 2,4 million

03. Jambi Tanjung Jabung Barat District USD 2,4 million

04. Bengkulu Bengkulu City USD 2,4 million

05. Sumatera Selatan Palembang City USD 4,5 million

06. Lampung Bandar Lampung City USD 3,5 million

07. Banten Serang City USD 3,5 million

08. Jawa Barat Sukabumi City USD 2,4 million

09. Jawa Tengah Semarang City USD 4,5 million

10. Jawa Tengah Pekalongan City USD 3,5 million

11. Jawa Timur Pasuruan City USD 2,4 million

12. Kalimantan Selatan Banjarmasin City USD 2,4 million

13. Kalimantan Tengah Kapuas District USD 2,4 million

14. Kalimantan Tengah Palangkaraya City USD 2,4 million

15. Sulawesi Selatan Makasar City USD 4,5 million

16. Sulawesi Selatan Bone District USD 2,4 million

17. Sulawesi Selatan Palopo City USD 2,4 million

18. Sulawesi Tenggara Kendari City USD 2,4 million

19. Nusa Tenggara Barat Bima City USD 2,4 million

20. Maluku Ambon City USD 2,4 million

Page 40: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

32 | P a g e

Appendix 2 List of Pekalongan City Slum Area Location

NO SUB DISTRICT NEIGHBOURHOOD SLUM AREA

01. West Pekalongan 1. Pasir Kraton Kramat

2. Tirto

3. Poncol

17,96 ha

3,70 ha

4,50 ha

02. East Pekalongan 1. Klego

2. Poncol

2,89 ha

9,21 ha

03. North Pekalongan 1. Kandang Panjang

2. Panjang Baru

3. Bandengan

4. Panjang Wetan

5. Krapyak Lor

6. Pabean

7. Krapyak Kidul

8. Degayu

9. Dukuh

10. Kraton Lor

28,22 ha

40,85 ha

23,92 ha

13,92 ha

6,39 ha

27,18 ha

5,51 ha

0,17 ha

0,01 ha

3,65 ha

04. South Pekalongan 1. Banyuurip Ageng

2. Jenggot

6,78 ha

0,80 ha

Page 41: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

33 | P a g e

Appendix 3 List of Directly Affected Resident

No Name Address Status in

Family

Total

Member

of

Family

Livelihood Average

income per day

1 Anas Rt 04 Rw VI Pasirsari HH 3 Worker Rp. 50,000.00

2 Alwi Rt 04 Rw VI Pasirsari

HH 4 Worker Rp. 50,000.00

3 Kholipah Rt 04 Rw VI Pasirsari

HH 4 Worker Rp. 50,000.00

4 Rasalim Rt 04 Rw VI Pasirsari HH

6 Worker Rp. 50,000.00

5 Susilowati Rt 02 Rw V Tirto HH

2 housewife/W

orker Rp. 25,000.00

6 Duriyah Rt 02 Rw V Tirto HH

1 Worker Rp. 50,000.00

7 Daryono Rt 06 Rw VI Pasirsari HH

4 Worker Rp. 50,000.00

8 Sobirin Rt 06 Rw VI Pasirsari HH

4 Worker Rp. 50,000.00

9 Sugiono Rt 06 Rw VI Pasirsari HH

1 Worker Rp. 50,000.00

10 Nur Ruzi Rt 06 Rw VI Pasirsari HH

3 Worker Rp. 50,000.00

11 Sanawi Rt 06 Rw VI Pasirsari HH

3 Trader Rp. 50,000.00

12 Suradi Rt 04 Rw VI Pasirsari HH

2 Worker Rp. 50,000.00

13 Wagiyo Waryadi Rt 05 Rw VI Pasirsari HH

2 Trader Rp. 50,000.00

14 Karyono Rt 05 Rw VI Pasirsari HH

6 Becak Driver Rp. 30,000.00

15 Sartono Rt 05 Rw VI Pasirsari HH

6 Trader Rp. 60,000.00

16 Ahmad Rojiun Rt 05 Rw VI Pasirsari HH

6 Worker Rp. 50,000.00

17 Pariyah Rt 05 Rw VI Pasirsari HH

3 Worker Rp. 30,000.00

18 A. Safawi Rt 05 Rw VI Pasirsari HH

8 Driver Rp. 60,000.00

19 Sulami Rt 05 Rw VI Pasirsari HH

5 Worker Rp. 50,000.00

20 Durrahman Rt 04 Rw VI Pasirsari HH

5 Housewife/W

orker Rp. 25,000.00

21 Nur Slamet Rt 04 Rw VI Pasirsari HH

4 Trader Rp. 50,000.00

22 Doto Rt 04 Rw VI Pasirsari HH

6 Worker Rp. 50,000.00

23 Kambali Rt 03 Rw VI Pasirsari HH

3 Trader Rp. 25,000.00

24 Solichin Rt 03 Rw VI Pasirsari HH

3 Tailor Rp. 50,000.00

25 Halifa Rt 03 Rw VI Pasirsari HH

4 Worker Rp. 50,000.00

26 Dasmi Rt 03 Rw VI Pasirsari HH

1 Worker Rp. 50,000.00

Page 42: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

34 | P a g e

No Name Address Status in

Family

Total

Member

of

Family

Livelihood Average

income per day

27 Ahmad Junaidi Rt 03 Rw VI Pasirsari HH

3 Worker Rp. 50,000.00

28 Edi Sambara Rt 03 Rw VI Pasirsari HH

4 Trader Rp. 50,000.00

29 Suroso Rt 03 Rw VI Pasirsari HH

4 Enterpreneur Rp. 100,000.00

30 Rudi Hartono Rt 03 Rw VI Pasirsari HH

2 Trader Rp. 60,000.00

31 Abadi Pasirsari HH

6 Worker Rp. 80,000.00

32 Waryudin Jl. Randusari No. 43

Pasirsari HH

6 Worker Rp. 50,000.00

Total HH 124

Page 43: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

35 | P a g e

Appendix 4 Vulnerable Age and Poor of APs

No NameVulner

able

Female

HouseHoldOccupation Type

Income/

day (IDR)No Land

Poor

HouseHold Vulnerable

01. ANAS Worker 50.000 02. ALWI Worker 50.000 03. KHOLIFAH Worker 50.000 04. RASALIM Worker 50.000 05. SUSILOWATI HouseWife/Worker 25.000 06. DURIYAH 60 Worker 50.000 07. DARYONO Worker 50.000 08. SOBIRIN Worker 50.000 09. SUGIONO Worker 50.000 10. NUR RUZI Worker 50.000 11. SANAWI Driver 50.000 12. SURADI Worker 50.000 13. WAGIYO WARYADI 60 Trader 50.000 14. KARYONO Becak Driver 30.000 15. SARTONO Trader 60.000 16. AHMAD ROJIUN Worker 50.000 17. PARIYAH 60 Worker 30.000 18. A. SAFAWI Driver 60.000 19. SULAMI Trader 50.000 20. DURRAHMAN Worker 25.000 21. ABADI Trader 50.000 22. NUR SLAMET Trader 50.000

23. KAMBALI Trader 25.000 24. SOLICHIN Tailor 50.000 25. HALIFA Worker 50.000 26. DASMI 63 Worker 50.000 27. AHMAD JUNAIDI Worker 50.000 28. EDI SAMBARA 64 Trader 50.000 29. SUROSO Enterpreneur 100.000 30. RUDI HARTONO Trader 60.000

31. DOTO Private Employees 80.000 32. WARYUDIN 63 Worker 50.000

Page 44: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

36 | P a g e

Appendix 5 The Reasonable Reimbursement Value of 32 The affected Residents

Building

(IDR)

Plant

(IDR)

Utilities

(IDR)

Loss Income

(IDR)

01. ANAS 48 L HOUSE 20 12 Worker 14.142.600 200.000 2.300.000 16.642.600 5.000.000 (11.642.600)

02. ALWI 54 L HOUSE 15 14 Worker 15.141.700 200.000 2.300.000 17.641.700 5.000.000 (12.641.700)

03. KHOLIFAH 45 P SHOP 10 16 Worker 18.080.800 3.310.400 21.391.200 5.000.000 (16.391.200)

04. RASALIM 55 L HOUSE & SHOP 5 12 Worker 12.978.600 3.232.800 16.211.400 5.000.000 (11.211.400)

05. SUSILOWATI 45 P HOUSE 10 14 HouseWife/Worker 15.820.700 200.000 2.300.000 18.320.700 5.000.000 (13.320.700)

06. DURIYAH 60 P HOUSE 10 16 Worker 18.080.800 2.300.000 20.380.800 5.000.000 (15.380.800)

07. DARYONO 43 L HOUSE 5 14 Worker 15.141.700 2.300.000 17.441.700 5.000.000 (12.441.700)

08. SOBIRIN 46 L HOUSE & SHOP 10 12 Worker 13.560.600 400.000 2.300.000 3.232.800 19.493.400 5.000.000 (14.493.400)

09. SUGIONO 46 L HOUSE 5 12 Worker 12.978.600 12.978.600 5.000.000 (7.978.600)

10. NUR RUZI 27 M HOUSE 20 14 Worker 16.499.700 2.300.000 18.799.700 5.000.000 (13.799.700)

11. SANAWI 56 M HOUSE & SHOP 5 18 Sopir 19.467.900 2.300.000 3.349.200 25.117.100 5.000.000 (20.117.100)

12. SURADI 48 M HOUSE 20 15 Worker 17.678.250 2.300.000 19.978.250 5.000.000 (14.978.250)

13. WAGIYO WARYADI 60 M SHOP 15 12 Trader 13.560.600 3.232.800 16.793.400 5.000.000 (11.793.400)

14. KARYONO 55 M HOUSE 10 12 Becak Driver 13.560.600 2.300.000 15.860.600 5.000.000 (10.860.600)

15. SARTONO 50 M HOUSE 20 15 Trader 17.678.250 2.300.000 3.891.000 23.869.250 5.000.000 (18.869.250)

16. AHMAD ROJIUN 50 M HOUSE 20 16 Worker 18.856.800 2.300.000 21.156.800 5.000.000 (16.156.800)

17. PARIYAH 60 F HOUSE & SHOP 17 18 Worker 20.340.900 400.000 2.300.000 2.149.200 25.190.100 5.000.000 (20.190.100)

18. A. SAFAWI 47 M HOUSE 20 12 Driver 14.142.600 2.300.000 16.442.600 5.000.000 (11.442.600)

19. SULAMI 55 F HOUSE & SHOP 6 16 Pedagang 17.304.800 2.300.000 3.310.400 22.915.200 5.000.000 (17.915.200)

20. DURRAHMAN 47 M HOUSE 20 12 Worker 14.142.600 2.300.000 16.442.600 5.000.000 (11.442.600)

21. ABADI 60 M HOUSE & SHOP 25 16 Trader 18.856.800 2.300.000 3.310.400 24.467.200 5.000.000 (19.467.200)

22. NUR SLAMET 55 M SHOP 20 20 Pedagang 23.571.000 3.388.000 26.959.000 5.000.000 (21.959.000)

23. KAMBALI 54 M HOUSE & SHOP 20 14 Trader 16.499.700 2.300.000 1.771.600 20.571.300 5.000.000 (15.571.300)

24. SOLICHIN 59 M HOUSE 17 16 Tailor 18.080.800 2.300.000 3.310.400 23.691.200 5.000.000 (18.691.200)

25. HALIFA 57 F HOUSE 20 15 Worker 17.678.250 2.300.000 19.978.250 5.000.000 (14.978.250)

26. DASMI 63 F HOUSE 20 18 Worker 21.213.900 2.300.000 23.513.900 5.000.000 (18.513.900)

27. AHMAD JUNAIDI 42 M HOUSE 15 15 Worker 16.950.750 2.300.000 19.250.750 5.000.000 (14.250.750)

28. EDI SAMBARA 64 M HOUSE 15 12 Trader 13.560.600 2.300.000 3.232.800 19.093.400 5.000.000 (14.093.400)

29. SUROSO 35 M HOUSE 10 14 Enterpreneur 15.820.700 2.300.000 18.120.700 5.000.000 (13.120.700)

30. RUDI HARTONO 42 M SHOP 12 16 Trader 18.080.800 3.910.400 21.991.200 5.000.000 (16.991.200)

31. DOTO 46 M HOUSE 20 20 Private Employees 23.571.000 2.300.000 25.871.000 5.000.000 (20.871.000)

32. WARYUDIN 63 M HOUSE 16 12 Worker 13.560.600 13.560.600 5.000.000 (8.560.600)

(480.136.200) T O T A L

Given

Compensation

Differences

(IDR)No Name Age Gender

Type Of

Building

Length

of Stay

(Year)

Area

(M2)

Reasonable Reimbursement Value

OccupationTotal

(IDR)

Page 45: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

37 | P a g e

Appendix 6 Plant Reasonable Reimbursement Value

Type Of

Plant Volume

Estimated

Plant

Price (IDR)

Total

(IDR)

01. ANAS Manggo 1 200.000 200.000 200.000

02. ALWI Banyan 1 200.000 200.000 200.000

03. SUSILOWATI Manggo 1 200.000 200.000 200.000

04. SOBIRIN Manggo 2 200.000 400.000 400.000

05. PARIYAH Manggo 2 200.000 400.000 400.000

1.400.000

R R V

(IDR)

T O T A L

No Name

Plant

Page 46: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

38 | P a g e

Appendix 7 Utilities Reasonable Reimbursement Value

01. ANAS Worker 12 1.500.000 800.000 2.300.00002. ALWI Worker 14 1.500.000 800.000 2.300.00003. KHOLIFAH Worker 16

04. RASALIM Worker 12

05. SUSILOWATI HouseWife/Worker 14 1.500.000 800.000 2.300.00006. DURIYAH Worker 16 1.500.000 800.000 2.300.00007. DARYONO Worker 14 1.500.000 800.000 2.300.00008. SOBIRIN Worker 12 1.500.000 800.000 2.300.00009. SUGIONO Worker 12

10. NUR RUZI Worker 14 1.500.000 800.000 2.300.00011. SANAWI Driver 18 1.500.000 800.000 2.300.00012. SURADI Worker 15 1.500.000 800.000 2.300.00013. WAGIYO WARYADI Trader 12

14. KARYONO Becak Driver 12 1.500.000 800.000 2.300.00015. SARTONO Trader 15 1.500.000 800.000 2.300.00016. AHMAD ROJIUN Worker 16 1.500.000 800.000 2.300.00017. PARIYAH Worker 18 1.500.000 800.000 2.300.00018. A. SAFAWI Driver 12 1.500.000 800.000 2.300.00019. SULAMI Trader 16 1.500.000 800.000 2.300.00020. DURRAHMAN Worker 12 1.500.000 800.000 2.300.00021. ABADI Trader 16 1.500.000 800.000 2.300.00022. NUR SLAMET Trader 20

23. KAMBALI Trader 14 1.500.000 800.000 2.300.00024. SOLICHIN Tailor 16 1.500.000 800.000 2.300.00025. HALIFA Worker 15 1.500.000 800.000 2.300.00026. DASMI Worker 18 1.500.000 800.000 2.300.00027. AHMAD JUNAIDI Worker 15 1.500.000 800.000 2.300.00028. EDI SAMBARA Trader 12 1.500.000 800.000 2.300.00029. SUROSO Enterpreneur 14 1.500.000 800.000 2.300.00030. RUDI HARTONO Trader 16

31. DOTO Private Employees 20 1.500.000 800.000 2.300.00032. WARYUDIN Worker 12

57.500.000T O T A L

TotalNo NameType of

Building

Area

(M2)PLN PDAM

Page 47: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

39 | P a g e

Appendix 8 Relocation Cost/Kerohiman

Demolition

Cost (IDR)

Moving

Costt

(IDR)

Rusunawa

Rent Cost

1 Year

Compensation

(IDR)

01. ANAS 48 L Worker 20 12 1.000.000 1.000.000 3.000.000 5.000.000

02. ALWI 54 L Worker 15 14 1.000.000 1.000.000 3.000.000 5.000.000

03. KHOLIFAH 45 P Worker 10 16 1.000.000 1.000.000 3.000.000 5.000.000

04. RASALIM 55 L Worker 5 12 1.000.000 1.000.000 3.000.000 5.000.000

05. SUSILOWATI 45 P HouseWife/Worker 10 14 1.000.000 1.000.000 3.000.000 5.000.000

06. DURIYAH 60 P Worker 10 16 1.000.000 1.000.000 3.000.000 5.000.000

07. DARYONO 43 L Worker 5 14 1.000.000 1.000.000 3.000.000 5.000.000

08. SOBIRIN 46 L Worker 10 12 1.000.000 1.000.000 3.000.000 5.000.000

09. SUGIONO 46 L Worker 5 12 1.000.000 1.000.000 3.000.000 5.000.000

10. NUR RUZI 27 L Worker 20 14 1.000.000 1.000.000 3.000.000 5.000.000

11. SANAWI 56 L Driver 5 18 1.000.000 1.000.000 3.000.000 5.000.000

12. SURADI 48 L Worker 20 15 1.000.000 1.000.000 3.000.000 5.000.000

13. WAGIYO WARYADI 60 L Trader 15 12 1.000.000 1.000.000 3.000.000 5.000.000

14. KARYONO 55 L Becak Driver 10 12 1.000.000 1.000.000 3.000.000 5.000.000

15. SARTONO 50 L Trader 20 15 1.000.000 1.000.000 3.000.000 5.000.000

16. AHMAD ROJIUN 50 L Worker 20 16 1.000.000 1.000.000 3.000.000 5.000.000

17. PARIYAH 60 P Worker 17 18 1.000.000 1.000.000 3.000.000 5.000.000

18. A. SAFAWI 47 L Driver 20 12 1.000.000 1.000.000 3.000.000 5.000.000

19. SULAMI 55 P Trader 6 16 1.000.000 1.000.000 3.000.000 5.000.000

20. DURRAHMAN 47 L Worker 20 12 1.000.000 1.000.000 3.000.000 5.000.000

21. ABADI 60 L Trader 25 16 1.000.000 1.000.000 3.000.000 5.000.000

22. NUR SLAMET 55 L Trader 20 20 1.000.000 1.000.000 3.000.000 5.000.000

23. KAMBALI 54 L Trader 20 14 1.000.000 1.000.000 3.000.000 5.000.000

24. SOLICHIN 59 L Tailor 17 16 1.000.000 1.000.000 3.000.000 5.000.000

25. HALIFA 57 P Worker 20 15 1.000.000 1.000.000 3.000.000 5.000.000

26. DASMI 63 P Worker 20 18 1.000.000 1.000.000 3.000.000 5.000.000

27. AHMAD JUNAIDI 42 L Worker 15 15 1.000.000 1.000.000 3.000.000 5.000.000

28. EDI SAMBARA 64 L Trader 15 12 1.000.000 1.000.000 3.000.000 5.000.000

29. SUROSO 35 L Enterpreneur 10 14 1.000.000 1.000.000 3.000.000 5.000.000

30. RUDI HARTONO 42 L Trader 12 16 1.000.000 1.000.000 3.000.000 5.000.000

31. DOTO 46 L Private Employees 20 20 1.000.000 1.000.000 3.000.000 5.000.000

32. WARYUDIN 63 L Worker 16 12 1.000.000 1.000.000 3.000.000 5.000.000

160.000.000 T O T A L

No Name Age GenderType of

Building

Length

of Stay

(Year)

Area

(M2)

Relocation Cost

Page 48: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

40 | P a g e

Appendix 9 The Affected Residents Asset Value

Page 49: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

41 | P a g e

Appendix 10 Project Struktur Organization

Page 50: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

42 | P a g e

Appendix 11 Existing House Condition

1. Name : RASALIM

Address : Jl. Randujajar RT. 05 RW. VI

2. Name : SULAMI

Address : Jl. Randujajar RT. 05 RW. VI

3. Name : KHOLIFAH

Address : Jl. Randujajar RT. 4 RW. VI

Page 51: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

43 | P a g e

4. Name : SARTONO

Address : Jl. Randujajar RT. 05 RW. VI

5. Name : PARIYAH

Address : Jl. Randujajar RT. 05 RW. VI

6. Name : KARYONO

Address : Jl. Randujajar RT. 05 RW. VI

Page 52: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

44 | P a g e

7. Name : A. SAFAWI

Address : Jl. Randujajar RT. 05 RW. VI

8. Name : AMAT ROJIUN

Address : Jl. Randujajar RT. 04 RW. VI

9. Name : DOTO

Address : Jl. Randujajar RT. 04 RW. VI

Page 53: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

45 | P a g e

10. Name : ANAS

Address : Jl. Randujajar RT. 04 RW. VI

11. Name : NUR SLAMET

Address : Jl. Randujajar RT. 04 RW. VI

12. Name : SURADI

Address : Jl. Randujajar RT. 04 RW. VI

Page 54: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

46 | P a g e

13. Name : DURRAHMAN

Address : Jl. Randujajar RT. 04 RW. VI

14. Name : ALWI

Address : Jl. Randujajar RT. 04 RW. VI

15. Name : ABADI

Address: Jl. Randujajar RT. 04 RW. VI

Page 55: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

47 | P a g e

16. Name : WAGIYO WARYADI

Address : Jl. Randujajar RT. 05 RW. VI

18. Name : SUSILOWATI

Address : Jl. Randujajar RT. 02 RW. V

17. Name : DURIYAH

Address : Jl. Randujajar RT. 02 RW. VI

Page 56: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

48 | P a g e

21. Name : WARYUDIN

Address : Jl. Randujajar RT. 03 RW. VI

20. Name : AHMAD JUNAIDI

Address : Jl. Randujajar RT. 03 RW. VI

19. Name : EDI SAMBARA

Address : Jl. Randujajar RT. 03 RW. VI

Page 57: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

49 | P a g e

24. Name : DASMI

Address : Jl. Randujajar RT. 03 RW. VI

23. Name : HALIFA

Address : Jl. Randujajar RT. 03 RW. VI

22. Name : SOLICHIN

Address : Jl. Randujajar RT. 03 RW. VI

Page 58: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

50 | P a g e

27. Name : KAMBALI

Address : Jl. Randujajar RT. 03 RW. VI

26. Name : SANAWI

Address : Jl. Randujajar RT. 03 RW. VI

25. Name : DARYONO

Address : Jl. Randujajar RT. 06 RW. VI

Page 59: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

51 | P a g e

30. Name : SUGIONO

Address : Jl. Randujajar RT. 06 RW. VI

29. Name : NUR RUZI

Address : Jl. Randujajar RT. 06 RW. VI

28. Name : SOBIRIN

Address : Jl. Randujajar RT. 06 RW. VI

Page 60: Neighborhood Upgrading and Shelter Project (Phase 2 ... - NUSP2 Resettlement Plan - Pekalongan City.pdf · (Musyawarah Perencanaan dan Pengembangan) and was proposed in Kelurahan

52 | P a g e

32. Name : RUDI HARTONO

Address : Jl. Randujajar RT. 03 RW. VI

31. Name : SUROSO

Address : Jl. Randujajar RT. 03 RW. VI