nbea update -

43
NBEA Update * E&A Act Overview * Unlicensed Practice * Coordinating Professional *Legislative Update

Upload: others

Post on 05-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NBEA Update -

NBEA Update* E&A Act Overview

* Unlicensed Practice* Coordinating Professional

*Legislative Update

Page 2: NBEA Update -

MELINDA PEARSON, FAIAEXECUTIVE DIRECTOR

Page 3: NBEA Update -

Vision and Mission of the Board

• Vision: Be the leader in safeguarding the life, health, property and the public welfare of the people of Nebraska with respect to the practice of architecture and engineering.

• Mission:

– Licensees are qualified

– Enforcement and education

– Quality and responsive service

Page 4: NBEA Update -

THE ENGINEERS AND ARCHITECTS REGULATION ACT

Page 5: NBEA Update -

StatutesRules and Regulations

Board PoliciesGuidelines

CommentariesWhite Papers

Page 6: NBEA Update -

THE E & A ACTHISTORY OF CHANGES

Page 7: NBEA Update -

Legislative History

• 1937 – Law passed by Legislature

• 1997 – E&A Act updated

• 1998 – Negotiated Rulemaking

• 2004 – LB 599

• 2007 – Rules and Regulations

Page 8: NBEA Update -

Negotiated Rulemaking Mandated By LB 599

• LB 599, passed on May 14, 2004– Clarifying exemptions (while specifying

that exemptions may only be increased, not decreased)

– Moving exemptions from Statute to Rules and Regulations

– NRM - A committee of 29 individuals was convened to build consensus on the main issues.

Page 9: NBEA Update -

LB599Struck Code Official language

• A public official charged with…

accepting… plans… shall not accept or

approve plans… which have not been

prepared in accordance with the E&A

Act.

Page 10: NBEA Update -

UNLICENSEDPRACTICE

Page 11: NBEA Update -

Anecdotal reports of unlicensed practice increasing

• A nurse designing an addition to a rural hospital

• A new bar/restaurant going into an existing downtown building with no licensee seals

• A community center with one licensee – the seal of an engineer on the metal building structure only

• An electrical contractor designing the work on a large multi-use development

• A new locker room for a high school with no licensee seals

Page 12: NBEA Update -

Growing Concern

• Half of all complaints related to building projects completed without licensed professionals

• Reduced communication from code officials

• Real and perceived number of licensees working in rural Nebraska

Page 13: NBEA Update -
Page 14: NBEA Update -
Page 15: NBEA Update -
Page 16: NBEA Update -

WINTER 2008/09NEWSLETTER

Page 17: NBEA Update -

NBEA Winter 2008-09 newsletter generated many comments

Page 18: NBEA Update -

Key comments from respondents

Don’t loosen the current laws!

– The law and rules are already set. The Board should increase enforcement, not loosen the rules.

– Looser requirements would only encourage more non-compliant projects This would be a move in the wrong direction.

– Code officials should be pushed to increase enforcement of current rules.

Who are Coordinating Professionals?

– Already defined in state statute

– Contractors should not be the CP

Page 19: NBEA Update -

FALL 2009NEWSLETTER

Page 20: NBEA Update -

NBEA Fall 2009 newsletter

Page 21: NBEA Update -

Coordinating Professional• Must be licensed architect or professional engineer

• The Coordinating Professional requirement is often not followed by licensees, but required by current statutes

– Most projects outside Lincoln/Omaha do NOT have a Coordinating Professional designated.

• NBEA stepping up enforcement

– Initial warning, then $100 fine, then $500 fine,then license probation

– Staff visiting code officials across the state

Page 22: NBEA Update -

Correct Use of the Seal

Page 23: NBEA Update -

Other Newsletter Items

• Board stepping up enforcement

– Initial warnings followed with increased penalties and fines

• Temporary reduction in renewal fees

• ARE increases $40 per division to $210 on Oct. 1

• Capitol Ceremony for new licensees

– Thursday, November 19 at 1:00 pm

Page 24: NBEA Update -

STRATEGIC PLANNING

Page 25: NBEA Update -

Board Committees Initiatedduring 2009 Strategic Planning

• Allied Board Committee

• Practice Committee

• Interior Designers

• Design Build / Alternative Delivery Systems

• Engineering Education

• Legislative Committee

Page 26: NBEA Update -

Legislative Committee

• Develop statute language for consideration at the 2011 legislative session.

• Consider working with Advisory Committee to get feedback on issues and concerns.

Page 27: NBEA Update -

Advisory Committee

• Goals

– Learn about partnership challenges

– Educate and update the group

– Seek understanding of common issues

• Members:

– Start with Negotiated Rulemaking Committee groups and seek out their leadership,

– Invite other groups who have shown interest, and

– Look at state organizations

Page 28: NBEA Update -

FUTURE LEGISLATION2011

Page 29: NBEA Update -

: Exemption Matrix

• The 2004 Negotiated Rulemaking committee made recommendations

• Exemptions should be based on maximizing safety of the occupants

• Exemptions will be defined by occupancy type; based on Nebraska state building code (the most current version of the International Building Code)

• People who cannot self-preserve should have the highest level of protection (or regulation)

Page 30: NBEA Update -

2011 Legislative Initiative

• Based on the recommendations of the

Negotiated Rulemaking committee and

– the NBEA’s responsibility to protect the

public,

– the NBEA proposes to reduce Exemptions

in the following occupancies.

Page 31: NBEA Update -

Commercial Structure Exemption Examples

• Assembly (A-1 thru A-5) • Proposed exemption 0 sf

• Currently less than 1,000 sf• All structures intended for the gathering of persons for

civic, social or religious functions; recreation; or food or drink consumption.

Page 32: NBEA Update -

Commercial Structure Exemption Examples

• Educational (E) Any part of a structure which can serve six or more persons, used for educational purposes or personal care services.

Proposed exemption = 0

Currently < 1,000 sf

• Portion of Business (B)

Clinic-outpatient onlyProposed exemption = 0

Currently < 3,000 sf

Page 33: NBEA Update -

Commercial Structure Exemptions Proposed

Institutional (I-1 through I-4)Institutional structures include those in which people are caredfor or live in a supervised environment, or in which people aredetained or restricted.

Personal Care (I-1) Structures housing > 16 persons on a 24 hour basisProposed exemption = 0Currently < 3,000 sf

Inpatient Healthcare (I-2) Structures for inpatient medical care for > 5 personsProposed exemption = 0Currently < 5,000 sf

Detention (I-3) Structures housing > 5 who are under restraintProposed exemption = 0Currently < 3,000 sf

Day Care (I-4) Structures for persons of any age who receive custodial care for < 24 hoursProposed exemption = 0Currently < 2,000 sf

Page 34: NBEA Update -

Commercial Structure Exemptions Proposed

High-Hazard (H-1 through H-5)Manufacturing, processing, generation or storage of materials posing a physical or health hazard.

Detonation hazard (H-1) Proposed exemption = 0Currently < 2,000 sf

Explosion or accelerated burning hazard (H-2) Proposed exemption = 0Currently < 2,000 sf

Combustible hazard (H-3) Proposed exemption = 0Currently < 2,000 sf

Health hazard (H-4)Proposed exemption = 0Currently < 2,000 sf

Semi-conductor hazard (H-5)Proposed exemption = 0Currently < 4,000 sf

Page 35: NBEA Update -

Crossover Practice

• Allow crossover practice

– In small buildings and

– Only in occupancies where individuals can self-preserve

Page 36: NBEA Update -

Certified Trade Professionals

• Limit Certified Trade Professional

– Master electricians

– Fire sprinkler trades

Page 37: NBEA Update -

Code Officials

Code officials are “first line of defense” and often the only eyes on proposed building projects

• Seek language that requires code officials tonotify NBEA when they suspect a violation

• Statement of support for statewide building code

• Require that all non-exempt projects be reviewed by code officials to assure compliance with codes

Page 38: NBEA Update -

Model Laws and Housekeeping

• NCARB language works well

– Direct Supervision

• NCEES language needs updated

– Experience to take PE

– Structural exam

• Clarification on Public Service Providers providing for services outside theirjurisdictions

Page 39: NBEA Update -

Engineering Education

• Masters degree or equivalent education

• Practice of engineering more complex with new building requirements

• More crucial now that engineers are involved in system design of complex structures

Page 40: NBEA Update -

Continuing Education Event• “Who’s In Charge of Your Integrated Project?”

• Thursday, October 22, Strategic Air & Space Museum near Ashland, 8:30 am – 4:30 pm, 6.5 HSW hours

• Focus on challenges of alternative delivery systems for building projects

– Ethical dilemmas and challenges of technology

– Definition of “Responsible Control”

– Ethics and internships

– The future of technology focusing on engineering

– Legal responsibilities

Page 41: NBEA Update -

TIMELINE

Page 42: NBEA Update -

Timeline for Legislative Committee

• September, 2009 Newsletter introduces Board intent to launch legislative change process

• Winter 2009-10 Legislative Committee works with E&A Advisory Committee to develop draft language

• End of 2009-10 session Legislature initiates an interim study resolution so that summer/fall study process is funded

• June-August 2010 Interim study works through summer

• September, 2010 Bill drafter creates the bill language from draft language

• October, 2010 Senator commits to introducing bill as bill sponsor

• November, 2010 New Legislators elected

• January, 2011 Senator introduces bill in first 10 days of the 90-day session

Page 43: NBEA Update -

MELINDA PEARSON, FAIAEXECUTIVE DIRECTOR

THANK YOU