Brief summary of my projectsSome of the projects I worked on during the past 3,5 years:
� Hongkong-Zhuhai-Macaobridge and tunnel link
� Ashdod Port extension
� Port MasterplanPort Said
� Design support barriers in Geumand Nakdong rivers
� Risk and safety study Panama Canal
Hongkong-Zhuhai-Macao Bridge and tunnel link (1/2)
Executed by TEC (Tunnel Engineering Consultants)
Project comprises a new connection between Hongkong(east) and Macao and Zhuhai (west), existing of a tunnel (6km), a bridge (30km), and four artificial islands (two for border control facilities and two at both ends of the tunnel)
Hongkong-Zhuhai-Macao Bridge and tunnel link (2/2)
My task was to determine the size of the armour units for the revetment of the artificial islands, particularly with respect to the expected future sea level rise.I convinced the design institute to use larger armour units than in the original design
Macao
Zhuhai
Ashdod Port extension, Israel (1/2)
Development of new container terminal, DHV lead consultant
24 M€ (including subcontractors)
>100 people world wide
All phases of work included
Some aspects:• Geotechnical consultation• Environmental Impact Assessment• Dredging• Breakwater and quay design• Numerical and physical modelling final port layout• Ship manoeuvring simulation study final port layout
Ashdod Port extension, Israel (2/2)
My tasks:
• Assistant Project manger (general management, planning, coordination, project finance)• Supervision of 3D physical modelling (took place in Wallingford, UK)
Master Plan of the Port Said East Port, Egypt
Port master planning, industrial zone planning and cargo forecast, conceptual design
My tasks:• Translating cargo forecasts into required quay length, terminal area, and crane capacity• Basin width calculations.• Reporting
Design support for barriers, Republic of Korea
Newly to be constructed barriers, part of the four major river restoration project.For this project 17 barriers are designed for which Dutch expertise was sought to consult on design, construction and maintenance issues.
My tasks were to assist during expert meetings and to organise field trips for the Koreans to Dutch, German and Scottish barriers.
Panama Canal Expansion: Safety against vessel impact
Panama Canal expansion started in 2007, finalisation in 2014. New larger locks on both sides of the channel
How to protect the locks (and thus the water in the lake/ canal) against vessel impact?
Identification of the risks and presentation of 3 possible mitigation measures:
- Operational measures
- Safety gate
- Emergency gate