multi-purpose agricultural facility

42
Multi-Purpose Agricultural Facility Council Presentation September 29, 2020 Enclosure 1

Upload: others

Post on 15-Mar-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Multi-Purpose Agricultural Facility

Council Presentation

September 29, 2020

Enclosure 1

Multi-purpose agricultural facility Final design, budget and construction update

During the presentation we will review:

• Facility vision and project purpose

• Strategic alignment

• Activities and use

• Final design and recommendation

• Construction schedule

2

BackgroundProject history

Throughout this process, Strathcona County has confirmed direction with Council and the community to ensure the facility supports community needs.

• December 2012 – Council approves feasibility study

• March – October 2013 – Resident and user group survey in conjunction with study

• January 2015 – Council directs administration to proceed with study next steps

• Summer 2016 – Local community group engagement to inform programming and early design concepts

• October 2016 – Council approves:

– a regional facility concept

– the purchase and servicing of additional land and outdoor amenities to support a “plus” model for future expansion

• September 2017 – Council selects facility location

• December 2017 – Council approves $16.1M for 2018 budget to complete design layout and servicing of purchased site, including outdoor amenities

• March 2018 – Announcement of location

• September 2019 – Council direction to:

– proceed with detailed design

– proceed with design for additional elements: serviced campground; covered outdoor arena

– Explore costs associated with kitchen facility

• December 2019 – Council approves $36M for 2020 budget to construct multi-purpose agricultural facility

• June 2020 – Council directs administration to complete economic impact report3

Agricultural Service Board

Roles and Responsibilities

• Mandate Letter as of January 1, 2020:

– Provide direction on design and programming of the Multi-Purpose Agricultural Facility

4

Advisory Committee

• Committee Purpose: provides insight and advice to the Project Working Team on the development of the MPAF

– specific to layout and design

• Was formed as a public engagement opportunity

– Listen and learn

• 13 members representing various stakeholder groups including:

– agriculture

– education and youth groups

– business

– community groups

– urban/rural perspectives

• Sept 24/2019: Committee was provided with a final look at schematic design and layout. It was understood that the layout and design was acceptable.

5

Facility vision

A destination where residents from across the County can enjoy agricultural, community and social events.

9/23/2020 6

Multi-purpose agricultural facility Project purpose

The facility and site will:

• Enable residents to be more healthy, active, vibrant, and creative through participation in community events of all kind

• Help the County become a champion for advancing diverse agricultural business

• Display our agricultural heritage

• Create a heightened sense of community throughout the County

• Be open to the general public

• Be multi-purpose in nature, meeting the needs of agricultural groups, hosting special events, and enabling other non-traditional agricultural activities to occur

7

Strategic plan

By meeting the guiding principles of this project, it will further the County’s vision to become Canada’s most liveable community.

Goal 1: Build strong communities to support the diverse needs of residents.

Goal 3: Cultivate economic diversification, within the petrochemical industry and beyond, through a business-friendly environment.

Goal 6: Provide facilities and services that are available and accessible to residents.

9/23/2020 8

Goal 1Goal 1

•Create opportunities for residents to lead healthy, active, vibrant lives

•Create unique spaces for agri-recreation

•Bring residents together to pursue their passion

Goal 3Goal 3

•Bookable event space for local business, agricultural or other

•Host events from conferences to livestock sales

Goal 6Goal 6

•Numerous available, accessible, and affordable spaces

•Provide quality amenities to encourage the interaction of community, recreation, and business uses

Multi-purpose agricultural facility Economic impact assessment

The facility will inspire a viable agriculture industry and economic development

• $33 million to local economy and 290 jobs over first five years of operation

• Revenues generated through medium and large regional events attracting visitors throughout Alberta

• Projected usage of 90 per cent (indoors) and 51 per cent (outdoors) by fifth year

9

Strategic alignment

Recreation Strategy [2019]

• provide opportunities for residents who

currently cannot pursue their passion locally

• will create space for all residents to discover and explore new opportunities

– through open space activities

– attractive, affordable amenities

• meets the needs for identified required amenities:

– trails

– campground

– day-use space

9/23/2020 10

Strategic alignment

Tourism Strategy [2020]

• The multi-purpose agricultural facility will assist in enhancing the tourism experience in Strathcona County, generating community economic benefit and acting as a Market Ready Tourism Product

o nature-based offerings

o authentic agritourism activities

o immersive cultural experiences

o engaging events

o sport tourism

• It will assist in furthering focus areas:

o destination development

o product development

o marketing and promotional development

9/23/2020 11

Strategic alignment

Agriculture Master Plan [2015]

• “The multi-purpose agricultural facility could serve as a central facility capable of service to a wide range of interests”

Social Framework [2017]

• This facility will support the vision of the social framework

o Together we create a supported, safe and connected community

o Supports the outcomes of:

affordability

access to programs and services

Other

• Regional Agricultural Master Plan [in development, EMRB]

• Municipal Development Plan [2016]

• Beaver Hills Tourism Opportunity Assessment [2013]

• Trails Strategy [2012]

• Recreation Master Plan- Josephburg [2012]

• Recreation Master Plan – Ardrossan [2009]

• Open Space and Recreation Facility Strategy [2008]

9/23/2020 12

ACTIVITIES AND USE

9/23/2020 13

9/23/2020 14

Animal housing

Main indoor arena

Open space

Covered outdoor arena

Camping area

Multi-purpose field

Video

9/23/2020 15

Bremner Heritage Site

16

17

Final design

Final designCovered outdoor arena: specs

18

• Community arena

• Supports the most local community uses

• Extends event season

• Not something we have in our community currently

• Barrel racing, 4H workshops, rodeo activities

o Pre-engineered

o Spectator seating (200)

o 38,500 sq ft

o Ring size is same as indoor arena

Final designCovered outdoor arena: design concerns raised

Concern raised:

• Current location too far from indoor arena

• Large events will want everything closer together for better event management and clear sight of animals

Principle:

• Facility designed with multiple components and vision of multi-purpose

• Location allows for multiple events to be hosted on the site at one time

• Moving location to beside indoor arena decreases opportunities for multiple events hosted at same time

• An additional outdoor covered arena is intended in future phasing.

Options:

a) Add additional outdoor covered arena for $4.5M + design and admin fees.

b) Alter the principles to reduce ability for multiple events at one time; and move the outdoor covered arena to the parking area west of the indoor arena. Potential for delay due to redesign.

19

Outdoor covered arena

Indoor arena

Final designIndoor arena

20From parking lot to lobby

Final designMain indoor arena

21Walking to lobby

Final designIndoor arena – lobby

Indoor arena

22

• Open, welcoming bright space

• Lighting designed to not distract animals

Concession

Customer service

Final designIndoor arena – view to main entrance

23

Final designIndoor arena – dog show

24

Final designIndoor arena – cattle show

25

Final designIndoor arena - banquet

26

Final designMain indoor arena - considerations

Concrete, weight-rated floor for multi-purpose use:

• trade shows

• RV shows

• farm equipment shows

• conferences

• indoor sports (can hold 7 basketball courts)

Concrete is most easy to sanitize

27

Final designIndoor arena - considerations

28

• Ceiling height (55’) = roof in Festival Place or the tower at fire halls

• Community and operational needs for high indoor clearance = large structural supports (steel and

concrete)

• Increasing volumes and costs for steel for roof systems

Final designMain indoor arena - considerations

29

• Will be the County’s largest conference space

• Allows for increased scope of events (including some at provincial level)

263’ x 132’ = 34,716 sq ft

• 6 Ardrossan banquet halls

• 7 Moyer banquet halls

With bleachers removed = 75,000 sq ft• Shell and Sherwood

Park Arena, back to back

• Both indoor Millennium Place fields

x7

Final designIndoor arena and animal housing

• Indoor arena 132’x263’

• Warm-up arena 132’ x 100’

• 80,000 sqft

• Pre-engineered structure

• Sized to support provincial event

• Spectator seating (1,200)

• Concrete floor

• Lobby

• Concession

• Site offices

• Washrooms

• Meeting rooms

• Catering room

• Judges lounge

30

Bookable for small community events

Animal housingIndoor arena

31

Final designAnimal loading and unloading area

Back of indoor arena

Animal housing

32

Flexible, convenient, and multipurpose

• Show offices and competitor prep area

• Heated

• Removable stalls: allows small trade fair

• Concrete building and floor

o most functional

o easy to sanitize

• Handwash stations at every door –

sanitation / bio-security

• Permanent wash racks

• Easy access to:

o washrooms (as close as possible to

outdoor arena)

o electrical (supports all types of shows)

o water

Final designAnimal housing

Final designAnimal housing – trade show

33

Final designAnimal housing – design concerns raised

34

Additional animal housing

Concern raised: Not enough stalls when facility opens

Principle:

• Facility designed to meet regional needs with potential of attracting large shows

• Designed so additional barn could be added

• Current needs could be met with tent structure for temporary stalling

Option: build additional animal housing for $8.5M + design and admin fees.

Access / egress from animal housing

Concern raised: Loading and unloading animals from only

one side of the building is unsafe and inefficient

Principle:

• Facility designed with safety and biosecurity in mind

• Intended to separate animals from public and animal handlers

• Doors on all sides for use in an emergency. These doors could

be used as access, dependent on the event booking.

Final designOutdoor area - close to facilities

35

Bleachers

Animal loading and handling zone

Campus style activity and programming space

Doors can be opened for indoor to outdoor activity

Outdoor uncovered arena

Final designServicing a rural site

• Multi-purpose

• Future growth to a provincial scale facility

• Environmentally responsible, sustainable and minimal operational impact while meeting the needs of users

36

Focus on servicing to meet community needs and vision:

• Water service

• Sanitary

• Fire protection

• Stormwater management

• Traffic impact assessment requires roadway upgrades

• On-site roads and parking

• Technology infrastructure

Additional cost summary

37

Budget category Additional Cost

Design and engineering $800,000

Construction

Site & utilities $13,750,000

TIA Impacts $800,000

IT networks / A/V /WiFi $1,000,000

Security Systems $250,000

Buildings <$ 4,500,000 >

Budget short fall $12,100,000

Revised construction estimate

Budget category Budget estimate

Design and engineering $ 4,298,000

Construction

• Site $ 23,966,000

• Buildings $ 24,860,000

Project administration and F/E $ 6,331,000

Contingency $ 4,755,000

Project estimate $ 64,210,000

Approved construction funding $ 16,110,000 (2018)

$ 36,000,000 (2020)

$ 52,110,000

Shortfall $ 12,100,000

38

Current project budget

Construction budget prepared using “Class C” estimate (Sept 2019)

Approved funding

• 2017 $7 M

• 2018 $16.1M

• 2020 $36M

• Total $59.1M

Current budget estimate (Sept. 3, 2020)

• “Class B” estimate

• $12.1M increase for servicing

• Revised total: $71.2M

Class D• Conceptual design

Class C• Schematic design

Class B

• Design development (range -10% to +20%

Class A

• Pre-tender (within 5 to 10% of actual contract award price)

Estimates at different project stages

39

Recommendation

• That Council approves an amendment to the capital budget of $12.1 million to allow the multi-purpose agricultural facility be built on scope and schedule, to move forward with vision.

• Alternately, that Council directs Administration to return with options to keep the budget within approved budget, which may include adjustment of vision, phasing or removal of components.

40

Project schedule forecast

Phase Timeline Status

1. Functional program - fall/winter2 2018/19 - completed

2. Conceptual design - winter/spring 2019 - completed

3. Schematic design - summer/fall 2019 - completed

4. Design development - winter/spring 2020 - finalizing, June/July

5. Project Council direction/approval - September 29, 2020 - in progress

6. Detail design completion - fall 2020 - in progress

7. Development permit approval - spring 2021 - in progress

8. Procurement - January 2021 - prequal completed

9. Contract Award - March 2021

10. Construction - spring 2021

11. Completion - end of 2022

41

Questions?

42