12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation http://www.drillingformulas.com/mudgasseparatorpoorboydegasserplaysavitalroleinwellcontrolsituation/ 1/9 About This Blog Contact Us Privacy Policy = Menu = « Drill Bits VDO Training 17 MindBlowing Oil Drilling Rig Photos – Get Inspired For Oilfield People » Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation By DrillingFormulas.Com | October 20, 2014 10:23 am | Well Control Mud gas separator located at downstream of the choke manifold is one of the important well control equipment that you need to focus. It separates gas out of the mud after the gas comes out of hole. Gas will be vent to atmosphere via the vent line in derrick (offshore operation) or the line away from the rigs (land operation) and the mud will be returned back to the pit. In the oilfield, people have several names for the mud gas separator as “poor boy degasser” or “gas buster”. While drilling, the mud gas separator should be lined up at all times and filled with the present mud weight currently used.

Upload: dinesh

Post on 29-Jan-2016

66 views

Category:

Documents


2 download

DESCRIPTION

Mud gas separator

TRANSCRIPT

Page 1: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 1/9

About This Blog Contact Us Privacy Policy

= Menu =

« Drill Bits VDO Training 17 Mind­Blowing Oil Drilling Rig Photos – Get Inspired ForOilfield People »

Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well ControlSituation  By DrillingFormulas.Com | October 20, 2014 ­ 10:23 am | Well Control

Mud gas separator located at downstream of the choke manifold is one of the important well control equipment that

you need to focus. It separates gas out of the mud after the gas comes out of hole. Gas will be vent to atmosphere via

the vent line in derrick (offshore operation) or the line away from the rigs (land operation) and the mud will be returned

back to the pit. In the oilfield, people have several names for the mud gas separator as “poor boy degasser” or “gas

buster”. While drilling, the mud gas separator should be lined up at all times and filled with the present mud weight

currently used.

Page 2: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 2/9

The concept of this equipment is density difference between liquid and gas. When the mud coming out from the choke

manifold goes into the mud gas separator, mud will hit the baffle plates which are used to increase travelling time and

allow gas to move out of the mud. Gas which has lower density than air will move up and mud will goes down due to

gravity (see – Figure 1). Mud leg will provide hydrostatic pressure in order to prevent mud going through the separator

into the rig.

Page 3: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 3/9

Figure 1 – Mud Gas Separator Diagram

The mud gas separator is strictly used for well control only. There are some events that this equipment is utilized in a

well testing operation. Additionally, inspection for the gas buster must be performed frequently the same as other well

control equipment. People tends to forgot about this since it is just only a vertical separator tank without high pressure

specification like BOP, choke manifold, valves, etc. Erosion is one of the worst enemies to the vessel like this and it

can be seen at the points where the drilling mud impinges on the internal wall vessel.

Each mud gas separator has limitation on much it can safely handle volume of gas. If the volume of gas exceeds the

maximum limit, gas can blow through into the rig. It is very important that you must estimate gas flow rate on surface

based on pit gain and kill rate in order to see how much expected gas on surface. This will be the limitation on how

much you can circulate for well killing operation. You can estimate the volume gas on surface by using well control kill

sheet provided by several companies. You need to ensure that the vent line should be as straight as possible with a

larger ID in order to minimize back pressure while venting the gas out.

The pressure gauge should be installed on the mud gas separator and frequently calibrated. This is very important

because you will use this gauge to monitor the gas blow through situation. If the pressure in the vessel is more than

hydrostatic pressure provided by mud leg, gas will blow through the vessel. By carefully monitoring, you will be able to

react in a timely manner. If the pressure gauge shows you that pressure will be reach the limit, you should reduce

Page 4: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 4/9

current circulation rate to control volume of gas coming

into it.

There are several considerations for mud gas separator

design. You need to know the reservoir gas because if it

is a sour gas (H2S), the mud gas separator should be able

to handle this. The normal vessel will not work safely with

H2S. Even though it has a name as “poor boy gasser”, it

does not mean that it can be built in a cheaper way by

some machine shops. The vessel must be fabricated to

meet ASME specification and there must be a third party

to certify it. What’s more, the scheduled preventive

maintenance must be in place and strictly followed.

How Much Pressure Will Cause Blow Through?

This is a very important concept of blowing through while performing well control. Mud leg length is 20 ft and mud

weight is 9.5 ppg (see – Figure 2)

Page 5: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 5/9

191 1

192Shares

Figure 2 – Mud Gas Separator and Blow Through

Pressure to blow through = Hydrostatic pressure provided by mud leg

Pressure to blow through = 0.052 x 9.5 x 20 = 9.88 psi

Reference books:  Well Control Books

Share the joy

Articles You May Like:

Design Factors Relating

To Properly Design The

Right Size of

Blow Through Situation in

Mud Gas Separator (Well

Control…

Blow Out Preventer (BOP)

Equipment VDO Training

Blowout Preventers (BOP)

VDO Training

Basic Blow Out Preventer

– VDO Training

Shallow Gas Hazard in

Well Control – Sedco 700

Shallow

Bullheading Well Control

Method

Basic Understanding of

Stripping Operation Well

Control with

Page 6: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 6/9

About DrillingFormulas.ComWorking in the oil field and loving to share knowledge.View all posts by DrillingFormulas.Com →

« Drill Bits VDO Training 17 Mind­Blowing Oil Drilling Rig Photos – Get Inspired ForOilfield People »

Tagged Mud Gas Separator, Poor Boy Degasser, Well Control. Bookmark the permalink.

2 Responses to Mud Gas Separator (Poor Boy Degasser) Plays A VitalRole in Well Control Situation

Auwdi May 23, 2015 at 1:38 pm

Hai,

I am confused, if you get 9.88 psi, it means it’s lower than atm pressure, right? Then how can the fluid

flows out from MGS?

And, what is the relation between MGS working pressure and the pressure calculated from mud leg?

bcause the MGS recommended working pressure is 150 psi while from mud leg is only 10 psi.

Thanks

Reply

DrillingFormulas.Com May 23, 2015 at 9:15 pm

Auwdi,

9.88 psi is psig. It is equal to 24.58 psia (9.88 + 14.7). The vessel rating can be high due to material

design but the hydrostatic column from mud leg is the limitation on how much pressure a MGS can

handle.

Regards,

Shyne

Reply

Default Comments (2) Facebook Comments ()

Name *

Email *

Your email address will not be published. Required fields are marked *

Leave a reply

Page 7: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 7/9

Custom Search

Categories

Select Category

Get Drilling Formulas Sheet For Free

Search on Drillingformulas.com

  Search

Oil Field Resume

Website

Comment

Post Comment

Subscribe to Get Free Calculation Sheet

email address

Click Here

Page 8: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 8/9

Drillingformulas.com on Facebook

OilfieldPix.com

Follow Me on Twitter Click Here

Page 9: Mud Gas Separator (Poor Boy Degasser) Plays a Vital Role in Well Control Situation

12/8/2015 Mud Gas Separator (Poor Boy Degasser) Plays A Vital Role in Well Control Situation

http://www.drillingformulas.com/mud­gas­separator­poor­boy­degasser­plays­a­vital­role­in­well­control­situation/ 9/9

Recent Comments

Darrell on Top Drive Collision Drill Pipe and Pipe Handling System– It just happens in few seconds.

Chinedu on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel

Imran Aslam on How To Free Stuck Pipe (Oilfield)

Jairo Molero on Basic Understanding of Hydraulic Fracturing

DrillingFormulas.Com on Margin of Overpull in Drillstring

Drilling Formulas and Drilling Calculations | Powered by Mantra & WordPress.