ms project 2007(basic)
DESCRIPTION
slides for ms-projects 2007 basicsTRANSCRIPT
1
MS Project 2007
Presented By – Dinesh
2
Agenda
Project Management Concepts Introduction to MS Project 2007 Working with Tasks Lab Exercise 1 Task Types & Task Constraints Working with Resources Lab Exercise 2
3
Project Management Concept What is a Project ?
Series of steps that are performed to achieve a unique and specific goal with given constraints
Triple Constraints Scope Cost Time
4
Project Management Concept Cont.
Project Management Life Cycle Initiation
Develop Business case Create Project Charter Identify Project Team Kick off presentation
Planning Project Scheduling / Resource allocation Scope / Cost / Quality / Risk / Communication / Procurement
Management Acceptance Plan
Execution Perform what is planned
Closing Perform Closure Review Closure
5
Project Management Concept Cont.
What about monitoring and Control ?It’s an umbrella activity across all phases
What is Project Management? Application of knowledge , skill, tools &
techniques to accomplish tasks to meet the objective set for the project
6
Introduction to MS Project 2007 Launching Project
Open a new project Open a template
Setup Project Information Start Date End Date Calendar Time Scale
Setup Options Setup Project Calendar
Setup Working hours Setup Holidays
7
Introduction to MS Project 2007
Navigation Task area Chart area
Views Gantt Network Calendar
Project Guide Pane To guide you throughout
Importing Data Import from Outlook tasks Import from Excel ( Simple copy and paste)
8
Working with Tasks Task Entry
Task WBS
WorkThe total effort required to complete a task
Task DurationThe total span of working time or elapsed time required to complete a task
Duration abbreviations M = Minutes H = Hours D = Days W = Weeks Mon = Months E = Elapsed ( EM, EH,ED etc)
Summary Task
9
Working with Tasks
MilestoneEnd of a phase or completion of important stage. Normally Milestone task should have zero duration
Linking Task Predecessors
Finish to Start (FS default) Start to Finish (SF) Start to Start (SS) Finish to Finish (FF rarely used)
10
Working with Tasks
Lag Time Delay between two tasks that are linked by a dependency
Lead Time Overlap between two tasks that are linked by a dependency
Critical PathIt’s a task or sequence of dependent task that takes maximum time to complete operation
11
Working with Tasks
Documenting Task Notes , comments or additional information about the task
Split Task It is used when you want to interrupt a task for a period and would like to resume at a later date.
12
Lab Exercise 1 Create Blank Project and save as MyProject Setup Calendar
Enter 25th Dec’09 , 26th Jan’10 and 15th Aug’10 as holiday Setup Project Information
Set Project Start Date as 15th Jan’10 Create Task
Create 5 tasks and one Milestone Create one summary task for task 1,2 &3 Create one summary task for task 4&5 Create One final summary at top Link first 3 tasks Create milestone after 3rd task Link 4 & 5th task Add Lag Time & Lead Time Save Project as MyProject
13
Task Constraints
Task Constraints As late as possible As soon as possible Finish no earlier than Finish no later than Must finish on Must start on Start no earlier than Start no later than
Task Deadlines
14
Working with Resources Resource
Resources are the people, equipment and supplies used to complete tasks in a project
Local Resources Enterprise Resources Dummy Resources Resource Type
Work Material Cost
15
Working with Resources
Resource Rate Documenting Resource Resource Calendar Assign Resource
16
Task Types Fixed units
Tasks where the resources are a fixed value & changes to the amount of work or the duration do not affect the resources
Fixed workTasks where the amount of work is a fixed value & changes to the duration or the number of resources do not affect the work.
Fixed duration (recommended)Tasks where the duration is a fixed value & changes to the work or the resources don't affect the duration.
Effort Driven The duration of a task shortens or lengthens as resources are added or removed from a task while the effort (work) remains the same.
17
Lab Exercise 2
Create Resource Sheet Create work task Create material task
Change calendar of a resource Assign Resource to tasks Check Project cost Set Task type and make the change in date,
work, duration, resource and observe the behavior
Set Deadline and make changes in the date, check the behavior
18
Q & A