mps learning management system...

28
ADDENDUM #1 FINAL – 2018.0111 Issued via email 11 January 2018 All changes to the original RFP document appear in green Request for Proposal (RFP) for Building Design Services RFP: 18-11 Minneapolis Public Schools - Special School District No. 1 1250 West Broadway Ave Minneapolis, Minnesota 55413-2398 Issued: Monday, 13 March 2017

Upload: others

Post on 14-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

ADDENDUM #1 FINAL – 2018.0111

Issued via email 11 January 2018 All changes to the original RFP document appear in green

Request for Proposal (RFP) for Building Design Services

RFP: 18-11 Minneapolis Public Schools - Special School District No. 1

1250 West Broadway Ave

Minneapolis, Minnesota 55413-2398 Issued: Monday, 13 March 2017

Page 2: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 2 of 28

TABLE OF CONTENTS

I. Overview Page II. Scope of Services Page

A Project Objective 3 1.0 RFP Background and Context 8

B Schedule of Proposal 3 2.0 Project Identification 8

C Submission of Written Questions 3 3.0 Project Intent 8

D Changes to the RFP and RFP Website 3 4.0 Project Scope 8

E Preparation of Proposals 4 5.0 Project Schedule 8

F Submission of Proposals 5 6.0 Project Construction Budget 8

G Withdrawal of Proposals 5 7.0 Consultant’s Basic Services 8

H Pre-Proposal Meeting 5 8.0 Consultant’s Additional Services 8

I Evaluation and Selection Process 6 9.0 Consultant’s Fee 9

J Interviews 6 10.0 Sustainability 9

K Contract Negotiations 6 11.0 Community Engagement 9

L Form of Contract 7

M Effective Period of Proposals 7

N Statement of Qualifications 7

O Proposal Reservations 7

III. Attachments Page

Att.1 RFP Cover Page and Declaration 14

Att.2 Respondent’s Team Qualifications 15

Att.2.1 Critical Team Member Experience 16

Att.2.2 Additional Team Member(s) 18

Att.3 Project Data Sheet 19

Att.4 Project Work Plan 20

Att.5 Project Schedule 21

Att.6 Project Fee 22

Att.6.1 Hourly Rates

Att.7 Sustainability

Att.8 Community Engagement

Att.9 Targeted Business Development 23

Att.9.1 Targeted Business Questionnaire 25

Att.10 General Business Information

Att.11 Contract Deliverables Completion

Att.12 Additional Services

Page 3: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 3 of 28

SECTION I: OVERVIEW

A. Project Objective The Board of Education (“BOE”) of Special School District No. 1 – Minneapolis Public Schools (the “District”, “Owner”, or “MPS”), through its Capital Planning and Construction Management (“CPCM”) group, invites proposals from qualified firms (“Respondent” or “Consultant”) to provide Building Design Services (“Services”) for one or more projects in the recently approved MPS FY18 Capital Plan. The District intends to select multiple Consultants to provide the Services required by the FY18 Capital Plan. Due to the number of projects in the FY18 Capital Plan, these projects will be initiated in three project groups, as reflected in the schedule below. The project group for each project will be identified in the Project Memo. PROJECT MEMO: Your firm is invited to submit proposals for the project(s) described in the relevant Project Memo(s). Project Memos will be issued separately. By reference, the Project Memo(s) is/are hereby made part of this RFP. PROJECT UPDATES: RFP 18-11 update – 2017.1229, RFP 18-11 update – 2018.0109 and RFP 18-11 update – 2018.0110 are hereby made a part of this RFP.

B. Schedule of Proposal

Milestone Day and Dates Time

Issue RFP: Tuesday, 19 Dec 2017 NA

Issue Project Memos Thursday, 21 Dec 2017 NA

Mandatory pre-proposal meeting Monday, 8 Jan 2018 10:00 AM CST

Cutoff time to receive emailed questions: Tuesday, 9 Jan 2018 5:00 PM CST

Last posting for responses to questions: Thursday, 11 Jan 2018 5:00 PM CST

Last day for district to post additional and/or new information/addenda/other documents to the RFP website:

Thursday, 11 Jan 2018 7:00 PM CST

Project Group 1: Proposal Submittal Time: Thursday, 18 Jan 2018 2:00 PM CST

Consultants selected and notified: Wednesday, 24 Jan 2018 NA

Anticipated BOE contract approval: Tuesday, 13 Feb 2018 NA

Project Group 1: Proposal Submittal Time Thursday, 15 Feb 2018 2:00 PM CST

Consultants selected and notified: Wednesday, 28 Feb 2018 NA

Anticipated BOE contract approval: Tuesday, 14 Aug 2018 NA

Project Group 3: Proposal Submittal Time Thursday, 15 Mar 2018 2:00 PM CST

Consultants selected and notified: Wednesday, 28 Mar 2018 NA

Anticipated BOE contract approval: Tuesday, 1/8/2019 NA

C. Submission of Written Questions

All questions about the RFP shall be submitted by e-mail per Section B to: Vivian Blini at [email protected]. To be considered, the subject line of the email must read “RFP 18-11 question”. The District will post the questions and district responses to the RFP website as per Section D.

Page 4: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 4 of 28

D. Changes to the RFP and RFP Website This RFP and related documents relevant to this RFP will be available at http://facilities.mpls.k12.mn.us/rfp_18-11_building_design_services. Documents will be uploaded to this webpage incrementally up to 11 Jan 2018. It is the responsibility of the respondent to check the website and ensure it is responding to the latest RFP language, addenda, responses to respondent questions and other documents at that website. Respondents are required to document that their proposal incorporates the latest RFP information via Attachment 1: RFP Cover Page and Declaration.

E. Preparation of Proposal

The attachments to this RFP constitute the basis and structure of proposals. Proposals that conform to submittal requirements and/or forms will be deemed Responsive Proposals and will be reviewed, if they are also a Timely Proposal, as per Section F. Proposals that do not conform to submittal requirements and/or forms will be deemed Non-Responsive proposals. Review of Non-Responsive Proposals may or may not occur, at the sole discretion of the District. Each proposal shall be prepared simply and economically, avoiding the use of elaborate promotional materials beyond what is sufficient to provide a complete, accurate, and reliable presentation. Proposal quality is judged by content, not by weight. The RFP must be submitted in the sequence shown below. Each primary section of the Proposal and Appendices following the cover page should be separated with a section divider page (not included in the page count) listing the title of the RFP section that follows the divider page. Section dividers are not desired to separate secondary sections (resumes, additional project information, Gantt chart and hourly rates) from their primary sections. See Section 13 below for additional information.

PROPOSAL: Format Max. pages allowed

Cover Page and Declaration Att. 1 1

Team Qualifications Att. 2 0 (Instructions only)

Critical Team Member Experience Att. 2.1 2

Additional Team Member(s) Att. 2.2 1

Relevant Projects Att. 3 0 (Instructions only)

Project Data Sheets Att. 3.1 3

Project Work Plan Att. 4 1

Project Schedule Att. 5 1

Project Fee Att. 6 1 (per project)*

Hourly Rates Att. 6.1 1

Project Sustainability Att. 7 1

Community Engagement Att. 8 1

Targeted Business Development Att. 9 0 (Instructions only)

Targeted Business Questionnaire Att. 9.1 2

General Business Requirements Att. 10 1

Maximum Proposal length 15-17* (including cover page)

APPENDIX:

Resumes 10

Additional Project Information 2 (per project)**

Page 5: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 5 of 28

Project GANTT chart 1

Maximum Appendix length 13-17**

RFP narrative must be:

1. double-spaced, with 2. margins no less than one-inch, 3. printed on both sides of 8 ½ by 11 inch paper (whenever possible). 4. font to be Calibri 11-point (the font and size of this RFP) or similar in size and simplicity. 5. all pages shall be numbered. 6. RFP shall be bound in portrait orientation (binding on the long side). Multiple staples are

acceptable for binding as long as the proposal opens like a book.

F. Submission of Proposals Evaluation of proposals for Group 1 projects by the District’s RFP Evaluation Committee will commence Thursday, 18 Jan 2018. Proposals received at the address below no later than 2:00 PM on that date (“Submittal Time”) will be considered Timely Proposals, and will be reviewed. Proposals received after the Submittal Time will be considered Non-Timely Proposals and may or may not be reviewed. Review of Non-Timely proposals will be at the sole discretion of the District.

Similarly, Group 2 project proposal evaluation will commence Thursday, 15 Feb 2018 and Group 3 project proposal evaluation will commence Thursday, 15 Mar 2018.

Proposals are to be delivered to the north security desk of the Davis Center located at 1250 West Broadway in Minneapolis. The north security desk is adjacent to the parking lot. It’s best not to deliver to the south security desk located adjacent to West Broadway Avenue. Address proposals to:

Vivian Blini, Purchasing Manager RFP 18-11 Minneapolis Public Schools 1250 West Broadway Ave. Minneapolis, MN 55411

Submit ten (10) physical copies and one (1) electronic copy on a USB flash drive. Documents must arrive in a sealed envelope. All materials submitted in response to this RFP will become the property of the District. All information submitted is considered public and may be disclosed to third parties. This solicitation does not commit the District to pay any costs incurred in the preparation and submission of proposals or in making necessary studies for the preparation thereof, nor to procure or contract for services.

G. Withdrawal of Proposals

A proposal may be withdrawn at any time by means of a written request signed by the properly authorized representative of the Respondent. Such written request must be delivered to Vivian Blini at [email protected]. This written request can be either electronic or a hard copy format.

H. Mandatory Pre-Proposal Meeting

Page 6: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 6 of 28

A pre-proposal meeting has been scheduled as noted in Section B. Attendance at this pre-proposal meeting is mandatory for Consultants that are interested in responding to this RFP. The District will not accept Proposals from Respondents that are not listed on the pre-proposal meeting sign-in sheet.

I. Evaluation and Selection Process

The RFP Evaluation Committee members will include personnel named by the Capital Planning and Construction Management (“CPCM”) Manager – David Richards. The RFP Evaluation Committee shall evaluate all proposals to determine which, at the sole discretion of the committee, best meet project and district needs. This evaluation may be augmented by verbal or written requests for clarification, or additional information as necessary to determine whether the scope of services can be met. The Committee may contact references supplied in the proposals. Proposals will be scored to reflect areas of interest as described in the scoring metric below. In order to be considered responsive, each Respondent must complete and submit all required Attachments without any modifications to the RFP Documents. Submission of a Proposal indicates the Respondent's acceptance of the evaluation criteria.

Attachment Description Max Points

1 RFP Cover Page and Declaration 3

2.1 Critical Team Member Experience 12

2.2 Additional Team Member(s) Experience 8

3 Project Data Sheet(s) 15

4 Project Work Plan 15

5 Project Schedule 10

6 Project Fee 15

6.1 Hourly rates 3

7 Project Sustainability 5

8 Community Engagement 5

9.1 Targeted Business Questionnaire 8

10 General Business Information 1

TOTAL POSSIBLE POINTS 100

J. Interviews are not anticipated for these projects K. Contract Negotiations

Upon acceptance of a proposal, the selected Consultant and the District will proceed with contract negotiations. The District has no liability to any Respondent participating in this RFP process prior to when the authorized District signer signs a contract with that Respondent. Negotiations may include all aspects of services and fees. This RFP and the proposal, or any part thereof, may be incorporated into and made a part of the final contract(s). If a contract with a selected Respondent is not finalized within 30 days, the District reserves the right to open negotiations with the next ranked Respondent.

Page 7: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 7 of 28

The successful Respondent shall not assign, transfer, convey, or otherwise dispose of the contract, or right, title of interest, or power to execute such a contract to any person, firm, or corporation without the previous consent in writing by the District.

L. Form of Contract

Form of contract: The draft “Contract for Consulting Services – 2018” is available at the RFP website. Design phases: The above contract defines “Basic Design Services” as the sum total of the following phases of design: 1) Feasibility Approval; 2) Scope Approval; 3) Final Cost Estimate Approval; 4) Quality Control Approval; and 5) Procurement. Approval of each phase is predicated on the receipt of the relevant Phase Report, which will include, but not be limited to, the minimum list of mutually agreed-upon deliverables as recorded in contract Exhibits G.2 to G.6. Deliverables: These deliverables can be condensed into two categories – design documents and contract documents, and each category includes several classes of deliverables. Contract Exhibit G.1, included as Attachment 11 summarizes the expectations for percent complete of general categories and classes of deliverables. SPECIAL ATTENTION MUST BE PAID TO THE PERCENT COMPLETE EXPECTATIONS FOR ALL PHASES OF BASIC DESIGN SERVICES. The summary of percents complete may reflect the expectations of project delivery methods other than more traditional consultant agreement formats. This is intentional, particularly the need for accelerated design outputs and early engineering involvement and deliverables. However, a contractor is not party to this agreement. Rather, construction-based input to project design is accomplished through constructability reporting that is a required deliverable. Some of these projects will be delivered via “Best Value” methodologies. For those projects, the primary responsibility for constructability reporting will reside with the chosen contractor. Consultant effort should be managed to support and enable contractor selection in early to mid Scope Approval Phase.

M. Effective Period of Proposals Proposals are expected to be effective for not be less than 150 days from the proposal date.

N. Statement of Qualifications

The District utilizes a ‘Statement of Qualifications’ submittal process to qualify professional service firms before contracting for their services, and qualification as per the SOQ process will be required for firms with whom the district contracts as a result of this RFP selection process.

O. Proposal Reservations Notwithstanding any other provisions of this RFP, the District reserves the right to award this contract to the Respondents that best meet the requirements of the RFP, and not necessarily to the lowest cost Respondent. Further, the District reserves the right to reject any or all proposals, to award in whole or part, and to waive minor, immaterial defects in proposals.

Page 8: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 8 of 28

SECTION II: SCOPE OF SERVICES 1.0 RFP Background and Context

The MPS FY18 Capital Plan was approved by the MPS BOE in June, 2017 and subsequently approved by the Minnesota Department of Education in November, 2017.

2.0 Project Identification The MPS Project Name and Project Number are included in the Project Memo for individual projects.

3.0 Project Intent Project Intent is described in the Project Memo for individual projects.

4.0 Project Scope

Project Scope is described in the Project Memo or individual projects.

5.0 Project Schedule A tentative Project Schedule is described in the Project Memo for individual projects.

6.0 Project Construction Budget The project Construction Budget is described in the Project Memo for individual projects.

7.0 Consultant’s Basic Project Services Services will include Basic Design Services and Basic Construction Services. Basic Design Services will commence upon execution of the design contract and shall be considered 100% complete when the District accepts a responsible bid that is equal to or less than the District’s construction budget. Progress documents shall reflect Basic Design Service phases as described below and reflect the percentage complete as shown in Attachment 11. Design work will be done utilizing REVIT software. Basic Construction Services for the Projects commence with District acceptance of the Consultant’s recommendation for contact award and shall be considered 100% complete when the District closes out the warranty period and project close-out phases of the contract. Basic Design Services shall include design professionals in the following disciplines (as required by the project): Architectural Design, Landscape Architecture, Structural Engineering, Civil Engineering, Electrical Engineering, Mechanical Engineering, Food Service Design, Interior Design, Low Voltage (Telecommunications/Data) Design, Constructability Analysis and Cost Estimating. All constructability reporting and cost estimating for the Project shall be prepared by a qualified, experienced, and licensed construction contractor or other cost estimator as approved by the District.

8.0 Consultant’s Additional Services Additional Services, if any, are defined in Attachment 12.

Page 9: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 9 of 28

9.0 Consultant’s Fee

The selected Consultants will perform all contracted services for a Contract Sum that shall be a fixed, lump sum fee that shall include all costs necessary to complete the work in accordance with the deliverables necessary to complete the work of the Contract, including Reimbursable Expenses for the Project and Consultant’s overhead and profit. The Consultant’s fee proposal, as called for in Attachment 6, shall include three of four separate fees: The first fee proposal is for all work necessary to complete all work included in Basic Design Services. The second fee proposal shall be for all work necessary to complete Basic Construction Services. The third fee proposal is for additional Design Services as noted in Attachment 12. No additional Construction Services are requested in this RFP. Provide a separate fee proposal for each project. Include a schedule of hourly rates effective for the duration of the contract in Attachment 6.1.

10.0 Sustainability It is unlikely the District will commit the resources necessary to obtain official, documented LEED Certification. However, sustainable design is expected by the District, and Respondents are requested to describe, as per Attachment 7, how sustainability is embedded in project design and what level of sustainability can be expected, expressed in terms of LEED levels of sustainability or other industry-accepted terms.

11.0 Community Engagement Community Engagement will be part of the design process for this project. The anticipated level of engagement is defined in the Project Memo. Respondents are to describe, as per Attachment 8, how community engagement has been deployed on previous projects.

Page 10: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 10 of 28

ATTACHMENT 1: COVER PAGE AND DECLARATION

Request for Proposal (RFP) 18-11 Building Design Services

Minneapolis Public Schools - Special School District No. 1

Submit to: 1250 West Broadway Ave – North Security Desk Minneapolis, Minnesota 55413-2398

1. Does the Respondent acknowledge it is using this Attachment as its Proposal Cover Page and that it has NOT modified or re-formatted the additional RFP Attachments?

☐ Yes ☐ No

2. Does the Respondent acknowledge it has read, understands, and agrees to ALL applicable items noted in the RFP Instructions, Requirements, and Rights Reserved by the District document?

☐ Yes ☐ No

3. Will the Respondent sign the Contract referenced in this RFP? ☐ Yes ☐ No

4. Respondent acknowledges receipt of the following total number of addenda that were issued with this RFP:

I hereby authorize the District to request from any individual or firm any information it deems necessary to verify any information provided by the Respondent in its Proposal and to determine the Respondent’s capacity and responsibility as a prospective design consultant with the District. I certify under penalty of perjury that I am a duly authorized representative of the Respondent listed below; I have carefully examined all RFP Documents and documents referenced in this RFP, I understand all instructions and requirements of the RFP; and all information, costs, and schedules submitted in response to the RFP are current, complete, true and accurate.

Respondent’s Legal Name of Firm Date of Submission

Printed Name of Respondent’s Representative Signature of Respondent’s Representative

E-mail Address Phone Number

Project(s) included in this proposal

Page 11: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 11 of 28

ATTACHMENT 2: RESPONDENT’S TEAM QUALIFICATIONS

1. Complete the following Critical Team Member Experience Form (Attachment 2.1) identifying the experience and responsibilities of the identified team members. Note the following when documenting this information:

a. Submit information for only the Project Roles specified in Attachment 2.1. Do NOT add additional roles.

b. List only ONE individual per role.

c. Attach a 1-sheet resume for EACH individual listed in Attachment 2.1 in the proposal appendix (4 max)

2. Complete the following Additional Team Member Form (Attachment 2.2) identifying the other

key Team Members / Subcontractors that will contribute to the success of the Project.

a. Attach a 1-sheet resume for EACH individual listed in Attachment 2.2 in the proposal appendix (6 max)

Page 12: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

ATTACHMENT 2.1: CRITICAL TEAM MEMBER EXPERIENCE (page 1)

Project Role Design Project Manager Design Architect

Name of Individual

E-mail Address

Individual’s Firm Name

Individual’s Firm Location

City, State City, State

Current job function within Firm

Years working within Firm

# #

Years working within Industry

# #

Number of projects completed with

other Team Members

1. Design Architect: # 2. Electrical Engineering P.M.: # 3. Mechanical Engineering P.M.: #

1. Design Project Manager: # 2. Electrical Engineering P.M.: # 3. Mechanical Engineering P.M.: #

Identify the name, cost, and completion

date for up to three comparable

completed projects. Additional

information on some or all of these

projects can be included in

Attachment 2.3

1a. Project Name 1b. Project Cost 1c. Completion Date

1a. Project Name 1b. Project Cost 1c. Completion Date

2a. Project Name 2b. Project Cost 2c. Completion Date

2a. Project Name 2b. Project Cost 2c. Completion Date

3a. Project Name 3b. Project Cost 3c. Completion Date

3a. Project Name 3b. Project Cost 3c. Completion Date

Briefly describe the Individual’s

Responsibilities for this Project

Percent of time anticipated on this

project #% #%

Page 13: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 2 of 28

ATTACHMENT 2.1: CRITICAL TEAM MEMBER EXPERIENCE (page 2)

Project Role Electrical Engineering Project

Manager Mechanical Engineering Project

Manager

Name of Individual

E-mail Address

Individual’s Firm Name

Individual’s Firm Location

City, State City, State

Current job function within Firm

Years working within Firm

# #

Years working within Industry

# #

Number of projects completed with

other Team Members

1. Design Project Manager: # 2. Design Architect: # 3. Mechanical Engineering P.M.: #

1. Design Project Manager: # 2. Design Architect: # 3. Electrical Engineering P.M.: #

Identify the name, cost, and completion

date for up to three comparable

completed projects. Additional

information on some or all of these

projects can be included in

Attachment 2.3

1a. Project Name 1b. Project Cost 1c. Completion Date

1a. Project Name 1b. Project Cost 1c. Completion Date

2a. Project Name 2b. Project Cost 2c. Completion Date

2a. Project Name 2b. Project Cost 2c. Completion Date

3a. Project Name 3b. Project Cost 3c. Completion Date

3a. Project Name 3b. Project Cost 3c. Completion Date

Briefly describe the Individual’s anticipated

responsibilities for this project

Percent of time anticipated on this

project #% #%

Page 14: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 3 of 28

ATTACHMENT 2.2: ADDITIONAL TEAM MEMBER(S)

Project Role / Subcontractor

Individual Name Firm Name Firm Location (City,

State)

Page 15: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 4 of 28

ATTACHMENT 3: RELEVANT EXPERIENCE

1. Complete and submit the following Project Data Sheet(s) (Attachment 3.1) identifying the specific project experience of the Respondent and their Critical Team Members. Note the following when documenting this information:

a. A separate Project Data Sheet must be prepared for EACH project with only one project allowed per sheet.

b. Submit no more than THREE total projects.

c. Listed project(s) must have been completed within the last FIVE years and should be similar to the District’s Project.

d. Listed project(s) must have been managed by the Respondent or any other firms on the Respondent’s team.

e. It is recommended that Respondents list projects completed by the Team Members identified in Attachment 2.1.

f. Attach any photos or additional information (two pages maximum) with each Project Data Sheet.

Page 16: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 5 of 28

ATTACHMENT 3.1: PROJECT DATA SHEET

Project Name:

Project Location: City, State

Project Owner:

Project Owner Phone:

Project Owner Contact E-mail:

Design Firm Name:

Project Architect:

Project Architect Phone:

Project Architect Contact E-mail:

Construction Cost:

Construction Start Date:

Construction End Date:

Project Size (SF):

Services Provided:

Construction Delivery Method (Bid, CMAR, Design-Build, etc.):

Proposed Team Members from Attachment 2.1 / 2.2 that worked

on this project:

Identify up to three design and/or program issues that were resolved in

this project design:

Page 17: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 6 of 28

ATTACHMENT 4: PROJECT WORK PLAN

1. Prepare and submit information pertaining to your approach/methodology as it applies to the Project’s intent, scope, schedule and budget. Identify constraints, risks, and/or issues you see affecting the Project at each phase.

2. Discuss your experience in accelerating design work as reflected in Attachment 11, particularly as it

relates to coordinating engineering design to achieve the required project deliverables.

3. A fraction of design effort will be devoted to ‘Operational Reports’. These will be defined during the proposal period, and generally reflect outcomes designed to enhance evaluation of this project design as well as generate an understanding of potential future projects. You are encouraged to discuss your experience providing design input of this type, which seeks to measure specific operational aspects of facility design as well as provide essential building data for use in future planning activities.

4. The District intends to execute at least one, and possibly as many as four projects in the FY18

Capital Plan using “Best Value” project delivery methods, as described in Minnesota Statute 16C.28. Discuss your experience with Best Value contracting (or similar methods) and describe which project(s), in your opinion, are well suited to such a project delivery approach.

Page 18: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 7 of 28

ATTACHMENT 5: PROJECT SCHEDULE

1. Provide a commentary on the project schedule included in the Project Memo. Address opportunities you may perceive to shorten the project schedule, optimize the project bidding environment, facilitate construction progress, and otherwise guarantee or enhance the date of beneficial use by the District as well as any potential scheduling risks that you may perceive.

2. Include in the appendix a suggested total project schedule in Gantt chart form (including all design and construction phases anticipated for the Project). This should be a realistic schedule that allows adequate time for District reviews/decision-making prior to approval of each design phase and notice to proceed to the next design phase. The schedule should provide a high level overview including all major milestones. Be mindful of certain issues in schedule planning:

a. Include two maintenance reviews during design, each of two weeks duration. b. Comment on your perception of this project requiring a Site Plan Review process

through Minneapolis Planning and Zoning and its potential impact on schedule.

Page 19: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 8 of 28

ATTACHMENT 6: PROJECT FEE

MPS project name:_________________________________________________ Compensation for Project Services as defined herein is a fixed fee of: $ (Basic Design Services) $ (Basic Construction Services) $ (Total Basic Services Fee) The above Basic Design Services fees will be allocated to the phases of work as shown below:

Phase of Basic Design Services:

Feasibility Approval Phase (if any) % percent

Scope Approval Phase % percent

Final Cost Estimate Approval Phase % percent

Quality Control Approval Phase % percent

Procurement Approval Phase % percent

Total Basic Design Services 100% One hundred percent

The above Basic Construction Services fees will be allocated to the phases of work as shown below:

Phase of Basic Construction Services:

Construction Administration Phase % percent

Warranty Approval Phase % percent

Project Close-out Phase % percent

Total Basic Construction Services 100% One hundred percent

Compensation for Additional Project Services (if any) is a fixed fee of: $ (Additional Design Services) $ (Additional Construction Services) $ (Total Additional Services Fee)

Page 20: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 9 of 28

ATTACHMENT 6.1: PROJECT FEE – HOURLY RATES

Provide the names and billable rate of the Consultant design team assigned the following roles. Provide additional roles and names as the project scope requires. Consultant affirms that the billable rates below will remain in effect for the duration of the project.

Job Title used in this contract: Person assigned to these roles: Hourly Rate:

Project Manager

Project Architect

Architectural Designer

Mechanical Project Manager

Mechanical Engineer

Mechanical Designer

Electrical Project Manager

Electrical Engineer

Electrical Designer

Low-Voltage Engineer/Designer

Structural Engineer

Civil Engineer

Landscape Architect

Interior Designer

Technical Assistant

Contract Administration Lead

Other

Other

Page 21: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 10 of 28

ATTACHMENT 7: PROJECT SUSTAINABILITY

1. It is unlikely the District will commit the resources necessary to obtain official, documented LEED Certification. Describe how sustainability is embedded in project design and what level of sustainability can be expected, expressed in terms of LEED levels of sustainability or other industry-accepted terms.

Page 22: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 11 of 28

ATTACHMENT 8: COMMUNITY ENGAGEMENT

1. This project will be designed in consultation with a Project Steering Committee (PSC), composed of MPS school and district staff. During the project Feasibility Approval Phase, the PSC, consultant and District staff will review materials associated with the Project Memo for re-validation. Revisions or changes to project scope, if any, will be reviewed by the District Chief Operating Officer for possible inclusion in the project.

2. During the Scope Approval Phase, the PSC will be supplemented by involvement of a site-based Project Review Committee (PRC), composed of school staff, parents and community members. During Scope Approval, revisions or changes to project scope, if any, will be reviewed by the PSC for possible inclusion in the project. If necessary, the PSC will include the District Chief Operating Officer in the review.

3. Discuss your experience with community engagement and your management of that process, particularly in light of the anticipated level of engagement described above and project communications discussed in the Project Memo.

Page 23: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 12 of 28

ATTACHMENT 9: TARGETED BUSINESS DEVELOPMENT

Definitions For the purposes of this RFP, a Targeted Business (“TGB”) firm is one which is:

51% owned and controlled by a minority, women, or person with a disability.

Minorities are defined as:

African-American persons who have origins in any of the black racial groups of Africa;

Hispanic-American persons of Spanish or Portuguese culture with origins in Mexico, South or Central America or the Caribbean Islands;

Asian-American persons having origins in the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands;

American Indians;

Alaskan Natives persons having origins in any of the original peoples of North America. Persons with disabilities are defined as:

Persons who satisfy the definition of qualified disabled persons according to The Americans Disabilities Act (P.L. 101-336)

Recognized Certifications:

US Small Business Administration;

State of Minnesota;

National or Minnesota Minority Supplier Development Council;

North Central minority Supplier Development Council (NCMSDC);

City of St. Paul Central Certification (CERT) Program;

Women’s Business Development Center-MN (WBDC-MN).

General Program Requirements

Respondent will demonstrate its commitment to achieve meaningful levels of participation with Targeted Businesses, by the percentage of work actually awarded to these businesses on this Project. A meaningful level of participation is a level that is considered reasonable for the size and type of project. The following goals and requirements apply for this Project:

Participation of Targeted Businesses equal to or greater than twelve percent (12%) of the Base Bid/Proposal costs.

Any level of participation that is not per se reasonable may be determined reasonable if the Respondent provides objective evidence that participation at the per se reasonable level is not available for the Project.

Submittal Requirements

Respondent shall submit, along with their Proposal, the following Targeted Business Questionnaire. Proposals that are not accompanied with this completed document may be deemed non-responsive. The awarded Respondent must submit the following information during the project:

Page 24: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 13 of 28

1. (Accompanying invoices) Copies of invoices verifying any supply or material purchases and/or

services provided from TGBs; 2. (Accompanying Insurance Certificate) Copies of all subcontract agreements issued with TGBs;

The awarded Respondent will be required to submit the following affidavits to the as a condition of the final payment after all work has been performed on the Project:

1. TGB Total Payment Affidavit (Document 00660); 2. TGB Verification of Completed Work Affidavit (Document 00661).

Workforce Utilization

Preventing Discrimination in Employment:

A Respondent demonstrates its commitment to prevent discrimination by its permanent employment of minorities, women, and disabled persons.

A Respondent demonstrates its commitment to prevent discrimination by its Equal Employment Opportunity / Affirmative Action Policy Statement.

A Respondent demonstrates its commitment to prevent discrimination by an approval or Certification by the State of Minnesota or by a Minnesota municipality (Minneapolis, St. Paul, Duluth, etc.) of its Affirmative Action Plan.

Page 25: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 14 of 28

ATTACHMENT 9.1: TARGETED BUSINESS QUESTIONNAIRE

Respondent’s Name:

Mailing Address:

Contact Name:

Phone Number:

E-mail Address:

Each Respondent shall answer the following questions and include completed document with their Proposal. Failure to complete may result in disqualification. Responses to the following questions will be scored in accordance with the following Targeted Business Questionnaire Scoring Guidelines, below. Professional Services Targeted Business Information One of the District's values is equity and diversity for employees, suppliers, and the products and services that are purchased. We support organizations who support and exhibit equity and diversity in many different areas. This initiative focuses on businesses certifiably owned and operated by women, minorities, or persons with disabilities. The scope of this project should reach into communities represented by the Targeted Business Program (TGB) and provide sustainable economic opportunities for protected classes. The District’s goal is a minimum of 12% Targeted Business participation. During the performance of this contract respondent is encouraged to support the District's values of equity and diversity for employees, suppliers, and the products that are purchased by:

1.) Utilizing certified Women, Minority, Disabled Business Enterprise (WMDBE) firms to supply goods and/or services.

2.) Support District values designed to mentor and/or build capacity of businesses owned by women, minorities and persons with disabilities.

Select one or more of the following two options

Option #1 (25 Available Points) 1. Value of TGB Subcontract will equal approximately $__________ or ___ % of the total value of this

contract. Describe expected scope of work to be completed by the Targeted Business partner.

_________________________________________________________________________________

Option #2 (25 Available Points) 2. Respondent will actively mentor a Targeted Business during the course of this contract. Describe

proposed outcomes.

The Respondent must have a minimum score of 25 or more points to successfully demonstrate commitment to the District’s Targeted Business Program.

Total Score ___________________ (Maximum of 50)

Page 26: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 15 of 28

ATTACHMENT 10: GENERAL BUSINESS REQUIREMENTS

A. Billing and Payment 1. Does your organization have automated invoicing and payment processes?

a. If no, state below if your organization is willing to transition to these methods for Minneapolis Public School invoicing.

2. What alternative payment and billing methods do you support (i.e., ACH and credit card)? 3. MPS pays its organizations on a net 30-day term. Is this acceptable?

a. If not, what are your standard payment terms? 4. Does your organization offer a discount if Minneapolis Public Schools pays in Net 20, Net

10? a. If yes, please list rebate or price discount.

5. To manage our Vendor Master profile in our procurement system, we prefer to remit payments to one central location only. If you have several offices, can we remit to one central location?

a. If no, provide an explanation as to why this is not possible. 6. Verify that your organization is able to accept a Purchase Order as a pdf attached to an

email.

D. Summary 1. The District’s key objective is to get the best overall value, taking into account quality, cost,

service, diversity, community involvement, sustainability and other relevant factors, for the services we intend to acquire. Because one of our objectives is to reduce our total cost of doing business, we ask you to summarize how you will help us accomplish this objective without compromising the overall value we receive from you.

Page 27: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 16 of 28

ATTACHMENT 11 – CONTRACT DELIVERABLES COMPLETION

The documents checked (“x” or ‘‘”) below represent some, but not necessarily all, of the deliverables required to complete this phase of work. Many deliverables noted below represent one document in different stages of development. Each Phase Report is expected to be thorough and complete for its phase, and fully explain the project at that point in time, recognizing that the deliverable in its final form represents 100% complete. As such, the documents below constitute the minimum acceptable deliverables.

Feasibility Approval

Phase

Scope Approval

Phase

Final Cost

Estimate Approval

Phase

Quality Control

Approval Phase

Procurement Approval

Phase

Const. Admin. Phase

Warranty Approval

Phase

Project Close-

out Approval

Approver PDM PDM PDM CC CC CC CC CC

DESIGN DOCUMENTS 30% 100%

Budget reports 20% 80% 100%

Communications reports 20% 90% 100%

Constructability reports 20% 95% 100%

Design reports 30% 95% 100%

Existing conditions reports 50% 100%

Operational reports 10% 80% 90% 100%

Phasing & sequencing reports 30% 90% 95% 100%

Regulatory reports 30% 100%

Schedule reports 30% 80% 95% 100%

Phase reports 30% 90% 95% 100%

CONTRACT DOCUMENTS

Drawings 10% 90% 99% 100%

General 10% 90% 99% 100%

Architectural 10% 90% 99% 100%

Civil 10% 90% 99% 100%

Landscape 10% 90% 99% 100%

Structural 10% 90% 99% 100%

Mechanical 10% 90% 99% 100%

Electrical 10% 90% 99% 100%

Conformed drawings 100%

Specification 5% 90% 99% 100%

Project Manual 5% 90% 95% 100%

Page 28: MPS Learning Management System RFP13-03facilities.mpls.k12.mn.us/uploads/rfp_18-11...Vivian.blini@mpls.k12.mn.us. To be considered, the subject line of the email must read ^RFP 18-11

Page 17 of 28

ATTACHMENT 12 – ADDITIONAL SERVICES

The services checked (“x” or ‘‘”) below are either: 1) included in the scope of work for Basic Design Services; 2) Included in the scope of work for potential additional services; or 3) Not included and not anticipated to be necessary or done by others.

Service Provided by

12.1 Space programming Not included

12.2 Measured drawings of existing conditions Not included

12.3.1 Educational adequacy assessment Not included

12.3.2 Facility condition assessment Not included

12.3.3 Site assessment Not included

12.4 LEED® certification Not included

12.5 Preliminary designs (in excess of three unique solutions) Not included

12.6 Historic preservation Not included

12.7 Furniture, Fixtures & Equipment (FF&E) design Not included

12.8 Building information modeling LOD 300 (min) Basic Design Services

12.9 Value analysis Basic Design Services

12.10 Security assessment Not included

12.11 Phase reports Basic Design Services

12.11.1 Space program report Basic Design Services

12.11.2 Existing condition reports Basic Design Services

12.11.3 Design reports Basic Design Services

12.11.3.1 Preliminary designs (floorplan(s), siteplan) Basic Design Services

12.11.3.2 Preliminary designs (elevations/sections) Basic Design Services

12.11.3.3 Preliminary designs (massing) Basic Design Services

12.11.4 Schedule reports Basic Design Services

12.11.5 Phasing & sequencing reports Basic Design Services

12.11.6 Regulatory reports Basic Design Services

12.11.7 Constructability reports Basic Design Services

12.11.8 Construction cost reports Basic Design Services

12.11.9 Communications reports Basic Design Services

12.11.10 Operational reports Additional services

12.11.10.1 Security index report Additional services

12.11.10.2 Space inventory report Additional services

12.11.10.3 Finishes inventory report Additional services

12.11.10.4 Maintenance schedules report Additional services

12.11.10.5 Site index report Additional services

12.11.10.6 Mechanical/Electrical access report Additional services

12.12 Conformed construction documents Basic Design Services

12.13 Commissioning Not included

12.14 As-constructed record documents Not included

12.15 On-site representation Not included

12.16 Post-occupancy evaluation Not included