Roof Penetrations 1 Large roof mounted system University of Wisconsin 2 COLLECTOR POSITIONING 3 Collector Positioning 4 Roof Mounting 5 6 7 8 9 COLLECTOR PLACEMENT WIND LOAD RESISTANCE – AWAY FROM RIDGES – PARALLEL TO ROOF PLANE – MAY REQUIRE SPECIFIC PE EVALUATION – INTERMITTENT WIND LOADS OF 130 MPH 10 WIND LOADING-COLLECTOR 11 12 Many Manufacturers Have Integrated Mounting Hardware 13

TRANSCRIPT

Page 1: Mounting

1

Collector Mounting

Roof Penetrations

Page 2: Mounting

2

Large roof mounted systemUniversity of Wisconsin

Page 3: Mounting

3

COLLECTOR POSITIONING

SOUTH ORIENTATION– 30-45 DEGREE EITHER EAST OR WEST OF DUE

SOUTH SATISFACTORYLATITUDE – +15 FOR WINTER– - 15 FOR SUMMER

ROOF AESTHETICSPIPE RUN BETWEEN COLLECTOR AND TANK– 100 FEET MAXIMUM

PROPER DRAINAGE FOR COLLECTOR AND LINES

Page 4: Mounting

4

Collector Positioning

South Orientation– 30-45 Degree Either East Or West Of Due South

SatisfactoryTilt of Collector is Typically Latitude – +15 For Winter– - 15 For Summer

Roof Aesthetics is important to the customerPipe Run Between Collector And Tank– 100 Feet Maximum (as a rule, could be longer)

Proper Drainage For Collector And Lines for Direct and Drain Back Systems

Page 5: Mounting

5

Roof Mounting

Rack Mounting– Pre-built Structural Frame– Not Common

Standoff Mounting– Standoffs Separate Collector From Roof– Allow Leaves, Water, Etc To Pass Between Collector

And Roof– Allows For Mounting The Collector At Various Slopes– Most Common Method Used

Page 6: Mounting

6

Page 7: Mounting

7

Page 8: Mounting

8

Page 9: Mounting

9

Page 10: Mounting

10

WIND LOADING

WIND LOAD RESISTANCE– INTERMITTENT WIND LOADS OF 130 MPH

COLLECTOR PLACEMENT– AWAY FROM RIDGES– PARALLEL TO ROOF PLANE

COLLECTOR ANCHORS AND FASTENERS WIND LOAD– MAY REQUIRE SPECIFIC PE EVALUATION

Page 11: Mounting

11

WIND LOADING-COLLECTOR

BACK SIDE WINDS - WANT TO PULL COLLECTOR UPFRONT SIDE WINDS - WANT TO PUSH COLLECTOR INTO GROUND (DOWN)COLLECTOR AND STRUCTURAL MOUNTING HAVE TO WITHSTAND ALL THIS FORCE

Page 12: Mounting

12

Page 13: Mounting

13

Many Manufacturers Have Integrated Mounting Hardware

Page 14: Mounting
Page 15: Mounting

15

Wind Loading

Dead Load: Structural-weight Of PanelLive Load: Walking On PanelWind Load: Check Wind Load Maps For Various Geographical AreasSnow Load: Snow Weight

Page 16: Mounting

16

Wind Loading

Building Code Calculations– Velocity Pressure (From Wind Map And Ground Height)

X– Force Co-efficient (Tilt Of Array To Roof) X– Use Factor (How Hazardous In The Event Of Failure)

All of these issues are to be your guide and will be used by a structural engineer to determine the mounting method used on a building.

Page 17: Mounting

17

Page 18: Mounting

18

Page 19: Mounting

19

Roof Penetration

Critical Part Of InstallationSolar And Roofing Industry Standards Are AppliedDiffering Methods– Flat Versus Pitched Roof– Truss Attachment

Flat Roof– Pitch Pans/epdm Boots

Page 20: Mounting

20

Bracket Mounting

Spanner Mounting– SPANNERS or STRUT/ANGLE STEEL– Must Have Access To Attic Or Crawl Space– Spanner Acts As Anchor For Threaded Rod– Can Loosen Up In Time

J-bolt Mounting– Grip Truss– Can Access From Roof / Attic Is Better

Lag-bolt Mounting– Best Method When Done Correctly– Have To Lag Into Truss Not Just Sheathing

Page 21: Mounting

21

Page 22: Mounting

22

Page 23: Mounting

23

Page 24: Mounting

24

Page 25: Mounting

Roof Rails

Page 26: Mounting
Page 27: Mounting

27

Roof Rails

Page 28: Mounting

28

Page 29: Mounting

Heritage Middle School

Raleigh, NC

Page 30: Mounting

30

Millbrook Elementary SchoolRaleigh, NC

Page 31: Mounting

31

Metal RoofsStanding seam “S-5 Clips”

Match the manufacturers roof model profile

Page 32: Mounting

32

S-5 Clip attached to standing seam

Page 33: Mounting

33

Ground Mounting

Applicable when collector can not be mounted on roof – Shade, etc.

Footers must be used to provide stabilityGap between bottom of collector and groundIdeal for THERMOSIPHON systems

Page 34: Mounting

34

Curb design is calculated for the load

Page 35: Mounting

35

390 Pounds of Weight Per Vertical Rail

Page 36: Mounting

36

Page 37: Mounting

37

Page 38: Mounting

38

Page 39: Mounting

39

Page 40: Mounting

40

Roof Curbs

Page 41: Mounting

41

Curbs and Rack

Page 42: Mounting

42

Page 43: Mounting

43

Roof Curbs

Page 44: Mounting

44

Roof Curbs

Cleaned to the Membrane

Page 45: Mounting

45

Page 46: Mounting

46

Roof Curbs

Page 47: Mounting

47

Spanneracross the

metal truss system

Page 48: Mounting

48

Strut and All Thread

Page 49: Mounting

49

Page 50: Mounting

64 Collector ArrayNew York City

Mixed Use Building

Commercial

Page 51: Mounting

51

Page 52: Mounting

52

Page 53: Mounting

53

Refurbished – (3) 6,000-Gallon – 100 Collector Solar Water Heating SystemsUSMC Camp Lejeune, NC

Rack

Page 54: Mounting

54

Page 55: Mounting

55

Manufactured Mounting System

Page 56: Mounting

Designed to less than 1-5 psf

Page 57: Mounting

57

Page 58: Mounting

58

Page 59: Mounting

59

Crash #3 Chicago O’Hare

Page 60: Mounting

60

Page 61: Mounting

61

Page 62: Mounting

62

Roof Curbs

Cleaned to the Membrane

Page 63: Mounting

63

Page 64: Mounting

64

Page 65: Mounting

65

Page 66: Mounting

66

Page 67: Mounting

67

Page 68: Mounting

68

Crash #3 Chicago O’Hare

Page 69: Mounting

69

End