M M O O N N T T H H L L Y Y P P R R O O G G R R E E S S S S R R E E P P O O R R T T Through March 2012 Current Strong Schools Bond Capital Improvement Projects Prepared by O’Connor Construction Management, Inc. & Gilbane Building Company

Upload: others

Post on 15-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

MMOONNTTHHLLYY  PPRROOGGRREESSSS  RREEPPOORRTT   

Through 

March 2012   

Current Strong Schools Bond Capital Improvement Projects 

Prepared by  

 O’Connor Construction Management, Inc. 

& Gilbane Building Company 

Page 2: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 2  

TABLE OF CONTENTS  

Executive Summary                  page 3   Attachment 1 – Consolidated Expenditure Report                

Capital Projects   

Gunn High School – New Classroom Buildings A & B          page 6  

Gunn High School – Phase I ‐ Parking and Drop‐off Sitework Improvement    page 7  

Gunn High School – New Gymnasium             page 8  

Palo Alto High School – Athletic Stadium Improvements        page 9  

Palo Alto High School – Project Classroom Building and Media Arts      page 10  

Palo Alto High School – Performing Arts Center          page 11  

Jordan Middle School                page 12  

J.L. Stanford Middle School              page 13  

Terman Middle School                page 14      

Fairmeadow Elementary School              page 15  

Duveneck Elementary School              page 16  

Technology                   page 17  

Completed Capital Projects  

Palo Alto High School – Haymarket and Tower Building Boiler Replacement    page 18  

Ohlone Elementary School               page 19  

Property Acquisition – 525 San Antonio Rd             page 20  

Jordan Middle School – Interim Classrooms            page 21  

Gunn High School – Air Conditioning of Existing Buildings        page 22  

J.L. Stanford Middle School – Interim Classrooms          page 23  

Fairmeadow Elementary School – Portable Relocation        page 24  

Elementary Classroom Improvements – Interactive Whiteboard & Sound Assist System  page 25  

Palo Alto High School – Multi‐use Field            page 26  

Gunn High School – Industrial Arts Renovation          page 27  

Gunn High School – Aquatic Center             page 28  

Middle School Pre‐Design                page 29  

Inactive Capital Projects  

Garland Elementary School              page 30  

Elementary School Teaching Walls – Phase 1 Schools          page 32  

High School Master Plan                page 33  

Hoover Elementary School               page 34  

Elementary Classroom Improvements – Phase 1 Schools Barron Park and El Carmelo  page 35  

Appendix Exhibit A – Bond Project List 

Page 3: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 3  

EXECUTIVE SUMMARY  Gunn High School – New Classroom Buildings A & B BRCO Constructors continued installation of underground utilities and poured concrete slab on grade at building A.  At building B, utility installation continued, and structural steel deliveries to the site began the last week of March 2012.  Steel erection is anticipated to begin in early April 2012.  Gunn High School – Parking and Drop‐off Sitework Improvement‐Phase I Design for the Miranda Ave. parking and drop‐off portion of this project will commence in April 2012.  Preliminary plans were presented to the City School Traffic and Safety Committee on March 15, 2012  for  initial  input.  DLM commenced planning and will meet with the staff for preliminary design review in April, 2012.  Gunn High School – New Gymnasium Structural  steel was delivered  to  the  site  and  S.J. Amoroso  commenced  steel erection  the  first week of March 2012.   By  the  end of March  2012, most of  the  steel  that makes  up  the main  gymnasium was  in  place.    Steel erection and fastening will continue through April 2012. 

 Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building floor slab and installed the footings for the entry tower and trellis. The masonry  contractor mobilized  on‐site  and  commenced  work  on  installation  of  the  concrete  block  walls.  Structural steel trellis columns arrived and installation is anticipated to be finished in April 2012.  Palo Alto High School – Classroom Building and Media Arts Building TCC completed the work on the foundation system. TCC continued to work on utility installation, including the new fire sprinkler supply to the media arts building.  Structural steel fabrication continued off site and is anticipated to be delivered the first week of April 2012.  Palo Alto High School – Performing Arts Center (PAC) On March 7, 2012, Deems Lewis McKinley (DLM) met with the PAC subcommittee and the theater consultants to review  theater equipment requirements.  DLM conducted a site verification meeting with PAUSD staff and their civil  engineer  and  landscape  consultants.    The  subcommittee  finalized  the  program  requirements  and  DLM completed a design progress set on March 30, 2012 to submit for district review.   Jordan Middle School S.J. Amoroso  commenced work on  the  foundation  systems  for  the new  classroom building  and  the  cafetorium addition.    Interior  renovation  of  building  L  progressed  to where wall  framing will  be  completed  in April  2012. Mechanical, electrical, and plumbing rough‐in will start in early April 2012.  J.L. Stanford Middle School Additional constructability and coordination of bid documents were  incorporated prior  to bidding  the project  in April 2012.  Construction estimates  indicate the project  is over budget approximately $550K.   Bids will be due  in May 2012.  Terman Middle School Hagensen  Pacific  commenced work  on  the  foundation  systems  for  the  new  drama  classroom  and  the  library expansion.   Hagensen also continued work on site utility  installation. At the new administration building,  interior improvements are underway with fire sprinkler installation, overhead mechanical duct installation, and framing of walls.   

Page 4: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 4  

Fairmeadow Elementary School – New Classroom Building and Modernization Best Contracting Services  (BCS) completed the excavation  for the  foundation of the new classroom building and library addition.   BCS commenced  investigation for underground site utility coordination and  installation of rebar for building footings.      Duveneck Elementary School – New Classroom Buildings and Modernization Gelfand submitted construction documents to DSA on February 27, 2012.  Gelfand continues work to complete the construction documents and  incorporate constructability comments.   To make way  for construction of  the new classroom buildings, seven portable classrooms will be relocated this summer.  Design continued for the relocation of seven portable classrooms for DSA approval and bidding in April 2012.  Technology Implementation  of  the  district‐wide  Voice‐over‐IP  (VoIP)  telephone  system  has  commenced  and will  continue throughout the 2011‐12 school year.  Also, bidding will occur in March/April 2012 to replace the district’s wireless network.  BOE award is anticipated on May 8, 2012.  COMPLETED CAPITAL PROJECTS   Palo Alto High School – Haymarket and Tower Building Boiler Replacement Environmental Services Inc. (ESI) initiated project closeout.  Staff continues to work on other improvements within the Tower building to improve the heating distribution and controls systems. 525 San Antonio Road – Site Acquisition The advisory committee has recommended to the BOE on January 31, 2012 to lease the property on a short‐term basis to one or more tenants.   Ohlone Elementary School – New Classroom Building and Modernization Move‐in to the new building and other existing classrooms occurred during winter break.  Students occupied the new building on January 3, 2012.    Jordan Middle School ‐ Interim Classrooms The portables have been installed, and were cleaned and moved into on September 30, 2011. All documents were submitted to DSA for closeout November 2, 2011.   Gunn High School – Air Conditioning of Existing Buildings Best Contracting Services Inc. completed the installation of air conditioning units and the cool roof coating on most of Gunn’s existing buildings.  J.L. Stanford Middle School ‐ Interim Classrooms Coulter Construction completed the work on the relocated portables in August.    Fairmeadow Elementary School – Portable Relocation The work on the relocated portable was complete on August 8, 2011.   All documents were submitted to DSA for closeout October 11, 2011.    Elementary Classroom Improvements – Installation of Interactive Whiteboards and Sound Assist Systems Installation  of  SmartBoards  and  Lightspeed  sound  assist  systems  were  completed  for  all  elementary  school classrooms and libraries in April 2011.    Palo Alto High School – Multi‐use Field The fields were available for play on February 1, 2011, and final change order negotiations completed on March 9, 2011.  

Page 5: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 5  

Gunn High School – Industrial Arts Addition & Renovation This facility was available for instruction in January 2010. DSA closeout received on July 18, 2011.  Gunn High School – Aquatic Center  This facility was available for use in July 2009, and has been closed out with DSA.  Middle Schools Pre‐Design – Jordan, J.L. Stanford and Terman AEDIS  presented  recommended  concept  plans  for  each  campus  to  the  Board  of  Education  for  approval  on September 8, which became the program documents for the new projects at each campus.  These projects for pre‐design work have been closed, and funds were transferred to the program contingency on June 14, 2011.  INACTIVE CAPITAL PROJECTS   Garland Elementary School Renovation The Board of Education has put new development  for Garland on hold until a growth plan  is established  for the elementary schools.  The board voted to terminate the lease with Stratford School in June 2011. Discussions with the Board on  future plans  for growth at  the elementary  schools will  resume during a  February 28, 2012  study session.  Elementary School Teaching Walls – Phase 1 Schools The district placed this project on hold after review of the  implementation of other classroom  improvements, as recommended  by  the  elementary  school  principals.    This  project  was  renamed  ‘Elementary  Classroom Improvements’ (see Capital Projects summary below).   High School Master Plan The Board of Education  (BOE) approved  the master plans  for both high  schools, and  these projects have been closed, with funds transferred to the respective campus reserve funds.  Hoover Elementary School – Pre‐Design This project has been put on hold until a growth plan is established for the elementary schools.    Elementary Classroom Improvements – Phase 1 Schools Barron Park and El Carmelo The project has been placed on hold pending further discussions with the BOE about elementary growth planning.     

Board Actions in March March 13, 2012 Consent 6 – Authorization  to  Issue Addendum No. 14  to Gelfand Partners Architects  for Additional  Services  at Ohlone School  Consent 7 – Authorization  to Bid Modular Classroom Projects at Duveneck Elementary School and Fairmeadow Elementary School  Action 12 – Approval of Tower Building and Haymarket Theater Upgrade and Repairs  March 27, 2012 Consent 10 – Approval of Strong Schools Bond Change Orders   

Page 6: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A B C C / A B - C C / B A - B

Gunn High School - High School Master Plan 142,389 136,008 117,415 82.5% 18,593 86.33% 6,381Gunn High School 1 - Aquatic Center 4,865,423 4,862,530 4,862,530 99.9% 0 100.00% 2,893Gunn High School 2 - I.A Building 5,082,403 5,049,558 5,048,789 99.3% 769 99.98% 32,845Gunn High School 3 - AD2- close out 5,777 5,777 5,777 100.0% 0 100.00% 0

Gunn High School 4 - New classroom Buildings 25,035,200 23,874,293 6,673,561 26.7% 17,200,732 27.95% 1,160,907Gunn High School 5 - Parking & Drop Off improvements 3,940,000 321,841 103,212 2.6% 218,629 32.07% 3,618,159Gunn High School 6- New/Auxiliary Gymnasium 12,914,800 11,048,548 3,876,809 30.0% 7,171,739 35.09% 1,866,252Gunn High School 7- A/C 2,600,000 2,293,922 2,102,554 80.9% 191,368 91.66% 306,078Gunn High School - Reserved 21,525,081 0 0 0.0% 0 0.00% 21,525,081Palo Alto High Schools - High School Master Plan 142,998 137,758 131,381 91.9% 6,377 95.37% 5,240Palo Alto High School 1 - Stadium Field 4,940,000 4,521,370 1,199,437 24.3% 3,321,933 26.53% 418,630Palo Alto High School 2 - Multi-Use Field (Multi-Fund) 2,609,680 2,609,680 2,609,680 100.0% 0 100.00% 0Palo Alto high School 3 - New classroom & Media Art Building 37,140,000 33,716,387 10,082,168 27.1% 23,634,219 29.90% 3,423,613Palo Alto High School 4 - New Theater 24,395,049 1,586,241 248,302 1.0% 1,337,939 15.65% 22,808,808Palo Alto High School 5 - Haymarket and Tower Admin. Building 800,000 449,321 339,847 42.5% 109,474 75.64% 350,679Palo Alto High School - Reserved 28,765,818 0 0 0.0% 0 0.00% 28,765,818Jordan Middle School -Program Management- MS Pre-Design 18,890 18,890 17,826 94.4% 1,064 94.37% 0Jordan Middle Schools 1- Interim Classrooms 600,342 466,263 430,638 71.7% 35,625 92.36% 134,079Jordan Middle School 2- Improvements 19,891,564 18,493,586 1,791,529 9.0% 16,702,057 9.69% 1,397,978J.L.S Middle School - Program Management- MS Pre-Design 18,799 18,799 18,408 97.9% 391 97.92% 0J L S Middl S h l 1 I t i Cl 446 844 397 608 372 881 83 4% 24 727 93 78% 49 236

BudgetSchool Name - Project NamePercent of

Budget Expended

Palo Alto Unified School DistrictStrong Schools Bond

3/31/2012

Percent of Expended

Contract BalanceExpenditures Budget BalanceCommitted

J.L.S Middle School 1 - Interim Classrooms 446,844 397,608 372,881 83.4% 24,727 93.78% 49,236 J.L.S Middle School 2- Improvements 17,184,699 3,346,412 2,156,470 12.5% 1,189,942 64.44% 13,838,287Terman Middle School - Program Management- MS Pre-Design 18,799 18,799 18,423 98.0% 376 98.00% 0Terman Middle School 1- Improvements 13,312,971 12,554,400 2,134,186 16.0% 10,420,214 17.00% 758,571PAUSD Elementary Schools - Program Management- Elem. Growth Plan 145,000 98,480 85,070 58.7% 13,410 86.38% 46,520Addison Elementary School 1-Phase I 21,267 21,267 21,267 100.0% 0 100.00% 0Duveneck Elementary School 1-Phase I 11,088,759 1,542,021 447,356 4.0% 1,094,665 29.01% 9,546,738Garland Elementary School 1- Phase I 22,178,544 281,279 280,113 1.3% 1,166 99.59% 21,897,265Fairmeadow Elementary School 1- Phase I 9,543,750 8,962,691 1,062,415 11.1% 7,900,276 11.85% 581,059Hoover Elementary School 1-Phase I 70,550 70,550 57,165 81.0% 13,385 81.03% 0Ohlone Elementary School 1- Phase I 11,667,965 10,766,033 9,564,174 82.0% 1,201,859 88.84% 901,932 Elementary Schools 1 - Elementary Classroom Improvements * 2,004,889 1,914,741 1,863,782 93.0% 50,959 97.34% 90,148Elementary Schools - Reserved 33,457,555 0 0 0.0% 0 0.00% 33,457,555PAUSD - Program Management 6,652,006 5,122,386 4,484,784 67.4% 637,602 87.55% 1,529,620PAUSD - Technology 8,238,257 6,435,924 6,095,039 74.0% 340,885 94.70% 1,802,333PAUSD - Technology -Reserved 5,669,108 0 0 0.0% 0 0.00% 5,669,108PAUSD - Reserved 5,759,069 0 0 0.0% 0 0.00% 5,759,069525 San Antonio -Property Acquisition 8,500,000 8,500,000 8,500,000 100.0% 0 100.00% 0Bond Issuance Cost 1,840,700 1,840,700 1,840,700 100.0% 0 100.00% 0Total 353,234,945 171,484,062 78,643,687 92,840,375 181,750,883

Prepared by: Business Services Department based on QSS accounting System

Page 7: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 6  

Gunn High School  

New Classroom Buildings A & B  A. PROJECT STATUS 

 BRCO Constructors continued  installation of underground utilities and poured  concrete  slab  on  grade  at  building  A.    At  building  B,  utility installation continued, and structural steel deliveries to the site began the  last week of March 2012.   Steel erection  is anticipated to begin  in early April 2012.             

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 3.1, 3.3, 3.4  D. PROJECT OVERVIEW: 

• This project is proceeding on schedule and is within budget.  

Funding State Funds  $0 Strong Schools Bond Funds  $25,035,200 Other Funding  $0 Total  $25,035,200  Budget Salaries and Benefits  $13,253 Supplies  $0 Contracts & Services  $4,462,881 Construction & Equipment  $20,482,302 Soft Costs Contingency  $76,764 Total  $25,035,200  Percent of Budget Expended  26.7%  Change Order Contingency • Starting Contingency Balance  $ 1,763,200 • Remaining Contingency Balance  $ 1,602,772 • Percent of Changes  9.1% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  

Conceptual Design (2)  September 8, 2009 BOE Approval  September 22, 2009  

Schematic Design (2)  January 12, 2010 BOE Approval  January 26, 2010  

Submit to DSA  August 4, 2010    Authorize to Bid (2)  March 8, 2011 BOE Approval  March 22, 2011  

Approval by DSA  May 27, 2011  

Bid Opening  July 13, 2011  

Award of Contract (1)  July 22, 2011  

Notice to Proceed  August 24, 2011  

Substantial Completion  March 23, 2013*  

Planned Occupancy  August 1, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 8: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 7  

Gunn High School Phase I – Parking and Drop‐off Sitework Improvement  A. PROJECT STATUS 

 Design  for  the Miranda Ave. parking  and drop‐off portion of  this project  will  commence  in  April  2012.    Preliminary  plans  were presented  to  the  City  School  Traffic  and  Safety  Committee  on March  15,  2012  for  initial  input.  DLM  commenced  planning  and will meet with the staff for preliminary design review in April, 2012.        

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 5.5  D. PROJECT OVERVIEW: 

• Phase I, Miranda Ave. parking and drop‐off, planning and design to commence in April, 2012. 

   

Funding State Funds  $0 Strong Schools Bond Funds  $3,940,000 Other Funding  $0 Total  $3,940,000  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $898,978 Construction & Equipment  $2,919,840 Soft Costs Contingency  $121,182 Total  $3,940,000  Percent of Budget Expended  2.6% 

Current Phase:  Conceptual Design – Phase I  

Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  

Conceptual Design (2)  N/A BOE Approval  N/A 

 Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    

Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A   

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 9: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 8  

Gunn High School  New Gymnasium   A. PROJECT STATUS 

 Structural  steel was delivered  to  the  site and S.J. Amoroso commenced steel erection the first week of March 2012.   By the end of March 2012, most of the steel that makes up the main gymnasium was in place.  Steel erection and fastening will continue through April 2012.              

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 3.4, 3.5, 3.13  D. PROJECT OVERVIEW: 

• This project is proceeding on schedule and is within budget.  

Funding State Funds  $0 Strong Schools Bond Funds  $12,914,800 Other Funding  $0 Total  $12,914,800  Budget Salaries and Benefits  $0 Supplies  $1,001 Contracts & Services  $2,677,293 Construction & Equipment  $10,158,210 Soft Costs Contingency  $78,296 Total  $12,914,800  Percent of Budget Expended  30.7%  Change Order Contingency • Starting Contingency Balance  $834,700 • Remaining Contingency Balance  $770,766 • Percent of Changes  7.7% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  

Conceptual Design (2)  September 8, 2009 BOE Approval  September 22, 2009  

Schematic Design (2)  January 12, 2010 BOE Approval  January 26, 2010  

Submit to DSA  August 4, 2010  

Authorize to Bid (2)  March 8, 2011 BOE Approval  March 22, 2011  

Approval by DSA  May 27, 2011  

Bid Opening  July 13, 2011  

Award of Contract (1)  July 20, 2011  

Notice to Proceed  August 1, 2011  

Substantial Completion  October 29, 2012*  

Planned Occupancy  January 1, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 10: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 9  

Palo Alto High School Athletic Stadium Improvements   A. PROJECT STATUS 

 Taisei  (TCC) completed  the concessions building  floor  slab and installed  the  footings  for  the  entry  tower  and  trellis.  The masonry contractor mobilized on‐site and commenced work on installation of  the  concrete block walls.   Structural  steel  trellis columns arrived and  installation  is anticipated to be finished  in April 2012.            

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 4.13  D. PROJECT OVERVIEW: 

• The project is proceeding on schedule and within budget. 

Funding State Funds  $0 Strong Schools Bond Funds  $4,940,000 Other Funding  $0 Total  $4,940,000  Budget Salaries and Benefits  $882 Supplies  $0 Contracts & Services  $829,025 Construction & Equipment  $4,071,162 Soft Costs Contingency  $38,931 Total  $4,940,000  Percent of Budget Expended  24.3%  Change Order Contingency • Starting Contingency Balance  $310,200 • Remaining Contingency Balance  $269,816 • Percent of Changes  4.3% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  January 26, 2010 BOE Approval  February 9, 2010  

Conceptual Design (2)  June 1, 2010 BOE Approval  June 22, 2010  

Schematic Design (2)  February 22, 2011 BOE Approval  March 8, 2011  

Submit to DSA  April 4, 2011  

Authorize to Bid (2)  June 28, 2011 BOE Approval  July 19, 2011  

Approval by DSA  July 26, 2011    

Bid Opening  December 1, 2011  

Award of Contract (1)  December 13, 2011  

Notice to Proceed  January 4, 2012  

Substantial Completion ‐ Concession August 15, 2012* Bleachers  March 1, 2013*  

Planned Occupancy ‐ Concessions  August 30, 2012*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 11: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 10  

Palo Alto High School Classroom Building and Media Arts   A. PROJECT STATUS  

 TCC completed the work on the foundation system. TCC continued to work on utility installation, including the new fire sprinkler supply to the media arts  building.    Structural  steel  fabrication  continued  off  site  and  is anticipated to be delivered the first week of April 2012.             

 B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 4.1 ‐ 4.3  D. PROJECT OVERVIEW: 

• This project is proceeding two months behind scheduled occupancy so occupancy is now anticipated in December 2013.  The project remains within budget. 

Funding State Funds  $0 Strong Schools Bond Funds  $37,140,000 Other Funding  $0 Total  $37,140,000  Budget Salaries and Benefits  $14,721 Supplies  $0 Contracts & Services  $7,056,446 Construction & Equipment  $29,740,000 Soft Costs Contingency  $328,833 Total  $37,140,000  Percent of Budget Expended  27.1%  Change Order Contingency • Starting Contingency Balance  $2,515,000 • Remaining Contingency Balance  $2,245,983 • Percent of Changes  10.7% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  

Conceptual Design (2)  September 8, 2009 BOE Approval  September 22, 2009  

Schematic Design (2)  January 12, 2010 BOE Approval  January 26, 2010  

Submit to DSA  August 4, 2010    

Authorize to Bid (2)  March 8, 2011 BOE Approval  March 22, 2011  

Approval by DSA  April 28, 2011  

Bid Opening  June 30, 2011  

Award of Contract (1)  July 12, 2011  

Notice to Proceed  August 4, 2011  

Substantial Completion  August 5, 2013*  

Planned Occupancy  October, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 12: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 11  

Palo Alto High School Performing Arts Center (PAC)  A. PROJECT STATUS 

 On  March  7,  2012,  Deems  Lewis  McKinley  (DLM)  met  with  the  PAC subcommittee  and  the  theater  consultants  to  review  theater  equipment requirements.  DLM conducted a site verification meeting with PAUSD staff and  their  civil  engineer  and  landscape  consultants.    The  subcommittee finalized  the program  requirements and DLM completed a design progress set on March 30, 2012 to submit for district review. 

       B. BUDGET & SCHEDULE SUMMARY 

                     

  

 C. BOND PROJECT LIST REFERENCE: 4.11 

 D. PROJECT OVERVIEW: 

• Development of design continued.  Project is proceeding on schedule and within budget.    

Funding State Funds  $0 Strong Schools Bond Funds  $24,395,049 Other Funding  $0 Total  $24,395,049  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $4,481,640 Construction & Equipment  $19,745,000 Soft Costs Contingency  $168,409 Total  $24,395,049  Percent of Budget Expended  1.0% 

Current Phase:  Design Development  

Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  

Conceptual Design (2)  June 1, 2010 BOE Approval  June 22, 2010  

Schematic Design (3)  June 14, 2011 BOE Approval  December 13, 2011 BOE Approval  January 17, 2012  

Submit to DSA  January 3, 2013*    

Approval by DSA  August 27, 2013*  

Authorize to Bid (2)  August 20, 2013* BOE Approval  September 9, 2013*  

Bid Opening  October 22, 2013*  

Award of Contract (1)  October 28, 2013*  

Notice to Proceed  November 11, 2013*  

Substantial Completion  May 13, 2015*  

Planned Occupancy  August 17, 2015*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 13: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 12  

Jordan Middle School  A. PROJECT STATUS 

 S.J. Amoroso commenced work on the foundation systems for the new  classroom  building  and  the  cafetorium  addition.    Interior renovation of building L progressed to where wall framing will be completed  in  April  2012.  Mechanical,  electrical,  and  plumbing rough‐in will start in early April 2012.           

    B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 2.1 – 2.3, 2.6 – 2.8, 2.10 – 2.12, 6.3 – 6.5  D. PROJECT OVERVIEW: 

• The project is proceeding on schedule and within budget. 

Funding State Funds  $0 Strong Schools Bond Funds  $19,891,546 Other Funding  $0 Total  $19,891,546  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $3,552,716 Construction & Equipment  $16,007,031 Soft Costs Contingency  $331,817 Total  $19,891,546  Percent of Budget Expended  9.0%  Change Order Contingency • Starting Contingency Balance  $1,389,700 • Remaining Contingency Balance  $1,389,700 • Percent of Changes  0.0% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  October 28, 2008 BOE Approval  October 30, 2008  

Conceptual Design (2)  June 23, 2009 BOE Approval  September 8, 2009  

Schematic Design (2)  March 23, 2010 BOE Approval  April 27, 2010  

Submit to DSA  December 21, 2010    

Authorize to Bid (2)  June 28, 2011 BOE Approval  July 19, 2011  

Approval by DSA  October 5, 2011  

Bid Opening  December 8, 2011  

Award of Contract (1)  December 13, 2011  

Notice to Proceed  December 27, 2011  

Substantial Completion  August 1, 2013*  

Planned Occupancy  August 26, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 14: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 13  

J.L. Stanford Middle School  A. PROJECT STATUS 

 Additional  constructability  and  coordination  of  bid documents were incorporated prior to bidding the project in April 2012.  Construction estimates  indicate the project is over budget approximately $550K.   Bids will be due  in May 2012.           

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 2.1 – 2.3, 2.5 – 2.8, 2.11 – 2.12, 6.4, 6.5  D. PROJECT OVERVIEW: 

• DSA approval received on January 24, 2012.  Anticipate project to bid in April 2012.  

 

Funding State Funds  $0 Strong Schools Bond Funds  $17,184,699 Other Funding  $0 Total  $17,184,699  Budget Salaries and Benefits  $0 Supplies  $3,458 Contracts & Services  $3,440,550 Construction & Equipment  $13,421,500 Soft Costs Contingency  $319,191 Total  $17,184,699  Percent of Budget Expended  12.5% 

Current Phase:  DSA Review 

Schedule: Architect Contract (2)  October 28, 2008 BOE Approval  October 30, 2008  

Conceptual Design (2)  June 23, 2009 BOE Approval  September 8, 2009  

Schematic Design (3)  June 1, 2010 BOE Approval  June 22, 2010 BOE Approval (Sitework)  September 28, 2010  

Submit to DSA  May 6, 2011    

Authorize to Bid (2)  November 29, 2011 BOE Approval  December 13, 2011  

Approval by DSA  January 24, 2012  

Bid Opening  May 3, 2012*  

Award of Contract (1)  May 8, 2012*  

Notice to Proceed  May 21, 2012*  

Substantial Completion  August 24, 2013*  

Planned Occupancy  January 1, 2014*  * Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings

Page 15: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 14  

Terman Middle School  A. PROJECT STATUS 

 Hagensen Pacific commenced work on the  foundation systems  for the new  drama  classroom  and  the  library  expansion.    Hagensen  also continued work  on  site  utility  installation. At  the  new  administration building,  interior  improvements  are  underway  with  fire  sprinkler installation,  overhead  mechanical  duct  installation,  and  framing  of walls.         

     B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 2.1 – 2.8, 2.11 – 2.12  D. PROJECT OVERVIEW: 

• The project proceeding on schedule and within budget. 

Funding State Funds  $0 Strong Schools Bond Funds  $13,312,971 Other Funding  $0 Total  $13,312,971  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $2,616,588 Construction & Equipment  $10,517,515 Soft Costs Contingency  $178,868 Total  $13,312,971  Percent of Budget Expended  16.0%  Change Order Contingency • Starting Contingency Balance  $929,900 • Remaining Contingency Balance  $929,900 • Percent of Changes  0.0% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  October 28, 2008 BOE Approval  October 30, 2008  

Conceptual Design (2)  June 23, 2009 BOE Approval  September 8, 2009  

Schematic Design (2)  May 11, 2010 BOE Approval  May 25, 2010  

Submit to DSA  December 21, 2010    

Authorize to Bid (2)  June 28, 2011 BOE Approval  July 19, 2011  

Approval by DSA  September 1, 2011  

Bid Opening  December 6, 2011  

Award of Contract (1)  December 13, 2011  

Notice to Proceed  December 27, 2011  

Substantial Completion  August 7, 2013*  

Planned Occupancy  September 4, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 16: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 15  

Fairmeadow Elementary School New Classroom Building and Modernization   A. PROJECT STATUS 

 Best Contracting Services  (BCS) completed the excavation  for the  foundation  of  the  new  classroom  building  and  library addition.   BCS commenced  investigation for underground site utility  coordination  and  installation  of  rebar  for  building footings.            

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1 – 1.2, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• The project is proceeding on schedule and within budget.  

Funding State Funds  $0 Strong Schools Bond Funds  $9,543,750 Other Funding  $0 Total  $9,543,750  Budget Salaries and Benefits  $0 Supplies  $3,132 Contracts & Services  $1,928,402 Construction & Equipment  $7,500,180 Soft Costs Contingency  $112,036 Total  $9,543,750  Percent of Budget Expended  11.1%  Change Order Contingency • Starting Contingency Balance  $642 ,300 • Remaining Contingency Balance  $642,300 • Percent of Changes  0.0% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Construction 

Schedule: Architect Contract (2)  October 13, 2009 BOE Approval  October 27, 2009  

Conceptual Design (2)  March 23, 2010 BOE Approval  April 6, 2010  

Schematic Design (2)  September 14, 2010 BOE Approval  September 28, 2010  

Submit to DSA  April 18, 2011    

Authorize to Bid (2)  October 11, 2011 BOE Approval  October 25, 2011  

Approval by DSA  November 14, 2011  

Bid Opening  December 5, 2011  

Award of Contract (1)  December 13, 2011  

Notice to Proceed  January 3, 2012  

Substantial Completion  August 5, 2013*  

Planned Occupancy  August 20, 2013*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 17: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 16  

Duveneck Elementary School New Classroom Buildings and Modernization  A. PROJECT STATUS 

 Gelfand submitted construction documents to DSA on February 27, 2012.  Gelfand continues work to complete the construction documents  and  incorporate  constructability  comments.    To make  way  for  construction  of  the  new  classroom  buildings, seven  portable  classrooms  will  be  relocated  this  summer.  Design  continued  for  the  relocation  of  seven  portable classrooms for DSA approval and bidding in April 2012.           

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1 – 1.2, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• Project plans submitted to DSA on February 27, 2012.  Project is on schedule and within budget. 

Funding State Funds  $0 Strong Schools Bond Funds  $11,088,759 Other Funding  $0 Total  $11,088,759  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $2,159,389 Construction & Equipment  $8,803,087 Soft Costs Contingency  $126,283 Total  $11,088,759  Percent of Budget Expended  4.0% 

Current Phase:  DSA Review  

Schedule: Architect Contract (2)  April 27, 2010 BOE Approval  May 11, 2010  

Conceptual Design (2)  December 14, 2010 BOE Approval  January 11, 2011  

Schematic Design (2)  June 14, 2011 BOE Approval  June 28, 2011  

Submit to DSA  February 27, 2012*    

Approval by DSA  October 8, 2012*  

Authorize to Bid (2)  October 28, 2012* BOE Approval  November 9, 2012*  

Bid Opening  December 22, 2012*  

Award of Contract (1)  December 27, 2012*  

Notice to Proceed  January 5, 2013*  

Substantial Completion  May 16, 2014*  

Planned Occupancy  August 1, 2014*  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 18: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 17  

Technology Improvements 

A. PROJECT STATUS   Implementation of the district‐wide Voice‐over‐IP (VoIP) telephone system has commenced and will continue throughout the 2011‐12 school year.  Also, bidding will occur in March/April 2012 to replace the district’s wireless network.  BOE award is anticipated on May 8, 2012.

      

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.5 – 1.7  D. PROJECT OVERVIEW: 

• VOIP implementation on‐going.  Bids for network upgrade will be opened in April 2012.  

Funding State Funds  $0 Strong Schools Bond Funds  $8,238,257 Other Funding  $0 Total  $8,238,257  Budget Salaries and Benefits  $0 Supplies & Computers  $7,855,662 Contracts & Services  $180,173 Construction & Equipment  $202,422 Soft Costs Contingency  $0 Total  $8,238,257  Percent of Budget Expended  74.0%  

Current Phase:  N/A 

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    

Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 19: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 18  

Palo Alto High School Boiler Replacement System  A. PROJECT STATUS  

 Environmental Services  Inc.  (ESI)  initiated project closeout and a notice of  completion  has  been  filed.  Staff  continues  to  work  on  other improvements  within  the  Tower  building  to  improve  the  heating distribution and controls systems.              

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 4.1 ‐ 4.3  D. PROJECT OVERVIEW: 

• Project completed on schedule and within budget.

Funding State Funds  $0 Strong Schools Bond Funds  $800,000 Other Funding  $0 Total  $800,000  Budget Salaries and Benefits  $0 Supplies  $400 Contracts & Services  $119,000 Construction & Equipment  $659,600 Soft Costs Contingency  $21,000 Total  $800,000  Percent of Budget Expended  42.5%  Change Order Contingency • Starting Contingency Balance  $39,200 • Remaining Contingency Balance  $33,930 • Percent of Changes  1.2% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Close‐out 

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  June 30, 2011    

Authorize to Bid (2)  May 10, 2011 BOE Approval  May 24, 2011  

Approval by DSA  August 24, 2011  

Bid Opening  September 28, 2011  

Award of Contract (1)  October 11, 2011  

Notice to Proceed  November 7, 2011  

Substantial Completion  January 6, 2012   

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 20: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 19  

Ohlone Elementary School New Classroom Building and Modernization  A. PROJECT STATUS  

 Move‐in to the new building and other existing classrooms occurred during winter break.  Students occupied the new building on January 3, 2012.               

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1 – 1.2, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• Occupancy occurred on January 3, 2012.  Project completed on schedule and within budget.  

Funding State Funds  $0 Strong Schools Bond Funds  $11,667,965 Other Funding  $0 Total  $11,667,965  Budget Salaries and Benefits  $7,196 Supplies  $44,253 Contracts & Services  $2,359,667 Construction & Equipment  $9,139,461 Soft Costs Contingency  $117,388 Total  $11,667,965  Percent of Budget Expended  82.0%  Change Order Contingency • Starting Contingency Balance  $748,400 • Remaining Contingency Balance  $654,714 • Percent of Changes  1.4% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Occupancy – January 3, 2012  

Schedule: Architect Contract (2)  September 30, 2008 BOE Approval  October 14, 2008  

Conceptual Design (2)  March 3, 2009 BOE Approval  March 17, 2009  

Schematic Design (2)  June 2, 2009 BOE Approval  June 23, 2009  

Submit to DSA  November 24, 2009  Authorize to Bid (2)  April 27, 2010 BOE Approval  May 11, 2010    

Approval by DSA  May 18, 2010  

Bid Opening  July 13, 2010  

Award of Contract (1)  August 3, 2010  

Notice to Proceed  August 19, 2010  

Substantial Completion  November 18, 2011  

Planned Occupancy  January 3, 2012  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 21: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 20  

Site Acquisition 525 San Antonio Rd   A. PROJECT STATUS 

 The advisory committee has recommended to the BOE on January 31, 2012 to  lease the property on a short‐term basis to one or more tenants.             

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1 – 1.2, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• BOE discussion on committee recommendation occurred on January 31, 2012. 

 

Funding State Funds  $0 Strong Schools Bond Funds  $8,500,000 Other Funding  $0 Total  $8,500,000  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $8,500,000 Construction & Equipment  $0 Soft Costs Contingency  $0 Total  $8,500,000  Percent of Budget Expended  100.0% 

Current Phase:  N/A 

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    

Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 22: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 21  

Jordan Middle Schools ‐ Interim Classrooms  A. PROJECT STATUS 

 The  portables  have  been  installed,  and were  cleaned  and  ready  for occupancy  a  week  ahead  of  schedule.    School  staff  requested additional time for packing and moved in on September 30, 2011. DSA closeout has commenced. The project is funded with both bond funds and impact fees.        

 B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 2.1, 6.4, 6.5  D. PROJECT OVERVIEW: 

• This project completed ahead of schedule and under budget. • Move in occurred on September 30, 2011. 

   

Funding State Funds  $0 Strong Schools Bond Funds  $392,120 Other Funding  $208,222 Total  $600,342  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $180,286 Construction & Equipment  $419,292 Soft Costs Contingency  $764 Total  $600,342  Percent of Budget Expended  70.4%*  *Budget previously expended   

Current Phase:  Move‐in 

Schedule: Approval by DSA  June 16, 2011  

Authorize to Bid (2)  June 14, 2011 BOE Approval  June 28, 2011  

Bid Opening  July 14, 2011  

Award of Contract (1)  July 20, 2011  

Notice to Proceed  July 27, 2011  

Substantial Completion  September 20, 2011  

Occupancy  September 30, 2011  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 23: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 22  

Gunn High School Air Conditioning of Existing Buildings  A. PROJECT STATUS 

 Best  Contracting  Services  Inc.  completed  the  installation  of  air conditioning  units  and  the  cool  roof  coating  on  most  of  Gunn’s existing buildings.           

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 3.7  D. PROJECT OVERVIEW: 

• Project in close‐out.  

Funding State Funds  $0 Strong Schools Bond Funds  $2,600,000 Other Funding  $0 Total  $2,600,000  Budget Salaries and Benefits  $1,919 Supplies  $0 Contracts & Services  $454,160 Construction & Equipment  $2,120,580 Soft Costs Contingency  $22,891 Total  $2,600,000  Percent of Budget Expended  80.9% 

Current Phase:  Close‐out 

Schedule: Architect Contract (2)  March 27, 2010 BOE Approval  April 6, 2010  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  October 20, 2010  

Approval by DSA  February 10, 2011  

Authorize to Bid (2)  February 22, 2011 BOE Approval  March 8, 2011  

Bid Opening  March 28, 2011  

Award of Contract (1)  April 8, 2011  

Notice to Proceed  April 11, 2011  

Substantial Completion  August 8, 2011   

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 24: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 23  

J.L. Stanford Middle School ‐ Interim Classrooms  A. PROJECT STATUS 

 Coulter  Construction  completed  the  work  on  the  relocated portables in August.             

 B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 2.1, 6.4, 6.5  D. PROJECT OVERVIEW: 

• Project completed on schedule and is currently in close‐out. 

  

Funding State Funds  $0 Strong Schools Bond Funds  $17,184,699 Other Funding  $0 Total  $17,184,699  Budget Salaries and Benefits  $0 Supplies  $3,458 Contracts & Services  $3,440,550 Construction & Equipment  $13,421,500 Soft Costs Contingency  $319,191 Total  $17,184,699  Percent of Budget Expended  11.4%  This portable relocation project funded by main JLS project. 

 

Current Phase:  Occupancy ‐ August 11, 2011  

Schedule: Approval by DSA  April 19, 2011 Jordan Project  June 16, 2011   

Authorize to Bid (2)  May 10, 2011 BOE Approval  May 24, 2011  

Bid Opening  June 1, 2011  

Award of Contract (1)  June 13, 2011  

Notice to Proceed  June 20, 2011  

Substantial Completion  August 8, 2011  

Planned Occupancy  August 15, 2011  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 25: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 24  

Fairmeadow Elementary School Portable Relocation Project  A. PROJECT STATUS  

 Guerra  Construction  Group  completed  the  work  on  the  relocated portable on August 8, 2011.   The JLS project  is funding the relocation of this portable for the construction of JLS’ new 2‐story classroom building.  Project in close‐out.     

       

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 6.4  D. PROJECT OVERVIEW: 

• Project completed ahead of schedule on August 8, 2011.    

Funding State Funds  $0 Strong Schools Bond Funds  $17,184,699 Other Funding  $0 Total  $17,184,699  Budget Salaries and Benefits  $0 Supplies  $3,458 Contracts & Services  $3,440,550 Construction & Equipment  $13,421,500 Soft Costs Contingency  $319,191 Total  $17,184,699  Percent of Budget Expended  11.4%  This portable relocation project funded by main JLS project. 

Current Phase:  Occupancy ‐ August 8, 2011  

Schedule: Architect Contract (2)  February 15, 2011 BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  March 3, 2011    

Approval by DSA  March 3, 2011  

Authorize to Bid (2)  May 11, 2011 BOE Approval  May 24, 2011  

Bid Opening  June 14, 2011  

Award of Contract (1)  June 14, 2011  

Notice to Proceed  June 20, 2011  

Substantial Completion  August 1, 2011  

Planned Occupancy  August 8, 2011  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 26: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 25  

Elementary Classroom Improvements Interactive Whiteboards and Sound Assist System Installation  A. PROJECT STATUS 

 Coulter  Construction  installed  SmartBoards  and  Lightspeed  sound  assist  systems,  and  completed  the installation April 29, 2011.   Phase 4 and 5  schools were  the  final elementary  schools  to  receive  interactive whiteboards and sound assist systems.     

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.5 – 1.7  D. PROJECT OVERVIEW: 

• All SmartBoards and Lightspeed sound systems installed.   

    

Funding State Funds  $0 Strong Schools Bond Funds  $2,004,889 Other Funding  $0 Total  $2,004,889  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $325,488 Construction & Equipment  $1,679,401 Soft Costs Contingency  $0 Total  $2,004,889  Percent of Budget Expended  93.0%  

Current Phase:  Complete ‐May 15, 2011  

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    

Approval by DSA  N/A  

Authorize to Bid (2)  November 9, 2010 BOE Approval  November 23, 2010  

Bid Opening  February 25, 2011  

Award of Contract (1)  March 8, 2011  

Notice to Proceed  March 9, 2011  

Completion  May 15, 2011   

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 27: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 26  

Palo Alto High School  Multi‐Use Field  A. PROJECT STATUS 

 The fields were available for play on February 1, 2011, and final change order negotiations completed on March 9, 2011.         

  

 B. BUDGET & SCHEDULE SUMMARY 

                     

   

C. BOND PROJECT LIST REFERENCE: 4.14  D. PROJECT OVERVIEW: 

• Field was open for use on February 1, 2011. 

   

Funding State Funds  $0 Strong Schools Bond Funds  $2,609,680 Other Funding  $1,007,255 Total  $3,616,935  Budget Salaries and Benefits  $0 Supplies  $1,506 Contracts & Services  $698,293 Construction & Equipment  $2,916,682 Soft Costs Contingency  $454 Total  $3,616,935   Percent of Budget Expended  100.0%  Change Order Contingency • Starting Contingency Balance  $269,300 • Remaining Contingency Balance  $230,579 • Percent of Changes  1.7% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Occupancy – February 1, 2011  

Schedule: Architect Contract (2)  September 30, 2008 BOE Approval  October 14, 2008  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  November 18, 2008 BOE Approval  December 09, 2008  

Submit to DSA  March 19, 2009    

Approval by DSA  September 30, 2009  

Authorize to Bid (2)  February 24, 2009 BOE Approval  March 17, 2009  

Bid Opening  March 16, 2010  

Award of Contract (1)  April 7, 2010  

Notice to Proceed  June 1, 2010  

Substantial Completion  January 31, 2011  

Planned Occupancy  February 1, 2011  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 28: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 27  

Gunn High School Industrial Arts Addition and Renovation  A. PROJECT STATUS 

 This facility was available for instruction  in January 2010. DSA closeout received on July 18, 2011.           

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 3.1, 3.7, 3.11  D. PROJECT OVERVIEW: 

• The building occupied as scheduled, and the project completed within budget.

Funding State Funds  $0 Strong Schools Bond Funds  $5,082,402 Other Funding  $0 Total  $5,082,402  Budget Salaries and Benefits  $1,061 Supplies  $88,985 Contracts & Services  $1,000,861 Construction & Equipment  $3,991,495 Soft Costs Contingency  $0 Total  $5,082,402  Percent of Budget Expended  99.3%  Change Order Contingency • Starting Contingency Balance  $349,000 • Remaining Contingency Balance  $141,967 • Percent of Changes  41.6% 

(Change Orders + Construction Change Directives vs. Original Contract) 

 

Current Phase:  Occupancy – January 4, 2010  

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  June 17, 2008    Approval by DSA  December 24, 2008  

Authorize to Bid (2)  October 14, 2008 BOE Approval  October 28, 2008  

Bid Opening  December 16, 2008  

Award of Contract (1)  December 24, 2008  

Notice to Proceed  January 6, 2009  

Substantial Completion  November 25, 2009  

Planned Occupancy  January 4, 2010  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 29: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 28  

Gunn High School Aquatic Center  A. PROJECT STATUS 

 This  facility was available  for use  in  July 2009, and has been closed out with DSA.       

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 3.12  D. PROJECT OVERVIEW: 

• This project completed within budget.

Funding State Funds  $0 Strong Schools Bond Funds  $4,865,423 Other Funding  $0 Total  $4,865,423  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $647,169 Construction & Equipment  $4,218,253 Soft Costs Contingency  $0 Total  $4,865,423  Percent of Budget Expended  99.9%  Change Order Contingency • Starting Contingency Balance  $389,887 • Remaining Contingency Balance  $195,148 • Percent of Changes  49.9% 

(Change Orders + Construction Change Directives vs. Original Contract) 

Current Phase:  Occupancy – June 15, 2009  

Schedule: Architect Contract (2)  N/A BOE Approval  N/A  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  December 11, 2007    Approval by DSA  April 24, 2008  

Authorize to Bid (2)  April 8, 2008 BOE Approval  April 22, 2008  

Bid Opening  May 28, 2008  

Award of Contract (1)  June 4, 2008  

Notice to Proceed  December 6, 2008  

Substantial Completion  June 15, 2009  

Planned Occupancy  June 15, 2009  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 30: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 29  

Middle School Pre‐Design Jordan, J.L. Stanford and Terman  A. PROJECT STATUS 

 AEDIS presented recommended concept plans for each campus to the Board of Education  for approval on September 8, which became  the program  documents  for  the  new  projects  at  each  campus.    These projects  for  pre‐design  work  have  been  closed,  and  funds  will  be transferred to the program contingency on June 14, 2011.        

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 2.1 – 2.12  D. PROJECT OVERVIEW: 

• This project has been completed. Board approval received on September 8, 2009.

Funding State Funds  $0 Strong Schools Bond Funds  $56,488 Other Funding  $0 Total  $56,488  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $56,488 Construction & Equipment  $0 Soft Costs Contingency  $0 Total  $56,488  Percent of Budget Expended  96.8%  

Current Phase:  Complete 

Schedule: Architect Contract (2)  October 28, 2008 BOE Approval  October 30, 2008  

Conceptual Design (2)  June 23, 2009 BOE Approval  September 8, 2009  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 31: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 30  

Garland Elementary School Campus Modernization  A. PROJECT STATUS 

 The Board of Education has put new development for Garland on hold until a growth plan is established for the elementary schools.  The board voted  to  terminate  the  lease with Stratford School  in June  2011,  so  that  future  plans  for  growth  at  the  elementary schools can begin on this campus as early as June 2014.        

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• This project has been placed on hold.

Funding State Funds  $0 Strong Schools Bond Funds  $22,178,544 Other Funding  $0 Total  $22,178,544  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $3,915,789 Construction & Equipment  $17,400,000 Soft Costs Contingency  $862,755 Total  $22,178,544  Percent of Budget Expended  1.3% 

Current Phase:  On Hold 

Schedule: Architect Contract (2)  October 28, 2008 BOE Approval  October 30, 2008  

Conceptual Design (2)  February 10, 2009 BOE Approval  February 24, 2009  

Schematic Design (2)  June 2, 2009 BOE Approval  June 23, 2009  

Submit to DSA  N/A    Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 32: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 31  

Elementary School Teaching Walls Phase 1 Schools  A. PROJECT STATUS 

 The  district  placed  this  project  on  hold  after  review  of  the implementation  of  other  classroom  improvements,  as recommended  by  the  elementary  school  principals.    This project  has  been  renamed  ‘Elementary  Classroom Improvements’ (see Capital Projects summary below).       

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.9  D. PROJECT OVERVIEW: 

• This project has been renamed ‘Elementary Classroom Improvements’ (see Capital Projects summary above). 

     

Funding State Funds  $0 Strong Schools Bond Funds  $0 Other Funding  $0 Total  $0  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $0 Construction & Equipment  $0 Soft Costs Contingency  $0 Total  $0  Percent of Budget Expended  0% 

Current Phase:  Project Renamed. See Classroom       Improvements Project  

Schedule: Architect Contract (2)  September 30, 2008 BOE Approval  October 14, 2008  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change

Page 33: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 32  

High School Master Plan Palo Alto HS and Gunn HS  A. PROJECT STATUS 

 The Board of Education (BOE) approved the master plans for both high  schools,  and  these  projects  have  been  closed,  with  funds transferred to the respective campus reserve funds.       

   

B. BUDGET & SCHEDULE SUMMARY  

                    

 C. BOND PROJECT LIST REFERENCE: 3.1 – 3.14, 4.1 – 4.14  D. PROJECT OVERVIEW: 

• Group 2 project planning at the high schools will re‐commence in fall 2011.        

Funding State Funds  $0 Strong Schools Bond Funds  $285,387 Other Funding  $0 Total  $285,387  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $285,387 Construction & Equipment  $0 Soft Costs Contingency  $0 Total  $285,387  Percent of Budget Expended  86.2% 

Current Phase:  Master Planning  Schedule: Architect Contract (2)  March 31, 2009 BOE Approval  April 14, 2009  Initial Master Plan Approval (2)  September 8, 2009 BOE Approval  September 22, 2009  Paly CEQA Approval (2)  February 9, 2010 BOE Approval  February 23, 2010  Gunn Master Plan Update (2)  March 23, 2010 BOE Approval  April 6, 2010  Gunn CEQA Approval (2)  April 27, 2010  BOE Approval  May 11, 2010   Master Plan Revision Approval (2)  September 14, 2010 Paly MP Revision Approval (2)  October 9, 2010 Gunn MP Revision Approval (2)  October 12, 2010  * Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 34: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 33  

Hoover Elementary School Pre‐Design  A. PROJECT STATUS 

 This project has been put on hold until a growth plan is established for the elementary schools.         

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.1 – 1.2, 1.4 – 1.10  D. PROJECT OVERVIEW: 

• Project is currently on hold.        

Funding State Funds  $0 Strong Schools Bond Funds  $70,550 Other Funding  $0 Total  $70,550  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $70,550 Construction & Equipment  $60 Soft Costs Contingency  $0 Total  $70,550  Percent of Budget Expended  100.0% 

Current Phase:  On Hold 

Schedule: Architect Contract (2)  April 27, 2010 BOE Approval  May 11, 2010  

Conceptual Design (2)  November 9, 2010 BOE Approval  N/A  

Schematic Design (2)  N/A BOE Approval  N/A  

Submit to DSA  N/A    

Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A 

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 35: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

Page | 34  

Elementary Classroom Improvements Phase 1 – Barron Park and El Carmelo  A. PROJECT STATUS 

 DSA  comments  were  returned  to  Gelfand  for  Phase  1  plans  that include  new  lighting,  adding  operable  windows  and  coverings, ventilation, and replacement of ceiling tiles for classrooms at Barron Park and El Carmelo elementary schools.  The authorization to bid has been placed on hold pending further discussions with the BOE about elementary growth planning.       

B. BUDGET & SCHEDULE SUMMARY  

                    

   

C. BOND PROJECT LIST REFERENCE: 1.5 – 1.7  D. PROJECT OVERVIEW: 

• This project has been placed on hold.    

 

Funding State Funds  $0 Strong Schools Bond Funds  $2,004,889 Other Funding  $0 Total  $2,004,889  Budget Salaries and Benefits  $0 Supplies  $0 Contracts & Services  $325,488 Construction & Equipment  $1,679,401 Soft Costs Contingency  $0 Total  $2,004,889  Percent of Budget Expended  93.0%  

Phase 1 Schools:  Barron Park and El Carmelo Current Phase:  On Hold  

Schedule: Architect Contract (2)  June 8, 2010 BOE Approval  June 22, 2010  

Conceptual Design (2)  N/A BOE Approval  N/A  

Schematic Design (2)  November 9, 2010 BOE Approval  December 7, 2010  

Submit to DSA  December 23, 2010    

Approval by DSA  N/A  

Authorize to Bid (2)  N/A BOE Approval  N/A  

Bid Opening  N/A  

Award of Contract (1)  N/A  

Notice to Proceed  N/A  

Substantial Completion  N/A  

Planned Occupancy  N/A  

* Anticipated Dates – Subject to Change ( ) Denotes number of Board of Education Readings 

Page 36: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

OHS WEST:260388860.1 A-1

EXHIBIT A

PALO ALTO UNIFIED SCHOOL DISTRICT BOND PROJECT LIST

[Note: The order in which projects are listed is not an indication of priority for funding or completion. Not all listed projects will be completed at every site.] 1. ELEMENTARY SCHOOL PROJECTS

Addison Barron Park Briones Duveneck El Carmelo

Escondido Fairmeadow Garland Greendell Hays

Hoover Nixon Ohlone Palo Verde

1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.

2. Replace temporary classrooms with permanent classrooms.

3. Acquire and install modular classrooms, as needed.

4. Expand libraries to accommodate enrollment growth.

5. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.

6. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.

7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.

8. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.

9. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.

10. Modernization/replacement of administration/multipurpose/library space.

Numbers Added

Page 37: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A-2 OHS WEST:260388860.1

2. MIDDLE SCHOOL PROJECTS

David Starr Jordan Jane Lathrop Stanford Terman

1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.

2. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.

3. Construct extra school-wide storage space.

4. Expand classrooms and classroom wings, library and administration spaces.

5. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.

6. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.

7. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.

8. Renovate gymnasium, including new gym floors, doors, windows, bleachers and athletic equipment; upgrade building infrastructure, including power and water distribution.

9. Renovate swimming pool and pool deck; new filtration system; new storage and restrooms; upgrade pool equipment.

10. Replace and/or improve play fields, including drainage and irrigation, install water meters; replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic equipment.

11. Repair/Replace and/or improve concrete walkways and asphalt; canopies; parking lot and driveways.

12. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.

Page 38: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A-3 OHS WEST:260388860.1

3. GUNN HIGH SCHOOL PROJECTS

1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.

2. Demolish old library building.

3. Replace temporary classrooms with permanent classrooms.

4. Construct additional restrooms.

5. Construct second gymnasium.

6. Construct new soccer field.

7. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.

8. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.

9. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.

10. Improve or provide new security systems, including alarms, lighting, locks, monitoring systems, fencing, etc.

11. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.

12. Replace swimming pool with new 35-meter pool, pool equipment and support structures, pool decking, bleachers, storage, restrooms, showers, associated equipment.

13. Renovate gymnasium; interior renovation including gymnasium floors and bleachers; replace athletic equipment.

14. Modernize football stadium, including new bathrooms and concession stands.

Page 39: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A-4 OHS WEST:260388860.1

4. PALO ALTO HIGH SCHOOL PROJECTS

1. Construct new permanent classrooms and classroom buildings to accommodate enrollment growth and expanded programs.

2. Replace temporary classrooms with permanent classrooms.

3. Construct additional restrooms.

4. Upgrade climate control systems, including passive technologies to conserve energy, such as shade canopies, energy-efficient windows, window coverings and shade control; install/replace heating, ventilation and air conditioning.

5. Install/improve local area network (LAN) and wide area network (WAN) infrastructure to accommodate technology upgrades; install/upgrade communications systems.

6. Building exterior and building shell renovation, including seismic structural upgrades and Americans with Disability Act (ADA) improvements to bring all buildings to current code; roofs; repainting and/or resurfacing.

7. Classroom and other school facilities modernization and building interior improvements, including infrastructure and major building system upgrades.

8. Library modernization and building interior improvements, including infrastructure and major building system upgrades.

9. Renovation or replacement of the Tower Building to accommodate administration, classroom and program support space.

10. Renovate Main Gymnasium and second gymnasium, including seismic upgrades; accessibility improvements; construction of new restrooms; install new roofing; replace doors and windows; replace gymnasium floors and athletic equipment, bleachers and renovation of interior. Renovation or replacement of weight training facility.

11. Construct new theater building.

12. Renovate and improve soccer field, including new retaining wall and bleachers; new fencing and storage.

13. Modernize football stadium, including replace bleachers; new bathrooms and concession stands.

14. Replace and/or improve play fields, including drainage and irrigation, install water meters; replace landscaping; re-surface and re-stripe hardcourts and replace outdoor athletic equipment.

Page 40: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A-5 OHS WEST:260388860.1

5. OTHER DISTRICT-WIDE PROJECTS

Furnishing and equipping of existing and newly constructed, modernized or rehabilitated classrooms and facilities on an ongoing basis, including to replace worn, broken, or out-of-date furniture and equipment for all classrooms, athletic facilities and other facilities, as needed.

1. Replace existing or acquire new computers, technology and related equipment on an ongoing basis.

2. Establish a planned maintenance fund to address maintenance work expected to be needed to all District facilities on an ongoing basis (other than as may be necessary for current maintenance, operation or repairs), in order to implement the District’s comprehensive facilities maintenance plan.

3. Acquisition of any of the facilities on the Bond Project List through temporary lease or lease-purchase arrangements, or execute purchase option under a lease for any of these authorized facilities.

4. If and as opportunities become available, and to the extent the Board of Education determines that bond funds are available for the purpose, acquisition of land and other interests in real property for future school buildings and other District facilities, and construction of such facilities, and rehabilitation/renovation of District-owned buildings and sites not otherwise listed.

5. Repair, upgrade, modify, expand, refinish, replace and construct site improvements, including off-street parking areas, pickup/dropoff, signage, paths, sidewalks and walkways, canopies, hard courts (student play areas), athletic play fields, landscaping, irrigation, permanent athletic field equipment and facilities (including nets, basketball standards, goals and goalposts, backstops), field lighting, etc.

6. ADDITIONAL NECESSARY AND INCIDENTAL PROJECTS

1. Remove, dispose of, and otherwise remediate hazardous materials, including asbestos, lead, etc., where necessary.

2. Address unforeseen conditions revealed by construction/modernization (including plumbing or gas line breaks, dry rot, seismic, structural, etc.).

3. Other improvements required to comply with existing building codes, including the Field Act, and access requirements of the Americans with Disabilities Act (ADA).

4. Site preparation/restoration in connection with new construction, renovation or remodeling, or installation or removal of relocatable classrooms, including ingress and egress, demolition of existing structures, removing, replacing, or installing irrigation and drainage, utility lines (such as gas lines, water lines, electrical lines, sewer lines, and communication lines), trees and landscaping, relocating fire access roads, traffic lights and mitigation, and acquiring any necessary easements, licenses, or rights of way to the property.

5. Rental or construction of storage facilities and other space on an interim basis, as needed to accommodate construction materials, equipment, and personnel, and interim classrooms (including relocatables) for students and school functions or other storage for classroom materials displaced during construction.

Page 41: MONTHLY PROGRESS REPORT...erection and fastening will continue through April 2012. Palo Alto High School – Athletics Stadium Improvements Taisei (TCC) completed the concessions building

A-6 OHS WEST:260388860.1

7. RENOVATION/MODERNIZATION (DEFINED)

For purposes of the Bond Project List, renovation and modernization projects are intended to restore the building systems and infrastructure, weather protections, finishes, and technology, or reallocate and reorganize space, to a condition that will provide a sustainable, functional educational and administrative environment for future years, comparable to new construction.

Renovation projects may include, but are not limited to nor necessarily encompass, all of the following, depending upon the age, condition and needs of each particular school facility:

1. upgrade electrical, communication, fire alarm, and similar building systems as well as main power service and distribution, which may include active and passive solar power and heating system acquisition, installation and construction

2. Replace, repair or upgrade plumbing, piping and drainage systems, including water supply, meters, water heating, and wastewater systems, plumbing fixtures and sinks, etc., within buildings and sites and to connect with city supply and drainage systems

3. Replace or modify aging heating, ventilation and air cooling systems with energy-efficient heating and air cooling systems (HVAC), including installing energy management systems (EMS);

4. Replace, modify, upgrade interior lighting and exterior safety/security lighting systems and fixtures, as necessary;

5. Repair, modify and construct structural elements of the existing structure as necessary;

6. Replace or repair aging roofs with similar materials or District standard materials;

7. Replace, repair, install and construct, as necessary, interior walls, floor and ceiling finishes, doors, door locks, windows, cabinets and casework, and equipment attached to wall surfaces (including white boards, marker boards, tack boards, television mounts, scoreboards, fire extinguishers, kitchen cabinets/equipment, etc.);

8. Upgrade, modify and construct restroom facilities;

9. Comply, as necessary, with Americans with Disabilities Act (ADA) and Title 24 requirements;

10. Refinish the exterior finishes of the school (including stucco, wood and metal trims, wood siding, paint, etc.); replace doors and windows

11. Modify, expand, separate, convert and construct school support areas; staff work and lunch areas; and educational areas to provide adequate, functional environments;

12. Modify, replace and construct functional components of altered or replaced building components (including rainwater leaders, fascias, mansards, etc.);

For any project involving renovation, modernization, remodeling or rehabilitation of a building or the major portion of a building, the District may proceed with new replacement construction instead (including any necessary demolition), if the Board of Education determines that replacement and new construction is more practical than rehabilitation and renovation, considering the building’s age, condition, expected remaining life, comparative cost, and other relevant factors.