Monroe Street Reconstruction Planning Monroe Street Reconstruction Project Planning July 2014

Upload: rahmani-bagher

Post on 20-Jul-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MonroeStreetPIM7-9-14

Monroe Street ReconstructionPlanning

Monroe Street Reconstruction Project

Planning

July 2014

Page 2: MonroeStreetPIM7-9-14

What to expect this evening

Introductions Project to date

Project scope and summary of input from April meeting Details: http://www.cityofmadison.com/engineering/monroe/p // y / g g/ /

Table conversations on three key topics Pedestrian safety Streetscape amenities (especially lighting) Crazylegs Triangle

Wrap-up, feedback forms and next steps

Page 3: MonroeStreetPIM7-9-14

City Planning, Engineering and E i D l ff

Introductions

Economic Development staffNew AlderYour turn

Page 4: MonroeStreetPIM7-9-14

Project scope

Page 5: MonroeStreetPIM7-9-14

Monroe Street today

Page 6: MonroeStreetPIM7-9-14

Monroe Street today

Page 7: MonroeStreetPIM7-9-14

Brief summary of ideas frombl i i A il

What we heard

table conversations in April

Page 8: MonroeStreetPIM7-9-14

Traffic and parking

Improve crosswalks, reduce speed, boost enforcement

Configure lanes for multi-modal friendly streetM i i ki i ll b i Maintain parking, especially near businesses

Make better use of library parking Address parking/traffic near Glenway Consider traffic calming and modified parking

on neighborhood streets

Page 9: MonroeStreetPIM7-9-14

Pedestrians, bikes and transit

Address pedestrian safety/crosswalks Reduce speed and increase enforcement Provide more space/options for bike use and

ddi i l bik kiadditional bike parking Offer more frequent buses, dedicated bus Put bus stops at far side of intersections Maintain parking for businesses, but

discourage commuter parking

Page 10: MonroeStreetPIM7-9-14

Stormwater and utilities

Minimize run-off Increase infiltration with permeable pavement,

rain gardens, etc.S i l f i l d i Strictly enforce erosion control measures during construction

Install treatment devices to collect sediment Consider watershed-wide stormwater

management Underground to improve diverse tree canopy

Page 11: MonroeStreetPIM7-9-14

Business and merchants

During construction, provide adequate access, parking, signage, detours

Communicate with city, contractors, customersO i i i i /d i f i Optimize timing/duration of construction

Ensure pedestrian safety Maintain/improve parking Add street amenities (lights, bike racks,

signage, banners, benches, etc.)

Page 12: MonroeStreetPIM7-9-14

Placemaking

Identify points of interest on kiosk/map Preserve existing amenities and character Support neighborhood placemaking initiatives Improve/maintain green space; add art and

storytelling opportunities Consider unintended parking/traffic problems Include potential traffic calming and modified

parking on neighborhood streets Improve Crazylegs Triangle

Page 13: MonroeStreetPIM7-9-14

Three rounds, one topic per roundT bl d l k

Tonight’s table conversations

Table maps and placemats to take notesSharing of “best of” between rounds (if time)

Page 14: MonroeStreetPIM7-9-14

Conversations that matter

What matters most to us as we head into the Monroe Street resurfacing/reconstruction project? One conversation, three topics Pedestrian Safety Streetscape Amenities Crazylegs Triangle

Page 15: MonroeStreetPIM7-9-14

Pedestrian safetyA Whi h i d i h

Round One Preview

A. Which crossings need improvement the most and why? (mark directly on the table map)

B. Of the options previewed, which do you prefer? (add notes or stickies to let us know)

Page 16: MonroeStreetPIM7-9-14

Pedestrian Safety/Crossings

Prioritize crossings that need improvement Ideas that have been used on other projects

Countdown timers at signalized intersections N t ffi i l New traffic signal Pedestrian refuge islands Colored or Continental crosswalks (more visible) Overhead “Yield to Pedestrian” sign Side street bump-outs Pedestrian activated flasher

Page 17: MonroeStreetPIM7-9-14

Pedestrian Safety/Crossings

New signal Timers at signals Refuge island

C l d lk Colored crosswalk Continental crosswalk Overhead sign Side street bump-out Pedestrian activated

flasher

Page 18: MonroeStreetPIM7-9-14

Pedestrian Activated Flashers

Page 19: MonroeStreetPIM7-9-14

Pedestrian safetyA Whi h i d i h d

Round One Work Time

A. Which crossings need improvement the most and why? (mark directly on the table map)

B. Of the options previewed, which do you prefer?(add notes or stickies to let us know)Timers at signals Refuge island Colored crosswalk

Continental crosswalk Overhead sign Side street bump-out

Pedestrian activated beacon New signals

Page 20: MonroeStreetPIM7-9-14

Sharing “best of” ideas…

Round One Wrap-up

Page 21: MonroeStreetPIM7-9-14

Streetscape amenitiesA Whi h li h i i i b f hi h ?

Round Two Preview

A. Which lighting option is best for which spot?(mark directly on the table map)

B. Of the other amenities previewed, which would you like to see where? (add notes or stickies to let us know)

Page 22: MonroeStreetPIM7-9-14

Lighting options

Three lighting options Tall street lights only Pedestrian lights in business areas Tall street lights at intersections; Tall street lights at intersections;

pedestrian lights mid-block

Costs vary considerably and will be distributed throughout the corridor

Page 23: MonroeStreetPIM7-9-14

Lighting costs

Tall street lights No existing underground lighting conduit/wire 100% assessable to adjacent property owners Approx $1500 for standard residential lot Approx $1500 for standard residential lot

Pedestrian lights Existing pedestrian lights between Stockton & Prospect New lights 100% assessable to adjacent owners Replacement of existing ped. lights not assessable Approx $5000 for standard lot

Page 24: MonroeStreetPIM7-9-14

Additional amenities

Bike racks Benches Posting kiosks

Page 25: MonroeStreetPIM7-9-14

Streetscape amenitiesA Whi h li h i i b f hi h

Round Two Work Time

A. Which lighting options are best for which spots? (mark directly on the table map)

B. Of the other amenities previewed, which would you like to see where? (add notes or stickies to let us know)Bike racks Benches Posting kiosks

Page 26: MonroeStreetPIM7-9-14

Sharing “best of” ideas…

Round Two Wrap-up

Page 27: MonroeStreetPIM7-9-14

Crazylegs Triangle:A i GET CREATIVE!

Round Three Preview

An opportunity to GET CREATIVE!

Page 28: MonroeStreetPIM7-9-14

Crazylegs Triangle

Page 29: MonroeStreetPIM7-9-14

Crazylegs Triangle

Monroe Street Plan ideas:

Page 30: MonroeStreetPIM7-9-14

Peace Park - Madison, WI

Charlotte

Page 31: MonroeStreetPIM7-9-14

Charlotte, NC

Charlotte

Page 32: MonroeStreetPIM7-9-14

Miami and Seattle

Page 33: MonroeStreetPIM7-9-14

Pittsburgh 3 PNC Triangle Park

Page 34: MonroeStreetPIM7-9-14

Detroit: Lafayette Greens

Page 35: MonroeStreetPIM7-9-14

Other examples

Page 36: MonroeStreetPIM7-9-14

Other examples

Page 37: MonroeStreetPIM7-9-14

More passive design…

Page 38: MonroeStreetPIM7-9-14

More active design…

Page 39: MonroeStreetPIM7-9-14

Crazylegs Triangle:A W i d d dl “ l ”

Round Three Work Time

A. Write, draw, doodle on your “placemat”B. We’ll share “best of” ideas if we have time

Page 40: MonroeStreetPIM7-9-14

Please include them with your feedback form

Additional ideas?

Page 41: MonroeStreetPIM7-9-14

Website: http://www.cityofmadison.com/engineering/monroe/

E il d

For more…

Email updates: https://my.cityofmadison.com/

Next meeting:6:30pm Monday, September 15, 2014

Edgewood College Anderson Auditorium Predolin 112

THANK YOU!