    Cathodic Protection Training Course

    Examples of records

    Typical pipe to soil 'potential readings' taken at intervals at CP test facilities along a pipeline

    The measurement was to be taken in the way shown below but no such drawing was available to operators.

    hodic Protection Network Module 1 Examples of records http://www.rogeralexander1938.webspace.virginmedia.com/cpn/Corre...

    6 25/03/2016 11:41

  • 7/26/2019 Module 1-05

    2/6

    Some locations had the position for the placement of the Cu/CuSO4 electrode provided. It was sometimes a short length of concrete pipe set

    upright in the groundand filled with soil or sand.

    Monthly readings were taken at manifolds and pressure reducing stations.

    hodic Protection Network Module 1 Examples of records http://www.rogeralexander1938.webspace.virginmedia.com/cpn/Corre...

    6 25/03/2016 11:41

  • 7/26/2019 Module 1-05

    3/6

    In the early 1980's the CIPS survey was introduced and the results were reported manually and the results were plotted in graph format.

    hodic Protection Network Module 1 Examples of records http://www.rogeralexander1938.webspace.virginmedia.com/cpn/Corre...

    6 25/03/2016 11:41

  • 7/26/2019 Module 1-05

    4/6

    Teams of technicians took 'pipe-to-soil potentials' using a trailing conductor to the CP test post, noting them manually to have them entered

    into a main frame computer.

    hodic Protection Network Module 1 Examples of records http://www.rogeralexander1938.webspace.virginmedia.com/cpn/Corre...

    6 25/03/2016 11:41

  • 7/26/2019 Module 1-05

    5/6

    The Alexander Cell was used successfully during this survey

    Recording voltmeters were used during this period to adjust voltages eliminating temporal fluctuations.

    hodic Protection Network Module 1 Examples of records http://www.rogeralexander1938.webspace.virginmedia.com/cpn/Corre...

    6 25/03/2016 11:41

  • 7/26/2019 Module 1-05

    6/6

    They were also used to record CIPS surveys and show the 'on' and 'off' voltages as well as the zero voltages when the electrode was not in

    contact with the ground.