modicon modernization solutions

13
Schneider Electric 1 - Division - Name – Date Modicon Modernization Solutions Upgrade your Modicon PLC while retaining your 984 LL programming

Upload: slone

Post on 13-Jan-2016

82 views

Category:

Documents


0 download

DESCRIPTION

Modicon Modernization Solutions. Upgrade your Modicon PLC while retaining your 984 LL programming. Your need. You’re looking for cost-effective and risk-free methods of preserving your hardware and programming investment while extending - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Modicon Modernization Solutions

Schneider Electric 1- Division - Name – Date

Modicon Modernization Solutions

Upgrade your Modicon PLC while retaining your 984 LL programming

Page 2: Modicon Modernization Solutions

2

Your need

You’re looking for cost-effective and risk-freemethods of preserving your hardware and

programming investment while extending

component life and improving your productivity and

manufacturing process.

Page 3: Modicon Modernization Solutions

3

Our solution

Providing an upgrade path betweencontrol applications developed in your existingModicon software (Modsoft, Concept, or ProWorX)

using 984 ladder logic, and Schneider Electric’spresent and future PLC software Unity Pro.

Page 4: Modicon Modernization Solutions

4

Unity V5.1 LL984

Objectives of the offer

● Provide you with a simple upgrade path for your Modicon PLCs

● Preserve your investment in Lader Logic programming applications

● Program in Unity with your known 984 style● Take full benefit of Unity Pro

What is the offer?● Integration of a sixth language for Unity – Modicon LL984● …allowing the import of your 984 applications into Unity

Page 5: Modicon Modernization Solutions

Schneider Electric 5- Installed Base – Nitin Dhayagude

Improve your developed programming with new capabilities

Keep•Your unique algorithms•The same familiar interface

Add•Improved throughput•Reduced downtime•Better process visibility

Page 6: Modicon Modernization Solutions

Schneider Electric 6- Installed Base – Nitin Dhayagude

Save prior investment in 984 LL application development

– highly evolved applications are retainedRisk-free software migration

– applications are imported versus converted– limited commissioning

Plant operators/maintenance use the same interface– Unity 984LL editor has the same look and feel– limited or no training

Future-proof– Unity gives access to the latest networks and

technology roadmap on your investment schedule– Allows hybrid applications (applications can be

written with all 6 editors)Reduced cost of ownership

– Increased reliability & uptime

Our value proposition

Before import

After import

Page 7: Modicon Modernization Solutions

Schneider Electric 7- Installed Base – Nitin Dhayagude

Software Offer – a 6th editor (984LL) for Unity:● Run 984LL programs on the Quantum Unity PLC platform

● Import 984LL application versus converting or rewriting the application

● Modsoft, Concept, Proworx NxT, ProWorx32 984LL programs are accepted for import

● Any PLC platform that runs 984LL may be converted by hardware upgrade

● Guaranteed sequencing and execution of code

● Enable online“ changing, within Unity rules

● „Hybrid“ applications are possible – ie multiple languages simultaneously for a single application

● User ergonomy for 984LL same as Concept/ProworX

What’s New in Unity Pro V5.1?

Scenario description:● A new LL-Editor (6th language) -- 11 x 7, 3 node representation of FBs

● Virtually all 984 instructions are supported● Performance can be reached or exceeded ● State flow as well as power flow animation (during runtime)● Use of flat addressing (%M100)● Latched coils like in 984LL (introduce non-latched coils to Unity)● EMTH & PCFL, XMIT, STAT and other system functions

Page 8: Modicon Modernization Solutions

Schneider Electric 8- Installed Base – Nitin Dhayagude

Enjoy the benefits of Unity™ Pro with LL984

The only programming tool you need to fully develop, test, debug, manage, and maintain your industrial Modicon PLCs with a broad range of functionality and collaborative tools:

● An easy-to-use graphical user interface● A built-in library of pre-tested application function blocks● Datatypes and structures (DDT)● Customizable, user-developed function blocks● Improved platform collaboration with intuitive diagnostics to eliminate errors● Choice of 5 IEC programming languages + integrated 984 Ladder Logic as the sixth

programming language● Compliance with international standard for PLC programming EN61131-3

Greater flexibility

Improved performance

Easier collaboration

Page 9: Modicon Modernization Solutions

Schneider Electric 9- Installed Base – Nitin Dhayagude

A quick demo of the import

You will see that it’s:

Fast during the import

Safe as all elements of the application are imported

Easy to adopt as it looks the same as a real LL984

Demo file to be insert

Page 10: Modicon Modernization Solutions

Schneider Electric 10- Installed Base – Nitin Dhayagude

What will you gain with your LL984 in Unity Pro ?● An Selectively update your PLC hardware without

rewriting your programming● Support the 984 instruction set and the 984

execution behaviour● Move to new technology step by step without

downtime, allowing your maintenance staff the time to learn the new functionalities

● Create hybrid applications by expanding an existing LL984 program with other IEC PLC programming languages best suited for the task.

Unity Pro software is a keyComponent of PlantStruxure

Designed with you and for you, to help you meetyour chalelenges of engineering productivity,Operator efficiency, and sustainability.

Page 11: Modicon Modernization Solutions

Schneider Electric 11- Installed Base – Nitin Dhayagude

Evolve to

Better plant performance begins with better automation

Open access to the latest networks and technology development

Ethernet interfaces for I/O expansion and device connectivity with minimal installation cost

Direct connectivity to SCADA, MES and ERP systems for better decision making and energy management opportunities

Increased reliability and uptime

Page 12: Modicon Modernization Solutions

Schneider Electric 12- Installed Base – Nitin Dhayagude

Upgrade to the new Modicon PLC

Risk-free modernization● No programming – import the old PLC application● Wiring adapters – save the existing wires● Fail-back strategy

Cost-effective modernization● Minimum down time – change a PLC in 1-2 hours● Stepwise – partial migrations● Limited commissioning● Reduced cost of ownership

Extensive capabilities of PlantStruxure● State-of-the-art today● Flexible and easy evolution for the next generation

Risk-free

Cost-effective

Bright Future

Page 13: Modicon Modernization Solutions

Schneider Electric 13- Installed Base – Nitin Dhayagude

Make the most of your energy