modeling tres-amigas modeling work group meeting august 27, 2009 wecc staff

21
Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Upload: erin-williams

Post on 27-Mar-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Modeling Tres-Amigas

Modeling Work Group MeetingAugust 27, 2009

WECC Staff

Page 2: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Overview

Page 3: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● The Tres Amigas project connects the ERCOT and SPP systems to the WECC system.

● In the 2019 dataset both the ERCOT and SPP markets are modeled as a price responsive markets.

● The models for the ERCOT and SPP markets each use an incremental cost curve and a price signal.

The price signal describes the price of power in the WECC.

The cost curve describes how the SPP or ERCOT market will respond to the price signal (price of power in the WECC).

3

Page 4: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

0

10

20

30

40

50

60

70

80

-3500 -2500 -1500 -500 500 1500 2500 3500

($ / MW)

MWs transfered from SPP to WECC

Cost Curve - SPP Summer Weekday Peak Hours

If the price signal to the SPP market is $20/MW, SPP will import 1322 MW from WECC.

If the price signal to the SPP market is $60/MW, SPP will export 1979 MW to WECC.

Cost Curve - SPP

Page 5: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● The price signals that the ERCOT and SPP markets use come from a hub created for the Tres Amigas project.

● Hub Definition 50% from Midway 25% from Westwing 25% from Palo Verde

5

Page 6: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● Would SPP or ERCOT respond to a $40 price signal at 3 a.m. and at 5 pm in the summer in the same way?

● The way market responds to a given price signal will vary depending on time day, and time of year.

● To account for this, all hours of the year are divided into six time periods where each time period has its own cost curve.

● The six time periods are: Summer weekday peak Summer weekday off-peak Summer weekend Non-Summer weekday peak Non-Summer weekday off-peak Non-Summer weekend

6

Page 7: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● Z Global provided Staff information to model the Tres Amigas project in Promod.

● Modeling Parameters: Six incremental heat rate curves for both SPP and ERCOT Seasonal fuel prices for both SPP and ERCOT to be used in conjunction

with the incremental heat rate curves.

7

Page 8: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Modeling in Promod

Page 9: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● Each cost curve is modeled in Promod using three thermal generators and a static load.

● Each generator models a segment of the cost curve.

9

G

G

G

SPPImport from WECC

Export to WECC

Page 10: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

10

0

10

20

30

40

50

60

70

80

0 1000 2000 3000 4000 5000 6000

$ / MW

Generation MW

Generation Cost Curve

Gen 1Gen 2

Gen 3

Page 11: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

11

● The generation parameters for the thermal units: Units are must run Minimum Capacity = 1 MW Minimum up/down time = 1 hour Ramp up/down rates = 9999 MW Forced Outage Rate = 0%

Page 12: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

● When the static load is netted against the generation, imports and exports can both be modeled: If the generation is greater than the static load, power is

exported to WECC. If the generation is less than the static load, power is imported

from the WECC.

12

G

G

G

SPPImport from WECC

Export to WECC

Page 13: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Tres Amigas

13

0

10

20

30

40

50

60

70

80

0 1000 2000 3000 4000 5000 6000

$ / MW

Gen ->Gen + Load ->

Cost Curve

Gen 1

Gen 2Gen 3

-3100 -2100 -1100 -100 900 1900 2900

Page 14: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Preliminary Results

Page 15: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

15

-1500

-1000

-500

0

500

1000

1500

Hour of the Year

ERCOT - WECC Imports (MW)

Page 16: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

-600

-400

-200

0

200

400

600

800

1000

1200

1400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ener

gy (a

MW

)

Hour of Day

ERCOT - WECC Imports (aMW)

Spring

Summer

Fall

Winter

Page 17: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

-1500

-1000

-500

0

500

1000

1500

2000

Hour of the Year

SPP - WECC Imports (MW)

Page 18: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

-1000

-500

0

500

1000

1500

2000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ener

gy (a

MW

)

Hour of Day

SPP - WECC Imports (aMW)

Spring

Summer

Fall

Winter

Page 19: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

-2500

-2000

-1500

-1000

-500

0

500

1000

1500

2000

2500

3000

Hour of the Year

Tres Amigas - WECC Imports (MW)

Page 20: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

-1500

-1000

-500

0

500

1000

1500

2000

2500

3000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ener

gy (a

MW

)

Hour of Day

Tres Amigas - WECC Imports (aMW)

Spring

Summer

Fall

Winter

Page 21: Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff

Questions ???