mixed-model line design line design calculation flowleanflowconsulting.fr/t3us.pdf ·...

17
Module LFT103 - Release 8.00 US Copyright © 2001-2008 – Philippe Magnier – All rights reserved Lean Flow Consulting Creating World-Class Lean Enterprise Process Terminal Product 22227777-000 22227777-CDT 33338888-000 33338888-CDT Panels Ass'y Labor 5% Panels Test Labor 2% 5% Machine 5% Labor 2% 3% 2% 1% 3% 1% 10% 2% 3% 4% Process Terminal Ass'y Product 22227777-000 22227777-CDT 33338888-000 33338888-CDT Panels Ass'y Labor 104% Panels Test Labor 110% 200% Machine 22% Labor 110% 105% 100% 105% 108% 112% 22% 105% 108% 112% MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional % Yield Scrap Actual Time from SOE’s Σ Dc TAKT ATw Resources LFT Dc Product 22227777-000 22227777-CDT 33338888-000 33338888-CDT 155 65 64 38 Process Terminal Ass'y Product 22227777-000 22227777-CDT 33338888-000 33338888-CDT Panels Ass'y Labor 19.0 Panels Test Labor 6.2 4.4 Machine 0.2 Labor 18.3 14.5 21.0 0.2 0.2 0.2 2.8 4.8 5.3 7.7 Process Terminal Ass'y Product 22227777-000 22227777-CDT 33338888-000 33338888-CDT Panels Ass'y Labor R Panels Test Labor R R X 2 Machine O – 22% Labor R R R R R R R R R O – 22%

Upload: others

Post on 24-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

ProcessTerminal

Ass'yProduct

22227777-00022227777-CDT33338888-00033338888-CDT

PanelsAss'yLabor5%

PanelsTest

Labor

2%

5%

Machine

5%

Labor

2%3%2%

1%3%1%

10%

2%3%4%

ProcessTerminal

Ass'yProduct

22227777-00022227777-CDT33338888-00033338888-CDT

PanelsAss'yLabor104%

PanelsTest

Labor

110%

200%

Machine

22%

Labor

110%105%100%

105%108%112%

22%

105%108%112%

MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW

Dc’s Required / Optional %Yield

Scrap

Actual Time from SOE’s

Σ Dc

TAKTATw

Resources

LFT

DcProduct

22227777-00022227777-CDT33338888-00033338888-CDT

155656438

ProcessTerminal

Ass'yProduct

22227777-00022227777-CDT33338888-00033338888-CDT

PanelsAss'yLabor19.0

PanelsTest

Labor

6.2

4.4

Machine

0.2

Labor

18.314.521.0

0.20.20.2

RRR

2.84.85.37.7

ProcessTerminal

Ass'yProduct

22227777-00022227777-CDT33338888-00033338888-CDT

PanelsAss'yLabor

R

PanelsTest

Labor

R

R X 2

Machine

O – 22%

Labor

RRR

RRR

RRR

RRR

O – 22%

Page 2: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

MIXED-MODEL LINE DESIGN REWORK AND SCRAP IMPACTS

Terminal PlateAssembly

PanelsAssembly

REWORK Test10%

PanelsTest

SCRAPPanels

Assembly10%

SCRAPPanelsTest15%

ProcessTerminal

Ass'yProduct

22227777-00022227777-CDT33338888-00033338888-CDT

PanelsAss'yLabor

Y – 90%

PanelsTest

Labor

R

R X 2

Labor Labor

S – 10%Y – 90%S – 15%

RRR

O – 10%

TestRework

Y – 90%S – 10%

S – 5%S – 5%

22227777-00022227777-CDT33338888-00033338888-CDT

110%126%

232%

126%110%115%

RRR

10%

116%116%

105%105%

ProcessTerminal

Ass'yProductPanelsAss'yLabor

PanelsTest

Labor Labor Labor

TestRework

Page 3: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

ALL FACTORS ROLLED PROCESS MAPOVERVIEW

§ Rolled-Up Volume Percentages – on a 100% basis – After having Considered :§ Required and Optional Work %.§ All Loops Rework Impacts %.§ Scrap and Cascading Impacts %.

§ Defining how Frequently a Process is consumed by a Product.

§ Mixed-Model Process Map with ONLY ONE NUMBER.

Process

L101TestProduct

Machine Labor

22227777-000

22227777-CDT

33338888-000

33338888-CDT

44447777-000

44447777-CDT

55559999-000

FRU111

L101Brazing

Labor

109%

218%

218%

218%

109%

210%

102%

L101Packaging

109% 10%

109%

100%

109% 100%

100%

10%

105% 100%

102% 100%

113% 113%

Page 4: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

PROCESS MAP TIMEOVERVIEW

§ Work Content required, by Process, to transform each Specific Product.

§ Total Times come Directly from Sequences of Events are used to complete Process Map Time.§ Labor Time.§ Machine Time.

§ Other Definition of Mixed-Model Process Map with :§ ONE LABOR TOTAL TIME,§ ONE MACHINE TOTAL TIME,

§ by Product and Process Relationship.

Process

L101TestProduct

Machine Labor

22227777-000

22227777-CDT

33338888-000

33338888-CDT

44447777-000

44447777-CDT

55559999-000

FRU111

L101Brazing

Labor

21.3

21.3

21.3

5.6

5.6

8.9

12.8

L101Packaging

12.3 10.3

14.4

10.3

23.7 12.4

12.4

10.3

20.5 10.3

8.3 10.3

3.8 5.1

Page 5: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

DAILY DEMAND MANAGEMENT OVERVIEW

Σ ( Dc x AT )ATw =

Σ Dc

LINE DESIGN : ONCE TO Dc

ATw= RESOURCES Dc

TAKT Labor – MachineLabor – Machine

DAILY MANAGEMENT : ONCE TO Dr

Σ ( Dr x AT )H x S

= RESOURCES Dr PeopleTo serve DEMAND

PeopleTo serve DEMAND

Dr = Daily Rate. (Number of Products)

Page 6: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

HIGH, AVERAGE AND LOW TIMES FLEXIBLE OPERATIONS

OP10 OP20 OP30 OP40

TAKT : 7 mn

ATw : 24 mn AT HIGH : 33 mn

OP10 OP20 OP30 OP40

TAKT : 7 mn

AT HIGH : 33 mn

OP10 OP20 OP30

TAKT : 7 mn

OP40

OP10 OP20 OP30 OP40

TAKT : 7 mn

AT LOW : 20 mn

OP10 OP20 OP30 OP40

OP25

OP25

Page 7: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

§ We can Increase the Utilization Rate, with fewer Machines, by Improving our Response Capability.

§ TPM Recommendation : Dc = 85% of Machine Capacity.

FAMILY OF PRODUCTS POWERFUL BENEFITS OF MIXED-MODEL

L01L02L03L04L05

AssemblyLines

FUS-001FUS-002

FUS-004APLG-145 SPLG-854 S

ProductsDemand

at Capacity(Dc)

170160170100155

MachineMaximum

200200200200200

Daily Rate(Dr)

200200200200200

(Dr/Dc) %

59%94%

147%70%71%

MachineUtilization

Rate

50%75%

35%55%

125%

40A40A40A63A63A

§ New Mixed-Model Line for Family of Products 40A with 3 Machines :

§ New Mixed-Model Line for Family of Products 63A with 2 Machines :

L01-L02-L03 Products 40A 500 600 500 100% 83%

L04-L05 Products 63A 255 400 180 71% 45%

??

Page 8: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

RIG

HT O

RD

ERRIG

HT O

RD

ER

RESPONSE OPTIMIZATIONTPc/t REDUCTION

§ Continuous Process Improvement.§ Along TPc/t Path First :

1. Eliminate Non-Value Added Work.2. Eliminate Quality Criteria.3. Move Internal Setup to External.4. Reduce Setup and Move Times.5. Reduce Value Added Work Times.

Page 9: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

OPERATIONAL DEFINITIONOVERVIEW

Σ Dc

H(S)TAKT =

§ Tasks Grouped "At or Below" TAKT Time Target.

§ Physical Place to Do Work,…§ … and One-Up, One-Down Flexibility.§ Consistent Process and Quality.§ Enables Flow of Product.

7..8

6..

4..5

2..3

1..

2..31..

6..

4..5

2..3

1..

15..13..1412..9..7..86..4..52..31..

OP07

Page 10: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

OPERATIONAL DEFINITION SEQUENCE OF EVENTS

Install fan capacitor – 1 nut X 0.8 Label : 4µF at the topConnect Wire N°7 to fan capacitorConnect Wire N°7 to power contactor X

X X0.30.3

M/F connector to Left plugM/F connector to Center plug

Unpack electrical cap

Fix 24V contactor – 1 screw – 1 washer – 1 wireFix 24V contactor – 1 screw – 1 washer

Fix start relay to front support – 1 screw

X

XX

X

0.2 D E0.2

X0.60.3

0.6Left sideSize 530 : 3ARR3CT10V5Size 536 : 3ARR3CT6A5

X

Install cap to control panel frameP/N : 45CG20AJ/45FG20AJ

Install support to control panel – 2 screws X 0.3 0.5 Use screws SCR23

Product P/NCONTROL PANEL TWK 530-536 NBL/NBL-OC

22227777-000 / 22227777-CDT / 33338888-000 / 33338888-CDTSEQUENCE OF EVENTS Process I.D.

Main Line Assembly

Ove

rlap

Task VA

TQC

Quality Criteria / Safety

Description

Setup

Mac

h

Lab

or

D/S

Qty I/E

Mac

h

Lab

or

Required Move

Mac

h

Lab

or

D/S

Qty I/E D

ist.

Install Sub-Assembly terminal plate – 2 screwsConnect Wire N°2 to fan capacitor X

X 1.0 Use locations : A4 and A5X0.3 F connector to Left plug

Evacuate Sub-Assembly control panel to IPK 0.1 D E 0.2

Install compressor capacitor – 1 nut X 1.1Use nut NUT89Size 530 : 35µFSize 536 : 40µF

Connect Wire N°2 to power connector X 0.3 Plug identification : "N1"X X0.3 Plug identification : "L1"X X0.3 Plug identification : "N2"

Connect Wire N°6 (Red) to power connector X 0.3 Plug identification : "N2"Connect Groung Wire to groung connector X 0.8 Plug identification : "Ground"Connect Wire N°4 (Black) to K5 contactor X X0.7 Use K51 plug to connectConnect Wire N°5 (Blue) to 100µF capacitor X 0.8 Right plug

Connect Wire N°21 to power connectorConnect Wire N°20 to power connector

Seq

. #

10203040

50

60708090

110120

200

100

130140150160170180190

WS

A 10A 10A 10A 10

A 10

A 10B 20B 20B 20

C 30C 30

D 40

B 20

C 30C 30C 30C 30D 40D 40D 40

OP A

OP B

OP C

OP D

2.4 mn2.4 mn

2.5 mn2.5 mn

2.5 mn2.5 mn

2.4 mn2.4 mn

TAKT Time : 2.5 mn

Page 11: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

STATIC SETUPSSPECIFIC OPERATION TO PERFORM S/U

Set crimping machine - Check wrench traction80 2.3 2.3 S 100 E Wrench traction : 80 N

Unpack electrical cap1020 X

0.2 D E0.7Install cap to control panel frame

Set screwing machine - Check Torque30 1.6 1.6 S 200 E Torque : 16 N.m

Install fan capacitor – 1 nut70 X 0.5 Label : 4µF at the top

Fix 24V contactor – 2 screws – 2 washers

Fix start relay to front support – 1 screw

40

50

X

X

X0.5 0.5

0.5 0.6Left sideSize 530 : 3ARR3CT10V5Size 536 : 3ARR3CT6A5

X

P/N : 45CG20AJ/45FG20AJ

Install support to control panel – 2 screws60 X 0.3 0.5 Use screws SCR23

Product P/NCONTROL PANEL TWK 530-536 NBL/NBL-OC

22227777-000 / 22227777-CDT / 33338888-000 / 33338888-CDT

Process I.D.Main Line Assembly

Seq

. #

Ove

rlap

Task VA

TQC Description

Setup

Mac

h

Lab

or

D/S

Qty I/E

Mac

h

Lab

or

Required Move

Mac

h

Lab

or

D/S

Qty I/E D

ist.

Crimp Wire N°790 X 0.3 0.3 M/F connector

110 Install Sub-Assembly terminal plate – 2 screwsConnect Wire N°2 to fan capacitor X

X 1.0 Use locations : A4 and A5X0.3 F connector to Left plug120

Evacuate Sub-Assembly control panel to IPK 0.1 D E 0.2200

Install compressor capacitor – 1 nut100 X 0.6Use AA56 reference point Size 530 : 35µFSize 536 : 40µF

Connect Wire N°2 to power connector X 0.3 Plug identification : "N1"130X X0.3 Plug identification : "L1"140X X0.3 Plug identification : "N2"150

Connect Wire N°6 (Red) to power connector X 0.3 Plug identification : "N2"160Connect Groung Wire to groung connector X 0.3 Plug identification : "Ground"170Connect Wire N°4 (Black) to K5 contactor X X0.3 Use K51 plug to connect180Connect Wire N°5 (Blue) to 100µF capacitor X 0.3 Right plug190

Connect Wire N°21 to power connectorConnect Wire N°20 to power connector

0P0P0P

2.5 mn2.5 mn

2.4 mn2.4 mn

2.5 mn2.5 mn

A 1A 1A 1

A 1

A 1B 1B 1

B 1C 1

C 1

B 1

C 1C 1C 1C 1C 1C 1C 1

Pos

te

A 10A 10A 10

A 10

A 10B 20B 20

B 20C 30

C 40

B 20

C 30C 30C 30C 40C 40C 40C 40

WS

OP A

OP B

OP C

SEQUENCE OF EVENTS

Quality Criteria / Safety

TAKT Time : 2.5 mn

Page 12: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

OPERATIONAL METHOD SHEETSOVERVIEW

§ Graphical Representation, at an Operation :§ Safety Criteria – Safety is Quality.§ Quality Criteria. – Verify – TQC's.§§ WorkWork.

§ Information comes from Sequence of Events. – Not Vice Versa.

§ To reinforce the Training Employees receive "Off-Line" to the detailed Sequence of Events.

LFT TOOL FOR EMPLOYEES FLEXIBILITY

Page 13: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

CONSISTENT ACROSSTHE ORGANIZATION

OPERATIONAL METHOD SHEETSLONG OPERATIONS

1 12 3 4 5 26 ../.. 28

1 52 43 6 ../.. 28

VERIFY3

VERIFY5

WORK &VERIFY

WORK &VERIFY

§ All Verify in the End can be Critical for Quality.§ Hidden, or Inaccessible Tasks.

§ Long Rework Times.§ To remove more parts.

§ Scrap.

Page 14: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

OPERATIONAL METHOD SHEETSSTANDARDIZATION ACROSS SITE

§ EMPLOYEE FLEXIBILITY.§ Engineering Control Ease.§ More People Can do Updates.

§ Library of Symbols.§ Eliminate Variation when Flexing.

§ Training Standards.§ "Off-Line" and "On-Line" Trainings.

Page 15: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

QUALITY MANAGEMENT PRODUCT In-PROCESS AUDIT

§ To Guarantee Elimination of Defect Near The Point Where Work is Performed.§ "Touch for Quality" Checks.

§ By Team Members, or Assembly Line Certified Employees.

§ Permanent Audit.

PRODUCT In-PROCESS

Page 16: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

QUALITY MANAGEMENT FINISHED GOODS AUDIT

FINISHED GOODS§ To Guarantee Free Defect in Finished Good by

Quality Inspection.§ "Touch for Quality" Checks.

§ Under the Responsibility of the Team's Quality Technician :§ By Audit Team :§ Manufacturing, Engineering, Marketing,…

§ By Team Members, or Assembly Line Certified Employees.

§ Permanent Audit.

Page 17: MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOWleanflowconsulting.fr/T3US.pdf · 2007-12-29 · MIXED-MODEL LINE DESIGN LINE DESIGN CALCULATION FLOW Dc’s Required / Optional

Module LFT103 - Release 8.00 USCopyright © 2001-2008 – Philippe Magnier – All rights reserved

Lean Flow ConsultingCreating World-Class Lean Enterprise

Product P/NCONTROL PANELS TWK 530-536 NBL/NBL-OC

22227777-000 / 2222777-CDTSEQUENCE OF EVENTS Process I.D.

Control Panel Assembly

Seq

. #

Ove

rlap

Task

Assemble fuse support to frame A – 1 screw

Install support to control panel - 2 screws

170

180

VA

X

X

TQ

C

Quality Criteria / Safety

Description

Setup

Mac

h

Labo

r

D/S

Qty

I/E

Mac

h

Labo

r

Required Move

Mac

h

Labo

r

D/S

Qty

I/E Dis

t.

X0.6

0.3 0.5

Left sideSize 530 : 3ARR3CT1OV5Size 536 : 3ARR3CT6A5Connectors orientation

TQC – Contactor Model NumberTQC – Fuse Model Number

188Contactor : 45(C/F)G20AJSize 530 : 3ARR3CT1OV5Size 536 : 3ARR3CT6A5

Install fan capacitor - 1 nut190 X 0.5 Identification : 4µF at the top

QUALITY MANAGEMENT REDUCE POTENTIAL VARIATION

§ When there are Multiple Ways to Perform Work,Multiple Ways to Perform Work, and ONLY ONE WAY IS CORRECT.

FINISHED GOODS AUDITSPRODUCT In-PROCESS AUDITS

WS

D50

D50

E60

E60