ministry of culture - niti aayogniti.gov.in/writereaddata/files/document_publication/culture.pdf ·...
TRANSCRIPT
Ministry of Culture
Themes CoS
Recommendations
Actionable Point and Action Plans
for implementation by the
Ministries/ Departments
Timeline Remarks
1. Accelerated
Growth with
inclusion and
equity
10-Industry and
Services
Single Window,
Single form online
services
Clearances for construction
activities near monuments
under Archaeological Survey of
India (ASI).
Archaeological Survey of India in collaboration with National Monuments Authority and Indian Space Research Organization has designed a web system for grant of permission for construction related activities near centrally protected monuments. This single window system would enable the applicant to apply to all concerned agencies such as Municipal Corporations, Town and Country Planning, Forest Department, etc. in a single on-line form.
(Time Line: Launch
of Single Window
System for Delhi and
Mumbai by
15.4.2016).
1. Accelerated
Growth with
inclusion and
equity
12- Industry and
Services – Services
Tourism for
inclusive growth: 20
Heritage
destinations
World Class tourist facilities to
be provided by Archaeological
Survey of India.
ASI has identified 25 monuments in the first phase as “Adarsh Smarak”. These monuments are being provided world class tourist facilities such as free wi-fi,
(Time Line: 50 more
monuments would be
declared as Adarsh
Smarak by October
2016).
Interpretation center, audio-visual centers, modern toilets, cafeteria, differently-abled friendly access, brail signage, etc. Gradually more monuments would be added as “Adarsh Smarak”.
Launch incredible
India
Festivals of India to be
organized
FOI Cell
The Standing Committee on Festivals of India in its meeting on 15.10.2015 identified 26 countries for conducting Festivals of India during 2016-17 subject to availability of funds. The logo of “Incredible India” will be used in all Festivals.
(Time Line: Orders
to be issued by
30.6.2016)
Detailed plan and schedule of FOIs in these countries will be finalized in consultation with the Missions.
(Time Line:
Communication to be
sent to selected
Missions by
30.6.2016)
Possibility of showcasing “Incredible India” will be explored through other ways in the Festivals of India in consultation with the Ministry of Tourism.
(Time Line: Final
decision to be taken
by 30.6.2016)
1. Accelerated 15– Financial Ministry would include Aadhar (Time Line: From
Growth with
inclusion and
equity
inclusion and Social
Security
Technology usage in
financial inclusion
details in the schemes.
Schemes handled by Performing Arts Section of the Ministry of Culture.
UID No. issued by NITI Aayog is required to be indicated by an
organization/NGO applying for financial assistance under the schemes handled by Performing Arts Section.
‘Aadhar” number may be
included in the application forms of Schemes from 2016-
17 onwards as optional.
October 2016
onwards)
Insurance coverage
and Social Security
Artists to be included especially
under artists pension scheme
A request has been made to Ministry of Health & Family Welfare to explore the possibility to include all the existing
pensioners of “Artistes Pension Scheme & Welfare Fund” under social security scheme namely “Rashtriya Swasthya Bima Yojana” on payment of premium amount by Ministry of Culture.
(Time Line: The Ministry is ready to
implement the proposal, once the
proposal has been examined by the Ministry of Health & Family Welfare).
1. Accelerated
Growth with
inclusion and
equity
18. People’s
Participation
Strong awareness
campaigns on
People’s
participation in
governance
Conservation portal of ASI,
Transparency to be ensured by
placing information and
selections conducted on the
websites.
Portal for Conservation works is being launched by the ASI which aims to capture details of all conservation and development works being undertaken by its circles.
(Time line: Launch of
the portal by
15.4.2016).
(Already
implemented)
Transparency is ensured by
placing information of tenders and grantee organizations on the website.
Suo moto declaration of information as per norms of RTI Act has been made on the website.
(Already
implemented)
E-tendering will be adopted by ASI.
(Time line: In the
Financial Year 2016-
17).
2. Employment
Generation
6. Policy and
Process
Participation by ASI (Time Line: By
Strategies interventions
RozgarUtsav
ASI has written a letter to Director, Employment to discuss the possibility of using Rozgar Utsav for hiring expert manpower such as stone cutters, etc.
October 2016)
2. Employment
Generation
Strategies
13. Creating
Employable Skills –
Bridging Skill
Infrastructure Gaps
Use spare
infrastructure for
skilling in public
institutions, private
organizations,
religious and
cultural
organizations.
MOC will explore the possibility
of utilization of spaces of its
training institutes.
ASI in collaboration with other institutions of MoC is identifying courses for enhancing skilled based competency in house. Further, efforts have been made to augment existing training facilities.
(Time Line: By
October 2016)
2. Employment
Generation
Strategies
Multi skill iconic
training centres in
every district
MOC will explore the possibility
of creating skill centres.
MOC will explore the possibility of creating skill centres.
(Time Line: By
October 2016)
3. Energy
Conservation
and Efficiency
8. Energy Efficient
Buildings and
Building Material
Incentivize new
energy efficient
Ministry shall consider in new
construction projects and also
while providing grants under
construction related schemes
such as Tagore Cultural
buildings to cover at
least 30%
constructions
Complexes, Museum Grant
Schemes, Science Cities and
Building Grant Schemes
ASI has already included energy efficiency in the design factor of its new buildings at INA, New Delhi, Tilak Marg, New Delhi and Greater NOIDA, UP.
Performing Arts Section of MoC administers two schemes on this issue namely:- Building
Grant Scheme and Tagore
Cultural Complex Scheme. To incentivize new energy efficient buildings covering at least 30% construction, the total cost of the project will be increased considerably. Keeping in view the limited
budgetary allocation under these two schemes, it would not be feasible to insist for the same. However, a provision will be added in these schemes that grantees will ensure sufficient natural light and use of LED bulbs/solar panels and
others energy efficient
(Already
implemented)
(Time Line: From
2016-17 onwards)
provision to the extent in the buildings being constructed with the grant provided by this Ministry.
3. Energy
Conservation
and Efficiency
Existing
Government
Buildings to reduce
energy by 25%
Saving by avoiding redundant
usage of energy.
Performing Arts Division
A provision will be added in the schemes that grantees will ensure sufficient natural light and use of LED bulbs/solar panels and others energy efficient provision to the extent in the buildings being constructed with the grant provided by this Ministry.
(Time Line: From
2016-17 onwards).
Museum Division
The Salar Jung Museum has installed 500 KWP (100 KWP x 5) Solar Power Plant, the work was entrusted to NERDCAP a State Government undertaking. The Plant was commissioned in the month of July 2015. The Museum has paid 240 lakh and the Ministry of NRE paid 30% as subsidy. The installation is connected to the grid on Net metering basis. Since, July 2015
(Already
implemented)
to February 2016 the solar power plant produced 3,41,032 units and resulted in savings of Rs.40.00 lakhs.
NCSM
Green building norms are being implemented in designing new Science Centre buildings under Science Cities scheme.
Energy efficient lightings / fixtures are being used for exhibitions / buildings, wherever applicable by replacing old fixtures in phases to reduce energy use.
(Already
implemented)
4. Good
Governance
4. Making services
faceless, paperless,
cashless.
Electronic Service
Delivery
Schemes and Services of the
MOC and its organizations to be
online.
ASI
ASI – NOC online application
portal for construction and
shooting in ASI monument
premises.
ASI – Conservation related
(Already given at 10-
Single Window, Single
form online services)
permissions, ISRO portal, NMA
portal.
Phase II of e-ticketing to be
Aadhar linked.
The e-ticketing software adopted by ASI has provision for Adhar based authentication of visitors.
(Already
implemented).
P. Arts
Implementation of end to end automation for all schemes including organizations under the Ministry.
(Time Line: By March
2017)
Accessibility of digital locker for artists – data automation.
All the schemes being administered by the P-Arts Section are online.
Library Section
National Library is under process of automating its library services and the entire catalogue will be online by March 2017.
(Time Line: By March
2017)
(Already
implemented).
(Time Line: March
2017).
Central Reference Library has already started Publishing Indian National Bibliography in 14 Indian languages in Electronic Format.
NMML:
The NMML shall develop December 2016 Fellowship application system through online. Also, it shall develop applications for providing online services to library users such as booking microfilm service,
(Already
implemented).
(Time Line: By March
2017).
requisition for photographs etc by March 2017.
NMA
NMA launched online NOC Application Portal and Processing System to automate the NOC application process flow on 29.9.2015. The portal was also designed to show the status of the application and generate reports.
Under “Ease of Doing Business” programme the portal is also being linked to the online portal of local bodies in Delhi and Mumbai in the first phase so that applications can be made from single window in case of new construction/ expansion etc.
(Already
implemented).
(Time Line: First
Phase will be
completed by
31.3.2016).
4. Good
Governance
10. Maximum
Governance
All Government
Departments to list,
review, re-engineer
their process.
Simplified forms, preferably one
page, available online.
A system is being developed in RRRLF for online submission of application.
A user interface is proposed to be developed on the website of RRRLF so that the client can directly approach the organization.
(Time-Line- By
December 2016)
(Time Line: By March
2017).
Archaeological Survey of India
Work is in hand to introduce simplified on-line form for permission of filming, photography, etc.
(Time Line: By
October, 2016).
11. Maximum
Governance –
Third party
monitoring of
schemes
Already in force in the Ministry Akademies:
Performance Audit in respect of all the Akademies and organizations has been carried out by the outside experts.
(Already
implemented).
6. Ganga
Rejuvenation
and Swachh
Bharat
12.People’s
participation
Expansion of
Swachh Bharat
Ambassadors chain.
Ministry of Culture and its
autonomous organizations to
identify and engage Swachh
Bharat Ambassadors.
Ministry of Culture has identified two autonomous organizations – National School of Drama and Sangeet Natak Akaemi – to engage renowned personalities in the sphere of performing art as Ambassadors for Swachh Bharat Mission.
ASI
A Scheme for awarding the best maintained monuments, sites or monuments is already under consideration in ASI. The scheme would be made applicable for 2015-16 and the first award would be released in 2016.
(Time Line: By
October 2016).
13. Communication
Strategy
Develop awareness
material and toolkit
at National / State
Ministry of Culture may direct
their cultural organizations/
grantee organization for
participation in a scheduled
manner.
level for all
motivators
P. Arts.
A clause has already been incorporated in the sanction order of the schemes to the effect that “Organizations/Individuals are requested to maintain cleanliness in their office premises as well as the place where seminars, research, workshops, festivals, exhibitions etc. are organized by them and to promote and propagate awareness about Swachh Bharat among the people.”
Already implemented