mine planning
TRANSCRIPT
Consortium
RUSSIAN Company History• The Mining Company for Opencasts, Underground, infrastructure and
Washing Plants (GIPROSHAHT) was founded in 1929.
• The Mines, Infrastructure and Washery plants thus constructed and jointly-
operated with project owners under several hundred projects have found
successful application and are widely known all over the world. European
Ventures Ltd is the financial partner of Giproshaht and also responsible for
International project funding.
• During this period, First in the Soviet Union and later Russia there were
built, commissioned and operated 244 coal projects and 17 granite mines,
49 washery beneficiation plants & briquette plants.
• Since 1982 ‘GIPROSHAHT’ was appointed as the EXCLUSIVE Chief
International Project Organization under assistance of former USSR. Thus
several projects were successfully realized since this period Internationally
including INDIA .
International ProjectsBulgaria
International Projects
We take pride in the fact that a total of 52 projects for coal mines, 16 projects of Washery plants were developed Internationally in the following countries where construction and operation were made by local government under Soviet assistance including current Russia :
- for India – 14 coal mines, 2 washery plants were projected;
- for PRC – 23 projects of coal mines , 5 projects of washery;
- for Vietnam – 3 projects of coal mines , 4 projects of washery;
- for Bulgaria – 2 projects of coal mines;
- for Romania – 2 projects of coal mines;
- for Democratic People’s Republic of Korea –3 projects of coal
mines,1 project of a washery plant
- Currently 1-project at India is under planning stage, 2 Projects
at Indonesia at implementation stage , 1-project at Bulgaria
under operation and 12-projects in Russia under various stages
of planning-construction and operation.
Bucket Wheel Excavator
Focus India
INDIAN HISTORY
India has been a partner country for
GIPROSAHT since 1960s whereby several critical projects were executed of National Importance.
• Since 1983 until 1987, we worked in India. in the Central Mine Planning and Design Institute (CMPDI, Ranchi, India).
• Carried out mine planning together with educating and consulting Indian experts, and jointly planned coal mines and collieries such as
Jhanjra, Kapuria, Gidi-A, Umrer, Ramgahr, Talchir, Jayant, South Balanda, Mukunda-Jharia, Singrauli and others.
• We developed projects on modernization and improvement of coal mines Gidi-A (state of Bihar, India) and Umrer (state of
Maharashtra, India) to reach higher coal production and transfer Underground Mining into Open cast .
siberia P&H Dumper loading.mpg
Indo Russia collaboration
GIPROSHAKHT AND CMPDIL
INDIAN COLLABORATION WITH RUSSIA – 2002 report
GIPROSHAKHT has assisted Coal India Ltd in the
implementation of :
•Nigahi opencast project(Northern Coalfields Ltd.) Stagewise
construction of Nigahi coal stripping, the total capacity of 14 mln
tons of coal per year including 4.3 mln t at the first stage with
Coal Handling plants.
•Khadia opencast project (Northern Coalfields Ltd.),
•Jhanjra underground project (Eastern Coalfields Ltd.) including
re-engineering without hampering 500mtr shaft during 2002.
• Master planning of Talcher Coal mines.
Indian Projectsconsortium : European Ventures Ltd group
•Ib-valley & Korba coalfields
•Master planning of Singrauli Coal Field
•Deployment of Mining equipment at Sarishathali
Open Cast Coal mines owned by Integrated Coal
Mines Ltd-Asansol and contracted to G.S.Atwal & Co
(Engineers) Pvt.Ltd
E:\3-28-
2008(1)\2008032
7104930.mpg
Open Cast Projects55-Million tons CoalSUEK-Krasnoyarsk
Projects at a glance
COAL Projects concluded : 350 enterprises of coal and
shale industry with aggregate projected capacity more
than 300 millions tones of coal per year.
Some of the current projects under operation with Consortium Mine owners :
Afanasievsky Opencast Coal Mines : 4.5 MTPA
Suek Krasnoyarsk Opencast Coal Mines : 55.0 MTPA
Suek Krasnoyarsk Opencast Coal Mines Stage II : 25.0 MTPA
Suek Severnaya Underground coal mines : 2.7 MTPA
Suek Vorkutinskaya Underground coal mines : 2.1 MTPA
Suek VorgashorSkaya No.1 underground coal mines : 6.0 MTPA
Ugarural Kapitalnaya Underground Mines : 2.3 MTPA
Ugarural Intinskaya Underground Mine : 3.0 MTPA
Total Coal Production achieved in 2007 : 100.6 Million Tons per Annum
40-years old Open Cast Mine under operation producing 7-MTPY with our
onsite mining team
Ugarural Kapitalnaya
Projects at a Glance
Some of the current projects under operation with
Consortium Washery and Industrial complex owners :
Enisey Industrial Complex for Washery: 2.0 MTPA
Pedora Coal Washery : 6.9 MTPA
Severnaya project coal Washery : 3.4 MTPA
Vorkutinskaya Coal Washery : 2.1 MTPA
Intinskaya Coal Washery complex : 3.0 MTPA
Total Project production for 2007 : 17.4 Million Tons per Annum
Washery Projects – Some of our Current Operation
5. Intinskaya Washery since 1970
Capacity: 3 MLNTPA
Washery Projects – Some of our Current Operation
Raspadskaya Coal Preparation Plant
The factory meets the most advanced
engineering requirements and is
technically equipped for enrichment of
coal from Raspadskaya Mine, MUK-96 Mine
and Razrez Raspadsky. It was put into
commission in 2005.
The preparation plant has a minimum
capacity of 7.5 million tons of black coal
annually.
40-years old Open Cast Mine under operation having 9-seams producing 7-MTPY with strip
ration upto 1:10
DEVELOPMENT & IMPROVEMENT INITIATED IN VARIOUS TURN KEY CONTRACT MINING PROJECTS
ROAD, FACE & DUMP•Widening of Haul Road width initiated •Maintenance of compact flat surface with 4% rolling resistance
•Create protective inlet-outlet culverts for rain water discharge
•Doze face to reduce tire & Suspension damage•Use Road signage to control speed & for warnings•Maintain gradient / use diversions on high gradient•Reduce turning angle/radius at all crossings•Excavator angle and slope to be monitored•Dump Yard Dozing and Compacting•Ramp maintenance
•Operator and Driver training to be enhanced •Engine idling to be avoided•Point Man to be used to reduce idle time•Dumpers must maintain speed •Use proper Mine lighting•Between Shifts Preventive Maintenance is mandatory.•Check tyre preassure and cuts regularly•Efficient Load factor to be maintained•Systematic and Safe Maintenance program to be adopted•Maintain Equipment and Tyre Log Books•Maintain fast moving spares, tools, tackles•Train and observe safety and environmental norms
Drilling/Blasting Haulage Infrastructure
Maintenance Manpower Training
End to End Solution Provided
CERTIFICATION
Project Provider: Lafarge Cement
year of Initiation : 2004
Project name: Design and
Operation of Afanasievsky Open
Cast Mine
Mineral Capacity: 4.5 Million tons
per annum (strip ration 1:5)
Materials: Limestone, Jurassiclays
etc.
CERTIFICATION
Project Partner : SUEK-
Krasnoyarsk Co.
Project Name : Design and
Operation of Berezovsky Open
Cast Mine
Coal capacity: 55 Million Tons Per
Year (Strip ration 1:6)
Execution and operation in stages:
1965, 1975 and 2003
CERTIFICATION
Large projects Designed by
“Giproshaht” and under Consortium
Operation with SUEK
1. Severnaya Underground Mine
Stages: 1969, 1973, 1991 and 1993
Coal Capacity: 2.7 MTPY (Strip 1:9)
2. Vorkutinskaya Underground Mine
Stages: 1973, 1976, 1994, and 1996
Coal Capacity: 2.1 MTPY (Strip 1:6)
3. Vorgashorskaya No.1 Open Cast Mines
Stages: 1975, 1988 and 1992
Coal Capacity: 6 MTPY (Strip 1:4)
CERTIFICATION
Large projects Designed by
“Giproshaht” and under Consortium
Operation with URALUGOL:
1. Kapitalnaya Underground Mine
Stages: 1980, 1987 and 1990
Coal Capacity: 2.3 MTPY (Strip 1:6)
2. Intinskaya Underground Mine
Stages: 1965, 1975, 1979 and 1991
Coal Capacity: 3 MTPY (Strip 1:5)
3. Ural –1 Underground Mine
Stages: 1967, 1972 and 1975
Coal Capacity: 4.5 MTPY
CERTIFICATION
Large projects Designed by
“Giproshaht” and under Consortium
Operation with SUEK:
1. Project Partner :SUEK
Project Name : Design and Operation of
Open Cast Coal Mines at Krasnoyarsk
Capacity : 25-MTPY (Strip ratio 1:4)
Project initiation : Since 1975 and
redesigned in 1985
CERTIFICATION : WASHERIES
Large Washeries Designed by “Giproshaht”
and under Consortium Operation with SUEK:
1. Project Name : Pedora Washery since 1993
Capacity: 6.9 MTPY
2. Project Name : Severnaya Washery –
belongs to underground project since 2002
Capacity: 3.4 MTPY
3. Project Name : Vorkutinskaya since 1998
Capacity: 2.1 MTPY
4. Intinskaya Washery since 1970
Capacity: 3 MTPY
Drilling/Blasting Haulage Infrastructure
Maintenance Manpower Training
End to End Solution Provided
POWER TOOLS & APPLINCES CO LTD
GIPROSHAHT, RUSSIA
«Russian Institute of Open Pit or Underground Mine Design, Development and Turn Key Operation »
Giproshaht Russia: 6/2 Griboyedov canal, Saint Petersburg, 191011, Russia
South East Asian Office : 152 Peary Mohan Roy Rd, Kolkata -700 029
Ph: +91-33-4003-2151. Fax : +91-33-4003-2155.