AGENDA ITEM: IX-2
MILPITAS PLANNING COMMISSION
STAFF REPORT
December 11, 2019
APPLICATION: BAPS Temple Façade Remodel (P-UA19-0002, P-MS19-0010) –
A request for a Conditional Use Permit Amendment to allow an
increase in building height above 35 feet within the Industrial Park
Zoning District and a Minor Site Development Permit to allow
changes to an existing building façade in three phases and associated
site improvements, including the dedication and improvement of
required street frontage along California Circle.
RECOMMENDATION: Staff recommends that the Planning Commission adopt
Resolution No. 19-003 approving the above application, subject
to the Conditions of Approval.
LOCATION:
Address/APN: 1430 California Circle (APN: 022-37-019)
Area of City: California Circle, south of Dixon Landing Road and east of
Interstate 880
PEOPLE:
Project Applicant: Bhavesh Patel, BAPS
Property/Business Owner: BAPS San Jose, LLC
Project Planner: Lillian VanHua, Associate Planner
LAND USE:
General Plan Designation: Industrial Park (INP)
Zoning District: Industrial Park (MP)
ENVIRONMENTAL: Categorically Exempt from environmental review under the
California Environmental Quality Act (CEQA) in accordance with
CEQA Guidelines Section 15301 (Existing Facilities) and Section
15183 (Projects Consistent with a Community Plan or Zoning).
EXECUTIVE SUMMARY
The applicant is requesting a Conditional Use Permit Amendment and Minor Site Development
Permit for an increase in building height above 35 feet within the Industrial Park Zoning District
and to remodel an existing building façade and allow for associated site improvements.
Staff reviewed the applicant’s request for a Conditional Use Permit Amendment and Minor Site
Development Permit and determined that the proposed project complies with the policies and
processes outlined in the City of Milpitas General Plan, Zoning Ordinance, and Municipal Code.
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 2 of 11
Staff recommends that the Planning Commission open and close the public hearing and adopt
Resolution No. 19-003, approving the subject applications, subject to the Conditions of Approval
included as Exhibit 1.
Map 1
Project Location
Map 2
Project Site Zoning
Project Site
N
Not to Scale
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 3 of 11
PROJECT DESCRIPTION
Background
In June 1986, the Planning Commission granted Site and Architectural approval for an
approximately 150,000-square foot industrial (research and development) building at the proposed
location. Subsequent approvals included landscape and parking lot modifications, outdoor
enclosures, and roof screens.
In February 2005, the Planning Commission approved a Use Permit UP2004-41, S-Zone Approval
Amendment SA2004-121 and Mitigated Negative Declaration EA2004-15 to convert a portion
(90,000 square feet) of the existing industrial building into a place of assembly (religious facility),
associated parking reduction, and site and architecture review for minor exterior changes to the
building.
On January 18, 2017, Bhavesh Patel, representing BAPS Shri Swaminarayan Mandir, submitted
an application for a Conditional Use Permit Amendment and a Minor Site Development Permit to
remodel the existing temple façade at 1430 California Circle. The application is submitted pursuant
to Milpitas Municipal Code (MMC) XI-10-57.04(B)(1) and XI-10-57.04(C)(1), which requires
Planning Commission approval for buildings that exceed three stories or 35 feet within the
Industrial Park zoning district.
The following is a summary of the applicant’s requests:
• Conditional Use Permit Amendment: To allow an increase in building height above 35 feet
within the Industrial Park zoning district as part of the project’s façade remodel.
• Minor Site Development: To allow architectural modifications to the existing building’s
façade in three phases and associated site improvements, including the dedication and
improvement of required street frontage along California Circle.
Overview
The site is located on a 10.27-acre parcel on California Circle. The property contains an existing
150,000- square-foot industrial building surrounded by paved surface parking and landscaping on
all sides of the building.
BAPS Shri Swamniarayan Mandir is a Hindu place of worship that has been operating in Milpitas
since 1991. After receiving their use permit in 2005, the religious facility moved to the project site.
The applicant will renovate the existing building’s façade in three phases, over the course of three
years. The façade improvements include various roof ornaments clustered at the main entrance of
the building. The project will also include the dedication and improvement of required street
frontage along California Circle.
Phase 1 include the addition of the shikhars on the rooftop above the main entrance (see Figure 1).
All roof ornaments will be composed of fiberglass-reinforced plastic with resin (FRP). Phase 1
will also include the dedication of required street frontage along California Circle and the
installation of sidewalk and landscaping to match existing improvement to the north and south.
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 4 of 11
The applicant will restripe one parking stall to adjust the ADA walkway and a new concrete curb.
Phase 1 will be completed within one year of obtaining entitlement approvals.
In Phase 2, the applicant will install new window and door treatments, composed of natural wood
along the entire building façade, as well as a new “sheer peach” paint color for the concrete panels.
The applicant will replace and plant new landscaping on any bare landscape islands across the site.
Phase 2 will be completed within two years of obtaining entitlement approvals.
In Phase 3, the applicant will address the north side of the building, currently leased to Valley
Transportation Authority (VTA), with a similar treatment. Figure 2 illustrates the façade treatment
proposed for this phase of the project. The applicant will complete any remaining perimeter on-
site landscape improvements. Phase 3 will be completed within three years of obtaining
entitlement approvals. The detailed phasing plan is provided on Sheet A104-1 of Attachment B.
As noted above, the project scope includes public right-of-way and landscaping improvements
along the project site’s frontage. Civil Sheets one through eight of Attachment B outline the
proposed changes to the existing sidewalk configuration. The applicant will reconfigure the
existing sidewalk to match the adjacent properties on the north (Waterstone) and south (KB Home)
sides of the project. The new sidewalk width will increase from four feet to eight feet, with four
feet of landscaping on both sides of the sidewalk. Additionally, the applicant will install
landscaping to match the existing streetscape of the north (Waterstone) and south (KB Home)
properties along California Circle.
The Planning Division has determined that the timing and assurance of project completion is an
essential factor in the decision to recommend approval of this project. In order to ensure
completion of the project, staff requested a construction phasing plan for the requested scope of
work, included as Attachment D. Staff has included a necessary project-specific Condition of
Approval (Condition of Approval No. 19 in Resolution 19-003) to ensure the project complies
with the requirements and intent of the Milpitas Municipal Code and this project approval.
Figure 1: Proposed Phase 1 Improvements – Front Façade
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 5 of 11
Figure 2: Entire Façade Improvements
Figure 3: Phase 3 Façade Changes to the North Side of the Building
Location and Context
The site is zoned Industrial Park (MP) and is bordered by residential uses to the north and south,
industrial uses to the west, and Penitencia Creek to the east. The abutting properties are zoned
Single Family Residential (R1-2.5) to the north, Multi-Family High Density Residential (R3) to
the south, Industrial Park (MP) to the west, and Park Open Space (POS) to the east. Vicinity and
location maps of the subject site location are included on the previous pages. For zoning and land
use summary, see Table 1:
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 6 of 11
Table 1: Zoning and Land Use Summary
General Plan Zone Uses
Subject Site Industrial Park (INP) Industrial Park (MP) Religious facility,
offices
North Single Family Medium
Density (SMD)
Single Family
Residential (R1-2.5) Residential
South
Multi-Family
Residential, High
Density (MFH)
Multi-Family High
Density Residential
(R3)
Multi-Family
Residential (under
construction)
East Industrial Park (INP) Industrial Park (MP) Vacant industrial
buildings
West Parks and Open Space
(POS)
Park Open Space
(POS) Penitencia Creek trail
PROJECT ANALYSIS
General Plan Conformance
General Plan
The General Plan designation for the project site is Industrial Park. The Industrial Park designation
accommodates research, professional, packaging and distribution facilities in a park-like setting,
free from noise, odor and other nuisances. As proposed, the proposed project conforms with the
policies in the City’s General Plan, as outlined in the following chart:
Table 2: General Plan Consistency
Policy Consistency Finding
2.a-I-17 Foster community pride and growth
through beautification of existing and future
development.
Consistent: The project’s façade and landscape
upgrades will enhance the site’s use as a
religious facility, and proposed streetscape
improvements along the California Circle
frontage will provide aesthetic consistency with
the adjacent landscaping from new
developments to the north and south of the site.
2.d-G-2 Develop adequate civic, recreational,
and cultural centers in locations for the best
service to the community and in ways which
will protect and promote community beauty
and growth.
Consistent: The project will upgrade the
building façade and landscaping on site to
improve the neighborhood and identify the
building as a religious facility and cultural
center serving the community and region.
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 7 of 11
Zoning Conformance
The Zoning designation for the project site is Industrial Park, and the existing assembly use
(religious facility) is allowed with approval of a Conditional Use Permit (CUP). The project is
consistent with the City of Milpitas Zoning Ordinance, as demonstrated in Table 3 below:
Table 3:
Summary of Development Standards
Standards Proposed Complies
Front Setback 35’ 72’ Yes
Side Yard Setback 10’ No change -
Rear Setback 20’ No change -
Floor Area Ratio .50 No change -
Building Height
None. However, prior to construction of
any structure that exceeds 3 stories or
35’ in height, the Planning Commission
must make an additional finding
Two stories
30’; architectural
features 64’6.5”
Yes, with
findings*
* With approval by Planning Commission by making the following findings: (1) That any such excess height will
not be detrimental to the light, air or privacy of any other structure or use currently existing or anticipated.
Building Height
The Industrial Park Zoning District does not prescribe a maximum building height; however, any
building that exceeds three (3) stories or 35’ in height requires approval of a Conditional Use
Permit (CUP) by the Planning Commission. The proposed height may be allowed, provided that
the finding can be made that any excess height will not be detrimental to the light, air or privacy
of any other structure or use currently existing or anticipated. Staff recommends the proposed
height as discussed below in Table 4:
Table 4:
Building Height Table
Projects Within the Area Proposed / Allowable Heights
BAPS’s architectural spires 64’6.5” (proposed)
Home2 Suites (1301 California Circle) 62’10” (allowed)
Holiday Inn Suites (1100 Cadillac Court) 68’11” (allowed)
As demonstrated above, the project’s proposed height is in the same range of building heights for
nearby projects that were recently approved. Furthermore, the existing building’s placement
exceeds the setback requirements from all property lines, which creates a greater linear distance
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 8 of 11
and lessens potential impacts on light, air and privacy to other existing or anticipated structures or
uses in the vicinity. The finding related to building height can be made.
Landscaping
In addition to the proposed façade improvements, the project includes a conceptual landscape plan
to enhance the site and lessen the impact of the new building height. The conceptual landscaping
plan includes various tall trees, shrubs, and adequate groundcover along the site’s frontage that are
consistent with the landscaping to the north and south of the site. The applicant will submit a
revised landscape plan, showing street tree species and new landscaping in all parking areas, prior
to Off-Site Plan approvals/permit issuance to be in compliance with the City’s standards and
details as part of Phase 1. The project will also dedicate approximately 16 feet of public street
easement along its California Circle frontage to accommodate the detached eight-foot-wide
sidewalk and two four-foot-wide landscape strips. The landscaping shall conform to existing and
proposed landscape improvements to the north and south to match the sidewalk improvements.
The project has also been conditioned (COA nos. 22 and 23) to restore and/or upgrade all of the
landscaping across the site as part of Phase 2 and 3.
FINDINGS FOR APPROVAL (OR DENIAL)
A finding is a statement of fact relating to the information that the Planning Commission has
considered in making a decision. Findings shall identify the rationale behind the decision to take
a certain action.
Conditional Use Permit Amendment
To approve the Conditional Use Permit Amendment, the following findings must be made
pursuant to Milpitas Municipal Code Section XI-10-57.04(F)(1):
1. The proposed use at this location will not be detrimental or injurious to property or
improvements in the vicinity nor to the public health, safety, and general welfare.
The project’s façade and landscape upgrades will enhance the site’s use as a religious facility,
and the proposed streetscape improvements along the California Circle frontage will provide
aesthetic consistency with the adjacent landscaping from new developments to the north and
south. The project will improve the neighborhood and foster community and cultural pride.
Furthermore, the project’s scope of work is strictly ornamental and will not be detrimental or
injurious to property, improvement, public health, safety and general welfare.
2. The proposed use is consistent with the Milpitas General Plan.
The General Plan designation for the project site is Industrial Park. The Industrial Park
designation accommodates research, professional, packaging and distribution facilities in a
park-like setting, free from noise, odor and other such nuisances. The project will upgrade the
building façade and landscaping on site to improve the neighborhood and identify the building
as a religious facility and cultural center serving the community and region. The project is
consistent with the General Plan Policies, as outlined in Table 2.
3. The proposed use is consistent with the Milpitas Zoning Ordinance.
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 9 of 11
As demonstrated in Table 3, the project complies with the development standards as set forth
in the Zoning Ordinance. The religious facility has been conditionally permitted since 2005.
The project consists of architectural and streetscape improvements and, therefore, will not
increase the building’s overall footprint. The project will be required to install landscaping and
street trees that are compliant with the City’s streetscape standards. Although residential uses
surround the project site, the project’s ornamental and architectural enhancements respects the
neighborhood’s color palette and remains compatible with the neighborhood. The project’s
proposed height is also permitted via the approval of a Conditional Use Permit.
To approve increases above the Maximum Building Height Findings (Section XI-10-57.04-2), the
Planning Commission makes the following findings based on the evidence in the public record in
approving Conditional Use Permit Amendment No. UA19-0002 to exceed the maximum height:
4. That any such excess height will not be detrimental to the light, air or privacy of any other
structure or use currently existing or anticipated.
The Zoning Code permits a height above the 35-foot requirement if the Planning Commission
determines that the increased height will not be detrimental to the to the light, air, or privacy
of any other structure or use existing or anticipated. The project adds shikhars, similar to spires,
to the front facade, which increases the building height to 64.5 feet. The elevation and the
position of the trees along the rear of the site provide a natural barrier to any visual impact
from the homes to the east. The building is also recessed 72 feet from the front property line.
The difference in height between the spires and the separation between parcels eliminates
impacts to light, air and privacy. The applicant is proposing a landscape plan to enhance the
project site and lessen the impact of the new building height. Based on this finding, the project
is consistent with the development standards contained in the Zoning Code.
5. The project exhibits exceptional architecture and aesthetic merit to warrant the excess height.
The project’s façade and landscape upgrades help identify the building as a religious facility
and cultural center serving the community and region. The roofline of the building provides
visual interest and movement by incorporating prefinished fiberglass-reinforced polymer
(FRP) roof ornaments in varied heights. The FRP material is lightweight, highly durable,
corrosion free, and has low thermal conductivity. The color palette of the surrounding
residential buildings along California Circle and behind Coyote Creek are white, beige, brown,
peach, light purple and pink. The project’s color palette consists of peach, pink, and apricot
colors with natural wood doors and doorways that match the residential buildings. The balcony
design on the façade is also consistent with the residential balconies to the north. While the
colors and balconies of the structure reflect the other residential buildings in the area, the roof
ornaments that exceed the height limit define the project site and provide architectural identity
to the building. Therefore, the project employs exceptional architecture and has aesthetic merit
that warrants the excess height.
Minor Site Development Permit
To approve the Minor Site Development Permit, the following findings must be made pursuant to
Milpitas Municipal Code Section XI-10-57.03(G):
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 10 of 11
1. The development recognizes and respects the nature of the neighborhood and site,
development patterns, materials used, and the expectations of those who will see and use the
building.
The proposed modification to the façade of the building recognizes and respects the changing
nature of the neighborhood, the site, development patterns, materials used, and the
expectations of those who will see and use the building. When the applicant purchased the
property in 2005, the surrounding area was primarily occupied by commercial and industrial
uses. Recently, properties to the north and south of the project site have been converted to
residential development. The project reconfigures the sidewalk to match the properties to the
north and south. The proposed modifications would meet the expectations of those who will
see and use the building, and the ornamental architectural changes will transform the building
and represent a traditional Hindu place of worship.
2. The development assures that modifications satisfy functional requirements, and are screened
with appropriate compatible materials.
The architectural modifications will refresh the building and provide greater aesthetic quality
and compatibility to its use as a religious facility. The proposed architectural style
complements the use of the building, and the proposed materials are compatible with the
existing materials and help in creating a cohesive design. While the proposed rooftop
architectural features increase the height of the building from 30 feet to 64.54 feet, the building
is recessed 72 feet from the front property line and the reconfiguration of the sidewalk along
the property’s frontage and plant landscaping will partially screen the proposed modifications.
3. The development assures that the modifications will not interfere with the privacy, quiet
enjoyment or view of the surrounding properties.
The proposed development does not involve additional windows, glare or substantial changes
to the building envelope such that the privacy and views of neighboring properties are
compromised. The rooftop architectural features will not emit any sound or direct light to
impact the surrounding properties. The building is also setback 72 feet from the front property
line. Furthermore, the existing building’s placement exceeds the setback requirements from
all property lines, which creates a greater linear distance and lessens potential impacts of the
privacy, quiet enjoyment or view of the surrounding properties. The development is also
located within the valley floor and surrounded by numerous trees and 100-foot power lines
throughout the area.
ENVIRONMENTAL REVIEW
The Planning Department conducted an environmental assessment of the project in accordance
with the California Environmental Quality Act (CEQA). Per staff’s review, the project is exempt
from California Environmental Quality Act (CEQA) review pursuant to CEQA Guidelines Section
15301 (Existing Facilities) in that the project consists of ornamental features along the building
façade and public right-of-way improvements and will not expand the use of the existing religious
Agenda Item IX-2: BAPS Façade Remodel 12/11/2019 Page 11 of 11
facility. Therefore, the project is categorically exempt. None of the exceptions to the applicability
of this categorical exemption are present.
As a separate and independent basis, the project is exempt from further environmental review
pursuant to CEQA Guidelines Section 15183 (Projects consistent with zoning, community plan,
or general plan). The project consists of exterior modifications that will not change the building’s
footprint and complies with the City’s existing zoning, specific plan, community plan, and general
plan. No peculiar circumstances exist, and therefore, no further environmental review is required.
PUBLIC COMMENT/OUTREACH
Staff provided public notice of the application in accordance with city and state public noticing
requirements. At the time of publishing this report, there have been no public comments received.
A notice was published in the Milpitas Post on November 29, 2019. In addition, the City sent
1,378 notices to owners and residents within 1,000 feet of the project site. A public notice was also
provided on the project site, on the City’s Website, www.ci.milpitas.ca.gov, and posted at City
Hall.
RECOMMENDATION
STAFF RECOMMENDS THAT the Planning Commission:
1. Open the Public Hearing to receive comments;
2. Close the Public Hearing; and
3. Adopt Resolution 19-003, approving Conditional Use Permit Amendment P-UA19-0002
and Minor Site Development Permit P-MS19-0010, subject to the findings and Conditions
of Approval
ATTACHMENTS
A: Resolution No. 19-003
B: Project Plans