michael boyd u.s. environmental protection agency ... michael boyd 2015.pdf · michael boyd u.s....
TRANSCRIPT
Michael Boyd
U.S. Environmental Protection Agency
Member of ICRP Committee 4
Third International ICRP Symposium
Seoul, Korea
20 October 2015
This presentation represents the author’s views and
opinions. It does not necessarily reflect the official
positions of the U.S. Environmental Protection Agency or
other federal and state agencies involved with managing
contaminated sites in the U.S.
This presentation has neither been approved nor endorsed
by the Main Commission of ICRP.
2
� In the U.S., radioactively contaminated sites may be
managed by local and state authorities or, at the federal
level, by the Department of Energy (DOE), the Nuclear
Regulatory Commission (NRC), the Department of
Defense (DoD), or the Environmental Protection Agency
(EPA), among others.
� This presentation focuses on sites where EPA either has
the lead or has had significant input into cleanup
decisions.
3
� Radium (and vanadium) sites from early 20th century
� Sites contaminated from atomic energy and nuclear
weapons development programs (includes Manhattan
Engineer District (MED) sites and Atomic Energy
Commission (AEC) sites)
� Uranium mill tailings sites
� Sites contaminated from previously allowed practices or
small accidental releases (includes nuclear, industrial,
medical, research and military uses of radioactive
material)
� Sites containing naturally occurring radioactive material
(rare earth mining, oil and gas industry)4
� No federal laws and regulations specifically addressed cleanup of radioactively contaminated sites until 1970s
� Legacy uranium milling sites and vicinity properties are cleaned up under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA)
� UMTRCA is an amendment to Atomic Energy Act (AEA)
� EPA and DOE may both use the process defined in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for managing site cleanups
� EPA implements CERCLA through the Superfund Program
� CERCLA/Superfund applies to all hazardous pollutants at a site
� NRC regulations for cleanup and decommissioning of their licensed facilities are under their AEA authority
5
� Uranium Mill Tailings Radiation Control Act (1978)
� Covers inactive and active U mill sites
� UMTRCA identified 22 inactive mill sites
� Using UMTRCA authority, EPA established cleanup
standards for sites contaminated with buried and wind-
blown tailings (40 CFR part 192, subpart B)
� General cleanup standard for Ra-226 in soil is 185 Bq/kg (given as 5 pCi/g) in top 15 cm; 555 Bq/kg below 15 cm (same value for Ra-228 at thorium sites)
� 555 Bq/kg viewed as a finding tool for locating buried tailings, which were generally much higher in concentration
6
� EPA’s Superfund Program implements CERCLA
� CERCLA cleanup process is sometimes used by other agencies outside the Superfund program
� For cleanup under Superfund, a site must first be listed
on the National Priorities List (NPL)
� NPL listings are determined by a Hazard Ranking System score (for all onsite contaminants except natural background)
� Cost of cleanup is shared by responsible parties (“polluter pays” doctrine), but the Superfund Program covers the cost of cleanup when no liable parties are identified
� Superfund funding mechanism allows for stringent risk
reduction goals to be achieved
9
� Preliminary Assessment/Site Investigation
� Initial site assessment
� National Priorities List (NPL) Site Listing Process
� Uses Hazard Ranking System to identify highest priority sites
� Remedial Investigation/Feasibility Study
� Site characterization phase; includes baseline risk assessment
� Determination of options for remediation
� Records of Decision (remedy selection)
� Final Steps: Cleanup activities, post-cleanup reviews,
eventual removal from the NPL
10
� Except for mill tailings sites, most EPA radiation site
cleanups are carried out using the CERCLA process
� Following cleanup, target residual risk goal is 10-4 to 10-6
excess cancers
� No more than ~ 1 lifetime excess radiogenic cancer among 10,000 individuals exposed at the cleanup level (95th
percentile lifetime exposure duration is 25 to 30 years)
� At current risk estimates, this equates to a cleanup goal of around 100 to 150 µSv per year to a reasonably maximally exposed individual
11
� ICRP Pub. 103 recommends public dose reference levels for existing site cleanups in the range of 1 to 20 mSv/a, with optimization below the reference level
� CERCLA-based regulations in the U.S. result in radiation site cleanup goals that yield public doses that are typically 10 to 100 x lower than this range (i.e., in the lower end of ICRP recommended range for planned exposures)
� Cleanup goals generally set based on unrestricted future use
� When unrestricted future use is not achievable, risk objectives may be met by limiting future site use to commercial/ industrial activities or other restricted access uses (park, game preserve, etc.)
12
� Curies discovered radium (RaCl) in 1898
� Some rare earth mining (e.g., vanadium) left behind radium in tailings
� Many radium sites associated with early 20th century uses and misuses of radium
� Radio-luminescent dials
� Medical treatments (some legitimate) and quackery
� Radium research activities
� Many contaminated sites ignored or not discovered until mid-20th century or later
� Radium sites now cleaned up following CERCLA process
13
� 1924 – 1944: University of Pennsylvania physics
professor enriched radium ore in his home
� 1964: Pennsylvania Department of Health performs
partial cleanup
� Pennsylvania informs EPA of site in 1983 and it is listed
on NPL in 1985; Cleanup is federally funded
� Threat from radium and radon assessed in house and
vicinity property
� Result: removal of 1,300 metric tons of contaminated
building rubble and 3,700 metric tons of contaminated
soil; Site removed from NPL in 1991
14
� 469 residential properties and ten municipal properties (total of ~50 hectares) contaminated from nearby radium processing facilities that operated in early 1900s
� State of New Jersey discovered high indoor radon and gamma levels in 1983; listed on NPL in 1985
� Estimated that 170,000 m3 of radium-contaminated soil was spread across the site over time
� Remedy involved excavation and off-site disposal of all radium-contaminated soil, followed by restoration of the properties (some residents temporarily relocated)
� Cleanup began in 1990, was completed in 2004, and site was removed from NPL in 2015
15
� Program started in 1974 to address sites with
contamination resulting from U.S. atomic energy and
nuclear weapons programs (1940s – 1960s)
� Sites contaminated with low levels of uranium, thorium and radium, and their decay products
� Cleanup responsibility transferred from U.S. Department
of Energy (DOE) to the U.S. Army Corps of Engineers
(ACE) in 1998
� Sites being cleaned up using CERCLA process
� Following cleanup, sites transferred to DOE Legacy Management Program
16
� Site was used by MED/AEC from 1947 – 1952 to store
residues from uranium ore processing
� Site is 77 hectares on federal land
� Radioactive waste is impounded in a 4 hectare interim
waste containment structure
� 184,000 m3 of soil contaminated with U-238, Th-230, Cs-137,and Ra-226; includes ~3,000 m3 of Ra-226 at 19 MBq/kg (legacy Belgian Congo ore)
� US ACE is in charge of ongoing site management and cleanup activities
18
� EPA regulations under Superfund and UMTRCA have
guided the cleanup of most legacy radiation sites since
~1980s
� Cleanup of existing exposure situations in the U.S. often
results in residual doses to the public well below ICRP
Pub. 103 reference levels
� EPA’s management of contaminated sites uses the ICRP
process of optimization to determine cleanup goals
� Superfund baseline risk assessments for determining risk-based cleanup goals rely on ICRP biokinetics and dosimetry
� Legacy radiation site management in the U.S. is a
continuing effort19