Page 1: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Mechanical equipment and operation and maintenance

Session VI

Elín Hallgrímsdóttir and Lilja Tryggvadóttir

Mannvit Strasbourg, Nov. 8th, 2012

Page 2: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Presentation overview

• Features of mechanical equipment used in geothermal power plants

• Example showing methods used for choosing a gas extraction system

• O&M with photographs of extreme conditions shown

Page 3: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant Preliminary P&ID

Two phase flow

Steam separators

Geothermal

water

Steam

Re-injection wells

Pressure

regulation

Geothermal water

emergency

exhaust

Turbines

Generators

Mist separators

Cooling

towers

Condenser

s

Condenser

s

Page 4: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant - Turbine

• Axial turbines

• Single flow

• Double flow

• Turbo expander

Page 5: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Single and double flow turbines

single flow 20 - 70 MW Double flow 40 - 140 MW

Page 6: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Double pressure 6,3/1,4 bara -> 0,1 bara

Page 7: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant – Turbine / generator

• Rotor

• Turbine blade size is over 30”

• Corrosion protection on the last stages

• Turbine drain

• Double steam inlet – Stem free test

• Generator

• Overpressure in generator housing

Page 8: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant - Heat Exchangers

• Evaporators/recuperators

• Conventional shell and tube or plate heat exchangers

• Hybrid

• Condensers

• Direct contact

• Indirect contact • Shell and tube

• Special cooling section for gas

Page 9: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant - Gas extraction system

• Type

• Compressors

• Vacuum pumps

• Ejectors

• Selection

• Gas content

• Condenser pressure

• Cost evaluation • Price of electricity/steam

2 stage hybrid system

Page 10: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant - Cooling Tower

25. 02. 2008

Wet CT Hybrid CT

• Type

• Wet

• Hybrid

• Dry

• Selection

• Cost efficiency

• Availability of water

• Visual impact

Page 11: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant - Layout

Page 12: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,
Page 13: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Layout – 45 MW unit at Hellisheiði

Page 14: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Power Plant – Building

• Turbine hall

• Conventional steel structure

• Connecting buildings

• Housing electrical rooms

• Concrete building to achieve higher tightness

• Earthquake requirements

Page 15: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Layout – 133 MW hot water plant at Hellisheiði

Page 16: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Example

• Selection of gas extraction system

• Assumptions

– Gas content 1% gas

– Steam consumption 83 kg/s

– Price of steam 500.000 EUR/kg/s

– Price of electricity 300.000 EUR/100 kW

Page 17: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Example, continued

• Vacuum pumps – Electrical consumption 1200 kW – Capital cost 400.000 EUR

• Ejectors – Steam consumption 5 kg/s – Capital cost 100.000 EUR

• Hybrid system – Electrical consumption 300 kW – Steam consumption 2 kg/s – Capital cost 200.000 EUR

Page 18: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Example, continued

• Evaluation formula

– CC+EC*PE+SC*PS

• Capital Cost (CC)

• Electrical Consumption (EC)

• Price of Electricity (PE)

• Steam Consumption (SC)

• Price of Steam (PS)

Page 19: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

• Vacuum pumps: – 400.000 + 1200*300.000/100 = 4.000.000 EUR

• Ejectors – 100.000 + 5*500.000=2.600.000 EUR

• Hybrid system – 200.000+2*500.000+300*300.000/100=2.100.000 EUR

• Hybrid system would be selected.

Please note that numbers are fictive.

Page 20: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Operation and maintenance

• In this session operation and maintenance of geothermal power plants with emphasis on the geothermal part of the plant is introduced. Photographs of extreme conditions will be shown.

Page 21: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Geothermal Power Plants

• Central operation centers

• Observation of machinery

• Security

• Operation supplies (chemical for cooling water, inhibitors, oil, filters for air cleaning, cleaning products, binary fluid)

Included in Operation & Maintenance

Page 22: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Geothermal Power Plants

• Maintenance – work (rotor and generator every 15 years)

• Maintenance – supplies

• Monitoring of the reservoir and area

• Drilling for maintaining steam

Operation & Maintenance

Page 23: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Operating Console

Page 24: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Turbine Monitoring

Page 25: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Wellhead

Page 26: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Enclosure Wellheads

Page 27: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Leakage in Wellhead

Page 28: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Leakage in Wellhead

Page 29: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Leakage in Wellhead

Page 30: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Leakage in Wellhead

Page 31: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Leakage in Wellhead

Page 32: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Well Discharge in Winter

Page 33: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Well Discharge in Winter

Page 34: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Wellhead Master Valve

Page 35: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Well Cleaning during Discharging

Page 36: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Steam Separator for 60 kg/sek

Page 37: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Cooling Tower in Winter

Page 38: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Turbine Rotor

Page 39: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Cleaning of Rotor

Page 40: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Scaling on Rotor

Page 41: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Scaling in Stationary Diaphragms

Page 42: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Erosion in Stationary Diaphragms

Page 43: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Erosion in Stationary Diaphragms

Page 44: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Erosion in Stationary Diaphragms

Page 45: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Diaphragm Repaired by Welding

Page 46: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Diaphragms Repaired by Welding

Page 47: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Erosion of Rotor

Page 48: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Damages Caused by Drainage

Page 49: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Improvement of Drains in Turbine

Page 50: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Drains in Turbine

Page 51: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Shut Down Valve Axle

Page 52: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Shut Down Valve End Bearing

Page 53: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Turbine and Generator Bearings

Page 54: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Oil filter

Page 55: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Oil System

Page 56: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Broken turbine blades

Page 57: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Damaged turbine housing

Page 58: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Generator broken

Page 59: Mechanical equipment and operation and · PDF fileMechanical equipment and operation and maintenance Session VI Elín Hallgrímsdóttir and Lilja Tryggvadóttir Mannvit th Strasbourg,

Thank You! VISIT GEOELEC.EU