  • THE METROPOLITAN DISTRICT

    HARTFORD COUNTY, CONNECTICUT

    PROJECT MANUAL

    January 2017

    MDC

  • The Metropolitan District (Project Name)

    Contract No. XXXX-XX

    Project Manual Table of Contents

     

    TOC‐1 

     Section Title Division 0 Bidding and Contract Requirements 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid Form

    Part A – Miscellaneous Work Part B – Sewers and Appurtenances Part C – Sewer Rehabilitation Part D – Water Main and Appurtenances Part E – Excavation and Backfill Part F – Maintenance and Protection of Traffic Part G – Paved Surface Restoration Part H – Unpaved Surface Restoration Part I – Project Specific Items Part J – Fixed Prices

    00400 Table of Contents Supplements to Bid Forms 00410 Bid Bond 00420 Bidder's Qualification Form 00425 Representation Regarding Self-Performed Work 00430 Affidavit of Non-Collusion and Independent Price Determination 00440 Certificate of Authority 00445 OSHA Compliance History Certification 00450 MDC Fair Employment Equal Opportunity Non-Discrimination 00460 Letter Re Performance and Payment Bonds 00470 Contractor Safety Final-revisions 00485B Named Subcontractor Bidder Qualification Form 00485C Contractor Licensing 00490 DAS Update (Bid) Statement 00500 Agreement 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond

  • The Metropolitan District (Project Name)

    Contract No. XXXX-XX

    Project Manual Table of Contents

     

    TOC‐2 

    Section Title 00630 Insurance Form 00700 Standard General Conditions 00800 Supplementary Conditions

    Division 1 General Requirements 01010 Summary of Work 01025 Measurement and Payment 01025A Asphalt Adjustment Table 01030 Allowances 01035 Modification Procedures 01040 Coordination With Utilities 01044 Progress and Sequence of Work 01046 Control of Work 01050 Field Engineering 01050A District Layout & Stationing Procedures 01060 Regulatory Requirements 01060A Application for Temp Hydrant Use 01060B Hydrant Meter Process Contractor 01060C DEEP Planned Bypass Form 01060D Command Center Procedure 01082 Project Signs 01082A Project Sign Template 01090 Reference Standards 01110 Environmental Protection Procedures 01120 Site Specific Health & Safety Plan 01152 Applications for Payment 01152A Application for Payment Form 01200 Project Meetings 01300 Submittals 01310 Progress Schedules 01320 Construction Photographs 01321 Color Audio-Video Documentation Surveys

  • The Metropolitan District (Project Name)

    Contract No. XXXX-XX

    Project Manual Table of Contents

     

    TOC‐3 

    Section Title 01370 Schedule of Values 01390 Contractor Evaluations 01390A MDC Contractor Performance Evaluation form at 50% 01390B MDC Contractor Performance Evaluation form at 100% 01450 Quality Control 01451 Independent Testing Services 01490 Contractor Staging Area 01500 Temporary Facilities 01510 Maintenance of Flow in Existing Sewers 01561 Pest Control 01562 Dust Control 01570 Maintenance and Protection of Traffic 01576 Traffic Control Persons 01600 Delivery, Storage, and Handling 01630 Substitutions and Product Options 01700 Contract Closeout 01720 As-Built Documents 01725 Preservation and Restoration of Project Features 01740 Warranties

    Division 2 Sitework 02011 Test Pits 02050 Demolition and Modifications 02053 Removal and Disposal of Existing Pipe, Manholes and Appurtenances 02054 Removal or Abandonment of Existing

    Water Main and Appurtenances 02100 Site Preparation 02112 Asbestos Cement Pipe Repairs, Removal and Disposal 02140 Dewatering and Drainage 02145 Handling Contaminated Groundwater 02150 Bypass Pumping, Handling Storm Runoff and Sanitary Sewage Flows 02160 Excavation Support Systems

  • The Metropolitan District (Project Name)

    Contract No. XXXX-XX

    Project Manual Table of Contents

     

    TOC‐4 

    Section Title 02200 Earthwork 02201 Earth Excavation Below Specified Grade and Outside Limits of the

    Trench 02202 Trench Refill 02210 Rock Excavation and Disposal (Blasting Not Allowed) 02213 Rock Excavation and Disposal (Blasting Allowed) 02260 Excavation, Handling, Transportation and Disposal of Regulated Soil 02270 Sedimentation and Erosion Control 02312 Shaft Excavation and Support 02317 Underground Warning Tape 02444 Chain Link Fence and Gates 02510 Temporary and Permanent Paved Surface Restoration 02515 Concrete Sidewalks and Walkways 02516 Concrete Driveway Aprons and Ramps 02517 Reinforced Concrete Pavement Base 02605 Manholes 02610 Sewer Testing and Cleaning 02612 Reinforced Concrete Pipe 02615 Ductile Iron Pipe for Sanitary Sewer 02622 Polyvinyl Chloride Sewer Pipe 02628 Pipe Repair Couplings 02640 Point Repairs to Sanitary Sewer Lines 02641 Air Valve Assembly 02642 12-Inch and Smaller Gate Valves 02644 16-Inch and Larger Butterfly Valves 02645 Fire Hydrant Assembly 02651 Ductile Iron Water Main and Fittings 02653 Disinfecting and Flushing Water Mains 02654 Removal of Protruding Taps 02656 Tapping Sleeve and Gate Valve 02657 Water Service Renewal or Reconnection

  • The Metropolitan District (Project Name)

    Contract No. XXXX-XX

    Project Manual Table of Contents

     

    TOC‐5 

    Section Title 02669 Blow-Off Assembly 02677 Sewer Service Lateral Rehabilitation 02720 Catch Basins 02721 Laying Sewer and Drain Pipe 02764 Television Inspection 02765 Cured-in-Place Spot Repair 02766 Cured-in-Place Pipe for Sewer Mains 02767 Manhole Rehabilitation 02768 Manhole Monolithic Lining System 02769 Manhole Chimney Lining System 02770 Manhole Cleaning 02771 Granite Curbing 02900 Landscaping 02905 Unpaved Surface Restoration and Reset Miscellaneous Items 02930 Loaming, Seeding and Sodding 02971 Cleanup

    Division 3 Concrete 03100 Concrete Formwork 03200 Concrete Reinforcing 03302 Miscellaneous Concrete 03604 Non-Shrink Construction Grout 03740 Modifications To Existing Concrete Appendix

    A MDC Standard Details Manual B MDC Standard Materials List   

  • Division 0 – Bidding and Contract Requirements

  • 00020-1

    THE METROPOLITAN DISTRICT

    INSERT CONTRACT NAME

    CONTRACT NUMBER INSERT NUMBER INVITATION TO BID Sealed Bids for construction of Contract Number 20##-##: [Insert Name of Project] Project will be received and safeguarded by The Metropolitan District, at the office of the District Clerk of the Metropolitan District, 555 Main Street, P.O. Box 800, Hartford, CT, 06142-0800 until 2:00 PM (Local Time), [Insert Date] and at that time and place Bids will be publicly opened and read aloud. The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for [insert project description] along with support equipment and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details. The Work shall be located in the City of Insert Location; in the State of Connecticut as shown on the Drawings and specified therein. Contract documents may be obtained from The Metropolitan District’s electronic procurement bidding system. Prospective Bidders must register at the web site; once registered, prospective bidders can download the bid package from the web site at www.ebidexchange.com/mdc. The Contract documents can also be viewed in person at MDC Headquarters located at 555 Main St., Hartford, CT by making an appointment with the District Clerk's Office at 860.278.7850, Ext. 3207. Each Bid shall be submitted in strict accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 10 percent of the Bid.

    The Contractor, and any Subcontractors performing work with a subcontract value of $500,000 or greater, shall hold a current DAS Contractor Prequalification Certificate from the Department of Administrative Services of the State of Connecticut according to C.G.S§ 4a-100, C.G.S. §4b-101 and C.G.S.§4b-91. The Certificate Classification shall be “insert classification”. Bidders shall submit with their Bids a DAS Contractor Prequalification Certificate along with a current Update (Bid) Statement. Any bid submitted without a copy of the DAS Prequalification Certificate and an Update (Bid) Statement shall be invalid. Prior to the commencement of any portion of the Work by a Subcontractor whose subcontract value is equal to or greater than $500,000, the Contractor shall provide to the Owner a current DAS Contractor Prequalification Certificate for such Subcontractor along with an Update (Bid) Statement. Bidders do not need to include subcontractor certificates with their bids, but the apparent low bidder shall submit such certificates to owner within fourteen (14) calendar days after Bid opening. The Successful Bidder and each of its Subcontractors having subcontracts in value equal

  • 00020-2

    to or greater than $500,000 shall maintain and keep current their respective DAS Contractor Prequalification Certificates at all times during the term of the Contract and any warranty period set forth in the Contract Documents. A mandatory pre-bid conference will be held for potential Bidders at INSERT DATE AND TIME, at MDC PreBid Conference Room, 231 Brainard Rd, Hartford, CT. Prospective Bidders must attend this conference. All prospective Bidders are invited to ask questions to the District and/or the District’s Agent(s) during this conference.

    John S. Mirtle District Clerk

  • 00100-1

    THE METROPOLITAN DISTRICT

    INSERT CONTRACT NAME

    CONTRACT NUMBER INSERT NUMBER

    INSTRUCTIONS TO BIDDERS ARTICLE 1. GENERAL INSTRUCTIONS 1.1 The Work of the Project is defined in Section 01010 of the technical specifications and the other specifications and Contract Drawings included in the Contract Documents and listed on eBid exchange. ARTICLE 2. COPIES OF CONTRACT DOCUMENTS 2.1 Complete sets of Contract Documents shall be used in preparing Bids; neither the Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. 2.2 The Owner and Engineer in making copies of Contract Documents available do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. ARTICLE 3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE 3.1 Before submitting a Bid, each Bidder must (a) examine the Contract Documents thoroughly, (b) attend the Mandatory Pre-Bid Conference and Site Tour to become familiar with local conditions that may in any manner affect cost, progress or performance of the Work, (c) become familiar with Federal, State and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work; and (d) study and carefully correlate Bidder's observations with the requirements of the Contract Documents. The Bidder’s attention is drawn to the Special Provisions document listed on the eBid exchange website. 3.2 Before submitting a Bid, Bidders shall, at their own expense, make such investigations and tests as they may deem necessary to determine their Bid for performance of the Work is in accordance with the time, price and other terms and conditions of the Contract Documents. 3.3 Not Used. 3.4 The lands upon which the Work is to be performed, rights-of-way for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Supplementary Conditions, Standard General Conditions or on the Contract Drawings.

  • 00100-2

    3.5 The submission of a Bid will constitute an incontrovertible representation that the Bidder has complied with every requirement of these Instructions and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the Work. 3.6 Any Contract or Contracts awarded under this invitation for Bids are expected to be funded in part by the State of Connecticut Department of Energy and Environmental Protection and/or the Department of Public Health. Neither the State of Connecticut nor any of its departments, agencies or employees is or will be a party to this invitation for Bids or any resulting Contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-482-4 of the Regulations of Connecticut State Agencies. A copy of these Regulations is included in the Supplementary Conditions. 3.7 The Successful Bidder shall have Insert Number of Days calendar days to perform the Work from the date specified in a Notice to Proceed issued by the Owner. ARTICLE 4. INTERPRETATIONS/QUESTIONS

    4.1 Questions concerning the Bid submittal process such as formats, forms, and bonding should be referred to the Owner’s Contract Specialist, Insert Name, at telephone 860-278-7850, Ext. XXXX between the hours of 8:00 a.m. to 4:00 p.m., Monday through Friday, except holidays.

    4.2 Questions about the meaning or intent of the Contract Documents shall be received only by email to the Owner’s Project Manager, Insert Name, at Insert Email Address no later than 4:00 PM on Insert Date. All inquiries should include a subject line beginning with “ Insert Contract Number Bid Period Inquiry, #, Organization” replacing “#” with the inquiry # (beginning with 1) and replacing “Organization” with the name of the organization submitting the inquiry. 4.3 The Owner is not responsible for any questions not received by the date and time required. The Owner will neither approve nor disapprove particular products or methods prior to the opening of the Bids; such products or methods will be considered only if offered by the Successful Bidder for incorporation into the Work using the methods prescribed by the Contract Documents including the provisions that relate to submittals and “or equal” substitutions. 4.4 Written clarifications, interpretations or any solicitation changes will be issued by Addenda not later than five (5) business days before the Bid opening date. Only questions answered by formal written Addenda will be binding. Oral and other clarifications or interpretations will be without legal effect. Addenda and all supporting documents will be posted on eBid exchange website (www.eBidexchange.com/mdc) to allow Bidders to download Addenda. 4.5 Bidders are responsible for determining that they have received all Addenda issued and noting such receipt on the Bid Form.

  • 00100-3

    ARTICLE 5. PRE-BID CONFERENCE AND SITE TOUR 5.1 A mandatory Pre-Bid Conference (and Site Tour) will be held for potential Bidders at Insert Date and Time at Insert Location and Address, Connecticut. Prospective Bidders must attend both the Pre-Bid Conference and Site Tour and provide requested information on the sign-in sheet provided at the start of the Pre-Bid Conference and initial the sign-in sheet following the conclusion of the Site Tour. All prospective Bidders are invited to ask questions to the Owner and/or the Owner’s Agent(s) during this conference, but only written responses to such questions may alter information contained in the Bid documents. Attendees on the Site Tour must have appropriate personal protective equipment (PPE), which shall at a minimum include hard hat, reflective vests, steel-toed boots, and eye protection. Attendees without appropriate PPE will not be allowed to participate in the Site Tour. ARTICLE 6. BID SECURITY 6.1 Each Bid must be accompanied by a Bid bond, or a certified check, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to the Owner (‘Bid Security”). Bid bonds must be issued by a surety licensed in Connecticut and listed on the Department of Treasury’s Listing of Approved Sureties with an underwriting limitation of no less than the full amount of the Bid. The Bid Security shall be in the amount EQUAL TO TEN PERCENT (10%) of the amount of the Bid. Bid Security shall be sealed in a separate envelope from the Bid and then attached to the envelope containing the Bid. All Bid Securities except those of the three (3) apparently lowest, responsible and eligible Bidders will be returned within ten (10) business days after opening of the Bids. All Bid Securities will be returned on the execution of the Agreement or if no award is made, within NINETY (90) business days after the actual date of opening of the Bids, unless forfeited under the conditions herein stipulated. 6.2 In case a party to whom a Contract is awarded shall fail or neglect to execute the Agreement and furnish the satisfactory bonds within the time specified, the Owner may determine that the Bidder has abandoned the Contract, and thereupon the Bid of such Bidder and Owner’s acceptance therefore shall be null and void and the Bid Security accompanying such Bid shall be forfeited to the Owner as liquidated damages for such failure or neglect and to indemnify said Owner for any loss which may be sustained by failure of the Bidder to execute the Agreement and furnish the bonds as aforesaid, provided that the amount forfeited to the Owner shall not exceed the difference between the Bid Price of said Bidder and that of the next lowest responsible and eligible Bidder and provided further that, in case of death, disability, or other unforeseen circumstances affecting the Bidder who failed to execute the Agreement and furnish the bonds as aforesaid, such Bid Security may be returned to such Bidder in the sole discretion of the Owner. After execution of the Agreement and acceptance of the bonds by the Owner, the Bid Security accompanying the Bid of the Successful Bidder will be returned.

  • 00100-4

    ARTICLE 7. PERFORMANCE, PAYMENT AND OTHER BONDS 7.1 Performance, Payment and other Bonds shall be provided in accordance with Article 5 of the Standard General Conditions, Special Provisions, and Supplementary Conditions of the Contract.- (“Contract Security”) 7.2 All Bonds required as Contract Security shall be furnished with the executed Agreement. ARTICLE 8. BID FORM 8.1 Each Bid shall be completed on the Bid Form, Document 00300, which shall be unchanged except for the insertion of names, addresses, prices and other required data in the spaces provided on the Bid Form. All blank spaces for Bid prices must be filled in with the unit price for the Item or the lump sum for which the Bid is made. Refer to Special Provisions for list of documents to be completed and submitted at time of Bid.

    8.2 Bid Forms shall be completed in ink or by typewriter. The Bid price of each Item on the form shall be stated in both words and figures. If unit prices are required on the Bid Form, discrepancies between unit prices and their respective total amounts will be resolved in favor of the unit prices. Discrepancies between words and figures will be resolved in favor of words. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 8.3 Bids by corporations shall be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature. 8.4 Bids by limited liability companies shall be executed in the limited liability company name by a duly authorized member or manager of the company. The company address and State of organization shall be shown below the signature. 8.5 Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title shall appear under the signature. The official address of the partnership shall be shown below the signature. 8.6 Not Used. 8.7 All names shall be typed or printed below the signature. Signatures shall be in blue ink. 8.8 The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which shall be filled in on the Bid Form). 8.9 The name, address and email address to which communications regarding the Bid are to be directed shall be shown clearly.

  • 00100-5

    8.10 One copy of each Bid shall be submitted in a sealed opaque envelope bearing on the outside the Bidder's name, address, and the Project Title for which the Bid is submitted. (If forwarded by mail, Bid and sealed envelope marked as described above shall be enclosed in another envelope with the notation "BID ENCLOSED" on the face and addressed as indicated in the Invitation to Bid.) 8.11 The Owner may consider not responsive any Bid not prepared and submitted in accordance with the provisions hereof. ARTICLE 9. RECEIPT OF BIDS 9.1 Sealed Bids for the Work of this Contract will be received and safeguarded at the time and place indicated in the Invitation to Bid. 9.2 Bidders are cautioned that it is the responsibility of each individual Bidder to assure that their Bid is in the possession of the responsible official or the designated alternate prior to the stated time and at the place of the Bid opening. The Owner is not responsible for Bids delayed by mail and/or delivery services, of any nature. ARTICLE 10. MODIFICATION AND WITHDRAWAL OF BIDS 10.1 Bids may be modified only by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 10.2 Bids may be withdrawn prior to the scheduled time (or authorized postponement thereof) for the opening of Bids only upon submission of a written request to the District Clerk. 10.3 No Bid may be withdrawn for a period of NINETY (90) business days after the actual date of the opening of the Bids. ARTICLE 11. OPENING OF BIDS 11.1 At the time specified in the Invitation for Bids, no further Bids shall be accepted and filed Bids shall be opened and the amounts of the base Bid read out loud. The Bid results will be posted on eBid and the apparent low Bidder notified that its Bid will be subject to a more detailed review as set forth herein. ARTICLE 12. ASSESSMENT OF BID FOR RESPONSIVENESS AND ELIGIBILITY 12.1 Upon identification of the apparent low Bidder, the Owner will carefully review the substance of the information contained in the Bid as submitted and to verify the information contained therein. A Bidder who submits a Bid package that is not complete may be deemed a non-responsive Bidder and the Bid will be rejected.

  • 00100-6

    12.2 A Bid which includes any line item of a Bid Price that is abnormally low or high may be rejected as unbalanced. While it is often a difficult task to determine if a line Item is truly unbalanced, the Owner reserves the right to have the Bidder explain the apparent unbalancing, and, if the explanation offered is not satisfactory, to reject the Bid. 12.3 If a Bid contains an apparent mistake, the Owner shall advise the Bidder of the apparent mistake and the reasons the Owner concluded that the identified Bid response was a mistake. The Bidder must, within ten (10) calendar days deliver to the Owner clear and convincing documentation from the Bidder either verifying that the response was not a mistake or to admit that there was a mistake and request relief from its Bid. 12.4 Mistakes include but are not limited to instances where decimal points are obviously misplaced, numbers obviously reversed or units improperly designated. Bids that are, in the opinion of the Owner so much lower than either the estimate or other Bids so as to lead to the conclusion that a mistake may have been made or are unbalanced or incomplete may also result in a request for Bid verification. The Owner may also seek verification that all work contained in a unit price Bid has been included in the price offered. 12.5 The Owner reserves the right to waive any and all informalities in the Bid if it is in the Owner’s interest to do so and the right to disregard all non-conforming, non-responsive or conditional Bids. ARTICLE 13. ASSESSMENT OF BIDDERS FOR RESPONSIBILITY 13.1 The Owner reserves the right to reject any Bid if the evidence submitted by, or the investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract Documents and to complete the Work contemplated therein. The Owner further reserves the right to waive any informality in or to reject any or all Bids if deemed to be in the Owner’s best interest. 13.2 Bidders may be investigated by the Owner to determine if they are qualified to perform the Work. All Bidders shall be prepared to submit within fourteen (14) calendar days of the Owner’s or Engineer's request, written evidence of such additional information and data as the Owner may deem necessary to make this determination. 13.3 The investigation of a Bidder will seek to determine whether: a. The Bidder has adequate financial resources to perform the Contract; b. The Bidder has the resources to meet the project schedule contained in the Bid

    documents; c. The Bidder has a satisfactory record of performing similar work; d. The Bidder has a satisfactory record of integrity and business ethics; e. The Bidder has the necessary organization to perform the Contract; f. The Bidder has the necessary technical resources and equipment needed to

    perform the Work.

  • 00100-7

    13.4 Other work to which the Bidder is then engaged or to which it is committed may also be considered as a factor in determining responsibility. 13.5 Bids received from any Bidder whose performance on a previous Metropolitan District project has been rated unacceptable in a Contractor Performance Evaluation will not be considered for award for the period specified therein. 13.6 The Bidder shall hold a current DAS Contractor Prequalification Certificate in Insert Classification from the Department of Administrative Services of the State of Connecticut according to C.G.S§ 4a-100, C.G.S. §4b-101 and C.G.S.§4b-91. Bidders shall submit with their Bids their DAS Contractor Prequalification Certificate along with a current Update Bid Statement. Any Bid submitted without a copy of the DAS Prequalification Certificate and an Update Bid Statement shall be invalid. As to proposed Subcontractors whose subcontract value is equal to or greater than $500,000, the apparent low Bidder shall submit to the Owner, no later than fourteen (14) days after Bid opening, a current DAS Contractor Prequalification Certificate in an appropriate work classification along with an Update Bid Statement for each such Subcontractor. Bidders do not need to include Subcontractor Prequalification Certificates and Update Bid Statements with their Bids. The Successful Bidder and each of its Subcontractors having subcontracts in value equal to or greater than $500,000 shall maintain and keep current their respective DAS Contractor Prequalification Certificates at all times during the term of the Contract and any warranty period set forth in the Contract Documents. 13.7 Each Bidder will include with the Bid Submission a list of Subcontractors and their qualifications as required by Section 00485A and 00485B herein. The list will include: Subcontractor’s name, legal address, amount of proposed subcontract, and specification sections and qualifications to perform the required Work. Bidders will provide this information for all Subcontractors with their Bids whose subcontracts equal or exceed $25,000.00.. 13.8 The Successful Bidder is required to self-perform a minimum of 25% of the value of the Work and to explain how that will be accomplished with its own forces in Section 00425. 13.9 Please note that this project has specific experience criteria that must be documented for a Bidder to be determined to be responsible. These criteria are included in Section 00420 of the Bid documents. ARTICLE 14. AWARD OF CONTRACT 14.1 The Contract will be awarded to the lowest responsive, responsible, and eligible Bidder (“Successful Bidder”). Such a Bidder shall possess the skill, ability, and integrity necessary for the faithful performance of the Work. The term "lowest responsive, responsible and eligible Bidder" as used herein shall mean the Bidder whose Total Base Bid plus accepted Bid alternatives is the lowest of those Bidders possessing

  • 00100-8

    the skill, ability and integrity necessary for the faithful performance of the Work. The Owner may accept any combination of Bid alternatives with the base Bid at its discretion. ARTICLE 15. EXECUTION OF AGREEMENT 15.1 When the Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by at least one (1) unsigned copy of the Agreement and all other applicable Contract Documents. Within fourteen (14) calendar days after the date of receipt of such notification Contractor shall complete and return the following Contract Documents to the Owner; a. Signed agreement b. Bonds c. Insurance Certificates d Executed agreements with all subcontractors with subcontract value of $25,000

    or greater. e. DAS Prequalification Certificates and Update (Bid) Statements for

    Subcontractors consistent with the timelines and requirements provided in Section 13.6 hereof

    f Evidence of Compliance with bond requirements of the Connecticut Department of Revenue Services, and

    g All other submittals required by the Contract Documents ARTICLE 16. NONDISCRIMINATION AND AFFIRMATIVE ACTION 16.1 The successful Contractor agrees to the following provisions: (1) Contractor agrees and warrants that in the performance of this Agreement Contractor will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, intellectual disability, mental disability or physical disability, including but not limited to blindness, unless it is shown by Contractor that such disability prevents performance of the work involved, in any manner prohibited by the laws of the United States or the State of Connecticut (the “State”); and Contractor further agrees to take affirmative action to insure that applicants with job-related qualifications are employed and that employees are treated when employed without regard to their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, intellectual disability, mental disability or physical disability, including but not limited to blindness, unless it is shown by Contractor that such disability prevents performance of the work involved; (2) Contractor agrees, in all solicitations or advertisements for employees placed by or on behalf of Contractor, to state that it is an “affirmative action-equal opportunity employer” in accordance with regulations adopted by the Connecticut Commission on Human Rights and Opportunities (the “Commission”); (3) Contractor agrees to provide each labor union or representative of workers with which Contractor has a collective bargaining agreement or other contract or understanding and each vendor with which Contractor has a

  • 00100-9

    contract or understanding, a notice to be provided by the Commission advising the labor union, workers' representative and vendor of Contractor's commitments under C.G.S. §§4a-60, and to post copies of the notice in conspicuous places available to employees and applicants for employment; (4) Contractor agrees to comply with each provision of C.G.S. §§4a-60, and with each regulation or relevant order issued by said Commission pursuant to C.G.S. §§46a-56; and (5) the Contractor agrees to provide the Commission with such information requested by the Commission, and permit access to pertinent books, records and accounts, concerning the employment practices and procedures of the Contractor as relate to the provisions of C.G.S. §§4a-60 and 46a-56. 16.2 The successful Contractor agrees to the following provisions: (1) Contractor agrees and warrants that in the performance of this Agreement Contractor will not discriminate or permit discrimination against any person or group of persons on the grounds of sexual orientation, in any manner prohibited by the laws of the United States or the State of Connecticut, and that employees are treated when employed without regard to their sexual orientation; (2) Contractor agrees to provide each labor union or representative of workers with which Contractor has a collective bargaining agreement or other contract or understanding and each vendor with which Contractor has a contract or understanding, a notice to be provided by the Commission advising the labor union, workers' representative and vendor of Contractor's commitments under C.G.S. §4a-60a, and to post copies of the notice in conspicuous places available to employees and applicants for employment; (3) Contractor agrees to comply with each provision of C.G.S. §4a-60a, and with each regulation or relevant order issued by said Commission pursuant to C.G.S. §46a-56; and (4) the Contractor agrees to provide the Commission with such information requested by the Commission, and permit access to pertinent books, records and accounts, concerning the employment practices and procedures of the Contractor which relate to the provisions of C.G.S. §4a-60a and 46a-56. 16.3 The successful Contractor agrees and warrants that it will make good faith efforts to employ minority business enterprises as subcontractors and suppliers of materials to perform work or services hereunder; and Contractor shall develop and maintain adequate documentation, in a manner prescribed by the Commission, of its good faith efforts. 16.4 If successful Contractor has one or more contracts with the State or a political subdivision thereof (including the District) that is valued at less than fifty thousand dollars for each year of the contract, Contractor shall provide the District with a written or electronic representation that complies with nondiscrimination agreements and warranties in Sections 16.1(1) and 16.2(1) above, provided if there is any change in such representation, Contractor shall provide the updated representation to the District not later than thirty days after such change. If the successful Contractor has one or more contracts with the State or a political subdivision thereof (including the District) that is valued at fifty thousand dollars or more for any year of the Contract, Contractor shall provide the District with any of the following:

  • 00100-10

    (A) documentation in the form of a company or corporate policy adopted by

    resolution of the board of directors, shareholders, managers, members or other governing body of Contractor that complies with the nondiscrimination agreements and warranties in Sections 16.1(1) and 16.2(1);

    (B) documentation in the form of a company or corporate policy adopted by a prior resolution of the board of directors, shareholders, managers, members or other governing body of Contractor if (i) the prior resolution is certified by a duly authorized corporate officer of Contractor to be in effect on the date the documentation is submitted, and (ii) the head of the agency of the State or such political subdivision, or a designee, certifies that the prior resolution complies with the nondiscrimination agreements and warranties in Sections 16.1(1) and 16.2(1); or

    (C) documentation in the form of an affidavit signed under penalty of false statement by a chief executive officer, president, chairperson or other corporate officer duly authorized to adopt Contractor’s company or corporate policy that certifies that the company or corporate policy of Contractor complies with the nondiscrimination agreements and warranties in Sections 16.1(1) and 16.2(1) and is in effect on the date that the affidavit is signed.

    16.5 The District shall not award a Contract to an Contractor who has not provided the representation or documentation required under Section 16.4, and the successful Contractor warrants that it has provided all such representations and documentation to the District as required under Section 16.4 hereof. Contractor shall not be required to resubmit such representation or documentation unless there is a change in the information contained in such representation or documentation. In the event of such a change, Contractor shall submit an updated representation or documentation, as applicable, either (A) not later than thirty days after the effective date of such change, or (B) upon the execution of a new contract with the State or a political subdivision thereof, whichever is earlier. Contractor shall also certify, in accordance with Section 16.4(B) or (C) and not later than fourteen (14) days after the twelve (12) month anniversary of the most recently filed representation or documentation, that such representation or documentation on file with the State or the political subdivision thereof is current and accurate. 16.6 The successful Contractor shall include the provisions of Sections 16.1, 16.2 and 16.3 in every subcontract or purchase order entered into in order to fulfill any obligation of Contractor under this Agreement and such provisions shall be binding on a Subcontractor, vendor or manufacturer unless exempted by regulations or orders of the Commission. The Contractor shall take such action with respect to any such subcontract or purchase order as the Commission may direct as a means of enforcing such provisions including sanctions for noncompliance in accordance with C.G.S. §46a-56; provided, if Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor, as a result of such direction by the Commission, the Contractor

  • 00100-11

    may request the State to enter into any such litigation or negotiation prior thereto to protect the interests of the State and the State may so enter. 16.7 For purposes of this Article 16, the terms “Agreement” shall include any extension or modification of the Agreement, and “Contractor” includes any successors or assigns of the successful Contractor; and the terms “minority business enterprise” and “good faith efforts” shall have the meanings assigned to such terms in C.G.S. §4a-60(e). ARTICLE 17. SAFETY AND HEALTH REGULATIONS 17.1 This project is subject to the Safety and Health Regulations (CFR 29, Part 1926 – “safety standards for the construction industry” and all subsequent amendments) as promulgated by the U.S. Department of Labor on June 24, 1974 and CFR 29, Part 1910, General Industry Safety and Health Regulations Identified as Applicable to Construction. 17.2 The Successful Bidder shall comply with the Department of Labor Safety and Health Regulations for Construction promulgated under the Occupational Safety and Health Act of 1970 (PL-91-596) and under Section 107 of the Contract Work Hours and Safety Standards Act (PL-91-54). 17.3 The Successful Bidder shall have a competent person or persons, as required under the Occupational Safety and Health Act on the Site to inspect the Work and to supervise the conformance of the Work with the regulations of the Act. 17.4 The Owner also has certain safety requirements outlined in the Project Manual included in the Contract Documents which must be complied with in the submission of the Contractor’s Health and Safety Plan. ARTICLE 18. STATE WAGE RATES 18.1 State wage rates apply to this project. The State Wage Determination is included in Project Specific Wage Rate Schedule included in the Special Provisions. 18.2 It is the responsibility of the Bidder before the Bid opening to request, if necessary, any additional information on State Wage Rates for those trades people who are not covered by the applicable Wage Determination, but who may be employed for the proposed work under this Contract. 18.3 All construction associated with this Contract will be governed by Heavy and Highway Rates. ARTICLE 19. See Special Provisions ARTICLE 20. ACCESS TO SITE

  • 00100-12

    20.1 The Owner, Engineer, Owner’s authorized representatives, and any local, state or federal agencies having a direct interest in the Work shall have access to the Work wherever it is in preparation or progress and the Contractor shall provide proper facilities for such access and inspection. Refer to Article 13.02 of the Standard General Conditions for additional requirements. ARTICLE 21. NOT TO BE USED (see article 16) ARTICLE 22. See Special Provisions ARTICLE 23. CONTRACTOR EVALUATION 23.1 The Successful Bidder will be evaluated on job performance in accordance with Section 01390. ARTICLE 24. See Special Provisions END OF SECTION

  • 00300-1

    BID FORM TO

    THE METROPOLITAN DISTRICT

    INSERT CONTRACT NAME

    CONTRACT NUMBER The undersigned declares that the only persons or parties interested in this Bid as principals are as stated; that the Bid is made without any collusion with other persons, firms, or corporations; that all the Contract Documents as prepared by The Metropolitan District and dated Insert Date have been carefully examined; that the undersigned is fully informed in regard to all conditions pertaining to the Work and the place where it is to be done, and from them the undersigned makes this Bid. These prices shall cover all expenses incurred in performing the Work required under the Contract Documents, of which this Bid Form is a part. If a Notice of Award accompanied by at least one unsigned copy of the Agreement and all other applicable Contract Documents is delivered to the undersigned within NINETY (90) Business days, after the actual date of the opening of the Bids, the undersigned will within fourteen (14) calendar days after the date of receipt of such notification, execute and return all copies of the Agreement and all other applicable Contract Documents to Owner. The premiums for all Bonds required shall be paid by Contractor and shall be included in the Contract Price. The undersigned Bidder further agrees that the Bid Security accompanying this Bid shall become the property of Owner if the Bidder fails to execute the Agreement as stated above. The undersigned hereby agrees that the Contract Time shall commence on the date set forth in a Notice to Proceed and to fully complete the Work for the Bid Items within Calendar Days in accordance with the terms as stated in the Agreement. The undersigned further agrees to pay Owner, as liquidated damages, Insert $ amount per day for each calendar day beyond the Contract Time Limit or extension thereof that the Work remains incomplete, in accordance with the terms of the Agreement. All addenda related to this Contract issued by the Owner shall be attached to and made part of this Contract. All such addenda shall be attached and submitted with this Bid as confirmation and acknowledgment of receipt. Failure to submit addenda acknowledgment and confirmation along with your Bid package may cause your Bid to be considered non-responsive and thereby rejected. The Owner assumes no responsibility nor shall it or its representatives be held liable for failure of the Bidder to submit addenda as required hereunder. The undersigned acknowledges receipt of addenda numbered: Addenda #:_________ Dated:__________ Addenda #:_________ Dated:__________ Addenda #:_________ Dated:__________ Addenda #:_________ Dated:__________ In accordance with the above understanding, the undersigned proposes to perform the Work, furnish all materials and complete the Work in its entirety in the manner and under the conditions required at the prices listed as follows:

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    $

    $

    $

    $

    $

    $

    $G- 6 Remove and Replace Tree(Section 02900) EA

    $

    $

    $

    PART A - MISCELLANEOUS WORK SUBTOTAL(Items G-1 through G-6):

    $

    G- 4 EA

    G- 5 $

    Catch Basin Sedimentation Control (Section 02270)

    Clearing and Grubbing(Section 02100) SY

    G- 3 LUMP SUM

    LUMP SUM

    G- 2 LUMP SUM

    Mobilization, Demobilization and Related Expense (no greater than 5% of total Bid, excluding this item itself and Item G-2)(Section 01025)

    General Requirements (no greater than 10% of total Bid, excluding this item itself and Item G-1)(Section 01025)

    Erosion and Sedimentation Control (Section 02270)

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    G- 1

    PART A - MISCELLANEOUS WORK

    ITEM NODESCRIPTION OF SCHEDULED

    ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    $

    TOTAL PRICE Dollar Figure

    00300-2

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    $

    $

    $

    $

    $

    $

    $

    $

    $

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    S-2- SMH II EA

    PART B - SEWERS AND APPURTENANCES

    S-1- SMH II EA

    EA

    Type II 4-ft Diameter, Precast Concrete Sewer Manholes Greater than 15-ft deep(Section 02605)

    Type IV 5-ft Diameter, Precast Concrete Sewer Manholes 0-ft to 10-ft deep(Section 02605)

    Type IV 5-ft Diameter, Precast Concrete Sewer Manholes Greater than 10-ft to 15-ft deep(Section 02605)

    Type IV 5-ft Diameter, Precast Concrete Sewer ManholesGreater than 15-ft deep(Section 02605)

    S-3- SMH II EA

    S-1- SMH IV

    Type VI 5-ft Diameter, Precast Concrete Sewer Manholes0-ft to 10-ft deep(Section 02605)

    $

    $

    Type II 4-ft Diameter, Precast Concrete Sewer Manholes 0-ft to 10-ft deep(Section 02605)

    Type II 4-ft Diameter, Precast Concrete Sewer Manholes Greater than 10-ft to 15-ft deep(Section 02605)

    S-3- SMH IV EA

    SMH IV

    EA

    S-2-

    S-2- SMH VI EA

    Type VI 5-ft Diameter, Precast Concrete Sewer ManholesGreater than 10-ft to 15-ft deep(Section 02605)

    S-1-

    S-3- SMH VI EA

    SMH VI EA

    Type VI 5-ft Diameter, Precast Concrete Sewer ManholesGreater than 15-ft deep(Section 02605)

    $

    $

    $

    $

    $

    $

    $

    TOTAL PRICE Dollar Figure

    00300-3

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    8DI LF

    EA

    SMH VI

    8-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    8-in DI Sewer0-ft to 8-ft deep(Section 02615)

    S-4- SMH VI EA

    Doghouse Type II Manhole Constructed Over Existing Sewer Greater than 15-ft deep(Section 02605)

    S-5- SMH II EA

    S-6- SMH II

    S-4- SMH II EA

    8-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    S-7- 8DI LF

    Doghouse Type II Manhole Constructed Over Existing Sewer0-ft to 10-ft deep(Section 02605)

    Doghouse Type II Manhole Constructed Over Existing SewerGreater than 10-ft to 15-ft deep(Section 02605)

    Doghouse Type VI Manhole Constructed Over Existing SewerGreater than 15-ft deep(Section 02605)

    Doghouse Type VI Manhole Constructed Over Existing SewerGreater than 10-ft to 15-ft deep(Section 02605)

    Doghouse Type VI Manhole Constructed Over Existing Sewer0-ft to 10-ft deep(Section 02605)

    S-5- EA

    LF

    S-9-

    S-6- SMH VI EA

    S-8- 8DI $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-4

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    12-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    S-10- 8DI

    LF

    8-in DI SewerGreater than 16-ft deep(Section 02615)

    10-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    10-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    12-in DI SewerGreater than 16-ft deep(Section 02615)

    10DI

    S-10- 10DI LF

    10-in DI Sewer0-ft to 8-ft deep(Section 02615)

    LF

    12-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    S-9- 10DI LF

    10-in DI SewerGreater than 16-ft deep(Section 02615)

    12-in DI Sewer0-ft to 8-ft deep(Section 02615)

    S-7- 10DI

    S-10- 12DI LF

    S-7- 12DI LF

    LF

    S-8-

    S-9- 12DI LF

    S-8- 12DI LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-5

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    18-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    18-in DI SewerGreater than 16-ft deep(Section 02615)

    24-in DI SewerGreater than 16-ft deep(Section 02615)

    30-in DI Sewer0-ft to 8-ft deep(Section 02615)

    S-9- 18DI

    S-10- 18DI

    S-8-

    LF

    LF

    24DI

    18DI LF18-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    30DI

    S-9- 24DI LF

    24-in DI Sewer0-ft to 8-ft deep(Section 02615)

    24-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    24-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    S-7- LF

    S-10- 24DI LF

    S-7- 18DI LF

    S-8- 24DI LF

    18-in DI Sewer0-ft to 8-ft deep(Section 02615)

    LFS-7-

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-6

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    30-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    30-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    LF

    LFS-10- 8PVC

    8-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    8-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    30-in DI SewerGreater than 16-ft deep(Section 02615)

    8PVC

    8-in PVC SewerGreater than 16-ft deep(Section 02622)

    10-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    10-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF

    LF

    10PVC

    S-7- 10PVC

    S-8-

    S-8-

    S-7- 8PVC

    LF

    S-9-

    LF

    8-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    8PVC

    S-10- 30DI

    LFS-9- 30DI

    S-8- 30DI LF

    LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-7

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-7- 15PVC LF

    12-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    10-in PVC SewerGreater than 16-ft deep(Section 02622)

    12-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    S-9- 15PVC LF

    15-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    15-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF

    12PVC

    15-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF

    LFS-7-

    10-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    12-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    S-9- 10PVC

    S-8- 15PVC

    S-9-

    LF

    S-10- 10PVC

    12PVC

    12-in PVC SewerGreater than 16-ft deep(Section 02622)

    S-8- 12PVC

    LF

    LF

    LF

    S-10- 12PVC

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-8

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-7- 18PVC18-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    S-8-

    18-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    18-in PVC SewerGreater than 16-ft deep(Section 02622)

    21-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF

    15PVC15-in PVC SewerGreater than 16-ft deep(Section 02622)

    S-9- 21PVC LF

    LF

    18-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF

    S-10-

    LF

    LF

    S-10-

    21-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    21PVC LF

    LF21PVC

    S-9- 18PVC

    S-10- 18PVC

    S-7- 21PVC

    21-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    21-in PVC SewerGreater than 16-ft deep(Section 02622)

    S-8- 18PVC LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-9

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $30-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    24-in PVC SewerGreater than 16-ft deep(Section 02622)

    27-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    27-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    27-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    S-7-

    S-9- 27PVC

    S-10-

    S-7-

    27-in PVC SewerGreater than 16-ft deep(Section 02622)

    LFS-8- 24PVC

    LF

    LF

    LF

    27PVC

    24PVC

    LF

    24-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF

    LF

    27PVC LF

    S-9-

    S-10- 24PVC

    S-7- 27PVC

    24PVC

    S-8-

    24-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    24-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    30PVC LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-10

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    30-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    15-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    S-8-

    30PVC

    12RCP

    12-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    12-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    12-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    15RCPS-7-

    12-in RCP SewerGreater than 16-ft deep(Section 02612)

    15-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF

    LF

    30-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    30-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF

    15RCP

    LF

    30PVC

    LF

    12RCP LF

    S-8- 12RCP

    S-9-

    S-10-

    S-8-

    LF

    30PVC

    LF

    S-9-

    S-7- 12RCP

    LF

    S-10-

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-11

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    24RCP

    S-9-

    24-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    18-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    18RCP LF

    S-7- 18RCP

    S-8-

    S-9-

    LF

    18RCP LF18-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    15-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    15RCP

    S-10- 18RCP LF

    LF

    LF

    S-9-

    S-7-

    18-in RCP SewerGreater than 16-ft deep(Section 02612)

    24-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    24-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    24RCP

    S-8-

    S-10- 15RCP

    24RCP LF

    LF

    18-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    15-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-12

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    36RCP

    S-8- 36RCP

    36-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    36-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF

    30-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    30-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    S-8- 30RCP

    LF

    36-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    30-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    30-in RCP SewerGreater than 16-ft deep(Section 02612)

    36-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF

    LF

    S-7- 30RCP

    24-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF

    S-10- 24RCP

    LF

    LFS-9- 30RCP

    S-10- 30RCP

    LF

    S-10- LF

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-9- 36RCP

    S-7- 36RCP

    00300-13

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-8- 48RCP

    S-10- 54RCP LF

    LF

    LF

    S-9- 54RCP LF

    48-in RCP SewerGreater than 16-ft deep(Section 02612)

    54-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF

    54-in RCP SewerGreater than 16-ft deep(Section 02612)

    48-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    S-10- 48RCP

    LFS-9- 48RCP

    54-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    54-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    S-7- 54RCP LF

    S-8- 54RCP LF

    48RCP

    48-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    48-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LFS-7-

    $

    $

    $

    $

    $

    $

    $

    $

    $S-11- 8DICross Country, 8-in DI Sewer0-ft to 8-ft deep(Section 02615)

    00300-14

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-14- 8DICross Country, 8-in DI SewerGreater than 16-ft deep(Section 02615)

    LF

    LF

    LF

    S-12- 8DICross Country, 8-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    LF $

    $

    S-13- 8DICross Country, 8-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    LF $

    S-11- 10DICross Country, 10-in DI Sewer0-ft to 8-ft deep(Section 02615)

    $

    S-12-

    LF $

    Cross Country, 10-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    LF $

    S-13- 10DICross Country, 10-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    10DI

    S-12- 12DICross Country, 12-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    LF $

    S-11- 12DICross Country, 12-in DI Sewer0-ft to 8-ft deep(Section 02615)

    $

    S-14- 10DICross Country, 10-in DI SewerGreater than 16-ft deep(Section 02615)

    LF $

    00300-15

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-14- 18DICross Country, 18-in DI SewerGreater than 16-ft deep(Section 02615)

    LF

    12DICross Country, 12-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    LF

    S-12- 18DICross Country, 18-in DI SewerGreater than 8-ft to 12-ft deep(Section 02615)

    LF

    S-14- 12DICross Country, 12-in DI SewerGreater than 16-ft deep(Section 02615)

    LF $

    S-13- $

    $

    S-11- 18DICross Country, 18-in DI Sewer0-ft to 8-ft deep(Section 02615)

    LF $

    $

    S-13- 18DICross Country, 18-in DI SewerGreater than 12-ft to 16-ft deep(Section 02615)

    LF $

    S-12- 8PVCCross Country, 8-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 8PVCCross Country, 8-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-13- 8PVCCross Country, 8-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    00300-16

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-14- 8PVCCross Country, 8-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-12- 10PVCCross Country, 10-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 10PVCCross Country, 10-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 10PVCCross Country, 10-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 10PVCCross Country, 10-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 12PVCCross Country, 12-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 12PVCCross Country, 12-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 12PVCCross Country, 12-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 12PVCCross Country, 12-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    00300-17

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-12- 15PVCCross Country, 15-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 15PVCCross Country, 15-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 15PVCCross Country, 15-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 15PVCCross Country, 15-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 18PVCCross Country, 18-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 18PVCCross Country, 18-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 18PVCCross Country, 18-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 18PVCCross Country, 18-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-11- 21PVCCross Country, 21-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    00300-18

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-12- 21PVCCross Country, 21-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-14- 21PVCCross Country, 21-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 21PVCCross Country, 21-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 24PVCCross Country, 24-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 24PVCCross Country, 24-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 24PVCCross Country, 24-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 24PVCCross Country, 24-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 27PVCCross Country, 27-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 27PVCCross Country, 27-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    00300-19

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-14- 27PVCCross Country, 27-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 27PVCCross Country, 27-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 30PVCCross Country, 30-in PVC SewerGreater than 8-ft to 12-ft deep(Section 02622)

    LF $

    S-11- 30PVCCross Country, 30-in PVC Sewer0-ft to 8-ft deep(Section 02622)

    LF $

    S-14- 30PVCCross Country, 30-in PVC SewerGreater than 16-ft deep(Section 02622)

    LF $

    S-13- 30PVCCross Country, 30-in PVC SewerGreater than 12-ft to 16-ft deep(Section 02622)

    LF $

    S-12- 12RCPCross Country, 12-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 12RCPCross Country, 12-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-13- 12RCPCross Country, 12-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    00300-20

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-14- 12RCPCross Country, 12-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-12- 15RCPCross Country, 15-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 15RCPCross Country, 15-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-14- 15RCPCross Country, 15-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 15RCPCross Country, 15-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    S-12- 18RCPCross Country, 18-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 18RCPCross Country, 18-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-14- 18RCPCross Country, 18-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 18RCPCross Country, 18-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    00300-21

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-12- 24RCPCross Country, 24-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 24RCPCross Country, 24-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-14- 24RCPCross Country, 24-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 24RCPCross Country, 24-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    S-12- 30RCPCross Country, 30-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 30RCPCross Country, 30-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-14- 30RCPCross Country, 30-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 30RCPCross Country, 30-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    S-11- 36RCPCross Country, 36-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    00300-22

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-12- 36RCPCross Country, 36-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-14- 36RCPCross Country, 36-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 36RCPCross Country, 36-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    S-12- 48RCPCross Country, 48-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 48RCPCross Country, 48-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    S-14- 48RCPCross Country, 48-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 48RCPCross Country, 48-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    S-12- 54RCPCross Country, 54-in RCP SewerGreater than 8-ft to 12-ft deep(Section 02612)

    LF $

    S-11- 54RCPCross Country, 54-in RCP Sewer0-ft to 8-ft deep(Section 02612)

    LF $

    00300-23

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    S-15- 4DI

    LF

    S-16- DI LF

    10-in DI Force Main, All Depths(Section 02615)

    12-in DI Force Main, All Depths(Section 02615)

    S-15- 10DI

    LF

    6-in DI Sewer Service Pipe, All Depths(Sections 02615)

    8-in DI Force Main, All Depths(Section 02615)

    6-in DI Force Main, All Depths(Section 02615) LFS-15-

    LF

    S-15- 12DI $

    $

    $

    $

    $

    $

    S-16- PVC6-in PVC Sewer Service Pipe, All Depths(Sections 02622)

    LF $

    S-14- 54RCPCross Country, 54-in RCP SewerGreater than 16-ft deep(Section 02612)

    LF $

    S-13- 54RCPCross Country, 54-in RCP SewerGreater than 12-ft to 16-ft deep(Section 02612)

    LF $

    LF4-in DI Force Main, All Depths(Section 02615)

    6DI

    S-15- 8DI

    00300-24

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    $

    $

    Double grate Pre-Cast Catch Basin, Type I(Section 02720)

    22

    25 EA

    18S-

    S- 21

    VF

    Double Grate Pre-Cast Catch Basin, Type II(Section 02720)

    Hartford Type Precast Catch Basin(Section 02720)

    Minimium Standard for Catch Basin in Areas not Subjected to Vehicular Traffic (in Private Lands)(Section 02720)

    Typical Catch Basin for Paved Lot or Area Drainage(Section 02720)

    EA

    $

    $

    $

    $

    $

    $

    S- 20

    $

    Hartford Type Auxiliary Inlet Basin(Section 02720)

    Air Release/Inlet Manhole along Force Main(Section 15100)

    EA

    S- 19 EA

    EA

    S- 24 EA

    $

    S-

    EA

    S-

    S- 17 Precast Sewer Chimney

    $

    S- 23 EACatch Basin (CTDOT) (Section 02720)

    00300-25

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART B - SEWERS AND APPURTENANCES

    TOTAL PRICE Dollar Figure

    $

    $

    $

    $

    $

    $

    $

    PART B - SEWERS AND APPURTENANCES SUBTOTAL(Items S-1 through S-32):

    $

    S-

    S- 28 EATypical Trough Catch Basin(Section 02720)

    Catch Basin with Offset Sump(Section 02720)

    Standard Catch Basin for Granite Curb Back(Section 02720)

    $

    $

    $S- 27 EA

    26 EA

    S- 32Removal of Existing SewerAll Sizes, All Depths (Section 02053)

    LF $

    S- 31Abandonment of Exisitng Sewer with CLSM, All Sizes, All Depths (Section 02053)

    LF $

    S- 29Removal of Existing Manhole or Catch Basin, All depths, All sizes(Section 02053)

    EA $

    S- 30Abandonment of Existing Sewer without CLSM, All Sizes, All Depths (Section 02053)

    Lump Sum $

    00300-26

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    Cured-in-Place Pipe $

    8-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    10-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    12-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    15-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    18-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    21-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    24-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    27-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    30-in Sewer, All Depths (Section 02766)

    R-1- 30 LF $

    LF

    21 LF

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    R-1- 10 LF

    PART C - REHABILITATION

    R-1- 8 LF $

    $

    TOTAL PRICE Dollar Figure

    R-1- 12

    R-1- 15 LF

    R-1- 18 LF

    R-1- 27 LF

    24

    R-1-

    R-1- LF

    $

    $

    $

    $

    $

    $

    00300-27

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART C - REHABILITATION

    TOTAL PRICE Dollar Figure

    Cured-in-Place Pipe $

    36-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe $

    48-in Sewer, All Depths (Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    8-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    10-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    12-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    15-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    18-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    21-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    24-in Sewer, All Depths(Section 02766)

    R-1- 48 LF $

    $

    LF

    8 LF

    R-2-

    R-2-

    LF

    21

    18

    R-1- 36 LF

    R-2- 24 LF

    R-2- 10 LF

    R-2- 15

    R-2- LF

    R-2- 12 LF

    $

    $

    $

    $

    $

    $

    $

    00300-28

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART C - REHABILITATION

    TOTAL PRICE Dollar Figure

    Cured-in-Place Pipe (Cross Country) $

    27-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    30-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    36-in Sewer, All Depths(Section 02766)

    Cured-in-Place Pipe (Cross Country) $

    48-in Sewer, All Depths(Section 02766)

    Heavy Hydraulic Cleaning/ Root Removal $

    (Section 02610)

    Heavy Hydraulic Cleaning/ Root Removal $

    (Cross Country)(Section 02610)

    Reconnect Active Service Lateral $

    (Section 02766)

    Reconnect Active Service Lateral $

    (Cross Country)(Section 02766)

    Cured-in-Place Spot Repair $

    6-in Sewer, All Depths(Section 02765)

    $

    $

    $

    $

    LF

    LF

    EA

    R-7- 6 EA

    LF

    R- 5 EA

    R-

    R- 3

    R-2- 30 LF $

    R-2- 48 LF $

    $

    LF27

    6

    R-2- 36

    R- 4

    R-2- $

    $

    00300-29

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART C - REHABILITATION

    TOTAL PRICE Dollar Figure

    Cured-in-Place Spot Repair $

    8-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    10-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    12-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    15-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    18-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    21-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    24-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    27-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    30-in Sewer, All Depths(Section 02765)

    EA

    $

    $

    R-7-

    R-7-

    15

    R-7-

    R-7- 18

    EA

    R-7-

    12

    EA

    EA

    EA

    EA

    $

    EA

    R-7- 21

    30

    27

    EA

    R-7- 8

    R-7- 10

    R-7- 24

    EA

    $

    $

    $

    $

    $

    $

    00300-30

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART C - REHABILITATION

    TOTAL PRICE Dollar Figure

    Cured-in-Place Spot Repair $

    36-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    48-in Sewer, All Depths(Section 02765)

    Cured-in-Place Spot Repair $

    6-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    8-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    10-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    12-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    15-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    18-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    21-in Sewer, All Depths(Cross Country)(Section 02765)

    R-8-

    R-8-

    R-8- 6 EA

    8 EA

    18

    48 EA

    EAR-8-

    R-8- 10 EA

    12 EA

    R-7-

    21

    EA

    15

    R-8-

    R-8-

    R-7- 36 EA

    EA

    $

    $

    $

    $

    $

    $

    $

    $

    $

    00300-31

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT PRICES Written Words

    BIDDER MUST FILL IN THE UNIT PRICES AND COMPUTE THE TOTALS(In case of error or discrepancies "UNIT PRICES Written Words" govern)

    ITEM NO DESCRIPTION OF SCHEDULED ITEM

    ESTIMATED QTY/ UNIT OF

    MEASURE

    PART C - REHABILITATION

    TOTAL PRICE Dollar Figure

    Cured-in-Place Spot Repair $

    24-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    27-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    30-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    36-in Sewer, All Depths(Cross Country)(Section 02765)

    Cured-in-Place Spot Repair $

    48-in Sewer, All Depths(Cross Country)(Section 02765)

    PVC Point Repair8-in Sewer $

    0-ft to 16-ft deep(Section 02640)

    PVC Point Repair8-in Sewer $

    Greater than 16-ft deep(Section 02640)

    PVC Point Repair10-in Sewer $

    0-ft to 16-ft deep(Section 02640)

    PVC Point Repair10-in Sewer $

    Greater than 16-ft deep(Section 02640)

    EA

    EA $

    10 EA $

    R-8- 24

    R-10-

    8

    8

    EA

    EA

    EAR-8-

    R-8- 36

    27

    R-8- 30 EA

    R-8- 48

    R-10-

    R-9-

    EA10R-9-

    EA

    $

    $

    $

    $

    $

    $

    $

    00300-32

  • The Metropolitan District

    (Project Name)Contract Number: XXXX-XX

    Schedule of Prices

    UNIT PRICES Dollars FigureUNIT