Page 1: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Mayor’s Bicycle Advisory

Commission 04.29.2020

Page 2: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

1. February minutes

2. City Updates

a. Planning

b. BPD

c. DOT

d. Rec & Parks

e. Mayor’s Office

3. Community Updates

a. Other updates from community commissioners and

attendees

4. Committee Updates

a. Events for May

b. Awards

5. Miscellaneous Business

a. Next meeting May 27th

Agenda

Page 3: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates:• Baltimore Greenway Trail Network:• Collective at Canton has starting laying concrete for the loop/trail betweenBoston Street and development's new grocery store• Sean Davis and his team at MRA have done 30% design for the BGE corridor and are preparing a presentation for feedback to theBGE executive team for their feedback

Updates: Planning

Page 4: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: Planning

Updates:• Bike Parking Zoning Update• Anthem House bike parking (2 levels) filled to over-capacity• McHenry Row residential only and grocery store parking. Hundreds of unused

spaces.

Page 5: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: BPD

Updates:

- Increasing police checks along Maryland Avenue

- BPD and TEO workshops delayed. Continuing to coordinate with DOT.

Page 6: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT

• Dockless Vehicle Update- Pandemic response- Ridership data- Annual Evaluation Report

• Bike Program Consultant team update- Wes Mitchell from WSP

- Prioritization criteria + updated scoring- Toole Design One Pagers and Assedo Outreach- Kittleson staff augmentation extension

• Safe/Slow streets Treatments- Treatments already implemented- Potential next steps

Page 7: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: COVID Updates

Permit Holders:

Considered Essential: each employee and vehicle given letters

Most requirements paused and response time extended to 6 hours

Operational: Spin and Jump

Paused: Lime

What we’ve asked:

• Deploy at food sites

• Deploy at healthcare sites

• Deploy when there is a disruption in transit

What has been additionally offered:

• Free rides for anyone employed at a hospital: janitors through doctors– all staff

• JUMP now expanding free rides to all essential workers – need staff contacts for interested

workplaces

Page 8: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

14,435

19,517

26,844

41,753

40,536

25,018

32,617

28,082

19,270

6,630

14,589

23,072

27,868

37,046

32,771

42,460

39,668

42,783

48,764

46,078

52,856

58,196

49,706

55,633

59,226

72,365

76,372

64,356

51,272

41,757

37,969

32,639

25,337

20,161

17,227

23,860

5,172

9,517

12,939

2,743 3,557

9,092 9,946

8,566

12,723

18,872

25,68925,480

18,580 17,060

10,…

12,559

0

10000

20000

30000

40000

50000

60000

70000

80000

1-S

ep

8-S

ep

15-S

ep

22-S

ep

29-S

ep

6-O

ct

13-O

ct

20-O

ct

27-O

ct

3-N

ov

10-N

ov

17-N

ov

24-N

ov

1-D

ec

8-D

ec

15-D

ec

22-D

ec

29-D

ec

5-J

an

12-J

an

19-J

an

26-J

an

2-F

eb

9-F

eb

16-F

eb

23-F

eb

2-M

ar

9-M

ar

16-M

ar

23-M

ar

30-M

ar

6-A

pr

13-A

pr

20-A

pr

27-A

pr

4-M

ay

11-M

ay

18-M

ay

25-M

ay

1-J

un

8-J

un

15-J

un

22-J

un

29-J

un

6-J

ul

13-J

ul

20-J

ul

27-J

ul

3-A

ug

10-A

ug

17-A

ug

24-A

ug

31-A

ug

7-S

ep

14-S

ep

21-S

ep

28-S

ep

5-O

ct

12-O

ct

19-O

ct

26-O

ct

2-N

ov

9-N

ov

16-N

ov

23-N

ov

30-N

ov

7-D

ec

14-D

ec

21-D

ec

28-D

ec

4-J

an

11-J

an

18-J

an

25-J

an

1-F

eb

8-F

eb

15-F

eb

22-F

eb

29-F

eb

7-M

ar

14-M

ar

21-M

ar

28-M

ar

4-A

pr

11-A

pr

18-A

pr

Weekly Dockless Rides & Vehicles Released

Dockless: Data

Rides

Vehicles

Page 9: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: COVID -19 Data

Rides

5,794

2,726

1,168

2,422

1,855

2,926

1,477

1,8…

3,320

2,0271,932

2,045

2,631

1,764

3,9843,803

2,419

1,126

1,591

1,091

835

0

1000

2000

3000

4000

5000

6000

7000

1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 4-Mar 11-Mar 18-Mar 25-Mar

Daily Dockless Vehicles Deployed and RidesPermit Program, January 1 2020 - Present

Thursday, March 12

First community transmission of COVID-19 in Maryland

School closures announced

Monday, March 16

Bars, restaurants,

gyms, movie

theaters close

Monday,

March 23

Non-essential

Businesses close

Vehicles

Page 10: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: COVID -19 Data

Trips are more dispersed than ever, the concentration of trips downtown has decreased.

March 24- April 27September – December 2019

Page 11: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: COVID -19 Data

September – December 2019

Inner

Harbor

Johns Hopkins Hospital

Johns Hopkins Hospital is now the top trip location, even ahead of the Inner Harbor.

March 24- April 27

Page 12: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: COVID -19 Data

March 24-April 27

Trips to Hospitals: We can track how many essential trips are taken to

hospitals, with a new policy layer we developed.

Other Metrics in

Development:

• Trips to food

sites

• Trips to/in parks

Page 13: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dockless: Updates

Annual Evaluation Report

• To be released in May

Complete Streets Manual DRAFT Inclusions:

Increasing diversity of modes• Speed control and space for all users – street typologies allow route choices• No need to immediately change definitions from being “bike facilities”

Increasing demand for curb space• Equity and Inventory are important• Maintenance and audits need to be constant

New Users• More signage and communication, attention to transitions

Page 14: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT

• Dockless Vehicle Update- Pandemic response- Ridership data- Annual Evaluation Report

• Bike Program Consultant team update- Wes Mitchell from WSP

- Prioritization criteria + updated scoring- Toole Design One Pagers and Assedo Outreach- Kittleson staff augmentation extension

• Safe/Slow streets Treatments- Project Updates- Treatments already implemented- Potential next steps

Page 15: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

BCDOT BIKE PROGRAM SUPPORT

15

Presented to:

MBAC

Presented by:

Page 16: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

PRIORITIZATION CRITERIA6 Step Prioritization Approach

1. High Level Screening

2. Data Driven Prioritization

3. Consideration Based Prioritization

4. Facility Type Identification

5. High Level Cost Estimate

6. Short, Medium and Long Term Project Identification

Page 17: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

PRIORITIZATION UPDATE

• Added additional projects based on recommendations from the last MBAC meeting.

• Continued Prioritization work to Step 3 and Step 4.• Identified facility type and

relationship to existing Baltimore Plans for all 108 projects .

17

Page 18: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

STEP 3: NEIGHBORHOOD PLANS• Evaluated neighborhood plans to determine bike support levels.

• Includes City Wide Plans, Transportation Plans, Neighborhood Plans, and Park Plans.

STEP 4: FACILITY TYPE IDENTIFICATION• Identified preliminary facility types per project based on the

following factors:

• Connections to Existing Facilities

• AADT Levels

• Bicycle Crash Levels

• Presence of Street Parking

• Number of Lanes

• Curb to Curb Width

• Vehicle Speeds

• Access to lower stress facilities

• User Group Comfort Levels

Page 19: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Example Project Cutsheet

19

Page 20: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

PROJECT PRIORITIZATION STATUS

• Prioritization Update Status• Completed the first part of step 3 including the

following:• Review of existing Plans relationship to the

projects• Completed preliminary facility type

recommendations

• Current Prioritization Results • Prioritization Matrix (Excel spreadsheet)• Spatial Rankings Map

20

Page 21: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Bike Program Flyers

Creating a series of illustrative and informational flyers about the implementation of the Bicycle Master Plan

Intended to assist DOT community liaisons with the “What, Why and Where” of upcoming DOT bicycle projects

8.5” x 11” size provides concise content and ease of distribution at community meetings

Page 22: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Current Outreach Efforts

• Updated outreach strategy document

• Developing infographic to simplify prioritization process for public

• Conducted audit of social media to assess bike inclusion in messaging

• 2019 predominantly focused on Bike 2 Work Day• Developing social media editorial calendar to

supplement positive biking messages • Creating a series of posts to include for Bike

Month starting May• Biking during COVID-19 (slipstreams)

22

Page 23: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

NEXT STEPS

• Rapid Implementation Projects

• Prioritization Process• Step 3: Consideration Based Prioritization

• Funds and Design Sections

• Step 4: Incorporate User Group Considerations into Facility Type Assessment

• Step 5: High Level Cost Estimates

• Step 6: Identify Projects• Short, medium, and long term

• Community Engagement• Standardized Community Presentations

Page 24: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Thank you

Page 25: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT

• Dockless Vehicle Update- Pandemic response- Ridership data- Annual Evaluation Report

• Bike Program Consultant team update- Wes Mitchell from WSP

- Prioritization criteria + updated scoring- Toole Design One Pagers and Assedo Outreach- Kittleson staff augmentation extension

• Bike Program Updates- Project Updates - Safe/Slow streets Treatments- Potential next steps

Page 26: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT Bike Program

Multiple projects are ongoing, falling into these general categories

• Design and Construction• Grant Project Identification/Grant Applications• The Big Jump assessment and Interim Concept Design• The Rapid Enhancement Plan• Bike Program Public Outreach

More detail on the timelines of each, the partners involved, and progress notes are included on subsequent slides.

Page 27: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT Design/Construction Projects

Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21

Concept Development

Concept Outreach

Choose Alternative

Alternative Refinement Outreach

Final Design

Public Notification of Design

Invoices, Grant Documentation and Closeout

Existing Conditions Analysis

Tradeoffs-Related Public Outreach

Alternative Development

Alternative Refinement Outreach

Alternative Selection

Finalize 30% Design and Notify Public

Survey

Initial Public Outreach

Stakeholder Outreach

Concept Development for Park, JHU, and BMA sections

Concept Refinement

Public and Stakeholder feedback on refined concepts

Advancement of Refined Concepts to 30% Design

Invoices, Grant Documentation and Closeout

Euta

w P

lace

(C

oncep

tto

Fin

al D

esig

n)

Wo

lfe/W

ash

ingto

n(F

easib

ility

to

30

%)

BG

T N

ort

hern

Seg

me

nts

(Desig

n to

30%

)

Consultant-led Design Tasks City-Led Outreach Efforts

Page 28: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT Design/Construction Projects

Dockless Vehicles – DOT Support- Educational Cards now available for interested groups to distribute- User survey to be launched February 28 – March 22- Striping machine arrived for corrals, stencils ordered

Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21

Project Kickoff

Development of Two Concept Plans

Survey

Selection of Preferred Alternative

Development of 65% Design Plans

Production of 95% Construction Documents

Notification to Public of Final Design

Bridge MOU Process

HAWK/RRFB Decision Process

Public Notice

Construction

Bush

Str

ee

t (F

inal D

esig

n)

Me

lro

se

Ave

nu

e(I

nsta

llatio

n)

Consultant-led Design Tasks City-Led Public Outreach Efforts City-Led Coordination with Partners

Page 29: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT Grant Applications and Big Jump Assessment

Dec-19 Feb-20 Apr-20 Jun-20

Bikeways/TAP Project Identification

Bikeways Application Period

TAP Application Period

Data Collection

Survey Development

Data Analysis

Public Survey

Interim Design Concepts

Final Report

Gra

nt

Ma

na

gem

en

tB

ig J

um

p A

sse

ssm

en

t

Consultant-assisted grant tasks Consultant-led Big Jump Assessment study

Page 30: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20

Project identification

Existing Bike Facility Audit

Contract Development

Contract Bid and Activation

Project Design

Project Installation

Development of Bike Program Materials

Inreach

Stakeholder Outreach (MBAC, etc.)

Neighborhood/Sector Outreach

Project Specific Outreach

Rapid

Enh

ance

me

nt

Pla

nP

ub

lic O

utr

ea

ch

Updates: Rapid Enhancement Plan/Public Outreach

Rapid Enhancement Plan Consultant-Assisted Bike Program Outreach

Page 31: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: DOT THIS MONTH

Task Partners NotesEutaw Place Concept

Development

Study led by McCormick

Taylor

Kicked off; substantive work to

begin soon

Wolfe/Washington Existing

Conditions AnalysisStudy led by RKK

Kicked off; substantive work to

begin soon

Bush Street Concept

DevelopmentStudy led by Toole Design

GroupWork underway

Bush Street Survey

Melrose Avenue HAWK vs. RRFB

decision process DOT Internal

HAWK more desired by community

but significantly more expensive

than the RRFB called for in design

Bikeways/Tap Project

Identification

Bike Program Delivery

Consultant Team, MBAC,

advocates, Planning

Coordinating with WSP’s

prioritization process

Big Jump Assessment Data

Collection/Analysis Study led by Toole Design

Group

Ongoing; using RITIS probe data

Survey to be distributed online and

via paper copies; advertised via

door hangers

Big Jump Assessment Survey

Deployment

REP Existing Bike Facility AuditSabra and Associates will

conduct the facility audit

Kickoff occurred, data collection to

begin soon

MLK Sidepath

MDOT and McCormick

TaylorPromised final 30% design

presentation to community groups

Page 32: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Social Distancing Pilot: Safe,

Healthy, Open Spaces in Parks

Page 33: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

• The City of Baltimore as a whole is responding to the COVID-19 crisis.

• All departments and agencies have a role in helping to meet people’s needs and communicating best practices.

• Many residents are asking for ways to exercise during this time of social distancing.

• DOT, BCRP, and DPW are important stewards of public space.• Safe and appropriate use of public space is essential to

reducing the spread of COVID-19.

• The City’s goals in these safe streets treatments:• Provide adequate space for social distancing to limit

exposure to COVID-19 while allowing for healthy exercise.

Why These Efforts?

Page 34: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

DOT/Complete Streets Contributions

DOT’s efforts to contribute to the COVID-19 response include four initiatives, with the following goals:

Get Outside, But Don’t Gather• Communicate how to safely share public space while walking

and bikingDon’t Push That Button

• Reduce pedestrian/bicyclist contact with shared surfaces Open Space for Physical Distance

• Provide enough space for people to walk and bike (for essential travel or for exercise) while effectively maintaining physical distance between people

The Hospitals are Busy Enough• Increase safety on roadways through communications and

possibly traffic calming installations

Page 35: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

The Hospitals are Busy Enough

Roadway safety is more important than ever• DOT is exploring opportunities build on its communication campaign with

traffic calming installations to increase safety

Page 36: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Social Distancing in Parks

Accessing parks, essential

exercising, walking/biking in

residential neighborhoods, and

getting out for fresh air are all

more common now than before

social distancing measures went

into effect.

City agencies can help make this

safer.

Page 37: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Social Distancing in Parks

• Park visitors are not always leaving physical distance• This can be improved both through communication and providing more

space • Existing treatments at Lake Montebello and Druid Hill Park• Potential Next Steps

Page 38: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Druid Hill Park

Consider closing intersections of Greenspring at Druid Park Drive and Greenspring at Auchentoroly in order to greatly decrease traffic through the park.

Greenspring vehicle access will be limited to Zoo, Park, and Public Safety employees.

This will allow much safer bicycling and walking options on Greenspring and through the trails on the northern edge of the park.

Expand space for people walking through use of parking restrictions on East Drive and around construction on Swann Drive.

Page 39: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Lake Montebello

Potential closure of Curran Drive at

Lake Montebello entrances and

detour to 32nd and Harford Road.

Eliminates all auto traffic especially

cut through traffic around lake. No

parking will be lost in closure.

Residents and park users still have

access via local, low stress roads.

Page 40: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Updates: RecNParks

Updates:• BCRP and DOT coordination

Page 41: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

MBAC Awards – Nominations & Awards

Mayor’s Office Updates

Page 42: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Sub-Committee: Events

Event Promotion

City Events• Rec N Parks events• MBAC Awards date (Bike to Work Day postponed until September)

Community Events• Maintenance and Mingle – April 30th, 6:00 – 8:00 pm.• Other?

Recurring Rides – Solo or same household!

Page 43: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Community Updates

Open to any other community announcements:

Page 44: Mayor’s Bicycle Advisory Commission 04.29 · 4/29/2020  · • Baltimore Greenway Trail Network: • Collective at Canton has starting laying concrete for the loop/trail between

Miscellaneous Business

Next meeting date is May 27th, 4-6pm