may 15, 2015 board meeting. san joaquin joint powers authority item 1 call to order pledge of...

64
May 15, 2015 Board Meeting

Upload: dwight-pope

Post on 02-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

May 15, 2015 Board Meeting

Page 2: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 1

Call to Order

Pledge of Allegiance

Roll CallOath of Office

Page 3: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 2

Presentation by City of Elk GroveMember Patrick Hume

Page 4: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

A Presentation to the San Joaquin Joint Powers Authority Regarding the City of Elk Grove’s Multimodal Station Planning and

Construction EffortsMike Costa, Transit PlannerCity of Elk Grove

May 15, 2015

Page 5: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

FYs 2015-16 and 2016-17 City Council Goal and

ImperativeGoal: Continue to foster and support the safest and most highly connected neighborhoods with diverse opportunities for urban and rural lifestyles

Imperative: Prioritize public transit opportunities (e.g., light rail, heavy rail and bus rapid transit, multimodal station); develop and implement a political and funding strategy that supports the City’s goals for enhanced regional connectivity.

Page 6: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Background

• Various locations assessed and opportunities considered

• State funding awarded for Comprehensive Operational Analysis and Multimodal Feasibility Study

• TIGER grant application for construction

Page 7: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Location

Page 8: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Location

Page 9: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Feasibility Study

• Awarded $125,000 Caltrans Sustainable Transportation Planning Grant

• Assess ridership projections, service demand, and possible Vehicle Miles Traveled reductions on State Route 99

• Provide preliminary site assessment that would assist with site design/engineering

• Conduct public and stakeholder outreach• Financial feasibility analysis

Page 10: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

TIGER Grant• $20.8 million requested, $5.2 million local match,

total project cost $26 million• Environmental, site design/engineering, and Right

Of Way • Construction of several on-site amenities:

– Passenger loading platform, – Vehicle parking (including electric charging stations) and

bike parking– Transit stop for e-tran service and SCT Link– Purchase of additional buses for increased e-tran service– Onsite access control and roadway improvements

• Begin construction activities in July 2017

Page 11: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Letter of Support

The City of Elk Grove is requesting a letter of support for the City’s efforts to plan and construct a multimodal station that would connect to the San Joaquins passenger rail corridor and provide the region with greater mobility and connectivity through alternative modes of transportation

Page 12: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Mike Costa, Transit Planner

May 15, 2015

QUESTIONS?

A Presentation to the San Joaquin Joint Powers Authority Regarding the City of Elk Grove’s Multimodal Station Planning and

Construction Efforts

Page 13: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Recommendation: Approve Letter of Support for the City

of Elk Grove’s TIGER Grant Application for a new Station in Elk Grove.

Letter of Support for Elk Grove TIGER Grant

Page 14: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 3

Consent Calendar 3.1 Approve Minutes from March 27, 2015 Board Meeting

3.2 Approve Next SJJPA Board Meeting Location and Start Time

July 24, 2015: Sacramento at 1:30 pm

Page 15: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 4

Public Comments

Page 16: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 5

Recommendations for Role and Membership of the San Joaquin Valley Rail Committee

Stacey Mortensen

Page 17: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The San Joaquin Valley Rail Committee (SJVRC) was established in 1987.

In statute, the SJVRC is formally identified as the “Steering Committee of the Caltrans Rail Task Force”.

The purpose of the SJVRC has been to discuss and formulate plans, suggestions, and ideas for changes and improvements to passenger trains service in the San Joaquin Rail Corridor and then pass these on to Caltrans and Amtrak.

Rec. for Role and Membership of the SJVRC

Page 18: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

AB 1779 states that the SJVRC shall become the Steering Committee of the San Joaquin Joint Powers Authority for the purpose of advising the joint powers board.

SJJPA JEPA states the SJVRC will advise the SJJPA on technical issues associated with the improvements in passenger rail service and related facilities in the San Joaquin Rail Corridor.

Rec. for Role and Membership of the SJVRC

Page 19: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

SJJPA JEPA states members of the SJJPA Board may not also concurrently serve as a member of the SJVRC.

SJJPA JEPA states future appointments to the SJVRC will be made by the Board in consultation with the Member Agencies.

Rec. for Role and Membership of the SJVRC

Page 20: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Staff recommendations: Once the administrative responsibility of the

San Joaquin rail service is transferred to the SJJPA, the SJVRC would report to the SJJPA and the SJVRC would be staffed by SJJPA staff.

SJVRC meet at least quarterly (as established in their By Laws) and be on the SJJPA Board Meeting agendas to make presentations to the SJJPA at least twice a year.

Rec. for Role and Membership of the SJVRC

Page 21: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Staff Recommendations: The function of the SJVRC would be as defined

in their By Laws and by the SJJPA JEPA.

SJVRC Regular Members, Alternate Members, Associate Members, and Agency Associate Members shall not include any elected officials.

Future SJVRC Members, Alternate Members, Associate Members, and Agency Associate Members shall be appointed by the SJJPA.

Rec. for Role and Membership of the SJVRC

Page 22: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The By Laws of the SJVRC currently require that “at least one (1) of each County’s two (2) Regular Members must be an elected official of the County.”

The SJVRC By Laws also need to be changed to state that future SJVRC Members, Alternate Members, Associate Members, and Agency Associate Members shall be appointed by the SJJPA in consultation with the Member Agencies

Rec. for Role and Membership of the SJVRC

Page 23: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Fiscal Impact: There will be some staff hours needed

to provide staffing for the SJVRC. However, this is an anticipated activity of SJJPA staff and is not expected to impact the proposed budget of the SJJPA.

Rec. for Role and Membership of the SJVRC

Page 24: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Recommendation: Approve “Staff Recommendations for

Role and Membership of the San Joaquin Valley Rail Committee” and direct staff to work with Caltrans to convene a meeting of the SJVRC to request that they make changes to their By Laws.

Rec. for Role and Membership of the SJVRC

Page 25: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 6

Approve a Resolution of the Governing Board of the San Joaquin Joint Powers Authority Adopting the 2015 Business Plan Update

Dan Leavitt

Page 26: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Approve 2015 Business Plan Update

Page 27: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The 2014 SJJPA Business Plan Update was adopted on January 23, 2015.

CalSTA requested that Business Plans from the three intercity passenger rail JPAs cover state fiscal years FY 15/16 and FY 16/17.

This Update includes the updated numbers for the Amtrak budget and the SJJPA administrative costs and updates portions of the Business Plan Update which were out-of-date.

Approve 2015 Business Plan Update

Page 28: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Chapter 5 (Comet Car Trainsets, Bi-Level & New Equipment):

The last paragraph concerning the Comet Cars was deleted.

 Chapter 7 (Short-Term and Long-Term Capital Improvement Program):

Table 7.3 “Stockton-Escalon Double Track Segment 4” project has been reduced from $33.5 million to $21.5 million.

Key Edits to 2015 Business Plan

Page 29: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Chapter 9 (Establishment of Fares): New information regarding the existing San

Joaquin fare policy (provided at the March 27, 2015 SJJPA Board Meeting) replaced previous language.

A new bullet was added stating: “Investigate changes to the existing fare policy of increasing fares as trains begin to reach capacity”.

Key Edits to 2015 Business Plan

Page 30: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Chapter 13 (Annual Funding Requirement):  FY 2015/16 the “operating loss” for the San

Joaquin service estimate was changed from $48.0 million to $47.3 million which includes $3.7 million for the operation of the 7th daily round trip between Oakland and Bakersfield (for half of the fiscal year).

For FY 2016/17 the San Joaquin operating subsidy is estimated to be $48.3 million (which includes $7.4 million for the 7th daily round trip).

Key Edits to 2015 Business Plan

Page 31: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Chapter 13 (Annual Funding Requirement):  Amtrak is projecting San Joaquin FY 16

ridership at 1.243 million passengers and ticket revenue at $40.374 million.

For FY 2015/16 and FY 2016/17, “Marketing Expenses” are assumed at $1.0 million rather than $1.9 million.

 SJJPA administrative costs for FY 2015/16 are now $1,595,606 (they were previously $1,304,985), for FY 2016/17 these costs are estimated at $1,669,120.

Key Edits to 2015 Business Plan

Page 32: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Chapter 13 (Annual Funding Requirement):

 A new org chart (Table 13.1) which includes the addition of two shared positions: Regional Initiatives and Planning Analyst

focusing on Business Plans, network integration, station area development, legislative matters, and other planning activities.

Connecting Services Coordinator to oversee Bus Operations and Coordination of the 16 routes administered by the San Joaquins.

Key Edits to 2015 Business Plan

Page 33: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 

Key Edits to 2015 Business Plan

Page 34: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Chapter 13 (Annual Funding Requirement):

End of first paragraph, replace where it states:

“The ITA will set forth the fund request for FY 2015/16 and FY 2016/17 to identify the maximum amount of funds to be transferred to the SJJPA for FY 2015/16 and FY 2016/17 which will be incorporated into the FY 2015/16 and FY 2016/17 Legislative Budget process.”

New Edits to 2015 Business Plan

Page 35: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Chapter 13 (Annual Funding Requirement):

With the following new text: “The Business Plan will set forth the

funding request for FY 2015/16 to identify the amount of funds to be transferred to the SJJPA. These funds will be incorporated in the FY 2015/15 Budget Process.”

New Edits to 2015 Business Plan

Page 36: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

 Edits from Caltrans: Name of “Caltrans Division of Rail” needs to

be changed to “Caltrans Division of Rail and Mass Transportation.

Page 46: Delete the following sentence: “This is in addition to the $1.2 million the State funds Amtrak annually for media advertising”.

Pages 23-24: Delete Route 20 (Capitol Corridor bus), delete Route 395, add Route 56, and note that Route 99 is a joint route with Capitol Corridor.

New Edits to 2015 Business Plan

Page 37: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Fiscal Impact: Approval of the 2015 Business Plan

Update is required for the completion of the Interagency Transfer Agreement (ITA).

A signed ITA by both the State and the SJJPA is required for the SJJPA to receive funding from the State for the administration, marketing, and operations for the San Joaquin service.

Approve 2015 Business Plan Update

Page 38: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Recommendation: Approve a Resolution of the Governing

Board of the San Joaquin Joint Powers Authority Adopting the 2015 Business Plan Update

2015 Business Plan Update

Page 39: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 7Approve a Resolution of the Governing Board of the San Joaquin Joint Powers Authority (SJJPA), Authorizing the Chair to Execute the Interagency Transfer Agreement With the State of California, Enabling the Administrative Responsibility of the San Joaquin Rail Service and Funding For the Service To be Transferred To SJJPA

Stacey Mortensen

Page 40: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

In order to take over the administrative responsibilities of the San Joaquin rail service, SJJPA must negotiate and sign an Interagency Transfer Agreement (ITA) with the State.

The ITA development has been underway for more than a year.

An Initial Draft ITA was presented at the September 26, 2014 SJJPA Board Meeting.

The current version includes edits from CalSTA and Caltrans

Approve ITA Resolution

Page 41: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The ITA has been improved, updated, and completed, but it remains predominately the same in content as the Initial Draft ITA presented September 2014.

SJJPA and LOSSAN JPA ITA efforts have been coordinated and the documents are consistent.

The Capitol Corridor Joint Powers Authority ITA was used as a model for the ITA.

The ITA between the SJJPA and the State shall cover the initial three-year period after the transfer, but may be extended thereafter by mutual agreement.

Approve ITA Resolution

Page 42: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Initial drafts for Appendix K (Role of the SJJPA) and Appendix L (Role of the State) were presented at the September 26, 2014 SJJPA Board Meeting.

The current versions include edits from CalSTA and Caltrans.

The primary change is that these two appendices have been expanded to include a “Statewide Working Group” to be established by CalSTA to improve coordination between the three JPAs and to assist with integrating the conventional intercity services with other rail and transit services.

Approve ITA Resolution

Page 43: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The ITA has been thoroughly reviewed by Caltrans Division of Rail and Mass Transit, Caltrans Legal, and CalSTA’s Deputy Secretary of Transportation

It has not been fully reviewed and approved by the Secretary of CalSTA.

There are a few of the Appendices which have not been completed.

Approve ITA Resolution

Page 44: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Staff recommends that SJJPA approve the attached ITA and give the Chairperson authority to sign the ITA, and direct the Chairperson to work with the Vice Chairs, SJJPA staff and legal counsel to deal with any changes proposed by the Secretary of CalSTA and to review the remaining Appendices.

Approve ITA Resolution

Page 45: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Fiscal Impact: A signed ITA by both the State and the

SJJPA is required for the SJJPA to take over administrative responsibility of the San Joaquin service and to receive funding from the State for the administration, marketing, and operations for the San Joaquin service.

 

Approve ITA Resolution

Page 46: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Recommendation: Adopt a Resolution Of The Governing

Board Of The San Joaquin Joint Powers Authority (SJJPA), Authorizing The Chair To Execute The Interagency Transfer Agreement With The State Of California, Enabling The Administrative Responsibility Of The San Joaquin Rail Service And Funding For The Service To Be Transferred To SJJPA.

Approve ITA Resolution

Page 47: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 8

San Joaquin Rolling Stock and Operations Update

Brian Schmidt

Page 48: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Update

Working with Amtrak, BNSF and UPRR determine the root cause of delays on the San Joaquin Service.

Working with Amtrak and Capitol Corridor develop a opportunities to modify consist sizing using average peak loads by month for San Joaquin and CCJPA by train # for the Summer Peak

Analyze ridership and revenue data from Amtrak and propose options on where to slot the 7th San Joaquin round trip train in coordination with the Caltrans and the BNSF into the current schedule or propose a modified schedule.

Page 49: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Train Delays for October through April

Near Miss Incidents - 28 Average Delay 6 minutes

Vehicle on Tracks - 42 Average Delay 23 minutes

San Joaquin Incidents- 12 Average Delay 112 minutes Other Train Incidents - 6 Average Delay 83

minutes (BNSF - 4 & CCJPA - 2)

San Joaquin Rolling Stock Update

Page 50: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin On Time Performance

Page 51: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin OTP Oct. 1 thru May 11, 2014

Trains Operated - 3,506 Trains On-Time - 2,714 Trains Late - 792 FY Year OTP - 70.8% May OTP - 69.7%

San Joaquin On Time Performance

Page 52: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Ridership Year-to-date vs. Projected %

FY15 Projected Diff San Joaquin 665,759 695,000 -

4.2 Capitol Corridor 847,647 815,700 +3.9 Pacific Surfliner 1,549,605 1,486,100

+4.3

FY 2015 Ridership

Page 53: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Monitor and develop strategies to increase ridership

Work with Caltrans, Amtrak and BNSF on the 7th roundtrip train schedule and implementation schedule

Work with Caltrans and Amtrak on equipment rotations to accommodate the 7th roundtrip

Next Corridor Improvement Team (CIT) meeting with the BNSF and UPRR is scheduled for July 7th, in Los Angeles

Next Steps

Page 54: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 9

CIPR Leadership Coalition Update

Dan Leavitt

Page 55: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

CA Intercity Passenger Rail Leadership Coalition

Page 56: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The CIPR lobby day was held on April 28 at the State Capitol. Chair Pedrozo and Vice Chairs Perea and Tatzin

represented the San Joaquin Joint Powers Authority along with Karlha Davies and Dan Leavitt.

Meetings were held with a many of the members of the Assembly and Senate throughout the state and the San Joaquin Corridor.

New CIPR Brochures and the CIPR Legislative Priorities were provided to the members of the Legislature and their staff.

CIPR Leadership Coalition Update

Page 57: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

The Passenger Rail Summit was held on April 29, 2015 at Sacramento City Hall. Chair Pedrozo and Vice Chair Tatzin attended Executive Director Mortensen spoke on

“Network Integration” Secretary Kelly was keynote speaker

Reception for the Passenger Rail Summit on April 28, 2015 at Rail Museum. Chair Pedrozo and Vice Chair Tatzin attended

CIPR Leadership Coalition Update

Page 58: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

An initial joint-hearing for the Assembly and Senate Select Committees was held on May 14 at the State Capitol. Vice Chair Tatzin attended and addressed the

Committee Members representing the CIPR Leadership Coalition

Agenda Items included: Overview of Rail Passenger Network: CalSTA Funding for Intercity Passenger Rail Improving Passenger Rail Safety Transfer of Administrative Responsibility to JPAs

CIPR Leadership Coalition Update

Page 59: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 10

Administrative Matters or Announcements• Correspondence•

Stacey Mortensen

Page 60: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Based on SJJPA direction from the March 27 SJJPA Board meetings, letters were sent related to the following:

The Strategic Growth Council for Sustainable Community applications which support transit-oriented development near SJJPA stations

The “Stockton-Escalon Double Track Segment 4” major application and “San Joaquin Fare Subsidy Program” minor TIRCP Cap & Trade SJJPA applications were submitted on April 10, 2015

Caltrans/Amtrak regarding the San Joaquin Fare Policy

Correspondence

Page 61: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

Letters of support for the SJJPA Cap & Trade applications were received from:Congressman McNerney, Senators Cannella, Senator Galgiani Assemblymember Eggman, Assemblymember Gray, Assemblymember Olsen SJV Regional Planning Agencies Directors’ Committee

CIPR Leadership Coalition, Kern COG, Fresno COG, Merced CAG,

San Joaquin COG, Sacramento Area COG, Contra Costa TA,

Cities of Stockton, Lodi, and Rancho Cordova, Sacramento Regional Transit, Central Valley Rail Working Group, CA Partnership for the San Joaquin Valley, Great Valley Center, San Joaquin Partnership, Central Valley Hispanic Chamber of Commerce, Catholic Charities Diocese of Stockton, Save Downtown Stockton, Amtrak, BNSF

Correspondence

Page 62: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 11

Board Members Comments

Page 63: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority

Item 12

Adjournment

Page 64: May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

May 15, 2015 Board Meeting