Page 1: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies
Page 2: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12Lyn Pratt, Richard ExleyCMTS, MAA GroupOracle Server Technologies

Metin YilmazSenior Principal Support Engineer,Oracle Support Services

Page 3: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions.The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.

Page 4: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

Agenda

• Maximum Availability Architecture (MAA)• E-Business Suite MAA• E-Business Suite Disaster Recovery• E-Business Suite MAA Demonstration • New Database Features and E-Business Suite

Page 5: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

Maximum Availability Architecture (MAA)

Page 6: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Maximum Availability Architecture (MAA)Maximum Availability = Unbreakable Architecture + Best Practices

Oracle's best practices blueprint based on proven Oracle high availability technologies and recommendations

Technology + Configuration + Operational Practices

Applications, Enterprise Manager, Application Server, Collaboration Suite and Database

• Constantly validated and enhanced as new products and features become available

• Focused on reducing unplanned and planned downtime

• Focused on making our customers successful• Papers published to the Oracle Technology Network (OTN)

• http://www.oracle.com/technology/deploy/availability/htdocs/maa.htm

Page 7: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Presentation Focus

• This presentation is on Oracle E-Business Suite Release 12 MAA

• Please see the MAA home page for detailed papers covering Oracle E-Business Suite 11i and R12 MAA• http://www.oracle.com/technology/deploy/availability/htdocs/maa.htm

Page 8: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

E-Business Suite MAA

Page 9: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAATarget Architecture

Primary Site

OracleRAC and

ASM

Disaster Recovery Site

Oracle Data Guard

OracleDatabase

OracleStandby

Database

Database Tier OracleRAC and

ASM

Application Tier

HA Storage

Page 10: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA Oracle Database MAA

Page 11: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAATransitioning to RAC and ASM

• Migrate Oracle Applications Release 12 to a Real Application Clusters (RAC) environment running Oracle database server 10g Release 2 with Automatic Storage Management (ASM)• https://metalink.oracle.com/metalink/plsql/ml2_documents.showDoc

ument?p_database_id=NOT&p_id=388577.1

Page 12: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA Application HA Features

Page 13: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA Load Balancing Configuration

• Load balancing distributes client requests across multiple application tier nodes, providing additional scalability and fault tolerance

• Implementation requires adding and configuring application tier nodes and configuring the load balancer

• Metalink note 380489.1 describes the application configuration options in detail:

• https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=380489.1

• Load balancer configuration is vendor specific• Persistence through cookies is required

Page 14: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA Parallel Concurrent Processing

• Parallel concurrent processing allows concurrent managers to execute on multiple server nodes at the same time, providing scalability and fault tolerance

• The feature is detailed in the Oracle Applications System Administrator's Guide, Release 12:• http://download.oracle.com/docs/cd/B34956_01/current/acrobat/120

sacg.pdf

• Metalink note 388577.1 explains additional considerations when using PCP with RAC:• https://metalink.oracle.com/metalink/plsql/ml2_documents.showDoc

ument?p_database_id=NOT&p_id=388577.1

Page 15: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAATarget Architecture

Primary Site

OracleRAC and

ASM

Disaster Recovery Site

Oracle Data Guard

OracleDatabase

OracleStandby

Database

Database Tier OracleRAC and

ASM

Application Tier

HA Storage

Page 16: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

E-Business Suite Disaster Recovery

Page 17: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster Recovery

• In this section we describe how to setup and operate a E-Business Suite disaster recovery site

• Detailed papers describing this process for 11i and R12 are published on the MAA home page• http://www.oracle.com/technology/deploy/availability/htdocs/maa.htm

• The process is based on Rapid Clone; see Metalink note 559518.1 for how to clone an EBS environment:• https://metalink.oracle.com/metalink/plsql/ml2_documents.showDoc

ument?p_database_id=NOT&p_id=559518.1

Page 18: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryCreating the Standby Site

Page 19: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryCreating the Standby Site

• Establish Standby Hardware and System Software• Install the standby site middle tier and database hardware,

networks, etc.• Think carefully about the performance and HA

requirements - best to mimic production?• Plan also for all required external services

• Install System Software

• Establish Oracle Clusterware• Required for ASM and RAC

• Establish ASM

Page 20: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryPreparation on the Primary

• Prepare for Data Guard operation• Enable archive log mode• Enable forced logging• Create database password files• Configure SQL*NET communication between sites• Set database parameters for Data Guard• Create standby redo logs

Page 21: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryClone and Configure Database Software

• Clone database software and prepare the standby instances• Run the E-Business Suite pre-clone utility on a primary database

node• Copy the database home to the standby database servers• [RAC Only] Run adclonectx.pl on each standby database server

• Edit the context file to adjust the cluster_database_instances, instance_number, instance_thread, and undotablespaceparameter values appropriately

• Run adcfgclone.pl on each standby database server• Configure Data Guard database parameters on standby site• Configure SQL*NET Communication on standby site• [RAC Only] Restart the listeners

Page 22: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryClone and Configure Application Software

• Clone the application tier to standby• Run the pre-clone utility on a primary applications tier node• Copy the software to the standby• Run adcfgclone.pl on each standby middle tier server

• Use atTechStack option and run AutoConfig with “run=INSTE8” option as there is no database connection

• [RAC Only] Edit the context file to point Tools OH TWO_TASK, iAS OH TWO_TASK, and Apps JDBC Connect Alias to the appropriate load balancing services

• (Optional) Establish log and out file synchronization• Use your favorite tool for this, for example rsync

Page 23: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryCreate the Physical Standby Database

• Establish the standby database• Back up the production database including archive logs, and the

production control file for standby• Restore the database to the DR site using (one of) the configured

instance(s)• Start managed recovery• Check out MAA papers for tuning best practices:

• http://www.oracle.com/technology/deploy/availability/pdf/MAA_WP_10gR2_RecoveryBestPractices.pdf

• http://www.oracle.com/technology/deploy/availability/pdf/MAA_WP_10gR2_DataGuardNetworkBestPractices.pdf

• [RAC Only] Register the standby database with Oracle Clusterware

Page 24: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster Recovery Operational Procedures

• Switchover• Be sure you are up to date with redo apply

• Have procedures in place to also be up to date with file system synchronization

• Shut down the app and all but one database instance on each site

• Prepare the primary database for standby, switch the standby to primary, open, and start other instances

• Remove the applications topology from the database • Run AutoConfig on database tier (twice for RAC) then middle

tiers to configure the application for DR operation• Start the Apps• Convert the old primary database to a Data Guard standby

Page 25: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryOperational Procedures

• Failover (assuming you lost the primary database)• Convert the standby to primary operation, open, and start

other instances• Remove the application topology from the database• Run AutoConfig on database tier (twice for RAC) and then on

middle tier to configure the application for the DR site• Start the Apps• If the primary site becomes available, flash the old primary

database back to before the failure and convert it to a physical standby

• If the primary site is permanently lost, create a new standby environment

Page 26: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryOperational Procedures

• Standby testing using flashback• Cancel media recovery on the standby database• Create a guaranteed restore point on the standby database• Switch the redo log on the primary database• Activate the standby database and configure EBS

• Take care with external interfaces such as Workflow -disable them before starting EBS

• [Perform testing at the standby site]• Flash the database back to the restore point

• Remove file system changes?• Drop the restore point• Convert the database back to a physical standby and resume

standby operation

Page 27: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite Disaster RecoveryAutomating Switchover and Failover

• Configure Data Guard Broker to automate Data Guard operation and the database failover and switchover steps

• Configure Data Guard Fast Start Failover to automatically detect a database failure and initiate failover

• Create a script to automate the application configuration and startup

• Create DB_ROLE_CHANGE trigger that will execute the script on switchover and failover

Page 28: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

E-Business Suite MAA Demonstration

Page 29: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA DemonstrationHardware Vendor Partners

• Part of MAA means proving and testing our best practices

• We work closely with our hardware vendor partners to check that our joint solutions work well together

Page 30: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA TestingDemo Configuration

• The demonstrations were developed and executed using HP Systems hardware and software and F5 load balancers

• Hardware• F5 BIG-IP Local Traffic Manager v9 - 3400 Series• HP DL145 G2 running HP Load Runner v8.1 for load generation• HP Integrity rx2620 servers for the application tier • HP Integrity rx4640 servers for the database tier • HP StorageWorks EVA4000 for database storage

• Software• HP-UX 11i v3 (11.31) for application and database Servers• HP Serviceguard extensions for RAC (SGeRAC) Version A.11.18• Oracle Enterprise Manager Grid Control was used to monitor the

systems

Page 31: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA DemonstrationLab Configuration

Page 32: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA TestingCurrent Test Configuration

• Testing for R12 was done with HP Systems hardware and software and F5 load balancers

• Hardware• F5 BIG-IP Local Traffic Manager v9 - 3400 Series• HP DL145 G2 running HP Load Runner v8.1 for load generation• HP BL 460c servers for the application and database tiers• HP StorageWorks EVA4400 for database storage

• Software• HP-UX 11i v3 (11.31) for application and database Servers• HP Serviceguard extensions for RAC (SGeRAC) Version A.11.18• Oracle Enterprise Manager Grid Control was used to monitor the

systems

Page 33: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA TestingCurrent Configuration

Page 34: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA DemonstrationSite Failure

Page 35: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

E-Business Suite MAA DemonstrationSite Failure

1. System running under load on primary site2. Power down primary site nodes3. Users begin to receive errors in client and are redirected to

fallback server where information about the outage is posted4. Oracle Data Guard Broker detects database down and

performs database failover to the standby 5. DB_ROLE_CHANGE trigger fires to execute E-Business Suite

failover script 6. E-Business Suite failover script removes the topology, runs

AutoConfig on DB and apps tiers, and starts the application 7. Network is switched to standby site through DNS push 8. Users are routed to standby site and login

Page 36: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

E-Business Suite MAA Demonstration

Page 37: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

<Insert Picture Here>

New Features and the

E-Business Suite

Page 38: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

New Database Features

• Secure File System (SFS) entering beta• Streams Extended Datatype Support (EDS) being

made available this week

Page 39: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Secure File System (SFS)

• File system in the database• Conceptually like NFS client

• User mode filesystem, no changes to Linux kernel

• Standards-based POSIX compatible• Transparent to file system applications• Mount SFS at a Linux mount point with a normal Unix path

Page 40: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

SFS – Potential Opportunities forE-Business Suite

• Concurrent Manager log and out files • Shared NFS mount for all PCP processes• Keep in EBS database. Failover to disaster recovery site will

be at virtually the same point in time as the OLTP transactions

• Application software – shared NFS install for local efficiency, DR consistency• Address single point of failure

Page 41: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Extended Datatype Support (EDS)

• Adds Streams support for:• Object columns with simple or nested objects• Object tables• XMLType (CLOB, Binary, ObjectRelational)• Varrays• Partial Spatial types (SDO_GEOMETRY)

• The EDS package generates workarounds for moving the above data

Page 42: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

Extended Datatype Support –Generated Workaround

• Streams configuration• Pre-instantiation setup• Post-instantiation setup• Clean-up

• Workaround to move unsupported data• Log table for source and target databases, capable of holding

all the fields in the original table, using only supported data types

• Trigger on base table on source database, to write inserts, updates, deletes to log table

• DML handler on log table on target database, to replicate original DML on the base table

Page 43: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

EDS – Potential Opportunities forE-Business Suite

• Reporting database• … if enough columns are now supported for the customer’s

reporting requirements• Still up to the customer to determine viability / mechanics

• Database-level maintenance is being researched:• Rolling database upgrade• Cross-platform migration

Page 44: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

HA Sessions, Labs, Demos From Oracle Development

Mon, Sep 22• 2:30 pm - Database 11g: Next-Gen HA, Moscone South 103

Tue, Sep 23• 9:00 am - Active-Active Data Centers, Moscone South 103• 11:30 am - Sharding with Oracle, Moscone South 302• 11:30 am - HA with Oracle VM, Moscone West 3024• 1:00 pm - Active Data Guard, Moscone South 104

Wed, Sep 24• 9:00 am - Fusion Middleware Grid HA, Marriott Nob Hill AB• 11:30 am - RMAN Best Practices, Moscone South 103• 5:00 pm - Data Guard & Real Application Testing, Moscone 102• 5:00 pm - EM in Secure MAA, Moscone West 2001

Wed, Sep 24 (contd.)• 5:00 pm - E-Business Suite HA, Moscone West 2002/04

Thu, Sep 25• 9:00 am - Oracle Secure Backup, Moscone South 102• 10:30 am - Streams Replication, Moscone South 102• 12:00 pm - Rolling Database Upgrades, Moscone South 103• 1:30 pm - Streams Performance, Moscone South 102• 3:00 pm - Oracle Grid Computing, Moscone South 303• 3:00 pm - E-Business Suite R12 MAA, Moscone West 2007• 3:00 pm - Siebel MAA, Moscone South 308• 3:00 pm - Fusion SOA HA & Scalability, Marriott Salon 14/15

Hands On Labs - Thu, Sep 25• 10:30 - 11:30 am, 12:00 - 1:00 pm - Active Data

Guard, Marriott Golden Gate A3

DEMOgrounds, Mon-Thu• Active Data Guard, Streams, Oracle Secure

Backup, RMAN/Flashback, MAA

Page 45: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies

For More Information

search.oracle.com

ororacle.com

Maximum availability architecture

Page 46: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies
Page 47: Maximum Availability Architecture(MAA) · Maximum Availability Architecture(MAA): Oracle E-Business Suite Release 12 Lyn Pratt, Richard Exley CMTS, MAA Group Oracle Server Technologies