mass assembly 10.9.13 – calice collaboration meeting lapp annecy jgu mainz - phi chau bruno bauss,...

37
Mass Assembly 10.9.13 – Calice Collaboration Meeting LAPP Annecy JGU Mainz - Phi Chau Bruno Bauss, Volker Büscher, Julien Caudron, Reinhold Degele, Karl Heinz Geib, Sascha Krause, Yong Liu, Lucia Masetti, Uli Schäfer, Rouven Spreckels, Stefan Tapprogge, Rainer Wanke

Upload: laura-simon

Post on 21-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Pick and Place Machine

Mass Assembly10.9.13 Calice Collaboration MeetingLAPP Annecy

JGU Mainz - Phi ChauBruno Bauss, Volker Bscher, Julien Caudron, Reinhold Degele, Karl Heinz Geib, Sascha Krause, Yong Liu, Lucia Masetti, Uli Schfer, Rouven Spreckels, Stefan Tapprogge, Rainer Wanke

Wing LDA/CCC StatusAHCAL wing data aggregator has been builtInitial power-up tests successfulSystem integration started (Andr, Rouven,), but further effort requiredFirmware for Kintex FPGAsFirmware / Software for Zynq processor (MARS ZX3)VME-sized clock/control unit acting as MARS test benchIssues in firmware load stage observed on engineering sampleFurther effort required to debug on production silicon available nowFor the time being cover all immediate needs (AHCAL LDA/CCC) with adapter modules on ZedboardClock/control adapters availableData aggregator adapter ready for productionNew batch of clock fan-out units in productionJulien working on software integration

210.09.2013

Format noch korrigieren2Need for an automatic productionAHCAL (final design)About 8.000.000 tiles have to be placed on HBU boardsWith an effort of 10 s per tile ~ 8 years are necessary for the assembling We need an automatic placement With 1 second per placement we need 1 year

Mass Assembly310.09.2013Format noch korrigieren3Mass productionDESY: Production of HBU boardsITEP: Production of the tilesHeidelberg University: Characterisation of tiles/SiPMWuppertal: LEDs calibrationsMainz University: Placement of the tiles on the HBU board, functionality tests of the assembled boards

410.09.2013Mass AssemblyFormat noch korrigieren4Automatic placementPick-and-place machineCamera detects tiles/SiPMs and suction cup places them on the HBU (SiPM pins through the pin holes)Vision system detects tiles and the SiPM pins quality assuranceProblem: Reflective surface of the tilesPick-and-place maschines with Vision systemsworks with light to detect the pins

5Pick-and-place machine10.09.2013Mass AssemblyCamera testsWe have produced dummy tiles for camera tests at machine manufactors

3 companies have confirmed, that vision system can handle the tiles

610.09.2013

Mass AssemblyCurrent designMounting of tile on HBU board:Tiles have to been pushed into the alignment pin holesVery small tolerances are needed to fitWith 4 pins (2 SiPM pins, 2 allignment pins), tolerances have to be quite big

10.09.20137Original design:Alignment pinsReflector foilHBUPin (SiPM)SiPMAbsorption layerMass AssemblyModified design: Option 1 Not wrapped tileMounting of modified tile on HBU board:Plane tiles without alignment pinsRequires: Fixation of the tile with gluepoint between tile and reflector foilJust 2 pins (from SiPM) tolerances are less demanding

8Original design:Reflector foilHBUPin (SiPM)SiPMGluepoint10.09.2013Absorption layerMass AssemblyModified design: Option 2 wrapped tile (Uni Hamburg)

9Mounting of modified wrapped tile on HBU board:Tile is wrapped with reflector foil and flex pin connectorFixation of the tile with gluepoint between HBU and reflector foil

Uni Hamburg design:HBUPin (SiPM)SiPMWith reflector foil wrapped tileGluepoint10.09.2013Absorption layerMass AssemblyAutomatic placementScreen printerSets gluepoints on the surface of the HBUHigh adhesive glue is needed, because we dont want any time for drying-out the glue SiliconePotential issue: Does Gluepoint reduce light yield? Tests

10Screen printer10.09.2013Pick-and-place machineMass AssemblyMeasurement Set-upMeasurement of the influence on the optical properties with cosmics

1110.09.2013

Trigger scintillatorAmplifierMass AssemblyMeasurement Set-upMeasurement of the influence on the optical properties with cosmics

1210.09.2013

AmplifierSiPMTrigger scintillatorTile between two layers of reflector foilMass Assembly12

First measurementThe first measurements are finished2 ITEP tiles with 2 Hamamatsu MPPC S10943-8584(X) are measured with cosmicsUnmodified without gluepointsWithout allignment pins with gluepoints (allignment pins are removed,