marine technology centre for learning. up-skilling millbay

49
MARINE TECHNOLOGY CENTRE FOR LEARNING / UP-SKILLING MILLBAY Design strategy & Technical study Ben Twells

Upload: ben-twells

Post on 22-Jul-2016

219 views

Category:

Documents


0 download

DESCRIPTION

A design document exploring how a new industry model can have economic, social and environmental benefits to a deprived area of Plymouth.

TRANSCRIPT

Page 1: Marine Technology Centre for Learning. Up-Skilling Millbay

MARINE TECHNOLOGY CENTRE FOR LEARNING / UP-SKILLING MILLBAY

Design strategy & Technical study Ben Twells

Page 2: Marine Technology Centre for Learning. Up-Skilling Millbay
Page 3: Marine Technology Centre for Learning. Up-Skilling Millbay

Contents

Project synopsis 3

Context and Site 4

Urban strategy 6 -Strategy vision 8 - Weaknesses 9 - Strengths 10 - Opportunities 11 - Key issues 12

Master Plan 13 - Site usage 14 - Site synergies 16

Project brief 18 - Education scheme 19

Building Proposition 20 - Concept 21 - Precedents 22 - User profiles 24 Design sequence 26

Structural details 38

Environmental strategy 42 - Heating strategy 44 - Heat loss calculation 45

Reflection 47

Page 4: Marine Technology Centre for Learning. Up-Skilling Millbay
Page 5: Marine Technology Centre for Learning. Up-Skilling Millbay

3

Project Synopsis

This building is going to facilitate the UP-SKILLING of LOCAL PEOPLE into the marine technology industry. Its going to encompass all age groups primarily between 6 and 21. 21 years and upwards will either be in the APPRENTICESHIP PROGRAMME or taking part in WATER SPORTS activities. The scheme implemented will inform EDUCATION through play and interaction.

On the wider scale the marine technology industry will be testing prototypes to manufacture and distribute world wide; putting Millbay and Plymouth on the map.

Key Actors Achievements How this is going to happenYoung local people To mix with similar people to build

relationships Self-interest workshops where peo-ple can carry out personal hobbies

Tourists To learn of Plymouth heritage and spread the knowledge produced by the education programs and spend money

Having viewing galleries into work-shops and exhibits to engage with the ongoing activity

Public people Engage with play and knowledge made

Partake in and observe water sports activities

University research To help inform future design in the industry

Local feedback relationships to learn from one another

University students Mix with students in practical learn-ing

Run 1 day per week on hands on workshops, industry students help and teach university students.

Page 6: Marine Technology Centre for Learning. Up-Skilling Millbay

4

Benjamin TwellsPlymouth University

Nov 28, 2013 11:44Scale 1:15000

1860

0 200 400 600 800 1000 1200 1400 1600 1800 2000 m

© Landmark Information Group Ltd and Crown copyright 2013. FOR EDUCATIONAL USE ONLY.

Historic Railway served Ship Building industry at Millbay, Loss of Industry, loss of rail, loss of connection

Millbay in Plymouth

Historical site context

Page 7: Marine Technology Centre for Learning. Up-Skilling Millbay

5

Existing site images

Page 8: Marine Technology Centre for Learning. Up-Skilling Millbay

6

Urban Strategy

The synopsis for the Urban Strategy is to create a new FUTURE PROOF IDENTITY FOR MILLBAY, that is based on a synergy between multiple site users: port authority (ABP), renewable MARINE TECHNOLOGY industry, EDUCATION SECTOR, tourism & leisure and private residential development.

Plymouth is currently on the short list for the second wave of investment made available for cities and regions by the government. If the city is successful with the ‘CITY DEAL’ there will be INVESTMENT into projects all over Plymouth with the majority funding a new centre for marine technology on ex mod owned ‘South Dockyard’ Devonport.

Millbay is the area where the marine technology industry in Plymouth can grow from, it will be a catalyst not only for change but for a new path into the future for the identity for the area. This pioneering industry will put Plymouth and the South West of England on the map as a base for all future renewable marine technologies. It is where KNOWLEDGE is PRODUCED, tried and tested to then be implemented anywhere in the world.

Page 9: Marine Technology Centre for Learning. Up-Skilling Millbay

7

Page 10: Marine Technology Centre for Learning. Up-Skilling Millbay

8

Strategy Vision

Page 11: Marine Technology Centre for Learning. Up-Skilling Millbay

9

Current Situation - Weaknesses

Poor land/water relationship Dis-jointed site area No community focused building Poor city wide connectionsLow employment in surrounding area

Page 12: Marine Technology Centre for Learning. Up-Skilling Millbay

10

Prime Location in Plymouth International Connections New Infrastructure Existing ABP Infrastructure

Resources and Assets - Strengths

Page 13: Marine Technology Centre for Learning. Up-Skilling Millbay

11

Opportunities

Gateway to Europe More International Connections Future Marine Industries Potential for a more vibrant community

Page 14: Marine Technology Centre for Learning. Up-Skilling Millbay

12

Key Issues

Site Permeability:

The site is currently isolated and has little/no routes traversing the space.Our aim is to creat a major route through the site running west to east. This route will be the main area of focus and the key facilities/ spaces will be situated along it.There will also be a secondary route running north to south through the site.

Landmarks:

In order to locate ones self in Millbay there are a number of key buildings to remain/ develop as landmarks. This will not only help with navigation around the space but also be the first thing tourists will be attracted to when arriving on the ferry and cruise ship.

Industry Sparks Employment:

Once the main research facility is created, a variety of supportive industries would set-up around it to develop/ manufacture the prototypes for testing. These facilities would be able to draw on the large number of unemployed people in the area (as opposed to bringing in a workforce from somewhere else).

Key Views:

There are a number of key views across the site that are seen as important and therefore these would dictate certain spaces of the masterplan. These views are from a number of key locations (that will be busy) and view key landmarks.

Historical Rail Connection:

Millbay was once a thriving industrial port that was well connected with the rest of the city because of a comprehensive rail network. This network has since been removed, but re-establising city wide connections (spatially and/or non-spatially)is important to the success of the development.

Page 15: Marine Technology Centre for Learning. Up-Skilling Millbay

13

A. Industry testing facility (Wave simulator)B. Association of British Ports (ABP) ferry terminalC. ABP Cruise ship terminal D. Watersports cable tow facility E. White water rapidsF. White water activity centreG. Street pavillionsH. Events and finish pool I. Kayaking & recreation poolJ. Site specific transport lineK. Hotel & office complex

Master Plan

Page 16: Marine Technology Centre for Learning. Up-Skilling Millbay

14

Associated British Ports:

A small proportion of local people will be employed to run and manage AB Ports operations with the ferries and cruise ships.

Industry:

The Marine Technology Industry will be the main source of local employment in the immediate area. It will also create a new identity for Millbay and be a trial for this type of industry before it is implemented in Devonport at South Yard.

Site usage in master plan

Page 17: Marine Technology Centre for Learning. Up-Skilling Millbay

15

Tourism & Leisure:

Engaging activities is at the heart of the scheme. Working in symbiosis with the marine Industry this complex of white water rapids and green spaces will encourage local peo-ple and tourists to have active and healthy life-styles; health and well-be-ing.

Residential:

This area of the site will be sold for high density apartments & maisonettes. The majority shall be of a very good quality with 30% social housing to encourage a mixed community.

Page 18: Marine Technology Centre for Learning. Up-Skilling Millbay

16

Site synergies

Page 19: Marine Technology Centre for Learning. Up-Skilling Millbay

17

Page 20: Marine Technology Centre for Learning. Up-Skilling Millbay

18

The site:My project is situated in the Millbay area of Plymouth and is located on the main pier to the south of King-point Marina. This site is challenging as the building will be exposed to the marine environment on three of its elevations.

Building: The building is set in the centre of the master plan to encompass all aspects of the strategy. It is a multi-use building that caters for many different users as well as exhibiting and demonstrating the renewable marine technologies manufactured on-site through the EDUCATION SCHEME. This will be in the form of APPRENTICESHIP PROGRAMMES & SELF INTEREST WORKSHOPS. It has been designed with young people with a disinterest in main stream education in mind. Skilled employees make visits to local schools twice each term, the idea being that a short 30 minute presentation and workshop is given. In-school presentations are given to every year group from year seven up to year thirteen. Lower years will receive simple ‘interest’ lectures whilst later years will have the opportunity to attend a course day each week at the Marine Technology Centre. This is a progressive scheme working up to 3 days per week attendance with the EQUIVALENT TO AN NVQ BEING AWARDED at the culmination of the course.

Need:The project will address the ISSUE OF LOCAL UNEMPLOYMENT. By having the NEW INDUSTRY in the heart of Millbay it not only creates a new identity for the area but also produces jobs. Millbay in the past has had shipbuilding at its core that provided employment in its locality. The project is going to benefit Millbay and the City of Plymouth not just through economic growth but also social and cultural through engagement with local people and TOURISM to inform the SPREAD OF KNOWLEDGE and promote health and well-being. The physical TECHNOLOGY PRODUCED will be distributed internationally to be DEPLOYED in areas that it is needed.

Facilities: Uses will include a fully functional workshop for carrying out many different activities and processes of manufacture. The main relationships are between the young ’self interest’ workshops and the industrial processes that are taking place in the building. Other uses will include a marine heritage museum and gallery, cafe, water sports hub whereby the wake board cable and sailing area can be managed from, there will also be a landscaped area where spectators can view white water rafting and kayak events. Part of the building will be dedicated to a low energy residential program to be directly tested and implemented on-site.

Funding: There are several different stakeholders active on-site, ABP, developers, City council. I see the funding for the project coming mainly from these parties. However there should be some contributed by government, Sport England and potentially the Heritage Lottery Fund.

Project brief

Page 21: Marine Technology Centre for Learning. Up-Skilling Millbay

19

Education scheme

Page 22: Marine Technology Centre for Learning. Up-Skilling Millbay

20

Building Proposition

Identified site Routes onto site

Page 23: Marine Technology Centre for Learning. Up-Skilling Millbay

21

Page 24: Marine Technology Centre for Learning. Up-Skilling Millbay

22

Precedents

FOA

- Yok

oham

a BI

G -

Chi

cago

Nav

y Pi

er

Page 25: Marine Technology Centre for Learning. Up-Skilling Millbay

23

ARUP

S - P

ompi

dou

OLY

MPI

CS

- Mas

ter p

lan

Page 26: Marine Technology Centre for Learning. Up-Skilling Millbay

24

User profiles

Page 27: Marine Technology Centre for Learning. Up-Skilling Millbay

25

Page 28: Marine Technology Centre for Learning. Up-Skilling Millbay

26

Design Sequence - Explanation of components / Formed concrete spine wall

Page 29: Marine Technology Centre for Learning. Up-Skilling Millbay

27

1

2

3 4

5

1 - Water sports storage e.g life jackets 2 - Lift shaft 3 - Main entrance from the city centre4 - Double height glazing along north side of swimming pool5 - 1m thick insulated formed concrete wall

Page 30: Marine Technology Centre for Learning. Up-Skilling Millbay

28

Ground floor spaces and facade

Page 31: Marine Technology Centre for Learning. Up-Skilling Millbay

29

6 7 8

11

9 10

1213 14

15

161718

6 - Rock labyrinth for cooling air to distribute inside 7 - Water sports storage for sailing boats, kayaks and canoes8 - Reception & foyer9 - Male changing room10 - Female changing room

11 - Water sports briefing room12 - Male & female toilets 13 - Swimming / training pool facility14 - Filtration room for pool 15 - CHP Plant room

16 - Access platform to cable park17 - Oversized steps for large crowds to gather at events 18 - Slipway to launch sailing boats18a - Community social club 18b - Pool viewing gantry

18a 18b

First floor plan

Page 32: Marine Technology Centre for Learning. Up-Skilling Millbay

30

Accessible green roof - into building at first floor level

Page 33: Marine Technology Centre for Learning. Up-Skilling Millbay

31

19

20

19 - Gentle slope upwards with partial vegetation on roof20 - External concrete columns to support roof over hang

Page 34: Marine Technology Centre for Learning. Up-Skilling Millbay

32

Workshop layout

Page 35: Marine Technology Centre for Learning. Up-Skilling Millbay

33

21

22

23

24

25

26

21 - Industrial workshop 22 - Heavy lifting beams for loading onto a floating barge23 - Shared workshop area24 - Self interest workshop25 - External breakout space and access to the water for products made

26 - Entrance into ground floor workshops

Page 36: Marine Technology Centre for Learning. Up-Skilling Millbay

34

First floor gallery & community facilities

Page 37: Marine Technology Centre for Learning. Up-Skilling Millbay

35

27

28

29

30

31

32 33

34

35

27 - Gallery & exhibition space with viewing windows down onto workshops 28 - Community hall with external roof terrace access 29 - Access gantry 30 - Female toilets & wash rooms 31 - Male toilets & wash rooms

32 - Seminar room B33 - Seminar room A34 - Kitchen with servery 35 - Workshop viewing windows

Page 38: Marine Technology Centre for Learning. Up-Skilling Millbay

36

Main roof - planted with local species of vegetation

Page 39: Marine Technology Centre for Learning. Up-Skilling Millbay

37

36

37

38

36 - Main roof planted with local wild flowers and vegetation 37 - Central roof light over the community space and gallery38 - Small green roof

Page 40: Marine Technology Centre for Learning. Up-Skilling Millbay

38

Structural explanation and details Technical section NTS

Page 41: Marine Technology Centre for Learning. Up-Skilling Millbay

39

Green roof detail, scale - 1:20

Page 42: Marine Technology Centre for Learning. Up-Skilling Millbay

40

Concrete wall / floor detail, scale - 1:20

Page 43: Marine Technology Centre for Learning. Up-Skilling Millbay

41

Foundation detail, scale - 1:20

Page 44: Marine Technology Centre for Learning. Up-Skilling Millbay

42

Environmental strategy

A

B

C

D

E

F

E1

Page 45: Marine Technology Centre for Learning. Up-Skilling Millbay

43

Rock labyrinth

This close to ground maze of concrete blocks, set out in rows to slow air movement down is known as a ‘rock labyrinth’. It draws air in from outside (hopefully not assisted by electric fans) and either pre-cools or pre-warms it depending on what time of year it is. Summer or winter.

A

Solar gains

The entire length of the building is subject to intense southerly solar gains throughout the day. Measures have been considered to mediate this through facade treatment; areas of brisoley have been strategically placed where over solar gain will occur.

B

Natural cross and stack ventilation

There is no mechanical ventilation system to circulate air. Three of the four immediate facades are surrounded by water, so air flow and air pressure on all sides of the building at any times of day or night should be constantly changing. Therefore successfully venting the building through the facades

C

Electrically controlled ventilation with manual override

There are many roof lights in the main roof which can be electronically controlled to mediate internal conditions

D

Green roof system

The 500mm+ thick roof structure offers the benefits of thermal, mass storage and regulates internal temperatures, whilst the generous overhang on the south facade also mediates the amount of solar rays entering the building. Water that falls onto this roof is vital for the sustenance of the vegetation at the same time as retaining it to reduce flash flooding in the local area

E & E1

Spine wall

Formed concrete at a thickness of 1000mm running the entire length of the building, acts as a thermal storage heater whilst keeping key spaces apart from one another to assist temperature regulation between areas an easier task

F

Page 46: Marine Technology Centre for Learning. Up-Skilling Millbay

44

27-29c

20c

16c

External temp

Heating strategy

CHP

I have opted for a Combined Heat and Power plant to heat and power my building. The main advantage to installing this system is that the slow constant heat output is perfect for maintaining the water temperature in the swimming / training pool.

Page 47: Marine Technology Centre for Learning. Up-Skilling Millbay

45

Heat loss calculations

Fabric heat loss:

Pf - Rate of fabric heat loss = heat energy lost over time (W)

U - U-Value of element considered (W/m2 K)

A - Area of that element (M2)

t - Difference between temperatures assumed for inside and out (degrees celsius)

Inside temp assumed - 17c

Outside temp assumed - 5c

Element U value W/m2k Area m2 Temp difference Rate of heat loss (w)Windows 2.78 361 12 12,042Doors 2.0 8.4 12 201Timber clad walls 0.25 296 12 888Solid walls 0.29 413 12 1,437Floor slab 0.35 888 12 3,729Green roof 1.41 528 12 8,933Total 27,230

Pf = U t

Ventilation heat loss:

Pf = CvN V t 3600 seconds per hour

Volumetric heat capacity is 1300 J/mK

1300 X 1.5 X 4,341 X 12 3600 = 28, 216.5

Total rate of heat loss = Fabric heat loss + Ventilation heat loss

27,230 + 28,216.5 = 55,446w

Page 48: Marine Technology Centre for Learning. Up-Skilling Millbay
Page 49: Marine Technology Centre for Learning. Up-Skilling Millbay

47

Reflection

Looking back over this journey highlights to myself, the amount of thought that has gone into detailing a large building such a this one. The Marine Technology Centre for Learning. I have come to realise that it is a difficult task to make a project that successfully translates the core values set out in the urban strategy. The building I have designed up until now has tried to incorporate these strategic layers and translate them through physical form. The placement on site, orientation, levels and components of the design are just simply the containment (the physical stuff) from which activity is created, nurtured and lead to evolve. People are the key factor within this designed system. It is reliant on the diverse user groups that make the building function. The project and its ongoing workshops and activities I hope, would spark interest within young disinterested people as well as everybody else to go out, play, learn and create.