    The Potential for

    MARC/VRE

    RUN- THROUGH SERVICES

    A Summary Report Submitted to

    The Honorable Eugene Conti

    Assistant Secretary for Transportation Policy

    U.S.Department of Transportation

    April 14, 1999

    Prepared by

    De Leuw, Cather & Company

    For

  • 8/14/2019 marcvre

    2/14

    1

    INTRODUCTION

    Intercity passenger, commuter, and freight rail services are projected to significantly expand in

    the Baltimore- Washington-Richmond corridor. Providing sufficient capacity to deal with all of

    the trains will become a critical issue. The improvements that would be necessary to permit

    increased train frequencies, reduced trip times, and increased capacity have been identified in a

    series of recent studies conducted by Amtrak, the Federal Railroad Administration (FRA), and

    the Washington Board of Trade. These studies included:

    the New York to Washington Corridor Transportation Plan, the Washington to Richmond Corridor Transportation Plan, and

    the MARC/VRE Run-Through Service Study

    In the Corridor Transportation Plan (CTP) studies, Amtrak and the FRA have been considering

    the larger issues of reducing travel time and increasing capacity. Higher-speed trains will soon be

    introduced in Amtrak's Boston-New York-Washington service, while the frequency of commuter

    and freight trains increases. Amtrak's new effort to develop mail and express business stands to

    greatly increase the level of switching activity, thus further taxing the already-limited capacity at

    Washington Union Station and in other terminals. Freight train operations have been steadily

    increasing, and this trend is expected to accelerate as a result of the Conrail Acquisition.

    Capacity must be increased to reduce trip times and achieve service reliability. Improvements to

    permit reduced trip times and improved capacity will enable the high-speed service to be

    operated reliably without adversely affecting, or being delayed by, the increasing number of

    frequently stopping commuter trains and the long freight trains.

    In addition to the analysis of train operations in the New York-Washington and Washington-Richmond Corridors, CTP studies included separate analyses of train operations and

    improvement requirements at:

    Washington Union Station

    Between Washington Union Station and Alexandria, VA, and

    The approaches to, and through, Richmonds Main Street Station

    The CTPs are being prepared by Amtrak and the FRA, at the request of Congress, to consider

    significant improvements necessary to raise speeds and expand capacity throughout the twoCorridors and at Washington Union Station. Computer simulations have identified the additional

    facilities that the implementation of the projected increases in all of the services would require.

  • 8/14/2019 marcvre

    3/14

    2

    Under the auspices of the City of Richmond, with the assistance of the Virginia Department of

    Rail and Public Transportation (VDRPT), a plan is also underway for the development of an

    extension of Amtrak service from Staples Mill to downtown Richmond, and the reopening of

    Main Street Station. This extension of service also is discussed in the Washington-Richmond

    CTP.

    Freight enhancement requirements have been analyzed in the CTPs and independently evaluated

    by CSX and Norfolk Southern (NS). Both carriers anticipate increased levels of freight trafficfollowing the completion of the Conrail Acquisition1. The Acquisition will bring an increase in

    the number of freight trains operating over all of the lines where MARC and VRE operate,

    including the Amtrak Northeast Corridor (Penn Line). CSX is planning to upgrade the critical

    line segment connecting the Richmond Corridor to the former B&O main line between

    Brunswick and Baltimore (Camden). This includes an upgrading of the Virginia Avenue

    Tunnel, in Southeast Washington, D.C.; improving the connection between the former Conrail

    and CSX freight lines at Anacostia; and possibly double-tracking the balance of the segment to

    Hyattsville.

    The results of the studies, the projected levels of traffic, and the recommended improvements are

    described below. A summary of the major capital costs is shown in Table 2.

    The MARC/VRE Run-Through Service Study

    A recently completed study, Coordination of MARC/VRE Commuter Services, A

    Conceptual Design, analyzed the possibility of implementing a run-through service for

    commuters in the Washington-Baltimore metropolitan area. The study was coordinated with the

    other study efforts and identified significant benefits that the extension of Maryland's MARC andVirginia's VRE trains, through Union Station to destinations in each other's service areas, would

    provide. For the first time, a seamless ride would be offered, without the need to change trains,

    when traveling from one part of the region to the other. The substantial benefits from integrating

    commuter rail services include:

    Enhancing convenience by eliminating transfers between trains;

    Reducing travel time;

    Improving air quality and reducing highway congestion by reducing automobile-based trips;

    Improving utilization of each operators trains; and Strengthening the economic vitality of the region

    Short and long-term solutions for integrating the service of MARC and VRE were evaluated.

    1Norfolk Southern will gain Conrail's operating rights between Alexandria, VA and Baltimore

  • 8/14/2019 marcvre

    4/14

    3

    The initial service revenues would cover 92 percent of the incremental costs. Cost recovery

    would increase, as additional trains were added, at a greater rate than the increase in trains

    operated. Long term expansion of the run-through service is estimated to generate a minimum of

    5,200 daily riders. In addition, there is considerable potential for recreational ridership between

    Maryland and Virginia stations, as well proposed commercial developments at certain stations,

    e.g., Broad Run, near Manassas, and New Carrollton. Additional development also is planned at

    Crystal City, and VRE is considering the possibility of moving the station southward, to better

    serve the expanded development and provide a direct connection to National Airport.

    COMMUTER RAIL SERVICE GROWTH IN THE WASHINGTON, D.C. -

    BALTIMORE METROPOLITAN AREA

    Service in the Washington, D.C.-Baltimore Metropolitan Area has expanded significantly in the

    last two decades. Penn Line service has expanded from 2 daily round trips in 1975, to 19 round trips, with

    26 round trips projected for the Year 2015. VRE service was initiated in 1992 and expects to significantly

    increase its number of trains by 2015. Union Station is the common terminus for both services. The

    station includes 24 tracks on 2 levels. The upper level has stub-end tracks, where trains terminateand must reverse direction, and a lower level with through tracks leading to the First Street Tunnel

    and connecting to points south of the Potomac River. The lower level handles all VRE commuter

    trains and Amtrakintercity trains to and from points south of Washington, D.C. MARC trains

    normally use the upper level. All VRE trains must use the lower level, because they enter the station via

    the tunnel. The MARC and VRE routes are shown in Figure 1, and the railroad network in the

    Washington, D.C. metropolitan area is shown in Figure 2.

  • 8/14/2019 marcvre

    5/14

    4

  • 8/14/2019 marcvre

    6/14

    5

    MARC offers 78 weekday trains on three routes:

    the Penn Line from Perryville, MD and Baltimore, via Amtrak' 5 Northeast Corridor (NEC);

    the Brunswick Line in the Potomac Valley from Martinsburg, WV, via CSX; and

    the Camden Line, from Baltimore's Camden Station, via CSX.

    Penn Line service is operated by Amtrak. Brunswick and Camden Line services are operated by

    CSX. There are plans for new service to Frederick, MD in the year 2001, via the Brunswick Line

    and Point of Rocks, MD.

    VRE offers 24 weekday trains on two routes: from Manassas, via Norfolk Southern; and from

    Fredericksburg, via CSX. Norfolk Southern's line diverges southwestward from CSXjust south

    of the Alexandria Station. CSX continues north from Alexandria to the junction with Amtrak,

    just north of the L'Enfant Station, then continues as a freight-only line to the north, passing

    through the Virginia Avenue Tunnel, and connecting with the Northeast Corridor at Landover,

    and with the CSX east-west main line at Hyattsville. All VRE trains are operated by Amtrak.

    Amtrak trains are operated on all commuter train routes except the Camden Line.

    Union Station is the primary destination of the vast majority of MARC's passengers. About

    2,300 riders, nearly one half of MARC commuters, walk to work from Union Station, and the

    rest continue their trips via public transportation. The final destinations for many MARC

    passengers are in the vicinity of the VRE L'Enfant and Crystal City stations, but currently there

    is no connecting VRE service available to serve these stations. Unlike MARC, 80 percent of

    inbound VRE passengers, about 2,800, detrain before Union Station, at Alexandria, Crystal City,

    or L'Enfant. L'Enfant provides convenient access to L'Enfant Plaza and Metrorail's Yellow,Green, Orange, and Blue lines.

    Union Station is the anchor at the south end of the Northeast Corridor, and the origin point for

    Amtrak's Metroliner Service. It is a major stop for Northeast Direct services between Newport

    News, Richmond, Philadelphia, New York, and Boston, and a major stop for three trains to

    Florida and one to Atlanta and New Orleans. One train to Charlotte, two to Chicago, and one to

    points in Vermont also originate there. Amtrak's plans to introduce a new generation of high-

    speed trains and extend high-speed rail service southward in cooperation with Virginia and North

    Carolina will intensify the existing operating congestion on the approaches to Washington, D.C.,and within the terminal.

  • 8/14/2019 marcvre

    7/14

    6

    RAIL CORRIDOR ISSUES

    The CTP for the Washington, D.C. to New York, NY segment of the Northeast Corridor is being

    prepared in response to a mandate from Congress that details (1) the state of the rail line, (2) all

    required capital improvements, (3) necessary improvements and recapitalization, and (4) a

    projected time line for these expenditures over the next 15 years. The need for integrated

    planning of the NEC and service south of Washington was identified, and Amtrak and FRA

    jointly decided that a preliminary analysis should be made of the Washington - RichmondCorridor to assess the existing capacity and identify the needs for projected year 2015 services.

    Planning work on the reconfiguration of Washington Union Station showed that the projected

    2015 Amtrak and VRE train operations at the lower level of Washington Union Station could be

    handled only with significant reconfiguration of track, platforms, and several interlockings.

    Baltimore - Washington This segment of the Northeast Corridor stretches 40 miles from Penn

    Station, in Baltimore, to Washington Union Station. Significant increases in the numbers of

    intercity passenger, commuter, and freight services are projected for the next 15 years. The

    introduction of the new higher speed trains further complicates the increase in frequenciesbecause the dichotomy between the faster and slower trains will increase. Detailed operational

    analysis has been performed to identify capacity "choke points" that restrict the movement of

    trains and inhibit the reduction of trip times. Simulations have confirmed that the existing

    railroad configuration cannot absorb the projected expansion in services. A "Target Plan" for the

    Year 2015 is being developed to provide a basis for design and construction of the needed

    additional facilities.

    Simulations indicate the need for two independent passing sidings in the 31-mile distance

    between West Baltimore and New Carrollton, the "open countryside" between the twometropolitan areas, where the fastest running is most easily attained. The sidings would be a

    minimum of 10 miles in length, and include at least three commuter stations. Locations of

    sidings and configurations of interlockings must be arranged to minimize freight interference.

    Given the length of the Baltimore-Washington segment, and the existing constraints, it was

    determined that a three-track system, with two southbound passing locations would minimally

    meet the needs to accommodate the Year 2015 level of intercity passenger, commuter, and

    freight train movements. A full four-track network would be necessary to effectively resolve all

    potential operating contingencies.

    Washington Union Station Lack of capacity is a critical concern at Union Station, even with

    today's level of traffic. The station was built to handle intercity trains that arrived and departed

    from distant places at various times spread throughout the day. It is ill-equipped to handle today's

    commuter trains concentrated in morning and evening peaks.

  • 8/14/2019 marcvre

    8/14

    7

    The station's layout reflects a segregation of the trains operated by the original owners, the

    Baltimore & Ohio (B&O) and the Pennsylvania (PRR). The B&O trains arrived on two routes,

    from Brunswick and Baltimore (Camden), and were channeled into the station down the west

    side of the viaduct. The PRR trains from Baltimore (Penn) were channeled into the east side of

    the station, including the lower level, to the extreme east. Consequently, moving the Camden and

    Brunswick trains across multiple tracks to get them to the lower level is time-consuming, and

    would restrict the use of the most critical upper-level tracks at the most crucial times.

    This dilemma is compounded by the reduction in facilities that occurred in the 1960s, when

    passenger train service was in decline and the facility was rationalized. Critical running tracks

    and crossovers were removed to reduce costs and accommodate the construction of Metro. The

    expansion of service in the Richmond Corridor, and the need to change engines from electric to

    diesel, and vice-versa, has significantly increased the number of extra, non-revenue movements

    on. the lower level. The increasing growth of mail and express business threatens to further

    exacerbate the problem.

    Washington - Richmond Planning work on the reconfiguration of Washington Union Station as

    part of the development of the Northeast Corridor CTP showed that the projected 2015 train

    operations at the lower level of Washington Union Station could be managed only with

    significant reconfiguration of track, platforms, and several interlockings. Consequently, the need

    for integrated planning of the NEC and service south of Washington was identified.

    The Washington - Richmond Corridor stretches 118 miles between Washington Union Station

    and Main Street Station in Richmond. At present, Staples Mill Rd. Station, located eight miles

    north of Main Street Station, serves as the Amtrak station in Richmond. Efforts are underway to

    extend the service downtown, to Main Street Station. A recent VDRPT study developed various

    scenarios culminating in a projected 90-minute trip time between Washington and Amtrak's

    Staples Mill Rd. Station; hourly service between Washington and Richmond; and an annual

    ridership of2.2 million in 2014.

    Amtrak and FRA jointly decided that a preliminary analysis should be made of the Washington

    Richmond rail line to assess the existing capacity of the line and determine its capability to

    operate reliably the levels of rail service projected for the year 2015 by intercity, commuter, and

    freight operators.

    CTP planning for 2015 has identified corridor-wide improvements that would include a less thantwo-hour trip time between Washington and Main Street Station in Richmond, with two

    intermediate stops, on one-hour headways during peak periods and two-hour headways off peak.

    Service between Washington and the existing Staples Mill Rd. Station would take less than 100

    minutes. The computer simulations performed for this effort indicate that, with the

    implementation of the projects recommended, less than 2-hour service, with two stops, could be

    operated between Washington and Richmond while accommodating projected levels of

    commuter and freight service. Providing this service on a frequent, reliable schedule requires

  • 8/14/2019 marcvre

    9/14

    8

    that more than 25 minutes be eliminated from the current schedule of the fastest train. The results

    also indicate that these schedules would be very tight with little margin for. error and that

    coordinated scheduling and service with disciplined dispatching would be essential to ensure the

    service goals are met.

    The trip time analyses which were performed concluded that the travel time goals are achievable

    using contemporary (non-tilting) equipment. Significant track realignments to increase speed are

    not required, and electrification of the route is not necessary. A set of recommendedimprovements have been developed to achieve these objectives.

    CSX Freight Line Improvements CSX plans to upgrade the critical freight service link

    connecting the Richmond Corridor to the former B&O main line between Brunswick and

    Baltimore, at Hyattsville, thoroughly integrating the former Conrail segment between the

    Potomac River and Landover. This will include major repair or replacement of the Virginia

    Avenue tunnel, in Southeast Washington, D.C. Although not used by passenger trains, its

    deteriorated condition and close proximity to L 'Enfant cause freight trains to operate at very

    slow speeds through the L 'Enfant Station area, drastically reducing the time available to runpassenger trains into and out of Washington Union Station. CSX is currently developing plans to

    improve the tunnel and increase freight train speeds. Expanding the tunnel to provide a double

    track configuration is under consideration. New connections are planned to allow direct

    movement between the former Conrail and CSX freight lines, at Anacostia, and a separate

    interchange for coal trains at Benning. Eventual double-tracking of the Alexandria Extension, to

    the connection with the CSX east-west main line, at Hyattsville, also is under consideration.

    These improvements will measurably enhance the ability of freight trains to move rapidly

    through the most critical segment of the Richmond Corridor, and result in a significant increase

    in the capacity to move additional trains.

    Another constraint exists that will limit the ability to operate the trains: the double track between

    L 'Enfant and Crystal City. Given the prominent location through East Potomac Park, and the

    cost to replace the bridge over the Potomac River, adding additional tracks south of 12th Street

    might not be possible. Until recently the incompatibility of cab signal systems used by MARC

    and VRE was a potential problem, but CSX has revised its system, which is now compatible with

    the Northeast Corridor cab signal system.

    RUN-THROUGH SERVICE

    A study of the potential for operating MARC and VRE commuter trains through Washington

    Union Station to each other's service area has found that there is a significant demand waiting to

    be satisfied. The study envisions a seamless service that would attract substantial new ridership

    by enabling many commuters to avoid changing trains to get to work. The level of participation

    and cooperation between the passenger train operators and the freight railroads demonstrated in

  • 8/14/2019 marcvre

    10/14

    9

    the preparation of this study indicates that they ready and willing to work together to provide the

    necessary capacity to make run-through service a success. All carriers, both passenger and

    freight, will monitor run-through service operations and cooperatively evaluate train scheduling

    and funding requirements.

    A limited run-through operation of MARC trains to VRE stations could, subject to completion of

    the agreed-upon improvements, be implemented initially with three Brunswick Line trains andtwo Camden Line trains. The MARC trains would run-through to Alexandria, stopping at

    L'Enfant and Crystal City. Layover tracks would be needed in the Alexandria area, to hold four

    trainsets. The third Brunswick Line trainset would operate to Manassas and return to Washington

    as the last morning Manassas Line train. Very little ridership was estimated in Virginia beyond

    Alexandria, and substantial mileage charges and operating costs would be incurred to continue

    the trains to either Manassas or Fredericksburg. The expense saved by not running low-patronage

    trains to and from Manassas will enable the capital cost of the layover tracks to be recovered in

    five years.

    Although the Penn Line constitutes 50 percent of MARC system ridership, the run-through of

    MARC's Penn Line electric trains was found not to be viable due to the high cost of constructing

    the extension of the electrification and the capacity limitations of the Potomac River Bridge.

    While any diesel-powered Penn Line train could, of course, run through, the issues of diesel

    locomotive operating cost and performance limitations are severe disadvantages in the electrified

    territory. By the Year 2001, all Penn Line trains will be electrically powered, precluding through

    operation without electrification.

    Run-through ridership into Maryland from VRE stations is quite limited in the near-term because

    there are few concentrated work destinations near MARC stations. The lack of projected

    ridership does not, however, preclude the use of VRE equipment on some MARC schedules, to

    achieve equipment utilization efficiencies for both operating entities.

    Other services with potential would provide wider access to Oriole Park, Baltimore's lnner

    Harbor, and other such locations for professional sports, major entertainment events and similar

    recreational activities. Weekend excursion service to Fredericksburg, Manassas, and Harpers

    Ferry is also a possibility. In the future, the trains could be extended to additional points in

    Maryland and Virginia.

    Ridership and Revenues

    Approximately 700 run through trips per day are expected initially, increasing to more than 5,000

    as the nunber of trains and the flexibility of the service increases. A large majority of initial run-

    through service commuters will be new riders. Approximately sixty percent of the initial riders

    will utilize L 'Enfant Station, indicating the importance of ease of access to both the immediate

  • 8/14/2019 marcvre

    11/14

    10

    vicinity and Metro. This represents an exceedingly conservative forecast, excluding some classesof riders that are difficult to identify and count, such as those without cars who could benefitfrom greater access to suburban job opportunities. The summary of both long term and initialridership is shown in Table 1.

    Table 1

    Summary of Run-through Service Ridership

    Rider Type Initial Year Year 2020 Increase (%)

    New 460 2,680 583%

    Existing 190 2,520 1326%

    Total 650 5,200 800%

    Revenue generated by the initial run-through service is estimated to be about $438,000, and the

    incremental operating expenses, based upon the availability of mid-day layover tracks near

    Alexandria, would be $473,579. If the mid-day layover tracks are constructed, the saving would

    allow revenues to cover about 92 percent of incremental costs, excluding capital investment for

    the layover tracks, as well as a c~nter platform at VRE's L'Enfant Station. The expense saved by

    not running low-patronage trains to Manassas will recover the capital cost of the layover tracksin five years. The service essentially breaks even and is projected to continue its favorable cost

    recovery in the long term because ridership increases at a faster rate than run-through trains are

    added to the schedule.

    Initial Service Implementation Requirements

    Initial run-through operations would require a center platform at L 'Enfant Station, mid-day

    layover tracks near Alexandria, and some improvements at Union Station. The estimated cost to

    construct these facilities is $48.1 million, including design and engineering work.

    The center platform at VRE's L'Enfant Station is estimated to cost $26.2 million. The mid-day

    layover tracks are estimated to cost $4.6 million, including the acquisition of necessary land.

    Improvements on the lower level at Union Station is estimated to cost $17.3 million, including

    electrification and signaling modifications. This work would contribute significantly to the

    station capacity and efficient handling of all trains using the lower level, not just the run-through

    servIce.

    A center-island platform at L 'Enfant will serve to increase both freight and passenger capacity

    on this critical segment. L 'Enfant will become a principal interchange station between commuter

    rail and Metrorail, and the projected 29 freight trains per day will strain track capacity. A center-

  • 8/14/2019 marcvre

    12/14

    11

    island platform would provide more efficient handling of passengers and flexibility in moving

    commuter trains, while allowing space to install an additional track on which to move freight

    trains.

    Long-Term Run-Through Service

    Once the viability and value of run-through service has been satisfactorily demonstrated,increased levels of service may be added. Ultimately, the proposed 2015 MARC run-through

    service would serve four Virginia destinations: Alexandria, Fredericksburg, Quantico, and

    Manassas. There will be no increase in the total number of trips; train sets from each operator

    would be used to fill the other's schedule, as required.

    To improve passenger handling at L'Enfant, and make the service more attractive, the station

    could be modified to include a direct connection to the Metro concourse. This is projected to cost

    an additional $ 17.4 million dollars, for a total of $ 65.5 million dollars.

    The capital requirements for long- and short-term operations are summarized in Table 2 below.

    This table also indicates the costs of the other major capital improvements, discussed earlier, that

    are projected to occur on the corridor between Baltimore and Fredericksburg.

    Table 2

    Summary of Capital Requirements

    Baltimore- Washington-Fredericksburg Corridor

    (Millions 1998 Dollars)

    NEC Baltimore-Washington Improvements 583

    NEC Union Station Interlocking and Station Improvements 346NEC Union Station Yard and Shop Improvements 108

    Initial Run-Through Service

    Mid-day Layover Tracks- Alexandria 4.6

    L 'Enfant Center-island Platfonn Station 26.2

    Run- Through-Specific Union Station Capacity Improvements 17.3

    Sub-total 48.1

    Long Term Run-Through Service (L'Enfant Connection to Metro) 17.4

    Long Term Run-Through Service Total 65.5

    CSX Freight Line Improvements (Va Ave. Tunnel Area) 32

    Washington-Fredericksburg Improvements 296.4

    Total Capital Requirements 1430.9

  • 8/14/2019 marcvre

    13/14

    12

    All estimates are preliminary and subject to revision. They include the cost of design and

    engineering, maintenance of traffic during construction, and land acquisition, where necessary.

    Long-Term Ridership and Revenues

    In 1994, MARC concluded that the extension of service to Northern Virginia would achieve the

    highest ridership gained per dollar of capital investment among eight service extension options

    examined. Approximately forty percent of these riders were expected to use the L 'EnfantStation. For the run-through study, patronage levels were developed for the initial run-through

    service, and for long-term run-through service in 2020. Long-term ridership was estimated at

    5,200 trips per day. Approximately 75 percent would utilize L 'Enfant Station. The core ridership

    would continue to be regular daily commuters, using monthly tickets, primarily originating at

    MARC stations and riding through to VRE destinations. Beginning with the initial run-through

    service, incremental revenues are estimated to cover the incremental costs of such service,

    excluding capital spending.

    The annual revenue generated by long-term run-through service is estimated at $2.8 million in

    1997 dollars, more than six times the revenue of the initial run-through service. Since the

    revenue attributable to run-through service would increase at a rate 1.5 times the increase in the

    level of train frequency, the service would cover its attributable costs and make a contribution to

    overhead expenses.

    Relationships with Freight Carriers and Amtrak

    To implement run-through service, MARC and VRE must resolve many details, such as railroad

    operating agreements, crew scheduling, capital spending responsibilities, and institutional issues,

    such as cost sharing and ticketing arrangements. Neither MARC nor VRE owns or controls anyroute mileage, and their continued operation and growth is dependent upon contracts negotiated

    with CSX, Norfolk Southern, and Amtrak. These contracts also could define operating

    constraints, such as the maximum number of trains operated and their times of operation. The

    rail lines involved are critical links in primary Northeast and Southeast freight routes. Capacity

    on these lines is limited and commuter rail operations could restrict the operation of freight

    services. Nevertheless, it is assumed that such issues can be satisfactorily resolved by all parties

    concerned.

    Freight Growth The rail line between L 'Enfant and Alexandria is a critical segment of the sole

    rail route along the Atlantic Coast between Boston and Miami. Norfolk Southern has operating

    rights over CSX between Alexandria and the Amtrak Northeast Corridor. Both CSX and Norfolk

    Southern view the Atlantic Coast corridor as a growth market. Together, they estimate that after

    full implementation of the Conrail Acquisition there will be an average of 29 freight trains per

    day using the congested segment between L 'Enfant and Alexandria, a sixty percent increase.

    This will include many high-priority intermodal trains and important carload freight trains,

    including the Tropicana "Juice Train".

  • 8/14/2019 marcvre

    14/14

    13

    The center-island platform proposal at L'Enfant includes a track reconfiguration that would

    maximize the flexibility needed for the movement of both freight and passenger trains through

    this constrained station area. A freight train could move through at the same time that two

    commuter trains are making station stops.

    CONCLUSIONS AND RECOMMENDATIONS

    A significant improvement in transportation mobility in the metropolitan Washington-Baltimorearea can be achieved by the MARC and VRE commuter trains extending their services beyond

    Washington Union Station, as run-through trains. By the year 2020, over 5,000 trips per day are

    projected for such a service. Maryland commuters would be able to reach employment centers in

    southwest Washington, D. C. and Crystal City. VRE trains could provide single-seat service

    north to Baltimore, MD. Run-through trains are estimated to cover the incremental operating

    costs of such services with a relatively small capital investment of $65.5 million.

    The substantial benefits to be derived from the coordination of commuter rail services include

    improving air quality by reducing automobile-based trips and highway congestion, creating moreconvenience by introducing a seamless service and eliminating transfers en route, reducing travel

    time and improving the utilization of commuter rail assets. There also is the important practical

    aspect of further cost savings and operating efficiencies which may be realized between the

    MARC and VRE systems by further coordination, equipment sharing and joint repair and storage

    yards.

    The expanded service would serve to strengthen the economic vitality of the region. The national

    economy would benefit as well, since the track configuration improvements at LEnfant would

    facilitate the flow of freight trains at a major choke point of the sole rail route along the AtlanticCoast. These improvements have been identified as critical investments that must be made under

    any circumstances to maintain sufficient capacity on the Richmond-Washington Corridor.

    The expansion of commuter rail services serving the Washington, D.C. metropolitan area must

    be considered within the larger context of Northeast Corridor rail operations. Significant

    increases in both freight and intercity passenger train operations also are projected. Freight train

    operations have been steadily increasing, and this trend is expected to accelerate as a result of the

    Conrail Acquisition. A substantial increase in capacity and operating speeds for all trains will be

    required. Amtrak and the FRA have been considering the larger issues of reducing travel time

    and increasing capacity on the Northeast Corridor between New York and Richmond. Plans by

    CSX to upgrade the critical connecting freight line segment will also serve to increase capacity.

    If Greater Washington is to continue its economic growth, it must provide alternative

    transportation options. The region should build on the commuter rail system that is in place and

    make the system the best it can possibly be. That is the challenge and opportunity for the future

    of commuter rail service.