manufacturing and materials management

29
Welcome to My Presentation

Upload: akbar-setiadi

Post on 01-Dec-2014

225 views

Category:

Education


4 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Manufacturing and materials management

Welcome to My Presentation

Page 2: Manufacturing and materials management

Curriculum vitae1. Personal Details

Name : Akbar Setiadi KusnadiAddress : Binong Permai Blok P 5 / 27, Binong, Curug,

Kab. TangerangPhone Number : 0838-0615-2521Place/Date of Birth : Jakarta, 13 Sept 1993Sex : MaleMarital Status : SingleReligion : IslamNationality : Indonesian

2. Education Details

1. 2000 – 2006 SDN Binong II, Kab. Tangerang2. 2006 – 2008 SMPN 6 Tangerang3. 2008 – 2011 SMAN 7 Tangerang4. 2011 – Now STMT Trisakti (Management Logistic & Material)

Page 3: Manufacturing and materials management

Manufacturing and materials management

By Akbar Setiadi K

Page 4: Manufacturing and materials management

INTRODUCTIONThis chapter aims to give the reader an overview of some of the most common forms of manufacturing planning and control techniques. It is not intended to examine these systems in great depth but rather to explain the basic principles of the various approaches and explain some of the terminology.Source: handbook onf logistics and distribution management 2006 hal.182

Page 5: Manufacturing and materials management

The following approaches will be covered:• just-in-time;•manufacturing resource planning (MRPII), incorporating material requirements planning (MRP);•flexible fulfilment or, as it has come to be known, postponement.

Source: handbook onf logistics and distribution management 2006 hal.182

Page 6: Manufacturing and materials management

Push and pull systems

• A 'push' system of manufacturing is one where goods are produced against the expectation of demand. In other words, goods are not produced specifically to order but are produced against a forecast demand.

Source: handbook onf logistics and distribution management 2006 hal. 183

Page 7: Manufacturing and materials management

• A 'pull' system of manufacturing is one where goods are only produced against known customer orders. This is because only actual orders from customers are being produced on the production line. None of the goods are being made to keep as finished product stocks that may be sold at a later date.

Source: handbook onf logistics and distribution management 2006 hal. 183

Page 8: Manufacturing and materials management

Dependent and independent demand

• Dependent demand is created by the demand for the constituent parts of the finished product. In other words, because it is planned to make a given finished product, this decision triggers the demand for all the constituent parts of that product.

Source: handbook onf logistics and distribution management 2006 hal. 183

Page 9: Manufacturing and materials management

• Independent demand is quite the opposite. In this situation the schedulers do not have a clear view of customer demand and are therefore forced to forecast demand in the best way they can

Source: handbook onf logistics and distribution management 2006 hal. 183

Page 10: Manufacturing and materials management

Cellular manufacturing

A lean method of producing similar products using cells, or groups of team members, workstations, or equipment, to facilitate operations by eliminating setup and unneeded costs between operations. Cells might be designed for a specific process, part, or a complete product. They are favorable for single-piece and one-touch production methods and in the office or the factory

Source: http://www.businessdictionary.com/definition/cellular-manufacturing.html # ixzz2gzJ9CcH8

Page 11: Manufacturing and materials management

JUST-IN-TIME

Just In Time (JIT) adalah suatu sistem produksi yang dirancang untuk mendapatkan kualitas, menekan biaya, dan mencapai waktu penyerahan seefisien mungkin dengan menghapus seluruh jenis pemborosan yang terdapat dalam proses produksi sehingga perusahaan mampu menyerahkan produknya (baik barang maupun jasa) sesuai kehendak konsumen tepat waktu

Source:. d.wikipedia.org/wiki/Just_In_Time_(JIT)

Page 12: Manufacturing and materials management

Elimination of wasted time

Movement through the manufacturing

process

KanbanRight first time

Finished product stocks

JUST IN TIME

Page 13: Manufacturing and materials management

Elimination of wasted time

Because only customers' orders are being produced and the speed of the production process is known, it is possible to synchronize deliveries of raw materials to the end of the production line (or to the precise point on the production line in some cases) with little time to spare before use. The whole purpose of this exercise is to reduce the working capital used in the overall manufacturing system.

Source: handbook onf logistics and distribution management 2006 hal. 185

Page 14: Manufacturing and materials management

Movement through the manufacturing process

If materials move through the system in a straight line it is reasonable to suppose that the minimum distance has been covered. In many manufacturing systems this is not always possible. In fact it has been identified in some manufacturing processes that components and sub-assemblies are moved around the factory in a very erratic pattern before they all come together in the finished product.

Source: handbook onf logistics and distribution management 2006 hal. 185

Page 15: Manufacturing and materials management

Kanbankanban is a card that is used to accommodate the needs of material parts preformance operation process. Kanban system is an information system which harmoniously controlling the production of products in the quantities required at the time required in each process (Monden, 2000).In a JIT production system, kanban system is supported by the following matters (Monden, 2000):

• accelerate production• standardization of work• Setup time reduction• improvement activities• The design of the machine layout• Autonomasi

Source: http://file2shared.wordpress.com/sistem-kanban/

Page 16: Manufacturing and materials management

Right first time

Quality problems in the form of scrapped or reworked products are waste of the first order. The Japanese developed several strategies to counter this problem. In one case they built their factory with no area to store scrap on the principle that having an area for scrap encouraged its production. Quality circles were created, where workers were allocated time specifically given over to discussing quality issues and their elimination, the target being zero defects. The philosophy of Kai zen, or continuous improvement, was engendered as a working culture in these organizations with support at the very top. Systems of quality management such as total quality management (TQM) and ISO 9000 seek to achieve the same ends.

Source: handbook onf logistics and distribution management 2006 hal. 186

Page 17: Manufacturing and materials management

Finished product stocks

These stocks only contain goods produced to a specific customer order. This too contributes to a reduction in working capital. Because of the needs of brevity it has only been possible to skim the surface of the JIT philosophy. Subjects such as the reduction of set-up and change over times, team working and empowerment, total productive maintenance, levelled production schedules and many more are arguably no less important.

Source: handbook onf logistics and distribution management 2006 hal. 186

Page 18: Manufacturing and materials management

MANUFACTURING RESOURCE PLANNING (MRPII)

Although MRP pre-dates MRPII, it is easier to see MRP in the context of MRPII rather than the other way round.As the name implies, manufacturing resource planning deals with more than simply production scheduling. Whilst the basic material requirements planning system is incorporated into MRPII, the wider system brings other activities into the picture. The objective is to harmonize and control more of the activities within the production plant. Areas outside an MRP system but included in an MRPII system usually are:

• maintenance management;• cost accounting;• stock management;• sales orders;• procurement;• personnel levels.Source: handbook onf logistics and distribution management 2006 hal. 186

Page 19: Manufacturing and materials management

MATERIAL REQUIREMENTS PLANNING (MRP)

Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and bike chains.

Source: http://www.inc.com/encyclopedia/material-requirements-planning-mrp.html

Page 20: Manufacturing and materials management

The master production schedule (MPS)

The MPS is a list of all the products or services to be supplied within a specific period of time. This period of time must be sufficiently long to allow for the ordering and delivery of required sub-assemblies and parts, as well as allowing sufficient time for manufacturing the product in question. The schedule may be made up of forecast demand and actual known demand, ie customers' orders

Source: handbook onf logistics and distribution management 2006 hal. 188

Page 21: Manufacturing and materials management

The bill of requirements

This is also referred to as the bill of materials (BOM). As explained earlier, this will list all the sub-assemblies, components and parts required in total to produce all the goods listed in the master schedule. It will also show the different levels at which these constituent parts are put together in order to produce the finished goods.For example, the finished product may contain two sub-assemblies that together complete the product (see Figure 10.1). This level is described as

Source: handbook onf logistics and distribution management 2006 hal. 188

Page 22: Manufacturing and materials management

Source: handbook onf logistics and distribution management 2006 hal. 189

Page 23: Manufacturing and materials management
Page 24: Manufacturing and materials management

Opening stock

The master schedule and the bill of requirements together form the framework of what is required and when it is required, but two other factors must be fed into the computer program at the same time. The first of these will be the current level of unallocated stocks of parts, components and sub-assemblies available for immediate use. There will be in total larger stocks on hand but these will already have been allocated to production via the system and are therefore unavailable. This information will, of course, modify any orders for raw materials placed on suppliers.

Source: handbook onf logistics and distribution management 2006 hal. 190

Page 25: Manufacturing and materials management

flexible fulfilment is a method of manufacturing that attempts to delay the final definition of a product to the last possible stage in the supply chain - hence the popular description of 'postponement' for this system.

Source: handbook onf logistics and distribution management 2006 hal. 191

FLEXIBLE FULFILMENT (POSTPONEMENT)

Page 26: Manufacturing and materials management
Page 27: Manufacturing and materials management

THE EFFECTS ON DISTRIBUTION ACTIVITIES

The effects on distribution systems of just-in-time (JIT) deliveries have led to more frequent deliveries of smaller quantities to stringent delivery timetables. This has had effects on vehicle fleets and scheduling as well as developments in linked information systems between manufacturer, supplier and transport provider. Without these developments, JIT would be virtually impossible. Distribution requirements planning (DRP) systems were developed as a logical extension of MRP systems. The principles have simply been extended into a forward distribution planning system.

Source: handbook onf logistics and distribution management 2006 hal. 192

Page 28: Manufacturing and materials management

SUMMARYThis chapter has provided an overview of materials management in the production area as a part of supply chain management. Explanations of the following were included:

• push and pull systems;• cellular manufacturing;• dependent and independent demand;• the philosophy of just-in-time, including a description of the 'seven

wastes', Kanban, and a 'right first time' approach to quality management;

• manufacturing resource planning (MRPII) and material requirements planning (MRP);

• flexible fulfilment, which has come to be known as postponement Finally, the effects of these manufacturing planning and control systems on distribution activities were briefly discussed.

Source: handbook onf logistics and distribution management 2006 hal. 193

Page 29: Manufacturing and materials management