manual of operation and procedures
TRANSCRIPT
Manual of Operating Procedures Bureau of Local Government Finance
November 2011
1
General Record Handling Processing time presented hereto are estimates under normal circumstances. It is assumed that Employee response time commences as document arrives and in complete order to warrant the action. This special section shows the standard record handling procedure i) from internal to external office; ii) from external office to internal office; iii) within internal offices.
Step Process Input Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
External source (inbound) going to an internal office. 1 Receiving the transmittal document
from the external source Mailing or transmittal details; Documentary content
10 minutes Admin Aide (Main
Records Section)
Date, time and details of documents recorded in logbook; Internal control number;
The main record section handles the recording of inbound and outbound communication within a regional office or the central office; Official mails are usually opened unless marked as confidential and/or personal mail;
2 Main Record Section routes the document to destination unit
Date, time and details of documents recorded in logbook; Internal control number; Documentary content
Within the day
Admin Aide (Main
Records Section)
Receiving unit acknowledges the receipt from the main records section; Date, time and details of documents recorded in logbook; Internal control number;
Main record section logbook still in use here;
2
Step Process Input Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3 Destination unit receives and records the inbound documents from main record section
Date, time and details of documents; Internal control number; Documentary contents
10 minutes Admin Aide (destination
unit)
Date, time and details of documents recorded in logbook; Internal control number;
Destination unit record logbook now in use here;
4 Destination unit routes the document to Division/Office Head
Date, time and details of documents; Internal control number; Documentary content
Within the day
Admin Aide (destination
unit)
Receiving officer acknowledges the receipt from the admin aide; Date, time and details of documents recorded in logbook; Internal control number;
Destination unit record logbook still in use here;
3
Step Process Input Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Internal source (outbound) going to an external office. This step will be taken after the document has been approved for release, returned to the unit in charge, a copy is retained and now being sent to the destination office.
1 Division/Office Head from originating division forwards the document to the Admin Aide for transmittal
Transmittal; Document content
10 minutes Officer in Charge
(origin unit)
Admin Aide of origin unit acknowledges the receipt from Officer in charge; Date, time and details of documents recorded in logbook; Internal control number;
Originating unit record logbook in use here;
2 Admin Aide of Origin Unit transmits the document to the main record section
Date, time and details of documents; Internal control number; Document content
Within the day
Admin Aide (origin unit)
Record section acknowledges the receipt from admin aide; Date, time and details of documents recorded in logbook; Internal control number; Document content
Originating unit record logbook still in use here;
3 Main record section receives and records the outbound document from origin unit
Date, time and details of documents; Internal control number; Document content
10 minutes Admin Aide (main record
section)
Date, time and details of documents recorded in logbook; Internal control number; Document content
Main record section logbook now in use here;
4
Step Process Input Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Main record section transmits the document to external destination office
Mode of transmittal; Date, time and details of documents; Internal control number; Document content;
Within the day
Admin Aide (main record
section)
Courier name; Tracking number; Transmittal details
Receipt of document by destination office may take longer depending on the mode of transmittal;
The basic rule in record handling is, there should be no document going out of the agency without the document passing thru the main record section
End of Process
5
Step Process Input Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Record handling within and among units/offices of a regional office or the central office 1 Officer in charge from originating unit
forwards the document to the Admin Aide for transmittal
Transmittal; Document content
10 minutes Officer in Charge
(origin unit)
Admin Aide of origin unit acknowledges the receipt from Officer in charge; Date, time and details of documents recorded in logbook; Internal control number;
Originating unit record logbook in use here;
2 Origin Unit Admin Aide transmits the document to the destination unit
Date, time and details of documents; Internal control number; Document content
Within the day
Admin Aide (origin unit)
Destination unit acknowledges the receipt from admin aide; Date, time and details of documents recorded in logbook; Internal control number; Document content
Originating unit record logbook still in use here;
3 Destination unit receives and records the document from origin unit
Date, time and details of documents; Internal control number; Document content
10 minutes Admin Aide (destination
unit)
Date, time and details of documents recorded in logbook; Internal control number; Document content
Destination unit logbook now in use here;
6
4 Destination unit Admin Aide transmits the document to the officer in charge
Officers in charge; Date, time and details of documents; Internal control number; Document content;
Within the day
Admin Aide (destination
unit)
Officer in charge acknowledges the receipt from admin aide; Date, time and details of documents recorded in logbook; Internal control number; Document content
Destination unit logbook still in use here;
The basic rule in record handling within the office is, there should be no document going in and out of the unit without the document passing thru the unit record logbook manned by the admin aide to enable record tracking and monitoring of records.
End of Process
7
Operating Procedures for Bureau Administration Internal Administration Office
Administrative Division
Human Resource Management
8
SERVICE : Internal Administration Office DIVISION : Administration UNIT NAME : Human Resource Management BRIEF DESCRIPTION : This unit manages the staffing requirement of the Bureau and LGU Treasurers & Assistant
Treasurers, and the render of general administrative servicing need of the said personnel. CLIENTS : BLGF Central & RO, LGU Treasurer & Assistant Treasurer (Municipal, Province, Cities), Any
Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Establish, manage and improve Bureau appointment policies and procedures, including those for the local treasury;
1.1 Issuance of Policies, Memo, Implementing Rules and Regulations, Administrative Order and Alike;
2. Facilitate and process appointments, designations, assignment to stations of Bureau employees, including those of the provincial, city, and municipal treasury officials (Treasurer and Assistance Treasurer), and prepare appropriate actions on related personnel matters;
2.1 Appointment (transfer) of BLGF Employees 2.2 Appointment (transfer) of Local Treasurer (Assistant
Treasurer) 2.3 Designation (detail) of BLGF Chief, Directors 2.4 Designation (detail) of Local Treasurer (Assistant Treasurer
3. Act on all personnel matters such as travel orders, leaves, resignations, retirements and others;
3.1 Processing Travel Authority (or Travel Order) 3.1.1 ROs 3.1.2 CO 3.1.3 Treasurers/Asst. Treasurers 3.2 Extension of Service for OIC/IOC 3.3 Leave of Absence Application 3.3.1 Rank & File 3.3.2 Directly supervised by IAO Director 3.3.3 Division Chief, Service Director
9
3.3.4 Assistant RD, RD, Deputy Executive Directors 3.3.5 Executive Director 3.4 Processing of Pass Slip Application (Official Business) 3.4.1 Rank & File 3.4.2 Division Chief 3.5 Loyalty Bonus 3.6 Issuance of Certification and Service Record 3.7 Notice of Step Increment 3.8 Employee Resignation 3.9 Employee Retirement 3.9.1 RO 3.9.2 CO 3.10 Processing Application to Authorize Practice of
Profession 3.10.1 Regional 3.10.2 Central 3.11 Processing Bureau Correspondence 3.12 Request to Hold Conference
4. Coordinate the required information (data elements), job descriptions (functional requirements) relative to Bureau employee profiles or service record, including those of the local treasurer in support of this function; Ensure that these specifications are imbedded or integrated with the personnel profile / service records database and management system;
4.1 Periodic updating of Personal Data Sheet and Service Records
4.2 Periodic updating of forms and other instruments to facilitate transaction
5. Produce before legal investigating bodies such papers, records, files or documents in compliance with subpoena duces tecum issued by appropriate authority;
5.1 Facilitating Bureau response to document request by appropriate authority;
10
SPECIFIC PROCEDURES 1.1 Issuance of Policies, Memo, Implementing Rules and Regulations, Administrative Order and Alike;
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Drafting of Policy Memo, Implementing Rules and Regulations, Administrative Order and Alike;
Executive Orders, Judicial Orders, New Legislations, Endorsement by a BLGF unit; Special order creating the TWG, the task and the regular meetings thereof
n/a CO Admin Officer
Draft Document Timeline will depend on the agreement of technical working group (TWG)
New policies, rules or regulation, memo or administrative orders may come from responses to queries, laws enacted by the legislative branch, interpretation made by the judicial branch, or orders issued by the executive branch. It is assumed that the documents borne out of these sources passed the required legal reviews.
2 Legal review of draft document Reference law, orders or endorsement; Draft document; Special Order
n/a CO Legal Officer
Approval endorsement; Draft Document
Timeline will depend on the extent of content and legal scope;
3 Endorsement to Executive Director (ED) for approval of draft document
Endorsement by the BLGF legal officer; Draft Document
30 minutes DED for Admin or Operation
Endorsement by DED; Draft Document
Admin officer appointed by TWG shall facilitate issuance; Subject to the availability of the DED
Endorsement by DED for Administration if document is Administrative in nature, endorsement by DED for operation if document is for operation in nature
4 Approval of Executive Director (ED) Endorsement by 30 minutes Executive Document
11
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
DED; Draft Document
Director approved and signed by ED
5 Recording and release of original document Date, time and details of documents
10 minutes ED secretariat
Date, time and details of documents recorded in logbook
Route the documents back to the Admin Officer in charge
6 Further processing of documents before transmittal
Original document and supporting documents
30 minutes CO Admin Officer
CO shall retain copy of original “issuance” document;
Supporting documents shall remain at the CO and will not be transmitted with the notice.
7 CO transmittal of “issuance” from BLGF CO to BLGF RD
Date, time and details of document to be released release
1 working day
CO Record Officer
(Records Section)
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
8 RO receipt and recording of “issuance” from CO
Date, time and details of document
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of “issuance”; Route the documents to the RO Admin Officer
9 Transmittal of “issuance” from BLGF RD to Provincial Treasurer / Assistant Provincial Treasurer
BLGF “issuance” with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
In case of Cities, transmits the “issuances” to the City Treasurer or Asst. Treasurer, as the case may be. In case of Municipalities, transmits the “issuances” to the Municipal Treasurer or Asst. Municipal Treasurer through the Provincial Treasurer, as the
case may be. End of Process
12
2.1 Process of Appointing (Filling-up of Vacant Position) BLGF Employees
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Submit directly to the BLGF RO in the case of RO applications. 1 RO receives application letters and
compilation of documentary requirements of applicants.
Date, time and details of documents
10 Minutes BGLF-RO Admin Aide
Date, time and details of documents recorded in logbook
Document classified as “application”. The document is forwarded to the Admin Officer (Action Officer)
2 Pre-evaluate qualifications of the applicants to ensure that all meet the prescribed qualification requirements
Compilation of documentary requirements
2 working days from receipt of complete
documents
RO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of applicants
The RO, after evaluation of completeness, may reject the document and return to concern applicant. A transmittal letter from the RD of such circumstance is attached to the documents.
3 Prepare comparative evaluation and determine the rating of each applicant.
Documentary requirements and the Profile of applicants
3 working days after the pre-
evaluation
RO Admin officer
Comparative Evaluation Matrix with Signature of Admin Officer
4 Regional Selection Board (RSB) convenes for the selection
List of RSB members and date of board meeting
RO Admin officer
Confirmation of RSB members
Subject to availability of RSB members or scheduled monthly meeting of RSB
5 BLGF-RSB deliberates /screen and evaluate applicants. Prepares resolution on best qualified.
Documentary requirements, Comparative
1 working day
BLGF-RSB RSB resolution Admin officer shall prepare resolution
13
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
evaluation matrix and Rating
6 Review and endorse documents Documentary requirements, Comparative evaluation matrix, Rating and RSB resolution
30 minutes BLGF-Assistant RD
Countersignature of Assistant RD on the RSB resolution
Subject to availability of Assistant RD
7 Approve and endorse RSB resolution and documentary requirements to the CO. Prepares transmittal letters/endorsement
Countersignature of Assistant RD to the RSB resolution and documentary requirements.
30 minutes BLGF-RD Approval and signature of RD on all documentations. Transmittal letter of endorsement
Subject to availability of RD
8 Transmit endorsement and related documentations to the CO by RO
Date, time and details of documents
1 working day
RO Record Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
9 CO receives endorsement and documentary requirements from RO
Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of document recorded in logbook
Document classified as “application”. The document is forwarded to the CO Admin Officer
10 CO validates the following; documentary requirements of the applicants
RO comparative evaluation matrix and rating
RSB signed resolution and endorsement of RD.
Checklist, formats, etc.
3 working days from receipt of complete
documents
CO Admin Officer
Validated and corrected comparative evaluation matrix; Validated documentary requirements, RSB
If need arises, the CO Admin Officer upon validation, may correct the details in comparative evaluation matrix
14
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
resolution and endorsements
11 CO conducts final deliberation (screening and evaluation) of the applicants. Prepare Board Resolution.
Validated and corrected comparative evaluation matrix; Validated documentary requirements, RSB resolution and endorsements
CO Selection Board
Final comparative evaluation of applicants with final rating (CER). Board Resolution
Once a month scheduled meeting
12 Review documents/comparative evaluation form and endorse Selection Board Resolution by Deputy Executive Director for Administration
Final comparative evaluation of applicants and final rating
30 minutes DED for Admin
Countersignature of Final comparative evaluation of applicants with final rating (CER) and SB Resolution
Submits the final CER and signed SB resolution to the ED
13 Review and approve the following; Documentary requirements of the
applicants; RO comparative evaluation matrix
and rating; RSB signed resolution and
endorsement of RD and DED.
Countersigned final comparative evaluation of applicants with final rating (CER) and SB Resolution
30 minutes ED Name of Selected / approved application
Subject to availability of ED
14 Preparation of appointment papers and attachments: Executive Director signs appointment.
Name of Selected / approved applicant
2 working days from receipt of
advise
CO Admin Officer
Appointment papers signed by the Executive Director
15 Appointment papers transmitted to CSC for attestation.
All supporting documents and
1 working day
CO Record Officer
Date, time and details of
Retains copy of all documentations
15
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the signed appointment papers
documents recorded in logbook; Endorsement letter from ED
16 CSC receives, verifies and attests on the CER, related documents and appointment papers
All supporting documents, the signed appointment papers and the endorsement letter of ED
CSC Action Officer
Confirmed appointment papers by CSC
Subject to the processes of CSC
17 Receive and record confirmed appointment papers from CSC by CO Records Section
Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of documents recorded in logbook
Route the documents back to the CO Admin Officer: CO shall retain copy of confirmed appointment papers; Supporting documents shall remain in the CO and will not be transmitted with the notice.
18 Transmit confirmed appointment papers from BLGF CO to BLGF RD
Date, time and details of document to be released release
1 working day
CO Record Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
19 RO receives and records confirmed appointment papers from CO
Date, time and details of document
10 minutes RO Admin Aide
Date, time and details of documents
RO shall retain copy of appointment papers; Route the documents
16
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook
to the Admin Officer
20 Transmit confirmed appointment papers from BLGF RD to appointed employee
BLGF approved and CSC confirmed appointment papers with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
End of Process for RO Transaction
Submit directly to the BLGF CO in the case of CO applications. 1 Receive application letters and compilation
of documentary requirements of applicants. Date, time and details of documents
10 Minutes BGLF-CO Admin Aide
Date, time and details of documents recorded in logbook
Document classified as “application”. The document is forwarded to the Admin Officer (Action Officer)
2 Pre-evaluate qualifications of the applicants to ensure that all meet the prescribed qualification requirements
Compilation of documentary requirements
2 working days from receipt of complete
documents
CO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of applicants
The CO, after evaluation of completeness, may reject the document and return to concern applicant. A transmittal letter from the concerned Director (from which the vacant position is applied to) of such circumstance is attached to the documents.
17
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3 Prepare comparative evaluation and determine the rating of each applicant.
Documentary requirements and the Profile of applicants
3 working days after the pre-
evaluation
CO Admin officer
Comparative Evaluation Matrix with Signature of Admin Officer
4 Convene and conduct deliberation (screening and evaluation) of the applicants. Prepare/draft resolution.
Validated and corrected comparative evaluation matrix; Validated documentary requirements, Notice to convene
CO Selection Board
Final comparative evaluation of applicants with final rating (CER); SB resolution
Once a month scheduled meeting
5 Review endorse Selection Board Resolution by Deputy Executive Director for Administration
Final comparative evaluation of applicants and final rating
30 minutes DED for Admin
Countersignature of Final comparative evaluation of applicants with final rating (CER) and SB Resolution
Submit the final CER and signed SB resolution to the ED
6 Review and approve appointment by Executive Director;
Documentary requirements of the applicants;
comparative evaluation matrix and rating;
SB signed resolution and endorsement of DED.
Countersigned final comparative evaluation of applicants with final rating (CER) and SB Resolution
30 minutes Executive Director
Name of Selected / approved applications
Subject to availability of Executive Director
7 Prepare appointment papers Name of Selected / approved applicant
2 working days from receipt of
advise
CO Admin Officer
Appointment papers signed by the Executive Director
18
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8 Transmit appointment papers to the CSC for attestation.
All supporting documents and the signed appointment papers
1 working days
CO Record Officer
Date, time and details of documents recorded in logbook; Endorsement letter signed by ED
Retains copy of all documentations
9 Receives, verifies and attests on the CER, related documents and appointments. treasurer
All supporting documents, the signed appointment papers and the endorsement letter of ED
CSC Action Officer
Confirmed appointment papers by CSC
Subject to the processes of CSC; CSC transmits attested/confirmed appointments to BLGF or BLGF may pick up the appointments
11 CO to collect the confirmed appointment papers from CSC
Pick-up schedule 1 working day
CO Admin Officer
Confirmed appointment papers by CSC
Subject to the approval of travel permit
10 Receive and record confirmed appointment papers from CSC by CO Records Section
Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of documents recorded in logbook
Route the documents back to the CO Admin Officer. CO shall retain copy of confirmed appointment papers. Supporting documents shall remain in the CO and will not be transmitted with the appointment
11 Transmit confirmed appointment papers from BLGF CO to appointed employee
BLGF approved and CSC confirmed
1 working day
CO Admin Officer
Date, time and details of
19
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
appointment papers with Date, time and details of document to be released from RO
documents recorded in logbook
End of Process
20
2.2 Process of Appointing (Filling-up of Vacant Position) Treasurer and Assistant Treasurer (Provincial/City/Municipal)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The Local Chief Executive (LCE)must submits list of three (3) ranking eligible recommendees, together with the documentary requirements of each in accordance with Sec. 470 and 471 of LGC of 1991 (RA No. 7160).
Checklist of Documentary Requirements
LCE and the Nominees
Recommendation of LCE (and Provincial Treasurer in the case of Municipality) with compilation of documentary requirements.
Prerogative of LCE to rank the recommendees according to preference. Transmittal may take several days depending on proximity and mode.
Submit directly to the BLGF RO in the case of Treasurer and Assistant Treasurer of the Province or City. Thru the office of the Provincial Treasurer in the case of Municipal Treasurer and Assistant Treasurer.
2 Receive recommendation letters and compilation of documentary requirements of the three eligible recommendees.
Date, time and details of documents
10 Minutes BGLF-RO Admin Aide
Date, time and details of documents recorded in logbook
Document classified as “appointment”. The document is forwarded to the Admin Officer
3 Pre-evaluate qualifications of the three eligible recommendees to ensure that all meet the prescribed qualification requirements
Compilation of documentary requirements and attached signed recommendation of LCE (and Provincial Treasurer in the case of Municipality). Time, date stamp
2 working days from receipt of complete
documents
RO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of recommendees
The RO, after evaluation, may reject the document and return to concern office. A transmittal letter from the RD of such circumstance is attached to the documents.
4 Prepare comparative evaluation and determine the rating of each
Documentary requirements and
3 working days after
RO Admin officer
Comparative Evaluation Matrix
21
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recommendees. the Profile of recommendees
the pre- evaluation
with Signature of Admin Officer
5 RO to convene the Regional Selection Board (RSB)
List of RSB members and date of board meeting
RO Admin officer
Confirmation of RSB members
Subject to availability of RSB members or scheduled monthly meeting of RSB
6 BLGF-RSB deliberation (screening and evaluation) of recommendees and resolution on best qualified.
Documentary requirements, Comparative evaluation matrix and Rating
1 working day
BLGF-RSB RSB resolution Admin officer shall prepare resolution
7 Review and endorse of documents Documentary requirements, Comparative evaluation matrix, Rating and RSB resolution
30 minutes BLGF-Assistant RD
Countersignature of Assistant RD on the RSB resolution
8 Approve and endorse RSB resolution and documentary requirements to the CO by the RD
Countersignature of Assistant RD on the RSB resolution and documentary requirements.
30 minutes Regional Director
Approval and signature of RD on all documentations. Signed transmittal letter of endorsement
9 Transmittal of endorsement and related documentations to the CO by RO
Date, time and details of documents
1 working day
RO Record Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
10 CO receives of RD endorsement and documentary requirements
Date, time and details of
10 minutes CO Admin Aide
Date, time and details of
Document classified as “appointment”. The
22
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documents document recorded in logbook
document is forwarded to the Admin Officer
11 CO validates the following; documentary requirements of the three (3) eligible recommendees
RO comparative evaluation matrix and rating
RSB signed resolution and endorsement of LCE and RD.
Checklist, formats, etc.
3 working days from receipt of complete
documents
CO Admin Officer
Validated and corrected comparative evaluation matrix; Validated documentary requirements, RSB resolution and endorsements
If need arises, the CO Admin Officer upon validation, may correct the details in comparative evaluation matrix
12 Conduct final deliberation (screening and evaluation) of the qualification of the three (3) eligible recommendees
Validated and corrected comparative evaluation matrix; Validated documentary requirements, RSB resolution and endorsements
CO Selection Board
Final comparative evaluation of recommendees with final rating (CER)
Once a month scheduled meeting
13 Review and endorse of Selection Board Resolution by Deputy Executive Director for Administration
Final comparative evaluation of recommendees and final rating
30 minutes DED for Admin
Countersignature of DED for Admin on Final comparative evaluation of recommendees with final rating (CER) and SB Resolution
Submits the final CER and signed SB resolution to the ED
14 Review and approve appointment by Countersigned 30 minutes Executive Name of Selected Subject to availability
23
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Director. Documentary requirements of the three (3) eligible recommendees; RO comparative evaluation matrix and rating; RSB signed resolution and endorsement of Treasurer, LCE, RD and DED.
final comparative evaluation of recommendees with final rating (CER) and SB Resolution
Director / approved appointment of Treasurer or Assistant Treasurer; Signed/approved appointment
of ED Appointment papers for transmittal to CSC.
16 Transmit appointment papers to the CSC for attestation.
All supporting documents and the signed appointment papers
1 working day
Record Officer (Action Officer)
Date, time and details of documents recorded in logbook; Endorsement letter from ED
Retains copy of all documentations
17 Receive, verify and attest the CER, related documents and appointment of approved treasurer / asst. treasurer
All supporting documents, the signed appointment papers and the endorsement letter of ED
CSC Action Officer
Confirmed appointment papers by CSC
Subject to the processes of CSC. CSC transmits the approved appointment to BLGF or BLGF will pick- up documents at CSC.
18 Receive and record confirmed appointment papers from CSC by CO Records Section
Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of documents recorded in logbook
Route the documents back to the Admin Officer. Supporting documents shall remain in the CO and will not be transmitted with the notice
19 Transmit confirmed appointment papers from BLGF CO to BLGF RD
Date, time and details of
1 working day
CO Record Officer
Date, time and details of
Transmittal may take several days
24
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
document to be released release
(Records Section)
documents recorded in logbook
depending on proximity and mode.
At the Regional Office
20 Receive and record confirmed appointment papers from CO
Date, time and details of document
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of appointment papers; Route the documents to the Admin Officer
21 Transmit confirmed appointment papers to Provincial Treasurer / Assistant Provincial Treasurer
BLGF approved and CSC confirmed appointment papers with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
In case of Cities, transmits the appointment papers to the City Treasurer or Asst. Treasurer,as the case may be. In case of Municipalities, transmits the appointment papers to the Municipal Treasurer or Asst. Municipal Treasurer through the Provincial Treasure, as the case may be.
End of Process
25
2.3 Process of Designating OIC/ICO BLGF Chief, Directors and other applicable positions
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Submit at least three recommended designee with the documentary requirements in accordance with DPO 335-03 to the RDs Office
Checklist of Documentary Requirements
10 Minutes RO Admin Officer and
the proposed designee
Recommendation of Admin Officer with compilation of documentary requirements.
Completion of documentation may take several days.
Submit directly to the BLGF RO in the case of RO designations
2 Receive recommendation letters and compile documentary requirements of the three eligible designee.
Date, time and details of documents
10 Minutes BGLF-RO Admin Aide
Date, time and details of documents recorded in logbook
Document classified as “designation”. The document is forwarded to the Admin Officer
3 Evaluate qualifications of the designee to ensure that the person meets the prescribed qualification requirements
Compilation of documentary requirements and attached signed recommendation of RO Admin Officer. Time, date stamp
2 working days from receipt of complete
documents
RO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of designee
The RO, after evaluation, may reject the document and return to concern unit. A transmittal letter from the RO Admin Officer of such circumstance is attached to the documents.
4 Prepare Regional Special Personnel Order (RSPO) of designee.
Documentary requirements and the Profile of designee
30 minutes or the
following working day
after the evaluation
RO Admin officer
Regional Special Personnel Order (RSPO) with Signature of Admin Officer
5 Review and endorse documents by Documentary 30 minutes BLGF- Signature of Subject to availability
26
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Assistant RD requirements, RSPO
Assistant RD Assistant RD to the RSPO
of Assistant RD
6 Approve and endorse RSPO and documentary requirements to the CO by the RD
Signature of Assistant RD to the RSPO and documentary requirements.
30 minutes BLGF-RD Approval and signature of RD on RSPO, all documentations. Transmittal letter of endorsement
Subject to availability of RD
7 Transmit endorsement and related documentations to the CO
Date, time and details of documents
1 working day
RO Record Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
At the Central Office
8 Receive endorsement and documentary requirements
Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of document recorded in logbook
Document classified as “designation”. The document is forwarded to the Admin Officer
9 Validate the following; documentary requirements of the designee;
Documentary Requirements RSPO endorsement of LCE and RD.
Checklist, formats, etc.
3 working days from receipt of complete
documents
CO Admin Officer
Validated documentary requirement RSPO and endorsements
If need arises, the CO Admin Officer upon validation, may correct the details in RSPO
10 Conducts final deliberation (screening and evaluation) of the designee
RSPO; Validated documentary requirements and endorsements
CO Selection Board
Endorsement of CO Selection Board
Once a month scheduled meeting
11 Review and endorse of RSPO by Deputy Executive Director for Administration
Endorsement of CO Selection
30 minutes DED for Admin
DED Admin Signature on the
27
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Board RSPO
12 Executive Director reviews and approves designation.
DED Admin Signature on the RSPO
30 minutes Executive Director
Approved designation
Subject to availability of Executive Director
13 Transmit designation papers to BLGF RD Date, time and details of document to be released release
1 working day
CO Record Officer
(Records Section)
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
At the Regional Office 14 Receive and record designation papers
from CO Date, time and details of document
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of appointment papers; Route the documents to the Admin Officer
15 Transmit designation papers from BLGF RD to designated officer
Designation papers with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
End of Process for the RO Transaction
1 The CO Admin Officer to submit at least three recommended designee with the documentary requirements in accordance with DPO 335-03 to the RDs Office
Checklist of Documentary Requirements
CO Admin Officer and
the proposed designee
Recommendation of Admin Officer with compilation of documentary requirements.
Completion of documentation may take several days.
Submit directly to the BLGF CO in the case of CO designations 2 CO to receive recommendation letters
and compilation of documentary requirements of the three eligible
Date, time and details of documents
10 Minutes BGLF-CO Admin Aide
Date, time and details of documents
Document classified as “designation”. The document is forwarded
28
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
designee. recorded in logbook
to the Admin Officer
3 CO to evaluate qualifications of the designee to ensure that the person meets the prescribed qualification requirements .
Compilation of documentary requirements and attached signed recommendation of CO Admin Officer. Time, date stamp
2 working days from receipt of complete
documents
CO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of designee
The CO, after evaluation, may reject the document and returned to concern unit. A transmittal letter from the Admin Officer of such circumstance is attached to the documents.
4 CO to prepare Special Personnel Order (SPO) of designee.
Documentary requirements and the Profile of designee
30 minutes or the
following working day
after the evaluation
CO Admin officer
Special Personnel Order (SPO) with Signature of Admin Officer
5 CO conducts final deliberation (screening and evaluation) of the designee
SPO; Validated documentary requirements and endorsements
CO Selection Board
Endorsement of CO Selection Board
Once a month scheduled meeting
6 Review and endorsement of SPO by Deputy Executive Director for Administration
Endorsement of CO Selection Board
30 minutes DED for Admin
DED Admin Signature on the RSPO
Subject to availability of DED for Admin
7 Review and approval of designation by Executive Director.
DED Admin Signature on the SPO
30 minutes Executive Director
Approved designation of chief, director
Subject to availability of Executive Director
8 Other preparation and processing of designation papers
Approved designation of chief, director
2 working days from receipt of
CO Admin Officer
Executive Director signature on the designation papers
29
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
advise
9 Concern unit/office receipt and recording of designation papers from ED
Date, time and details of document
10 minutes Concern unit/office Admin Aide
Date, time and details of documents recorded in logbook
Unit/office shall retain copy of designation papers; Route the documents to the unit/office concern;
10 Transmittal of designation papers to designated officer
Designation papers with Date, time and details of document to be released
1 working day
Admin Officer
Date, time and details of documents recorded in logbook
End of Process
30
2.4 Process of Designating OIC/ICO Treasurer and Assistant Treasurer (Provincial/City/Municipal)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 LCE submits recommended designee with the documentary requirements in accordance with DPO 335-03 and the Sec. 470 and 471 of LGC of 1991 (RA No. 7160) to the RDs Office
Checklist of Documentary Requirements
LCE and the proposed designee
Recommendation of LCE (and Provincial Treasurer in the case of Municipality) with compilation of documentary requirements.
Prerogative of LCE to recommend specific designee. Transmittal may take several days depending on proximity and mode.
Submit directly to the BLGF RO in the case of Treasurer and Assistant Treasurer of the Province or City. Thru the office of the Provincial Treasurer in the case of Municipal Treasurer and Assistant Treasurer.
2 Receive recommendation letters and compilation of documentary requirements of the three eligible recommendees.
Date, time and details of documents
10 Minutes BGLF-RO Admin Aide
Date, time and details of documents recorded in logbook
Document classified as “designation”. The document is forwarded to the Admin Officer
3 Evaluate qualifications of the designee to ensure that the person meets the prescribed qualification requirements
Compilation of documentary requirements and attached signed recommendation of LCE (and Provincial Treasurer in the case of Municipality). Time, date stamp
2 working days from receipt of complete
documents
RO Admin Officer
Accept or denies the documents. If accepted, the Admin Officer confirms completeness of documents and qualification of designee
The RO, after evaluation, may reject the document and return to concern office. A transmittal letter from the RD of such circumstance is attached to the documents.
4 Prepare Regional Special Personnel Order (RSPO) of designee.
Documentary requirements and
30 minutes or the
RO Admin officer
Regional Special Personnel Order
31
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the Profile of designee
following working day
after the evaluation
(RSPO) with Signature of Admin Officer
5 Review and endorse documents. Documentary requirements, RSPO
30 minutes BLGF-Assistant RD
Signature of Assistant RD on the RSPO
Subject to availability of Assistant RD
6 Approve and endorse of RSPO and documentary requirements to the CO by the RD
Signature of Assistant RD on the RSPO and documentary requirements.
30 minutes BLGF-RD, BLGF,
Regional Director (RD)
Approval and signature of RD on RSPO, all documentations. Transmittal letter of endorsement
Subject to availability of RD
7 Transmit and endorse related documentations to the CO by RO
Date, time and details of documents
1 working day
RO Record Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
At the Central Office (CO) 8 Receive endorsement and documentary
requirements from Regional Office Date, time and details of documents
10 minutes CO Admin Aide
Date, time and details of document recorded in logbook
Document classified as “designation”. The document is forwarded to the Admin Officer
9 Validate the following; documentary requirements of the designee;
Documentary Requirements RSPO endorsement of LCE and RD.
Checklist, formats, etc.
3 working days from receipt of complete
documents
CO Admin Officer
Validated documentary requirement RSPO and endorsements
If need arises, the CO Admin Officer upon validation, may correct the details in RSPO
10 Conduct final deliberation (screening RSPO; Validated CO Selection Endorsement of Once a month
32
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and evaluation) of the designee
documentary requirements and endorsements
Board CO Selection Board
scheduled meeting
11 Review and endorse RSPO by Deputy Executive Director for Administration
Endorsement of CO Selection Board
30 minutes DED for Admin
DED Admin Signature on the RSPO
12 Review and approve of designation by Executive Director.
DED Admin Signature on the RSPO
30 minutes Executive Director
Approved designation of Treasurer or Assistant Treasurer, Signature of ED on designation papers
Subject to availability of Executive Director
14 Transmit designation papers to BLGF Regional Office
Date, time and details of document to be released
1 working day
CO Record Officer
(Records Section)
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
At the Regional Office 15 Receive and record designation papers
from CO Date, time and details of document
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of appointment papers; Route the documents to the Admin Officer
16 Transmit designation papers to Provincial Treasurer / Assistant Provincial Treasurer
Designation papers with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
In case of Cities, transmits the designation papers to the City Treasurer or Asst. Treasurer, as the case may be. In case of Municipalities, transmits the designation papers to the Municipal Treasurer or Asst. Municipal Treasurer through the Provincial
33
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Treasure, as the case may be. End of Process
34
3.1.1 Processing Travel Authority (or Travel Order) for ROs Step Procedure Input or
Requirement Processing
Time Responsible
Person Output or Decision Point
Remarks
1 The Applicant writes other request for travel authority letter to the RD with attached documentary requirements
Letter justifying travel authority request; Documentary requirements
Applicant Letter request and documentary requirements reviewed
Endorsement letter to BLGF CO prepared and signed by Regional Director
2 Transmit the endorsement with attached documentary requirements to the CO
Endorsement letter from the RD; Travel authority request from the applicant; Documentary requirements
5 to 7 working days
RO Admin Officer
Date, time and details of documents recorded in logbook
Before transmitting to CO, the RO must ensure that all documentary requirements are complete; Timeline may vary depending on transmittal mode (2 days for LBCs, FedEx, etc. 7 days for ordinary mail);
At the Central Office 3 Receive the transmittal documents
from the RO or courier Mailing or transmittal details; Endorsement letter from RD; Travel authority request from the applicant; Documentary requirements
10 minutes CO Admin Aide
(Records Section)
Date, time and details of documents recorded in logbook; Internal control number;
Official mails are usually opened unless marked as confidential and/or personal mail
Routed documents to CO Admin Division.
35
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Receive and record document Date, time and details of documents recorded in logbook; Internal control number; Endorsement from RD; Travel authority request from the applicant; documentary requirements
Within the day
CO Admin Aide (records
Section)
Date, time and details of documents recorded in logbook; Internal control number;
5 Record and route the document to officer in charge
Date, time and details of documents; Internal control number; Endorsement from RD; Travel authority request from the applicant; documentary requirements
10 minutes CO Admin Aide (Admin
Division)
Date, time and details of documents recorded in logbook; Internal control number;
6 Verify completeness of documents. Prepare draft BLGF Travel Authority
Endorsement from the RD; Travel authority request from the applicant; Documentary
1 to 2 working days
Admin Officer
All required documents complete; Draft BLGF Travel Authority with attached
Admin officer may require additional information thru phone or facsimile;
36
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
requirements; Date, time, details of travel
supporting documents
7 Validate and endorse the draft BLGF Travel Authority
Draft BLGF Travel Authority with attached supporting documents
30 minutes Division Chief, Admin
Division
Signature of Chief Admin Division on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
8 Validate and endorse the draft BLGF Travel Authority to the Director, Internal Administration Office (IAO)
Signature of admin division chief; Draft BLGF Travel Authority with attached supporting documents
30 minutes IAO Director Signature of IAO Director on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
9 Validate and endorse the draft BLGF Travel Authority to the Deputy Executive Director (DED) for Administration
Signature of IAO Director; Draft BLGF Travel Authority with attached supporting documents
30 minutes IAO Director Signature of IAO Director on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
37
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 Validate and endorse the draft BLGF Travel Authority to the ED
Signature of IAO Director; Draft BLGF Travel Authority with attached supporting documents
30 minutes DED for Admin
Signature of DED for Admin on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Subject to the availability of the DED for Admin
11 Validate and approve the draft BLGF Travel Authority
Signature of DED for Admin; Draft BLGF Travel Authority with attached supporting documents
30 minutes Executive Director
Signed/Approved BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Transmit approved/signed travel authority and attached supporting documents to concern division/unit
12 Receive and record signed/approved travel authority
Approved BLGF Travel Authority with attached supporting documents; Date, time and details of
1 working day from receipt of
advise
CO Admin Officer (Admin
Division)
Certified true copy of the Travel Authorization; Date, time and details of documents recorded in
Admin Division shall retain original copy of document; Route the documents to the Record Section
38
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
document logbook of ED secretariat and other units required
13 Transmit Certified true copy of the Travel Authority to BLGF Regional Office
Date, time and details of document to be released
1 working day
CO Record Officer
(Records Section)
Date, time and details of documents recorded in logbook; Transmittal mode details like the tracking number, etc.
Record section shall retain copy of document; Transmittal may take several days depending on proximity and mode.
14 Receive and record Certified true copy of the Travel Authority from CO
Date, time and details of document; Certified true copy of the Travel Authority
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of Certified true copy of the travel authority; Route the documents to the RO Admin Officer
15 Transmit Certified true copy of the Travel Authority from BLGF RD to requesting personnel
Certified true copy of the Travel authorization with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
End of Process
39
3.1.2 Processing Travel Authority (or Travel Order) for CO Employees
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The Applicant writes a letter for travel authority letter request to the Executive Director, and transmits the same with attached documentary requirements
Letter request for travel authority; Documentary requirements
Applicant Endorsement from the Division/Unit Chief
2 Transmits the endorsement with attached application and documentary requirements to the CO Admin Division
Endorsement letter from the Division/Unit Chief; Travel authority request from the applicant; Documentary requirements
Within the day
Admin Aide (Originating
division/unit)
Date, time and details of documents recorded in logbook; Internal control number
Before transmitting to CO Admin Division, the Admin Aide must ensure that all documentary requirements are complete;
For the case of the Admin Division employee requesting travel authority, the endorsement will be forwarded directly to the admin division chief for further endorsement;
3 Receive and record the transmitted document from the originating unit
Endorsement letter from division/unit chief; Travel authority request from the applicant; Documentary requirements
10 minutes CO Admin Aide (Admin
Division)
Date, time and details of documents recorded in logbook; Internal control number;
40
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Route the document to CO Admin Division Action Officer
Date, time and details of documents; Internal control number; Endorsement from unit chief; Travel authority request from the applicant; documentary requirements
Within the day
CO Admin Aide (Admin
Division)
Action Officer acknowledges the receipt from the admin aide; Date, time and details of documents recorded in logbook; Internal control number;
5 Verify completeness of documents and prepare draft BLGF Travel Authority
Endorsement from Division/unit; Travel authority request from the applicant; Documentary requirements; Date, time, details of travel
1 to 2 working days
Admin Action Officer
Draft BLGF Travel Authority with attached supporting documents
Admin Action Officer may require additional information;
6 Validate and endorse the draft BLGF Travel Authority to the IAO Director
Draft BLGF Travel Authority with attached supporting documents
30 minutes Admin Division Chief
Admin Division Chief signature on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
41
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8 Validate and endorse the draft BLGF Travel Authority to the DED for Administration
Signature of Admin Division chief; Draft BLGF Travel Authority with attached supporting documents
30 minutes IAO service director
Signature of IAO Director on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
9 Validate and endorse the draft BLGF Travel Authority to the ED
Signature of IAO service director; Draft BLGF Travel Authority with attached supporting documents
30 minutes DED for Admin
Signature of DED for Admin on the draft BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Subject to the availability of the DED for Admin
10 Validate and approve the draft BLGF Travel Authority
Signature of DED for Admin; Draft BLGF Travel Authority with attached supporting documents
30 minutes Executive Director
Signed/Approved BLGF Travel Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Subject to the availability of the ED Transmit and approved/signed Travel Authority and attached supporting
42
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documents to concern division/unit
11 Receive and record signed/approved travel authority
Approved BLGF Travel Authority with attached supporting documents; Date, time and details of documents
1 working day from receipt of
advise
CO Admin Officer (Admin
Division)
Certified true copy of Travel Authorization; Date, time and details of documents recorded in logbook of ED secretariat and other units required
Admin Division shall retain original copy of document; Route the documents to the Record Section
12 Transmit certified true copy of the Travel Authority to requesting unit personnel
Certified true copy of Travel Authorization; Date, time and details of document to be released
1 working day
CO Records Officer (Main
Records Section)
Date, time and details of documents recorded in logbook; Transmittal mode details like the tracking number, etc.
Record section shall retain copy of document; Transmittal may take several days depending on proximity and mode.
13 Receive and record Certified True copy of the Travel Authority from Main Record Section;
Date, time and details of document; Travel Authority
10 minutes Admin Aide (origin unit)
Date, time and details of documents recorded in logbook
43
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14 Transmit Travel Authority to concern personnel;
Certified true copy of Travel authorization with Date, time and details of document to be released from Admin Aide
1 working day
Admin Aide (origin unit)
Acknowledgement of receipt; Date, time and details of documents recorded in logbook
End of Process
44
3.2 Extension of Service for OIC/IOC Bureau Employees and Local Treasurers (& Assistant Treasurer)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Applicant writes a letter request for an Extension of Service to the Executive Director
Letter justifying extension of service; Extension period
Applicant Endorsement from the RD;
Extension may not be granted beyond mandatory retirement age;
If applicant is a Local Treasurer or an officer from the RO, the later will need endorsement from the RD in the case of City Treasurer, Provincial Treasurer, RO Officers. If the applicant is a local municipal treasurer, the later will need both endorsement from the Provincial Treasurer first and
then the RD. 2 RO prepares and transmits
endorsement with attached request letter and justification to the CO
Request letter and justification from the applicant;
5 to 7 working days
RO Admin Officer
Date, time and details of documents recorded in logbook; Signed endorse letter from Regional Director
Before transmitting to CO, the RO must ensure that all documentary requirements are complete; Timeline may vary depending on transmittal mode (2 days for LBCs, FedEx, etc. 7 days for ordinary mail);
At the Central Office
3 CO receives the transmittal document from the RO or courier
Mailing or transmittal details; Endorsement letter from RD; Request letter and justification from the applicant;
10 minutes CO Admin Aide
(Records Section)
Date, time and details of documents recorded in logbook; Internal control number;
45
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 CO Records Section routes the document to CO Admin Division
Date, time and details of documents; Internal control number; Endorsement from RD; Request letter and justification from the applicant;
Within the day
CO Admin Aide (records
Section)
CO Admin Division acknowledges the receipt from the CO records section; Date, time and details of documents recorded in logbook; Internal control number;
5 CO Admin Division records and routes the document to Admin Officer
Date, time and details of documents; Internal control number; Endorsement from RD; Request letter and justification from the applicant;
10 minutes CO Admin Aide (Admin
Division)
CO Admin Division officer in charge acknowledges the receipt from the admin aide; Date, time and details of documents recorded in logbook; Internal control number;
6 CO- Admin Division verify completeness of documents and prepares draft Extension of Service Authorization
Endorsement from the RD; Request letter and justification from the applicant; Date, time, details of travel
1 to 2 working days
Admin Officer
Draft Extension of Service Authority with attached supporting documents
Admin officer may require additional information thru phone or facsimile;
7 CO- Admin Division validates and endorses the draft Extension of Service Authority to Office/Service Director
Draft Extension of Service Authority with attached supporting
30 minutes Admin Division Chief
Admin Division Chief signature on the draft Extension of
Routing of this document should follow standard record handling procedures
46
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documents Service Authority with attached supporting documents
9 IAO service director validates and endorses the draft Extension of Service Authority to the Deputy Executive Director (DED) for Administration
Signature of admin division chief; Draft Extension of Service Authority with attached supporting documents
30 minutes IAO service Director
Signature of IAO director on the draft Extension of Service Authority with attached supporting documents
Routing of this document should follow standard record handling procedures
10 DED for Administration validates and endorses the draft Extension of Service Authority to the Executive Director (ED)
Signature of IAO Director; Draft Extension of Service Authority with attached supporting documents
30 minutes DED for Admin
DED for Admin signature on the draft Extension of Service Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Subject to the availability of the DED for Admin
11 ED validates and approves the draft Extension of Service Authority
Signature of DED for Admin; Draft Extension of Service Authority with attached supporting documents
30 minutes Executive Director
Approved Extension of Service Authority with attached supporting documents
Routing of this document should follow standard record handling procedures; Revisions may be introduced along the way on the travel authority; Subject to the availability of the Executive Director
47
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12 Office of the Executive Director records and releases approved Extension of Service Authority/Designation
Approved Extension of Service Authority with attached supporting documents
1 working day from receipt of
advise
CO Admin Officer (Admin
Division)
Certified true copy of the Extension of Service Authorization; Date, time and details of documents recorded in logbook of ED secretariat and other units required
Admin Division shall retain original copy of document; Route the documents to the Records Section
13 Transmits of Certified true copy of the Extension of Service Authority to BLGF RD
Date, time and details of document to be released
1 working day
CO Record Officer
(Records Section)
Date, time and details of documents recorded in logbook; Transmittal mode details like the tracking number, etc.
Record section shall retain copy of document; Transmittal may take several days depending on proximity and mode.
14 Receive and record Certified true copy of the Extension of Service Authority from CO
Date, time and details of document; Certified true copy of the Extension of Service Authority
10 minutes RO Admin Aide
Date, time and details of documents recorded in logbook
RO shall retain copy of Certified true copy of the Extension of Service authority; Route the documents to the RO Admin Officer
48
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
15 RO transmits Certified true copy of the Extension of Service Authority from BLGF RD to requesting personnel
Certified true copy of the Extension of Service authorization with Date, time and details of document to be released from RO
1 working day
RO Admin Officer
Date, time and details of documents recorded in logbook
Transmittal may take several days depending on proximity and mode.
Assistant RDs, RDs, the Deputy Executive Directors and the Executive Director application for “extension of service” shall require the approval of the Department of Finance Secretary.
End of Process
49
3.3.1 Application for Leave of Absence (Rank & File)
Application for vacation, sick leave or special privilege leave for one full day or more shall be made on this Form (CSC Form No.6) and to be accomplished at least in duplicate. Application for vacation leave shall be filed in advance or whenever possible (5) days before going into such leave. Application for sick leave filed in advance, or exceeding five (5) days shall be accompanied by a medical certificate.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Applicant completes the CSC Form No 6 and attaches the documentary requirements if any
CSC Form 6 and documentary requirements;
Applicant Complete CSC Form 6 with applicant signature and documentary requirements;
2 Verify recommend the approval of the application for leave
Complete CSC Form 6 with applicant signature and documentary requirements;
30 minutes Division Chief Signature of Division Chief on the CSC Form 6 and documentary requirements
3 Transmittal of the leave form to the Admin Division
CSC Form 6 signed by applicant and supervisor with documentary requirements;
10 minutes Admin Aide (originating
office)
Date, time and details of documents recorded in logbook;
4 Admin Division records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and supervisor with documentary requirements;
10 minutes Admin Aide (Admin
Division)
Date, time and details of documents recorded in logbook; Internal control number;
50
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Verify completeness of form and supporting documents, verifies available leave credits and updates the employee leave card
Leave information; Leave card
30 minutes Admin officer Leave card updated; Information of leave credits provided in the CSC form no 6; certification of available leave
6 CO- Admin Division validates information on the form and supporting documents, and endorses the application for approval of the IAO Director
CSC form 6 with certification of available leave
30 minutes Admin Division Chief
Signature of Admin Division Chief on the CSC form 6 and certification
7 IAO Director reviews and approves of leave application
Signature of Admin Division Chief on the CSC form 6 and certification
30 minutes IAO Director Approved / signed application for leave
8 CO- Admin Division updates of leave card, post leave information to time and attendance ledger
Leave information; Time and attendance ledger
30 minutes Admin Officer
Updated leave card and time and attendance ledger
9 CO- Admin Division records and releases approved leave application
Approved leave application
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook
Admin Division shall retain copy of document; Route the documents to the Record Section
51
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO- Records Section transmits approved leave to requesting personnel
Approved leave application; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting personnel; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
Leave application of rank and file employees at the regional office, the procedures in step 1 to 3 applies and continue following the procedure for regional office below.
4 RO- Admin Section records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and supervisor with documentary requirements;
10 minutes Admin Aide (RO Admin Section)
Date, time and details of documents recorded in logbook; Internal control number;
5 RO- Personnel officer verifies completeness of form and supporting documents, verifies available leave credits and updates the employee leave card
Leave information; Leave card
30 minutes RO Admin officer
Leave card updated; Information of leave credits provided in the CSC form no 6; certification of available leave
6 Assistant RD validates information on the form and supporting documents, and endorses the application for approval of RD
CSC form 6 with certification of available leave
30 minutes Assistant RD Signature of Assistant RD on the CSC form 6 and certification
7 Review and approve leave application Signature of Assistant RD on the CSC form 6 and certification
30 minutes RD Approved / signed application for leave
52
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8 Update leave card, post leave information to time and attendance ledger
Leave information; Time and attendance ledger
30 minutes RO Admin Officer
Updated leave card and time and attendance ledger
RO Admin Section shall retain copy of document; Provide copy to the CO; Route the documents to the RO Record Section
9 Other preparation and processing of leave document
Approved leave application
1 working day from receipt of advise
RO Admin Officer (Admin Division)
Date, time and details of documents recorded in logbook of RD secretariat and other units required
10 Transmit approved leave to requesting personnel
Approved leave application; Date, time and details of document to be released
1 working day
RO Record Officer (Records Section)
Acknowledgement of requesting personnel; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
53
3.3.2 Application for Leave of employees directly supervised by the IAO Director
Application for vacation, sick leave or special privilege leave for one full day or more shall be made on this Form (CSC Form No.6) and to be accomplished at least in duplicate. Application for vacation leave shall be filed in advance or whenever possible (5) days before going into such leave. Application for sick leave filed in advance, or exceeding five (5) days shall be accompanied by a medical certificate.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The Applicant fills-up CSC Form No 6 and attaches the documentary requirements if any
CSC Form 6 and documentary requirements;
Applicant/ Employee
Complete CSC Form 6 with applicant signature and documentary requirements;
2 Verify and recommend the approval of the application for leave
Complete CSC Form 6 with applicant signature and documentary requirements;
30 minutes Division Chief of Applicant
Signature of Division Chief on the CSC Form 6 and documentary requirements
3 Transmit the accomplished leave form to the Admin Division
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (IAO Director
Office)
Date, time and details of documents recorded in logbook;
4 CO- Admin Division records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (Admin
Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date, time and details of documents
54
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook; Internal control number;
5 CO- Admin Division verifies completeness of form and supporting documents, verifies available leave credits and updates the employee leave card
Leave information; Leave card
30 minutes Admin Officer/
Personnel Officer
Leave card updated; Information of leave credits indicated in the CSC form no 6; certification of available leave
6 Admin Division Chief validates information on the form and supporting document, and endorses the application for approval of DED for Administration
CSC form 6 with certification of available leave
30 minutes Admin Division Chief
Signature of Admin Division Chief on the CSC form 6 and certification
7 Review and approve leave application Signature of Admin Division Chief on the CSC form 6 and certification
30 minutes DED for Admin
Approved / signed for leave application
8 CO- Admin Division updates leave card and posts leave information to time and attendance ledger
Leave information; Time and attendance ledger
30 minutes Admin Officer
Updated leave card and time and attendance ledger
Admin Division shall retain copy of document; Routes the documents to the Record Section
55
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Other preparation and processing of leave document
Approved leave application
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of DED secretariat and other units required
10 CO- Records Section transmits approved leave to requesting personnel
Approved leave application; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting personnel; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
56
3.3.3 Application for Leave of Division Chief, Service Directors
Application for vacation, sick leave or special privilege leave for one full day or more shall be made on this Form (CSC Form No.6) and to be accomplished at least in duplicate. Application for vacation leave shall be filed in advance or whenever possible (5) days before going into such leave. Application for sick leave filed in advance, or exceeding five (5) days shall be accompanied by a medical certificate.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The Applicant completes the CSC Form No 6 and attaches the documentary requirements if any
CSC Form 6 and documentary requirements;
Division Chief or Service Director
Complete CSC Form 6 with applicant signature and documentary requirements;
2 Verify and recommend the approval of the application for leave
Complete CSC Form 6 with applicant signature and documentary requirements;
30 minutes Service Director for
Division Chief; DED for Service
Director
Signature of Service Director for Division Chief, or DED for Service Director on CSC Form 6 and documentary requirements
3 Transmit the accomplished leave form to the Admin Division
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (Origin Office)
Date, time and details of documents recorded in logbook;
4 CO- Admin Division records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (Admin
Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date,
57
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
time and details of documents recorded in logbook; Internal control number;
5 CO- Admin Division verifies completeness of form and supporting documents, verifies available leave credits and updates the employee leave card
Leave information; Leave card
30 minutes Admin Officer/
Personnel Office
Leave card updated; Information of leave credits indicated in the CSC form no 6; certification of available leave
6 CO- Admin Division validates information on the form and supporting document, and endorses the application for approval of DED for Administration
CSC form 6 with certification of available leave
30 minutes Admin Division Chief
Signature of Admin Division Chief on the CSC form 6 and certification
7 Validate information on the form and supporting document, and endorses the application for approval of DED for Administration
Signature of Admin Division Chief on the CSC form 6 and certification
30 minutes IAO Director Signature of IAO Director on the CSC form 6 and certification
8 Validate information on the form and supporting document, and endorses the application for approval of ED
Signature of IAO Director on the CSC form 6 and certification
30 minutes DED for Admin
Signature of DED for Admin on the CSC form 6 and certification
9 Review and approve leave application Signature of DED for Admin on the CSC form 6 and certification
30 minutes Executive Director
Approved / signed application for leave
58
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO- Admin Division Updates leave card and posts leave information to time and attendance ledger
Leave information; Time and attendance ledger
30 minutes Admin Officer
Updated leave card and time and attendance ledger
Admin Division shall retain copy of document; Routes the documents to the Record Section
11 CO- Records Section transmits approved leave to requesting Division Chief, Service Director
Approved leave application; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting officer; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
59
3.3.4 Application for Leave of Assistant RDs, RD, Deputy Executive Director
Application for vacation, sick leave or special privilege leave for one full day or more shall be made on this Form (CSC Form No.6) and to be accomplished at least in duplicate. Application for vacation leave shall be filed in advance or whenever possible (5) days before going into such leave. Application for sick leave filed in advance, or exceeding five (5) days shall be accompanied by a medical certificate.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The Applicant fills- up CSC Form No 6 and attaches the documentary requirements if any
CSC Form 6 and documentary requirements;
ARD, RD, or DED
Complete CSC Form 6 with the applicant signature and documentary requirements;
2 Verify and recommends the approval of the application for leave
Complete CSC Form 6 with applicant signature and documentary requirements;
30 minutes DED for Admin
Signature of DED for Admin on the CSC Form 6 and documentary requirements
3 Transmit leave form to the Admin Division
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (DED for Admin)
Date, time and details of documents recorded in logbook;
4 CO- Admin Division records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and DED for Admin with documentary requirements;
10 minutes Admin Aide (Admin
Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date, time and details of documents
60
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook; Internal control number;
5 CO- Admin Division verifies completeness of form and supporting documents, verifies available leave credits and updates the employee leave card
Leave information; Leave card
30 minutes Admin officer Leave card updated; Information of leave credits indicated in the CSC form no 6; certification of available leave
6 CO- Admin Division validates information on the form and supporting document, and endorses the application for approval of DED for Administration
CSC form 6 with certification of available leave
30 minutes Admin Division Chief
Signature of Admin Division Chief on the CSC form 6 and certification
7 Validates information on the form and supporting document, and endorse the application for approval of DED for Administration
Signature of Admin Division Chief on the CSC form 6 and certification
30 minutes IAO Director Signature of IAO Director on the CSC form 6 and certification
8 Validates information on the form and supporting document, and endorses the application for approval of ED
Signature of IAO Director on the CSC form 6 and certification
30 minutes DED for Admin
Signature of DED for Admin on the CSC form 6 and certification
9 Review and approve leave Signature of DED for Admin on the CSC form 6 and certification
30 minutes Executive Director
Approved / signed application for leave
10 Update leave card, post leave information to time and attendance
Leave information; Time and
30 minutes Admin Officer
Updated leave card and time and
Admin Division shall retain copy of
61
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
ledger attendance ledger attendance ledger document; Routes the documents to the Record Section
11 CO- Records Section transmits approved leave to requesting Division Chief, Service Director
Approved leave application; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting officer; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
62
3.3.5 Application for Leave of the Executive Director
Application for vacation, sick leave or special privilege leave for one full day or more shall be made on this Form (CSC Form No.6) and to be accomplished at least in duplicate. Application for vacation leave shall be filed in advance or whenever possible (5) days before going into such leave. Application for sick leave filed in advance, or exceeding five (5) days shall be accompanied by a medical certificate.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Applicant completes the CSC Form No 6 and attaches the documentary requirements if any
CSC Form 6 and documentary requirements;
Executive Director
Complete CSC Form 6 with applicant signature and documentary requirements;
3 Transmit the leave form to the Admin Division
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (OED)
Date, time and details of documents recorded in logbook;
4 CO- Admin Division records and routes the document to the personnel officer (or officer in charge)
CSC Form 6 signed by applicant and IAO Director with documentary requirements;
10 minutes Admin Aide (Admin
Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date, time and details of documents recorded in logbook; Internal control number;
5 CO- Admin Division verify completeness of form and supporting documents, verifies available leave credits and updates the
Leave information; Leave card
30 minutes Admin officer Leave card updated; Information of
63
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
employee leave card leave credits provided in the CSC form no 6; certification of available leave
6 Validate information on the form and supporting document, and endorse the application for approval of IAO Director
CSC form 6 with certification of available leave
30 minutes Admin Division Chief
Signature of Admin Division Chief on the CSC form 6 and certification
7 Validate information on the form and supporting document, and endorse the application for approval of DED for Administration
Signature of Admin Division Chief on the CSC form 6 and certification
30 minutes IAO Director Signature of IAO Director on the CSC form 6 and certification
8 Validate information on the form and supporting document, and endorse the application for approval of ED
Signature of IAO Director on the CSC form 6 and certification
30 minutes DED for Admin
Signature of DED for Admin on the Memorandum, CSC form 6 and certification
9 Approve/sign Memorandum for the Undersecretary, DOF
Signature of DED for Admin on the CSC form 6 and certification
30 minutes Executive Director
Approved / signed Memorandum for the USED, DOF, application for leave
Application for Leave including documentary requirements are forwarded to the Records Section for release to the USEC, DOF
10 Update leave card, post leave information to time and attendance ledger
Leave information; Time and attendance ledger
30 minutes Admin Officer
Updated leave card and time and attendance ledger
64
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11 CO- Records Section transmits memorandum and supporting documents
Approved / signed Memorandum for the USED, DOF, application for leave and supporting documents
1 working day
Record Officer
(Records Section)
Acknowledgement of USEC record officer; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of acknowledgement;
End of Process
65
3.4.1 Processing of Pass Slip (Official Business) for Rank & File
An employee, who will be out for Official Business (OB), for at least four (4) hours but not exceeding one (1) day, shall file with the Personnel Section a Pass
slip (PS) before proceeding to his/her assignment and or destination. In case of urgent Official Business (OB) and the employee needs to directly proceed to
his/her assignment, he/shall submit the same pass slip with the required documents within 2 days upon his/her return to the office.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee completes the Pass Slip Form and attaches documentary requirements;
Notice of meeting; Memorandum; Order; Pass Slip Form
Employee Complete Form with applicant signature and documentary requirements;
2 Verify and recommend the approval of the Pass Slip
Complete Form with applicant signature and documentary requirements;
30 minutes Division Chief Signature of Division Chief on the Form and documentary requirements
3 Transmit Pass Slip to the Admin Division Signature of Division Chief on the Pass Slip and documentary requirements
10 minutes Admin Aide Date, time and details of documents recorded in logbook;
4 Record and route the document to the personnel officer (or officer in charge)
Signature of Division Chief on the Pass Slip and documentary requirements
10 minutes Admin Aide (Admin Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date, time and details of documents
66
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook; Internal control number;
5 CO- Admin Division verifies completeness of form and supporting documents;
Signature of Division Chief on the Form and documentary requirements;
30 minutes Admin officer Signature of Personnel Officer on the Form and documentary requirements;
6 CO- Admin Division validates information on the form and supporting document, and endorses the application for approval of IAO Director
Signature of Personnel Officer on the Form and documentary requirements;
30 minutes Admin Division Chief
Signature of Admin Division Chief on the Form and documentary requirements;
7 Review and approve Pass Slip
Signature of Admin Division Chief on the Form and documentary requirements;
30 minutes IAO Director Signature of IAO Director on the Pass Slip and documentary requirements;
8 CO- Admin Division posts Pass Slip information to time and attendance ledger
Pass Slip information; Time and attendance ledger
30 minutes Personnel Officer
Updated time and attendance ledger
Admin Division shall retain copy of document; Routes the documents to the Record Section
10 CO- Records Section transmits approved Pass Slip to requesting employee
Approved Pass Slip; Date, time and details of document to be released
1 working day
Record Officer (Records Section)
Acknowledgement of requesting employee; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
67
3.4.1 Processing of Pass Slip (Official Business) for Division Chiefs
An employee, who will be out for Official Business (OB), for at least four (4) hours but not exceeding one (1) day, shall file with the Personnel Section a Pass
slip (PS) before proceeding to his/her assignment and or destination. In case of urgent Official Business (OB) and the employee needs to directly proceed to
his/her assignment, he/shall submit the same pass slip with the required documents within 2 days upon his/her return to the office.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee fills-up the Pass Slip Form and attaches the documentary requirements;
Notice of meeting; Memorandum; Order; Pass Slip Form
Employee Completed Form with applicant signature and documentary requirements;
2 Verify and recommends the approval of the Pass Slip
Completed Form with applicant signature and documentary requirements;
30 minutes Division Chief Signature of Division Chief on the Form and documentary requirements
3 Transmit Pass Slip to the Admin Division Signature of Division Chief on the Form and documentary requirements
10 minutes Admin Aide (Originating
unit)
Date, time and details of documents recorded in logbook;
4 CO- Admin Division records and routes the document to the Personnel Officer (or officer in charge)
Signature of Division Chief on the Form and documentary requirements
10 minutes Admin Aide (Admin
Division)
Admin personnel officer acknowledges the receipt from the admin aide; Date, time and details of documents
68
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook; Internal control number;
5 CO- Admin Division verifies completeness of form and supporting documents;
Signature of Division Chief on the Form and documentary requirements;
30 minutes Admin Officer/
Personnel Officer
Signature of Personnel Officer on the Form and documentary requirements;
6 CO- Admin Division validates information on the form and supporting document, and endorses the application for approval of IAO Director
Signature of Personnel Officer on the Form and documentary requirements;
30 minutes Admin Division Chief
Signature of Admin Division Chief on the Form and documentary requirements;
7 Validate information on the form and supporting document, and endorse the application for approval of DED for Administration
Signature of Admin Division Chief on the Form and documentary requirements;
30 minutes IAO Director Signature of IAO Director on the Form and documentary requirements;
8 Review and approve Pass Slip
Signature of IAO Director on the Form and documentary requirements;
30 minutes DED for Admin
Approved Pass Slip and documentary requirements;
9 CO- Admin Division posts Pass Slip information to time and attendance ledger
Pass Slip information; Time and attendance ledger
30 minutes Admin Officer
Updated time and attendance ledger
Admin Division shall retain copy of document; Routes the documents to the Record Section
69
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO- Records transmits approved Pass Slip to requesting employee
Approved Pass Slip; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting employee; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
70
3.5. Processing of Loyalty Bonus for both Regional and the CO
A Loyalty Award in the form of cash per year of service is granted to employees of the department/agency who have completed at least ten (10) years of continuous and satisfactory service in the government and ensuing fifth year.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO HR section determines schedule of granting loyalty awards to employees
Date and Time (timing); Draft list of recipients;
30 minutes Admin Officer
Schedule of award One of the Admin officer is usually appointed as personnel officer; Pursuant to Section 7, Rule X of the Omnibus Rules Implementing Book V of EO 292 of the CSC
2 CO HR section verifies certification and service records of employee
Service records; Certificate of continuous and satisfactory service in the government;
30 minutes Admin Officer
Verified certification that the employee has obtained a Very Satisfactory rating and has not incurred 50 days leave without pay for the 1st ten year and not more than 25 days for the ensuing fifth year
Please refer to Sec. 60, Rule XVI of the Omnibus Rules Implementing Book V of the EO 292 on the effect of vacation leave without pay
3 CO HR section prepares and finalizes Memorandum for the Grant of Loyalty Award and Memorandum to the Financial Management Division (FMD) for fund allocation
Verified certificate of continuous and satisfactory service; Service records
30 minutes Admin
Officer
Signature of the
Admin Officer
(Personnel Officer)
on the
Memorandum for the
Grant of Loyalty Award
and Memorandum to
the FMD for fund
71
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Memorandum for
the Grant of
Loyalty Award and
Memorandum to
the FMD for fund
allocation
allocation with
documentary
requirements are
forwarded to the
Admin Division Chief
4 CO Admin Division reviews
Memorandum for Grant of Loyalty
Award and Memorandum to the FMD
for fund allocation with documentary
requirements
Signature of the
Admin Officer
(Personnel Officer)
on the
Memorandum for
the Grant of
Loyalty Award and
Memorandum to
the FMD for fund
allocation together
with the
documentary
requirements
30 minutes Admin
Division Chief
Signature of the
Admin Division
Chief on the
Memorandum for
the Grant of
Loyalty Award and
Memorandum to
the FMD for fund
allocation with
documentary
requirements
If corrections/ revisions are made by the Admin Division Chief on the Memorandum for the Grant of Loyalty Award and Memorandum to the FMD for fund allocation, the same are returned to the Admin Officer (Personnel Officer) for editing/ finalization, then proceed back to step 3,
otherwise the Memorandum for the Grant of Loyalty Award and Memorandum to the FMD for fund allocation are forwarded to the Office of the Director of Internal Administration for review
72
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 CO Admin Division records and
transmits the Memorandum for
Granting Loyalty Award and
Memorandum to the Financial
Management Division (FMD) for fund
allocation to the Office of the Director,
IAO
Signature of the
Admin Division
Chief on the
Memorandum for
the Grant of
Loyalty Award and
Memorandum to
the Financial
Management
Division (FMD) for
fund allocation
with documentary
requirements
10 minutes Admin Aide Date, time and
details of the
document
recorded in the
logbook of the
Admin
The Memorandum for the Grant of Loyalty Award and Memorandum to the FMD are routed to concern Office Directors (which the nominated employees belong) for review and signature, thereafter for the approval of the Executive Director.
6 Reviews the Memorandum for Grant
Loyalty Award and Memorandum to the
Financial Management Division (FMD)
for fund allocation with documentary
requirements
Signature of the
Personnel Officer
& Admin Division
Chief on the
Memorandum for
the Grant of
Loyalty Award and
Memorandum to
the Financial
Management
Division (FMD) for
30 minutes IAO Director Signature of the
IAO Director on
the Memorandum
for the Grant of
Loyalty Award and
Memorandum to
the FMD with
documentary
requirement
73
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
fund allocation
with documentary
requirements
If corrections/ revisions are made by the IAO Director on the Memorandum for Grant Loyalty Award and Memorandum to the FMD for fund
allocation with documentary requirement, the same are returned to HR Section for editing/ finalization. Then, proceed back to Step 3, otherwise
the Memorandum for Grant Loyalty Award and Memorandum to the FMD for fund allocation with documentary requirement are forwarded to
the Office of the Deputy Executive Director, Administration for review
7 Review the Memorandum for the Grant
of Loyalty Award and Memorandum to
the Financial Management Division
(FMD) with documentary requirements
Signature of the
IAO Director on
the Memorandum
for the Grant of
Loyalty Award and
Memorandum to
the FMD with
documentary
requirement
30 minutes DED for
Admin
Signature of the
DED for Admin on
the Memorandum
for the Grant of
Loyalty Award and
Memorandum to
the FMD
If corrections/ revisions are made by the DED for Admin on the Memorandum for Grant Loyalty Award and Memorandum to the FMD for fund
allocation with documentary requirement, the same are returned to HR Section for editing/ finalization. Then, proceed back to Step 3, otherwise
the Memorandum for Grant Loyalty Award and Memorandum to the FMD for fund allocation with documentary requirement are forwarded to the
Office of the Executive Director
74
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8 Approve and sign the Memorandum to
FMD for appropriate action
Memorandum for
the ED for the
Grant of Loyalty
Award signed by
DED for Admin;
Memorandum to
the FMD
countersigned by
Admin Division
Chief, IAO
Director, DED for
Admin with
documentary
requirements
30 minutes Executive
Director
Approved/signed
Memorandum to
FMD for payment
of loyalty bonus
If corrections/ revisions are made by the ED on the memoranda, the same are returned to HR Section for editing/ finalization. Then, proceed to Step 4 otherwise forward the approved memorandum for the Grant of Loyalty Award and Memorandum to FMD.
9 CO- Admin Division receives and records approved Memoranda
Approved Memorandum for the Grant of Loyalty Award and Memorandum to the FMD
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED Admin Aide and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
75
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO- Records Section transmits approved Memorandum for the Grant of Loyalty Award and Memorandum to the FMD for proper action
Approved Memorandum for the Grant of Loyalty Award and Memorandum to the FMD
1 working day
Record Officer
(Records Section)
Acknowledgement of FMD; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
76
3.6 Issuance of Certifications or Service Record
Service Records and other personnel related certifications are requested by officials and employees as supporting documents for government transaction
such as GSIS, PAG-IBIG, etc.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee fills-up the request form and attaches the documentary requirements;
Personal and government service information;
Employee Completed request form with applicant signature and documentary requirements;
2 CO HR section receives Request for Service Records (SR) and other personnel related Certification from BLGF official/employee
Completed request Form
10 minutes Admin Aide (Admin Division)
Acknowledgement of request; Date, time and details recorded in logbook; Request for SR or other personnel related Certification;
3 CO HR section prepares SR /
Certification
201 file of the employee; Employee’s Leave Card; Salary schedule
30 minutes Admin
Officer
Signature of
Admin Officer on
the SR or
Certification
77
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 CO- Admin Division verifies and signs
the SR / Certification
Countersigned
SR/Certification
with attached
Request Form
30 minutes Admin
Division Chief
Approved / signed
SR or certification
Admin Division shall
retain copy of
document; Routes the
documents to the
Record Section
6 CO- Records Section transmits approved SR / certification to requesting employee
Approved / signed SR or certification; Date, time and details of document to be released
1 working day
Record Officer
(Records Section)
Acknowledgement of requesting employee; Date, time and details of documents receipt recorded in logbook;
Record section shall retain copy of document;
End of Process
78
3.7 Notice of Step Increment
A one (1) step increment is granted to officials and employees for every three (3) years of continuous satisfactory service in the position.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Examine employee service records to identify candidate for salary grade step increment. Notify the CO Admin Division Chief thru a formal request to issue Notice of Step Increment (NOSI)
Employee service records
Admin Officer of
ROs and COs
List of Nominees Every admin officer should take responsibility in ensuring that periodic review for NOSI is performed;
2 CO HR section receives and records request with documentary requirements from the Admin Officer of CO or the ROs for the issuance of NOSI;
Letter request with documentary requirements from the Admin Officer of CO or the ROs
10 minutes Admin Aide Date and details of documents recorded in the logbook. Corresponding CCS no. attached.
The letter request together with the documentary requirements is forwarded to concerned Admin Officer
3 CO HR section evaluates the attached documentary requirements as basis for the issuance of NOSI
Letter request with documentary requirements from the Admin Officer of CO or the ROs
1 hour
Admin Officer
Documentary requirements evaluated
4 CO HR section prepares the NOSI with cover memo to the BLGF Executive Director
Completed Documentary requirements;
Within the day
Admin Officer
Signature of the Admin Officer on the NOSI and cover memo
The NOSI and cover memo is forwarded to the Admin Division Chief for review
5 CO Admin Division Chief reviews and endorses the NOSI and the cover memo
Signature of Admin Officer on the NOSI and cover memo
30 minutes Admin Division Chief
Signature of Admin Division Chief on the NOSI and cover memo
If corrections/ revisions are made by the Admin Division Chief on the NOSI and cover memo, the
79
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
same are returned to the Admin Officer for editing/ finalization. Otherwise, the NOSI and cover memo are forwarded to the IAO Director for review
The NOSI and cover memo are routed to the Office Directors for review and signature 6 Review and endorse the NOSI and cover
memo Signature of Admin Division Chief on the NOSI and cover memo
30 minutes IAO Director Signature of IAO Director on the NOSI and cover memo
If corrections/ revisions are made by the IAO Director on the NOSI and cover memo, the same are returned to Admin Officer for editing/ finalization, then proceed to step 3, otherwise the NOSI and cover memo are forwarded to DED for Admin for review
7 Review and endorse the NOSI and cover memo
Signature of IAO Director on the NOSI and cover memo
30 minutes DED for Admin
Signature of DED for Admin on the NOSI and cover memo
If corrections/ revisions are made by the DED for Admin on the NOSI and cover memo, the same are returned to Admin Officer for editing/ finalization, then proceed to step 3, otherwise the NOSI and cover memo are forwarded to Executive Director for review and approval
8
Review and approve the Notice Of Salary Increment (NOSI)
Signature of DED for Admin on the NOSI and cover memo
30 minutes Executive Director
Approved and signed NOSI by BLGF Executive Director
If corrections/ revisions are made by the Executive Director on the NOSI, the same is returned to Admin Division for editing/ finalization, then proceed back to step 3.
9 Record and transmit the approved and signed appointment papers to the Admin Division
Approved and signed NOSI by BLGF Executive Director
10 minutes Admin Aide (OED)
Date and details of the appointment papers recorded in the logbook of the OED
80
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO Admin Division receives and records the approved and signed NOSI
Approved and signed NOSI by BLGF Executive Director
10 minutes Admin Aide Date and details of the appointment papers recorded in the logbook of the Admin Division
The duplicate copy of the NOSI is kept by the Division for 201 file. Original copies of the approved NOSI is transmitted to Records Section
11 CO Admin Division prepares transmittal letter with the approved NOSI to concern divisions of CO or to the ROs
Approved and signed NOSI by BLGF Executive Director
30 minutes Admin Officer
Transmittal letter with approved NOSI signed by the Admin Officer
The transmittal letter is forwarded to the Admin Division Chief for review
12 CO Admin Division reviews the transmittal letter with approved NOSI
Transmittal letter with approved NOSI signed by the Admin Officer
30 minutes Admin Division Chief
Transmittal letter with approved NOSI signed by Admin Division Chief
If corrections/ revisions are made by the Admin Division Chief on the transmittal letter with approved NOSI, the same is returned to the Admin Officer for editing/ finalization. Otherwise, the transmittal letter with approved NOSI is forwarded to the IAO Director for review and signature
13 Review and approve the transmittal letter with approved NOSI
Transmittal letter with approved NOSI signed by the Admin Officer
30 minutes IAO Director Approved transmittal letter with approved NOSI
14 CO Records Section receives, records and transmits the approved transmittal letter with the approved NOSI
Approved transmittal letter with approved NOSI
10 minutes Records Officer
Date and details of the transmittal letter with attached requirements recorded in the logbook of the CO Records Section
Records Section transmits the approved transmittal letter with approved NOSI to the concerned divisions or regional offices
End of Process
81
3.8 Employee Resignation
Sec.1, Rule XII of the CSC, Rules Implementing Book V of EO 292 relative to resignation, the following shall be submitted to the CSC: a) the voluntary
written notice of the employees informing the appointing authority that he is relinquishing his position and the affectivity date of resignation; and
b) the acceptance of resignation in writing by the agency head or appointing authority which shall indicate the date of affectivity of said resignation.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO Records Section receives and records Resignation Letter with documentary requirements;
Resignation letter with documentary requirements
10 minute Record Officer Date, time and details of the Resignation Letter with documentary requirements recorded in the logbook of the Records Section
Resignation Letter with documentary requirements is forwarded to HR Section.
2 CO HR section reviews and evaluates the Resignation Letter with documentary requirements
Details of resignation informing the appointing authority (Executive Director) that she/he is relinquishing his position with the effectivity date of said resignation; Checklist of Requirements for Resignation
2minutes Admin Officer Signature of the Admin Officer for the Resignation Letter with documentary requirements evaluated
Admin officer may be assigned as the personnel officer
3 CO HR section prepares and finalizes the Verified 30 minutes Admin Officer Draft Memorandum relative
82
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
draft memorandum relative to the resignation and acceptance letter address to the resigning employee and for the compliance of the requirements for resignation
Resignation Letter; Checklist of requirements
memorandum relative to the resignation and acceptance letter signed by the Admin Officer with documentary requirements
to the resignation and acceptance Letter with documentary requirements are forwarded to the Admin Division Chief
4 CO Admin Division reviews the draft memorandum relative to the resignation and the acceptance letter with documentary requirements
Draft memorandum relative to the resignation and the acceptance letter signed by the Admin Officer with documentary requirements
30 minutes Admin Division Chief
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Division Chief with documentary requirements
If corrections/ revisions are made by the Admin Division Chief on the draft memorandum relative to the resignation and acceptance letter, the same are returned to the Admin Officer (Personnel Officer) for editing/finalization, then proceed back to step 3, otherwise the draft memorandum relative to
the resignation and acceptance letter with documentary requirements are forwarded to the Office of the IAO Director for review 5 CO Admin Division records and transmits the
draft memorandum relative to the resignation and acceptance letter with documentary requirements to the Office of the IAO Director
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Division Chief with documentary requirements
10 minutes Admin Aide Date, time and details of the memorandum relative to the resignation and acceptance letter with documentary requirements recorded in the logbook of the
83
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Admin Division
The draft memorandum relative to the resignation and acceptance letter with documentary requirements is routed to the concerned Office Directors for review and signature and for the approval of the Executive Director.
6 Review the draft memorandum relative to the resignation and the acceptance letter with documentary requirements
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Officer and Admin Division Chief with documentary requirements
30 minutes IAO Director Draft memorandum relative to the resignation and acceptance letter reviewed and signed by the IAO Director with documentary requirements
If corrections/revisions are made by the IAO Director on the memorandum relative to the resignation and acceptance letter, the same are returned to Admin Division for editing/finalization, then proceed back to step 3, otherwise the draft memorandum relative to the resignation and acceptance
letter with documentary requirements are forwarded to the Office of the Deputy Executive Director (DED) for Administration for review 7 Review the draft memorandum relative to
the resignation and the acceptance letter with documentary requirements
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Officer, Admin Division Chief and IAO Director with documentary requirements
1 hour DED for Admin
Draft memorandum relative to the resignation and acceptance letter reviewed and signed by the DED for Admin with documentary requirements
If corrections/revisions are made by the DED-Administration on the Memorandum relative to the resignation and Acceptance Letter, the same are returned to ADMIN Division for editing/finalization, then proceed back to step 3, otherwise the draft memorandum relative to the resignation and
84
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
acceptance letter with documentary requirements are forwarded to the Office of the Executive Director (OED) 8 Proofread the draft memorandum relative
to the resignation and acceptance letter with documentary requirements
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Officer, Admin Division Chief, IAO Director and DED for Admin with documentary requirements
1 hour Executive Assistant of
OED
Draft memorandum relative to the resignation and acceptance letter verified by the OED Executive Assistant with documentary requirements
If corrections/revisions are made by the Executive Assistant II on the Memorandum relative to the resignation and Acceptance Letter, the same are returned to ADMIN Division for editing/finalization. Then proceed back to step 3, otherwise the Memorandum relative to the resignation and
Acceptance Letter with documentary requirements are forwarded to Executive Director for review/approval 9 Review and approve the memorandum
relative to the resignation and acceptance letter with documentary requirements
Draft memorandum relative to the resignation and acceptance letter signed by the Admin Officer, Chief, ADMIN, Director, IAO and DED-Administration with documentary requirements
1 hour Executive Director
Approved Memorandum relative to the resignation and Acceptance Letter
85
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
If corrections/revisions are made by the Executive Director on the draft memorandum relative to the resignation and acceptance letter, the same are returned to Admin Division for editing/finalization, then proceed back to step 3. The memorandum relative to the resignation and acceptance letter with documentary requirements, after having been reviewed and signed and approved by the Executive Director, shall be transmitted back to the
Admin Division for the next step 10 Record and transmit the approved
memorandum relative to the resignation and acceptance letter with documentary requirements
Approved memorandum relative to the resignation and acceptance letter with documentary requirements
10 minutes Admin Aide (OED)
Date, time and details of the memorandum relative to the resignation and acceptance letter together with the documentary requirements recorded in the OED logbook
11 CO Admin Division receives and records the approved memorandum relative to the resignation and the acceptance letter with documentary requirements
Approved memorandum relative to the resignation and acceptance letter with documentary requirements
10 minutes Admin Aide Date, time and details of the Memorandum relative to the resignation and Acceptance Letter with documentary requirements recorded in the ADMIN Division logbook
Xerox copy is kept in the Division for file. Original and duplicate copies of the approved memorandum relative to the resignation and acceptance letter with documentary requirements are forwarded to Records Section for filing and transmitted to the concerned party.
12 CO Records Section records and transmits the approved memorandum relative to the
Approved memorandum
10 minutes Records Officer of CO
Date, time and details of the
Original copies of approved
86
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
resignation and the acceptance letter with documentary requirements to the concern Division Offices
relative to the resignation and acceptance letter with documentary requirements
Records Section
memorandum relative to the resignation and acceptance letter with documentary requirements recorded in the Records Section logbook
memorandum relative to the resignation and acceptance letter with documentary requirement are transmitted to resigning employee. Xerox copies of the document are retained for file.
End Of Process
87
3.9.1 Employee Retirement process for the ROs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee fills-up the BLGF Retirement Form and the GSIS Form No. A-RETB-03-01 (application for retirement benefit) and attaches the supporting documents
BLGF Retirement Form; the GSIS Form No. A-RETB-03-01; Service record information
Employee Completed BLGF and GSIS Form with supporting documents
2 RO Admin section receives and record employee application for retirement benefits documents;
Complete BLGF and GSIS Form with supporting documents
10 minutes Admin Officer
Date, time and details of document recorded in the logbook
3 RO Admin Section verifies completeness of document and prepares the draft endorsement letter
Applicant information
30 minutes Admin Officer
Draft endorsement letter to CO
4 Validates documents and endorses endorsement letter for signature of RO
RD draft endorsement letter to CO
30 minutes Assistant RD Signature of Assistant RD on the RD draft endorsement letter to CO
5 RD validates and signs the endorsement letter to CO;
Signature of Assistant RD on the RD endorsement letter to CO ; Retirement
30 minutes RD Signed/Approved endorsement letter to CO with supporting documents
88
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
application with supporting documents
6 RO records and transmits endorsement letter, employee application for retirement benefits with supporting document
Signed endorsement letter with supporting documents
Within the day
RO Record Officer
Date, time and details of document recorded in the logbook; Transmittal details
Transmittal may take days depending on the proximity and mode;
At the Central Office
7 CO Record Section receives and records endorsement letter from RO and supporting documents to CO, BLGF & GSIS Forms, and supporting documents.
Date, time and details of documents; Document Content
10 minutes Record Officer
Acknowledgment of receipt; Date, time and details of document recorded in logbook
Document classified as “retirement”. The document is forwarded to the CO HR section
8 CO HR section receives and refer the RD endorsement letter, BLGF & GSIS Forms, and supporting documents to the Action Officer
Date, time and details of documents; Document Content
10 minutes Admin Aide Acknowledgment of Admin Officer (Action Officer); Date, time and details of document recorded in logbook
89
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 CO- Admin Division examines the
qualification and verifies the
completeness of the documents; and
prepares the draft ED endorsement
letter to GSIS and memorandum for
FMD.
Endorsement
letter; Retirement
application and
supporting
documents
1 to 2
working days
upon receipt
Admin
Officer
Draft
Endorsement
letter to GSIS and
Memorandum for
FMD.
Process time will depend on the volume of request communications and other circumstances; Memo for the FMD is for fund allocation of BLGF retirement benefits
10 CO- Admin Division reviews and endorses the draft endorsement letter to GSIS and memorandum for FMD to the IAO Director
Draft endorsement letter to GSIS
30 minutes Admin Division Chief
Signature of Admin Division Chief to the draft endorsement letter to GSIS and memorandum for FMD.
11 Review and endorse endorsement letter to GSIS and memorandum for FMD
Signature of Admin Division Chief to the draft ED endorsement letter to GSIS and memorandum for FMD
30 minutes IAO Director Signature on IAO Director to the draft endorsement letter to GSIS and memorandum for FMD
Endorsement letter to GSIS and memorandum for FMD forwarded to DED for Administration
12 Review and endorse the draft endorsement letter to GSIS and memorandum for FMD
Signature of IAO Director to the endorsement letter to GSIS and memorandum for FMD
30 minutes DED for Admin
Signature of DED for Admin on draft endorsement letter to GSIS and memorandum for FMD
Endorsement letter to GSIS and memorandum for FMD forwarded to Executive Director for signature/approval
90
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13 Review and approve the endorsement letter to GSIS and memorandum for FMD
Signature of IAO Director, DED for Admin on the endorsement letter to GSIS and memorandum for FMD
30 minutes Executive Director
Signed/Approved endorsement letter to GSIS and memorandum for FMD
Signed/approved endorsement letter to GSIS forwarded to Admin Division
14 CO- Admin Division receives and records endorsement letter and supporting documents
Approved ED endorsement letter to GSIS; Complete forms and supporting documents
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; and forwards the documents to the Record Section
15 Transmittal of approved ED endorsement letter to GSIS, Complete forms and supporting documents to the GSIS; and transmittal of Memorandum to the FMD;
Transmittal mode; Document
1 working day
Record Officer
(Records Section)
Acknowledgement of FMD and applicant; Date, time and details of documents receipt recorded in logbook; Transmittal to GSIS details
Record section shall retain copy of document;
16 CO notification to RO on the status of employee application for retirement benefits
Complete set of duplicate documents; Transmittal details
1 working day
CO Admin Officer
Notice email or formal letter
A copy is also provided to the applicant
91
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
17 BLGF to facilitate with GSIS the approval and release of benefits to employee
Details of transactions
CO Admin Officer
Eventual release of retirement benefits from BLGF and GSIS
Release may take weeks depending on the processes of GSIS
End of Process
92
3.9.2 Employee Retirement process for the COs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee completes the BLGF Retirement Form and the GSIS Form No. A-RETB-03-01 (application for retirement benefit) and attaches the supporting documents
BLGF Retirement Form; the GSIS Form No. A-RETB-03-01; Service record information
Employee Complete BLGF and GSIS Form with supporting documents
2 CO Record Section receives and record employee application for retirement benefits with supporting documents;
Complete BLGF and GSIS Form with supporting documents
10 minutes Record Officer
Date, time and details of document recorded in the logbook
Record Section routes the employee application for retirement benefits with supporting documents;
3 CO HR Section routes the employee application for retirement benefits with supporting documents to the Action Officer;
Complete BLGF and GSIS Form with supporting documents
10 minutes Admin Aide Acknowledgement of Admin Officer; Date, time and details of document recorded in the logbook
4 Examines the qualification and verifies
the completeness of the documents;
and prepares the draft ED endorsement
letter to GSIS and memorandum for
FMD.
Complete BLGF
and GSIS Form
with supporting
documents
1 to 2
working days
upon receipt
Admin
Officer
Draft ED
endorsement
letter to GSIS and
memorandum for
FMD.
Process time will depend on the volume of request communications and other circumstances; Memo for the FMD is for fund allocation of BLGF retirement benefits
93
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Reviews and endorses the draft ED endorsement letter to GSIS and memorandum for FMD to the IAO Director
Draft ED endorsement letter to GSIS
30 minutes Admin Division Chief
Signature of Admin Division Chief to the draft ED endorsement letter to GSIS and memorandum for FMD.
6 Reviews and endorses the draft ED endorsement letter to GSIS and memorandum for FMD to the DED for Admin
Signature of Admin Division Chief to the draft ED endorsement letter to GSIS and memorandum for FMD
30 minutes IAO Director Signature of IAO Director to the draft ED endorsement letter to GSIS and memorandum for FMD
7 Reviews and endorses the draft ED endorsement letter to GSIS and memorandum for FMD to the ED
Signature of IAO Director to the draft ED endorsement letter to GSIS and memorandum for FMD
30 minutes DED for Admin
Signature of DED for Admin to the draft ED endorsement letter to GSIS and memorandum for FMD
8 Reviews and approves the draft endorsement letter to GSIS and memorandum for FMD
Signature of DED for Admin to the draft ED endorsement letter to GSIS and memorandum for FMD
30 minutes ED Approved endorsement letter to GSIS and memorandum for FMD
94
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Other preparation and processing of ED endorsement letter to GSIS; Memorandum for FMD; Complete forms and supporting documents
Approved ED endorsement letter to GSIS; Memorandum for FMD; Complete forms and supporting documents
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
10 Transmittal of approved ED endorsement letter to GSIS, Complete forms and supporting documents to the GSIS; and transmittal of Memorandum to the FMD;
Transmittal mode; Document
1 working day
Record Officer
(Records Section)
Acknowledgement of FMD and applicant; Date, time and details of documents receipt recorded in logbook; Transmittal to GSIS details
Record section shall retain copy of document;
11 HR Section notifies employee on the status of application for retirement benefits
Complete set of duplicate documents; Transmittal details
1 working day
CO Admin Officer
Notice email or formal letter
A copy is also provided to the applicant
12 BLGF to facilitate with GSIS the approval and release of benefits to employee
Details of transactions
CO Admin Officer
Eventual release of retirement benefits from BLGF and GSIS
Release may take weeks depending on the processes of GSIS
End of Process
95
3.10.1 Processing application to authorize Practice of Profession at the ROs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee writes a letter requesting endorsement from the RD for an authorization from the CO to practice law and profession;
Details of request and Supporting documents
Employee Letter request with supporting documents
2 RO Admin section receives and record employee application to practice law and profession;
Letter request with supporting documents
10 minutes Admin Officer
Date, time and details of document recorded in the logbook
3 RO Admin Officer verifies completeness of document and prepares the draft RD endorsement letter;
Applicant information
30 minutes Admin Officer
RD draft endorsement letter to CO
4 Assistant RD validates documents and endorses the draft RD letter for signature
RD draft endorsement letter to CO
30 minutes Assistant RD Signature of Assistant RD to the RD draft endorsement letter to CO
5 RD validates and signs the draft endorsement letter to CO;
Signature of Assistant RD to the RD draft endorsement letter to CO ; application with
30 minutes RD Approved endorsement letter to CO with supporting documents
96
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
supporting documents
6 RO recording and transmittal of RD endorsement letter, employee application for authority to practice law and profession with supporting document
RD endorsement letter with supporting documents
Within the day
RO Record Officer
Date, time and details of document recorded in the logbook; Transmittal details
Transmittal may take days depending on the proximity and mode;
7 CO Record section receives the RD endorsement, employee application for authority to practice law and profession and supporting documents from courier;
Date, time and details of documents; Document Content
10 minutes Record Officer
Acknowledgment of receipt; Date, time and details of document recorded in logbook
Document classified as “authorization”. The document is forwarded to the CO HR section
8 CO HR section receives and refer the RD endorsement, employee application for authority to practice law and profession and supporting documents to the Action Officer
Date, time and details of documents; Document Content
10 minutes Admin Aide Acknowledgment of Admin Officer (Action Officer); Date, time and details of document recorded in logbook
9 Examines the qualification and verifies
the completeness of the documents;
secures formal opinion from the BLGF
legal division; and prepares draft
authorization to practice law and
Endorsement of
RD; application
and supporting
documents; Legal
opinion from BLGF
1 to 2
working days
upon receipt
Admin
Officer
Draft
authorization,
legal opinion with
supporting
Process time will depend on the circumstances of applicant;
97
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
profession Legal Division documents
10 Reviews and endorses the draft authorization, legal opinion with supporting documents
Draft authorization, legal opinion with supporting documents
30 minutes Admin Division Chief
Signature of Admin Division Chief to the Draft authorization, legal opinion with supporting documents
11 Reviews and endorses the Draft authorization, legal opinion with supporting documents to the DED for Admin
Signature of Admin Division Chief to the Draft authorization, legal opinion with supporting documents
30 minutes IAO Director Signature of IAO Director to the Draft authorization, legal opinion with supporting documents
12 Reviews and endorses the Draft authorization, legal opinion with supporting documents to the ED
Signature of IAO Director to the Draft authorization, legal opinion with supporting documents
30 minutes DED for Admin
Signature of DED for Admin to the Draft authorization, legal opinion with supporting documents
13 Reviews and approves the Draft authorization, legal opinion with supporting documents
Signature of DED for Admin to the Draft authorization, legal opinion with supporting documents
30 minutes ED Approved authorization, legal opinion with supporting documents;
98
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14 Other preparation and processing of the “authority to practice law and profession”
Approved authority to practice law and profession
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
15 Transmittal of Approved authority to practice law and profession to RO
Transmittal mode; Document
1 working day
Record Officer
(Records Section)
Transmittal details Record section shall retain copy of document;
16 RO Record section receives and records the document from courier
Date, time and content of document
10 minutes RO Admin Aide
Date, time and details of document recorded in logbook
RO Record Section routes the document to the RO Admin Officer;
17 RO transmit the document to the applicant
Document set Within the day
RO Admin Officer
Acknowledgement of the applicant
RO Admin Officer retains copy of the document
End of Process
99
3.10.2 Processing application to authorize Practice of Profession at the COs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Employee writes a letter requesting endorsement from the RD for an authorization from the CO to practice law and profession;
Details of request and Supporting documents
Employee Letter request with supporting documents
2 Verifies the justification of employee and division workload
Letter request with supporting documents
Concern Division Chief
Endorsement of Division Chief
3 CO Record section receives the concern Division Chief endorsement, employee application for authority to practice law and profession and supporting documents;
Endorsement of Division Chief, Letter request with supporting documents
10 minutes Record Officer
Acknowledgment of receipt; Date, time and details of document recorded in logbook
Document classified as “authorization”. The document is forwarded to the CO HR section
4 CO HR section receives and refer the endorsement, employee application for authority to practice law and profession and supporting documents to the Action Officer
Date, time and details of documents; Document Content
10 minutes Admin Aide Acknowledgment of Admin Officer (Action Officer); Date, time and details of document recorded in logbook
100
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Examines the qualification and verifies
the completeness of the documents;
secures formal opinion from the BLGF
legal division; and prepares draft
authorization to practice law and
profession
Endorsement;
application and
supporting
documents; Legal
opinion from BLGF
Legal Division
1 to 2
working days
upon receipt
Admin
Officer
Draft
authorization,
legal opinion with
supporting
documents
Process time will depend on the circumstances of applicant;
6 Reviews and endorses the draft authorization, legal opinion with supporting documents
Draft authorization, legal opinion with supporting documents
30 minutes Admin Division Chief
Signature of Admin Division Chief to the Draft authorization, legal opinion with supporting documents
7 Reviews and endorses the Draft authorization, legal opinion with supporting documents to the DED for Admin
Signature of Admin Division Chief to the Draft authorization, legal opinion with supporting documents
30 minutes IAO Director Signature of IAO Director to the Draft authorization, legal opinion with supporting documents
8 Reviews and endorses the Draft authorization, legal opinion with supporting documents to the ED
Signature of IAO Director to the Draft authorization, legal opinion with supporting documents
30 minutes DED for Admin
Signature of DED for Admin to the Draft authorization, legal opinion with supporting documents
101
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Reviews and approves the Draft authorization, legal opinion with supporting documents
Signature of DED for Admin to the Draft authorization, legal opinion with supporting documents
30 minutes ED Approved authorization, legal opinion with supporting documents;
10 Other preparation and processing of the “authority to practice law and profession”
Approved authority to practice law and profession
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
11 Transmittal of Approved authority to practice law and profession to the applicant
Document set 1 working day
Record Officer
(Records Section)
Acknowledgement of employee
Record section shall retain copy of document;
End of Process
102
3.11 Processing Bureau Correspondence
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO Admin section receives and records correspondence from government or private entity;
Correspondence 10 minutes Admin Aide Date, time and details of document; Classification of document; Internal control number
Admin aide routes the document to appropriate action officer
2 RO Admin officer examines document and determines appropriate respondent
Correspondence and classification of document
30 minutes Admin Officer
Referral to appropriate respondent
If required response can be provided by the RO, the admin officer provides appropriate action, from step 2, following next step 3 RO Admin officer prepares response
letter and documentary requirements if any
Information required; Document required
Within the day
Admin Officer
Draft response letter with documentary requirement if any
4 Verifies and endorses response of RO to the RD
Draft response letter with documentary requirement if any
30 minutes Assistant RD Signature of ARD to the draft response letter with documentary requirement if any
103
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Validates and approves response letter of RO with appropriate documentation
Signature of ARD to the draft response letter with documentary requirement if any
30 minutes RD Approved response letter with documentary requirements
6 Other preparation and processing of the “response letter” with documentary requirements
Approved response letter with documentary requirements
1 working day from receipt of
advise
Admin Officer
Date, time and details of documents recorded in logbook of RO and other units required
Admin section shall retain copy of response document; Routes the documents to the Record Section for transmittal
7 Transmittal of “response letter” with documentary requirements
Document set 1 working day
Record Officer
(Records Section)
Acknowledgement of requesting part
Record section shall retain copy of document;
If required response will need to come from CO, the admin officer provides appropriate action, from step 2, following next step 3 RO Admin officer prepares
endorsement letter to CO Information required; Document required
30 minutes Admin Officer
Draft endorsement letter with documentary requirement if any
4 Verifies and endorses the draft endorsement letter of RO to the CO
Draft response letter with documentary requirement if any
30 minutes Assistant RD Signature of ARD to the draft endorsement letter to CO with documentary requirement if any
104
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Validates and approves endorsement letter of RO to CO with appropriate documentation
Signature of ARD to the draft endorsement letter with documentary requirement if any
30 minutes RD Approved endorsement letter to CO with documentary requirements
6 Other preparation and processing of the “endorsement letter” with documentary requirements
Approved endorsement letter with documentary requirements
1 working day from receipt of
advise
Admin Officer
Date, time and details of documents recorded in logbook of RO and other units required
Admin section shall retain copy of response document; Routes the documents to the Record Section for transmittal
7 Transmittal of “endorsement letter” to CO with documentary requirements
Document set 1 working day
Record Officer
(Records Section)
Transmittal details Record section shall retain copy of document;
8 CO records section receives and records the transmittal from RO; Determines the appropriate division to respond
Document content 10 minutes Record Officer (Record Section)
Date, time and details of document; Classification of document; Internal control number
Routes the document to appropriate division for response
9 Concern Division receives and records the document from RO, and routes the document to action officer
Document0 content
10 minutes Admin Aide (Concern Division)
Acknowledgement of document; Date, time and details of document
Routes the document to appropriate action officer of the division
105
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 Preparation of response letter and other documentary requirements
Document content and requirements
Within the day
Admin Officer
Draft response letter and documentary requirements
11 Reviews and endorses the draft response letter and other documentary requirements
Draft response letter and other documentary requirements
30 minutes Admin Division Chief
Signature of Admin Division Chief to the Draft response letter and other documentary requirements
12 Reviews and endorses the Draft response letter and other documentary requirements to the DED for Admin
Signature of Admin Division Chief to the Draft response letter and other documentary requirements
30 minutes IAO Director Signature of IAO Director to the Draft response letter and other documentary requirements
13 Reviews and endorses the Draft response letter and other documentary requirements to the ED
Signature of IAO Director to the Draft response letter and other documentary requirements
30 minutes DED for Admin
Signature of DED for Admin to the Draft response letter and other documentary requirements
14 Reviews and approves the Draft response letter and other documentary requirements
Signature of DED for Admin to the Draft response letter and other documentary
30 minutes ED Approved authorization, legal response letter and other documentary
106
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
requirements requirements
15 Other preparation and processing of the “response letter and other documentary requirements”
Approved response letter and other documentary requirements
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
16 Transmittal of response letter and other documentary requirements to RO
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of RO
Record section shall retain copy of document;
17 RO Record section receives and records document from CO
Response letter of CO and other documentary requirements
10 minutes Record Officer (RO
Record Section)
Date, time and details of document
18 Transmittal of response letter and other documentary requirements to requesting party
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of requesting party
RO Record section shall retain copy of document;
End of Process
107
3.12 Processing Request to Hold Conference
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RD issues order creating a technical working group (TWG) and the tasking;
RO staff listing; Task list;
RD Office order creating the TWG and the task assigned;
2 RO TWG convenes, determines the necessity, plans and prepares the conference program thru a technical working group
Conference Objective; Target Audience and Number
As prescribed by the order
TWG Conference program; Draft request letter to hold conference
Conference program shall include the executive summary, conference description, objective, scope, activities, target audience, estimated budget and organization
3 ARD verifies and endorses the output conference program and the draft request letter to hold conference
Conference program; Draft request letter to hold conference
30 minutes ARD Signature of the ARD on the Draft request letter to hold conference and conference program
4 Approval of the conference program and the request letter to hold conference
Signature of the ARD on the Draft request letter to hold conference and conference program
30 minutes RD Approved request letter to hold conference and conference program
If revisions or additional requirements are made by any of the officers on the draft letter request to hold conference and conference program, the same are returned to the TWG for editing/finalization, then proceed back to step 3, otherwise if there are no revisions or additional requirements
the documents are forwarded to the Executive Director
108
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Recording and transmittal of request letter to hold conference and conference program to the CO
Request letter and conference program
Within the day
Record Officer
Date, time and details of document recorded in logbook; Transmittal details
May take several days depending on the mode of transmittal
6 CO records section receives and records the transmittal from RO; Determines the appropriate division to respond
Document content 10 minutes Record Officer (Record Section)
Date, time and details of document; Classification of document; Internal control number
Routes the document to appropriate division for response
7 Concern Division receives and records the document , and routes the document to action officer
Document content 10 minutes Admin Aide (Concern Division)
Acknowledgement of document; Date, time and details of document
Routes the document to appropriate action officer of the division
8 Examines the request and conference program, prepares the authorization to hold conference and comment or inputs to the conference program if any;
Document content and requirements
Within the day
Concern Officer for
the supervising
division
Draft endorsement to authorize RO to hold conference and comments or inputs to the conference program if any;
109
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Supervising division’s approval of the comment or inputs to the program and endorsement to authorize RO to hold conference
Draft endorsement to authorize RO to hold conference and comments or inputs if any;
30 minutes Supervising Division Chief
Endorsement to Admin Division to Authorize RO to hold conference and comment or inputs to the conference program
10 Preparation of draft authority to hold conference
Endorsement to Admin Division to Authorize RO to hold conference and comment or inputs to the conference program
30 minutes Admin Officer
Draft authorization to hold conference with attached documentation
Document shall include request letter from RO, conference program, Supervising division endorsement to Admin Division to Authorize RO to hold conference and comment or inputs to the conference program
11 Reviews and endorses the draft authorization to hold conference with attached documentation
Draft authorization to hold conference with attached documentation
30 minutes Admin Division Chief
Signature of Admin Division Chief to the Draft authorization to hold conference with attached documentation
12 Reviews and endorses the Draft authorization to hold conference with attached documentation to the DED for Admin
Signature of Admin Division Chief to the Draft authorization to hold conference with attached
30 minutes IAO Director Signature of IAO Director to the Draft authorization to hold conference with attached
110
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documentation documentation
13 Reviews and endorses the Draft authorization to hold conference with attached documentation to the ED
Signature of IAO Director to the Draft authorization to hold conference with attached documentation
30 minutes DED for Admin
Signature of DED for Admin to the Draft authorization to hold conference with attached documentation
14 Reviews and approves the Draft authorization to hold conference with attached documentation
Signature of DED for Admin to the Draft authorization to hold conference with attached documentation
30 minutes ED Approved authorization for RO to hold conference with attached documentations
15 Other preparation and processing of the “authorization for RO to hold conference”
Approved authorization for RO to hold conference with attached documentations
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
16 Transmittal of the documents to RO Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of RO
Record section shall retain copy of document;
111
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
17 RO Record section receives and records the document from CO
Response letter of CO and other documentary requirements
10 minutes Record Officer (RO
Record Section)
Date, time and details of document
18 RO to conduct the conference as planned
19 Preparation of post-activity report and transmittal thereof to the CO
Outcome vs. Plan; Issues, action taken, resolutions, recommendation and next action
Within 3 days after the
conference
TWG Post conference report; Transmittal details to CO
RO record section retains a copy of the report; A softcopy of the report may be posted on the website for downloading of participants
20 CO publish the report on the website and notifies all concern regarding the publication
Copy of the report; listing of participants
Within the day
Admin Officer
Report downloadable from website; Email notification to all; Participant database establish
End of Process
112
4.1 Periodic Updating of Personal Data Sheet (PDS) and Service Record (SR)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Every end of each quarter, the CO HR section prepares draft notice for all employees to update their PDS and SR
PDS form; SR form; 201 Files Deadline of submission
30 minutes Admin Officer
Draft notice for all employees to update their PDS and SR
Appoint an admin officer as personnel officer
2 Reviews and endorses the draft notice for all employees to update their PDS and SR
Draft notice for all employees to update their PDS and SR
30 minutes Admin Division Chief
Signature of Admin Division Chief to the Draft notice for all employees to update their PDS and SR
Notice shall include all Treasurers and Assistant Treasurer
3 Reviews and endorses the Draft notice for all employees to update their PDS and SR to the DED for Admin
Signature of Admin Division Chief to the Draft notice for all employees to update their PDS and SR
30 minutes IAO Director Signature of IAO Director to the Draft notice for all employees to update their PDS and SR
4 Reviews and endorses the Draft notice for all employees to update their PDS and SR to the ED
Signature of IAO Director to the Draft notice for all employees to update their PDS and SR
30 minutes DED for Admin
Signature of DED for Admin to the Draft notice for all employees to update their PDS and SR
5 Reviews and approves the Draft notice for all employees to update their PDS and SR
Signature of DED for Admin to the Draft notice for all employees to
30 minutes ED Approved notice for all employees to update their PDS and SR
113
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
update their PDS and SR
6 Other preparation and processing of the “notice for all employees to update their PDS and SR”
Approved notice for all employees to update their PDS and SR
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
7 Transmittal of the documents to all CO divisions and the RO
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of CO divisions and RO
Record section shall retain copy of document;
8 RO Record section receives and records the document from CO
Notice for all employees to update their PDS and SR
10 minutes Record Officer (RO
Record Section)
Date, time and details of document
9 RD advises all employees, posting of notice on the RO Bulletin Board, transmittal of notice to all LGU treasurers
List and contact number of LGU Treasurers; Notice for all employees to update their PDS and SR
Within 10 working days
RO Admin Officer
Date, time and details of transmittal and acknowledgement
114
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 RO collects all PDS from RO employees and LGU treasurers & assistant treasurers within their administrative jurisdiction; CO collects PDS of CO employees
List and contact number of LGU Treasurers;
5 working days
Admin Officer (CO/RO
Personnel Officer)
Updated PDS and SR
PDS and SR must be signed by the employee, else, the document must be rejected. It is always assumed that the PDS and SR submitted by the employees are true and correct; PDS and SR with update such as change of status, additional dependent, etc., must submit supporting documents and related forms from GSIS, Pag-Ibig, etc.
11 Verification of submitted documents and Updating of 201 files of each employees
Submitted PDS and SR
Until completed
Admin Officer (CO/RO
Personnel Officer)
Updated 201 files Updated database if any
12 Upon completion of the RO in updating the 201 files, a notice is transmitted to the CO together with the copy of 201 files
Updated 201 files Within 3 days upon
completion of updating
RD Notice and updated 201 Files
RO shall maintain 201 files of their employees, and the CO shall maintain all 201 files of CO and ROs
115
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13 The CO Admin Officer, 20 days before the end of the quarter shall follow-up submission of PDS & SR, and ensures the compliance of everyone.
Inventory of submitted PDS & SR summary
Within 10 working days
Admin Officer
Summary of progress, number of PDS submitted vs total number expected; List of persons who submitted and not
14 The CO and RO coordinates with concern agency like GSIS, Pag-Ibig, Philhealth, etc., the updates on the PDS & SR;
Completed PDS and Forms; Summary of updates like change of status, change of dependents;
Within 10 working days
Admin Officer
Acknowledgement or completion form by GSIS, PagIbig, etc.
Admin Division Chief shall ensure that this task is done
15 The CO and RO prepares report on the latest list of employees, summary of updates like change of status, change of dependents, additional trainings, etc.; Submits the report to the RD and the ED
Completed PDS and Forms; Summary of updates like change of status, change of dependents; Acknowledgement or completion form by GSIS, PagIbig, etc.
Within 10 working days
Admin Officer
Date, time and details of document receipt by RD or CO
End of Process
116
4.2 Periodic Updating of Forms and other Instruments to Facilitate Transactions;
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 The CO and RO at any time, may introduce and adopt a new form or instrument to improve their facilitation of function and collection of information; Nonetheless, at least every February of the Year, the HR section initiates the updating, introduction and adoption of new forms in all divisions as a regular function without the need for memo to initiate the task
Inventory of Forms used by the HR section and other divisions of the Bureau;
Admin Officer
Summary of new forms or instruments; Schedule of deliberations
The TWG is automatically composed of division chief; MISD should be involved to ensure capture of new data onto the database;
2 Deliberation of new forms and instruments
Justifications such as value to the organization and related organization; Cost of maintenance or changes in database; Legal basis; Similar best practice
2 hours per meeting
TWG Endorsement letter from the TWG and Finalized Forms and Instruments
Deliberation may take more than 1 meetings; Deliberation will also include the utilization and value of current forms; Finalized forms and instruments report shall also include the guidelines of use; The report may be in the form of a Memo
3 Reviews and endorses the Endorsement letter from the TWG and Finalized Forms and Instruments
Endorsement letter from the TWG and Finalized Forms and Instruments
30 minutes IAO Director Signature of IAO Director to the Endorsement letter from the TWG and Finalized Forms and Instruments
117
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Reviews and endorses the Endorsement letter from the TWG and Finalized Forms and Instruments
Signature of IAO Director to the Endorsement letter from the TWG and Finalized Forms and Instruments
30 minutes DED for Admin
Signature of DED for Admin to the Endorsement letter from the TWG and Finalized Forms and Instruments
5 Reviews and approves the Endorsement letter from the TWG and Finalized Forms and Instruments
Signature of DED for Admin to the Endorsement letter from the TWG and Finalized Forms and Instruments
30 minutes ED Approved new Forms and Instruments
6 Other preparation and processing of the “New Official Forms and Instruments”
Approved new Forms and Instruments
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
7 Transmittal of the documents to all CO divisions and the RO
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of CO divisions and RO
Record section shall retain copy of document;
End of Process
118
5.1 Facilitating Bureau response to documents requested by appropriate authority;
The same in all other divisions, no Bureau documents shall be release to another government agency without approval of the Regional Director for the
Regional Offices, or the Executive Director for the Central Office, and without the request passing thru the Record Section of the Central Office;
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO Admin section receives and records correspondence from government or private entity;
Correspondence 10 minutes Admin Aide Date, time and details of document; Classification of document; Internal control number
Admin aide routes the document to appropriate action officer
2 RO Admin officer examines document and determines appropriate respondent
Correspondence and classification of document
30 minutes Admin Officer
Referral to appropriate respondent
If required response can be provided by the RO, the admin officer provides appropriate action, from step 2, following next step
3 RO Admin officer prepares response letter and documentary requirements if any
Information required; Document required
Within the day
Admin Officer
Draft response letter with documentary requirement if any
For request such as subpoena or anything that may cause legal complication, a legal opinion of a competent entity must accompany the response letter
119
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Verifies and endorses response of RO to the RD
Draft response letter with documentary requirement if any
30 minutes Assistant RD Signature of ARD to the draft response letter with documentary requirement if any
5 Validates and approves response letter of RO with appropriate documentation
Signature of ARD to the draft response letter with documentary requirement if any
30 minutes RD Approved response letter with documentary requirements
6 Other preparation and processing of the “response letter” with documentary requirements
Approved response letter with documentary requirements
1 working day from receipt of
advise
Admin Officer
Date, time and details of documents recorded in logbook of RO and other units required
Admin section shall retain copy of response document; Routes the documents to the Record Section for transmittal
7 Transmittal of “response letter” with documentary requirements
Document set 1 working day
Record Officer
(Records Section)
Acknowledgement of requesting part
Record section shall retain copy of document;
If required response will need to come from CO, the admin officer provides appropriate action, from step 2, following next step 3 RO Admin officer prepares
endorsement letter to CO Information required; Document required
30 minutes Admin Officer
Draft endorsement letter with documentary requirement if any
120
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Verifies and endorses the draft endorsement letter of RO to the CO
Draft response letter with documentary requirement if any
30 minutes Assistant RD Signature of ARD to the draft endorsement letter to CO with documentary requirement if any
5 Validates and approves endorsement letter of RO to CO with appropriate documentation
Signature of ARD to the draft endorsement letter with documentary requirement if any
30 minutes RD Approved endorsement letter to CO with documentary requirements
6 Other preparation and processing of the “endorsement letter” with documentary requirements
Approved endorsement letter with documentary requirements
1 working day from receipt of
advise
Admin Officer
Date, time and details of documents recorded in logbook of RO and other units required
Admin section shall retain copy of response document; Routes the documents to the Record Section for transmittal
7 Transmittal of “endorsement letter” to CO with documentary requirements
Document set 1 working day
Record Officer
(Records Section)
Transmittal details Record section shall retain copy of document;
8 CO records section receives and records the transmittal from RO; Determines the appropriate division to respond
Document content 10 minutes Record Officer (Record Section)
Date, time and details of document; Classification of document; Internal control
Routes the document to appropriate division for response
121
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
number
9 Concern Division receives and records the document from RO, and routes the document to action officer
Document0 content
10 minutes Admin Aide (Concern Division)
Acknowledgement of document; Date, time and details of document
Routes the document to appropriate action officer of the division;
10 Preparation of response letter and other documentary requirements
Document content and requirements
Within the day
Admin Officer
(concern division
Draft response letter and documentary requirements
For request such as subpoena or anything that may cause legal complication, a legal opinion of a competent entity must accompany the response letter
11 Reviews and endorses the draft response letter and other documentary requirements
Draft response letter and other documentary requirements
30 minutes Division Chief (concern division)
Signature of Admin Division Chief to the Draft response letter and other documentary requirements
12 Reviews and endorses the Draft response letter and other documentary requirements to the DED for Admin
Signature of Admin Division Chief to the Draft response letter and other documentary requirements
30 minutes IAO Director Signature of IAO Director to the Draft response letter and other documentary requirements
122
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13 Reviews and endorses the Draft response letter and other documentary requirements to the ED
Signature of IAO Director to the Draft response letter and other documentary requirements
30 minutes DED for Admin
Signature of DED for Admin to the Draft response letter and other documentary requirements
14 Reviews and approves the Draft response letter and other documentary requirements
Signature of DED for Admin to the Draft response letter and other documentary requirements
30 minutes ED Approved authorization, legal response letter and other documentary requirements
15 Other preparation and processing of the “response letter and other documentary requirements”
Approved response letter and other documentary requirements
1 working day from receipt of
advise
Admin Officer (Admin
Division)
Date, time and details of documents recorded in logbook of OED and other units required
Admin Division shall retain copy of document; Routes the documents to the Record Section
16 Transmittal of response letter and other documentary requirements to RO
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of RO
Record section shall retain copy of document;
17 RO Record section receives and records document from CO
Response letter of CO and other documentary requirements
10 minutes Record Officer (RO
Record Section)
Date, time and details of document
123
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
18 Transmittal of response letter and other documentary requirements to requesting party
Document set 1 working day
Record Officer
(Records Section)
Transmittal mode; Acknowledgement of requesting party
RO Record section shall retain copy of document;
End of Process
124
Operating Procedures for Bureau Administration Internal Administration Office
Administrative Division
Property Section
125
SERVICE : Internal Administration Office (IAO) DIVISION : Administrative Division
UNIT NAME : Property Section BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LAMP2, ADB, and other partner agencies; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Property Custodian 1.1 Enforce policies rules and regulations on care and use of assets (COA Handbook)
1.2 Maintain inventory of assets and supplies; 1.3 Issuance of Property Acknowledgement Receipt (PAR) for
equipment and Inventory Custodian Slip for common-use supplies and materials;
1.4 Maintenance and repair of assets (registration, insurance, etc.) 1.5 Disposal of unserviceable assets 1.6 Prepare periodic and on- demand information pertaining assets
2. Procurement 2.1 Facilitate the preparation and approval of annual Procurement Plan assets, supplies, materials services etc.)
2.2 Conduct regular procurement based on the Annual Procurement Plan 2.2.1 Bidding 2.2.2 National Shopping 2.2.3 Emergency Purchase (Small Value Procurement)
2.3 Actual procurement of common-use office supplies, materials and equipment at the Procurement Service;
2.4 Inspection and Acceptance of Delivered Items from the PS (also, applicable to delivered items purchased from outside suppliers)
Preparation of RIS,PR,PO,MR; Including provision for technical assistance on procurement related activities (donor funded);
126
SPECIFIC PROCEDURES 1.2 Maintain inventory of assets and supplies Mandated by Sec. 45-Procedures in the Receipt, Inspection, Acceptance and Recording Deliveries of Inventory Items and Equipment of the Manual on the New Government Accounting System (NGAS) 2002, sequence 1 to 5, pp. 48-49; The Property Section maintains an inventory of items on stock using the Supplies Ledger Card. Common use items for stock shall be recorded and treated as inventory items in the supplies ledger card. The supplies ledger cards are used to account all items on stock together with their corresponding costs. Balances should likewise be checked periodically in order to ascertain the extent of remaining items. Items on the received and issued RIS shall be recorded on the supplies ledger card using the Perpetual Inventory Method (Sec. 43-NGAS, p. 47) with modification. Issuance of on-stock items are dependent on the RIS received by the Property Section in the preparation of the procurement plan. Two copies of the RIS shall be retained by the Property Section while the last copy will be given to the end-user. The said items shall be delivered or asked to be picked-up by the concerned end-user/s at the Property Section.
Step Procedure Input or
Requirement Processing
Time Responsible
Person Output or
Decision Point Remarks
1. C.O. Property/Supply Officer records
delivered supplies, materials and
equipment
Supplies Ledger
Card
45 mins. Property/Sup
ply Officer
Officer
Running Inventory
of supplies,
materials and
equipment
Items recorded in the
supplies ledger card
using the Perpetual
Inventory Method
(Sec. 43-NGAS, p. 47)
with modification.
2. C.O. Property/Supply Officer prepares the
supplies, materials and equipment for
distribution
Running Inventory
of supplies,
materials and
equipment
45 mins. Property/Sup
ply Officer
Supplies, materials
and equipment for
actual distribution
Issuance of on-stock
items are dependent
on the RIS received by
the Property Section
while preparing the
procurement plan
127
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3. C.O. Property/Supply Officer distributes
supplies, materials and equipment
Supplies, materials
and equipment for
actual distribution
30 mins. Property/Sup
ply Officer
RIS signed by the
Property/Supply
Officer as issued
The said items shall be
delivered or asked to
be picked-up by the
concerned end-user/s
at the Property
Section.
4. Receipt of supplies, materials and
equipment
RIS signed by the
Property/Supply
Officer as issued
20 mins. Division
Chiefs or
their
authorized
representativ
es
RIS signed by the
Property/Supply
Officer as issued
countersigned by
respective Division
Chiefs as received
Two copies of the RIS
shall be retained by
the Property Section
while the last copy will
be given to the end-
user
5. C.O. Property/Supply Officer records signed
received RIS by the respective Division
Chiefs
RIS signed by the
Property/Supply
Officer as issued
countersigned by
respective Division
Chiefs as received
10 minutes Property/Sup
ply Officer
Actual remaining
balance of
supplies, materials
and equipment
Costs of the items
delivered shall be
deducted from the
remaining balance.
End of Process
128
1.3 Issuance of Property Acknowledgement Receipt (PAR) for equipment and Inventory Custodian Slip for common-use supplies and materials; All tangible assets regardless of sources that are included in the list of COA Circular 2005-002 dated April 14, 2005 shall be issued with the corresponding Inventory Custodian Slip (ICS). Tangible assets that are considered as property and equipment shall be issued together with the corresponding Property Acknowledgement Receipt (PAR) pursuant to Sec. 47.-Procedures in the Requisition and Issuance of Equipment, seq. 8 to 14 (NGAS 2002, pp. 55-56) as applicable to BLGF.
STEPS PROCESS INPUT
REQUIREMENT PROCESSING
TIME RESPONSIBLE
PERSON OUTPUT/DECISION
POINT REMARKS
1. C.O. Property/Supply Officer
records delivered tangible
assets and equipment
COA Circular 2005-
002, and Sec. 47.-
Procedures in the
Requisition and
Issuance of
Equipment, seq. 8 to
14 (NGAS 2002, pp.
55-56)
45 mins. Property/Supply
Officer
Accomplished
PAR/ICS
PAR/ICS stating the
quantity, unit price, actual
brand name and model of
the tangible assets and
equipment requested
2. C.O. Property/Supply Officer
prepares the tangible assets
and equipment
Accomplished
PAR/ICS
15 mins. Property/Supply
Officer
PAR/ICS signed issued
by the
Property/Supply
Officer
PAR/ICS together with the
tangible assets and
equipment is delivered to
the end-user for
acceptance and receipt
3. C.O. Property/Supply Officer
delivers tangible assets
and/or equipment
PAR/ICS signed
issued by the
Property/Supply
Officer
45 mins. Property/Supply
Officer
PAR/ICS signed issued
by the
Property/Supply
Officer and signed
received by the end-
If dispute arises regarding
material deviations from
the tangible assets and
materials delivered, then
proceed to Step 3- Steps in
129
user receiving delivered office
supplies, materials and
equipment purchased from
the procurement service
(PS)/or outside suppliers,
otherwise the PAR will be
forwarded to the end-user
concerned.
4.
End-User’s receives the
tangible assets and/or
equipment
PAR/ICS signed
issued by the
Property/Supply
Officer and signed
received by the end-
user
15 mins. End-user PAR/ICS signed issued
by the
Property/Supply
Officer and signed
received by the end-
user
2nd copy will be retained by
the Property/Supply
Officer
End of Process
130
2.1 Facilitate the preparation and approval of annual Procurement Plan assets, supplies, materials services etc.) In line with the Government of the Philippines (GOP) financial disciplinary measures, the BLGF must have an Annual Procurement Plan in accordance with ‘Rule II-Procurement Planning, Section 7’ of R-IRR-R.A. 9184 which states that ‘all procurement should be within the approved budget and should be meticulously and judiciously planned’ (R-IRR-R.A. 9184 2009, p. 6). All goods to be purchased should come from an approved procurement plan within the approved budget. All Division Chiefs will be required to submit their respective supplies, materials and equipment requirement in preparation of the procurement plan for the preceding year. Submission of the supplies, materials and equipment requirement should be on the month of October based on DBM Circular Letter No. 2011-6A dated September 28, 2011
Step Procedure Input or
Requirement Processing
Time Responsible
Person Output or
Decision Point Remarks
1. C.O. –Property Section prepares of Memorandum to all Division Chiefs to submit supplies, materials and equipment requirements for the preceding year
Section 7’ of R-IRR-R.A. 9184
30 mins. Property Officer
Memorandum to all Division Chiefs-counter signed by Property/Supply Officer
Memorandum is forwarded to Chief ADMIN for review.
2. C.O.-Chief ADMIN reviews memorandum Memorandum
countersigned by
Property/Supply
Officer
30 mins. Chief, Admin Memorandum
reviewed and
countersigned by
Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the
Memorandum is
forwarded to the
Office of the Director,
Internal
Administration (IAO)
131
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
for review
3. Director, IAO reviews memorandum Memorandum
countersigned by
Property/Supply
Officer/Chief,
ADMIN
30 mins. Director, IAO Memorandum
reviewed and
countersigned by
Director, IAO
If corrections/revisions
are made by the
Director, IAO, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the
Memorandum is
forwarded to the
Office of the Deputy
Executive Director
(DED)-Administration
for review
4. DED-Administration reviews memorandum Memorandum
countersigned by
Property/Supply
Officer, Chief,
ADMIN/Director,
IAO
30 mins. DED-
Administration
Memorandum
reviewed and
signed by the
Executive Director
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the
Memorandum is
132
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
forwarded to the
Office of the Executive
Director for review
5. Executive Director reviews memorandum Memorandum
countersigned by
Property/Supply
Officer, Chief,
ADMIN/Director,
IAO/DED-
Administration
30 mins. Executive
Director
Signed
Memorandum
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the
Memorandum is
forwarded back to the
Property Section
6. C.O.-Property Section distributes signed
Memorandum
Memorandum
countersigned by
Property/Supply
Officer, Chief,
ADMIN/Director,
IAO/DED-
Administration,
signed and
approved by the
Executive Director
25 mins. Property
Section
Signed
memorandum
received by
respective Division
Chiefs
Signed Memorandum
will be disseminated
to respective Division
Chief to ensure
compliance, in return
respective Division
Chiefs shall fill-out the
Requisition and Issue
Slip (RIS) with their
respective supplies,
materials and
133
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
equipment
requirement for the
preceding year for
consolidation
7. C.O.-Division Chiefs prepares their
respective supplies, materials and
equipment requirements
Requisition and
Issue Slip (RIS) as
stated and defined
on NGAS 2002,
Appendix 50, pp.
114-115
One
working day
Division Chiefs RIS signed by
respective Division
Chiefs
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the respective Division
for editing/finalization,
then proceed to step
8, otherwise the RIS is
forwarded to Chief,
ADMIN for review
8. Chief, ADMIN reviews RIS RIS signed by
respective Division
Chiefs
25 mins. Chief, ADMIN RIS signed by
respective Division
Chiefs and
countersigned by
Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
respective Division for
editing/finalization,
then proceed to step
8, otherwise the RIS is
forwarded to the
Office of IAO Director
for review
134
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9. Director, IAO reviews RIS RIS signed by
respective Division
Chiefs and
countersigned by
Chief, ADMIN
25 mins. Director, IAO RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN and
Director, IAO
If corrections/revisions
are made by the
Director, IAO, the
same is returned to
the respective Division
for editing/finalization,
then proceed to step
8, otherwise the RIS is
forwarded to the DED-
Administration for
review
10. DED-Administration Director reviews RIS RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN and
Director, IAO
25 mins. DED-
Administration
RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN ,
Director, IAO and
DED-
Administration
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the respective Division
for editing/finalization,
then proceed to step
8, otherwise the RIS is
forwarded to the OED
11. Executive Director reviews RIS RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN ,
Director, IAO and
20 mins. Executive
Director
RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN ,
Director, IAO,
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the respective Division
for editing/finalization,
135
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
DED-
Administration
DED-
Administration
and approved by
the Executive
Director
then proceed to step
8, otherwise the RIS is
forwarded to the
Property Section for
review
12. C.O.-Property/Supply Officer reviews
approved RIS
RIS signed by
respective Division
Chiefs,
countersigned by
Chief, ADMIN ,
Director, IAO,
DED-
Administration
and approved by
the Executive
Director
Three
working
days
Property/Supp
ly Officer
Procurement Plan The inputs from the
accomplished and
approved RIS shall be
consolidated to draft
the procurement plan.
13. C.O.-Property/Supply Officer prepares the
Procurement Plan
Procurement Plan-
Section 7’ of R-
IRR-R.A. 9184
Included in
step 13
Property/Supp
ly Officer
Procurement Plan
signed by the
Property/Supply
Officer
Procurement plan is
forwarded to the
Chief, Financial
Management Division
(FMD) for review
136
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14. C.O.-Chief, FMD reviews Procurement Plan Procurement Plan
signed by the
Property/Supply
Officer
15 mins. Chief. FMD Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD
If corrections/revisions
are made by the Chief,
FMD the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
13, otherwise the
Procurement Plan is
forwarded to the
Chief, ADMIN for
review
15. Chief, ADMIN reviews Procurement Plan Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD
30 mins. Chief, ADMIN Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD and
countersigned by
the Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property Section for
editing/finalization,
then proceed to step
13, otherwise the
Procurement Plan is
forwarded to the
Director, IAO for
review
137
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
16. Director, IAO reviews procurement plan Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD, and
countersigned by
the Chief, ADMIN
25 mins. Director, IAO Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD,
countersigned by
the Chief, ADMIN
and noted by the
Director, IAO
If corrections/revisions
are made by the
Director, IAO, the
same is returned to
the Property Section
for editing/finalization,
then proceed to step
13, otherwise the
Procurement Plan is
forwarded to the DED-
Administration for
recommendation
17. DED-Administration reviews procurement
plan
Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD,
countersigned by
the Chief, ADMIN
and noted by the
Director, IAO
15 mins. DED-
Administration
Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD,
countersigned by
the Chief, ADMIN,
noted by the
Director, IAO with
recommendation
from DED-
Administration
If corrections/revisions
are made by the
Director, IAO, the
same is returned to
the Property Section
for editing/finalization,
then proceed to step
13, otherwise the
Procurement Plan is
forwarded to the OED
for approval
138
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
18. Executive Director reviews procurement
plan
Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD,
countersigned by
the Chief, ADMIN,
noted by the
Director, IAO with
recommendation
from DED-
Administration
10 mins. Executive
Director
Procurement Plan
signed by the
Property/Supply
Officer with
concurrence of the
Chief, FMD,
countersigned by
the Chief, ADMIN,
noted by the
Director, IAO,
recommendation
from DED-
Administration
and approved by
the Executive
Director
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property Section
for editing/finalization,
then proceed to step
12, otherwise the
Procurement Plan will
be submitted to FMD
to be forwarded to
DBM per Circular
Letter No. 2011-6A
dated September 28,
1011
End of Process
139
2.2.1 Bidding: Conduct of public bidding by the BLGF are in accordance with R-IRR-R.A. 9184 and the World Bank Procurement Guidelines (for foreign assisted projects).
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. C.O. Property/Supply Officer reviews
procurement plan where tangible assets
and/or equipment are not available at the
PS wherein total amount is more than Php
500,000.00.
Procurement Plan 45 mins. Property/Sup
ply Officer
Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer
C.O. Property/Supply
Officer forwards DPS
to Chief, ADMIN for
review
2. Chief, ADMIN reviews DPS Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer
20 mins. Chief, ADMIN Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer and signed
noted by the
Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the
Director, IAO for
review
3. Director, IAO reviews DPS Detailed
Procurement
Schedule (DPS)
20 mins. Director, IAO Detailed
Procurement
Schedule (DPS)
If corrections/revisions
are made by the
Director , IAO, the
140
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
signed prepared
by the
Property/Supply
Officer and signed
noted by the
Chief, ADMIN
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN and
countersigned by
Director, IAO
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the DED-
Administration for
review
4. DED-Administration reviews DPS Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN and
countersigned by
Director, IAO
15 mins. DED-
Administratio
n
Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO and
DED-
Administration
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the OED
for review and
approval
5. Executive Director reviews and approves
DPS
Detailed
Procurement
Schedule (DPS)
signed prepared
15 mins. Executive
Director
Detailed
Procurement
Schedule (DPS)
signed prepared
If corrections/revisions
are made by the
Executive Director, the
same is returned to
141
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO and
DED-
Administration
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO,
DED-
Administration
and signed
approved by the
Executive Director
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded back to the
Property/Supply
Officer for the
preparation of the
Invitation to Bid(ITB)
6. C.O. Property/Supply Officer prepares ITB ITB 30 mins. Property/Sup
ply Officer
ITB countersigned
by the
Property/Supply
Officer
ITB is forwarded to
Chief, ADMIN for
review
7. Chief, ADMIN reviews ITB ITB countersigned
by the
Property/Supply
Officer
20 mins. Property/Sup
ply Officer
ITB countersigned
by the
Property/Supply
Officer and Chief,
ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the ITB is
forwarded to the
142
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office of the Director,
Internal
Administration (IAO)
for review
8. Director, IAO reviews ITB ITB countersigned
by the
Property/Supply
Officer and Chief,
ADMIN
20 mins. Director, IAO ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO
If corrections/revisions
are made by the
Director, IAO the same
is returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the ITB is
forwarded to the DED-
Operations for review
9. DED-Operations reviews ITB ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO
20 mins. DED-
Operations
ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Operations
If corrections/revisions
are made by the DED-
Operations the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the ITB is
forwarded to the DED-
Administration for
143
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
review
10. DED-Administration reviews ITB ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Operations
20 mins. DED-
Administratio
n
ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Operations
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the ITB is
forwarded to the OED
for review
11. Executive Director reviews ITB ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Operations
15 mins. Executive
Director
ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, DED-
Operations, DED-
Administration
and signed
approved by the
Executive Director
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the RFQ is
forwarded to back to
the Property/Supply
Officer for posting at
the Phil-GEPS website
and other conspicuous
144
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
places and newspaper
of nationwide
circulation
12. C.O. Property/Supply
registers/advertisement of ITB to the Phil-
GEPS website and newspaper, respectively
ITB countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, DED-
Administration
and signed by the
Executive Director
1 working
day after
registration/
publication
Property/Sup
ply Officer
ITB posted at Phil-
GEPS Website and
BLGF Website and
published in a
newspaper of
nationwide
circulation
C.O. Property/Supply
Officer prepares the
Bidding Documents
Preparation of the bidding documents is in accordance with the Philippine Bidding Documents (as harmonized with Development Partners) 4th Edition and Rule VI-Preparation of Bidding Documents under IRR-R.A. 9184
For the conduct of Pre-Procurement Conference please refer to RULE VII – INVITATION TO BID of IRR-R.A. 9184, Section 20. Pre-procurement Conference
13. C.O. BAC Secretariat prepares Notice of
Meeting
Approved ITB/DPS 30 mins. BAC
Secretariat
Notice of Meeting
signed by Head,
BAC Secretariat
BAC Secretariat
distributes Notice of
Meeting to BAC
Members
14 C.O. BAC Secretariat convenes BAC
Members
Pre-Bid
Conference/Atten
dance of Present
suppliers/bidders
and BAC Members
3 hrs. BAC
Secretariat
Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members and
signed certified by
Minutes of Pre-Bid
Conference is
forwarded to the
Chief, ADMIN (BAC
Member) for review
145
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the Head, BAC
Secretariat
15. Chief, ADMIN reviews Minutes of the Pre-
Bid Conference
Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members and
signed certified by
the Head, BAC
Secretariat
20 mins. Chief, ADMIN Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members, signed
certified by the
Head, BAC
Secretariat and
signed by Chief,
ADMIN (BAC
Member)
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the BAC
Secretariat for
editing/finalization,
then proceed to step
14, otherwise the
Minutes of Pre-bid
Conference is
forwarded to the
Director, IAO for
review
16. Director, IAO reviews Minutes of the Pre-Bid
Conference
Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members, signed
certified by the
Head, BAC
Secretariat and
signed by Chief,
ADMIN (BAC
20 mins. Director, IAO Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members, signed
certified by the
Head, BAC
Secretariat, signed
by Chief, ADMIN
and Director, IAO
If corrections/revisions
are made by the
Director , IAO, the
same is returned to
the BAC Secretariat for
editing/finalization,
then proceed to step
14, otherwise the
Minutes of the Pre-Bid
Conference is
forwarded to the DED-
146
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Member) (BAC Members) Administration for
review
17. DED-Administration reviews Minutes of the
Pre-Bid Conference
Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members, signed
certified by the
Head, BAC
Secretariat, signed
by Chief, ADMIN
and Director, IAO
(BAC Members)
15 mins. DED-
Administratio
n
Minutes of Pre-Bid
Conference
countersigned by
BAC Secretariat
Members, signed
certified by the
Head, BAC
Secretariat, signed
by Chief, ADMIN
and Director, IAO
(BAC Members)
and DED-
Administration
(BAC Co-
Chairman)
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the BAC Secretariat for
editing/finalization,
then proceed to step
14, otherwise the
Minutes of the Pre-Bid
Conference is returned
back to the BAC
Secretariat for future
references
For the conduct of submission and opening of bids please refer to Rule VII-Opening of Bids under IRR-R.A. 9184
18. C.O. TWG evaluates the Bidding Documents Bids presented
and tabulated
Five working
days
TWG Bid Evaluation
Report (BER)
signed by the TWG
BER is forwarded to
the Chief, ADMIN (BAC
Member) for review
For the Evaluation of Bids please refer to Rule IX-Bid Evaluation of IRR-R.A. 9184
19. Chief, ADMIN (BAC Member) reviews the
BER
BER signed by the
TWG
30 mins. Chief, ADMIN
(BAC
BER signed by the
TWG and Chief,
ADMIN (BAC
If corrections/revisions
are made by the Chief,
ADMIN (BAC
147
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Member) Member) Member), the same is
returned to the TWG
for editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
Director, IAO (BAC
Member) for review
20. Director, IAO (BAC Member) reviews the
BER
BER signed by the
TWG and Chief,
ADMIN (BAC
Member)
30 mins. Director, IAO
(BAC
Member)
BER signed by the
TWG, Chief,
ADMIN and
Director IAO (BAC
Members)
If corrections/revisions
are made by the
Director, IAO, ADMIN
(BAC Member), the
same is returned to
the TWG for
editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
Director, SPMS (BAC
Member) for review
21. Director, SPMS (BAC Member) reviews the
BER
BER signed by the
TWG, Chief,
ADMIN and
Director IAO (BAC
Members)
30 mins. Director,
SPMS (BAC
Member)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the TWG
for editing/finalization,
148
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Members) then proceed to step
18, otherwise the BER
is forwarded to the
Director, PES for
review
22 Director, PES reviews the BER BER signed by the
TWG, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
30 mins. Director, PES BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
If corrections/revisions
are made by the
Director, PES, the
same is returned to
the TWG for
editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
DED-Operations (BAC
Co-Chairman) for
review
23. DED-Operations (BAC Co-Chairman) reviews
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
30 mins. DED-
Operations
(BAC Co-
Chairman)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
If corrections/revisions
are made by the DED-
Operations (BAC Co-
Chairman), the same is
returned to the TWG
for editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
149
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
DED-Administration
(BAC Chairman) for
review
24 DED-Administration (BAC Chairman) reviews
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
30 mins. DED-
Administratio
n (BAC Co-
Chairman)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
Administration
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the TWG
for editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
Executive Director for
review and approval
25 Executive Director reviews and approves
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
Administration
30 mins. Executive
Director
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations,
DED-
Administration
and approved by
the Executive
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the TWG for
editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
BAC Secretariat for the
Resolution
150
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director
26. C.O. BAC Secretariat prepares Resolution Minutes of
Opening of
Bids/BER
1 hour BAC
Secretariat
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members
Resolution is
forwarded to the
Chief, ADMIN (BAC
Member) for review
27. Chief, ADMIN (BAC Member) reviews the
Resolution
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members
30 mins. Chief, ADMIN
(BAC
Member)
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members and
signed by Chief,
ADMIN
If corrections/revisions
are made by the Chief,
ADMIN (BAC
Member), the same is
returned to the BAC
Secretariat for
editing/finalization,
then proceed to step
26, otherwise the
Resolution is
forwarded to the
Director, IAO (BAC
Member) for review
28. Director, IAO (BAC Member) reviews the
Resolution
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
30 mins. Director, IAO
(BAC
Member)
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
If corrections/revisions
are made by the
Director, IAO (BAC
Member), the same is
returned to the BAC
151
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Members and
signed by Chief,
ADMIN
Members, signed
by Chief, ADMIN
and Director, IAO
Secretariat for
editing/finalization,
then proceed to step
26, otherwise the
Resolution is
forwarded to the
Director, SPMS (BAC
Member) for review
29. Director, SPMS (BAC Member) reviews the
Resolution
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members, signed
by Chief, ADMIN
and Director, IAO
30 mins. Director,
SPMS (BAC
Member)
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members, signed
by Chief, ADMIN,
Director, IAO and
Director, SPMS
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the BAC
Secretariat for
editing/finalization,
then proceed to step
26, otherwise the
Resolution is
forwarded to the
Director, SPMS (BAC
Member) for review
30 Director, PES reviews the Resolution Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
30 mins. Director, PES Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the BAC
152
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Members, signed
by Chief, ADMIN,
Director, IAO and
Director, SPMS
Members, signed
by Chief, ADMIN,
Director, IAO,
Director, SPMS
and Director, PES
Secretariat for
editing/finalization,
then proceed to step
26, otherwise the
Resolution is
forwarded to the DED-
Operations (BAC Co-
Chairman for review
31. DED-Operations (BAC Co-Chairman) reviews
the Resolution
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members, signed
by Chief, ADMIN,
Director, IAO,
Director, SPMS
and Director, PES
30 mins. DED-
Operations
(BAC Co-
Chairman)
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
Members, signed
by Chief, ADMIN,
Director, IAO,
Director, SPMS,
Director, PES and
DED-Operations
(BAC Co-
Chairman)
If corrections/revisions
are made by the DED-
Operations (BAC Co-
Chairman), the same is
returned to the BAC
Secretariat for
editing/finalization,
then proceed to step
26, otherwise the
Resolution is
forwarded to the DED-
Administration (BAC
Chairman) for review
32 DED-Administration (BAC Chairman) reviews
the BER
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
30 mins. DED-
Administratio
n (BAC Co-
Chairman)
Resolution signed
by the Head, BAC
Secretariat,
counter signed by
BAC Secretariat
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the TWG
153
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Members, signed
by Chief, ADMIN,
Director, IAO,
Director, SPMS,
Director, PES and
DED-Operations
(BAC Co-
Chairman)
Members, signed
by Chief, ADMIN,
Director, IAO,
Director, SPMS,
Director, PES,
DED-Operations
(BAC Co-
Chairman) and
DED-
Administration
(BAC Chairman)
for editing/finalization,
then proceed to step
18, otherwise the BER
is forwarded to the
Property/Supply
Officer for the
preparation of Notice
of Award (NOA)
33 C.O. Property/Supply Officer prepares NOA Approved BER 25 mins. Property/Sup
ply Officer
NOA
countersigned by
Property/Supply
Officer
C.O. Property/Supply
Officer forwards NOA
to Chief, ADMIN for
review
34. Chief, ADMIN (BAC Member) reviews the
NOA
NOA
countersigned by
Property/Supply
Officer
30 mins. Chief, ADMIN
(BAC
Member)
NOA
countersigned by
Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
If corrections/revisions
are made by the Chief,
ADMIN (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
154
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director, IAO (BAC
Member) for review
35 Director, IAO (BAC Member) reviews the
NOA
NOA
countersigned by
Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
30 mins. Director, IAO
(BAC
Member)
NOA
countersigned by
Property/Supply
Officer, Chief,
ADMIN and
Director, IAO
If corrections/revisions
are made by the
Director, IAO, ADMIN
(BAC Member), the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
Director, SPMS (BAC
Member) for review
36. Director, SPMS (BAC Member) reviews the
NOA
NOA
countersigned by
the Chief, ADMIN
and Director IAO
(BAC Members)
30 mins. Director,
SPMS (BAC
Member)
NOA
countersigned by
the Chief, ADMIN,
Director, IAO and
Director, SPMS
(BAC Members)
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
155
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director, PES for
review
37 Director, PES reviews the NOA NOA
countersigned by
the Chief, ADMIN,
Director, IAO and
Director, SPMS
(BAC Members)
30 mins. Director, PES NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members)
and Director, PES
If corrections/revisions
are made by the
Director, PES, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
DED-Operations (BAC
Co-Chairman) for
review
38. DED-Operations (BAC Co-Chairman) reviews
the NOA
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members)
and Director, PES
30 mins. DED-
Operations
(BAC Co-
Chairman)
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members),
Director, PES and
DED-Operations
If corrections/revisions
are made by the DED-
Operations (BAC Co-
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
156
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
DED-Administration
(BAC Chairman) for
review
39 DED-Administration (BAC Chairman) reviews
the NOA
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members),
Director, PES and
DED-Operations
30 mins. DED-
Administratio
n (BAC Co-
Chairman)
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members),
Director, PES,
DED-Operations
and DED-
Administration
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
Executive Director for
review and approval
40 Executive Director reviews and approves
the NOA
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members),
Director, PES,
DED-Operations
and DED-
30 mins. Executive
Director
NOA
countersigned by
the Chief, ADMIN,
Director, IAO,
Director, SPMS
(BAC Members),
Director, PES,
DED-Operations,
DED-
Administration
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
33, otherwise the NOA
is forwarded to the
157
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Administration and signed
approved by the
Executive Director
Property/Supply
Officer for the
distribution to the
winning supplier
Preparation of Contract
41 C.O. Property/Supply Officer prepares
Contract
Approved BER 25 mins. Property/Sup
ply Officer
Contract
countersigned by
Property/Supply
Officer
C.O. Property/Supply
Officer forwards
Contract to the Chief,
ADMIN for review
42 Chief, ADMIN (BAC Member) reviews the
Contract
Contract
countersigned by
Property/Supply
Officer
30 mins. Chief, ADMIN
(BAC
Member)
Contract
countersigned by
Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
If corrections/revisions
are made by the Chief,
ADMIN (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the Director, IAO
(BAC Member) for
review
43 Director, IAO (BAC Member) reviews the Contract
countersigned by
30 mins. Director, IAO
(BAC
Contract
countersigned by
If corrections/revisions
are made by the
158
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Contract Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
Member) Property/Supply
Officer, Chief,
ADMIN and
Director, IAO
Director, IAO, ADMIN
(BAC Member), the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the Director, SPMS
(BAC Member) for
review
44 Director, SPMS (BAC Member) reviews the
Contract
Contract
countersigned by
Property/Supply
Officer, Chief,
ADMIN and
Director, IAO
30 mins. Director,
SPMS (BAC
Member)
Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the Director, PES for
review
159
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
45 Director, PES reviews the Contract Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
30 mins. Director, PES NOA
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director,
SPMS and
Director, PES (BAC
Members)
If corrections/revisions
are made by the
Director, PES, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the DED-Operations
(BAC Co-Chairman) for
review
46. DED-Operations (BAC Co-Chairman) reviews
the Contract
Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
30 mins. DED-
Operations
(BAC Co-
Chairman)
Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director,
SPMS, Director,
PES (BAC
Members) and
signed as second
witness by the
DED-Operations
If corrections/revisions
are made by the DED-
Operations (BAC Co-
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the DED-
Administration (BAC
160
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
(BAC Co-
Chairman)
Chairman) for review
47 DED-Administration (BAC Chairman) reviews
the Contract
Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director,
SPMS, Director,
PES (BAC
Members) and
signed as second
witness by the
DED-Operations
(BAC Co-
Chairman)
30 mins. DED-
Administratio
n (BAC
Chairman)
Contract
countersigned by
the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director,
SPMS, Director,
PES (BAC
Members), signed
as second witness
by the DED-
Operations (BAC
Co-Chairman) and
signed as first
witness by the
DED-
Administration
(BAC Chairman)
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the Executive
Director for review
and approval
48 Executive Director reviews and approves
the Contract
Contract
countersigned by
the
Property/Supply
Officer, Chief,
30 mins. Executive
Director
Contract
countersigned by
the
Property/Supply
Officer, Chief,
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
161
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
ADMIN, Director,
IAO, Director,
SPMS, Director,
PES (BAC
Members), signed
as second witness
by the DED-
Operations (BAC
Co-Chairman) and
signed as first
witness by the
DED-
Administration
(BAC Chairman)
ADMIN, Director,
IAO, Director,
SPMS, Director,
PES (BAC
Members), signed
as second witness
by the DED-
Operations (BAC
Co-Chairman),
signed as first
witness by the
DED-
Administration
(BAC Chairman)
and approved by
the Executive
Director
Officer for
editing/finalization,
then proceed to step
33-A, otherwise the
Contract is forwarded
to the Property/Supply
Officer for the
distribution to the
winning supplier
Preparation of Notice to Proceed (NTP)
49 C.O. Property/Supply Officer prepares
Notice to Proceed
Accomplished
Contract
25 mins. Property/Sup
ply Officer
Notice to Proceed
(NTP)
countersigned by
Property/Supply
Officer
C.O. Property/Supply
Officer forwards NTP
to Chief, ADMIN for
review
50 Chief, ADMIN (BAC Member) reviews the NTP countersigned
by
30 mins. Chief, ADMIN
(BAC
NTP countersigned
by
If corrections/revisions
are made by the Chief,
162
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
NTP Property/Supply
Officer
Member) Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
ADMIN (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
Director, IAO (BAC
Member) for review
51 Director, IAO (BAC Member) reviews the
NTP
NTP countersigned
by
Property/Supply
Officer and Chief,
ADMIN (BAC
Member)
30 mins. Director, IAO
(BAC
Member)
NTP countersigned
by
Property/Supply
Officer, Chief,
ADMIN and
Director, IAO
If corrections/revisions
are made by the
Director, IAO, ADMIN
(BAC Member), the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
Director, SPMS (BAC
Member) for review
52 Director, SPMS (BAC Member) reviews the NTP countersigned
by the
30 mins. Director,
SPMS (BAC
NTP countersigned
by the
If corrections/revisions
are made by the
163
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
NTP Property/Supply
Officer Chief,
ADMIN and
Director IAO (BAC
Members)
Member) Property/Supply
Officer Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
Director, SPMS (BAC
Member), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
Director, PES for
review
53 Director, PES reviews the NTP NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
30 mins. Director, PES NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
If corrections/revisions
are made by the
Director, PES, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
DED-Operations (BAC
Co-Chairman) for
review
54 DED-Operations (BAC Co-Chairman) reviews NTP countersigned
by the
30 mins. DED-
Operations
NTP countersigned
by the
If corrections/revisions
are made by the DED-
164
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the NTP Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
(BAC Co-
Chairman)
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
Operations (BAC Co-
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
DED-Administration
(BAC Chairman) for
review
55 DED-Administration (BAC Chairman) reviews
the NTP
NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
30 mins. DED-
Administratio
n (BAC Co-
Chairman)
NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
Administration
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
Executive Director for
review and approval
165
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
56 Executive Director reviews and approves
the NTP
NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
Administration
30 mins. Executive
Director
NTP countersigned
by the
Property/Supply
Officer Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations,
DED-
Administration
and signed
approved by the
Executive Director
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
41, otherwise the NTP
is forwarded to the
Property/Supply
Officer for the
distribution to the
winning supplier for
the delivery of goods
under contract
For the receipt/inspection and acceptance/issuance and inventory of delivered goods please refer to STEPS IN RECEIVING DELIVERED OFFICE SUPPLIES, MATERIALS AND EQUIPMENT PURCHASED FROM THE PROCUREMENT SERVICE (PS) and STEPS FOR ISSUANCE OF PROPERTY ACKNOWLEDGEMENT RECEIPT AND INVENTORY CUSTODIAN SLIP
Preparation of P.O.-repeat Steps 7 to 12 FOR SMALL VALUE PROCUREMENT (Tangible assets and equipment that requires immediate purchase goods less than Php100,000.00)
Preparation of D.V. please refer to STEPS 7 to 12 FOR THE PROCUREMENT OF COMMON USE OFFICE SUPPLIES, MATERIALS AND EQUIPMENT AT THE PROCUREMENT SERVICE USING THE AGENCY PROCUREMENT REQUEST (APR)
166
2.2.2 National Shopping: (Tangible assets and equipment that requires immediate purchase goods more than Php100,000.00 but less than Php 500,000.00)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. C.O. Property/Supply Officer reviews
procurement plan where tangible assets
and/or equipment are not available at the
PS wherein total amount is more than
Php100,000 but less than Php500,000
Procurement Plan 45 mins. Property/Sup
ply Officer
Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer
C.O. Property/Supply
Officer forwards DPS
to Chief, ADMIN for
review
2. Chief, ADMIN reviews DPS Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer
20 mins. Chief, ADMIN Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer and signed
noted by the
Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the
Director, IAO for
review
3. Director, IAO reviews DPS Detailed
Procurement
Schedule (DPS)
20 mins. Director, IAO Detailed
Procurement
Schedule (DPS)
If corrections/revisions
are made by the
Director , IAO, the
167
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
signed prepared
by the
Property/Supply
Officer and signed
noted by the
Chief, ADMIN
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN and
countersigned by
Director, IAO
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the DED-
Administration for
review
4. DED-Administration reviews DPS Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN and
countersigned by
Director, IAO
15 mins. DED-
Administratio
n
Detailed
Procurement
Schedule (DPS)
signed prepared
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO and
DED-
Administration
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded to the OED
for review and
approval
5. Executive Director reviews and approves
DPS
Detailed
Procurement
Schedule (DPS)
signed prepared
15 mins. Executive
Director
Detailed
Procurement
Schedule (DPS)
signed prepared
If corrections/revisions
are made by the
Executive Director, the
same is returned to
168
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO and
DED-
Administration
by the
Property/Supply
Officer, signed
noted by the
Chief, ADMIN
countersigned by
Director, IAO,
DED-
Administration
and signed
approved by the
Executive Director
the Property/Supply
Officer for
editing/finalization,
then proceed to step
1, otherwise the DPS is
forwarded back to the
Property/Supply
Officer for the
preparation of the
Request for Quotation
(RFQ)
6. C.O. Property/Supply Officer prepares RFQ RFQ 30 mins. Property/Sup
ply Officer
RFQ countersigned
by the
Property/Supply
Officer
RFQ is forwarded to
Chief, ADMIN for
review
7. Chief, ADMIN reviews RFQ RFQ countersigned
by the
Property/Supply
Officer
20 mins. Property/Sup
ply Officer
RFQ countersigned
by the
Property/Supply
Officer and Chief,
ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the RFQ is
forwarded to the
169
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office of the Director,
Internal
Administration (IAO)
for review
8. Director, IAO reviews RFQ RFQ countersigned
by the
Property/Supply
Officer and Chief,
ADMIN
20 mins. Director, IAO RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO
If corrections/revisions
are made by the
Director, IAO the same
is returned to the
Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the RFQ is
forwarded to the DED-
Administration for
review
9. DED-Administration reviews RFQ RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO
20 mins. DED-
Administratio
n
RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Administration
If corrections/revisions
are made by the DED-
Administration, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the RFQ is
forwarded to the OED
170
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
for review
10. Executive Director reviews RFQ RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and DED-
Administration
15 mins. Executive
Director
RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, DED-
Administration
and signed
approved by the
Executive Director
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Property/Supply
Officer for
editing/finalization,
then proceed to step
6, otherwise the RFQ is
forwarded to back to
the Property/Supply
Officer for posting at
the Phil-GEPS website
and other conspicuous
places
11. C.O. Property/Supply registers RFQ to
the Phil-GEPS website
RFQ countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, DED-
Administration
and signed by the
Executive Director
1 working
day after
registration
Property/Sup
ply Officer
Approved RFQ
posted at Phil-
GEPS Website and
BLGF Website
C.O. Property/Supply
Officer retrieves the
RFQ for opening
171
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12. C.O. BAC Secretariat, BAC Members,
Property/Supply Officer convenes for the
opening of RFQ
Accomplished/Seal
ed or Opened RFQ
2 hours BAC
Secretariat/P
roperty/Supp
ly Officer
RFQ presented
and tabulated
C.O. BAC Secretariat
prepares minutes of
the opening and
forwards the RFQ to
the Technical Working
Group (TWG)
13. C.O. TWG evaluates the RFQ RFQ presented
and tabulated
Five working
days
TWG Bid Evaluation
Report (BER)
signed by the TWG
BER is forwarded to
the Chief, ADMIN (BAC
Member) for review
14. Chief, ADMIN (BAC Member) reviews the
BER
BER signed by the
TWG
30 mins. Chief, ADMIN
(BAC
Member)
BER signed by the
TWG and Chief,
ADMIN (BAC
Member)
If corrections/revisions
are made by the Chief,
ADMIN (BAC
Member), the same is
returned to the TWG
for editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
Director, IAO (BAC
Member) for review
15. Director, IAO (BAC Member) reviews the
BER
BER signed by the
TWG and Chief,
ADMIN (BAC
Member)
30 mins. Director, IAO
(BAC
Member)
BER signed by the
TWG, Chief,
ADMIN and
Director IAO (BAC
If corrections/revisions
are made by the
Director, IAO, ADMIN
(BAC Member), the
same is returned to
172
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Members) the TWG for
editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
Director, SPMS (BAC
Member) for review
16. Director, SPMS (BAC Member) reviews the
BER
BER signed by the
TWG, Chief,
ADMIN and
Director IAO (BAC
Members)
30 mins. Director,
SPMS (BAC
Member)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
If corrections/revisions
are made by the
Director, SPMS (BAC
Member), the same is
returned to the TWG
for editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
Director, PES for
review
17 Director, PES reviews the BER BER signed by the
TWG, Chief,
ADMIN, Director,
IAO and Director,
SPMS (BAC
Members)
30 mins. Director, PES BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
If corrections/revisions
are made by the
Director, PES, the
same is returned to
the TWG for
editing/finalization,
then proceed to step
13, otherwise the BER
173
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
is forwarded to the
DED-Operations (BAC
Co-Chairman) for
review
18. DED-Operations (BAC Co-Chairman) reviews
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members) and
Director, PES
30 mins. DED-
Operations
(BAC Co-
Chairman)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
If corrections/revisions
are made by the DED-
Operations (BAC Co-
Chairman), the same is
returned to the TWG
for editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
DED-Administration
(BAC Chairman) for
review
19 DED-Administration (BAC Chairman) reviews
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES and
DED-Operations
30 mins. DED-
Administration
(BAC Co-
Chairman)
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
If corrections/revisions
are made by the DED-
Administration (BAC
Chairman), the same is
returned to the TWG
for editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
Executive Director for
174
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Administration review and approval
20 Executive Director reviews and approves
the BER
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations
and DED-
Administration
30 mins. Executive
Director
BER signed by the
TWG, Chief,
ADMIN, Director,
IAO, Director,
SPMS (BAC
Members),
Director, PES,
DED-Operations,
DED-
Administration
and approved by
the Executive
Director
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the TWG for
editing/finalization,
then proceed to step
13, otherwise the BER
is forwarded to the
Property/Supply
Officer for the
preparation of P.O.
Preparation of P.O.-repeat Steps 7 to 12 FOR SMALL VALUE PROCUREMENT (Tangible assets and equipment that requires immediate purchase goods less than Php100,000.00)
Preparation of D.V. please refer to STEPS 7 to 12 FOR THE PROCUREMENT OF COMMON USE OFFICE SUPPLIES, MATERIALS AND EQUIPMENT AT THE PROCUREMENT SERVICE USING THE AGENCY PROCUREMENT REQUEST (APR)
End of Process
175
2.2.3 Emergency Purchase (Small Value Procurement) (Tangible assets and equipment that requires immediate purchase goods less than Php100,000.00) Procedures for the conduct of shopping and small value procurement by the BLGF are in accordance with R-IRR-R.A. 9184 and Government Policy Procurement Board (GPPB) Guidelines for Shopping and Small Value Procurement. Shopping [Section 52.1. (a), Annex H]-IRR R.A. 9184. When there is an unforeseen contingency requiring immediate purchase, the amount shall not exceed to Php 100,000.00 and Php 500,000.00
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
1. C.O. Property/Supply Officer
reviews procurement plan
where tangible assets
and/or equipment are not
available at the PS wherein
total amount is less than
Php 100,000.00
Procurement Plan 45 mins. Property/Supply
Officer
Quotation Form
signed by
Property/Supply
Officer
C.O. Property/Supply
Officer prepares to
distribute quotation form
2. C.O. Property/Supply
Officer distributes
quotation form to
reputed supplier
Quotation Form
signed by
Property/Supply
Officer
1 hour Supplier Quotation Form
signed by
Property/Supply
Officer accomplished
and countersigned by
the supplier
C.O. Property/Supply
retrieves accomplished
quotation forms
3. C.O. Property/Supply
Officers prepares abstract of
canvass
Quotation Form
signed by
Property/Supply
Officer accomplished
and countersigned
30 mins. Property/Supply
Officer
Abstract of Canvass
signed prepared by
the Property/Supply
Officer
Abstract of Canvass is
forwarded to Chief,
ADMIN for review
176
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
by the supplier
4. Chief, ADMIN reviews
abstract of canvass
Abstract of Canvass
signed prepared by
the Property/Supply
Officer
20 mins. Property/Supply
Officer
Abstract of Canvass
signed prepared by
the Property/Supply
Officer and
countersigned by the
Chief, ADMIN
If corrections/revisions
are made by the Chief,
ADMIN, the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 3,
otherwise the Abstract of
Canvass is forwarded to
the Office of the Director,
Internal Administration
(IAO) for review
5. Director, IAO reviews
abstract of canvass
Abstract of Canvass
signed prepared by
the Property/Supply
Officer,
countersigned by the
Chief, ADMIN
20 mins. Director, IAO Abstract of Canvass
signed prepared by
the Property/Supply
Officer, countersigned
by the Chief, ADMIN
and signed
recommended by the
Director, IAO
If corrections/revisions
are made by the Director,
IAO the same is returned
to the Property/Supply
Officer for
editing/finalization, then
proceed to step 3,
otherwise the Abstract of
Canvass is forwarded to
the Director, SPMS for
review
177
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
6. Director, SPMS reviews
Abstract of Canvass
Abstract of Canvass
signed prepared by
the Property/Supply
Officer,
countersigned by the
Chief, ADMIN and
signed
recommended by
the Director, IAO
20 mins. Director, SPMS Abstract of Canvass
signed prepared by
the Property/Supply
Officer, countersigned
by the Chief, ADMIN,
signed recommended
by the Director, IAO
and counter signed by
the Director, SPMS
If corrections/revisions
are made by the Director,
SPMS the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 3,
otherwise the Abstract of
Canvass is forwarded to
the DED-Operations for
review
7. DED-Operations reviews
Abstract of Canvass
Abstract of Canvass
signed prepared by
the Property/Supply
Officer,
countersigned by the
Chief, ADMIN, signed
recommended by
the Director, IAO and
counter signed by
the Director, SPMS
20 mins. DED-Operations Abstract of Canvass
signed prepared by
the Property/Supply
Officer, countersigned
by the Chief, ADMIN,
signed recommended
by the Director, IAO
and counter signed by
the Director, SPMS
and DED-Operations
If corrections/revisions
are made by the DED-
Operations the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 3,
otherwise the Abstract of
Canvass is forwarded to
the DED-
Administration/Chairman,
Bids and Awards
Committee for review and
approval
178
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
6. DED-
Administration/Chairman,
Bids and Awards Committee
reviews abstract of canvass
Abstract of Canvass
signed prepared by
the Property/Supply
Officer,
countersigned by the
Chief, ADMIN, signed
recommended by
the Director, IAO and
counter signed by
the Director, SPMS
and DED-Operations
20 mins. DED-
Administration
Abstract of Canvass
signed prepared by
the Property/Supply
Officer, countersigned
by the Chief, ADMIN,
counter signed by the
Director, SPMS DED-
Operations, signed
recommended by the
Director, IAO and
approved by the DED-
Administration
(Chairman, Bids and
Awards Committee)
If corrections/revisions
are made by the DED-
Administration/Chairman,
Bids and Awards
Committee, the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 3,
otherwise the Abstract of
Canvass is forwarded to
back to the Property
Section for the
preparation of Purchase
Order (P.O.)
7. C.O. Property/Supply Officer
prepares P.O.
Abstract of Canvass
signed prepared by
the Property/Supply
Officer,
countersigned by the
Chief, ADMIN, signed
recommended by
the Director, IAO and
counter signed by
the BAC Members
20 mins. Property/Supply
Officer
P.O. countersigned by
the Property/Supply
Officer
P.O. together with the
approved Abstract of
Canvass is forwarded to
the Chief, ADMIN for
review
179
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
8. Chief, ADMIN reviews P.O. P.O. countersigned
by the
Property/Supply
Officer
15 mins. Chief, ADMIN P.O. countersigned by
the Property/Supply
Officer and Chief,
ADMIN
If corrections/revisions
are made by the Chief,
ADMIN the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 7,
otherwise the P.O. is
forwarded to the Office of
the IAO Director for
review
9. Director, IAO reviews P.O. P.O. countersigned
by the
Property/Supply
Officer and Chief,
ADMIN
15 mins. Director, IAO P.O. countersigned by
the Property/Supply
Officer, Chief, ADMIN
and Director, IAO
If corrections/revisions
are made by the Director,
IAO the same is returned
to the Property/Supply
Officer for
editing/finalization, then
proceed to step 7,
otherwise the P.O. is
forwarded to the DED-
Operations for review
10. Director, SPMS reviews P.O. P.O. countersigned
by the
Property/Supply
Officer, Chief,
15 mins. Director, SPMS P.O. countersigned by
the Property/Supply
Officer, Chief, ADMIN,
Director, IAO and
If corrections/revisions
are made by the Director,
SPMS the same is
returned to the
180
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
ADMIN and Director,
IAO
Director, SPMS Property/Supply Officer
for editing/finalization,
then proceed to step 7,
otherwise the P.O. is
forwarded to the DED-
Operations for review
11. DED-Operations reviews
P.O.
P.O. countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO and Director,
SPMS
15 mins. DED-Operations P.O. countersigned by
the Property/Supply
Officer, Chief, ADMIN,
Director, IAO,
Director, SPMS and
DED-Operations
If corrections/revisions
are made by the DED-
Operations the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 7,
otherwise the P.O. is
forwarded to the DED-
Administration for review
12. DED-Administration reviews
P.O.
P.O. countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director, SPMS
and DED-Operations
15 mins. DED-
Administration
P.O. countersigned by
the Property/Supply
Officer, Chief, ADMIN,
Director, IAO,
Director, SPMS, DED-
Operations and DED-
Administration
If corrections/revisions
are made by the DED-
Administration the same
is returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 7,
otherwise the P.O. is
forwarded to the OED for
181
STEPS PROCESS INPUT
REQUIREMENT
PROCESSING
TIME
RESPONSIBLE
PERSON
OUTPUT/DECISION
POINT
REMARKS
review and approval
13. Executive Director reviews
P.O.
P.O. countersigned
by the
Property/Supply
Officer, Chief,
ADMIN, Director,
IAO, Director, SPMS,
DED-Operations and
DED-Administration
15 mins. Executive
Director
P.O. countersigned by
the Property/Supply
Officer, Chief, ADMIN,
Director, IAO,
Director, SPMS, DED-
Operations, DED-
Administration and
approved by the
Executive Director
If corrections/revisions
are made by the Executive
Director, the same is
returned to the
Property/Supply Officer
for editing/finalization,
then proceed to step 7,
otherwise the P.O. is
forwarded to the Property
Section for the
preparation of DV
Preparation of D.V. please refer to STEPS 7 to 12 FOR THE PROCUREMENT OF COMMON USE OFFICE SUPPLIES, MATERIALS AND EQUIPMENT AT THE
PROCUREMENT SERVICE USING THE AGENCY PROCUREMENT REQUEST (APR)
182
2.3 Actual procurement of common-use office supplies, materials and equipment at the Procurement Service
The bulk of common use office supplies, materials and at times equipment to be stocked shall be procured from the Procurement Service (PS). The PS has an official price list of common-use office supplies, materials and equipment at a given time available off-shelf that can be downloaded on-line at the Phil-GEPS website. The procurement of “on-stock” items shall be done on a quarterly basis. The Property/Supply Officer shall be responsible in assigning the control number of the APR. The Property/Supply officer shall accomplish the APR stating the date, the date and number of the price list or the viewed date if the price list was taken at the Phil-GEPS website (if applicable) and the corresponding unit prices of items requirement. All items to be reflected in the APR should be in accordance with the approved procurement plan. The APR shall be prepared in seven copies per P.S. requirement NOTE: The PS has a new on-line process for the procurement of common-use office supplies, materials and equipment unfortunately, the BLGF is not included in their pilot government agency. As such the BLGF still uses the manual procedure in procuring such items.
STEPS PROCESS INPUT REQUIREMENT PROCESSING TIME
RESPONSIBLE PERSON
OUTPUT/DECISION POINT
REMARKS
1. C.O.-Property/Supply Officer
prepares APR
Procurement Plan 45 mins. Property/Supply
Officer
Agency Procurement
Request (APR)signed
by Property/Supply
Officer
APR is forwarded to Chief,
ADMIN for review
2. Chief, ADMIN Reviews APR Agency Procurement
Request (APR)signed
by Property/Supply
Officer
20 mins. Chief, ADMIN Agency Procurement
Request (APR)signed
by Property/Supply
Officer
countersigned by
Chief, ADMIN
If corrections/revisions are
made by the Chief, ADMIN
the same is returned to the
Property Section for
editing/finalization, then
proceed to step 1, otherwise
the APR is forwarded to the
Director, IAO for review
3. Director, IAO reviews APR Agency Procurement
Request (APR)signed
15 mins. Director, IAO Agency Procurement
Request (APR)signed
If corrections/revisions are
made by the Director, IAO
183
by Property/Supply
Officer countersigned
by Chief, ADMIN
by Property/Supply
Officer
countersigned by
Chief, ADMIN and
Director, IAO
the same is returned to the
Property Section for
editing/finalization, then
proceed to step 1, otherwise
the APR is forwarded to the
DED-Administration for
review
4. DED-Administration reviews
APR
Agency Procurement
Request (APR)signed
by Property/Supply
Officer countersigned
by Chief, ADMIN and
Director, IAO
15 mims. DED-
Administration
Agency Procurement
Request (APR)signed
by Property/Supply
Officer
countersigned by
Chief, ADMIN,
Director, IAO and
DED-Administration
If corrections/revisions are
made by the DED-
Administration, the same is
returned to the Property
Section for
editing/finalization, then
proceed to step 1, otherwise
the APR is forwarded to the
Executive Director for
approval
5. Executive Director reviews
and approves APR
Agency Procurement
Request (APR)signed
by Property/Supply
Officer countersigned
by Chief, ADMIN,
Director, IAO and
DED-Administration
10 mins. Executive
Director
Agency Procurement
Request (APR)signed
by Property/Supply
Officer
countersigned by
Chief, ADMIN,
Director, IAO, DED-
Administration and
approved by the
Executive Director
If corrections/revisions are
made by the Executive
Director, the same is
returned to the Property
Section for
editing/finalization, then
proceed to step 1, otherwise
the APR is forwarded to the
Accountant, Financial
management Division (FMD)
184
for review and certification
of availability of funds
6. C.O.-Chief, Accountant
reviews APR
Agency Procurement
Request (APR)signed
by Property/Supply
Officer countersigned
by Chief, ADMIN,
Director, IAO, DED-
Administration and
approved by the
Executive Director
30 mins. Chief,
Accountant,
FMD
Agency Procurement
Request (APR)signed
by Property/Supply
Officer
countersigned by
Chief, ADMIN,
Director, IAO, DED-
Administration,
approved by the
Executive Director
and certified and
signed by the Chief
Accountant as to
funds availability
If corrections/revisions are
made by the Chief,
Accountant, the same is
returned to the Property
Section for
editing/finalization, then
proceed to step 1, otherwise
the APR is returned back to
the Property Section for the
preparation of Disbursement
Voucher (DV)
7. C.O.-Property/Supply Officer
prepares DV
DV 15 mins. Property/Supply
Officer
Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer together with
the approved APR
DV together with the
approved APR is forwarded
to Chief, ADMIN for review
8. Chief, ADMIN reviews DV Accomplished DV
including the total
15 mins. Chief, ADMIN Accomplished DV
including the total
If corrections/revisions are
made by the Chief, ADMIN,
185
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer together with
the approved APR
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer and Chief,
ADMIN together
with the approved
APR
the same is returned to the
Property Section for
editing/finalization, then
proceed to step 7, otherwise
the DV together with the
approved APR is forwarded
to the Director, IAO for
review
9. Director, IAO reviews DV Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer and Chief,
ADMIN together with
the approved APR
10 mins. Director, IAO Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer , Chief,
ADMIN and Director,
IAO together with
the approved APR
If corrections/revisions are
made by the Director, IAO,
the same is returned to the
Property Section for
editing/finalization, then
proceed to step 7, otherwise
the DV together with the
approved APR is forwarded
to the DED-Administration
for review
10. DED-Administration reviews
DV
Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
10 mins. DED-
Administration
Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
If corrections/revisions are
made by the DED-
Administration, the same is
returned to the Property
Section for
editing/finalization, then
proceed to step 7, otherwise
186
Officer , Chief, ADMIN
and Director, IAO
together with the
approved APR
Officer , Chief,
ADMIN, Director,
IAO and DED-
Administration
together with the
approved APR
the DV together with the
approved APR is forwarded
to the OED for review
11. Executive Director reviews
and approves DV
Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer , Chief,
ADMIN, Director, IAO
and DED-
Administration
together with the
approved APR
10 mins. Executive
Director
Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
Property/Supply
Officer , Chief,
ADMIN, Director,
IAO, DED-
Administration and
signed by the
Executive Director
together with the
approved APR
If corrections/revisions are
made by the Executive
Director, the same is
returned to the Property
Section for
editing/finalization, then
proceed to step 7, otherwise
the DV together with the
approved APR is forwarded
to Chief, Accountant, FMD
for review
12. Chief Accountant reviews DV Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
15 mins. Chief Accountant Accomplished DV
including the total
actual cost of items
reflected in the APR
to be purchased
countersigned by the
If corrections/revisions are
made by Chief Accountant,
the same is returned to the
Property Section for
editing/finalization, then
proceed to step 7, otherwise
187
Property/Supply
Officer , Chief,
ADMIN, Director, IAO,
DED-Administration
and signed by the
Executive Director
together with the
approved APR
Property/Supply
Officer , Chief,
ADMIN, Director,
IAO, DED-
Administration
signed by the
Executive Director
and Chief
Accountant with the
approved APR
the DV together with the
approved APR is forwarded
to Chief, Cashier, CASH for
review
13. C.O.-Chief, Cashier prepares
checks
Please refer to the M.O.P. for the preparation of cheques
14. Submission of approved APR
to PS with corresponding
payment
APR/Checks/DV 30 mins. Property/Supply
Officer
Official
Receipt/Procuremen
t Service (PS)
The APR together with the
DV and the corresponding
check/s will be
submitted/hand carried by
the Property/Supply Officer
or their authorized
representative to the PS for
payment and delivery of
ordered items.
End of Process
188
2.4 Inspection and Acceptance of Delivered Items from the PS (also, applicable to delivered items purchased from outside suppliers) From the PS, the items delivered shall be accepted by the Property/Supply Officer. The Property/Supply Officer shall make an initial physical count of the delivered items, noting its completeness or partiality. The Property/Supply Officer should also make it a point to see that the items delivered are in good condition and free of defects. The Property/Supply Officer shall prepare the Inspection and Acceptance Report indicating all the items delivered, and the quantity. For partial delivery, the same procedure shall apply, however, the Property/Supply Officer needed to note the Reply Action Document (RAD) number attached to the delivery receipt from PS.
STEPS PROCESS INPUT REQUIREMENT
PROCESSING TIME
RESPONSIBLE PERSON
OUTPUT/DECISION POINT
REMARKS
1. C.O. Property/Supply
Officer receives the
items from P.S. and/or
winning supplier
Items/Delivery
receipt and/or
Invoice Receipt
20 mins. Property/Supply
officer
Delivery Receipt
signed by
Property/Supply
Officer
Property/Supply Officer will
accepts delivered items
and retains the original
copy of D.R. and/or Invoice
Receipt
2. C.O. Property/Supply
Officer prepares
Inspection and
Acceptance Report
Delivery Receipt
and/or Invoice
Receipt/ Delivered
Items accepted
30 mins. Property/Supply
Officer
Inspection and
Acceptance Report
signed by the
Property/Supply
Officer
Inspection Report is
forwarded to the Property
Inspector for Inspection
together with the accepted
and signed D.R./Invoice
Receipt.
3. C.O. Property Inspector
inspects the delivered
items and reviews the
Inspection and
Acceptance Report
Inspection and
Acceptance Report
signed by the
Property/Supply
Officer
20 mins. Property
Inspector
Inspection and
Acceptance Report
signed by the
Property/Supply
Officer and Property
Inspector
If items delivered are found
to be non- compliant to the
requirements of the BLGF,
the Property Inspector
together with the
Property/Supply Officer
189
STEPS PROCESS INPUT REQUIREMENT
PROCESSING TIME
RESPONSIBLE PERSON
OUTPUT/DECISION POINT
REMARKS
shall need to call the
attention of the supplier,
ask an explanation for the
deviation and demand for
the required items
otherwise, the same,
together with the D.R.,
Invoice and Inspection and
Acceptance Report will be
forwarded to the FMD to
be taken up into the books
of accounts.
End Of Transaction
190
Operating Procedures for Bureau Administration Internal Administration Office
Administrative Division
Record Section
191
SERVICE : Internal Administration Office DIVISION : Administrative Division
UNIT NAME : Record Section BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Act as official repository of all records/documents and other official papers (whether active, inactive type of correspondence) of the Bureau, Regional Offices, Local Treasury Offices and other Offices
1.1 Inbound: Receive, classify, assigns and distribute all correspondence and Communication of the Bureau.
2.1 Outbound: Record and release official action papers of the Bureau
2.2 Establish, manage and improve the filing , retrieval and archiving system of the Bureau
2.3 Manage communication protocols, guidelines and conflicts arising thereof
2.4 Establish, operate and maintain application software on document tracking
2.5 Establish, implement and improve information access policies, procedures and care of documents
2.6 Issue certified true copies of records or documents upon official request with the approval of proper authorities
192
3. Produce before the investigating legal bodies and upon official request; legal documents, papers, records and files in compliance with subpoena duces tecum and other legal actions issued by proper authority
4. Disposal of valueless records
4.1 Prepare inventory and appraisal of records 4.2 Prepare Records Disposition Schedule (RDS) for approval
of National Archives of the Philippines (NAP) 4.3 Dispose Valueless Records
193
SPECIFIC PROCEDURES 1. Inbound: Receive, classify, assigns and distribute all correspondence and Communication of the Bureau.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-Records Section receives and classifies
the incoming documents
Inbound
mails/corresponde
nce, queries and
reports
5 minutes Admin Aide
VI
Pertinent details
such as name and
address of the
sender, date of the
letter, time and
date of receipt,
name and address
of the receiver
(addressee),
signature and
subject matter of
the letter
examined
Documents
classified and
acknowledged by
Receiving Clerk
2 CO-Records Section records documents
received.
Pertinent details
such as name and
address of the
sender, date of the
5 minutes Admin Aide
VI
Date, time and
pertinent details
of documents
recorded in the
194
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
letter, time and
date of receipt,
name and address
of the receiver
(addressee),
signature and
subject matter of
the letter.
log-book of the
Records Section.
Internal control
number assigned
to the documents
3 CO-Records Section routes documents
and/or communication to concerned offices
of the Bureau (BLGF).
Documents with
internal control
numbers assigned
10 minutes Admin Aide
VI
Documents
received by
concerned offices
of BLGF. Receiving
remarks and
initials of
Receiving Officer/s
of concerned
office/s affixed on
logbook
For mis- routed documents
4 CO- Records Section receives and re-classify
misrouted documents (from Records
officers of different offices of BLGF)
Internal control
number and
pertinent details
of documents such
as name and
address of the
sender, date of the
5 minutes Admin Aide
VI (Records
Section)
Misrouted
documents
received and re-
classified
195
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
letter and subject
matter
5 CO –Records Section records and re- routes
documents to concerned BLGF offices .
Re – classified
documents
10 minutes Admin Aide
Vi
Date, time and
details of the
documents
recorded in the
logbook of the
Records Section.
End of Process
196
2.1 Outbound: Record and release official action papers of the Bureau
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-Records Section receives and classify
out-going documents.
Out-going
documents name
and address of the
sender, date,
name and address
of the addressee,
time, signature
and subject
matter.
5 minutes Records
Officer
Outbound
documents
classified
Documents referred
herein maybe in the
form of letters (mails),
memoranda, circulars
or other forms
2 CO-Records Section records outbound
documents
Classified
documents
5 minutes Records
Officer
Date, time and
details of classified
documents
recorded in the
logbook of the
Records Section.
Control number
on documents
assigned.
3 CO- Records Section segregate s Original
copy from Duplicate copy.
Classified
document/s
(Signed orig. copy/
duplicate copy
10 minutes
per
document
Records
Officer
Copies of
documents
segregated:
Original
197
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
with initials of
signatories and
complete
attachments)
copy of
the
document(
s) for
release
/Duplicate
copy for
file.
4 CO-Records Section classifies documents
according to urgency of the letter
Copy of the
documents,
Subject matter of
the documents
5 minutes Records
Officer
Urgent documents
classified
Urgent Documents
send thru fastest
means (delivered
within Metro Manila
and Courier outside
Metro Manila)
5 CO-Records Section releases documents
thru mail, delivery and pick-up
Envelops and other mailing materials
are prepared for documents sent thru
mail.
Original Copy of
Documents /
Classification of
urgency of the
letter (in priority
basis).
Within the
day
Records
Officer
Documents
released thru pick-
up and delivery
Receiving
remarks and
signature of
receiving/conc
erned person
affixed on
duplicate copy
Some documents for
Metro Manila Offices
are delivered .
Documents for pick-up
by representative of
addressee is required
to submit
authorization letter
Concerned person
/offices acknowledged
198
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
of the
document
Documents
released thru
mail; Receipt
of registry
secured
receipt of Picked-up
/delivered documents
by affixing signature
on the file copy.
End Of Transaction
199
2.2 Establish, manage and improve the filing, retrieval and archiving system of the Bureau
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-Records Sect CO –Records Section classifies and sorts
duplicate file copies.
Duplicate file
copies and
attachments.
10 minutes Records
Officer
File classification
code assigned
(marked in red ball
pen)
File copies sorted
wherein name of
the addressee(s)
and subject matter
are categorized
for proper file
classification in
preparation for
reference and
cross-referencing.
Forwards classified
documents for file
2 CO- Records Section prepares folders, labels
and reproduces file copies required in the
physical filing of documents.
Classified, marked
and sorted-out file
copies with
attachments (if
there’s any).
10 minutes Filing Clerk Folders, labels
prepared and
copies of
document/s
reproduced
In cross-referencing
method of filing, the
filing clerk reproduces
multiple sets of file
copies depending on
the number of
addressees stated in
200
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the document/s.
3 CO – Records Section compiles documents
in the labeled folder according to file
classification code
Labeled folders
,classified
documents
5 minutes Filing clerk Compiled file
copies
(documents)
stored in the
designated area of
filing.
4 CO-Records Section files document in
designated area.
Compiled
documents.
Within the
day
Filing Clerk Documents stored
in the designated
area of filing.
Usually located within
the Records Section.
5 CO-Records Section sets file break on the
filed /compiled documents
Documents stored
in the storage area
5 minutes
per
folder/compil
ation
Filing Clerk Documents stored
according to file
break in
designated area
File breaks are usually
set at the end of the
fiscal or calendar year
Documents are stored
periodically
Retrieval – Documents on file are retrieved and use as reference and Records Section adopts requisition and Charge-out Card procedure before issuing a file to borrower.
1 CO-Records Section receives and records
request for retrieval of files
Filled –up Request
form
File classification
code or subject
matter
2 minutes Records
Officer
Date, time and
details of request
recorded in the
logbook of the
Records Section
201
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
2 CO-Records Section approves request s for
retrieval of document s
File classification
code and subject
matter
2 minutes Records
Officer
Approved request
3 CO-Records Section verifies /checks
availability of records requested
Approved request
File classification
code and subject
matter
5 minutes Filing clerk Availability of
records verified
4 CO-Records Section retrieves documents. Approved request 10 minutes Filing Clerk Document/s
requested by
borrower
retrieved
5 CO-Records Section apply charge-out
card/Borrower’s Card.
Fill-up Borrower’s card
Borrower’s Card;
Documents
retrieved
2 minutes
per request
BLGF
personnel
who borrows
the
documents
Filled- up
Borrower’s Card
except column for
Date Returned
6 CO-Records Section records and releases
borrowed documents
Documents
retrieved
2 minutes Filing clerk Date, time and
details of
borrowed
documents
recorded and
released to
202
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
borrower
Return of Borrowed Documents
7 BLGF Employees return the borrowed
document(s) to Records Section
Borrowed
Documents
5 minutes BLGF
personnel
who
borrowed
the
document
Filing clerk
acknowledge
receipt of
Documents
8 Step 1 CO-Records Section fills – up date of return
column in the borrowers card
Borrowers card Filing Date of return on
Borrowers Card
filled-up
Return remarks
indicated on
logbook of
Records Section
9 CO-Records Section returns the retrieved
document(s) to respective storage area
Borrowed
document(s)
5 minutes Filing clerk Documents
retrieved returned
to respective
storage area
End of Process
203
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Archiving – All records with five years and above retention period are transfer from current storage area to BLGF Records Center or BLGF mini Archives before its disposal.
1 CO-Records Section assign a designated
place that serves as a Records Center ( mini
Archives) to house all non- current records
of the Bureau
Non-current
records ; proposed
place to house
non-current
records
1 week Records
Officer
BLGF Records
center designated
2 CO-Records Section conducts examination of
BLGF files( once year) to identify non –
current records that can be transferred to
BLGF Records Center (mini-Archives) in
accordance with BLGF Records Disposition
Schedule (RDS) and General Records
Disposition Schedule (GRDS)
Files in the storage
area
Records
Disposition
Schedule (RDS)
and General
Records
Disposition
Schedule (GRDS)
10 days Records
officer /Filing
Clerk
Valueless and non-
current records
identified
Non Current Records
with Permanent and 5
years or more
retention period are
recommended for
transfer to BLGF
Records Center
3 CO-Records Section prepares an inventory of
non- current Records to be transferred to
BLGF Records Center
Non –Current
records identified
3 days Records
Officer
Inventory list of
non- Current
Records
4 CO-Records Section transfers non- current Non -current
Records in the
1 month Filing Clerk Non Current
records
Non- current Records
in the BLGF Records
204
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
records to BLGF Records Center /Archives Storage area;
Inventory list of
non-current
records
transferred to
BLGF Records
center/ Archives
Center with
Permanent and 30
years or more
retention period shall
be transferred directly
to NAP Archives with
the authority of BLGF
Head
5 CO-Records Section prepares records
description and period covered of the
document before placing inside the carton
Kind of records ,
Subject matter
and year covered
2 minutes Records
Officer/Filing
Clerk
Records
Description and
period covered of
documents
prepared
6 CO-Records Section place non- current
records in a carton or any storage container
appropriate to store non-current records
Non -Current
records
transferred to
Records center
5 minutes
per
document
Filing Clerk Non-Current
Records in a
storage container
Files dealing with
single filing code and
particular subject are
kept together in a
carton
7 CO-Records Section labels the carton before
placing it on the shelves
Records
Description/
Period Covered
5 minutes Filing Clerk Carton containing
Non-Current
Records labeled
8 CO-Records section prepares finding aids
for easy retrieval of documents
Labeled Carton/s
containing Non-
5 minutes Filing Clerk Finding aids
205
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Index Card
Location Register
Current Records Index Card
Location
Register
for easy retrieval
of document
Retrieving documents in the BLGF Records Center/Archives - See process for retrieval of document
End of Process
206
2.6 Issue certified true copies of records or documents upon official request with the approval of proper authorities
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Submit letter to Records Section requesting
certified true copy of document to
Records Section
Letter request
with pertinent
details such as
name of
addressee,
signature of
sender, subject
matter and
purpose
2 minutes Concerned
person/client
s/stakeholde
rs
Letter request
submitted to
Records Section
Submit request to Records Section – See process for Inbound documents 2 CO- concerned division receives and records
letter request
Letter request 5 minutes Records
Officer of
concerned
Division
Date, time and
details of request
recorded in
logbook of
concerned division
3 CO- concerned division retrieve from CO -
Records Section the documents
requested for photocopying
Letter request 5 minutes Records
Officer of
Concerned
Offices
Documents
requested
photocopied
Retrieve documents – See process for Retrieval of files 4 CO- concerned Division records and forward
photocopied document to CO -Records
Section for stamping certified copy
Photocopied
document
5 minutes Records
Officer of
Concerned
Details of
photocopied
documents
207
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Offices recorded in the
logbook of
concerned offices
5 CO - Records Section receives the document
, stamp certified true copy and
sign the same
Photocopied
document
2 minutes
Per
document
Records
Officer of
Records
Section
Document
stamped certified
copy and signed
by Records Officer
of Records Section
6 S CO- Records Section records and returned
ccertified copy signed by Records Officer to
cconcerned offices for transmittal
Certified copy
signed by Records
Officer
2 minutes Records
officer
Details of
document
recorded in
logbook Receiving
remarks and
initials of
concerned
Receiving Officer
of concerned
offices affixed on
logbook
7 CO –Records Section receive from
concerned BLGF offices signed
letter transmitting the certified
documents to concerned person
/offices for release
Signed Transmittal
letter and certified
documents
5 minutes Records
Officer
Documents
released
208
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Receive from concerned offices signed letter transmitting the certified documents – See process for outbound documents Step 8 - - File the duplicate copy – See process for filing of documents – Step 1 -6
End of Process
209
4.1 Prepare inventory and appraisal of records
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-Records Section facilitates the creation of Records Management Improvement Committee ( RMIC) thru an office order
Name of
personnel
recommended by
IAO Director
10 minutes Records
Officer / IAO
Director
Request for Office
Order
For the preparation of Office Order creating the RMIC – See process in the preparation of Office Order under Administrative Division
2 CO-Records Section prepares and finalizes
letter to National Archives of the
Philippines(NAP) requesting to assign a
Records Management Analyst (RMA) to
BLGF who will brief Records Officers of all
divisions regarding Records Disposition and
assist in the preparation of NAP FORMs and
Memorandum for Executive Director
(covering Memorandum-for signature of IAO
Director)requesting her approval
Date and place of
Briefing
30 minutes Records
Officer
Letter to National
Archives of the
Philippines(NAP)
and Memorandum
to Executive
Director
Date of briefing must
be 15 days later from
the date of letter
request
3 CO – Records Section records and transmits
the letter and memorandum to
Administrative (Admin) Division
Letter to National
Archives of the
Philippines and
Memorandum for
Executive Director
5 minutes Records
Officer
Date, time and
details of Letter
and Memorandum
recorded in the
logbook of the
Records Section
4 CO-Admin Division receives and records Letter to National
Archives of the
5 minutes Admin Clerk,
Admin
Date, time and
details of Letter to
Letter and
Memorandum are
210
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
letter and memorandum Philippines and
Memorandum for
the Executive
Director
Division National Archives
of the Philippines
and Memorandum
recorded in
logbook of Admin
Division
forwarded to the
Division Chief, Admin
Division
5 CO- Admin Division Chief reviews letter and
memorandum
Letter to National
Archives of the
Philippines and
Memorandum for
the Executive
Director
1 hour Division
Chief, Admin
Letter to National
Archives of the
Philippines and
Memorandum
reviewed and
countersigned by
the Division Chief,
Admin Division
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to step
3, otherwise forward
documents to
Director, IAO
6 Director, IAO reviews letter and
memorandum
Letter to National
Archives of the
Philippines and
Memorandum for
the Executive
Director
countersigned by
the Division Chief,
Admin
1 hour IAO Director Letter to National
Archives of the
Philippines
reviewed and
countersigned by
IAO Director and
Memorandum for
Executive Director
signed
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to Step
3, otherwise the
documents are
forwarded to the
211
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Deputy Executive
Director (DED)-
Administration
7 Deputy Executive Director (DED) –
Administration reviews letter
Letter to National
Archives of the
Philippines
countersigned by
the Division Chief ,
Admin Division,
IAO Director and
signed
Memorandum
1 hour DED -
Administratio
n
Letter to National
Archives of the
Philippines
reviewed and
countersigned by
the DED-
Administration
I f
corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to step
3, otherwise forward
documents to
Executive Director
8 CO-Office of the Executive Director
proofreads letter
Letter to National
Archives of the
Philippines
countersigned by
the Division Chief
, Admin Division,
IAO Director and
DED-
Administration
and signed
Memorandum
30 minutes Executive
Assistant
(OED)
Letter to National
Archives of the
Philippines
proofread
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to Step
3, otherwise the
documents are
forwarded to the
Executive Director
212
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Executive Director reviews and
approves/signs letter to National Archives
of the Philippines
Letter to National
Archives of the
Philippines
countersigned by
the Division Chief ,
Admin Division,
IAO Director and
DED
Administration
and signed
Memorandum
1 hour Executive
Director
Approved/signed
Letter to National
Archives of the
Philippines
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to step
3.
Signed letter for release– See process for Outbound Documents
Filing of Duplicate copy – See process for Filing of Documents
Upon Receipt of Letter to NAP and an RMA has been assigned to the Bureau, the following shall be undertaken :
10 CO - Records Section facilitate preparation
of office order requesting all Records
Officers of all Divisions to attend briefing on
Records Disposition
Name of Records
Officers of all
Divisions ,Date,
time and place
30 minutes Records
Officer
Office Order Office Order will be
distributed to all
Divisions /Offices by
Admin Division
For the preparation of Office Order requesting all Records Officer to attend briefing – See process in the preparation of Office Order under Administrative Division
11 Confer with the Records Management
Analyst of the National Archives of the
Philippines
NAP Form, Office
Order
1 day Records
Officer
Officers
/Custodian of
NAP Forms
distributed to all
Records Officers /
custodians of all
213
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
all Divisions divisions
12 Fill - up NAP Form 1
Records Series &
Description,
Period Covered,
Volume location
Time Value ,Utility
Value and
retention period
of Records
10 days All Records
Officers /
Custodians of
all Divisions
NAP Form 1 filled
–up and approved
/signed by Division
Chiefs
Records Management
Analyst of NAP will
confer to each division
to assist them in
accomplishing NAP
Form 1
13 Submit to Records Section accomplished
NAP Form 1 approved by Division Chief
Accomplished NAP
Form 1
approved/signed
by division Chief
10 days Records
Officers of all
Divisions
Accomplished NAP
Form 1 of all
Divisions
submitted to
Records Section
14 CO – Records Section receives and record
accomplished NAP Form 1
Accomplished NAP
Form 1 of all
Division
5 minutes Records
Officer
Records
Section
Date and details
recorded in
logbook of
Records section
15 CO -Records Section compile all
accomplished NAP Form I
Accomplished NAP
Form 1 received
5 minutes Records
Officer
Records
Section
Accomplished NAP
Form I compiled
16 CO – Records Section request Records Accomplished 30 minutes Records Records
214
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Management Analyst assigned to the
Bureau to sign the accomplished NAP Form
1
NAP Form I Officer Management
Analyst of National
Archives of the
Philippines
requested to sign
NAP Form 1
17 Records Management Analyst review s /
signs approved accomplished NAP Form 1
Accomplished NAP
Form I
1 hour Records
Management
Analyst
Nap Form 1
reviewed /signed
and approved by
Records
Management
Analyst
If corrections/revisions
are made on the
documents, the same
are returned to
Division concerned
thru Records Section
for editing/finalization,
then back to step 12
18 CO – Records Section receives from Records
Management Analyst signed NAP Form 1
Signed NAP Form
1
5 minutes Records
Officer
Signed NAP Form I
received by
Records Section
from Records
Management
Analyst of NAP
19 CO- Records Section photocopy NAP Form 1
and distributes to Records Management
Improvement Committee
NAP Form 1
approved by
Division Chief and
signed by Records
Management
1 day Records
Officer
NAP Form I
photocopied
Original copy retained
by Records Section for
safekeeping
215
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Analyst
20 CO - Records Management Committee
receives signed NAP Form I
Photocopied NAP
Form 1
5 minutes Records
Management
Improvement
Committee
Signed / Approved
NAP Form I
received by
Records
Management
Improvement
Committee
End of Process
216
4.2 Prepare Records Disposition Schedule (RDS) for approval of National Archives of the Philippines (NAP)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-Records Section accomplish /Filled -up
NAP Form 2 (Records Disposition Schedule
)for signature of RMIC Chairman
recommending approval to Executive
Director and for submission to National
Archives of the Philippines for approval
Item no.
Disposition
Authority /
Remarks and
Approved National
Archive of the
Philippines (NAP)
Form No. 1.
2 days Records
Officer
NAP Form 2 filled-
up
2 CO – Prepares and finalizes notice of
meeting of Records Improvement
Committee to be signed by Chairman with
attached NAP Form 2
Notice ,Date, Time
and Place
5 minutes Records
Officer
Notice of meeting The Director of IAO is
also the RMIC
Chairman
3 CO- Records Section records and transmit
notice of meeting to Administrative
(Admin) Division with attached NAP Form 2
Notice of meeting 5 minutes Records
Officer
Date and details of
notice of meeting
recorded in
logbook of the
Records Section.
4 CO- Admin Division receives and records
notice of meeting with attached NAP Form
2
Notice of meeting 5 minutes Admin Clerk,
Admin
Division
Date and details of
notice of meeting
recorded in
logbook of Admin
Notice of meeting is
forwarded to Division
Chief, Admin Division
217
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Division
5 CO – Admin Division reviews notice of
meeting with attached NAP Form 2
Notice of meeting 1 hour Division Chief
, Admin
Notice of meeting
reviewed and
countersigned by
the Division Chief,
Admin Division
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 3
otherwise forward
documents to Director
,IAO
6 Director , IAO reviews and signs notice of
meeting with attached NAP Form 2
Notice of meeting
countersigned by
the Division Chief,
Admin Division
30 minutes Director, IAO Notice of meeting
reviewed and
signed
7 CO- Office of IAO Director records and
transmit notice of meeting with attached
NAP Form 2 to Records Section
Signed Notice of
meeting
5 minutes Secretary of
IAO Director
Date and details of
meeting recorded
in logbook
8 CO- Records Section photocopy notice of
meeting and Filled up NAP Form 2 for
distribution to Records Management
Improvement Committee (RMIC )
Signed notice of
meeting and filled
-up NAP Form 2
30 minutes Records
Officer
Notice of meeting
and filled-up NAP
Form 2
photocopied for
218
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
distribution
Signed notice of meeting and filled up NAP Form 2 for distribution to Records Management Improvement Committee-See process for outbound documents
Filing of Duplicate copy – See process for Filing of Documents
9 Records Management Improvement
Committee convene and reviews Filled –
up NAP Form 2 and signs by RMIC Chairman
Filled – up NAP
Form 2
1 day RMIC BLGF Records
Disposition
Schedule (NAP
Form 2)reviewed /
signed by
Chairman of
Records
Management
Improvement
Committee
If corrections/revisions
are made on the NAP
Form 2, the same are
returned to Records
Division for
editing/finalization,
then back to RMIC
Chairman for signature
Upon signing of RMIC Chairman of NAP Form 2 the following steps shall be undertaken:
10 CO- Office of the IAO Director records and
transmit signed NAP Form 2 to Records
Section
Signed NAP Form
2
5 minutes Secretary of
IAO Director
-(RMIC
Chairman)
Date and details
recorded in
logbook of IAO
Director.
11 CO- Records Section receives and records
NAP Form 2 signed by Chairman of Records
Management Improvement Committee for
signature of Executive Director and for
transmittal to National Archives of the
NAP Form 2 signed
by RMIC Chairman
5 minutes Records
Officer
NAP Form 2
recorded in the
Records Section
logbook
219
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Philippines for approval
12 CO- Records Section prepares and finalizes
Memorandum for Executive
Director(covering letter for signature of
Director II-IAO) and Transmittal letter to
National Archives of the Philippines for
(signature of ED) transmitting the NAP
Form 2(for approval of ED).
NAP Form 2 signed
by RMIC Chairman
30 minutes Records
Officer
Memorandum and
Transmittal Letter
to National
Archives of the
Philippines and
NAP Form 2
13 CO- Records Section records and transmit
the memorandum, letter and NAP Form 2
to Administrative (Admin ) Division
Memorandum
transmittal letter
to National
Archives of the
Philippines and
NAP Form 2
5 minutes Records
Officer
Date,time and
details of
Memorandum
,transmittal letter
and NAP Form 2
recorded in
logbook of Admin
Division
Memorandum, letter
and NAP Form 2
forwarded to Division
Chief, Admin
14 CO- Admin Division Chief reviews
memorandum, letter and NAP Form 2
Memorandum
,Letter and NAP
Form 2
1 hour Admin Clerk,
Admin
Division
Memorandum ,
Transmittal letter
to National
Archives of the
Philippines and
NAP Form 2
reviewed and
countersigned by
Division Chief,
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 13
otherwise forward
documents to Director
220
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Admin Division ,IAO
15 Director ,IAO reviews memorandum ,
letter to National Archives of the
Philippines and NAP Form 2
Memorandum , l
letter to National
Archives of the
Philippines and
NAP Form 2
countersigned by
the Division Chief,
Admin
1 hour IAO Director Memorandum
signed ,transmittal
letter to National
Archives of the
Philippines and
NAP Form 2
reviewed and
countersigned by
IAO Director
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 13
otherwise forward
documents to the
Deputy Executive
Director (DED)-
Administration
16 Deputy Executive Director (DED) –
Administration reviews letter and NAP
Form 2
Letter to National
archives of the
Philippines and
NAP Form 2
countersigned by
Division Chief,
Admin Division,
IAO Director and
signed
Memorandum
1 hour DED -
Administratio
n
Transmittal letter
to National
Archives of the
Philippines and
NAP Form 2
reviewed and
countersigned by
DED-
Administration
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 13
otherwise forward
documents to the
Executive Director
17 CO- Office of the Executive Director Signed
Memorandum,
1 hour Executive
Assistant
Transmittal letter
and NAP Form 2
If corrections/revisions
are made on the
221
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
proofreads letter and NAP Form 2 transmittal letter
to National
Archives of the
Philippines and
NAP Form 2
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
(OED) proofread documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 13
otherwise forward
documents to the
Executive Director
18 Executive Director reviews and approves/
signs letter to National Archives of the
Philippines and NAP Form 2
Transmittal letter
to National
Archives of the
Philippines and
NAP Form 2
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Director
Signed transmittal
letter to National
Archives of the
Philippines and
approved NAP
Form 2
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 13
20 CO – Office of the Executive Director
records and transmit letter and NAP Form
2 to Records Section
Signed transmittal
letter to National
Archives of the
Philippines and
5 minutes Secretary of
Executive
Director
Date, time and
details of letter
recorded in
logbook of Office
222
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
approved NAP
Form 2
of Executive
Director
Signed letter for release to National Archives of the Philippines transmitting NAP Form 2 for approval - See process for Outbound Documents
Filing of Duplicate copy– See process for filing of documents End of Process
223
4.3 Dispose Valueless Records
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO – Records Section received from National
Archives of the Philippines approved NAP
Form 2
Approved NAP
Form 2
5 minutes Receiving
Clerk
Approved Nap
Form received
NAP Form 2 –returned
by National Archives of
the Philippines, if
approved for
implementation ,if
revision/ corrections
are made on the
documents, the same
are returned to BLGF
and back to Records
Section for
editing/finalization
then transmit again to
NAP
Received approved NAP Form 2 – See process for Inbound documents
Upon receipt of approved NAP Form 2 from National Archives of the Philippines the following steps shall be undertaken :
2 CO-Records Section prepares and finalizes
Memorandum to all Division Chiefs
requesting to fill up NAP Form 3 and submit
to Records Section together with the
valueless records listed thereat with
attached approved NAP Form 2 and NAP
Memorandum
,NAP Form 2 , NAP
Form 3 and NAP
GRDS
30 minutes Records
Officer
Memorandum for
Executive Director
Only records included
in the approved NAP
Form 2 and NAP
General Records
Disposition Schedule
(GRDS) shall be
224
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
GRDS as basis to determine their valueless
records for signature of Executive Director
included in the
Request for authority
to disposed of records.
Records not included
in the approved NAP
Form 2 shall be
submitted to NAP for
approval
3 CO- Records Section records and transmit
the memorandum with attached NAP Form
3 ,NAP Form 2 and GRDS to Administrative
(Admin ) Division
Memorandum 5 minutes Records
Officer
Date, time and
details of
Memorandum
recorded in
logbook of Admin
Division
Memorandum
forwarded to Division
Chief, Admin
4 CO- Admin Division Chief reviews
memorandum
Memorandum 1 hour Admin Clerk,
Admin
Division
Memorandum
reviewed and
countersigned by
Division Chief,
Admin Division
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 3
otherwise forward
documents to Director
,IAO
225
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 Director ,IAO reviews memorandum Memorandum
countersigned by
the Division Chief,
Admin
1 hour IAO Director Memorandum
reviewed and
countersigned by
IAO Director
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 3
otherwise forward
documents to the
Deputy Executive
Director (DED)-
Administration
6 Deputy Executive Director (DED) –
Administration reviews memorandum
Memorandum
countersigned by
Division Chief,
Admin Division,
IAO Director
1 hour DED -
Administratio
n
Memorandum
reviewed and
countersigned by
DED-
Administration
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 3
otherwise forward
documents to the
Executive Director
7 CO- Office of the Executive Director
proofreads letter
Memorandum
countersigned by
the Division Chief,
Admin, Admin
1 hour Executive
Assistant
(OED)
Memorandum
proofread
If corrections/revisions
are made on the
documents, the same
are returned to
226
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Division, IAO
Director and DED-
Administration
Records Division for
editing/finalization,
then back to step 3
otherwise forward
documents to the
Executive Director
8 Executive Director reviews and approves/
signs Memorandum to all Division Chiefs
Memorandum
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Director
Signed
Memorandum
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 3
9 CO – Office of the Executive Director
records and transmit Memorandum to
Records Section
Signed
Memorandum
5 minutes Secretary of
Executive
Director
Date, time and
details of
memorandum
recorded in
logbook of Office
of Executive
Director
10 CO- Records Section Photocopy Signed
Memorandum, NAP Form 2 , NAP Form 3
and NAP GRDS for distribution to all offices
and Divisions
Memorandum
,NAP Form2 and
NAP GRDS
30 minutes Records
Officer
Memorandum
,NAP Form 2 and
NAP GRDS
photocopied
Original copy of NAP
Form 2 retain to
records for
safekeeping
227
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Signed Memorandum with attached NAP Form 2, NAP Form 3 and NAP GRDS for release– See process for Outbound Documents
Filing of Duplicate copy – See process for filing of documents
11 CO-Records Section and concerned
divisions with records maintained in their
division determines valueless records
(records that have reached their prescribed
retention period ) by checking with the
approved NAP Form 2 and NAP GRDS
Records in the
storage ,NAP Form
2 and NAP GRDS
1 day Records
Officer of
Records
section and
all divisions
Valueless records
for disposal
determined
12 CO- Records Section and concerned
divisions with records maintained in their
division fill–up NAP Form 3 in triplicate
copies
Item No. Records
Series Title and
Description ,
period covered
,NAP Form 2
,GRDS and NAP
Form 3
5 days Records
officer of all
divisions
including
Records
section
NAP Form 3 filled -
up
13 CO- Records Section separates records for
disposal from those records for further
retention and place them in a designated
area (area for disposable records )
Records for
disposal
1 week Records
officer of
Records
section
Valueless records
for disposal
separated
14 CO- Concernedl divisions records and
forward NAP Form 3 together with the
records listed thereat ( for disposal) to
Records Section
Records for
disposal
5 minutes Records
officer of all
divisions
NAP Form 3
recorded in the
logbook of
concerned
divisions
228
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
15 CO- Records Section receives and records
NAP Form 3
NAP Form 3 and
Submitted records
for disposal
5 minutes Records
Officer
NAP Form 3
together with the
records to be
dispose recorded
in the logbook of
Records Section
16 CO- Records Section checks /Verifies with
the approved NAP Form 2 and GRDS if the
records submitted are for disposal and
place them in the designated area ( area for
disposable records )
Submitted records
for disposal
5 minutes Records
Officer
Valueless records
verified/Checked
If records submitted are not
yet for disposal return the
records to concerned division
or retain in the records Section
and dispose upon reaching the
prescribed retention period
17 CO- Records Section consolidates and
finalizes Request for Authority to Dispose
of Records (NAP Form 3) and prepares
transmittal letter to National Archives of
the Philippines for approval /signature of
Executive Director
Transmittal letter
and Filled –up NAP
Form 3
2 days Records
Officer
Transmittal letter
to National
Archives of the
Philippines , Filled-
up NAP Form No.
3
Estimate the volume of records
in cubic meter
Only valueless records shall be
included in the request for
authority to dispose records
and comply with the existing
laws and regulations.
Financial records that
are subject for audit
and Public records
involved in any case
cannot be dispose
until they are post
audited and finally
229
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
settled / decided
18 CO- Records Section records and transmit
Letter to National Archives of the
Philippines and NAP Form 3 to
Administrative (Admin ) Division
Letter and NAP
Form 3
5 minutes Records
Officer
Date,time and
details of letter
and NAP Form 3
recorded in
logbook of Admin
Division
Letter and NAP Form 3
forwarded to Division
Chief, Admin
19 CO- Admin Division Chief reviews letter and
NAP Form 3
Letter and NAP
Form 3
1 hour Admin Clerk,
Admin
Division
Letter and NAP
Form 3 reviewed
and countersigned
by Division Chief,
Admin Division
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 19
otherwise forward
documents to Director
,IAO
20 Director ,IAO reviews letter and NAP Form
3
Letter and NAP
Form 3
countersigned by
the Division Chief,
Admin
1 hour IAO Director Letter and NAP
Form 3 reviewed
and countersigned
by IAO Director
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
230
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then back to step 19
otherwise forward
documents to the
Deputy Executive
Director (DED)-
Administration
21 Deputy Executive Director (DED) –
Administration reviews letter and NAP
Form 3
Letter and NAP
Form 3
countersigned by
Division Chief,
Admin Division,
IAO Director
1 hour DED -
Administratio
n
Letter and NAP
Form 3 reviewed
and countersigned
by DED-
Administration
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 19
otherwise forward
documents to the
Executive Director
22 CO- Office of the Executive Director
proofreads letter and NAP Form 3
Letter and NAP
Form 3
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Assistant
(OED)
Letter and NAP
Form 3 proofread
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to Step
19, otherwise the
documents are
forwarded to the
231
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Director
23 Executive Director reviews and approves/
signs Letter and NAP Form 3
Letter and NAP
Form 3
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Director
Signed letter to
NAP and approved
NAP Form 3
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to step
19
24 CO – Office of the Executive Director
records and transmit letter to National
Archives of the Philippines t transmitting
NAP Form 3 to Records Section
Signed letter to
NAP and approved
NAP Form 3
5 minutes Secretary of
Executive
Director
Date, time and
details of letter
recorded in
logbook of Office
of Executive
Director
Signed letter for release– See process for Outbound Documents
Filing of Duplicate copy – See process for Filing of Documents
Upon receipt of the National Archives of the Philippines of BLGF request to dispose of records the following steps shall be undertaken by their office:
25 Appraise and examine disposable records
Approved NAP
Form 3
Records
Management
Services
Division
(RMSD) of
National
Archives of
NAP Form No. 4
(Appraisal and
Examination of
Records)
If
corrections/revisions
are made on the
documents, the same
will be returned to
BLGF and back to
Records Section for
232
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the
Philippines
editing/finalization,
then proceed to step
19
26 Issue Authority to Dispose Records with
copy of Records Management Analysis
Report
NAP Form No. 4 Director of
National
Archives of
the
Philippines
NAP Form 5 –
(Authority to
Dispose Records)
issued indicating
the mode of
Disposal For sale –
Conduct bidding
and submit
contract to NAP
or avail the
services of NAP
official buyer
Authority will be
issued based on the
recommendation of
Records Management
Services Division and
final evaluation of the
Executive Director of
National Archives
27 CO- Records Section receives from National
Archives of the Philippines NAP Form 5
NAP Form 5 5 minutes Receiving
Clerk
NAP Form 5
received by BLGF
Records Section
Received authority to dispose records from National Archives of the Philippines –See process for Inbound documents
28 Upon receipt of authority to dispose records
from NAP the following steps shall be
undertaken:
29 CO- Records Section segregate records for
disposal in accordance with the authority to
Segregated
Valueless records
3 days All records
Personnel
Valueless records
segregated
233
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
dispose of records issued by NAP NAP Form 5
30 CO- If mode of Disposal is for sale Records
Section facilitate conduct of public bidding
and submit contract of winning bidder to
NAP or submit letter of availment if opted
to avail the services of National Archives
of the Philippines official buyer
Draft letter 5 minutes Records
Officer
Draft letter NAP recommend
mode of disposal – by
destruction, landfill or
for sale (if for sale
agency has the option
to avail the services of
NAP official buyer or
conduct public bidding
Conduct bidding – See process of Property Section for bidding
In submitting contract of winning bidder or letter of availment of services of NAP official buyer (depends on the mode of disposal chosen) ,the following steps shall be undertaken :
31 CO – Records Section prepares and finalizes letter to National Archives of the Philippines requesting to avail the services of their official buyer or letter submitting contract of winning bidder for signature of Executive Director
Letter to National
Archives of the
Philippines
30 minutes Records
Officer
Letter to National
Archives of the
Philippines
Submit contract or
letter of availment
prior to the date of
actual disposal
32 CO- Records Section records and transmit
Letter to National Archives of the
Philippines to Administrative (Admin )
Division
Letter to National
Archives of the
Philippines
5 minutes Records
Officer
Date, time and
details of letter
recorded in
logbook of Admin
Division
Letter forwarded to
Division Chief, Admin
33 CO- Admin Division Chief reviews letter Letter to National 1 hour Admin Clerk, Letter reviewed If corrections/revisions
234
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Archives of the
Philippines
Admin
Division
and countersigned
by Division Chief,
Admin Division
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 31
otherwise forward
documents to Director
,IAO
34 Director ,IAO reviews letter Letter
countersigned by
the Division Chief,
Admin
1 hour IAO Director Letter reviewed
and countersigned
by IAO Director
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then back to step 31
otherwise forward
documents to the
Deputy Executive
Director (DED)-
Administration
35 Deputy Executive Director (DED) –
Administration reviews letter
Letter
countersigned by
Division Chief,
Admin Division,
1 hour DED -
Administration
Letter reviewed
and countersigned
by DED-
Administration
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
235
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
IAO Director editing/finalization,
then back to step 3
otherwise forward
documents to the
Executive Director
36 CO- Office of the Executive Director
proofreads letter
Letter
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Assistant
(OED)
Letter proofread If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to Step
31, otherwise the
documents are
forwarded to the
Executive Director
37 Executive Director reviews and approves/
signs Letter
Letter
countersigned by
the Division Chief,
Admin, Admin
Division, IAO
Director and DED-
Administration
1 hour Executive
Director
Signed letter to
NAP
If corrections/revisions
are made on the
documents, the same
are returned to
Records Division for
editing/finalization,
then proceed to step
31
236
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
CO – Office of the Executive Director
records and transmit letter to National
Archives of the Philippines to Records
Section
Signed letter to
NAP
5 minutes Secretary of
Executive
Director
Date, time and
details of letter
recorded in
logbook of Office
of Executive
Director
Signed letter for release– See process for Outbound Documents
Filing of Duplicate copy – See process for Filing of Documents
38 CO- Records Section and NAP RMA set date
and time of actual disposal of records and
inform COA about the date of disposal
Date and Time 5 minutes Receiving
Clerk
Actual date of
Disposal received
Date and time to be
set depends on the
availability of RMA,
BLGF represenrtative
and COA
39 Take custody of Valueless Records. Disposable records
in the designated
area
Up to the
time of
actual
disposal
All Records
Personnel
All disposable
records are in
place and safe
Maybe subjected for
re-examination of
NAP-RMA and/or COA
as need arises to
safeguard the sanctity
of the Records and
that no insertion of
any other records may
have been done.
40 Dispose Records
Disposable
Records
NAP-RMA
BLGF
representativ
Hauling of records
by the buyer
Records shall not be
disposed without
237
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
es , COA authority from NAP
Witness by BLGF,
assigned Records
Management Analyst
of NAP and COA to
ensure that the
records to be disposed
of are the same
records that were
authorized for disposal
.
41 Buyer remits payment for disposed records
to BLGF Cashier
Proceeds of sale of
disposed records
10 minutes Buyer Payment received
42 CO- Cashier issues receipt for the payment
received
Amount received 10 minutes BLGF Cashier Receipt Issued Payment received by
BLGF Cashier will be
remitted to National
Treasury
National Archives of the Philippines issues
Certificate of disposal to BLGF
Prepare in triplicate copy Original- BLGF Copy – NAP and COA
NAP Form 6. National
Archives of
the
Philippines
Certificate of
Disposal issued
End of Process
238
Operating Procedures for Bureau Administration Internal Administration Office
Administrative Division
Cash Section
239
Operating Procedures for Bureau Administration Internal Administration Office
Financial Management Division
Accounting
240
SERVICE : Internal Administration Office (IAO) DIVISION : Financial Management Division (FMD)
UNIT NAME : Accounting BRIEF DESCRIPTION : The Financial Management Division (FMD) is under the Internal Administration Office (IAO).
The FMD ensures that funds are available for efficient implementation of the Bureau’s planned activities. It certifies that funds are properly utilized and recorded in accordance with existing budgeting, accounting and auditing rules and regulations
CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province, Cities), Any Government or Private Entity, General Public;
Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Accounting of financial transactions following the Government Appropriation and Accounting Manual, including periodic generation of reports;
1.1 Recording of Dishonored Checks
1.2 Processing of Disbursement Voucher (preparation of DV)
1.3 Preparation of JEV
1.4 Recording in the CkDJ
1.5 Preparation of Unadjusted Trial Balance
1.6 Preparation of Pre-Trial Balance
1.7 Preparation of Other Reports 1.8 Balance Sheet
1.9 Income Statement
1.10 Cash Flow
1.11 Budget Preparation and Legislation
1.12 Preparation Financial Plan and Cash Program
241
1.13 Monitoring and Recording of Allotments Received from DBM
1.14 Recording of Sub Allotment Release Order (Sub-ARO) by the RO by the CO
1.15 Recording of Obligations
1.15.1 Preparation of O.R (Obligation Request)
1.15.2 Monitoring registry of obligations
1.15.3 Preparation of SAOB (statement of allotment and obligation)
242
SPECIFIC PROCEDURES 1.2 Processing of Disbursement Voucher (Preparation of Disbursement Voucher)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1
CO - FMD receives and records original,
duplicate, and triplicate copies of Disbursement
Voucher (DV), originals of supporting documents
and Original copies of Obligation Request (ObR)
from the CO- Budget Unit.
Disbursement
Voucher (DV) with
the following
information:
1. Agency – name of
the agency
2. Mode of Payment
–
mark in the
appropriate box
opposite the mode
of payment
3. – Name of the
Payee
4. Employee No. –
number assigned by
the agency to the
officer/employee
5. TIN – Tax
30 minutes Admin Aide Date, time and
details of
Disbursement
Voucher, Obligation
Request and
supporting
documents recorded
in the logbook of
FMD. DV Number
assigned in all copies
of the DV
The numbering
structure for DV
shall be as follows:
Allotment Class –
PS – 100
MOOE – 200
CO – 300
Copies 1-3 of DV,
originals of supporting
documents and Copies 1-
3 of ObR are forwarded
to the Bookkeeper for
processing
243
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Identification
Number of the
Payee
6. Address – address
of the Payee
7. Responsibility
Center – code
assigned to each
cost center
8. Explanation– brief
description of
disbursement
covered by the DV
9. Amount – amount
of claim covered by
the DV
10. Certified (Box A)
– certification of the
Head of Accounting
or his Authorized
representative that:
cash is available;
subject to Authority
to Debit Account
(When applicable)
and the
Year of Issue
Month of Issue –
Serial Number –(one
series for each year)
0000000000
244
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
completeness of the
supporting
documents
11. Approved for
Payment (Box B) –
approval of the
Head of the Agency
or Authorized
representative on
the payment
covered by the DV.
12. Received
Payment (Box C) –
acknowledgement
by the claimant or
his duly
representative for
the receipt of the
check/cash and the
date of receipt. The
claimant/payee shall
affix his signature on
the space provided
and shall indicate
the no. and date of
check/ADA, bank's
name and branch
and OR no. and
245
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
date. And other
relevant documents
issued to
acknowledge the
receipt of payment
(i.e. Special Power of
Attorney)
13. JEV No. and
Date of the Journal
Entry Voucher.
14. ObR No. and
Date - assigned ObR
No. and date for
reference
15. This form shall be prepared in triplicate copies to be distributed as follows: Original –Accounting Unit Duplicate Copy – Cash Unit Triplicate Copy – Payee's File
2. CO-FMD reviews DV for completeness and
propriety of supporting documents.
1-3 copies of DV,
originals of
supporting
documents and 1-3
Bookkeeper Copies of DV,
original supporting
documents
If DV is incomplete,
returns to the concerned
party for compliance
Comment [B1]: Provide entries on processing time and responsible person
246
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
copies of ObR. reviewed
3. CO-FMD checks Index of Payments (IP) from file
and determines whether there was prior
payment of the same claim.
1-3 copies of DV,
originals of
supporting
documents and 1-3
copies of ObR.
5 minutes Bookkeeper Index of Payments
(IP) checked if prior
payment has been
made.
If the claim was already
paid, returns the DV and
supporting documents to
the Receiving/Releasing
Staff to be returned to
claimant.
If not yet paid, records the following in the IP: name and address of creditor, DV date and number, explanation and amount, then forward documents to Budget Officer for ObR preparation
4.
CO-FMD/Budget Unit reviews Obligation Request (ObR)
Copies of DV, original supporting documents and copies of ObR
10 minutes Budget Officer
Copies of DV and Obligation Requestcertified by Budget Officer as to availability of appropriation/allotment
Copies of DV, original supporting documents and copies of ObR forwarded to accountant for review
5.
CO-FMD reviews and evaluates DV together with the supporting documents
1-3 copies of DV, originals of supporting
Accountant DV together with the supporting documents and ObR
1-3 copies of DV, originals of supporting documents and 1-3
Comment [B2]: Provide entries on processing time and responsible person
Comment [B4]: Indicate processing time
247
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documents and 1-3 copies of ObR certified by Budget Officer
reviewed and evaluated. Box A of DV signed by Accountant
copies of ObR forwarded to Chief, FMD
6 CO-FMD reviews the DV and supporting documents.
1-3 copies of DV, originals of supporting documents and 1-3 copies of ObR
5 minutes Head of Accounting Unit (Chief, FMD)
Box B of DV countersigned by Chief, FMD
1-3 copies of DV, originals of supporting documents and 1-3 copies of ObR are forwarded to the Receiving/Releasing Clerk
7 CO-FMD records and transmits the documents to the Office of the Executive Director
Copies 1-3 of DV, originals of supporting documents and Copies 3 of ObR
5 minutes Receiving / Releasing Staff (FMD)
Date, time and details DV, supporting documents and ObR recorded in logbook of the FMD
8 Executive Director reviews and approves DV. Copies 1-3 of DV, Copy 3 of ObR and originals of supporting documents.
15 minutes Executive Director
Approved/signed DV
9. CO-Office of the Executive Director records and transmits the documents to FMD
Approved/signed copies of DV, Copy 3 of ObR and originals of supporting documents.
10 minutes Secretary of the Executive Director
Date, time and details of approved/signed copies of DV, Copy 3 of ObR and originals of supporting documents recorded in the logbook of the Office of the Executive Director
10. CO-FMD receives and records signed/approved Signed copies 1-3 of 10 minutes Receiving / Signed copies 1-3 of Forward Copies 1-3 of
Comment [B3]: Provide entry for Processing Time
248
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
DV from the OED DV and originals of supporting document and Copy 3 of OBR
Releasing Staff (FMD)
DV and originals of supporting document and, Copy 3 of OBR received and recorded in logbook of the FMD
DV, Copy 3 of the ObR and originals of supporting documents to the Cash Section for check preparation
End of Process
249
1.3 Preparation of JEV
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FMD receives and records original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents from CASH unit in the logbook.
Receipt of original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents from CASH unit in the logbook.
10 minutes Admin Aide Date, time and details of original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents recorded in the logbook of FMD.
Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents are forwarded to Bookkeeper for review.
2. CO-FMD reviews and analyzes Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents
Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents
30 minutes Senior Bookkeeper
Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents
250
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
reviewed and analyzed by Bookkeeper.
3. CO-FMD prepares and finalizes Journal Entry
Voucher (JEV) with Original, duplicate
copies of RCI together with duplicate and
triplicate Copies of check, original and
duplicate copies of DVs, original ALOBS ObR
and original copies of all supporting
documents
Original, duplicate
copies of RCI
together with
duplicate and
triplicate Copies of
check, original and
duplicate copies of
DVs, original
ALOBS ObR and
original copies of
all supporting
documents
30 minutes Senior
Bookkeeper
JEV countersigned
by Senior
Bookkeeper with
Original, duplicate
copies of RCI
together with
duplicate and
triplicate Copies of
check, original and
duplicate copies of
DVs, original
ALOBS ObR and
original copies of
all supporting
documents
JEV with Original,
duplicate copies of RCI
together with
duplicate and triplicate
Copies of check,
original and duplicate
copies of DVs, original
ALOBS ObR and
original copies of all
supporting documents
are forwarded to
Accountant
After JEV preparation, proceed to recording in the CkDJ. - Check Disbursement Journal - Cash Disbursement Journal - Cash Receipts Journal
General Journal
4. CO-FMD certifies and sign JEV with Original, duplicate copies of RCI together with duplicate and triplicate Copies of check,
JEV countersigned by Senior Bookkeeper with
1 day Accountant JEV with Original, duplicate copies of RCI together with
If corrections/revisions are made by the Accountant on the JEV
251
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents
Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents
duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents certified and signed by Accountant.
with Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents, the same are returned to Senior Bookkeeper for editing/finalization then proceed to step 3, otherwise JEV with Original, duplicate copies of RCI together with duplicate and triplicate Copies of check, original and duplicate copies of DVs, original ALOBS ObR and original copies of all supporting documents are forwarded to Commission on Audit (COA) for audit.
End of Process
252
1.4 Recording in the Check Disbursement
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-FMD records JEV and RCI, checks, DV, ObR
and supporting documents.
Copies 1-2 of JEV
and Copy 1 of RCI,
Copy 2 of checks,
Copy 1 of DVs, Copy
3 of ObR and
supporting
documents
5 minutes Bookkeeper JEV recorded in the
Check Disbursement
Journal (CkDJ)
Retains Copy 2 of JEV for
file..
2 CO-FMD records and transmits Copy 1 of JEV, RCI
and DV, Copy 2 of checks, Copy 3 of ObR and
supporting documents to to COA for audit
Copies 1 of JEV and
Copy 1 of RCI, Copy
2 of checks, Copy 1
of DVs, Copy 3 of
ObR and supporting
documents
10 minutes Admin Aide Copies 1of JEV and
Copy 1 of RCI, Copy
2 of checks, Copy 1
of DVs, Copy 3 of
ObR and supporting
documents recorded
in the logbook of
FMD
3 COA receives and records copies JEV, RCI, DVs,
ObR checks and originals of supporting
documents.
Copies 1 of JEV and
Copy 1 of RCI, Copy
2 of checks, Copy 1
of DVs, Copy 3 of
ObR and supporting
documents
10 minutes COA Copies 1 of JEV and
Copy 1 of RCI, Copy
2 of checks, Copy 1
of DVs, Copy 3 of
ObR and supporting
documents recorded
in the logbook of
COA.
For the succeeding
activities, refer to,
Preparation and
Submission of Trial
Balances and Other
Reports.
End of Process
Comment [B5]:
Comment [B6]: Indicate processing time
253
1.7 Preparation of Other Reports;
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Reconciles the totals of the Subsidiary Ledgers with the totals of the General Ledgers accounts.
Subsidiary Ledgers (SLs) and General Ledgers (GLs) Totals.
Within the day.
Bookkeeper Totals of the Subsidiary Ledgers and Totals of the General Ledgers accounts reconciled
2 If unreconciled, checks the difference and prepares adjusting/ correcting entries as maybe necessary thru the JEV.
Subsidiary Ledgers (SLs) and General Ledgers (GLs) Totals.
Within the day.
Bookkeeper Difference checked and adjusting/correcting entries prepared
3 If reconciled, prepares individual supporting schedules per account based on the Subsidiary Ledgers.
Subsidiary Ledgers (SLs) and General Ledgers (GLs) Totals.
Within the day.
Bookkeeper Individual supporting schedules per account prepared
4 Initials the supporting schedules and the Pre-Closing Trial Balance.
Pre-Closing Trail Balance.
Within the day.
Bookkeeper Pre-Closing Trial Balance and supporting schedules initialed
5 Forwards the same to the Head of the Accounting Unit/Accountant for review
Pre-Closing Trail Balance.
Within the day.
Accountant Pre-Closing TB reviewed
6 Signs the ‘Certified Correct’ portion of the Pre-Closing Trial Balance and the supporting schedules
Pre-Closing Trail Balance.
Within the day.
Head of the Accounting/A
ccountant
Pre-Closing TB signed
254
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Unit (FMD)
7 Forwards the said documents to the Releasing/receiving staff
Pre-Closing Trail Balance.
Within the day.
Admin Aide Pre-Closing TB for recording in the logbook
8 Records submission in the logbook maintained. Files Copy 4 of the Pre-Closing Trial Balance and Copy 4 of supporting schedules for preparation of financial Statements.
Pre-Closing Trail Balance.
Within the day.
Admin Aide Pre-Closing Trial Balance Submitted to COA
End of Process
255
Operating Procedures for Bureau Administration Internal Administration Office
Financial Division
Budget
256
Operating Procedures for Bureau Administration Internal Administration Office
Planning and Policy Research Division
257
SERVICE : Internal Administration Office (IAO) DIVISION : Planning and Policy Research Division (PPRD) UNIT NAME : BRIEF DESCRIPTION : Is one of the Divisions under the umbrella of the Internal Administration Office which primary
function is to implement and evaluate planning policies as well as conducting and monitoring performances of all BLGF Central, Regional Offices, and NCR Treasury and Assessment Offices. Other task of this Division centers in assisting the local Treasury and Assessment Offices in planning and determining target setting and strategic planning.
CLIENTS : BLGF Central and Regional Offices, DOF Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Formulation and preparation of Annual Plans, medium and long-term Plans and Programs for implementation by the Bureau and its service units
1.1 Assist in the conduct of the Annual and Quarterly Regional Planning and Evaluation Conferences (2-3) days
1.1.1 Annual Plans and Programs with KRAs 1.2 Assist in the conduct of the NCR Treasury and Assessment
Offices Planning and Target Setting Conference (First Quarter of the year) 2-3 days
1.2.1 Annual Plans and Programs with KRAs 1.3 Annual Bureau Conference 1.3.1 Preparation of Bureau Annual Plans with KRAs (each
division will submit their proposed annual plan)
1.1 Preparation of Annual Plan
1.1.1 Review Plans and Programs of all Regional Offices, Central Office and National Capital Region (NCR) Treasury and Assessment Offices
1.2 Including GAD Plan 1.3 Conduct continuing
studies on development priorities
258
of LGU’s
2. Monitor and coordinate progress of activities and programs carried out during the relevant
period in behalf of the Executive Director
2.1 Consolidates, review / evaluate Unit Performance Evaluation Sheets of the Central Office Services and Divisions / Units, Regional Offices and the National Capital Region Treasury and Assessment Offices
2.2 Collection, follow-up submission of Unit Performance Evaluation Sheets (UPES) every semesters of the current year
2.3 Evaluation and rating of UPEs vs. Plans Programs. 2.4 Coordination of evaluation result and ratings to respective
divisions/units of the Bureau. 2.5 Transmittal (coordination) of Evaluation and Ratings result
to ROs and NCR (no ROs).
3. Prepare the general framework and policy guidelines for the conduct of the Bureau operations and activities
3.1 Long-term strategic plan (log frame) – 2 existing Strat Plan (LOGOFIND 5 yrs. + PAHRDF 3 yrs.) Ideally 5 yrs.
3.2 Collection, evaluation of best practices, complaints, feedbacks etc. from various stakeholders (LGUs, Associated Agencies) pertaining policy guidelines.
3.3 Preparation of proposed policy guidelines improvement. 3.4 Deliberation and approval of proposed policy guidelines 3.5 Implementation of new policy guidelines (updating of
Manual and distribution of information
3.1 Conduct continuing studies on local finance matters, revenue potentials.
4. Development of planning tools/metrics for adoption of LGUs through regional office
4.1 Development of rating system, evaluation system formats, templates, conference materials
259
SPECIFIC FUNCTIONS
1.1.1 Review/evaluate Plans and Programs and Programs of all Regional Offices, Central Office and National Capital
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
1.
CO-PPRD receives and records Regional and Central Office Division Plans and Programs
Plans and Programs of Regional Offices and Central Office Divisions
5 working days
Planning Officer
Consolidated Plans and Programs
2. CO-PPRD finalizes the Plans and Programs Draft Plans and Programs
8 working days
Planning Officer
Plans and Programs countersigned by the Planning Officer
3. CO-PPRD reviews Plans and Programs Plans and Programs countersigned by the Planning Officer
1 hour PPRD Chief Plans and Programs reviewed and countersigned by the PPRD Chief
If corrections/ revisions are made by the PPRD Chief on the Plans and Programs, the same is returned to the PPRD Chief, then proceed to step 2, otherwise the Plans and Programs is forwarded to the Office of the Director of Internal Administration Office (IAO)
4. CO-PPRD records and transmits Plans and Programs
Plans and Programs countersigned by
10 minutes Admin Aide Date, time and details of Plans and Programs recorded
260
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
the PPRD Chief in the logbook of PPRD
The Plans and Programs is routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director 5. Director, Internal Administration Office
(IAO) reviews and endorses Plans and Programs
Plans and Programs countersigned by the PPRD Chief
1 hour IAO Director Plans and Programs reviewed and countersigned with endorsement and recommendation by the IAO Director
If corrections/revisions are made by the IAO Director on the Bureau Plans and Programs, the same is returned to the PPRD, then proceed to step 2, otherwise the Bureau Plans and Programs is forwarded to the Office of the Deputy Executive Director (DED), Administration
6. Deputy Executive Director (DED), Administration reviews and endorses Plans and Programs
Plans and Programs countersigned by the PPRD Chief and with endorsement and recommendation by the IAO Director
1 hour DED for Admin
Plans and Programs reviewed and countersigned with endorsement and recommendation by the DED for Admin
If corrections/ revisions are made by the DED for Admin on the Bureau Plans and Programs, the same is returned to the PPRD, then proceed to step 2, otherwise the Bureau Plans and Programs is forwarded to the Office of the
261
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Executive Director (OED)
7. CO-Office of the Executive Director (OED) proofreads Plans and Programs
Plans and Programs countersigned by the PPRD Chief, with endorsement and recommendation by the IAO Director and DED for Admin
1 hour Executive Assistant
Plans and Programs proofread by the Executive Assistant
If corrections/revisions are made by the Executive Assistant on the Bureau Plans and Programs, the same is returned to the PPRD, then proceed to step 2, otherwise the Bureau Plans and Programs is forwarded to Executive Director for review and approval
8. Executive Director reviews, endorses and approves/signs Plans and Programs
Plans and Programs countersigned by the Planning Officer V, PPRD Chief, with endorsement and recommendation by the IAO Director and DED for Admin
1 hour Executive Director
Plans and Programs reviewed and approved/signed with endorsement and recommendation by the Executive Director
If corrections/revisions are made by the Executive Director on the Bureau Plans and Programs, the same is returned to the PPRD, then proceed to step 2,
The Plans and Programs, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to PPRD for the next step
9. CO- Office of the Executive Director (OED) Approved/signed 10 minutes Admin Aide Date, time and
262
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
records and transmits approved/signed Plans and Programs
with endorsement and recommendation Plans and Programs
details of approved/signed Plans and Programs recorded in the logbook of OED
10. CO-PPRD receives and records Approved/signed Plans and Programs
Approved/signed with endorsement and recommendation Plans and Programs
10 minutes Admin Aide Date, time and details of approved/signed Plans and Programs recorded in the logbook of PPRD
Original and duplicate copies of approved/signed Plans and Programs are forwarded to Records Section for filing and transmittal to the concerned offices.
11. CO-Records Section receives and records approved/signed Plans and Programs
Approved/signed Plans and Programs
10 minutes Record Officer (CO Records
Section)
Date, time and details of approved/signed Plans and Programs recorded in the logbook of Records Section
Records Section transmits approved/signed Plans and Programs to the concerned offices. (Refer to process of transmittal of documents under Records Section.)
End of Process
263
1.2.1 Assist in the conduct of the Annual and Quarterly Evaluation and Planning Conference for Central Office, Regional Offices and the National Capital Region Treasury and Assessment Offices Target Setting
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
1. CO- PPRD prepares and finalizes Plan schedule for Annual Evaluation and Quarterly Planning Conferences
Date, Time and Place, Budget, List of Resource Speakers and List of Participants
15 minutes PPRD Chief in consultation with DED for
Admin
List of Participants, Resource Speakers, estimated costs/expenses, date, time and venue of conference finalized
For the conference venue, canvass of hotels and other possible venues, refer to R.A 9184 for the process of Canvass or under Property and Supply Section
2. CO-PPRD prepares and finalizes Program of Activities and invitation Letter
Proposed activities, List of Resource Speakers, Date, Time and Venue of Conference
10 minutes Planning Officer
Program of Activities and Invitation letter countersigned by the Planning Officer
Program of Activities, and Invitation Letter are forwarded to the PPRD Chief for review
3.
CO-PPRD requests Admin Division for the preparation of Office Order
List of participants, Date, Time, Venue of Conference
15 minutes PPRD Chief Preparation of Office Order requested
For the preparation of Office Order, please refer to Procedure in the Preparation of Office Order under the CO- Admin. Division
4. CO-PPRD reviews the Program of Activities and Invitation Letter
Program of Activities, and Invitation Letter countersigned by
5 minutes PPRD Chief Program of Activities, and Invitation Letter reviewed and
The Program of Activities and Invitation Letter are forwarded to the
264
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
the Planning Officer
countersigned by the PPRD Chief
Office of the Director for Internal Administration (IAO)
5. CO-PPRD records and transmits Program of Activities and Invitation Letter to the IAO Director for review
Program of Activities, and Invitation Letter countersigned by the PPRD Chief
5 minutes Admin Aide Date, time and details of Program of Activities, and Invitation Letter recorded in the logbook of PPRD Division
The Program of Activities and Invitation Letter are routed to the concerned Office Directors for review and countersignature and to the Executive Director for approval
6. IAO Director reviews Program of Activities and Invitation Letter
Program of Activities, and Invitation Letter countersigned by the PPRD Chief
30 minutes IAO Director Program of Activities, and Invitation Letter reviewed and countersigned by the IAO Director
If corrections/ revisions are made by the IAO Director on the Program of Activities, and Invitation Letter, the same are returned to PPRD for editing/finalization, then proceed to step 2, otherwise the Program of Activities, and Invitation Letter to Resource Speakers are forwarded to the Deputy Executive Director (DED)- Administration
Deputy Executive Director (DED) , Program of 30 minutes DED for Program of If corrections/
265
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Administration reviews Program of Activities and Invitation Letter
Activities, and Invitation Letter countersigned by the PPRD Chief and IAO Director
Admin Activities, and Invitation Letter reviewed and countersigned by the DED for Admin
revisions are made by the DED for Admin on the Program of Activities, and Invitation Letter, the same are returned to PPRD for editing/ finalization, then proceed to step 2, otherwise the Program of Activities, and Invitation Letter are forwarded to the Office of the Executive Director (OED)
8. CO-Office of the Executive Director proofreads Program of Activities, and Invitation Letter
Program of Activities, and Invitation Letter countersigned by the PPRD Chief, IAO Director and DED for Admin
30 minutes Executive Assistant
Program of Activities, and Invitation Letter proofread by the Executive Assistant
If corrections/ revisions are made by the Executive Assistant on the Program of Activities, and Invitation Letter, the same are returned to PPRD for editing/finalization, then proceed to step 2, otherwise the Program of Activities, and Invitation Letter are forwarded to the Executive Director
266
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
(ED) for review and approval
9. Executive Director reviews and approves/signs Program of Activities and Invitation Letter
Program of Activities, and Invitation Letter countersigned by the IAO Director and DED- Administration
30 minutes Executive Director
Program of Activities, and Invitation Letter reviewed and approved/signed by the Executive Director
If corrections/ revisions are made by the Executive Director on the Program of Activities, and Invitation Letter, the same are returned to PPRD for editing/finalization, then proceed to step 2
The Program of Activities and Invitation Letter, after reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the PPRD for the next steps.
10. CO-Office of the Executive Director records and transmits the approved/signed Program of Activities and Invitation Letter
Approved/signed Program of Activities and Invitation Letter
10 minutes Admin Aide Date, time and details of approved/signed program of Activities and Invitation Letter recorded in the logbook of the Office of the Executive Director.
11. CO-PPRD Division receives and records the approved/signed Program of Activities and Invitation Letter
Approved/signed Program of Activities, and Invitation Letter
10 minutes Admin Aide Date, time and details of approved/signed program of Activities and Invitation Letter recorded in the logbook of PPRD.
Preparation of Memorandum of Agreement or Contract for Conference Venue
12 CO-PPRD prepares and finalizes Abstract of Quotation 30 minutes Admin Aide Memorandum of Memorandum of
267
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Memorandum of Agreement or Contract for Venue
from Property and Supply Section
Agreement /Contract for Venue countersigned by the PPRD Chief
Agreement /Contract for venue is forwarded to the Office of the Director of Internal Administrative Office (IAO) for review
13 CO-PPRD records and transmits Memorandum of Agreement/Contract for Venue
Memorandum of Agreement/Contract for Venue countersigned by the PPRD Chief
10 minutes PPRD Chief Date, time and details of Memorandum of Agreement/Contract for Venue recorded in the logbook of the PPRD
The Memorandum of Agreement/Contract of Venue are routed to the concerned Office Directors for review and countersignature and for approval of Deputy Executive Director (DED), Administration
13. IAO Director reviews Memorandum of Agreement /Contract
Memorandum of Agreement /Contract countersigned by the PPRD Chief
30 minutes IAO Director Memorandum of Agreement /Contract for Venue reviewed and countersigned by the IAO Director
If corrections/ revisions are made by the IAO Director on the Memorandum of Agreement/Contract for Venue, the same are returned to the PPRD for editing/finalization, then proceed to step 12, otherwise the Memorandum of Agreement/Contract
268
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
for Venue are forwarded to the Office of the Deputy Executive Director (DED), Administration for review and approval.
14. Deputy Executive Director (DED), Administration reviews and approves/signs Memorandum of Agreement /Contract for Venue
Memorandum of Agreement /Contract for Venue countersigned by the IAO Director
30 minutes DED for Admin
Memorandum of Agreement /Contract for Venue reviewed and approved/signed by the DED for Admin
If corrections/ revisions are made by the DED for Admin on the Memorandum of Agreement/ Contract for Venue, the same are returned to the PPRD, then proceed to the step 12
The Memorandum of Agreement/Contract for Venue, after having been reviewed and countersigned by the concerned Office Director and approved/signed by the DED for Admin, shall be transmitted back to PPRD for the next step
15 CO-PPRD records and transmits Memorandum of Agreement/Contact and supporting Documents to Financial Management Division for processing of Voucher
Memorandum of Agreement /Contract approved/signed by the DED- Administration together with the supporting documents
10 minutes Admin Aide Date, time and details of approved/signed Memorandum of Agreement /Contract together with the supporting documents recorded in the logbook of PPRD
Refer to processing of Disbursement Voucher under FMD.
16 CO-PPRD disseminates Invitation to Resource Speakers, Office Orders to Central
Approved/signed Office Order and
1 day Admin Aide Confirmation of Resource Speakers,
269
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
and Regional Offices’ participants Invitation Letter, List of Resource Speakers and Participants
participants
17. CO-PPRD prepares and reproduces hand outs for Planning Conference
Materials/documents for reproduction
Depends on the volume of handouts
to be reproduced
Machine Operator for Reproduction
Materials for Handouts prepared
18. CO-PPRD prepares needed materials and supplies needed for the Planning
List of planning materials like Handouts, Nametags and Seminar Kits, supplies needed
5 days Admin Aide (PPRD)
List of preplanning materials like Handouts, Nametags and Seminar Kit prepared
RIS is required for materials needed and forwarded to Property and Supply Section for processing
End of Process
270
2.1 Consolidates, review / evaluate Unit Performance Evaluation Sheets of the Central Office Services and Divisions / Units, Regional Offices and the National Capital Region Treasury and Assessment Offices.
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
1.
CO-PPRD receives and records UPES of Central Office Services/divisions, Regional Offices (ROs)and National Capital Region (NCR) LGUs
UPES (of Central Office Services/divisions, ROs, and NCR LGUs
10 minutes Admin Aide Date, time and details of UPES recorded in the logbook.
UPES are forwarded to Statistician
2. CO-PPRD reviews, evaluates and validates the UPES of accomplishments for the semesters
UPES 1-3 days Statistician UPES reviewed, evaluated and validated with corresponding comments/ observations/ recommendations, performance rating
For validation purposes, secure data: Revenue collection efficiency from the Revenue Division. Trainings/Seminars etc. from Admin Division
3. CO-PPRD evaluates UPES with corresponding performance ratings and prepares and finalizes Transmittal Letter
UPES reviewed, evaluated and validated with corresponding comments/ observations/ recommendations, performance rating
1-2 days Statistician UPES and Transmittal Letter countersigned by Statistician
4. CO-PPRD reviews UPES and Transmittal Letter
UPES and Transmittal Letter countersigned by
1 hour PPRD Chief UPES and Transmittal Letter reviewed and
If corrections/ revisions are made by the PPRD Chief on
271
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Statistician countersigned by PPRD Chief
the UPES and Transmittal Letter, the same are returned to Planning Officer V for editing/finalization, then proceed to step 3, otherwise the UPES and Transmittal Letter are forwarded to the Office of the Director, Internal Administration Office (IAO).
5. CO-PPRD Division records and transmits UPES and transmittal to IAO Director
UPES and Transmittal Letter countersigned by Planning Officer V and PPRD Chief
10 minutes Admin Aide Date, time and details of UPES and Transmittal Letter recorded in the logbook of PPRD.
The UPES and Transmittal Letter are routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director
6. Director, Internal Administration Office (IAO) reviews the UPES and Transmittal Letter
UPES and Transmittal Letter countersigned by PPRD Chief
1 hour IAO Director UPES and Transmittal Letter
reviewed and countersigned by
IAO Director
If corrections/ revisions are made by the IAO Director on the UPES and Transmittal Letter, the same are returned to PPRD for editing/finalization, then proceed to step
272
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
3, otherwise the UPES and Transmittal Letter are forwarded to the Office of the Deputy Executive Director (DED), Administration
7. Deputy Executive Director (DED), Administration reviews of the UPES and Transmittal Letter
UPES and Transmittal Letter countersigned by PPRD Chief and IAO Director
1 hour DED for Admin
UPES reviewed and countersigned by
DED, for Administration
If corrections/ revisions are made by the DED for Admin on the UPES and Transmittal Letter, the same are returned to PPRD for editing/finalization, then proceed to step 3, otherwise the UPES and Transmittal Letter are forwarded to the Office of the Executive Director (OED)
8. CO-Office of the Executive Director proofreads the UPES and Transmittal Letter
UPES countersigned by the PPRD Chief, IAO Director and DED for Admin
1 hour Executive Assistant
UPES and Transmittal Letter
proofread by Executive Assistant
If corrections/ revisions are made by the Executive Assistant on the UPES and Transmittal Letter, the same are returned to PPRD for editing/finalization, then proceed to step
273
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
3, otherwise the UPES and Transmittal Letter are forwarded to the Executive Director for approval
9. Executive Director reviews and approves/signs the UPES and Transmittal Letter
UPES and Transmittal Letter countersigned by the PPRD Chief, IAO Director and DED for Admin
1 hour Executive Director
UPES and Transmittal Letter approved/signed
by Executive Director
If corrections/ revisions are made by the Executive Director on the UPES and Transmittal Letter, the same are returned to PPRD for editing/finalization, then proceed to step 3.
The UPES and Transmittal Letter, after having been reviewed and countersigned by the concerned offices Directors and approved/signed by the Executive Director, shall be transmitted back to the PPRD for the next steps
10. CO-Office of the Executive Director records and transmits approved/signed UPES and Transmittal Letter
Approved/signed UPES and Transmittal Letter
10 minutes Admin Aide Date, time and details of
Approved/signed UPES and
Transmittal Letter recorded in the logbook of OED.
11. CO-PPRD receives and records approved/signed UPES and Transmittal Letter
Approved/signed UPES and Transmittal Letter
10 minutes Admin Aide Date, time and details of
Approved/signed UPES and
Transmittal Letter recorded in the
logbook of PPRD.
Original and duplicate copies of approved/signed UPES and Transmittal Letter are forwarded to Records Section for filing and
274
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
transmittal to the concerned offices.
12. CO-Records Section receives and records approved/signed UPES and Transmittal Letter
Approved/signed UPES and Transmittal Letter
10 minutes Records Officer of CO-
Records Section
Date, time and details of
Approved/signed UPES and
Transmittal Letter recorded in the
logbook
Records Section transmits approved/signed UPES and Transmittal Letter to the concerned offices. (Refer to process of transmittal of documents under Records Section.)
End of Process
275
Operating Procedures for Bureau Administration Internal Administration Office
Public Information and Assistance Division
276
SERVICE : Internal Administration Office (IAO) DIVISION : Public Information and Assistance Division (INFO)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Prepare disseminate information materials regarding Bureau-wide programs, operations and activities
1.1 Dissemination of official instruction/documents from Office of the President, Depart of Finance and other concerned agencies
1.2 Publication through BLGF Website/Newsletter
2. Render assistance to the general public in following up official matters/transactions with the various component units of the Bureau
2.1 Preparation of Certificate of Appearance 2.2 Assist general public/researchers in securing copies of
Local Finance Circulars, Executive Orders, Memorandum Circulars, Administrative Orders and etc…
The CO-INFO Division attend and assist researchers/General Public in securing copies of official documents if needs arises
3. Library Holdings
3.1 Card cataloguing and barrowing of books 3.2 Indexing and inventory of books
4. Dispensing of medicines 4.1 Dispensing of medicines to employees for emergency purpose only
5. Reproduction of official documents 5.1 Mimeographing of official documents
277
SPECIFIC PROCEDURES 1.1 Dissemination of official instruction/documents from Office of the President, Depart of Finance and other
concerned agencies
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-INFO Division receives and records incoming documents/ official instructions.
Official instructions/documents (Exec. Order, Republic Act, Memo Circular, Resolutions coming from different government agencies)
5 minutes Admin Aide Date, time and details of official Instructions/ documents recorded in logbook, CCS number assigned
The documents/official instructions are forwarded to the Supervising Admin Officer for preparation of
2. CO-INFO Division prepares memorandum circulars
Official instructions/documents
1 day Supervising Admin Officer
Memorandum Circular relative to official instructions/documents prepared and countersigned by the Supervising Admin Officer
Memorandum Circular is prepared to circulate the official instructions/documents in the Regional Offices and other concerned agencies
3. CO-INFO Division records and transmits Memorandum Circular to the Office of the IAO Director
Memorandum Circular countersigned by the Supervising Admin
5 minutes Admin Aide
Date, time and details of Memorandum Circular and attached official
278
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Officer and attached official instructions/documents
instructions/documents recorded in the logbook of INFO Division
The correspondence and attachments are routed to concerned Office Directors for review and countersignature and/or approval of Executive Director
4. IAO Director reviews Memorandum Circular and attached official instructions/documents
Memorandum Circular countersigned by The Supervising Admin Officer and attached official instructions/documents
1 hour IAO Director Memorandum Circular relative to official instructions/ documents reviewed and countersigned by the Director/ IAO
If corrections/revisions are made by the IAO Director on the Memorandum Circular, the same is returned to INFO Division for editing/finalization, then proceed to Step 2, otherwise the Memorandum Circular is forwarded to the Deputy Executive Director (DED), Administration
5. Deputy Executive Director (DED)- Administration reviews Memorandum Circular and attached official instructions/documents
Memorandum Circular countersigned by the Supervising Admin Officer, IAO Director
1 hour DED for Admin
Memorandum Circular relative to official instructions/ documents reviewed and countersigned by
If corrections/revisions are made by the DED- Administration on the Memorandum Circular, the same is returned to INFO
279
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and attached official instructions/documents
the DED- Administration
Division for editing/finalization, then proceed to step 2, otherwise the Memorandum Circular is forwarded to the Office of the Executive Director
6. Office of the Executive Director proofreads the Memorandum Circular
Memorandum Circular countersigned by By the Supervising Admin Officer, IAO Director, DED-Administration and attached official instructions/documents
1 hour Executive Assistant,
OED
Memorandum Circular relative to official instructions/ documents proofread
If corrections/revisions are
made by the Executive Assistant on the Memorandum Circular, the same is returned to INFO Division for editing/finalization, then
proceed to step 2, otherwise the
Memorandum Circular is forwarded to the Executive Director
7. Executive Director reviews, approves and signs Memorandum Circular
Memorandum Circular countersigned by Supervising Admin
1 hour Executive Director
Approved /signed Memorandum Circular
If corrections/revisions are made by the Executive Director on the
280
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Officer, IAO Director, DED-Administration and attached official instructions/documents
Memorandum Circular, the same is returned to INFO Division for Editing/finalization, then proceed to step 2.
The Memorandum Circular together with the attachments, after reviewed and countersigned by the concerned Office Directors and approved and signed by the Executive Director, the same are transmitted back to the concerned Division (INFO) for appropriate action/next step.
8. CO-Office of the Executive Director records and transmits the Memorandum Circular and attached documents to INFO Division
Approved/signed Memorandum Circular together with the attached official instructions/documents
10 minutes Secretary of the
Executive Director
Date, time and details of approved and signed Memorandum Circular and attached official instructions/documents recorded in the logbook
9. CO-INFO Division receives and records approved/signed Memorandum Circular and attachments
Approved/signed Memorandum Circular together with the attached official instructions/documents
10 minutes Admin Aide
Date, time and details of approved and signed Memorandum Circular and attached official instructions/documents recorded in the logbook of
The approved/signed Memorandum Circular is forwarded to HR Officer- Admin. Division for assignment of control number then, the Memorandum Circular with assigned control number is
281
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the INFO Division
transmitted back to INFO Division
10. CO-INFO Division reproduces approved/signed Memorandum Circular
Approved/signed Memorandum Circular with assigned control number and attached official instructions
1 day Reproduction Machine Operator
(RMO)
Printed copies of approved/ signed Memorandum Circular with assigned control number and attached official instructions
A photocopy of the approved/ signed Memorandum Circular and attachments are kept by the Division for file Original and duplicated copies of approved/signed Memorandum Circular and attached official instructions/documents are forwarded to Records Section for transmittal to concerned offices A copy of the same is forwarded to the MIS for uploading to the BLGF website, if necessary.
11. CO-Records Section receives and records approved/signed Memorandum Circular and attached
Approved/signed Memorandum Circular
10 minutes Records Officer (CO-
Records
Date, time and details of approved and
Records Section transmits copies of
282
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
official instructions
and attached official instructions
Section) signed Memorandum Circular and attached official instructions/documents recorded in the logbook of Records Section
approved/signed Memorandum Circular and attached official instructions/documents to concerned offices (Refer to process of transmitting outbound documents under Records Section)
End of Process
283
1.2 Publication through BLGF Website/Newsletter
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-INFO Division prepares and finalizes Memorandum regarding request for information (news, progress, milestones, activities, programs) to be published in the BLGF newsletter and website
List of Regional Offices/CO Divisions, requirements like deadline of submission, period covered to be published
30 minutes Supervising Admin Officer
Memorandum prepared and countersigned by the Supervising Admin Officer
2. CO-INFO Division records and transmits
Memorandum to the Office of the IAO
Director
Memorandum countersigned by the Supervising Admin Officer
5 minutes Admin Aide Date, time and details of memorandum recorded in the logbook of the INFO Division
The Memorandum is routed to concerned Office Directors for review and countersignature and/or approval of Executive Director
3. IAO Director reviews Memorandum
Memorandum countersigned by The Supervising Admin Officer, IAO Director
1 hour IAO Director Memorandum reviewed and countersigned by the IAO Director
If corrections/revisions are made by the IAO Director on the Memorandum, the same is returned to INFO Division for editing/finalization then proceed to step 1, otherwise the memorandum is forwarded to the
284
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Deputy Executive Director (DED) - Administration
4. Deputy Executive Director (DED)- Administration reviews and approves/signs Memorandum
Memorandum countersigned by the Supervising Admin Officer, IAO Director
1 hour DED for
Admin
Approved/signed Memorandum
If corrections/revisions are made by the DED-Administration on the Memorandum, the same is returned to INFO Division for editing/finalization then proceed to step 1
5. CO-Office of the Deputy Executive Director records and transmits the Memorandum to the INFO Division
Approved/signed Memorandum
10 minutes Secretary of the
DED for Admin
Date, time and details of approved and signed Memorandum recorded In the logbook
6. CO-INFO Division receives and Records approved/signed Memorandum
Approved/signed Memorandum
10 minutes Admin Aide Date, time and details of approved and signed Memorandum recorded In the logbook of INFO Division
A photocopy of the approved/signed Memorandum and attachments are kept by the Division for file. Original and reproduced copies of approved/signed Memorandum are forwarded to Records Section for transmittal
285
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
to concerned offices
7. CO-Records Section receives and records approved/signed Memorandum
Original and reproduced copies of approved/signed Memorandum
10 minutes Records
Officer (CO
Records
Section)
Date, time and details of approved and signed Memorandum recorded in the logbook of Records Section
Records Section transmits copies of approved/signed Memorandum to concerned Offices. (Refer to process of transmitting outbound documents under Records Section)
The INFO Division follow-ups inputs from the Regional Offices and Division of the Central Office. All inputs/responses shall pass the Records Section for recording purposes.
8. CO-INFO Division prepares lay-out, design of newsletter and contents
Inputs such as articles, news, progress, milestones, activities, programs, submitted by the Regional Offices/Divisions of the Central Office
2 weeks Information Education
Communication (IEC) Officer
Draft newsletter
9. CO-INFO Division prepares and finalizes cover memorandum requesting approval of the draft
Draft newsletter 30 minutes Information Education
Communicati
Cover memorandum
Cover memorandum forwarded to the Division
286
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
newsletter
on (IEC) Officer
Chief, INFO/Supervising Administrative Officer
The draft newsletter is reviewed and proofread by the Editor-in-Chief and the Managing Editor
10. CO-INFO Division reviews and signs cover memorandum
Cover memorandum and draft Newsletter proofread by the Editor-in-Chief and the Managing Editor
30 minutes INFO Division Chief, INFO/
Supervising Admin Officer
Covering memorandum reviewed and signed by Division Chief/Supervising Admin Officer
11. CO-INFO Division records and transmits draft newsletter with cover memorandum to the Office of the IAO Director
Draft newsletter 10 minutes Information Education
Communication (IEC) Officer
Date, time and details of draft newsletter recorded in the logbook of the INFO Division
12.
IAO Director reviews draft Newsletter
Draft newsletter with cover Memorandum
1 day IAO Director Draft newsletter reviewed and note of IAO Director affixed on the cover memorandum
In case corrections/revisions are made, draft newsletter is transmitted to INFO Division for editing/finalization, then proceed to step 11, otherwise the same is forwarded to DED- Administration.
287
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13. Deputy Executive Director (DED)- Administration reviews draft Newsletter
Draft newsletter with cover Memorandum
1 day DED for
Admin
Draft newsletter reviewed and note of DED-Administration affixed on the cover memorandum
In case corrections/revisions are made, draft newsletter is transmitted to INFO Division for editing/finalization, then proceed to step 11, otherwise the same is forwarded to Executive Director.
14.
Executive Director reviews and approved draft newsletter
Draft newsletter with cover Memorandum
1 day Executive Director
Draft newsletter reviewed and approval note of Executive Director affixed on the cover memorandum
In case corrections/revisions are made, draft newsletter is transmitted to INFO Division for editing/finalization, then proceed to step 11.
15. Office of the Executive Director Records and transmits approved draft newsletter to INFO Division
Approved newsletter
10 minutes Secretary of the
Executive Director
Date, time and details of approved newsletter recorded in the logbook
16. CO-INFO Division receives and records approved newsletter
Approved newsletter
10 minutes Admin Aide Date, time, and details of printed newsletter recorded in the logbook of INFO
The approved newsletter is forwarded to the Property and Supply Section for the
288
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Division
printing of newsletter and to the MIS Division for publication through the BLGF Website. Refer to the Process of Procurement (Services) including inspection of delivered items, under Property and Supply Section.
17. CO-INFO received and forward approved newsletter from the Office of the Executive Director to Property Division for the canvassing of printing press publication
Approved newsletter
2 minutes Admin Aide Recorded approved BLGF newsletter
Please refer steps for canvassing to Property Division. If canvassing is already done, Property Division will notify the CO-INFO to request RIS for the publication of newsletter
18. CO-INFO prepares and signed RIS for the publication of newsletter
Approved BLGF Newsletter
2 minutes Information and
Communication Associate
Signed RIS with Date, time, and details of printed newsletter together with the approved BLGF Newsletter
The RIS routed to concerned Office Directors for review and countersignature and/or approval of Executive Director
18. CO-INFO received Approved RIS and Signed RIS with 5 minutes Admin Aide
289
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
transmit it to Property Division Date, time, and details of printed newsletter together with the approved BLGF Newsletter
20. CO-INFO Division receives and records printed copies of the Newsletter
Printed copies of Newsletter
30 minutes Admin Aide Date, time and details of printed newsletter recorded in the logbook of INFO Division
Printed copies of newsletter are disseminated in the Central Office by the INFO Division, for the Regional Offices, copies are forwarded to the Records Section for mailing. Refer to Procedure on Release of Outbound Mails and Documents under Records’ Section.
21. CO-INFO will allocate and distribute the BLGF Newsletter to BLGF-Regional Offices
Printed Copies of Newsletter
2hours Information and
Communication Associate
Collated newsletter per region and recorded into INFO-Logbook
22. CO-INFO transmit/forward collated newsletter to Records Section for mailing
Collated newsletter per region and recorded into INFO-Logbook
2 minutes Records Officer
Number of copies received recorded in the logbook for mailing
Refer to Records section for the steps in mailing documents.
End of Process
290
2.1 Preparation of Certificate of Appearance
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-INFO Division records and receives Travel Order of requesting person.
Travel order of person requesting certificate of appearance
5 minutes Requesting Client (s)
Date, time and details of request recorded in the logbook, requesting person logs at the logbook.
2.
CO-INFO Division prepares Certificate of Appearance
Name of requesting person, Purpose of visit to Manila, day arrived in Manila, day of departure From Manila
10 minutes Admin Officer
Certificate of Appearance with initials of Administrative Officer
3. CO-INFO Division approves/signs the Certificate of Appearance
Certificate of Appearance
10 minutes Supervising Admin Officer
Signed Certificate of Appearance
4. CO-INFO Division records and releases Certificate of Appearance
Signed Certificate of Appearance
10 minutes Admin Officer
Date, time and details of signed Certificate recorded in logbook and received by requesting client, initials affixed on logbook.
291
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
At the end of the month, Administrative Officer should file and arrange the duplicate copies of all COA issuances
5. CO-INFO arrange duplicate copies issued, records and transmit the copies to Records section for filing/(record keeping)
Duplicate copies of the issued COA’s
2 minutes Records Officer
Duplicate copies of COA’s filed
End of Process
292
3.1 Card cataloguing and barrowing of books
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. Employee request for books/ reference materials
List of
books/reference
materials to be
borrowed.
5 minutes Admin Aide Books/reference materials (SCRA, copy of RA, EO, PD, Memo Circulars, Regulations, etc.)
Employee logs in the
borrowing card
2.
CO-INFO Division logs the name of
requested employee
Date, name and
division/unit of
requested
employee
5 minutes Admin Aide Date, name of books/reference materials are logged in the index card.
3. CO-INFO Division records and releases the
book materials/borrowed
Books/materials
logged for
borrowing
10 minutes Admin Aide Date, time and details of books borrowed recorded in the logbook of INFO Division
4. Employee borrowed books/reference
materials
Borrowed
books/reference
materials
5 minutes Admin Aide Returned
books/reference
materials
INFO staff will signed at the borrowing card to prove the return of borrowed books/reference materials
End of Process
293
3.2 Indexing and inventory of books
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-INFO Division receives and records the
Official Gazette
Official Gazette 3 minutes Admin Aide Date, volume and number of official gazette recorded in the logbook of INFO Division.
The Official Gazette is
published weekly –
(every Monday)
2. CO-INFO Division indexes the Official
Gazette
Official Gazette 15 minutes Admin Aide Date, volume, number of official gazette and details of public issuances (Republic Acts, Executive Orders, Memorandum Circulars, Proclamations)
3. CO-INFO Division conducts inventory of
books at the end of the month and update
records in the inventory of books
Logbook for
Inventory of book
in the BLGF library
4 hours Admin Aide Actual count of
book to be
updated in the List
of Books
(inventory book)
If in any case, that the Bureau needs to purchase an important book references, the CO-INFO will process the RIS please refer procedures in “Publication of /BLGF Website/Newsletter …step No. 18
4. Co-INFO received and recorded the
purchased/donated books from
Property/other agencies
Purchased/Donate
d books/official
gazette
5 minutes Information and
Communication Associate
Updated logbook for the inventory of books/official gazette
294
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-INFO serializes books received and files
the book at the BLGF library
Books received
and logged from
Property Division
5 minutes Information and
Communication Associate
Serialized Books purchased/donated with attached barrowers card
End of Process
295
4.1 Dispensing of medicines to employees for emergency purpose only
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. Employee presents prescription especially antibiotics and hypertension.
Prescription 5 minutes Supervising Admin. Officer
Medicine Employee logs in the log book.
2.
CO-INFO Division checks If medicine is on stock, if it is on stock, staff dispenses the medicine to employee
Prescription 5 minutes Any INFO staff
Name of medicine, employee, date and signature
If medicine is not available, staff informs employee to purchase medicine in the nearest drugstore. Medicines to be given are for emergency purposes only.
Inventory of medicine is conducted monthly, and requesting/purchasing of medicines is conducted by quarter.
3. CO-INFO Division conducts inventory of
medicines
List of medicines
(Inventory
book)and log book
for medicine
dispensing
4 hours Admin Aide Actual count of
medicines logged
in the
book/inventory
form
In every quarter, a
copy of inventory for
the medicines was
submitted to Financial
Management Division
and to BLGF-
Commission on Audit
Office
End of Process
296
5.1 Mimeographing of official documents
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-INFO Division receives and records request to reproduce form
Request form, materials needed (stencil, ink and paper) and documents for reproduction
5 minutes Concerned employee
Date, time and details of request recorded in the logbook
2. CO-INFO Division reproduce copies of the documents
Reproduction materials and document
Depending on the
number to reproduced
(machine capacity)
Reproduction Machine Operator
(RMO)
Reproduced official documents
Subject to availability of Reproduction Machine Operator (RMO) and the machine
3. CO-INFO Division records and releases reproduced copies of the documents
Copies of reproduce documents
20 minutes
Admin Aide Date, time and details of documents (reproduced) recorded in the logbook
Reproduced
documents released to
concerned
Division/Unit
End of Process
297
Operating Procedures for Bureau Administration Internal Administration Office
Management Information & Data Systems Division
298
Operating Procedures for Bureau Administration Intelligence and Investigation Office
Intelligence Division
299
SERVICE : Intelligence and Investigation Office (IIO) DIVISION : Intelligence Division (INTEL)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only)
UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Resolution of Administrative complaints against Bureau personnel and local treasurers;
1.1 Prepare initial actions on complaints against Bureau personnel and local treasurers
1.2 Evaluates Report of Investigation with recommendation for the dismissal of the complaint submitted by the Regional Offices
1.3 Evaluates Report of Investigation with finding that a prima facie case exist
1.4 Prepares related/miscellaneous communications in connection with pending administrative complaint filed against Bureau personnel and local treasurers
1.5 Prepares communications regarding decisions, resolutions, orders of judicial bodies and quasi-judicial bodies on pending administrative or criminal complaints and
1.6 Assists in the conduct of fact-finding investigation, when requested by the Regional Office
2. General Administration 2.1 Issues Certificate of No Pending Administrative Complaint 2.2 Prepare periodic and on-demand reports;
300
SPECIFIC PROCEDURES 1.1 Prepare initial actions on complaints against local treasurers and Bureau personnel
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-INTEL receives and records complaint including attachments
Copy of the complaint including attachments
10 minutes Admin Officer
Date, time and details of the complaint recorded in the logbook of INTEL. Corresponding CCS attached.
The complaint is forwarded to Intelligence Officer, for appropriate action.
2 CO-INTEL studies and evaluates whether the complaint together with the attachment is sufficient in substance and in form
Complaint 2 days Intelligence Officer
Complaint is sufficient in substance and form, attachments reviewed.
3 CO-INTEL prepares and draft the letter-reply to the complaint and letter-directive to the Regional Office to conduct preliminary investigation on the complaint
Initial action/draft 1 day Intelligence Officer
Letter-reply/Letter-directive prepared by Intelligence Officer
Letter-reply/Letter-directive is forwarded to the INTEL Chief for review
4 CO-INTEL reviews the Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned by Intelligence Officer
2 days INTEL Chief Letter-reply/Letter-directive reviewed and countersigned INTEL Chief
If corrections/revisions are made by the INTEL Chief on the Letter-reply/Letter-directive, the same is returned to the Intelligence Officer for editing/finalization, then proceed to step
301
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4, otherwise the Letter-reply is forwarded to the Office of the Director, Intelligence and Investigation (IIO), for review.
5 CO-INTEL records and transmits Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned Intelligence Officer and INTEL Chief
10 minutes Admin Aide Date, time and details of Letter-reply/Letter-directive are recorded in the logbook of INTEL
6 IIO Director reviews Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned Intelligence Officer and INTEL Chief
1 day IIO Director Letter-reply/Letter-directive reviewed and countersigned by IIO Director
If corrections/revisions are made by the IIO Director on the Letter-reply/Letter-directive, the same is returned to the INTEL Division for editing/finalization, then proceed to step 4, otherwise the Letter-reply is forwarded to the Office of the Deputy Executive Director (DED), Administration, for review.
302
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7 DED for Admin reviews Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned Intelligence Officer, INTEL Chief and IIO Director
1 day DED for Admin
Letter-reply/Letter-directive reviewed and countersigned by DED for Admin
If corrections/revisions are made by the DED for Admin on the Letter-reply/Letter-directive, the same is returned to the INTEL Division for editing/finalization, then proceed to step 4, otherwise the Letter-reply is forwarded to the Office Deputy Executive Director (OED) for review
8 CO-Office of the Executive Director (OED) proofreads Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned Intelligence Officer, INTEL Chief, IIO Director and DED for Admin
1 day Executive Assistant
Letter-reply/Letter-directive proofreads by Executive Assistant
If corrections/revisions are made by the Executive Assistant on the Letter-reply/Letter-directive, the same is returned to the INTEL Division for editing/finalization, then proceed to step 4, otherwise the Letter-reply is forwarded to the Executive Director for review
303
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9 Executive Director reviews and approves/signs Letter-reply/Letter-directive
Letter-reply/Letter-directive countersigned Intelligence Officer, INTEL Chief, IIO Director and DED for Admin
1 day Executive Director
Letter-reply/Letter-directive reviewed and approved/signed by Executive Director
If corrections/revisions are made by the Executive Director on the Letter-reply/Letter-directive, the same is returned to the INTEL Division for editing/finalization, then proceed to step 4,
The Letter-reply/Letter-directive, after having been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division for the next steps.
10 CO-OED records and transmits approved/signed Letter-reply/Letter-directive
Approved/signed Letter-reply/Letter-directive
10 minutes
Admin Aide Date, time and details of Approved/signed Letter-reply/Letter-directive recorded in the logbook of OED
11 CO-INTEL receives and records approved/signed Letter-reply/Letter-directive
Approved/signed Letter-reply/Letter-directive
10 minutes Admin Aide Date, time and details of Approved/signed Letter-reply/Letter-directive recorded in the logbook of INTEL
A photocopy of the Letter-directive is kept for file. Original and duplicate copies of the Letter-directive together with the attachments, are routed out to Records Section
304
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12 CO-Records Section receives and records approved/signed Letter-reply/Letter-directive
Approved/signed Letter-reply/Letter-directive
10 minutes Records Officer (CO-
Records Section)
Date, time and details of Approved/signed Letter-reply/Letter-directive recorded in the logbook of Records Section
The approved/signed Letter-directive is transmitted to concerned office/person.
End of Process
305
1.2 Evaluates Report of Investigation with recommendation for the dismissal of the complaint submitted by the
Regional Offices
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives, Report of Investigation and record the same in the INTEL logbook
Report of Investigation/ including attachments
10 minutes Admin Officer
Date, time, and details of Report recorded in the logbook of the INTEL Division. Corresponding CCS attached.
The Report of Investigation is forwarded to Intelligence Officer, for appropriate action.
2
CO – INTEL Division studies and evaluates the nature/merit of the request together with the attachments
Report of Investigation
7 days
Intelligence Officer
Completeness of the documents/ attachments reviewed. Initial action prepared.
3 CO - INTEL Division prepares and finalizes the initial action/draft on the Report of Investigation submitted by the Regional Office
Initial action/draft 1 day Intelligence Officer
Initial action prepared by Intelligence Officer
Letter-directive to prepare a Resolution for the dismissal of the complaint (Letter-directive, for brevity) is forwarded to the INTEL Chief, for review.
4 CO-INTEL Division reviews the initial draft/action
Letter-directive countersigned by the Intelligence Officer
4 days INTEL Chief Letter-directive reviewed and countersigned by the INTEL Chief
If corrections/revisions are made by the Division Chief on the letter-directive, the same is returned to the Intelligence Officer for editing/revision,
306
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to step 4 to 5, otherwise the Letter-directive is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO- INTEL Division records and transmits the Letter-directive
Letter-directive countersigned by the Intelligence Officer, and INTEL Chief
5 minutes Admin Officer I,INTEL Division
Date, time and details of Letter-directive are recorded in the logbook of the Office of IIO Director
The initial draft of Letter-directive is forwarded to the IIO Director , for review.
The Before and After counter signature/ approval by the concerned Directors shall be recorded in the logbook Of the Respective Office Administration Officers I / Secretaries.
6 IIO Director reviews the letter-directive Letter-directive countersigned by the Intelligence Officer and INTEL Chief
2 days IIO Director Letter-directive reviewed and countersigned by the IIO Director
If corrections/revisions are made by the Director IIO on the letter-directive, the same is returned to the Intelligence Officer for editing/revision, then proceed to Step 4 to 6, otherwise the Letter-directive is forwarded to the Deputy Executive Director (DED) for Administration, for review.
307
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7 Deputy Executive Director (DED), Administration reviews and recommends Letter-directive
Letter-directive countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
1 day DED for Admin
Letter-directive reviewed, recommended and countersigned by the DED for Admin
If corrections/revisions are made on the letter-directive, by the Deputy Executive Director, Administration, the same is returned to INTEL Division for corrections, then proceed to step 3 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
8
Executive Assistant/Executive Director proofreads/edits/ reviews and approves the Letter-directive
Letter-directive countersigned by the Division INTEL Chief, IIO Director and DED for Admin
1 day Executive Assistant/ Executive Director
Letter-directive proofread/edited/and reviewed by the Executive Assistant and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/Executive Director, the same is returned to INTEL Division for corrections, then proceed to step 3 to 12, otherwise, the same is forwarded to the Executive Director, for final approval.
The letter-directive of the BLGF-Central Office to the Report of Investigation submitted by the Regional Office, after having been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division to be routed out to the
Records Section, which in turn shall be transmitted to the Regional Office concerned, for dissemination.
9 CO-INTEL receives and records the Approved/signed 10 minutes Admin Date, time and A photocopy of the
308
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
approved/signed Letter-directive Letter-directive Officer details of approved/signed Letter-directive are recorded in the logbook of INTEL Division
Letter-directive is kept for file. Original and duplicate copies of the Letter-directive together with the attachments, are routed out to Records Section
10 CO-Records Section receives and records the approved/signed Letter-directive
Approved/signed Letter-directive
5 minutes Records Officer (CO
Records Section)
Date, time and details of approved/ signed Letter-directive are recorded in the logbook of the Records Section
The approved/signed Letter-directive is transmitted to concerned office (Regional Office)/person.
End of Process
309
1.3 Evaluates Report of Investigation with finding that a prima facie case exist
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives, Resolution from the Regional Office and record the same in the INTEL logbook
Report of Investigation including attachments
10 minutes Admin Officer
Date, time, and details of the Report of Investigation recorded in the logbook of the INTEL Division. Corresponding CCS attached.
The Report of Investigation is forwarded to Intelligence Officer, for appropriate action.
2
CO – INTEL Division studies and evaluates the nature/merit of the Report of Investigation together with the attachments.
Report of Investigation
7 days
Intelligence Officer
Completeness of the documents/ attachments reviewed. Initial action prepared.
3 CO - INTEL Division prepares and finalizes the initial action/draft on the Report of Investigation submitted by the Regional Office
Initial action/draft 1 day Intelligence Officer
Initial action/draft prepared by Intelligence Officer
Letter-directive to file a formal charge (letter-directive, for brevity) is forwarded to the INTEL Chief, for review.
4 CO-INTEL Division reviews the initial draft/action
Letter-directive countersigned by the Intelligence Officer
4 days INTEL Chief Letter-directive reviewed and countersigned by the INTEL Chief
If corrections/revisions are made by the Division Chief on the letter-directive, the same is returned to the Intelligence Officer for editing/revision, then proceed to step
310
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4, otherwise the Letter-directive is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO-INTEL Division records and transmits the Letter-directive
Letter-directive countersigned by Intelligence Officer and Division INTEL Chief
5 minutes Admin Officer, INTEL
Date, time and details of the Letter-directive are recorded in the logbook of the INTEL Division
The initial draft of Letter-directive is forwarded to the IIO Director , for review.
The before and after counter signature/ approval by the concerned directors shall be recorded in the logbook of the respective office administration officers I/ secretaries
6 IIO Director reviews the letter-directive Letter-directive countersigned by Intelligence Officer and INTEL Chief
2 days IIO Director Letter-directive reviewed and countersigned by the IIO Director
If corrections/revisions are made by the Director IIO on the letter-directive, the same is returned to the Intelligence Officer for editing/revision, then proceed to step 4 to 6, otherwise the Letter-directive is forwarded to the Deputy Executive Director (DED) for Administration, for review.
7 Deputy Executive Director (DED), Administration reviews and recommends
Letter-directive countersigned by
1 day DED for Admin
Letter-directive reviewed,
If corrections/revisions are made on the
311
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the Letter-directive Intelligence Officer Division INTEL Chief & IIO Director
recommended and countersigned by the Deputy Executive Director, Administration
Letter-directive by the Deputy Executive Director, Administration, the same is returned to INTEL Division for corrections, then proceed to step 3 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
8 Executive Assistant/Executive Director proofreads/edits/ reviews and approves the Letter-directive
Letter-directive countersigned by the Division INTEL Chief, IIO Director and DED for Admin
1 day Executive Assistant/ Executive Director
Letter-directive proofread/edited/ and reviewed by the Executive Assistant and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/Executive Director, the same is returned to INTEL Division for corrections, then proceed to step 3 to 12, otherwise the same is approved by the Executive Director.
The letter-directive of the BLGF-Central Office to the Report of Investigation submitted by the Regional Office, after having been reviewed by the
concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division to be routed out to the
Records Division, which in turn shall be transmitted to the Regional Office concerned for dissemination.
9
CO-INTEL Division receives and records the approved/signed Letter-directive
Approved/signed Letter-directive
10 minutes Admin Officer
Date, time and details of approved/signed
A photocopy of the Letter-directive is kept for file. Original and
312
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Letter-directive are recorded in the logbook of INTEL Division
duplicate copies of the Letter-directive together with the attachments, are routed out to Records Section.
10 CO-Records Section receives and records the approved/signed Letter-directive
Approved/signed Letter-directive
5 minutes Records Officer (CO
Records Section)
Date, time and details of approved/signed Letter-directive are recorded in the logbook of the Records Section
The approved/signed Letter-directive is transmitted to concerned office (Regional Office)/person.
End of Process
313
1.4 Prepares related/miscellaneous communications in connection with pending administrative complaint filed
against Bureau personnel and local treasurers
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives related/miscellaneous communications and records the same in the INTEL logbook;
Related/ miscellaneous communications including attachments
10 minutes Admin Officer
Date, time, and details of the related/ miscellaneous communications recorded in the logbook of the INTEL Division. Corresponding CCS attached.
The related/miscellaneous communications is forwarded to Intelligence Officer, for appropriate action.
2
CO – INTEL Division studies and evaluates the nature/merit of the related/miscellaneous communications together with the attachments.
Related/ miscellaneous communications
2 days
Intelligence Officer
Completeness of the documents/ attachments reviewed. Initial action prepared.
Related/miscellaneous communications may not be necessarily related to a pending complaint filed in the Bureau (i.e. complaint against barangay treasurer).
3 CO - INTEL Division prepares and finalizes the initial action/draft on the related/miscellaneous communications
Initial action/draft 1 day Intelligence Officer
Initial action/draft prepared by Intelligence Officer
Letter-reply(communication) is forwarded to the INTEL Chief, for review.
4 CO-INTEL Division reviews the initial draft/action
Letter-reply countersigned by the Intelligence
2 days Division INTEL Chief
Letter-reply reviewed and countersigned by
If corrections/revisions are made by the Division Chief on the
314
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Officer the Division INTEL Chief
letter-reply, the same is returned to the Intelligence Officer for editing/revision, then proceed to Step 4, otherwise the Letter-reply is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO-INTEL Division records and transmits the Letter-directive
Letter-directive countersigned by Intelligence Officer and Division INTEL Chief
5 minutes Admin Officer, INTEL
Division
Date, time and details of the Letter-reply are recorded in the logbook of the INTEL Division
The initial draft of Letter-reply is forwarded to the IIO Director , for review.
6 CO-Office of the IIO Director receives and records the Letter-reply
Letter-reply countersigned by Intelligence Officer and Division INTEL Chief
5 minutes Admin Aide, Office of the IIO Director
Date, time and details of the Letter-reply are recorded in the logbook of the Office of IIO Director
7 IIO Director reviews the Letter-reply Letter-reply countersigned by Intelligence Officer and INTEL Chief
1 IIO Director Letter-reply reviewed and countersigned by the IIO Director
If corrections/revisions are made by the IIO Director on the letter-reply, the same is returned to the Intelligence Officer for editing/revision, then
315
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
proceed to step 4 to 6, otherwise the Letter-reply is forwarded to the Deputy Executive Director (DED) for Administration, for review.
8 CO- Office of the IIO Director records and transmits the Letter-reply
Letter-reply countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
5 minutes Admin Aide, Office of the IIO Director
Date, time and details of Letter-reply are recorded in the logbook of the Office of the IIO Director
The final draft of Letter-reply is forwarded to the Office of the Deputy Executive Director (DED) for Administration, for review and countersignature.
9 CO- Office of the Deputy Executive Director (DED), Administration receives and records the Letter-reply
Letter-reply countersigned by Intelligence Officer, Division Chief III, INTEL & IIO Director
5 minutes Secretary of the DED for
Admin
Date, time, details of Letter-reply are recorded in the logbook of the Office of the DED for Admin
10 Deputy Executive Director (DED), Administration reviews and recommends the Letter-reply
Letter-reply countersigned by Intelligence Officer, Division INTEL Chief, & IIO Director
1 day DED for Admin
Letter-reply reviewed, recommended and countersigned by the DED for Admin
If corrections/revisions are made on the Letter-reply by the DED for Admin , the same is returned to the INTEL Division for corrections, then proceed to step 3 to 9, otherwise, the same is
316
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
forwarded to the Office of the Executive Director (OED).
11
CO- Office of the Deputy Executive Director, Administration records and transmits the Letter-reply
Letter-reply countersigned by Division INTEL Chief, IIO Director & DED for Admin
5 minutes Secretary of the DED for
Admin
Date, time and details of Letter-reply are recorded and transmitted in the logbook of the Office of the Deputy Executive Director, Administration
The final draft of Letter-reply is forwarded to the Executive Assistant, Office of the Executive Director (OED), for proofreading/editing.
12 CO-Office of the Executive Director receives and records the signed/approved Letter-reply
Letter-reply countersigned by the Division INTEL Chief, IIO Director & DED Administration
5 minutes Secretary of the Office of
the Exec. Director
Date, time and details of Letter-reply are recorded in the logbook of the Office of the Executive Director
The Letter-reply is forwarded to the Executive Assistant, Office of the Executive Director for proofreading/editing.
13 Executive Assistant/Executive Director proofreads/edits/ reviews and approves the Letter-reply
Letter-reply Countersigned by the Division INTEL Chief, IIO Director and DED Administration
1 day Executive Assistant/ Executive Director
Letter-reply proofread/edited and reviewed by the Executive Assistant and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/Executive Director, the same is returned to INTEL Division for corrections, then proceed to step 3 to 12, otherwise the same is approved by the Executive Director.
The letter-reply of the BLGF Central Office on related/miscellaneous communications in connection with the pending administrative complaint, after
317
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
having been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division
to be routed out to Records Section, which in turn shall be transmitted to the concerned office/person, for dissemination.
14 Office of the Executive Director records and transmits the approved/signed Letter-reply
Approved/signed Letter-reply
5 minutes Secretary of the Office of the Executive
Director
Date, time and details of approved/signed Letter-reply are recorded in the logbook of the Office of the Executive Director
The approved/signed Letter-reply is transmitted to INTEL Division.
15 CO-INTEL Division receives and records the approved/signed Letter-reply
Approved/signed Letter-reply
10 minutes Admin Officer
Date, time and details of approved/signed Letter-reply are recorded in the logbook of INTEL Division
A photocopy of the Letter-reply is kept for file. Original and duplicate copies of the Letter-reply together with the attachments are routed out To Records Section.
16 CO-Records Section receives and records the approved/signed Letter-reply
Approved/signed Letter-reply
5 minutes Records Officer (CO
Records Section)
Date, time and details of approved/signed Letter-reply are recorded in the logbook of the Records Section
The approved/signed Letter-reply is transmitted to concerned office/person.
End of Process
318
1.5 Prepares communications regarding decisions, resolutions, orders of judicial bodies and quasi-judicial bodies on
pending administrative or criminal complaints
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives decision/resolution/ order and record the same in the INTEL logbook
Decision/ Resolution/Order including attachments
10 minutes Admin Officer
Date, time, and details of the decision/ resolution/order recorded in the logbook of the INTEL Division. Corresponding CCS attached.
The decision/resolution/order is forwarded to Intelligence Officer, for appropriate action.
2
CO – INTEL Division studies and evaluates the decision/resolution/ order together with the attachments.
Decision/ Resolution/Order
2 days
Intelligence Officer
Completeness of the documents/ attachments reviewed. Initial action prepared.
3 CO - INTEL Division prepares and finalizes the initial action/draft on the decision/resolution/ order
Initial action/draft 1 day Intelligence Officer
Initial action/draft prepared by Intelligence Officer
Letter-reply(letter-referral, for brevity), Intelligence Officer prepares either a:1)letter-reply to judicial and quasi-judicial bodies, or 2) a letter referral to the regional office is forwarded to the INTEL Chief, for review.
319
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 CO-INTEL Division reviews the Letter-reply/Letter referral
Letter-reply/Letter-referral countersigned by the Intelligence Officer
2 days Division INTEL Chief
Letter-reply/Letter-referral reviewed and countersigned by the Division INTEL Chief
If corrections/revisions are made by the Division Chief on the letter-reply/letter-referral, the same is returned to the Intelligence Officer for editing/revision, then proceed to Step 4, otherwise the Letter-reply is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO-INTEL Division records and transmits the Letter-reply/Letter-referral
Letter-reply/Letter referral countersigned by Intelligence Officer and Division INTEL Chief
5 minutes Admin Officer, INTEL
Division
Date, time and details of Letter-reply/Letter-referral are recorded in the logbook of the INTEL Division
The initial draft of Letter-reply/Letter-referral is forwarded to the IIO Director , for review.
6 CO-Office of the IIO Director receives and records the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by Intelligence Officer and Division INTEL Chief
5 minutes Admin Aide, Office of the IIO Director
Date, time and details of the Letter-reply/Letter-referral are recorded in the logbook of the Office of IIO Director
320
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7 IIO Director reviews the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by Intelligence Officer and Division INTEL Chief
1 day IIO Director Letter-reply/Letter-referral reviewed and countersigned by the IIO Director
If corrections/revisions are made by the IIO Director on the Letter-reply/Letter-referral, the same is returned to the Intelligence Officer for editing/revision, then proceed to step 4 to 6, otherwise the Letter-reply/Letter-referral is forwarded to the Deputy Executive Director (DED) for Administration, for review.
8 CO- Office of the IIO Director records and transmits the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
5 minutes Admin Aide, Office of the IIO Director
Date, time and details of Letter-reply/Letter-referral are recorded in the logbook of the Office of the IIO Director
The final draft Letter-reply/Letter-referral is forwarded to the Office of the Deputy Executive Director (DED), for Administration, for review and countersignature.
9 CO- Office of the Deputy Executive Director (DED), Administration receives and records the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by the Intelligence Officer, Division
5 minutes Secretary of the DED for
Admin
Date, time and details of Letter-reply/Letter-referral are recorded in the logbook of the
321
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
INTEL Chief & IIO Director
Office of the DED for Admin
10 Deputy Executive Director (DED), Administration reviews and recommends the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
1 day DED for Admin
Letter-reply/Letter-referral reviewed, recommended and countersigned by the DED for Admin
If corrections/revisions are made on the Letter-reply/Letter-referral by the DED for Admin , the same is returned to the INTEL division for corrections, then proceed to step 3 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
11
CO-Office of the DED for Admin records and transmits the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by Division INTEL Chief, IIO Director , & DED for Admin
5 minutes Secretary of the DED for
Admin
Date, time and details of Letter-reply/Letter-referral are recorded and transmitted in the logbook of the Office of the deputy Executive Director, Administration
The final draft of Letter-reply/Letter-referral is forwarded to the Executive Assistant, Office of the Executive Director (OED), for proofreading/editing.
12 CO-Office of the Executive Director receives and records the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by the Division INTEL
5 minutes Secretary of the Office of the Executive
Director
Date, time and details of Letter-reply/Letter-referral re recorded in the
The Letter-reply is forwarded to the Executive Assistant, Office of the Executive Director for
322
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief, IIO Director & DED Administration
logbook of the Office of the Executive Director
proofreading/editing.
13 Executive Assistant/Executive Director proofreads/edits/ reviews and approves the Letter-reply/Letter-referral
Letter-reply/Letter-referral countersigned by the Division INTEL Chief, IIO Director & DED Administration
1 day Executive Assistant/ Executive Director
Letter-reply/Letter-referral proofread/edited and reviewed by the Executive Assistant and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/Executive Director, the same is returned to INTEL Division for corrections, then proceed to step 3 to 12, otherwise, the same is approved by the Executive Director.
The letter-reply/Letter-referral of the BLGF-Central Office on decision/resolution/order from judicial and quasi-judicial bodies relative to pending
administrative/criminal complaints against Bureau personnel and local treasurers, after having been reviewed by the concerned Office Director and
approved/signed by the Executive Director, shall be transmitted back to the INTEL Division to be routed out to Records Section, which in turn shall be
transmitted to the concerned office/person, for dissemination.
14 Office of the Executive Director records and transmits the approved/signed Letter-reply/Letter-referral
Approved/signed Letter-reply
5 minutes Secretary of the Office of the Executive
Director
Date, time and details of approved/signed Letter-reply/Letter-referral are recorded in the logbook of the Office of the Executive Director
The approved/signed Letter-reply/Letter-referral is transmitted to INTEL Division.
15 CO-INTEL Division receives and records the Approved/signed 10 minutes Admin Date, time and A photocopy of the
323
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
approved/signed Letter-reply/Letter-referral Letter-reply/Letter-referral
Officer details of approved/signed Letter-reply/Letter-referral are recorded in the logbook of INTEL Division
Letter-reply/Letter-referral is kept for file. Original and duplicate copies of the Letter-reply/Letter-referral together with the attachments, are routed out to Records Section.
16 CO-Records Section receives and records the approved/signed Letter-reply/Letter-referral
Approved/signed Letter-reply/Letter-referral
5 minutes Records Officer (CO
Records Section)
Date, time and details of approved/signed Letter-reply/Letter-referral are recorded in the logbook of the Records Section
The approved/signed Letter-reply/Letter-referral is transmitted to concerned office /person.
End of Process
324
1.6 Assists in the conduct of fact-finding investigation, when requested by the Regional Office
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives, request to assist in the conduct of fact-finding/preliminary investigation (request, for brevity) and records the same in the INTEL logbook
Request to assist in the conduct of fact-finding/preliminary investigation including attachments
10 minutes Admin Officer
Date, time, and details of request to assist in the conduct of fact-finding/preliminary investigation. Corresponding CCS attached.
The request to assists in the conduct of fact-finding/preliminary investigation is forwarded to Intelligence Officer, for appropriate action.
2
CO – INTEL Division studies and evaluates the nature/merit of the request together with the attachments
Request to assist in the conduct of fact-finding/preliminary investigation including attachments
1 day
Intelligence Officer
Completeness of the documents/ attachments reviewed. Initial action prepared.
INTEL Division will either prepare a Bureau Special Personnel Order (BSPO) which includes the composition of the fact-finding/preliminary investigating team (which should be coordinated with the CO-FOED Division) or a letter-reply to the Regional Office which shall state the reasons for the denial of the request
3 CO - INTEL Division prepares and finalizes the initial action/draft on the request
Draft BSPO or letter-reply
2 days Intelligence Officer
Initial Draft BSPO or letter-reply countersigned by the Intelligence
The initial draft is forwarded to the INTEL Chief, for review.
325
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Officer
4 CO-INTEL Division reviews the BSPO/letter-reply
BSPO/letter-reply countersigned by the Intelligence Officer
2 days INTEL Chief BSPO/letter-reply reviewed and countersigned by the INTEL Chief
If corrections/revisions are made by the INTEL Chief on the BSPO/letter-reply, the same is returned to the Intelligence Officer for editing/revision, then proceed to steps 3 to 4, otherwise the Letter-directive is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO- INTEL Division records and transmits the BSPO/letter-reply
BSPO/letter-reply countersigned by the Intelligence Officer, and INTEL Chief
5 minutes Admin Officer, INTEL
Division
Date, time and details of BSPO/letter-reply are recorded in the logbook of the Office of IIO Director
The initial draft of BSPO/letter-reply is forwarded to the IIO Director , for review.
The before and after counter signature/ approval by the concerned Directors shall be recorded in the logbook Of The Respective Office Administrative Officers I / Secretaries.
6 IIO Director reviews the letter-reply/BSPO Letter-reply/BSPO countersigned by the Intelligence Officer and INTEL Chief
1 day IIO Director Letter-reply/BSPO reviewed and countersigned by the IIO Director
If corrections/revisions are made by the Director IIO on the letter-reply/BSPO, the same is returned to the Intelligence Officer for editing/revision,
326
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to steps 4 to 6, otherwise the Letter-directive is forwarded to the Deputy Executive Director (DED) for Administration, for review.
7 Deputy Executive Director (DED), Administration reviews and recommends BSPO/letter-reply
BSPO/letter-reply countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
1 day DED for Admin
BSPO/letter-reply reviewed, recommended and countersigned by the DED for Admin
If corrections/revisions are made on the BSPO/letter-reply, by the Deputy Executive Director, Administration, the same is returned to INTEL Division for corrections, then proceed to steps 3 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
8
Executive Assistant/Executive Director proofreads/edits/ reviews and approves the BSPO/letter-reply
BSPO/letter-reply countersigned by the Division INTEL Chief, IIO Director and DED for Admin
1 day Executive Assistant/ Executive Director
BSPO/letter-reply proofread/edited/and reviewed by the Executive Assistant and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/Executive Director, the same is returned to INTEL Division for corrections, then proceed to steps 3 to
327
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12, otherwise, the same is forwarded to the Executive Director, for final approval.
The BSPO/letter-reply of the BLGF-Central Office to the Request for assistance by the Regional Office, after having been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division to be routed out to the Records Section,
which in turn shall be transmitted to the Regional Office concerned, for dissemination. 9 CO-INTEL receives and records the
approved/signed BSPO/letter-reply Approved/signed BSPO/letter-reply
10 minutes Admin Officer
Date, time and details of approved/signed BSPO/letter-reply are recorded in the logbook of INTEL Division
A photocopy of the BSPO/letter-reply is kept for file. Original and duplicate copies of the Letter-reply together with the attachments, are routed out to Records Section.
10 CO-Records Section receives and records the approved/signed BSPO/letter-reply
Approved/signed BSPO/letter-reply
5 minutes Records Officer (CO
Records Section)
Date, time and details of approved/ signed BSPO/letter-reply are recorded in the logbook of the Records Section
The approved/signed BSPO/letter-reply is transmitted to concerned office (Regional Office)/person.
End of Process
328
2.1 Issues Certificate of No Pending Administrative Complaint
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-INTEL receives request form for no pending administrative complaint (request form, for brevity) and records the same in the INTEL logbook
request form from Administrative Division
5 minutes
Admin Officer
Date, time and details of the request form recorded in the logbook of INTEL Division.
The Admin. Officer I checks the index files of the INTEL Division and PR 130 if there is a pending complaint or case filed against the concerned Bureau personnel or local treasury official.
2 CO-INTEL evaluates, the request form and certifies that the concerned Bureau personnel or local treasury official has no pending administrative complaint filed with the Bureau
request form 10 minutes Admin Officer
Request form countersigned by the Administrative Officer I, INTEL Division
The request form together with the PR 130 are forwarded to the INTEL Chief for review and countersignature.
3 CO-INTEL Division reviews the request form Request form 5 minutes INTEL Chief Division
Request form reviewed and countersigned by the INTEL Chief Division
If corrections are made by the Division INTEL Chief on the request form, the same is returned to the Admin. Officer I for correction, then proceed to step 2, otherwise the Certificate is forwarded to the INPRO Division for countersignature.
4 CO-INTEL Division Request form 5 minutes Admin Date, time, and The request form
329
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
records and transmits the request form countersigned by Admin. Officer I and INTEL Chief Division
Officer details of request form are recorded in the logbook of the INTEL Division
together with PR 130 are forwarded to the Admin. Officer I, INPRO Division, for countersignature.
End of Process
330
2.2 Prepare periodic and on-demand reports;
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO - INTEL Division receives and records Written/verbal request/ with the attachments
Written/verbal request/ including attachments
10 minutes Admin Officer
Date, Time, and details of Written/verbal request/ with the attachments recorded in the logbook of the INTEL Division. Corresponding CCS attached.
The written/verbal request is forwarded to Intelligence Officer, for appropriate action. The request may be for the regular reports required from the Intelligence Division (i.e., Monthly Report of Output (MRO), Unit Performance Evaluation Sheets (UPES), Status of Pending Administrative Complaints, or on-demand reports (i.e. report for budget preparation or report required by the House of Representatives or the Senate)
2
CO – INTEL Division prepares and finalizes Report with the attachments
Written/verbal request with the attachments
3 days
Intelligence Officer
Report countersigned by the Intelligence Officer with the attachments
If the Report required is periodic in nature, the 2-day processing period shall be applicable, however if the required Report is considered on-
331
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
demand the 1-day processing period shall be applicable. Report is forwarded to the INTEL Chief for review
4 CO-INTEL Division reviews Report Report countersigned by the Intelligence Officer
1 day INTEL Chief Report reviewed and countersigned by the INTEL Chief Division
If corrections/revisions are made by the INTEL Chief on the Report, the same is returned to the Intelligence Officer for editing/finalization, and then proceed to Step 2; otherwise the Report is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5 CO-INTEL Division records and transmits the Report
Report countersigned by the Intelligence Officer and INTEL Chief Division
5 minutes Admin Officer
Date time, and details of Report are recorded in the logbook of the INTEL Division
The initial draft of Report is forwarded to the IIO Director , for review.
6 CO-Office of the IIO Director receives and records the Report
Report countersigned by the Intelligence Officer, INTEL Chief Division
5 minutes Admin Aide, Office of the IIO Director
Date time, and details of Report are recorded in the logbook of the Office of the IIO
332
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director
7
IIO Director reviews the Report Report countersigned by Intelligence Officer, and INTEL Chief Division
1 day
IIO Director Report is reviewed and countersigned by the IIO Director
If corrections/revisions are made by the IIO Director on the Report, the same is returned to the Intelligence Officer for editing/revision, then proceed to step 4 to 6, otherwise the same is forwarded to the Deputy Executive Director (DED) for Administration, for further review.
8 CO-Office of the IIO Director records and transmits the Report
Report countersigned by Intelligence Officer, Division INTEL Chief & Director, (IIO)
5 minutes Admin Aide, Office of the IIO Director
Date, time and details of Reports are recorded in the logbook of the Office of the IIO Director
The final draft of the Report is forwarded to the Office of the Deputy Executive Director (DED), Administration, for further review and countersignature.
9 CO – Office of the DED for Admin receives and records the Report
Report countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
5 minutes Secretary of the
Deputy Executive Director
Date, time and details of Report are recorded in the logbook of the Office of the Deputy Executive Director, Administration
The Decision is transmitted to the DED for Admin for review and countersignature.
333
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10
DED for Admin reviews and recommends the Report
Report countersigned by Intelligence Officer, Division INTEL Chief & IIO Director
1 day DED for Admin
Report reviewed, recommended and countersigned by the Deputy Executive Director, Administration
If corrections/revisions are made on the Report by the Deputy Executive Director, Administration, the same is returned to INTEL Division for editing/corrections, then proceed to step no. 4 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
11 CO-Office of the DED for Admin records and transmits the Report
Report countersigned by Division INTEL Chief, IIO Director , Deputy Executive Director (DED), Administration
5 minutes Secretary of DED for Admin
Date, time and details of the Report are recorded in the logbook of the Office of the Deputy Executive Director, Administration
The final draft Report is forwarded to the Executive Assistant, Office of the Executive Director (OED), for proofreading/editing.
12 Office of the Executive Director receives and records the Report
Report countersigned by Division INTEL Chief, IIO Director , & Deputy Executive Director, Administration
5 minutes Secretary of Office of the
Executive Director
Date, time and details of Report are recorded in the logbook of the Office of the Executive Director
The Report is forwarded to the Executive Assistant, Office of the Executive Director for proofreading/editing.
334
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13 Executive Assistant /Executive Director proofreads/ reviews / approves the Report
Report countersigned by Division INTEL Chief IIO Director , & Deputy Executive Director, Administration
1 day Executive Assistant/ Executive Director
Report proofread/ reviewed/edited by the Executive Assistant and approved/ signed by the Executive Director
If corrections/revisions are made by the Executive Assistant/ Executive Director, the same is returned to INTEL Division corrections, then proceed to step no. 3 to 12.otherwise, the same is approved by the Executive Director.
The Report of the Intelligence Division which may be classified as periodic reports/updates (i.e. UPES, Monthly Report of Output (MRO), after having
been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL Division to be
routed out to Internal Administration Office (IIO), in compliance to the office policy on submission of monthly reports. On the other hand, if the Reports
required are considered on-demand reports (i.e. report needed in the budget preparation, or those required by the House of Representatives or the
Senate), after having been reviewed by the concerned Office Director, and approved/signed either by the Deputy Executive Director for
Administration/Executive Director shall be transmitted back to the INTEL Division to be routed out to concerned office/person, for utilization of the
information required.
14 Office of the Executive Director records and transmits the approved/signed Report
Approved/ signed Report
5 minutes Secretary of Office of the
Executive Director
Date, time and details of approved/signed Report are recorded in the logbook of the Office of Executive Director.
The approved/signed Report is transmitted to INTEL Division.
15 CO-INTEL receives and records the approved/signed Report
Approved/ signed Report
10 minutes Admin Officer
Date, time and details of approved / signed
A photocopy of the Report is kept by the Division for file.
335
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Report are recorded in the logbook of INTEL Division
Original and duplicate copies of the Report together with the attachments, are transmitted to Internal Administration Office (IAO), if the Report required is periodic in nature, however, if the Report required is considered on-demand report (or for submission to budget hearing in the House of representatives or the Senate),it shall be routed out to Records Section and transmitted to concerned offices, for utilization of the information required therein.
16 CO – Internal Administration Office (IAO)/Records Section receives and records the approved Report
Approved/ signed Report
5 minutes Secretary, (IAO) /
Records Officer, CO
Records Section
Date, time and details of approved/ signed Report are recorded in the logbook of the Internal Administration
The approved/signed Report is transmitted to concerned offices.
336
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office (IAO)/Records Section
End of Process
337
Operating Procedures for Bureau Administration Intelligence and Investigation Office
Investigation and Prosecution Division
338
SERVICE : Intelligence and Investigation Office (IIO) DIVISION : Investigation and Prosecution Division UNIT NAME : BRIEF DESCRIPTION : Investigation and Prosecution Division (INPRO) is directly supervised by Director II,
Intelligence and Investigation Office. This Division handles administrative proceedings in disciplinary cases. As such, it prosecutes administrative cases with formal charge until the termination of the case. Likewise, it enforces administrative discipline against Bureau personnel and local treasury officials and renders decisions thereon.
CLIENTS : BLGF Central & Regional Offices, LGUs, DOJ, Judiciary Branch, General Public Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Prosecution of administrative cases filed against Bureau Personnel and Local Treasury Officials and render decisions thereof
1.1 Conduct formal hearing and resolve administrative cases filed against BLGF employees and local treasurer;
1.2 Represent the Bureau in court hearing whenever local treasurer, assessment officials and BLGF employees are sued in court;
1.3 Prepare periodic and on-demand report on administrative cases;
1.4 Prepare related communications, in connection with pending administrative case and other matters pertaining to administrative discipline;
2. Enforcement of administrative resolutions, decisions from judicial and quasi-judicial agencies
2.1 Implement and enforce decisions/resolutions of the Office of the Ombudsman, Sandiganbayan, Court of Appeals, CSC, Supreme Court, and other agencies that have concurrent jurisdiction with the BLGF over administrative cases/liabilities of BLGF employees and local treasurers
339
SPECIFIC FUNCTIONS
1.1 Resolves administrative cases filed against BLGF employees and local treasurers;
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Refer to Uniform Rules on Administrative Cases in the Civil Service (URACCS) -CSC Resolution No. 991936- relative to administrative proceedings prior to the submission of the docket, with recommendation, by the BLGF Regional Office to the BLGF Central Office
1. CO-INPRO Division receives, records, and indexes, the subject docket of the case with supporting documents from CO-Record Section
Docket of the case with Formal Charge: Answer; Report of Formal Investigation with recommendation; Preventive Suspension Order; if applicable
10 minutes Admin Officer Date, Time, and Details of (docket of the case with supporting documents recorded in the logbook and indexed the same. Corresponding ccs no. Attached;
The docket of the case with supporting documents are forwarded to Special Investigator ll / Intelligence Officer lll
2. CO – INPRO Division evaluates, prepares, and finalizes draft decision on the case at hand
Docket of the case with Formal Charge: Answer; Report of Formal Investigation with recommendation; Preventive Suspension Order; if applicable
14 days
Special Investigator &
the Intelligence Officer
Draft Decision The docket, together with draft decision is forwarded to the Admin Officer
3.
CO - INPRO Division records and transmits the draft
Draft Decision with docket of the case
5 minutes Admin Officer Date, time and details of draft Decision with
The draft decision with docket of the case are forwarded to INPRO Chief for review and
340
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Decision docket of the case are recorded in the logbook
countersignature;
4. CO-INPRO Division reviews the draft Decision with docket of the case
Draft Decision countersigned by Special Investigator II / Intelligence Officer with docket of the case
10 days INPRO Chief Draft Decision with docket of the case countersigned by INPRO Chief
If corrections/revisions are made by the INPRO Chief on the draft Decision with docket of the case, the same are returned to the Special Investigator ll / Intelligence Officer lll, for editing/research/ finalization, then proceed to step no. 2 to 4, otherwise draft Decision with docket of the case are forwarded to the Office of the Director, Intelligence and Investigation Office (IIO)
5. CO - Office of the IIO Director, receives and records the Decision countersigned by INPRO Chief
Decision countersigned by INPRO Chief
5 minutes Secretary of the IIO Director
Date, time and details of decision are recorded in the logbook of the Office of the IIO Director
The Decision is transmitted to the IIO Director for review and countersignature
The Before and After counter signature/ approval by the concerned Directors shall be recorded in the logbook Of the Respective Office Administrative Officers I/ Secretaries.
6. IIO Director reviews and evaluates decision with docket of the case
Decision countersigned by Special Investigator II / Intelligence Officer lll and INPRO Chief, with docket
4 days
IIO Director Decision is reviewed and countersigned by the IIO Director with docket of the case
If corrections/revisions are made by the IIO Director on the Decision with docket of the case, the same are returned to the INPRO for editing/research/finalization,
341
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
of the case then proceed to step no. 2 to 5, otherwise the Decision with docket of the case are forwarded to the Office of the Deputy Executive Director (DED) for Administration
7. Deputy Executive Director, Administration reviews /evaluates Decision with docket of the case
Decision countersigned by Special Investigator II / Intelligence Officer lll, INPRO Chief and IIO Director
1 day Deputy Executive Director for
Administration
Decision reviewed and countersigned by the Deputy Executive Director, Administration
If corrections/revisions are made by the Deputy Executive Director – Administration, on the Decision, the same are returned to INPRO for editing/research/finalization, then proceed to step no. 2 to 6, otherwise, the Decision is forwarded to the Office of the Executive Director
8. CO-Office of the Executive Director proofreads Decision with docket of the case and Executive Director reviews and approves/signs Decision with docket of the case
Decision countersigned by Special Investigator II, INPRO Chief, IIO Director and DED, Administration
1 day Executive Assistant, Executive Director
Decision proofread by the Executive Assistant and reviewed and approved/signed by the Executive Director with docket of the case
If corrections/revisions are made by the Executive Director on the Decision, the same are returned to
The Decision/Resolution, after having been reviewed by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the INPRO for next steps
9. CO-INPRO receives and records the signed/approved Decision
Approved /signed Decision
15 minutes Admin Officer Date, time and details of approved / signed Decision are recorded in the
A photocopy of the Decision/Resolution are kept by the Division for file. Original and duplicate copies
342
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
logbook of INPRO Division
of Decision/ with attachments, are transmitted to Records Section
10. CO – Records Section receives and records the approved Decision
Approved /signed Decision
10 minutes Admin Aide (CO Records Section)
Date, time and details of approved / signed Decision are recorded in the logbook of Records Section
Decision is transmitted to concerned office (Regional Office)/ person.
End Of Process
343
1.3 Prepare periodic and on-demand report on administrative cases
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
A verbal and/or written request for submission of Periodic, on-demand Report / monitoring Report is given to INPRO Division 1. CO – INPRO Division
receives, request and records the same in the Legal logbook;
Written/verbal request/ including attachments
10 minutes Admin Officer Date, Time, and details of request recorded in the logbook of the Legal Division. Corresponding CCS attached.
The written/verbal request is forwarded to Legal Assistant, for appropriate action. The request may be for the regular reports required from the Legal Division (i.e., Monthly Report of Output (MRO), Unit Performance Evaluation Sheets (UPES), Status of Pending administrative non-disciplinary cases or on-demand reports (i.e. report for budget preparation or report required by the House of Representatives or the Senate)
2. CO – INPRO Division prepares and drafts the report together with the attachments.
Written/verbal request
1 day
Legal Assistant Completeness of the documents/ attachments reviewed. Initial action prepared.
If the Report required is periodic in nature, the 2-day processing period shall be applicable, however if the required Report is considered on-demand the 1-day processing period shall be applicable.
3.
CO - INPRO Division finalizes the draft
Initial draft of the reports
1 day Legal Assistant Reports prepared by Legal Assistant
Report is forwarded to the Legal Chief Division, for
344
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Report review.
4. CO-INPRO Division reviews the Report
Report countersigned by the Legal Assistant
1 day Legal Chief Report reviewed and countersigned by the Legal Chief Division
If corrections/revisions are made by the Legal Chief on the Report, the same is returned to the Legal Assistant for editing/revision, then proceed to Step 4, otherwise the Report is forwarded to the Director, Intelligence and Investigation (IIO), for review.
5. CO-INPRO Division records and transmits the Report
Report countersigned by the Legal Assistant and Legal Chief Division
5 minutes Admin Officer Date time, and details of Report are recorded in the logbook of the Legal Division
The initial draft of Report is forwarded to the IIO Director, for review .
The before and after counter signature/ approval by the concerned directors shall be recorded in the logbook Of the Respective office Administration officers I/ Secretaries.
6. IIO Director reviews the Report
Report countersigned by Legal Assistant, and Legal Chief Division
1 day
IIO Director Report is reviewed and countersigned by the IIO Director
If corrections/revisions are made by the IIO Director on the Report, the same is returned to the Legal Assistant for editing/revision, then proceed to step 4 to 6, otherwise the same is forwarded to the Deputy Executive Director (DED) for Administration, for further review.
345
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
7. Deputy Executive Director, Administration reviews and recommends the Report
Report countersigned by Legal Assistant, Division Chief, INTEL & IIO Director
1 day DED for Admin Report reviewed, recommended and countersigned by the Deputy Executive Director, Administration
If corrections/revisions are made on the Report by the Deputy Executive Director, Administration, the same is returned to Legal Division for editing/corrections, then proceed to step no. 4 to 9, otherwise, the same is forwarded to the Office of the Executive Director (OED).
The Report of the Intelligence Division which may be classified as periodic reports/updates (i.e. UPES, Monthly Report of Output (MRO), after having been reviewed by the concerned Office Director and approved/signed by the Executive Director, shall be transmitted back to the INTEL
Division to be routed out to Internal Administration Office (IIO), in compliance to the office policy on submission of monthly reports. On the other hand, if the Reports required are considered on-demand reports (i.e. report needed in the budget preparation, or those required by the
House of Representatives or the Senate), after having been reviewed by the concerned Office Director, and approved/signed either by the Deputy Executive Director for Administration/Executive Director shall be transmitted back to the INTEL Division to be routed out to concerned
office/person, for utilization of the information required.
8. CO-INPRO receives and records the approved/signed Report
Approved/ signed Report
10 minutes Admin Officer Date, time and details of approved / signed Report are recorded in the logbook of Legal Division
A photocopy of the Report is kept by the Division for file. Original and duplicate copies of the Report together with the attachments, are transmitted to Internal Administration Office (IAO), if the Report required is periodic in nature, however, if the Report required is considered on-demand report (or for submission to budget hearing in the House of representatives or the
346
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Senate),it shall be routed out to Records Section and transmitted to concerned offices, for utilization of the information required therein.
9. CO – Internal Administration Office (IAO)/Records Section receives and records the approved Report
Approved/ signed Report
5 minutes Secretary, Internal
Administration Office
(IAO)/Records Officer II, Central
Records
Date, time and details of approved/ signed Report are recorded in the logbook of the Internal Administration Office (IAO)/Records Section
The approved/signed Report is transmitted to concerned offices.
End Of Process
347
1.4 Prepares related communications, in connection with pending administrative cases.
Step Process
Input Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-INPRO Division receives, records, and indexes, the subject follow-up letter, letter-query, letter-request; / Indorsement, with attachments
follow-up letter; letter-query; letter-request/ Indorsement, with attachments
10 minutes
Admin Officer
Date, Time, and Details of follow-up letter; letter-query; letter-request/Indorsement registered in the logbook and indexed the same. Corresponding ccs no. attached.
The subject-letter, with attachments, is forwarded to Special Investigator II
2
CO-INPRO Division evaluates, prepares, and finalizes draft letter-reply/ Indorsement
follow-up letter; letter-query; letter-request;/ Indorsement, with attachments
1 to 3 days Special Investigator
Draft letter-reply/ Indorsement
Draft letter-reply / Indorsement forwarded to Admin Officer
3. CO-INPRO Division Records and transmits draft letter-reply/Indorsement
Draft Letter-reply/Indorsement
5 minutes Admin Officer
Date, Time and details of draft letter-reply/ Indorsement are recorded in the logbook of INPRO
Draft letter-reply/ Indorsement is transmitted to INPRO Chief, for review and countersignature
4
CO-INPRO Division reviews the draft Letter-reply / Indorsement
Draft Letter-reply/ Indorsement
2 days
INPRO Chief Draft Letter-reply/Indorsement countersigned by the INPRO Chief
If corrections/revisions are made by the INPRO Chief on the draft letter-reply/Indorsement, the said letter is returned to Special Investigator ll for
348
Step Process
Input Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/research/finalization, then proceed to step no. 2 to 4, otherwise the same is forwarded to the Office of the Director, Intelligence and Investigation Office
5 CO - INPRO Division records and transmits the draft Letter-Reply/ Indorsement
Draft letter-reply/Indorsement countersigned by Special Investigator ll and INPRO Chief
5 minutes Admin Officer
Date, time and details of draft letter-reply / Indorsement are recorded in the logbook of INPRO
Draft letter-reply / Indorsement is forwarded to the Office of the Director ll, Intelligence and Investigation Office
6 CO- Office of the Director, Intelligence and Investigation Office, receives and records the letter-reply/Indorsement, countersigned by INPRO Chief
Letter-reply / Indorsement countersigned by INPRO Chief
5 minutes Secretary of the IIO
Director
Date, time and details of draft letter-reply / Indorsement are recorded in the logbook of the Office of the Director, Intelligence and Investigation Office
Letter-reply / Indorsement is transmitted to the Director, Intelligence and Investigation Office, for review and countersignature
The letter-reply/indorsement is routed to the Office Director for review and countersign, and approval of the Executive Director
7
IIO Director reviews and re-evaluates the letter-reply/Indorsement
Letter-reply /Indorsement countersigned by INPRO Chief
1 day IIO Director letter-reply / Indorsement is reviewed and countersigned by Director, Intelligence and Investigation Office
If corrections/revisions are made by the Director, Intelligence and Investigation Office, on the letter-reply / Indorsement, the same is returned to INPRO, for editing/research/ finalization, then proceed to step no. 2 to 5, otherwise the same is forwarded to the Deputy Executive Director (DED)-for
349
Step Process
Input Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
Administration
8 CO-Office of the Director, Intelligence and Investigation Office records and transmits the letter-reply/Indorsement
Letter-reply/Indorsement countersigned by the Director, Intelligence and Investigation Office
5 minutes Secretary of the IIO
Director
Date, time and details of letter-reply/indorsement are recorded in the logbook of the Office of the Director, Intelligence and Investigation Office
The final draft letter-reply/indorsement is forwarded to the Office of the Deputy Executive Director for Administration
9
CO- Office of the Deputy Executive Director, Administration, receives and records the draft letter-reply/Indorsement
Letter-reply/Indorsement countersigned by INPRO Chief and Director, Intelligence and Investigation Office
5 minutes Secretary of the DED for
Admin
Date, time and details of letter-reply/indorsement are recorded in the logbook of the Office of the Deputy Executive Director for Administration
The draft letter-reply / Indorsement is transmitted to the Deputy Executive Director for Administration for review and countersignature
10 Deputy Executive Director for Administration reviews/evaluates the draft letter-reply/indorsement countersigned by INPRO Chief and Director, Intelligence and Investigation Office
Letter-reply / Indorsement countersigned by INPRO Chief, and Director, Intelligence and Investigation Office
1 day DED for Admin
Draft Letter-reply /Indorsement reviewed and countersigned by the Deputy Executive Director for Administration
If correction/revisions are made by the Deputy Executive Director for Administration, the same is returned to INPRO for editing/research/finalization, then proceed to step no. 2 to 6, otherwise, the same is forwarded to the Office of the Executive Director
350
Step Process
Input Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
11 CO-Office of the Deputy Executive Director for Administration, records and transmits the letter-reply/Indorsement countersigned by INPRO Chief, Director, Intelligence and Investigation Office, to the Office of the Executive Director
Letter-reply/Indorsement countersigned by INPRO Chief, Director, Intelligence and Investigation Office, Deputy Executive Director
5 minutes Secretary of DED for Admin
Date, time and details of the decision are recorded in the logbook of the Office of the Deputy Executive Director, Administration
The final draft letter-reply is forwarded to the Office of the Executive Director
12 Office of the Executive Director receives and records the letter-reply/INdorsement
Letter-reply/Indorsement countersigned by INPRO Chief, Director, Intelligence and investigation Office, and Deputy Executive Director for Administration
5 minutes Secretary of the Office of
the Executive Director
Date, time and details of the decision are recorded in the logbook of the Office of the Executive Director
The letter-reply/Indorsement is transmitted to the Exrcutive Assistant, Office of the Executive Director for proofreading
13 Executive Assistant/Executive Director proofreads/reviews/approves the letter-reply/indorsement
Letter-reply / Indorsement countersigned by INPRO Chief, Director, Intelligence and Investigation Office, Deputy Executive Director for Administration
1 day Executive Assistant / Executive Director
Letter-reply proofread by Executive Assistant and reviewed, approved and signed by the Executive Director
If corrections/revisions are made by the Executive Assistant /Executive Director, the same is returned to INPRO for editing and finalization, then proceed to step 2 to 9
The letter-reply / IInodrsement after having been reviewed by the concerned Office Directors and approved/signed by the Executive Director shall be transmitted back to the INPRO for next steps
351
Step Process
Input Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
14 Office of the Executive Director records and transmits the signed/approved Indorsement /Letter-reply
Approved/ signed Indorsement / Letter-reply
5 minutes Secretary of the Office of
the Executive Director
Date, time and details of approved/signed letter-reply / Indorsement are recorded in the logbook of the Office of Executive Director.
The approved/signed Letter-reply / Indorsement is transmitted to INPRO
15 CO-INPRO receives and records the signed/approved letter-reply / Indorsement
Approved /signed letter-reply/Indorsement
10 minutes Admin Officer
Date, time and details of approved / signed letter-reply / Indorsement are recorded in the logbook of INPRO Division
A photocopy of the letter-reply/ Indorsement is kept by INPRO for file. Original and duplicate copies of the same are transmitted to Records Section
16 CO – Records Section receives and records the approved letter-reply/Indorsement
Approved /signed letter-reply/Indorsement
5 minutes Admin Aide (CO Records
Section)
Date, time and details of approved / signed letter-reply /indorsement are recorded in the logbook of Records Section
Letter-reply/Indorsement is transmitted to concerned office (Regional Office)/ person.
End of Process
352
2.1 Implement and enforce decisions/resolutions of the Office of the Ombudsman, Sandiganbayan, Court of Appeals,
CSC, Supreme Court, and other agencies that have concurrent jurisdiction with the BLGF over administrative
cases/liabilities of BLGF employees and local treasurers
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
1. CO-INPRO Division receives, records, and indexes, the subject decision / resolution / order from judicial and quasi-judicial body
decision / resolution / order from judicial and quasi-judicial body
10 minutes Admin Officer Date, Time, and Details of decision / resolution / order from judicial and quasi-judicial body registered in the logbook and indexed the same. Corresponding ccs no. Attached.
The subject decision /
resolution / order from
judicial and quasi-judicial
body, is forwarded to Special
Investigator II / Intelligence
Officer lll
2. CO-INPRO Division evaluates, prepares, and finalizes draft letter-reply and letter-directive
decision / resolution / order from judicial and quasi-judicial body
1 to 3 days
Special Investigator / Intelligence
Officer
Draft letter-reply and letter-directive
Draft letter-reply and letter-
directive forwarded to Admin
Officer
3.
CO-INPRO Division Records and transmits draft letter-reply and letter-directive
Draft Letter-reply/ and letter-directive
10 minutes Admin Officer Date, Time and details of draft letter-reply/ and letter-directive are recorded in the logbook of INPRO
Draft letter-reply and letter-directive is transmitted to INPRO Chief, for review and countersignature
4. CO-INPRO Division Draft Letter-reply and letter-directive
2 days INPRO Chief Draft Letter-reply If corrections/revisions are made by the INPRO Chief on
353
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
reviews the draft
Letter-reply and
letter-directive
and letter-directive
countersigned by
the INPRO Chief
the draft letter-reply and letter-directive, the said letter is returned to Special Investigator ll for editing/research/finalization, then proceed to step no. 2 to 4, otherwise the same is forwarded to the Office of the Director, Intelligence and Investigation Office
5. CO- Office of the Director, Intelligence and Investigation Office, receives and records the letter-reply and letter-directive , countersigned by INPRO Chief
Letter-reply and letter-directive countersigned by INPRO Chief
5 minutes Secretary of the IIO Director
Date, time and details of draft letter-reply and letter directive are recorded in the logbook of the Office of the Director, Intelligence and Investigation Office
Letter-reply and letter directive are transmitted to the Director, Intelligence and Investigation Office, for review and countersignature
The Before and After counter signature/ approval by the concerned Directors shall be recorded in the logbook Of the Respective Office Administration Officer I / Secretaries
6. IIO Director reviews and evaluates the letter-reply and letter-directive
Letter-reply and letter directive countersigned by INPRO Chief
1 day IIO Director letter-reply and
letter directive are
reviewed and
countersigned by
Director,
ntelligence and
If corrections/revisions are
made by the Director,
Intelligence and Investigation
Office, on the letter-reply and
letter-directive, the same is
returned to INPRO, for
editing/research/ finalization,
354
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
Investigation Office then proceed to step no. 2 to
5, otherwise the same is
forwarded to the Deputy
Executive Director (DED)-for
Administration
7. Deputy Executive Director for Administration reviews/evaluates the draft letter-reply and letter directive
Letter-reply and letter directive countersigned by INPRO Chief, and Director, Intelligence and Investigation Office
1 day Deputy Executive Director for
Administration
Draft Letter-reply and letter directive reviewed and countersigned by the Deputy Executive Director for Administration
If correction/revisions are made by the Deputy Executive Director for Administration, the same are returned to INPRO for editing/research/finalization, then proceed to step no. 2 to 6, otherwise, the same is forwarded to the Office of the Executive Director
8. CO-Office of the Executive Director proofreads draft letter-reply and letter-directive and Executive Director reviews and approves/signs letter-reply and letter-directive
Letter-reply and letter directive countersigned by INPRO Chief, Director, Intelligence and Investigation Office, Deputy Executive Director for Administration
1 day Executive Assistant, and
Executive Director
Letter-reply and
letter directive
proofread by the
Executive Assistant
and reviewed and
approved/signed
by the Executive
Director with
docket of the case
If corrections/revisions are made by the Executive Director on the letter-reply and letter-directive, the same is returned to INPRO for editing and finalization, then proceed to step no. 2 ,
The letter-reply and letter directive, after having been reviewed by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the INPRO for next steps
355
Steps Procedure Input Or
Requirement Processing
Time Responsible
Person Output/Decision
Point Remarks
9. CO-INPRO receives and records the signed/approved letter-reply and letter directive
Approved /signed letter-reply and letter-directive
15 minutes Admin Officer Date, time and details of approved / signed letter-reply and letter-directive are recorded in the logbook of INPRO Division
A photocopy of the letter-reply and letter directive is kept by INPRO for file. Original and duplicate copies of the same are transmitted to Records Section
10. CO – Records
Section receives and
records the
approved letter-
reply and letter-
directive
Approved /signed letter-reply and letter-directive
15 minutes Admin Aide (CO Records Section)
Date, time and
details of approved
/ signed letter-
reply and letter-
directive are
recorded in the
logbook of
Records Section
Letter-reply and letter directive are transmitted to concerned office (Regional Office)/ person.
End Of Process
356
Operating Procedures for Bureau Operations Local Finance Policy Enforcement Service
Local Treasury Operations Division
357
SERVICE : Policy Enforcement Service (PES) DIVISION : Local Treasury Operations Division (LTOD)
UNIT NAME : BRIEF DESCRIPTION : The Local Treasury Operations Division (LTOD) is one of the divisions under the Policy
Enforcement Service (PES). The Division prepares actions, rulings, opinions or views on queries regarding computation and collection of real property tax and other matters relating to local treasury operations. It also takes charge of updating the income re-classification of LGUs every four (4) years; Grants authority for LGUs to purchase blank forms of Community Tax Certificates from the Bureau of Internal Revenue and recommends approval to the Department of Finance the requests of LGUs to open and maintain depository accounts with banks other than government depository banks.
CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province, Cities), Any Government or Private Entity, General Public;
Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. (Assist in the) formulation of Department/Bureau issuance setting forth local treasury policies and rules and standard operating procedures on real property tax collection and other local treasury matters.
1.1 Monitor of new laws, conflicts or improvement requirement relative to real property tax collection policies, rules and standard operating procedures. (Review of existing Laws)
Real Property Tax Collection only; Memo Circulars, Department Order (Bureau or Department); Except business taxes/ local tax, fees and charges as stated in the tax
358
ordinance; Treasury matters would refer to treasury functions of treasurers, manner of operation;
2. Prepare the general framework and procedural guidelines for cash management and funds flow systems for adoption and implementation of local treasury offices.
This task is not currently done. Some activities related hereof are lodged at the FOED and REV
3. Monitor and evaluate tax collection performance of local treasury offices.
This task is not currently done. Some activities related hereof are lodged at the REV
4. Evaluate and recommend actions on requests of LGUs for budgetary aids, additional allotments, and other forms of financial assistance.
This task is not currently done. Some activities related hereof are lodged at the FOED
5. Compile and analyze the trial balances and financial reports of LGUs to determine their financial conditions and/or the existence of cash or fund overdrafts
This task is not currently done. Some activities related hereof are lodged at the FOED
6. Prepare actions (referrals, queries, etc.), opinions, or rulings on matters relative to (market operations) real property tax collection and other local treasury operations of LGUs.
6.1 Prepare opinions/rulings
Market Operations under LTPD; Investigation is not commonly done but it is recommended to be an ideal process;
7. Prepare actions on local (financial) treasury matters or transactions requiring approval of the Department and/or other national offices and agencies.
7.1 Authenticate the signature of the treasurer 7.2 Certified Income of LGUs from COA for reclassification
purposes 7.3 Recommend approval of LGUs request to open and
Purchase of CTCs from BIR Reclassification of LGUs Opening of Depository accounts with banks other
359
maintain depository account with banks other than government owned depository banks
7.4 (Monitor) Compilation of LGU remittances on withholding tax and GSIS contributions;
7.5 Maintenance of related documents or database required thereof
than government owned banks
8. Provide technical assistance to government agencies on legislation initiatives on local treasury operations.
8.1 Reviews legislative measures/proposals on local taxation and prepares comments/recommendation thereon.
8.2 Drafts comments on proposed legislation on real property taxation and related matters
Covers all outside of business tax, assessment of RPT, tax ordinance
9. Provide technical assistance on local treasury related initiatives/studies by BLGF, NGAs, NGOs.
9.1 Participate in public hearings/committee meetings or as resource person
10. Periodic Classification of LGUs 10.1 Research and review of data from DBM on Internal Revenue Allotment (IRA) as basis for income bracket
10.2 Prepare department order on income brackets as basis for the Research and review of data from DBM on Internal Revenue Allotment (IRA) as basis for income bracket
10.3 Prepare department order on income brackets as basis for the reclassification of LGUs
10.4 Prepare Memo Circular on classification/ reclassification 10.5 Maintenance of related documents or database required
thereof
Every four (4) years Criteria?
360
SPECIFIC PROCEDURES 1.1 Monitor of new laws, conflicts or improvement requirement relative to real property tax collection policies, rules
and standard operating procedures. (Review of existing Laws)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records letter-request from LGUs and taxpayers
Letter-request
from LGUs/
taxpayers
2 minutes
Admin Aide
Date, time and
details of letter-
request/s
recorded in the
logbook.
Corresponding CCS
no. attached
The letter-request/s
is/are forwarded to
LTOO III,
Administrative Officer
V and Statistician II.
2. CO-LTOD evaluates the letter-request as to proper classification, whether it be a Local Finance Circular, Memorandum Circular, Department Order, etc.
Letter-Request,
Researches on
pertinent law,
rules and
regulations
relative to the
subject matter of
the request
1 day
Local Treasury
Operations Office
(LTOO), Admin
Officer and Statistician
Appropriate
classification of
the letter-request
identified. Letter-
request maybe
acted upon
through Local
Finance Circular/
Memorandum
Circular/
Department
Order, etc.
361
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3. CO-LTOD prepares and finalizes draft Local
Finance Circular/ Memorandum Circular/
Department Order and a Memorandum to
the signatory of the Circular or
Memorandum
Letter-Request,
Researches on
pertinent law,
rules and
regulations
relative to the
subject matter of
the request
5 days LTOO, Admin
Officer and
Statistician
Local Finance
Circular/
Memorandum
Circular/
Department Order
countersigned by
Local Treasury
Operations Office
III (LTOO III),
Administrative
Officer V and
Statistician II with
attached letter-
request.
Local Finance Circular/
Memorandum
Circular/ Department
Order is forwarded to
the LTOD Division
Chief for review.
4. CO-LTOD reviews Local Finance Circular/
Memorandum Circular/ Department Order.
Local Finance
Circular/
Memorandum
Circular/
Department Order
countersigned by
the LTOO III,
Administrative
Officer V and
Statistician II
2 days Local
Treasury
Operations
Office (LTOO)
Local Finance
Circular/
Memorandum
Circular/
Department Order
reviewed and
countersigned by
the LTOO V.
If corrections/revisions
are made by the
Division Chief on the
Local Finance Circular/
Memorandum
Circular/ Department
Order, the same is
returned to the Action
Officer for
editing/finalization,
then proceed to Step
no. 3
362
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-LTOD records and transmits Local Finance Circular/ Memorandum Circular/ Department Order to the Office of the PES Director for review.
Local Finance Circular/ Memorandum Circular/ Department Order countersigned by the LTOO III, Administrative Officer V, Statistician II and LTOO V
2 minutes Admin Aide Date and details of Local Finance Circular/Memorandum Circular/Department Order recorded in the logbook of LTOD
The Local Finance Circular/ Memorandum Circular/Department Order is routed to the Office Directors for review and counter signature
6. PES Director reviews Local Finance Circular/
Memorandum Circular/ Department Order.
Local Finance
Circular/
Memorandum
Circular/
Department Order
countersigned by
the LTOO III,
Administrative
Officer V,
Statistician II and
LTOO V.
1 day PES Director Local Finance
Circular/
Memorandum
Circular/
Department Order
reviewed/
countersigned by
the PES Director
If corrections/revisions
are made by the PES
Director on the Local
Finance Circular/
Memorandum
Circular/ Department
Order, the same is
returned to LTOD for
editing/finalization,
then proceed to step
no. 3. If there are no
corrections/revisions,
it shall be forwarded
to the DED for
Operations.
363
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. Deputy Executive Director (DED)-Operations
reviews Local Finance Circular/
Memorandum Circular/ Department Order
Local Finance
Circular/
Memorandum
Circular/
Department Order
countersigned by
the LTOO III,
Administrative
Officer V,
Statistician II ,
LTOO V and PES
Director
1 day DED for
Operations
Local Finance
Circular/
Memorandum
Circular/
Department Order
reviewed/
countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
Local Finance Circular/
Memorandum
Circular/ Department
Order, the same is
returned to LTOD for
editing/ finalization,
proceed to step no. 3.
If there are no
corrections/ revisions,
it shall be forwarded
to the Office of the
Executive Director for
approval.
8. CO-Office of the Executive Director proofreads Local Finance Circular/Memorandum Circular/Department Order
Local Finance Circular/ Memorandum Circular/ Department Order countersigned by the LTOO III, Administrative Officer V, Statistician II , LTOO V, PES Director and DED
1 day Executive Secretary of
the Executive Director
Local Finance Circular/ Memorandum Circular/ Department Order proofread by Executive Secretary
If corrections/revisions are made by the Executive Secretary of the Executive Director on the Local Finance Circular/ Memorandum Circular/ Department Order, the same is returned to LTOD for editing/finalization, then proceed to step
364
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
for Operations no. 3. If there are no corrections/revisions, it shall be forwarded to the Executive Director.
9. Executive Director reviews and evaluates Local Finance Circular/Memorandum Circular/Department Order for approval/signature
Local Finance Circular/ Memorandum Circular/ Department Order countersigned by the LTOO III, Administrative Officer V, Statistician II , LTOO V, PES Director and Deputy Executive Director for Operations
1 day Executive Director (ED)
Local Finance Circular/ Memorandum Circular/ Department Order reviewed, approved/signed by the Executive Director
If corrections/revisions are made by the Executive Director on the Local Finance Circular/ Memorandum Circular/ Department Order, the same is returned to LTOD for correction/finalization, then proceed to step no. 3.
The Local Finance Circular/Memorandum Circular/Department Order, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the LTOD for the next steps.
10. CO-Office of the Executive Director records and transmits approved/signed Local Finance Circular/ Memorandum Circular/ Department Order to LTOD.
Approved/signed Local Finance Circular/ Memorandum Circular/ Department Order
2 minutes Admin Aide (OED)
Date, time and details of Local Finance Circular/ Memorandum Circular/ Department Order recorded in the logbook of the
365
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office of the Executive Director
11. CO-LTOD receives and records the signed/approved Local Finance Circular/ Memorandum Circular/ Department Order
Approved/Signed Local Finance Circular/ Memorandum Circular/ Department Order
2 minutes Admin Aide (LTOD)
Date, time and details of Local Finance Circular/Memorandum Circular/Department Order recorded in the logbook of LTOD
A photocopy of the Local Finance Circular/ Memorandum Circular/ Department Order is kept by the Division for file; Original and duplicate copies of the approved Local Finance Circular/ Memorandum Circular/ Department Order transmitted to Records Section; Soft copy of the Local Finance Circular/ Memorandum Circular/ Department Order is forwarded to MIS for uploading in the BLGF Website.
12. CO-Records Section receives and records signed/approved Local Finance Circular/ Memorandum Circular/ Department Order
Approved/Signed Local Finance Circular/ Memorandum Circular/
2 minutes Admin Aide (CO-Records
Section)
Date, time and details of Local Finance Circular/Memorandum
Records Section transmits approved/signed Memorandum Circular to Regional Offices and
366
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Department Order Circular/Department Order recorded in the logbook of Records Section
Local Treasury/Assessment Offices while Finance Circulars and Department Orders shall be forwarded to the Department of Finance for the Secretary’s signature. (Refer to process of transmitting out-bound documents under records section.)
End of Process
367
6.1 Prepare opinions/rulings
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records letter-request from LGUs and taxpayers
Letter request from LGUs/taxpayers
2 minutes
Admin Aide (LTOD)
Date, time and details of letter-request/s registered in the logbook. Corresponding CCS no. attached
The letter-request /s is/are forwarded to LTOO III, Administrative Officer V and Statistician II.
2. CO-LTOD evaluates the letter-request as to proper classification of the letter request, whether it be an opinion/ ruling or referral
Letter Request, Researches on pertinent law, rules and regulations relative to the subject matter of the request
1 day
LTOO, Admin Officer and Statistician
Appropriate classification of the letter- request maybe acted upon through opinion/ruling or referral.
3. CO-LTOD prepares and finalizes draft opinion/ ruling or referral
Letter Request, Researches on pertinent law, rules and regulations, precedents relative to the subject matter of the request
5 days LTOO, Admin Officer and Statistician
Opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V and Statistician II with attached letter-request.
Opinion/ ruling or referral is forwarded to the LTOO V for review
4. CO-LTOD reviews opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V and Statistician II
Opinion/ ruling or referral countersigned by the LTOO III, Administrative
5 days Local Treasury
Operations Office (LTOO)
Opinion/ ruling or referral reviewed and countersigned by Local Treasury Operations Office
If corrections/revisions are made by the LTOO V on the opinion/ ruling or referral, the same is returned to
368
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Officer V and Statistician II.
V (LTOO V) the LTOO III, Administrative Officer V and Statistician II for editing/finalization, then proceed to Step no. 3, otherwise the opinion/ruling or referral is forwarded to the Office of the PES Director.
5. CO-LTOD records and transmits opinion/ ruling or referral to the Office of the Director II, PES
Opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V and Statistician II and Division Chief
2 minutes LTOO, Admin Officer and Statistician
Date, time and details of opinion/ ruling or referral recorded in the logbook of LTOD
The Opinion/ ruling or referral is routed to the Office Directors for review and counter signature.
6. PES Director reviews opinion/ ruling or referral
Opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V , Statistician II and LTOO V
1 day PES Director Opinion/ ruling or referral reviewed and countersigned by the PES Director
If corrections/revisions are made by the PES Director on the opinion, ruling or referral, the same is returned to LTOD for editing/ finalization, then proceed to step no. 3, otherwise the opinion/ruling or referral is forwarded to the DED for
369
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Operations.
7. Deputy Executive Director (DED)-Operations reviews opinion/ ruling or referral
Opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V , Statistician II, LTOO V and Director II-PES
1 day DED for Operations
Opinion/ ruling or referral reviewed and countersigned by DED for Operations
If corrections/revisions are made by the DED for Operations on opinion, ruling or referral, the same is returned to LTOD for correction/ finalization, proceed to step no. 3 otherwise the opinion/ruling or referral is forwarded to the Office of the Executive Director.
8. CO-Office of the Executive Director proofreads opinion/ ruling or referral
Opinion/ ruling or referral countersigned by the LTOO III, Administrative Officer V , Statistician II, LTOO V and Director II-PES and DED for Operations
1 day Executive Secretary of
the Executive Director
Opinion/ ruling or referral proofread by Executive Secretary
If corrections/revisions are made by the Executive Secretary of the Executive Director on the opinion/ ruling or referral, the same is returned to LTOD for correction/finalization, then proceed to step no. 3 otherwise the opinion/ruling or referral is forwarded to the Office of the Executive Director for approval
9. Executive Director reviews and evaluates Opinion/ ruling or 1 day Executive Opinion/ ruling or If corrections/revisions
370
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
opinion/ ruling or referral referral countersigned by the LTOO III, Administrative Officer V , Statistician II, LTOO V and Director II-PES
Director referral reviewed, approved/signed by the Executive Director
are made by the Executive Director on the opinion/ ruling or referral, the same is returned to LTOD for correction/finalization, then proceed to step no. 3.
The opinion, ruling or referral, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the LTOD for the next steps.
10. Office of the Executive Director records and transmits signed/approved opinion/ ruling or referral to the concerned Division (LTOD)
Approved/signed opinion/ ruling or referral
2 minutes Admin Aide (OED)
Date, time and details of opinion/ ruling or referral recorded in the logbook of the Office of the Executive Director
11. CO-LTOD receives and records the signed/approved opinion/ ruling or referral
Approved/Signed opinion/ ruling or referral
2 minutes Admin Aide (LTOD)
Date, time and details of opinion/ ruling or referral recorded in the logbook of LTOD
A photocopy of the opinion/ ruling or referral is kept by the Division for file; Original and duplicate copies of the approved opinion/rulings or referral transmitted to Records Section; A soft copy of the opinion/ruling or referral is forwarded to MIS for uploading in the Website.
371
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12. CO-Records Section receives and records
signed/approved opinion/ruling or referral.
Approved/Signed
opinion/ruling or
referral.
2 minutes Admin Aide
(CO Records
Section)
Date, time and
details of
opinion/ruling or
referral recorded
in the logbook of
Records Section.
Records Section
transmits
approved/signed
opinion/ruling or
referral to requesting
party.
(Refer to process of
transmitting outbound
documents under
Records Section.)
End of Process
372
7.1 Authenticate the signature of the treasurer
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records letter-request /purchase orders from LGU
Purchase Order
signed by the local
treasurer
2 minutes
Admin Aide
Date, time and
details of purchase
order recorded in
the logbook.
Corresponding CCS
no. attached
The Purchased Order
is forwarded to LTOO
III, Administrative
Officer V and
Statistician II.
2. CO-LTOD evaluates the signature on the
purchase order
Purchase Order
signed by the local
treasurer
1 minute LTOO, Admin
Officer and
Statistician
Date and number of CTC blank forms to be purchased.
No action on the
request if there is no
specimen signature of
the local treasurer
submitted or kept on
file.
3. CO-LTOD prepares and finalizes letter to the BIR recommending approval for the purchase of community tax certificates
Purchase Order signed by the local treasurer
2 minutes LTOO, Admin
Officer and
Statistician
Letter to the BIR
countersigned by
the LTOO III,
Administrative
Officer V and
Statistician II
4. CO-LTOD reviews letter to the BIR Letter to the BIR countersigned by the LTOO III, Administrative Officer V and Statistician II
5 minutes Local Treasury
Operations Officer
Letter to the BIR
countersigned by
the LTOO III,
Administrative
Officer V,
373
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Statistician II and
approved by the
LTOO V
5. CO-LTOD records and transmits the approved/signed letter to CO-Records Section
Approved/signed letter
10 minutes Admin Aide (LTOD)
Date, time and
details of
approved/signed
letter recorded in
the logbook of
LTOD.
Approved letter with
attached Purchase
Order forwarded to
Records Section.
6. CO-Records Section receives and records approved/signed letter
Approved/signed letter
2 minutes Admin Aide Record Section
Letter with the
signature of the
LTOO V.
Records Section
transmits
approved/signed letter
to the requesting
party.
End of Process
374
7.2 Certified Income of LGUs from COA for reclassification purposes
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD prepares and finalizes letter-
request to the COA
Letter indicating
the details of the
request
1 day LTOO and/or
the Admin
Officer
Letter-request
countersigned by
the LTOO III
and/or
Administrative
Officer V.
2. CO-LTOD reviews letter-request
countersigned by the LTOO III and/or
Administrative Officer V
Letter-request
countersigned by
the LTOO III
and/or
Administrative
Officer V
1 day Local
Treasury
Operations
Officer
(LTOO)
Letter-request
reviewed and
countersigned by
the LTOO V
If corrections/
revisions are made by
the LTOO V on the
letter-request, the
same is returned to
the LTOO III and/or
Administrative Officer
V for editing/
finalization, then
proceed to Step no. 2
otherwise the letter-
request is forwarded
to the PES Director
3. CO-LTOD records and transmits letter-
request to the Office of the PES Director
Letter-request
countersigned by
the LTOO III
2 minutes Admin Aide Date, time and
details of Letter-
request recorded
375
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and/or
Administrative
Officer V and
LTOO V
in the logbook of
LTOD
The Letter-request is routed to the Office Directors for review and countersignature
4. PES Director reviews letter-request Letter-request
reviewed and
countersigned by
the LTOO III
and/or
Administrative
Officer V and
LTOO V
1 day PES Director Letter-request
reviewed and
countersigned by
the LTOO III
and/or
Administrative
Officer V , LTOO V
and PES Director
If corrections/
revisions are made by
the PES Service
Director on the letter-
request , the same is
returned to LTOD for
editing/ finalization,
then proceed step no.
2. If there are no
corrections/revisions,
is shall be forwarded
to the DED for
Operations.
5. Deputy Executive Director (DED) reviews
letter-request
Letter-request
countersigned by
the LTOO III
and/or
Administrative
Officer V, LTOO V
and PES Director
1 day DED for
Operations
Letter-request
reviewed and
countersigned by
the DED-
Operations
If corrections/
revisions are made by
the Deputy Executive
Director for
Operations on the
letter-request , the
same is returned to
LTOD for correction/
376
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/ revision, then
go back to step no. 2.
If there are no
corrections/revisions,
it shall be forwarded
to the Executive
Director.
6. CO-Office of the Executive Director
proofreads letter-request
Letter-request
countersigned by
the LTOO III
and/or
Administrative
Officer V, LTOO V,
PES Director and
DED for
Operations
1 day Executive
Secretary of
the Executive
Director
Letter-request
proofread by
Executive
Secretary
If corrections/
revisions are made by
the Executive Assistant
of the Executive
Director on the letter-
request , the same is
returned to LTOD for
correction/
finalization, then
proceed to step no. 2.
If there are no
corrections/revisions,
the letter-request is
forwarded to
Executive Director for
review and approval.
7. Executive Director reviews and evaluates
letter-request for approval signature
Letter-request
countersigned by
the LTOO III
1 day Executive
Director
Letter-request
reviewed,
approved/signed
If corrections/
revisions are made by
the Executive Director
377
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and/or
Administrative
Officer V, LTOO V,
PES Director and
DED for
Operations
by the Executive
Director
on letter-request , the
same is returned to
LTOD for correction/
finalization, and then
proceed to step no. 2.
The letter-request, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted to the concerned division (LTOD) for the next steps.
8. Office of the Executive Director records and
transmits approved/signed letter-request to
concerned Division (LTOD)
Approved/signed
letter request
2 minutes Admin Aide
(OED)
Date, time and
details of letter-
request recorded
in the logbook of
the Office of the
Executive Director
9. CO-LTOD receives and records the
approved/signed letter-request
Approved/Signed
letter-request
2 minutes Admin Aide
(LTOD)
Date, time and
details of letter-
request recorded
in the logbook of
LTOD
A photocopy of the
letter-request is kept
in the Division for file;
Original and duplicate
copies of the
approved/signed
Letter-Request is
forwarded to Records
Section for filing and
transmittal to the
378
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
COA;
A soft copy of the
letter-request is
forwarded to the MIS
for uploading in the
BLGF Website;
10. CO-Records Section receives and records
approved/ signed letter-request action
Approved/Signed
letter-request
2 minutes Admin Aide
(CO Records
Section)
Date, time and
details of letter-
request recorded
in the logbook of
Records Section
Records Section
transmits
approved/signed
letter-request;
(Refer to process of
transmitting out-
bound documents
under Records
Section);
End of Process
379
7.3 Recommend approval of LGUs request to open and maintain depository account with banks other than government
owned depository banks
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records letter-request from LGUs to open and maintain deposit accounts with non-government depository banks
Letter-request 2 minutes Admin Aide Date, time and details of letter-request recorded in the logbook. Corresponding CCS attached.
The letter-request is forwarded to assigned LTOO III, Administrative Officer V and Statistician II.
2. CO-LTOD evaluates the letter-request submitted if in accordance with the Bureau’s MC 03-2006
Letter-request 30 minutes LTOO, Admin Officer and Statistician
Letter-request with complete requirements
Incomplete requirements will be returned to the LGU concerned for compliance
3. CO-LTOD prepares and finalizes memorandum to the Assistant of Finance transmitting the complete requirements and recommending approval of the request. A draft indorsement approving the opening of depository account, to be signed by the DOF Assistant is likewise prepared.
Letter-request with complete requirements.
1 hour LTOO, Admin Officer and Statistician
Memorandum and Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II.
Memorandum and Indorsement are forwarded to LTOO V for review.
4. CO-LTOD reviews Memorandum and Indorsement
Memorandum and Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II .
30 minutes LTOO (LTOD) Memorandum and Indorsement countersigned by the LTOO V, LTOD
If corrections/revisions are made by the LTOO V, LTOD on the Memorandum and Indorsement, the same are returned to LTOO III, Administrative Officer V and Statistician II for
380
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/finalization, then proceed to step3, otherwise the Memorandum and Circular are forwarded to the Office of the Service Director, PES.
5. CO-LTOD records and transmits Memorandum and Indorsement to the PES Director.
Memorandum and Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II and LTOO V, LTOD
2 minutes Admin Aide Date, time and details of Memorandum and Indorsement recorded in the logbook of LTOD.
The Memorandum and Indorsement are routed to the Office Directors for review and countersignature
6. Director, Policy Enforcement Service (PES) reviews Memorandum and Indorsement
Memorandum and Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II and LTOO V, LTOD
1 day PES Director Memorandum and Indorsement countersigned by the PES Director.
If corrections/revisions are made by the Director, PES on the Memorandum, the same are returned to LTOD for editing/finalization, then proceed to step 3, otherwise the Memorandum and Circular are forwarded to the Deputy Executive Director (DED)-Operations.
7. Deputy Executive Director (DED)-Operations Memorandum and 1 day DED for Memorandum and If corrections/revisions
381
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
reviews Memorandum and Indorsement Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II , LTOO V, LTOD and PES Director
Operations Indorsement reviewed and countersigned by DED for Operations
are made by the DED for Operations on the Memorandum, the same are returned to LTOD for editing/finalization, then proceed to step 3, otherwise the Memorandum and Circular are forwarded to the Office of the Executive Director (OED).
8. CO-Office of the Executive Director proofreads Memorandum and Indorsement
Memorandum and Indorsement countersigned by the LTOO III, Administrative Officer V and Statistician II , LTOO V, LTOD, PES Director and DED for Operations
1 day Executive Secretary of
the Executive Director
Memorandum and Indorsement proofreads by the Executive Assistant
If corrections/revisions are made by the Executive Assistant on the Memorandum, the same are returned to LTOD for editing/finalization, then proceed to step 3, otherwise the Memorandum and Circular are forwarded to the Executive Director (ED) for approval.
9. Executive Director reviews and evaluates Memorandum and Indorsement for approval/signature
Memorandum and Indorsement countersigned by the LTOO III,
1 day Executive Director (ED)
Memorandum and Indorsement reviewed and approved/signed
If corrections/revisions are made by the Executive Director on the Memorandum, the
382
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Administrative Officer V and Statistician II , LTOO V, LTOD, Director, PES and DED for Operations
by the Executive Director.
same are returned to LTOD for editing/finalization, then proceed to step 3.
The Memorandum and Indorsment are reviewed and countersigned by the concerned Offices Directors and approved/signed by the Executive Directors, then transmitted to LTOD for the next steps.
10. CO-Office of the Executive Director records and transmits approved/signed Memorandum and Indorsement to LTOD
Approved/signed Memorandum and Indorsement
2 minutes Admin Aide Date, time and details of approved/signed Memorandum and Indorsement are recorded in the logbook of OED.
11. CO-LTOD receives and records the approved/signed Memorandum and Indorsement
Approved/signed Memorandum and Indorsement
2 minutes Statistician Date, time and details of approved/signed Memorandum and Indorsement are recorded in the logbook of LTOD.
Xerox copy kept in the Division for file. Original and duplicate copies of the approved/signed Memorandum and Indorsement is forwarded to Records Section for filing and transmittal to concerned offices. A soft copy of the approved/signed Memorandum Circular
383
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
is forwarded to MIS for uploading in the BLGF website.
12. CO-Records Section receives and records approved/signed Memorandum and Indorsement
Approved/signed Memorandum and Indorsement
2 minutes Records Officer (CO-
Records Section)
Date, time and details of the approved/signed Memorandum and Indorsement recorded in the logbook of Records Section.
Records Section transmits approved/signed Memorandum and Indorsement to concerned offices. (Refer to process of transmitting outbound documents under Records Section)
End of Process
384
7.4 (Monitor) Compilation of LGU remittances on withholding tax and GSIS contributions
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records Remittance report
Remittance reports
2 minutes Admin Aide Date, time and details recorded in the logbook. Corresponding CCS attached.
Remittance Report is forwarded to assigned LTOO III, Administrative Officer V and Statistician II.
2. CO-LTOD evaluates and posts details of the Remittance report
Remittance reports
2 minutes LTOO, Admin Officer and Statistician
Database for withholding tax and GSIS premiums
3. CO-LTOD files remittance reports Database for withholding tax and GSIS premiums
2 minutes LTOO, Admin Officer and Statistician
End of Process
385
8.1 Reviews legislative measures/proposals on local taxation and prepares comments/recommendation thereon.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records copy of proposed bills from Congress or DOF
Proposed bill 2 minutes Admin Aide Date, time and details of proposed bill recorded in the logbook. Corresponding CCS attached.
The proposed bill is forwarded to the LTOO III or Administrative Officer V
2. CO-LTOD evaluates the proposed bill Proposed bill, Researches on pertinent law, rules and regulations relative to the subject matter
1 day LTOO, Admin Office
Draft comment
3. CO-LTOD prepares and finalizes draft comment
Proposed bill, Researches on pertinent law, rules and regulations
5 days LTOO, Admin Office
Proposed comment countersigned by the LTOO III, Administrative Officer V
The draft comment is forwarded to LTOO V, for review.
4. CO-LTOD reviews proposed comment Proposed comment countersigned by the LTOO III, Administrative Officer V
2 days LTOO Proposed comment reviewed and countersigned by the LTOO V
If corrections/revisions are made by the LTOO V on the draft comment, the same is returned to the LTOO III or Administrative Officer V for editing/finalization, then proceed to step
386
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3, otherwise the draft comment is forwarded to the Office of the Service PES Director.
5. CO-LTOD records and transmits proposed comment to the PES Director
proposed comment countersigned by the LTOO III, Administrative Officer V and LTOO V
2 minutes Admin Aide Date, time and details of proposed comment recorded in the logbook of LTOD.
The proposed comment is routed to the Office Directors for review and countersignature
6. Director II, Policy Enforcement Service (PES) reviews proposed comment
Proposed comment countersigned by the LTOO III, Administrative Officer V and LTOO V
1 day PES Director Proposed comment reviewed and countersigned by the PES Director.
If corrections/revisions are made by the Director, PES on the proposed comment, the same is returned to the LTOD for editing/finalization, then proceed to step 3, otherwise the draft comment is forwarded to the Deputy Executive Director (DED)-Operations
7. Deputy Executive Director (DED)-Operations reviews proposed comment
Proposed comment countersigned by the LTOO III, Administrative Officer V, LTOO V,
1 day DED for Operations
Proposed comment reviewed and countersigned by the DED for Operations
If corrections/revisions are made by the DED for Operations on the proposed comment, the same is returned to the LTOD for
387
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and Director II II, PES
editing/finalization, then proceed to step 3, otherwise the draft comment is forwarded to the Office of the Executive Director (OED).
8. CO-Office of the Executive Director proofreads proposed comment
Proposed comment countersigned by the LTOO III, Administrative Officer V, LTOO V, PES Director and DED for Operations
1 day Executive Assistant
Proposed comment proofread by the Executive Assistant
If corrections/revisions are made by the Executive Assistant on the proposed comment, the same is returned to the LTOD for editing/finalization, then proceed to step 3, otherwise the draft comment is forwarded to the Executive Director for approval
9. Executive Director reviews and evaluates proposed comment
Proposed comment countersigned by the LTOO III, Administrative Officer V, LTOO V, PES Director and DED for Operations
1 day Executive Director
Proposed Comment reviewed and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Director on the proposed comment, the same is returned to the LTOD for editing/finalization, then proceed to step 3,
The proposed comment after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, then transmitted to LTOD for the next steps.
388
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10. CO-Office of the Executive Director records and transmits approved/signed proposed comment
Approved/signed proposed comment
2 minutes Admin Aide Date, time and details of proposed comment recorded in the logbook of the OED.
11. CO-LTOD receives and records approved/signed proposed comment
Approved/signed proposed comment
2 minutes Admin Aide Date, time and details of approved/signed proposed comment recorded in the logbook of the LTOD
Xerox copy kept in the Division for file. Original and duplicate copies of the approved/signed proposed comment is forwarded to Records Section for filing and transmittal to concerned offices A soft copy of the approved/signed proposed comment is forwarded to MIS for uploading in the BLGF website.
12. CO-Records Section receives and records approved/signed proposed comment
Approved/signed proposed comment
2 minutes Records Officer (CO-
Records Section)
Date, time and details of approved/signed proposed comment
Records Section transmits approved/signed proposed comment to concerned offices.
389
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in the logbook of the Records Section.
(Refer to process of transmitting outbound documents under Records Section)
End of Process
390
9.1 Participate in public hearings/committee meetings or as resource person
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD receives and records the Invitation with the order/notation of the Executive Director or Deputy Executive Director to participate in the initiative
Invitation with the Executive Director or Deputy Executive Director’s notation
10 minutes Statistician Inform the Chief about the Invitation. Date, time and details of Invitation with the order/notation of the Executive Director or Deputy Executive Director recorded in the logbook.
2. CO-LTOD evaluates invitations if request is within the Division’s jurisdiction
Invitation 10 minutes LTOO Attendance/non-attendance depends on the availability of funds or the resource speaker
3. CO-LTOD acts as resource speaker or participates in public hearings/committee meetings
End of Process
391
10.4 Prepare Memo Circular on classification/reclassification
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTOD prepares and finalizes
Memorandum Circular
Details of the
Memorandum
Circular
1 hour LTOO, Admin
Officer and
Statistician
Memorandum
Circular
countersigned by
the LTOO III,
Administrative
Officer V and
Statistician II
Memorandum Circular
is forwarded to the
LTOO V for review.
2. CO-LTOD reviews Memorandum Circular Memorandum
Circular
countersigned by
the LTOO III,
Administrative
Officer V and
Statistician II.
1 hour LTOO Memorandum
Circular
Reviewed and
countersigned by
the LTOO V
If corrections/
revisions are made by
the LTOO V on the
Memorandum
Circular, the same is
returned to the LTOO
III, Administrative
Officer V and
Statistician II for
editing/ finalization,
Then proceed to step
1.
3. CO-LTOD records and transmits
Memorandum Circular to the Office of the
PES Director
Memorandum
Circular
countersigned by
the LTOO III,
2 minutes Admin Aide Date, time and
details of the
Memorandum
Circular is
392
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Administrative
Officer V,
Statistician II and
LTOO V
recorded in the
logbook of LTOD
The Memorandum Circular is routed to the Office Directors for review and countersignature
4. PES Director reviews Memorandum Circular Memorandum
Circular
countersigned by
the LTOO III,
Administrative
Officer V,
Statistician II and
LTOO V
1 day PES Director Memorandum
Circular reviewed
and countersigned
by the PES
Director
If corrections/
revisions are made by
the PES Director on
the Memorandum
Circular, the same is
returned to LTOD for
editing/ finalization,
then proceed to step
no. 2, otherwise the
Memorandum Circular
is forwarded to the
DED for Operations.
5. Deputy Executive Director (DED)-Operations
reviews Memorandum Circular
Memorandum
Circular
countersigned by
the LTOO III,
Administrative
Officer V,
Statistician II,LTOO
V and PES Director
1 day DED for
Operations
Memorandum
Circular
countersigned by
the DED for
Operations
If corrections/
revisions are made by
the PES Director on
the Memorandum
Circular, the same is
returned to LTOD for
editing/ finalization,
then proceed to step
no. 2. otherwise the
393
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Memorandum Circular
is forwarded to the
Office of the Executive
Director.
6. CO-Office of the Executive Director
proofreads Memorandum Circular
Memorandum Circular countersigned by the LTOO III, Administrative Officer V, Statistician II,LTOO V, PES Director and DED for Operations
1 day Executive Secretary of
the Executive Director
Memorandum Circular proofread
If corrections/
revisions are made by
the Executive Assistant
of the Executive
Director on the
Memorandum
Circular, the same is
returned to concerned
Division (LTOD) for
editing/ finalization,
then proceed to step
no. 2. If there are no
corrections/revisions,
the document is
forwarded to the
Executive Director.
7. Executive Director reviews and evaluates Memorandum Circular
Memorandum Circular countersigned by the LTOO III, Administrative Officer V,
1 day Executive Director
Memorandum Circular reviewed, approved and signed by the Executive Director
If corrections/
revisions are made by
the Executive Director
on the Memorandum
Circular, the same is
returned to the
394
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Statistician II,LTOO V, PES Director and DED for Operations
Division for
editing/finalization,
then proceed to step
no. 3.
The Memorandum Circular, after being reviewed and countersigned by the concerned Office Directors and approved /signed by the Executive Director shall be transmitted back to the Division for appropriate action/next steps.
8. Office of the Executive Director records and transmits signed/approved Memorandum Circular to the Division
Approved/signed Memorandum Circular
2 minutes Executive Assistant
(OED)
Date and details of Memorandum Circular recorded in the logbook of the Office of the Executive Director
9. CO-LTOD receives and records the signed/approved Memorandum Circular
Approved/signed Memorandum Circular
2 minutes
Admin Aide Date and details of Memorandum Circular recorded in the logbook of LTOD
A photocopy of
the Memorandum
Circular is kept by
the Division for
file.
Original and
duplicate copies of
the
approved/signed
Memorandum
Circular is
forwarded to
Records Section
for filing and
395
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
transmittal to
concerned offices.
A soft copy of the
approved/signed
Memorandum
Circular is
forwarded to the
MIS for uploading
in the BLGF
Website
10. CO-Records Section receives and records approved/ signed Memorandum Circular.
Approved/signed Memorandum Circular
2 minutes
Admin Aide (CO Record
Section)
Date and details of Memorandum Circular recorded in the logbook of Records Section.
Records Section
transmits
approved/signed
Memorandum Circular
to concerned offices.
(Refer to process of
transmitting out-
bound documents
under Records
Section.)
End of Process
396
Operating Procedures for Bureau Operations Local Finance Policy Enforcement Service
Local Tax Policy Research & Review Division
397
SERVICE : Local Finance Policy Enforcement Service DIVISION : Local Tax Policy Research and Review Division (LTPD) UNIT NAME : BRIEF DESCRIPTION : The Local Tax Policy Research and Review Division (LTPD) is under the Operations Group of
the BLGF particularly the Policy Enforcement Service (PES). It renders technical assistance on local taxation (business taxes) to LGUs and the general public. It works closely with LTOD, LASS, FOED Divisions
CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. (Review and recommend actions) Provide technical assistance on local tax ordinances enacted by local legislative bodies pursuant to the provisions of the Local (Tax) Government Code, (as amended.)
1.1 Render advisory assistance to LGUs in the enactment of local tax ordinances.
1.2 Render comments/inputs to local tax ordinance (content of
the tax code)
1.3 On-site assistance (write shop)
2. Evaluate and recommend actions/decisions on protests, appeals or complaints against local tax ordinances
Function transferred to DOJ and Proper Court
3. Prepare opinions, rulings, clarification and replies to queries/issues concerning provisions of the Local (Tax)
3.1 Research with regard to decision of the Supreme Court, Requires regular access or downloading of latest
398
Government Code, as amended or local tax ordinances. CTA, CA, DOJ
3.2 Conduct investigation (referral to BLGF Legal or other
NGAs, fact-finding)
3.3 Ocular inspection/field verification
3.4 Prepare opinions/rulings
3.5 Prepare responses to appeals/reconsiderations
opinions/rulings from Supreme Court, CTA, CA, DOJ
4. (Render advisory assistance to LGUs in the enactment of local tax ordinances.)
5. Assist in the formulation of Department / Bureau issuances setting for the local tax policies and rules and standard operating procedures.
5.1 Maintenance of local tax policy rules and regulations,
standard operating procedure database
5.2 Preparation and issuances of local finance circular
Local Finance Circular Signed by the Secretary of DOF Definition of Terms (Circulars, Tax Policy)
6. Prepare policy guidelines and procedures to govern the local taxes.
6.1 Preparation of Memorandum Circular governing local taxes Memorandum Circular Signed by the Executive Director of BLGF
7. Render comments on legislation initiatives on local taxes 7.1 Prepare comments/recommendations
7.2 Conduct research of related initiatives
8. Provide technical assistance on local tax related initiatives/studies by BLGF, NGAs, NGOs.
8.1 Participate in public hearings/committee meetings or as resource person
399
SPECIFIC PROCEDURES 1.1 Render advisory assistance to LGUs in the enactment of local tax ordinances.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives and records letter requests
from LGUs concerned and taxpayers.
Letter requests from LGUs concerned or taxpayers relative to local taxation
10 minutes Admin Aide CCS#, date, time and details of letter request recorded in logbook of the LTPD.
2. CO-LTPD evaluates request Letter request 1 day Tax Specialist Appropriate classification of the letter request identified.
Re-route to other Division if letter request is not the concern of the Division
3. CO-LTPD prepares and finalizes letter/indorsement
Local tax ordinance 3 days Tax Specialist Letter/indorsement reviewed and countersigned by Action Officer (Tax Specialist).
4. CO-LTPD reviews letter/indorsement Local tax ordinance 1 week LTPD Chief Letter/indorsement reviewed and countersigned by the Division LTPD Chief.
5. CO-LTPD records and transmits letter/indorsement to the Office of the PES Director
Letter/indorsement countersigned by the Action Officer, Division LTPD Chief
5 minutes Admin Aide Date, time and details of letter/indorsement recorded in logbook of LTPD.
The letter/indorsement is routed to the Office Directors for review and countersignature 6. PES Director reviews letter/indorsement Letter/indorsement
countersigned by the Action Officer, Division LTPD Chief
1 hour PES Director Letter/indorsement reviewed and countersigned by the PES Director.
If corrections/revisions
are made by the PES
Director on the letter/
indorsement, the same is
400
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
returned to LTPD for
editing/finalization, then
proceed to step 3,
otherwise the
letter/indorsement is
forwarded to the DED-
Operations
7. DED for Operations reviews letter/indorsement Letter/indorsement countersigned by the Action Officer, Division LTPD Chief, PES Director
1 hour DED for Operations
Letter/indorsement reviewed and countersigned by the DED-Operations.
If corrections/revisions
are made by the DED-
Operations on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 3,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
8. CO-Office of the Executive Director proofreads the letter/indorsement
Letter/indorsement countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive Secretary
Letter/indorsement proofread.
If corrections/revisions
are made by the Executive
Secretay on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 3,
otherwise the
letter/indorsement is
401
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
forwarded to the
Executive Director
9. DED for Operations reviews letter/indorsement Letter/indorsement countersigned by the Action Officer, Division LTPD Chief, PES Director
1 hour DED for Operations
Letter/indorsement reviewed and countersigned by the DED-Operations.
If corrections/revisions
are made by the DED-
Operations on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 3,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
10. CO-Office of the Executive Director proofreads the letter/indorsement
Letter/indorsement countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive Secretary
Letter/indorsement proofread.
If corrections/revisions
are made by the Executive
Secretay on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 3,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
11. Executive Director reviews, approves and signs the letter/indorsement
Letter/indorsement countersigned by the Action Officer, Division LTPD Chief,
1 hour
Executive Director
Approved and signed letter/indorsement.
If corrections/revisions
are made by the Executive
Secretay on the
402
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
PES Director, DED-Operations
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 3
The letter/indorsement after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
12. CO-Office of the Executive Director records and transmits the approved and signed letter/indorsement to the concerned Division (LTPD)
Approved and signed letter/indorsement
10 minutes Secretary of the Executive
Director
Date, time and details of letter/indorsement recorded in logbook of the Executive Director.
13. CO-LTPD receives and records the approved and signed letter/indorsement from the OED
Approved and signed letter/indorsement
10 minutes Admin Aide Date, time and details of letter/indorsement recorded in logbook of the LTPD Division.
A photocopy of the approved and signed letter/indorsement is kept by the Division for file Original and duplicate
copies are transmitted to
CO-Records Section
14. CO-Records Section receives and records signed/approved letter/indorsement
Approved and signed letter/indorsement
10 minutes Records Officer
Date, time and details of letter/indorsement recorded in logbook of the Records Section.
Records Section transmits
approved/signed
letter/indorsement
End of Process
403
1.2 Render comments/inputs to local tax ordinance (content of the tax code)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives and records letter requests
from LGUs concerned and taxpayers.
Letter requests from
LGUs concerned or
taxpayers relative to
local taxation.
10 minutes Admin Aide Date, time and
details of letter
request recorded in
logbook of the LTPD.
Corresponding CCS
attached.
The letter-request is
forwarded to Senior Tax
Specialist (STS), Tax
specialist II (TS II).
2. CO-LTPD prepares and finalizes
letter/indorsement.
Letter-request 3 days Senior Tax Specialist, Tax
Specialist
Letter/indorsement
reviewed and
countersigned by
Senior Tax Specialist,
Tax Specialist
The letter/ Indorsement
forwarded to LTPD Chief
for review.
3. CO-LTPD reviews letter/indorsement Letter/indorsement countersigned by Senior Tax Specialist, Tax Specialist
1 week LTPD Chief Letter/indorsement
reviewed and
countersigned by
the LTPD Chief.
If corrections/revisions
are made by LTPD Chief
on the
letter/indorsement, the
same is returned to
Senior Tax Specialist, Tax
Specialist for
editing/finalization, then
proceed to step 2,
otherwise the
letter/indorsement is
forwarded to the Office
of the PES Director.
4. CO-LTPD records and transmits letter/indorsement to the Office of the PES
Letter/indorsement countersigned by
5 minutes Admin Aide Date, time and details of
404
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director. the Senior Tax Specialist, Tax Specialist, LTPD Chief
letter/indorsement recorded in logbook of LTPD.
The letter/indorsement is routed to the Office Directors for review and countersignature
5. PES Director reviews letter/indorsement Letter/indorsement countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief
1 hour PES Director Letter/indorsement reviewed and countersigned by the PES Director.
If corrections/revisions
are made by the PES
Director on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
otherwise the
letter/indorsement is
forwarded to the Deputy
Executive Director (DED) -
Operations
6. DED - Operations reviews letter/indorsement Letter/indorsement countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director
1 hour DED for Operations
Letter/indorsement reviewed and countersigned by the DED-Operations.
If corrections/revisions
are made by the DED-
Operations on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
7. CO-Office of the Executive Director proofreads Letter/indorsement 30 minutes Executive Letter/indorsement If corrections/revisions
405
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the letter/indorsement countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director, DED- Operations
Secretary of the Executive
Director
proofread by the Executive Secretary
are made by the Executive
Secretary on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
otherwise the
letter/indorsement is
forwarded to the
Executive Director for
approval.
8. Executive Director reviews and evaluates the letter/indorsement for approval/signature.
Letter/indorsement countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director, DED- Operations
1 hour
Executive Director
Letter/indorsement reviewed and approved/signed by Executive Director.
If corrections/revisions
are made by the
Executive Director on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2
The letter/indorsement after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
9. CO-Office of the Executive Director records and transmits the approved and signed letter/indorsement to the concerned Division (LTPD)
Approved and signed letter/indorsement
10 minutes Admin Aide Date, time and details of letter/indorsement recorded in logbook of the office of the Executive Director.
10. CO-LTPD receives and records the approved and signed letter/indorsement.
Approved and signed letter/indorsement
10 minutes Admin Aide Date, time and details of letter/indorsement
A photocopy of the approved and signed letter/indorsement is
406
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in logbook of the LTPD.
kept by the Division for file. Original and duplicate copies of approved/signed letter/indorsement is forwarded to Records Section for filing and transmitted to concerned offices.
11. CO-Records Section receives and records
signed/approved letter/indorsement
Approved and signed letter/indorsement
10 minutes Admin Aide Date, time and details of letter/indorsement recorded in logbook of the Records Section.
Records Section
transmits
approved/signed
letter/indorsement to
concerned offices.
(Refer to process of
transmitting outbound
documents under Record
Section.)
End of Process
407
1.3 On-site assistance (writeshop)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives and records request from the LGUs concerned
Letter requests from LGUs concerned
10 minutes Admin Aide CCS#, date, time and details of letter request recorded in logbook of the LTPD.
LTPD personnel should be experienced and familiar with the conduct of writeshop
2. Prepares Travel Order of personnel List of personnel who will attend writeshop
1 day BLGF-CO Admin Officer
ED signature on Travel Order
Refer to ADMIN Process on Travel Order
3. Prepares the disbursement voucher Itinerary of Travel
Disbursement Voucher, Itinerary of Travel
1 day Admin Aide (LTPD)
Refer to FMD’s processing of DV
4. A) Orientation: Discusses with the local Sanggunian, the Finance Committee and other local officials the following:
1. Sources of taxing powers of LGUs and
its limitations 2. Sources of revenues 3. Updates on local taxation (rulings &
opinion, court decisions, etc.) 4. Procedures in the enactment/approval
of tax ordinance and its effectivity 5. Mandatory Public Hearings and the
necessary publication thereof B) Present Model Ordinance
Local Government Code and court rulings/decisions Model Ordinance
1 day LTPD Chief Proposed draft of revised revenue code or tax ordinance/Model Ordinance Advice or Recommendations
Any tax adjustment should not exceed 10% of the rates fixed in the Code not oftener than once every five (5) years. (Section 191, LGC)
5. Facilitate the workshop Advise or
recommendations
1 day LTP Chief Draft of revised
revenue code or tax
ordinance
408
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6. Encode Revenue Code/Tax Ordinance Draft Revenue
Code/Tax Ordinance
1 day Tax Specialist Final Draft of the
revised Revenue
Code/Tax Ordinance
7. Attend public hearings Final Draft of the
revised Revenue
Code/Tax Ordinance
1 day LTPD Chief Revised revenue
code/tax ordinance
to be finalize for
submission and
approval of the LCE
optional
8. Upon approval secure a copy of Ordinance Revised revenue
code/tax ordinance
1 day Tax Specialist Copy of Ordinance
End of Process
409
3.1 Research with regard to decision of the Supreme Court, CTA, CA, DOJ
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. Access website Rulings/Decisions from Supreme Court, Court of Tax Appeals, Court of Appeals, Department of Justice
1 working day
Tax Specialist Copy of rulings/decisions related to the issues raised
2. Proceed to office library If website is not accessible
Rulings/Decisions from Supreme Court, Court of Tax Appeals, Court of Appeals, Department of Justice
1 working day
Tax Specialist Copy of rulings/decisions related to the issues raised
End of Process
410
3.2 Conduct investigation (referral to BLGF legal or other NGAs, fact-finding)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. Receive requests for assistance from division concern (FO-ED, INTEL)
Request letter N/A Division concerned
Determination/Validation of allegations
2. Prepare the necessary document such as Itinerary of Travel and Disbursement Voucher to avail of cash advance.
Pls. refer to FMD’s
processes.
3. Meet and discuss the procedures or strategy
that may be employed in the conduct of the
investigation.
Request/report/co
mplaint from
interested
party/ies.
3 hours The Fact-
finding team
Set of procedures
or a strategy for
an effective
activity formulated
The person assigned to examine treasury records should have at least prior experience in actual fact-finding activity
4. Request for office Order to Administration
Division.
Pls. refer to
Administration
Division’s processes;
5. Proceed to the LGU concerned and make a
courtesy call at the office of the LCE/Office
of the Administrator.
Office Order 30 minutes The Fact-
finding team
LCE or other LGU
officials properly
informed of the
activity
Make sure that the copy of the Order is received by the concerned office and that either the LCE or the administrator is properly informed of the activity to be conducted
6. Gather all the necessary documents/evidence to support any adverse
Photo copies of Entire The Fact- Evidences Make sure that team has all the important
411
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
findings.
documents/record
s subject of the
investigation
duration of
the fact-
finding
finding team gathered to
support any
adverse findings
documents/evidences that will support any adverse findings.
7. 1. ILLEGAL USED OF FUND, ABSCOND OR CASH SHORTAGE:
Examine/Review pertinent records in the treasury and accounting office
2. CASH POSITION OF THE LGU Examine pertinent treasury records
particularly the transactions
involved in the collection, recording
and disbursement of funds.
Cash Count
Sheets, Inventory
sheets for
Accountable
Forms and other
forms the may be
necessary
depending the
kind of
investigation to be
conducted.
Until
concluded
Tax Specialist
II or any
other staff
assigned to
assist the
Legal Office
Team
Initial findings Personnel assigned to make an examination should be familiar with what kind of documents to be verified and examined especially if the objective is to establish any shortage or illegal use of public funds.
8. Prepare and submit report to the
Intelligence and Investigation Office (IIO).
Findings/report 2 days The Fact-
finding team
Draft report or
consolidated
finding/final
reports
Make sure that any adverse finding is supported by documentary evidence.
9. Forward report to the IIO Findings/final
report
10 minutes Admin Aide Final report
Forward report to BLGF management Consolidated
findings/report
10 minutes Admin Aide Final report
submitted to the
BLGF Management
Participation of the LPTD personnel ends upon the submission of the report unless the BLGF Management
412
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
decided to pursue the investigation that will lead the filing of formal charges if the findings warrant so.
10. Participate in legal proceedings if
management decides to pursue the
investigation
Final Report 1 day The
composite
team
Composite team will
compose of IIO, IAO
and PES; Output will
be prepared by the
Division concerned.
11. Prepare the Liquidation Report. Pls. refer to FMD’s
processes.
End of Process
413
3.3 Ocular inspection/field verification
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives order from OED for an ocular inspection.
Letter requests from LGU or individual concerned, order from OED noted on the request letter.
1 day Executive Director
Order from OED received.
It may also come from the Bureau itself in the pursuit of its own confirmation or verification especially with regard to a ruling or opinion pursued by any interest party.
2. CO-LTPD reviews and assigns the request. Note of the OED 1 hour LTPD Chief Request assigned to designated A.O.
3. CO-LTPD prepares the necessary document such as Itinerary of Travel and Disbursement Voucher to avail of cash advance to defray any expenses necessary and incidental to the activity to be conducted.
Pls. refer to FMD’s
processes.
4. CO-LTPD requests for office Order to
Administration Division.
Pls. refer to
Administration Division’s
processes.
5. CO-LTPD proceeds to the LGU where the site
for ocular inspection is located.
Duly approved
Office/Personnel Order.
1-3 days LTPD Chief Copies of the Order
to be provided to
both site and local
officials
If necessary, the team may inform the local officials more particularly the Treasurer’s Office
6. CO-LTPD conducts actual interview and inspection and gathering of all information needed in its course of action after the ocular.
Details of the case for
ocular inspection.
1-3 days LTPD Chief Consolidated
information
gathered, cases
If necessary, the team may conduct an exit conference to provide initial findings to concerned individuals or
414
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
verified/confirmed. even local officials
7. CO-LTPD prepares and finalizes
Report/Memorandum.
Consolidated
information.
1-3 days Tax Specialist Report/Memorandu
m reviewed and
countersigned by
Action Officer
8. CO-Review draft report. Draft
Report/Memorandum.
1 hour LTPD Chief Draft
Report/Memorandu
m reviewed.
9. CO-LTPD reviews Report/Memorandum. Final
Report/Memorandum.
30 minutes LTPD Chief Final
Report/Memorandu
m reviewed and
countersigned by
the Division LTPD
Chief
10. CO-LTPD records and transmits
Report/Memorandum to the Office of the PES
Director
Final
Report/Memorandum.
5 minutes LTPD receiving
clerk
Date, time and
details of
Report/Memorandu
m recorded in
logbook of LTPD
The Report/Memorandum is routed to the Office Directors for review and countersignature.
11. CO-PES Director reviews Report/Memorandum Report/Memorandu
m countersigned by
the Action Officer,
Division LTPD Chief
1 hour PES Director Report/Memorandu
m reviewed and
countersigned by
the PES Director
If corrections/revisions
are made by the PES
Director on the
Report/Memorandum, the
same is returned to LTPD
for editing/finalization,
415
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to step 7,
otherwise the
Report/Memorandum is
forwarded to the DED-
Operations
12. DED for Operations reviews
Report/Memorandum
Report/Memorandu
m countersigned by
the Action Officer,
Division LTPD Chief,
PES Director
1 hour DED for
Operations
Report/Memorandu
m reviewed and
countersigned by
the DED-Operations
13. CO-Office of the Executive Director proofreads
the Report/Memorandum
Report/Memorandu
m countersigned by
the Action Officer,
Division LTPD Chief,
PES Director, DED-
Operations
30 minutes Executive
Secretary
Report/Memorandu
m proofread
14. Executive Director reviews, approves and signs
the Report/Memorandum
Report/Memorandu
m countersigned by
the Action Officer,
Division LTPD Chief,
PES Director, DED-
Operations
1 hour
Executive
Director
Approved and
signed Report/
Memorandum
If corrections/revisions
are made by the Executive
Director on the
Report/Memorandum, the
same is returned to LTPD
for editing/finalization,
then proceed to step 7
The Report/Memorandum after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action.
15. Office of the Executive Director records and
transmits the approved and signed
Approved and 10 minutes Secretary of
the Executive
Date, time and
details of
416
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Report/Memorandum to the concerned Division
(LTPD)
signed Report/
Memorandum
Director Report/Memorandu
m recorded in
logbook of the
Executive Director
16. CO-LTPD receives and records the approved and
signed Report/Memorandum from the OED
Approved and
signed Report/
Memorandum
10 minutes Admin Aide Date, time and
details of
Report/Memorandu
m recorded in
logbook of the LTPD
Division
A photocopy of the approved and signed Report/Memorandum is kept by the Division for file Original and duplicate
copies are transmitted to
CO-Records Section
17. CO-Records Section receives and records
signed/approved Report/Memorandum
Approved and
signed
Report/Memorandum
10 minutes Records
Officer
Date, time and
details of
Report/Memorandu
m recorded in
logbook of the
Records Section
Records Section files
approved/signed
Report/Memorandum
18. CO-LTPD prepares the required Liquidation
Report.
See FMD’s processes.
End of Process
417
3.4 Prepare opinions/rulings
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives and records letter requests
from LGUs concerned and taxpayers.
Letter requests from LGUs concerned or taxpayers relative to local taxation
10 minutes Admin Aide CCS#, date, time and details of letter request recorded in logbook of the LTPD.
2. CO-LTPD evaluates request Letter request 1 day Tax Specialist Appropriate classification of the letter request identified.
Re-route to other Division if letter request is not the concern of the Division
Preliminary action shall first be prepared in case of initial (1st
time) letter-request for opinion/ruling.
Preliminary action may be:
Seek comments/recommendations from local treasurers concerned. Conduct ocular inspection.
3. Research on pertinent laws, rules and regulations relative to request
LGC, SC rulings, CTA rulings
3 days Tax Specialist Pertinent provisions, rulings
When necessary
4
.
CO-LTPD prepares and finalizes letter/indorsement
Facts/information submitted Comments and/or recommendation of concerned local treasurer, if necessary Report of ocular inspection conducted, if necessary
1 week Tax Specialist Letter/indorsement reviewed and countersigned by Action Officer (Tax Specialist).
Minimum of one week or it depends if the request needs further study/research or on the heavy workloads of the Division
5
.
CO-LTPD reviews letter/indorsement Draft
letter/indorsement
30 minutes Division Chief Letter/indorsement reviewed and countersigned by the Division LTPD
418
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief.
6
.
CO-LTPD records and transmits letter/indorsement to the Office of the PES Director
Letter/indorsement
countersigned by
the Action Officer,
Division LTPD Chief
5 minutes Admin Aide Date, time and details of letter/indorsement recorded in logbook of LTPD.
The letter/indorsement is routed to the Office Directors for review and countersignature
7
.
PES Director reviews letter/indorsement Letter/indorsement
countersigned by
the Action Officer,
Division LTPD Chief
1 hour PES Director Letter/indorsement reviewed and countersigned by the PES Director.
If corrections/revisions
are made by the PES Director on the letter/indorsement, the same is returned to LTPD for editing/finalization, then proceed to step 4, otherwise the letter/indorsement is forwarded to the DED-Operations
8
.
DED for Operations reviews letter/indorsement Letter/indorsement
countersigned by
the Action Officer,
Division LTPD Chief,
PES Director
1 hour DED for Operations
Letter/indorsement reviewed and countersigned by the DED-Operations.
If corrections/revisions
are made by the DED-
Operations on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 4,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
419
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9
.
CO-Office of the Executive Director proofreads the letter/indorsement
Letter/indorsement
countersigned by
the Action Officer,
Division LTPD Chief,
PES Director, DED-
Operations
30 minutes Executive Secretary
Letter/indorsement proofread.
If corrections/revisions
are made by the Executive
Secretay on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 4,
otherwise the
letter/indorsement is
forwarded to the
Executive Director
1
0
.
Executive Director reviews, approves and signs the letter/indorsement
Letter/indorsement
countersigned by
the Action Officer,
Division LTPD Chief,
PES Director, DED-
Operations
1 hour
Executive Director
Approved and signed letter/indorsement.
If corrections/revisions
are made by the Executive
Secretay on the
letter/indorsement, the
same is returned to LTPD
for editing/finalization,
then proceed to step 4
The letter/indorsement after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
1
1
.
CO-Office of the Executive Director records and transmits the approved and signed letter/indorsement to the concerned Division (LTPD)
Approved and
signed
letter/indorsement
10 minutes Secretary of the Executive
Director
Date, time and details of letter/indorsement recorded in logbook of the Executive Director.
1CO-LTPD receives and records the approved and signed letter/indorsement from the OED
Approved and
signed
10 minutes Admin Aide Date, time and details of
A photocopy of the approved and signed
420
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
2
.
letter/indorsement letter/indorsement recorded in logbook of the LTPD Division.
letter/indorsement is kept by the Division for file Original and duplicate
copies are transmitted to
CO-Records Section
1
3
.
CO-Records Section receives and records signed/approved letter/indorsement
Approved and
signed
letter/indorsement
10 minutes Records Officer
Date, time and details of letter/indorsement recorded in logbook of the Records Section.
Records Section
transmits
approved/signed
letter/indorsement
End of Process
421
3.5 Prepare responses to appeals/reconsiderations
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
12. CO-LTPD receives and records of letters of reconsideration from the LGUs concerned, taxpayers.
Date, time and
details of
documents
10 minutes Admin Aide Date, time and
details of
documents recorded
in logbook of the
LTPD. Corresponding
CCS attached.
The letter of
reconsideration is
forwarded to Senior Tax
Specialist (STS), Tax
specialist II (TS II).
13. CO-LTPD prepares and finalizes letter of
reconsideration.
Letters of reconsideration
10 working days
Senior Tax Specialist, Tax
Specialist,
Letters of reconsideration assigned to Senior Tax Specialist, Tax Specialist
The letter of
reconsideration is
forwarded to LTPD Chief
for review.
Preliminary action shall first be prepared in case of initial (1st
time) letter-request for opinion/ruling.
Preliminary action may be:
Seek comments/recommendations from local treasurers concerned. Conduct ocular inspection.
14. CO-LTPD reviews letter of reconsideration Letter of
reconsideration countersigned by Senior Tax Specialist, Tax Specialist
1 working day LTPD Chief Letter of
reconsideration
reviewed and
countersigned by
the LTPD Chief.
If corrections/revisions
are made by LTPD Chief
on the letter of
reconsideration, the
same is returned to
Senior Tax Specialist, Tax
Specialist for
editing/finalization, then
proceed to step 2,
otherwise the letter of
422
reconsideration is
forwarded to the Office
of the PES Director.
15. CO-LTPD records and transmits letter of reconsideration to the Office of the PES Director.
Letter of reconsideration countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief
5 minutes Admin Aide Date, time and details of letter of reconsideration recorded in logbook of LTPD.
The letter of reconsideration is routed to the Office Directors for review and countersignature
16. PES Director reviews letter of reconsideration Letter of reconsideration countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief
1 hour PES Director Letter of reconsideration reviewed and countersigned by the PES Director.
If corrections/revisions
are made by the PES
Director on the letter of
reconsideration, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
otherwise the letter of
reconsideration is
forwarded to the Deputy
Executive Director (DED)
-Operations
17. DED - Operations reviews letter of reconsideration
Letter of reconsideration countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director
1 hour DED for Operations
Letter of reconsideration reviewed and countersigned by the DED-Operations.
If corrections/revisions
are made by the DED-
Operations on the letter
of reconsideration, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
423
otherwise the letter of
reconsideration is
forwarded to the
Executive Director
18. CO-Office of the Executive Director proofreads the letter of reconsideration
Letter of reconsideration countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director, DED- Operations
30 minutes Executive Secretary of
the Executive Director
Letter of reconsideration proofread by the Executive Secretary
If corrections/revisions
are made by the
Executive Secretary on
the letter of
reconsideration, the
same is returned to LTPD
for editing/finalization,
then proceed to step 2,
otherwise the letter of
reconsideration is
forwarded to the
Executive Director for
approval.
19. Executive Director reviews and evaluates the letter of reconsideration for approval/signature.
Letter of reconsideration countersigned by the Senior Tax Specialist, Tax Specialist, LTPD Chief, PES Director, DED- Operations
1 hour
Executive Director
Letter of reconsideration reviewed and approved/signed by Executive Director.
If corrections/revisions
are made by the
Executive Director on the
letter of reconsideration,
the same is returned to
LTPD for
editing/finalization, then
proceed to step 2
The letter of reconsideration after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
20. CO-Office of the Executive Director records and Approved and 10 minutes Admin Aide Date, time and
424
transmits the approved and signed letter of reconsideration to the concerned Division (LTPD)
signed letter of reconsideration
details of letter of reconsideration recorded in logbook of the office of the Executive Director.
21. CO-Records Section receives and records
signed/approved letter of reconsideration
Approved and signed letter of reconsideration
10 minutes Admin Aide Date, time and details of letter of reconsideration recorded in logbook of the Records Section.
Records Section
transmits
approved/signed letter
of reconsideration to
concerned offices.
(Refer to process of
transmitting outbound
documents under Record
Section.)
End of Process
425
5.1 Maintenance of local tax policy rules and regulations, standards operating procedures database
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. Digest signed LFCs, rulings, opinions, regulations
Signed LFC, ruling, opinions, regulations
1 hour LTPD Records Officer
Particulars, subject, legal basis, views
Format data elements such as ccs#, source, origin, date subject matter, legal basis.
2. Encode Particulars, subject, legal basis, views
1 hour LTPD Records Officer
Database of LFC, ruling, opinions, regulations
1 hour or it depends on the volume of signed LFC, ruling, opinions, regulations
End of Process
426
5.2 Preparation and issuances of Local Finance Circular
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives and records letter requests
from LGUs concerned and taxpayers.
Letter requests from LGUs concerned or taxpayers relative to local taxation
10 minutes Admin Aide CCS#, date, time and details of letter request recorded in logbook of the LTPD.
If the Division observed that the queries or requests for rulings and opinions are recurring issues it may be, motu proprio, obliged to issue LFC.
2. CO-LTPD prepares and finalizes invitation letter to LGUs and taxpayers for the conduct of consultative meeting
Letter Request, Date, venue and subject of consultative meeting
1 day Tax Specialist
Invitation Letters countersigned by Action Officer (Tax Specialist), list of LGUs and taxpayers concerned, addresses and contact/fax numbers
The invitation letter is forwarded to Division LTPD Chief for review.
3. CO-LTPD reviews invitation letter Invitation letter 30 minutes Division Chief Invitation Letter reviewed and countersigned by Division LTPD Chief
If corrections/revisions are made by the Division Chief on the invitation letter, the same is returned to Action Officer for editing/finalization.
4. CO-LTPD records and final transmit invitation letter to the office of the PES Director
Invitation letter countersigned by Action Officer, Division LTPD Chief
5 minutes Admin Aide Date, time and details of invitation letter recorded in logbook of the LTPD.
The invitation Letter is routed to the Office Directors for review and countersignature
5. PES Director reviews the invitation letter Invitation letter countersigned by Action Officer, Division LTPD Chief
1 hour PES Director Invitation Letter reviewed and countersigned by the PES Director
If corrections/revisions
are made by the PES Director on the invitation letter, the same is
427
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
returned to LTPD for editing/finalization, then proceed to step 2, otherwise the invitation letter is forwarded to the DED-Operations
6. Deputy Executive Director – Operations reviews the invitation letter
Invitation letter countersigned by Action Officer, Division LTPD Chief, PES Director
1 hour` Deputy
Executive
Director
Operations
Invitation letter reviewed and countersigned by the DED-Operations
If corrections/revisions
are made by the DED-
Operations on the
invitation letter, the same
is returned to LTPD for
editing/finalization, then
proceed to step 2,
otherwise the invitation
letter is forwarded to the
Executive Director
7. CO-Office of the Executive Director proofreads the Invitation letter
Invitation letter countersigned by Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive
Assistant
Invitation letter proofread
If corrections/revisions
are made by the Executive
Secretary on the invitation
letter, the same is
returned to LTPD for
editing/finalization, then
proceed to step 2,
otherwise the invitation
letter is forwarded to the
Executive Director
8. Executive Director reviews, approves and signs the Invitation letter
Invitation letter countersigned by
1 hour Executive Approved and signed invitation
If corrections/revisions
428
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Action Officer, Division LTPD Chief, PES Director, DED-Operations
Director letter are made by the Executive
Director on the invitation
letter, the same is
returned to LTPD for
editing/finalization, then
proceed to step 2
The invitation letter after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
9. CO-Office of the Executive Director records and transmits the approved and signed invitation letter to the concerned Division (LTPD)
Approved and signed invitation letter
10 minutes Admin Aide Date, time and details of invitation letter recorded in logbook of the Executive Director
10. CO-LTPD receives and records the approved and signed invitation letter from the OED
Approved and signed invitation letter
10 minutes Admin Aide Date, time and details of invitation letter recorded in logbook of the LTPD Division
11. CO-LTPD sends invitations to LGUS, taxpayers for the conduct of consultative meeting
Signed Letter of Invitation
1 day Tax Specialist
Confirmation from LGUs and taxpayers
The invitation letter is
sent thru fax or e-mail
12. BLGF conducts consultative meeting with concerned LGUs and taxpayers
Issues, pertinent laws on local taxation
1 day LTPD Chief Proposed LFC
13. CO-LTPD prepares and finalizes proposed Local Finance Circular (LFC) and Memorandum to the Secretary
Proposed LFC 5 days Tax Specialist
Proposed LFC, Memorandum for the Secretary countersigned by the Action Officer (Tax Specialist)
429
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14. CO-LTPD reviews proposed LFC and memorandum letter
Draft memorandum letter and proposed LFC
1 hour LTPD Chief Draft memorandum letter and proposed LFC reviewed and countersigned by the Division LTPD Chief
If corrections/revisions
are made by the Division
Chief on the
memorandum letter and
proposed LFC, the same is
returned to Action Officer
for editing/finalization
15. CO-LTPD records and transmits memorandum letter and proposed LFC to the Office of the PES Director
Memorandum letter and proposed LFC countersigned by the Action Officer, Division LTPD Chief
5 minutes Admin Aide Date, time and details of memorandum letter and proposed LFC recorded in logbook of LTPD
The proposed LFC and memorandum for the DOF Secretary is routed to concerned Office Directors for review and countersignature
16 PES Director reviews the Memorandum letter and proposed LFC
Memorandum letter and proposed LFC countersigned by the Action Officer, Division LTPD Chief
1hour PES Director Memorandum letter and proposed LFC reviewed and countersigned by the PES Director
If corrections/revisions
are made by the PES
Director on the
memorandum letter and
proposed LFC, the same is
returned to LTPD for
editing/finalization, then
proceed to step 13,
otherwise, the
memorandum letter and
proposed LFC are
forwarded to the DED-
Operations
17. Deputy Executive Director – Operations reviews memorandum letter and proposed LFC
Memorandum letter and proposed LFC
1 hour Deputy
Executive
Memorandum letter and proposed LFC
If corrections/revisions
are made by the DED-
430
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by the Action Officer, Division LTPD Chief, PES Director
Director
Operations
reviewed and countersigned by the DED-Operations
Operations on the
memorandum letter and
proposed LFC, the same is
returned to LTPD for
editing/finalization, then
proceed to step 13,
otherwise, the
memorandum letter and
proposed LFC are
forwarded to the
Executive Director
18. CO-Office of the Executive Director proofreads the Memorandum letter and proposed LFC
Memorandum letter and proposed LFC countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive
Assistant
Memorandum letter and proposed LFC proofread
If corrections/revisions
are made by the Executive
Secretary on the
memorandum letter and
proposed LFC, the same is
returned to LTPD for
editing/finalization, then
proceed to step 13,
otherwise, the
memorandum letter and
proposed LFC are
forwarded to the
Executive Director
19. Executive Director reviews, approves and signs the Memorandum letter and proposed LFC
Memorandum letter and proposed LFC countersigned by the Action Officer, Division LTPD Chief,
1 day Executive
Director
Memorandum letter signed and proposed LFC countersigned
If corrections/revisions
are made by the Executive
Director on the
memorandum letter and
431
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
PES Director, DED-Operations
proposed LFC, the same is
returned to LTPD for
editing/finalization, then
proceed to step 13
The Memorandum letter and proposed Finance Circular (LFC) after reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, the same are transmitted back to the Division (LTPD) for appropriate action
20. CO-Office of the Executive Director records and
transmits the approved and signed
memorandum letter and proposed LFC to the
concerned Division (LTPD)
Approved and signed memorandum letter and proposed LFC
10 minutes Secretary of
the Executive
Director
Date, time and details of the signed memorandum letter and proposed LFC recorded in the logbook of the Office of the Executive Director
21. CO-LTPD receives and records the approved and
signed memorandum letter and proposed LFC
from the OED
Approved and signed memorandum letter and proposed LFC
10 minutes Admin Aide Date, time and details of the approved and signed memorandum letter and proposed LFC recorded in the logbook of the LTPD
A photocopy of the approved and signed memorandum letter and proposed LFC are kept by the Division for file Original and duplicate
copies are transmitted to
CO-Records Section
22. CO-Records Section records and transmits
memorandum letter and proposed LFC to the
Office of the Secretary of Finance
Approved and signed memorandum letter and proposed LFC
1 hour Record officer Date, time and details of the approved and signed memorandum letter and proposed LFC recorded in the logbook of the Record Section
432
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Tracking of documents by LTPD
23. Secretary of Finance approves LFC Proposed LFC 1 working day Secretary of
Finance
LFC approved and signed by the Secretary of Finance
24. CO-LTPD secures copy of the approve LFC LFC approved and signed by the Secretary of Finance
30 minutes Records
Officer
Copy of approved LFC
Provide copy to INFO
and Records Section
25. Disseminate LFC thru Memorandum Circular LFC approved and signed by the Secretary of Finance
Refer to process for the
process on preparation
and dissemination of
memorandum circular
under the INFO
End of Process
433
6.1 Preparation of Memorandum Circular governing local taxes.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD prepares and finalizes memorandum circular to disseminate LFC, ruling/opinions to RDs, local treasurers and others concerned
Signed LFC, rulings/opinions
1 day Tax Specialist Memorandum Circular countersigned by the Action Officer (Tax Specialist).
Original Action
2. CO-LTPD reviews Memorandum Circular Draft Memorandum Circular
1 hour Division Chief Draft Memorandum Circular reviewed and countersigned by the Division LTPD Chief.
If corrections/revisions are made by the Division Chief on the Memorandum Circular, the same is returned to Action Officer for editing/finalization.
3. CO-LTPD records and transmits Memorandum Circular to the Office of the PES Director
Memorandum Circular countersigned by the Action Officer, Division LTPD Chief
5 minutes
Admin Aide Date, time and details of memorandum circular recorded in logbook of LTPD.
The Memorandum Circular is routed to concerned Office Directors for review and countersignature
4. PES Director reviews the Memorandum Circular Memorandum Circular countersigned by the Action Officer, Division LTPD Chief
1 hour PES Director Memorandum Circular reviewed and countersigned by the PES Director.
If corrections/revisions are made by the PES Director on the Memorandum Circular, the same is returned to LTPD for editing/finalization, then proceed to step 1, otherwise, the Memorandum Circular is forwarded to the DED-Operations
434
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. Deputy Executive Director – Operations reviews the Memorandum Circular
Memorandum Circular countersigned by the Action Officer, Division LTPD Chief, PES Director
1 hour DED for Operations
Memorandum Circular reviewed and countersigned by the DED-Operations.
If corrections/revisions are made by the DED-Operations on the Memorandum Circular, the same is returned to LTPD for editing/finalization, then proceed to step 1, otherwise, the Memorandum Circular is forwarded to the Executive Director
6. CO-Office of the Executive Director proofreads the Memorandum Circular
Memorandum Circular countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive Secretary
Memorandum Circular proofread.
If corrections/revisions are made by the Executive Secretary on the Memorandum Circular, the same is returned to LTPD for editing/finalization, then proceed to step 1, otherwise, the Memorandum Circular is forwarded to the Executive Director
7. Executive Director reviews, approves and signs the Memorandum Circular
Memorandum Circular countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
1 hour Executive Director
Memorandum Circular signed
If corrections/revisions are made by the Executive Secretary on the Memorandum Circular, the same is returned to LTPD for editing/finalization, then proceed to step 1
The Memorandum Circular after reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, the same are transmitted back to the Division (LTPD) for appropriate action
435
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8. CO-Office of the Executive Director records and transmits the approved and signed Memorandum Circular and to the concerned Division (LTPD)
Approved and signed Memorandum Circular
10 minutes Secretary of the Executive
Director
Date, time and details of the signed Memorandum Circular recorded in the logbook of the Office of the Executive Director
Xeroxed copy of the signed memorandum Circular
9. CO-LTPD receives and records the approved and signed Memorandum Circular and proposed LFC from the OED
Approved and signed Memorandum Circular
10 minutes Admin Aide Date, time and details of the approved and signed Memorandum Circular recorded in the logbook of the LTPD
A photocopy of the approved and signed Memorandum Circular is kept by the Division for file
Original and
duplicate copies
are transmitted
to CO-Records
Section
10. CO-Records Section receives and records signed/approved Memorandum Circular
Approved and signed Memorandum Circular
1 hour Record officer Date, time and details of the approved and signed Memorandum Circular recorded in the logbook of the Record Section
CO-Records
Section records
and transmits
singed
Memorandum
Circular
End of Process
436
7.1 Preparation comments/recommendations on legislation initiatives on local taxes
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives letter request for comments/recommendations from the Senate or House of Representatives
Letter request from the Senate or House of Representatives
10 minutes Admin Aide CCS#, date, time and details of letter request recorded in logbook of the LTPD.
2. CO-LTPD evaluates request Letter request 1 working day
Tax Specialist Appropriate classification of the letter request identified
3. CO-LTPD prepares and finalizes comments/recommendations
Draft comments/recommendations
1 hour Tax Specialist comments/recommendations reviewed and countersigned by Action Officer
Minimum of one week or it depends if the request needs further study/research or on the heavy workloads of the Division
4. CO-LTPD reviews comments/recommendations
Draft comments/recommendations
1 hour LTPD Chief Comments/recommendations reviewed and countersigned by the Division LTPD Chief
5. CO-LTPD records and transmits comments/recommendations to the Office of the PES Director
Comments/recommendations countersigned by the Action Officer, Division LTPD Chief
5 minutes Admin Aide Date, time and details of comments/recommendations recorded in logbook of LTPD
437
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
The comments/recommendations is routed to the Office Directors for review and countersignature
6. PES Director reviews comments/recommendations
Comments/recommendations countersigned by the Action Officer, Division LTPD Chief
1 hour PES Director Comments/recommendations reviewed and countersigned by the PES Director
If corrections/revisions
are made by the PES
Director on the
comments/recommend
ations, the same is
returned to LTPD for
editing/finalization,
then proceed to step 3,
otherwise the
comments/recommend
ations is forwarded to
the DED-Operations
7. DED for Operations reviews comments/recommendations
Comments/recommendations countersigned by the Action Officer, Division LTPD Chief, PES Director
1 hour DED for Operations
Comments/recommendations reviewed and countersigned by the DED-Operations
8. CO-Office of the Executive Director proofreads the comments/recommendations
comments/recommendations countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
30 minutes Executive Secretary
comments/recommendations proofread
If corrections/revisions
are made by the
Executive Secretary on
the
comments/recommend
ations, the same is
returned to LTPD for
editing/finalization,
438
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to step 3,
otherwise the
comments/recommend
ations is forwarded to
the Executive Director
9. Executive Director reviews, approves and signs the comments/recommendations
comments/recommendations countersigned by the Action Officer, Division LTPD Chief, PES Director, DED-Operations
1 hour
Executive Director
Approved and signed comments/recommendations
If corrections/revisions
are made by the
Executive Secretary on
the
comments/recommend
ations, the same is
returned to LTPD for
editing/finalization,
then proceed to step 3
The comments/recommendations after reviewed and countersigned by the concerned Office Directors and approved by the Executive Director, the same is transmitted back to the concerned Division (LTPD) for appropriate action
10. CO-Office of the Executive Director records and transmits the approved and signed comments/recommendations to the concerned Division (LTPD)
Approved and signed comments/recommendations
10 minutes Secretary of the Executive
Director
Date, time and details of comments/recommendations recorded in logbook of the Executive Director
CO-Office of the
Executive Director
records and transmits
the approved and
signed
comments/recommend
ations to the concerned
Division (LTPD)
439
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO-LTPD receives and records the approved and signed comments/recommendations from the OED
Approved and signed comments/recommendations
10 minutes Admin. Aide Date, time and details of comments/recommendations recorded in logbook of the LTPD Division
A photocopy of the approved and signed comments/recommendations is kept by the Division for file Original and duplicate
copies are transmitted
to CO-Records Section
12. CO-Records Section receives and records signed/approved comments/recommendations
Approved and signed comments/recommendations
10 minutes Records Officer
Date, time and details of comments/recommendations recorded in logbook of the Records Section
Records Section
transmits
approved/signed
comments/recommen
dations
End of Process
440
8.1 Participate in public hearings/committee meetings or as resource person
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LTPD receives invitation letter Invitation letter 30 minutes LTPD Chief, Tax Specialist
Invitation letter
2. CO-LTPD forwards invitation letter to the Office of the Executive Director
Invitation letter 10 minutes Admin Aide Invitation letter
3. Executive Director approves invitation letter Invitation letter 10 minutes Executive Director
Approved invitation letter
4. Executive Director endorses/issues order to Division Chief, LTP
Invitation letter 10 minutes Executive Director
Assigns invitation letter
5. CO-LTPD prepares necessary documents such as Itinerary of Travel and Disbursement Voucher to avail of cash advance
Invitation letter 1 hour Tax Specialist Documents such as Disbursement Voucher (DV), Itinerary of Travel (IT).
Refer to FMD’s process of DV and IT
6. CO-LTPD attends Committee/Public Hearings Issues/concerns, related laws, comments/recommendations
LTPD Chief, Tax Specialist
Notes on committee hearings
7. CO-LTPD prepares and finalizes report Notes on committee hearings
1 day LTPD Chief, Tax Specialist
Final Report
8. CO-LTPD furnishes copies of report to Service Director, Deputy Executive Director and Executive Director
Final Report 10 minutes Tax Specialist Final report received by the Bureau officials
Format of report
End of Process
441
Operating Procedures for Bureau Operations Local Finance Policy Enforcement Service
Local Assessment Operations Division
442
SERVICE : Local Finance Policy Enforcement Service (PES) DIVISION : Local Assessment Operations Division
UNIT NAME : BRIEF DESCRIPTION : This division supervises and regulates LGU real property tax assessment matters and work
closely with PASS Division. CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), LGU Assessor & Assistance Treasurer, Any Government or Private Entity, General Public;
Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Assist in the formulation of Department / Bureau issuances setting for the local assessment policies and rules and standard operating procedures.
1.1 Maintenance of local assessment policy rules and standard procedure.
1.2 Preparation and issuances of local assessment regulations.
Assessment Regulation Signed by the Secretary of DOF Definition of Terms (Regulations, Circulars, Assessment Policy)
2. Prepare policy guidelines and procedures to govern the valuation and assessment of real properties for taxation purposes.
2.1 Preparation of Memorandum Circular governing valuation and assessment of real properties for information dissemination to Regional Offices, Assessors and Treasurers of the different LGUs.
Memorandum Circular Signed by the Executive Director of BLGF
3. Monitor and evaluate local assessment operations and determine impact on the revenue potentials/yields of the real property values and tax assessments.
3.1 Collection and maintenance of related information 3.2 Evaluation/analysis of present valuation and assessment of
properties against potential revenue of LGUs 3.3 Recommend strategies to improve local assessment
operation benefiting revenue potential and yield
Not a function of LASS As per discussion this should be lodged to PASS Division
443
3.4 Monitor property assessment operations 3.5 Publication of impact assessment
4. Compile and analyze field reports on real property values and (tax) assessments.
4.1 Review of SMV pursuant to Local Assessment Regulation No. 1-2007
4.2 Enforce Compliance Reporting System (CRS) 4.3 Analysis of SMV pursuant to Assessment Regulation 1-92 4.4 Recommend corrections/revisions of property base unit
values and tax assessment 4.5 Monitor compliance in the preparation of SMV
Currently only BLGF Form No. 3 is being collected from LGUs. CRS still subject to implementation
5. Prepare actions, opinions or rulings on queries or requests of property owners relative to property values and tax assessments.
5.1 Prepare preliminary action 5.2 Conduct further research/study necessary prior to the
preparation of an opinion/ruling. 5.3 Conduct fact-finding investigation and/or ocular
inspection. 5.4 Prepare opinions/ruling 5.5 Prepare response on appeals/ request for reconsiderations
6. Provide technical assistance on legislative measures pertaining to real property tax; assistance to line division/LGUs/public and other govt. agencies
6.1 Prepare comments/ recommendations on proposed legislative measures pertaining to real property taxation.
6.2 Provide technical assistance to LGUs/other govt. agencies and the general public re. real property appraisal/ assessment.
6.3 Provide technical assistance in the conduct of assessment audit.
6.4 Assist in the review/evaluation of existing policies effecting real property appraisal and assessment.
444
SPECIFIC PROCEDURES 1.2 Preparation and issuances of local assessment regulations
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LASS prepares and finalizes Memorandum and Policies for proper guidance in local assessment operations
Research, study, analysis
months Local Assessment Operation
Officer (LAOO)
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO
Memorandum and Policies for proper guidance in local assessment operations is forwarded to LASS Chief
2 CO-LASS reviews Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO
10 minutes LASS Chief Memorandum and Policies for proper guidance in local assessment operations countersigned by LASS Chief
If corrections/revisions are made by the LASS Chief on the Memorandum and Policies for proper guidance in local assessment operations, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum and Policies for proper guidance in local assessment operations is forwarded to the Office of the Director, Policy Enforcement
445
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Service (PES).
3 CO-LASS records and transmits Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO and LASS Chief
10 minutes Admin Aide Date, time and details of Memorandum and Policies for proper guidance in local assessment operations recorded in the logbook of LASS
Memorandum and Policies for proper guidance in local assessment operations are routed to the concerned PES Director for review and countersignature and for approval of the Executive Director.
4 PES Director reviews Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO and LASS Chief
1 hour PES Director Memorandum and Policies for proper guidance in local assessment operations countersigned by PES Director
If corrections/revisions are made by the PES Director on the Memorandum and Policies for proper guidance in local assessment operations, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum and Policies for proper guidance in local assessment operations is forwarded to the Office of the Deputy Executive Director
446
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
(DED), Operations
5 Deputy Executive Director (DED), Operations reviews Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO , LASS Chief and PES Director
1 hour DED for Operations
Memorandum and Policies for proper guidance in local assessment operations reviewed and countersigned by DED for Operations
If corrections/revisions are made by the DED for Operations on the Memorandum and Policies for proper guidance in local assessment operations, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum and Policies for proper guidance in local assessment operations is forwarded to the Office of the Executive Director (OED)
6 CO-OED proofreads Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO , LASS Chief, PES Director and DED for Operations
1 hour Executive Assistant
Memorandum and Policies for proper guidance in local assessment operations proofreads by Executive Assistant
If corrections/revisions are made by the Executive Assistant on the Memorandum and Policies for proper guidance in local assessment operations, the same are returned to LAOO for editing/finalization then proceed to step
447
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1, otherwise the Memorandum and Policies for proper guidance in local assessment operations is forwarded to the Executive Director for review
7 Executive Director reviews Memorandum and Policies for proper guidance in local assessment operations
Memorandum and Policies for proper guidance in local assessment operations countersigned by LAOO , LASS Chief, PES Director and DED for Operations
1 hour Executive Director
Memorandum and Policies for proper guidance in local assessment operations reviewed and approved/signed by Executive Director
If corrections/revisions are made by the Executive Director on the Memorandum and Policies for proper guidance in local assessment operations, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the proposed assessment regulations are forwarded to the Office of the Secretary (OSEC), DOF.
8 CO-OED records and transmits approved/signed Memorandum and Policies for proper guidance in local assessment operations
Approved/signed Memorandum and Policies for proper guidance in local assessment operations
10 minutes Admin Aide Date, time and details of Approved/signed Memorandum and Policies for proper guidance in local
448
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
assessment operations recorded in the logbook of OED
9 DOF receives and records Approved/signed Memorandum and Policies for proper guidance in local assessment operations
Approved/signed Memorandum and Policies for proper guidance in local assessment operations
10 minutes Admin Officer, OSEC
Date, time and details of Approved/signed Memorandum and Policies for proper guidance in local assessment operations recorded in the logbook of Receiving Officer-DOF
10 Office of the Secretary-DOF reviews Policies for proper guidance in local assessment operations
Approved/signed Memorandum and Policies for proper guidance in local assessment operations
1 day Secretary, DOF
Policies for proper guidance in local assessment operations reviewed and approved/signed by the Secretary, DOF
If corrections/revisions are made by the Secretary on the Policies for proper guidance in local assessment operations, the same are returned to LASS Division for editing/finalization then proceed to step 1
11 DOF records and transmits Approved/signed Policies for proper guidance in local assessment operations
Approved/signed Policies for proper guidance in local assessment
10 minutes Admin Aide Date, time and details of Approved/signed Policies for proper
Xerox copies are kept in the division for file. Original duplicate
449
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
operations guidance in local assessment operations recorded in the logbook of LASS
copies of Approved/signed Policies for proper guidance in local assessment operations are forwarded to Records Section for filing and transmittal to concerned offices. Original copy of Approved/signed Policies for proper guidance in local assessment operations for reproduction of documents.
13 CO-INFO receives and records Approved/signed Policies for proper guidance in local assessment operations
Approved/signed Policies for proper guidance in local assessment operations
10 minutes Admin Aide Date, time and details of Approved/signed Policies for proper guidance in local assessment operations recorded in the logbook of INFO
(Refer to the process of reproduction of documents)
14 CO-Records Section records and transmits Date, time and details of Approved/signed Policies for proper guidance in local assessment operations recorded
Approved/signed Policies for proper guidance in local assessment operations
10 minutes Admin Aide Date, time and details of Approved/signed Policies for proper guidance in local
Records Section transmits Approved/signed Policies for proper guidance in local
450
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
assessment operations recorded
assessment operations to concerned person/party
End of Process
451
2.1 Preparation of Memorandum Circular governing valuation and assessment of real properties for information dissemination to Regional Offices, Assessors and Treasurers of the different LGUs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LASS prepares Memorandum Circular embodying the signed opinion/ruling re. real property valuation and/or assessment of real properties
Signed BLGF opinion/ruling Numerous/similar leter-requests of property owners or local assessors or other concerned parties , relative to real property valuation and/or assessment
1 day LAOO Memorandum Circular countersigned by LAOO
Memorandum Circular is forwarded to LASS Chief
2 CO-LASS reviews Memorandum Circular Memorandum Circular countersigned by LAOO
1 hour LASS Chief Memorandum Circular countersigned by LASS Chief
If corrections/revisions are made by the LASS Chief on the Memorandum Circular, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum Circular is forwarded to the Office of the Director, Policy Enforcement Service (PES).
3 CO-LASS records and transmits Memorandum Circular
Memorandum Circular
10 minutes Admin Aide Date, time and details of
452
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by LAOO and LASS Chief
Memorandum Circular recorded in the logbook of LASS Division.
The Memorandum Circular are routed to the concerned PES Director for review and countersignature and for approval of the Executive Director
4 PES Director reviews Memorandum Circular Memorandum Circular countersigned by LAOO and LASS Chief
1 hour PES Director Memorandum Circular countersigned by PES Director
If corrections/revisions are made by the PES Director on the Memorandum Circular, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum Circular is forwarded to the Office of the Deputy Executive Director (DED), Operations
5 Deputy Executive Director (DED), Operations reviews Memorandum Circular
Memorandum Circular countersigned by LAOO , LASS Chief and PES Director
1 hour DED for Operations
Memorandum Circular reviewed and countersigned by DED for Operations
If corrections/revisions are made by the DED for Operations on the Memorandum Circular, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum Circular is forwarded to the Office of the Executive
453
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Director (OED)
6 CO-Office of the Executive Director (OED) proofreads Memorandum Circular
Memorandum Circular countersigned by LAOO , LASS Chief, PES Director and DED for Operations
1 hour Executive Assistant
Memorandum Circular proofread by Executive Assistant
If corrections/revisions are made by the DED for Operations on the Memorandum Circular, the same are returned to LAOO for editing/finalization then proceed to step 1, otherwise the Memorandum Circular is forwarded to the Office of the Executive Director (OED)
7 Executive Director reviews and approves/signs Memorandum Circular
Memorandum Circular countersigned by LAOO , LASS Chief, PES Director and DED for Operations
1 hour Executive Director
Memorandum Circular reviewed and approved/signed by Executive Director
If corrections/revisions are made by the Executive Director on the Memorandum Circular, the same are returned to LAOO for editing/finalization then proceed to step 1
8 CO-OED records and transmits approved/signed Memorandum Circular
Approved/signed Memorandum Circular
10 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook of OED
9 CO-LASS receives and records approved/signed Memorandum Circular
Approved/signed Memorandum Circular
10 minutes Admin Aide Date, time and details of Memorandum
Xerox copies are kept in the division for file.
454
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Circular recorded in the logbook of LASS
Original duplicate copies of approved/signed Memorandum Circular are forwarded to Records Section for filing and transmittal to concerned offices. Original copy of approved/signed Memorandum Circular for reproduction of documents.
10 CO-Records Section records and transmit approved/signed Memorandum Circular
Approved/signed Memorandum Circular
10 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook of Records Section
Records Section transmits approved/signed Memorandum Circular to concerned person/party
11 CO-INFO receives and records approved/signed Memorandum Circular
Approved/signed Memorandum Circular
10 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook of INFO
(Refer to the process of reproduction of documents)
End of Process
455
5.2 Conduct further research/study necessary prior to the preparation of an opinion/ruling
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LASS Division receives and records letter-request from local assessor or property owner or other concerned, from the Records Section.
Letter-request for opinion/ruling, or appeals/request for reconsideration or complaint re: valuation/assessment of real property from Records Section.
10 minutes Admin Aide Date, time and details of documents registered in the logbook. Index card with corresponding CCS No. attached.
The letter request/appeals’ is/are forwarded to LASS Chief
2. CO-LASS Division evaluate assign to action officer.
Facts/information embodied in the back communication.
10 minutes LASS Chief Letter-requests with notations of the LASS Chief
The letter request/appeals’ is/are forwarded to LAOO .
Preliminary action shall first be prepared in case of Initial (1st time) letter-request for opinion/ruling; complaint. Research/study and /or conduct of fact-finding investigation and/or ocular inspection to be conducted, whenever necessary, in order that appropriate opinion/ruling can be rendered.
3. CO-LASS Division prepares and finalizes opinion/ruling re. real property evaluation and/or assessment of real properties and Indorsement letter.
O Letter-request/appeal O Facts/information submitted O Comments and/or recommendation of concerned local assessor, if necessary O Report of fact-finding investigation and/or ocular
5 days LAOO, LASS Chief
Opinion/Ruling and Indorsement letter
*Initially, an acknowledgement letter will be sent to the party concerned. * Opinion/ Ruling and Indorsement letter are forwarded to LASS Chief for review.
456
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
inspection conducted, if necessary
4. CO-LASS Division reviews the Opinion/Ruling and Indorsement Letter.
Opinion/Ruling and Indorsement letter
½ day LASS Chief Opinion/Ruling and Indorsement letter reviewed and countersigned by LASS Chief
Processing time depending on the subject matter and bulk of papers for review.
5. CO-LASS Division records and transmits Opinion/Ruling and Indorsement Letter to the PES Director.
Opionion/Ruling and Indorsement letter countersigned by the Action Officer and Division Chief
10 minutes Admin Aide Date, time and details Opinion/Ruling and Indorsement letter registered in the logbook of LASS Division.
Assessment Audit Report and Letter to Local Chief Executive (LCE) are routed to the Office of the Deputy Executive Director (DED), Operations for review and countersigned and for approval of the Executive Director.
6. PES Service Director reviews the Opinion/Ruling and Indorsement letter
Opinion/Ruling and Indorsement letter countersigned by the LAOO and LASS Chief.
1 hour PES Director Opinion/Ruling and Indorsement letter countersigned by the .PES Service Director
If corrections/ revisions are made by the PES Director on the Opinion/Ruling and Indorsement letter, the same are returned to concermed Division (LASS) for correction/edited/revision, then go back to step No. 3, otherwise the same is forwarded to the office of the
457
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Deputy Executive Director (DED).
7. CO-Office of the PES Service Director records and transmits Opinion/Ruling and Indorsement letter to the Office of the DED for Operations, for review.
Opinion/Ruling and Inbdorsement letter countersigned by the Action Officer, Division Chief and PES Service Director.
10 minutes Secretary of the Service
Director
Date, Time and details of Opinion/Ruling and Indorsement letter registered in the logbook of the Office of the PES Service Director.
8. CO-Office of the Deputy Executive Director-Operations receives and records Opinion/Ruling and Indorsement letter.
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief and PES Service Director.
10 minutes Secretary of the Deputy Executive Director-
Operations
Date, Time and Details of Opinion/Ruling and Indorsement letter registered in the logbook of the Office of the Deputy Executive Director-Operations.
Opinion/Ruling and Indorsement letter forwarded to Deputy Executive Director for review and countersignature.
9. Deputy Executive Director reviews Opinion/Ruling and Indorsement letter.
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief and PES Service Director.
Deputy Executive Director
Opinion/Ruling and Indorsement letter countersigned by Deputy Executive Director-Operations.
If corrections/revisions are made by the Deputy Executive Director-Operations on the Opinion/Ruling and Indorsement letter, the same are returned to concerned Division (LASS) for correction/edited/revi
458
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
sion, then go back to step No. 3.
10. CO-office of the Deputy Executive Director-Operations records and transmits Opinion/Ruling and Indorsement letter to the Office of the Executive director, for review.
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief and Deputy Executive Director-Operations.
10 minutes Secretary of the Deputy Executive Director-
Operations
Date, time and details of Ruling/Opinion and Indorsement letter registered in the logbook of the Office of the Deputy Executive Director-Operations.
11. CO-Office of the Executive Director receives and records Opinion/Ruling and Indorsement letter Records Section records and transmits approved/signed Assessment Audit Report and Letter to Local Chief Executive (LCE)
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief, PES Service Director and Deputy Executive Director-Operations.
10 minutes Secretary of the Executive
Director
Date, time and details of Ruling/Opinion and Indorsement letter registered in the logbook of the Office of the Executive Directors.
Opinion/Ruling and Indorsement letter forwarded to Executive Secretary of the Executive Director for review.
12. CO-Office of the Executive Director reviews Opinion/Ruling and Indorsement letter.
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief, PES Service Director and Deputy
1 hour Secretary of the Executive
Drector
Opinion/Ruling and Indorsement letter reviewed.
If corrections/revisions are made by the Secretary of the Executive Director on the Opinion/Ruling and Indorsement letter, the same are
459
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Director-Operations.
returned to concerned Division (LASS) for correction/edited/revision, then go back to step No. 3, otherwise Opinion.Ruling and Indorsement letter are forwarded to Executive Director for review and approval.
13. Executive Director reviews Opinion/Ruling and Indorsement letter.
Opinion/Ruling and Indorsement letter countersigned by the Action Officer, Division Chief, PES Service Director and Deputy Executive Director-Operations.
1 hour Executive Director
Opinion/Ruling and Indorsement letter reviewed, approved and signed by the Executive Director
If corrections/revisions are made by the Secretary of the Executive Director on the Opinion/Ruling and Indorsement letter, the same are returned to concerned Division (LASS) for correction/edited/revision, then go back to step No. 3.
14. CO-Office of the Executive Director records and transmits the Opinion/Ruling and Indorsement letter to concerned Division (LASS)
Opinion/Ruling and Indorsement letter reviewed, approved and signed by the Executive Director.
10 minutes Secretary of the Executive
Director
Date, time and details of approved/signed Opinion/Ruling and Indorsement letter registered in the logbook of the Office of the
460
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Directors.
15. CO-LASS Division receives and records the signed/approved Opinion/Ruling and Indorsement letter
Approved/signed Opinions/Ruling and Indorsement letter
10 minutes Admin Aide Date, time and details of approved/signed Ruling/Opinion and Indorsement letter registered in the logbook of LASS Division.
A photocopy of the approved/signed Opinion/Ruling and Indorsement letter are kept by the Division for file. Original and duplicate copies of approved/signed Opinion/Ruling and Indorsement letter to records Section.
16. CO-Records Section receives and records signed/approved action to the Record’s Section.
Approved/signed Opinion/Ruling and Indorsement letter
10 minutes Records Officer of Central Records
Date, time and details of Opinion/Ruling and Indorsement letter recorded in the logbook of Record Section.
Records Section transmits approved/signed Opinion/Ruling and Indorsement letter to concerned person/party requesting said opinions.
End of Process
461
5.4 Prepare opinions/rulings
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LASS Division receives and records
letter-request from local assessor or
property owner or other concerned, from
the Records Section.
Letter-request for
opinion/ruling, or
appeals/request
for
reconsideration or
complaint re:
valuation/assessm
ent of real
property from
Records Section.
10 minutes Admin Aide Date, time and
details of
documents
registered in the
logbook. Index
card with
corresponding CCS
No. attached.
The letter
request/appeals’
is/are forwarded to
LASS Chief
2. CO-LASS Division evaluate assign to action
officer.
Facts/information
embodied in the
back
communication.
10 minutes LASS Chief Letter-requests
with notations of
the LASS Chief
The letter
request/appeals’
is/are forwarded to
LAOO .
Preliminary action shall first be prepared in case of initial (1st time) letter-request for opinion/ruling; complaint. Research/study and/or conduct of fact-finding investigation and/or ocular inspection to be conducted, whenever necessary, in order that appropriate opinion/ruling can be rendered.
3. CO-LASS Division prepares and finalizes
opinion/ruling re. real property evaluation
and/or assessment of real properties and
Indsorsement letter.
Letter-
request/appeal
Facts/information
submitted
Comments and/or
recommendation
of concerned local
5 days LAOO, LASS Chief
Opinion/Ruling
and Indorsement
letter
Initially, an acknowledgement letter will be sent to the party concerned.
Opinion/ Ruling and Indorsement letter are forwarded to LASS Chief for
462
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
assessor, if
necessary
Report of fact-
finding
investigation
and/or ocular
inspection
conducted, if
necessary
Report of fact-
finding
investigation
and/or ocular
inspection
conducted, if
necessary
review.
4. CO-LASS Division reviews the
Opinion/Ruling and Indorsement Letter.
Opinion/Ruling
and Indorsement
letter
½ day LASS Chief Opinion/Ruling
and Indorsement
letter reviewed
and countersigned
by LASS Chief
Processing time
depending on the
subject matter and
bulk of papers for
review.
5. CO-LASS Division records and transmits
Opinion/Ruling and Indorsement Letter to
the PES Director.
Opinion/Ruling
and Indorsement
letter
10 minutes Admin Aide Date, time and
details
Opinion/Ruling
463
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by
the Action Officer
and Division Chief
and Indorsement
letter registered in
the logbook of
LASS Division.
Assessment Audit Report and Letter to Local Chief Executive (LCE) are routed to the Office of the Deputy Executive Director (DED), Operations for review and countersignature and for approval of the Executive Director.
6. PES Service Director reviews the
Opinion/Ruling and Indorsement letter
Opinion/Ruling
and Indorsement
letter
countersigned by
the LAOO and
LASS Chief.
PES Director Opinion/Ruling
and Indorsement
letter
countersigned by
the .PES Service
Director
If corrections/revisions
are made by the PES
Director on the
Opinion/Ruling and
Indorsement letter,
the same are returned
to concerned Division
(LASS) for
correction/edited/revi
sion, then go back to
step No. 3, otherwise
the same is forwarded
to the Office of the
Deputy Executive
Director (DED).
7. CO-Office of the PES Service Director
records and transmits Opinion/Ruling and
Indorsement letter to the Office of the DED
for Operations, for review.
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
10 minutes Secretary of
the Service
Director
Date, Time and
Details of
Opinion/Ruling
and Indorsement
letter registered in
464
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Division Chief and
PES Service
Director.
the logbook of the
Office of the PES
Service Director.
8. CO-Office of the Deputy Executive Director-
Operations receives and records
Opinion/Ruling and Indorsement letter `
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief and
PES Service
Director.
Secretary of
the Deputy
Executive
Director-
Operations
Date, Time and
Details of
Opinion/Ruling
and Indorsement
letter registered in
the logbook of the
Office of the
Deputy Executive
Director-
Operations..
Opinion/Ruling and
Indorsement letter
forwarded to Deputy
Executive Director for
review and
countersignature.
9. Deputy Executive Director reviews
Opinion/Ruling and Indorsement letter. `
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief and
PES Service
Director.
Deputy
Executive
Director
Opinion/Ruling
and Indorsement
letter
countersigned by
Deputy Executive
Director-
Operations.
If corrections/revisions
are made by the
Deputy Executive
Director-Operations
on the Opinion/Ruling
and Indorsement
letter, the same are
returned to concerned
Division (LASS) for
correction/edited/revi
sion, then go back to
step No. 3.
465
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10. CO-office of the Deputy Executive Director –
Operations records and transmits
Opinion/Ruling and Indorsement letter to
the Office of the Executive director, for
review.
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief and
Deputy Executive
Director-
Operations.
Secretary of
the Deputy
Executive
Director-
Operations
Date, time and
details of
Ruling/Opinion
and Indorsement
letter registered in
the logbook of the
Office of the
Deputy Executive
Director-
Operations.
11. CO-Office of the Executive Director receives
and records Opinio0n/Ruling and
Indorsement letter
Records Section records and transmits
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief, PES
Service Director
and Deputy
Executive Director-
Operations.
Secretary of
the Executive
Director
Date, time and
details of
Ruling/Opinion
and Indorsement
letter registered in
the logbook of the
Office of the
Executive
Directors.
Opinion/Ruling and
Indorsement letter
forwarded to
Executive Secretary of
the Executive Director
for review.
12. CO-Office of the Executive Director reviews
Opinion/Ruling and Indorsement letter.
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief, PES
Secretary of
the Executive
Director
Opinion/Ruling
and Indorsement
letter reviewed.
If corrections/revisions
are made by the
Secretary of the
Executive Director on
the Opinion/Ruling
and Indorsement
466
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Service Director
and Deputy
Executive Director-
Operations.
letter, the same are
returned to concerned
Division (LASS) for
correction/edited/revi
sion, then go back to
step No. 3, otherwise
Opinion/Ruling and
Indorsement letter are
forwarded to
Executive Director for
review and approval.
13. Executive Director reviews Opinion/Ruling
and Indorsement letter
Opinion/Ruling
and Indorsement
letter
countersigned by
the Action Officer,
Division Chief, PES
Service Director
and Deputy
Executive Director-
Operations.
Executive
Director
Opinion/Ruling
and Indorsement
letter reviewed,
approved and
signed by the
Executive Director
If corrections/revisions
are made by the
Secretary of the
Executive Director on
the Opinion/Ruling
and Indorsement
letter, the same are
returned to concerned
Division (LASS) for
correction/edited/revi
sion, then go back to
step No. 3.
14. CO-Office of the Executive Director records
and transmits the Opinion/Ruling and
Indorsement letter to concerned Division
Opinion/Ruling
and Indorsement
letter reviewed,
Secretary of
the Executive
Date, time and
details of
approved/signed
467
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
(LASS) approved and
signed by the
Executive Director.
Director Opinion/Ruling
and Indorsement
letter registered in
the logbook of the
Office of the
Executive
Directors.
15. CO-LASS Division receives and records the
signed/approved Opinion/Ruling and
Indorsement letter
Approved/signed
Opinion/Ruling
and Indorsement
letter
Date, time and
details of
approved/signed
Ruling/Opinion
and Indorsement
letter registered in
the logbook of
LASS Division.
A photocopy of the
approved/signed
Opinion/Ruling and
Indorsment lette are
kept by the Division
for file.
Original and duplicate
copies of
approved/signed
Opinion/Ruling and
Indorsement letter to
Records Section.
16. CO-Records Section receives and records
signed/approved action to the Record’s
Section.
Approved/signed
Opinion/Ruling
and Indorsement
letter
Records
Officer (CO
Records
Section)
Date, time and
details of
Opinion/Ruling
and Indorsement
letter recorded in
the logbook of
Records Section
transmits
approved/signed
Opinion/Ruling and
Indorsement letter to
concerned
468
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Record Section. person/party
requesting said
opinions.
End of Process
469
6.1 Prepare comments/ recommendations on proposed legislative measures pertaining to real property taxation
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LASS Division receives and records copy of a House Bill from Records Section.
Copy of House Bill from Records Section for comments/recommendations regarding issues involving in real property taxation.
10 minutes Admin Aide Date, time and details of documents registered in the logbook. Index card with corresponding CCS No. attached.
Copy of House Bill forwarded to the Division Chief.
2. CO-LASS Division evaluates/assigns to action officer.
Issues pertaining to real property taxation embodied in the House Bill.
10 minutes LASS Chief Copy of House Bill with notations of the LASS Chief
Copy of House Bill is forwarded to LAOO .
3. CO-LASS Division prepares and finalizes comments/recommendations on issues involving real property taxation.
House Bill regarding issues involving real property taxation.
5 days LAOO LASS Chief
Comments/recommendations on issues involving real property taxation
Comments/recommen
dations on issues
involving real property
taxation is forwarded
to LASS Chief for
review.
4. CO-LASS Division reviews the comments/recommendations on issues involving property taxation.
Comments/recommendations on issues involving real property taxation.
½ day LASS Chief Comments/recommendations on issues involving real property taxation registered in the logbook of LASS Division.
Processing time depending on the subject matter and bulk of papers for review.
470
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-LASS Division records and transmits comment/recommendations on issues involving real property taxation to the PES Director.
Comments/recommendations on issues involving real property taxation countersigned by the LAOO, LASS Chief.
10 minutes PES Director Comments/recommendations on issues involving real property taxation countersigned by the PES Service Director.
CO-LASS Division records and transmits comments/recommendation on issues involving real property taxation to the PES Director.
Comments/recommendations on issues involving real property taxation is routed to the Office of the Deputy Executive Director (DED), Operations for review and countersignature and for approval of the Executive Director.
6. PES Service Director reviews comments/recommendation on issues involving real property taxation.
Comments/recommendations on issues involving real property taxation countersigned by the LAOO and LASS Chief.
1 hour PES Director Comments/recommendations on issues involving real property taxation countersigned by the PES Service Director.
If corrections/revisions are made by the PES Director on the comments/recommendations on issues involving real property taxation, the same is returned to concerned Division (LASS) for correction/edited/revision, then go back to step No. 3, otherwise the same is forwarded to the Office of the Deputy Executive Director (DED).
7. CO-Office of the PES Service Director Records and transmits comments/recommendations on issues involving real property taxation to the office of the DED for Operations, for review.
Comments/recommendations on issues involving real property taxation.
10 minutes Secretary of the Service
Director
Date, time and details of comments/recommendations on issues involving
471
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Countersigned by the Action Officer, Division Chief and PES Service Director.
real property taxation registered in the logbook of the Office of the PES Service Director.
8. CO-Office of the Deputy Executive Director-Operations receives and records comments/recommendations on issues involving real property taxation.
Comments/recommendations on issues involving real property taxation countersigned by the Action Officer, Division Chief and PES Service Director.
10 minutes Secretary of the Service
Director
Date, Time and Details of Comments/recommendations on issues involving real property taxation registered in the logbook of the Office of the Deputy Executive Director-Operations.
Comments/recommendations on issues involving real property taxation forwarded to Deputy Executive Director for review and countersignature.
9. Deputy Executive Director reviews comments/recommendations on issues involving real property taxation.
Comments/recommendations on issues involving real property taxation countersigned by the Action Officer, Division Chief and PES Service Director.
1 hour Deputy Executive Director
Comments/recommendations on issues involving real property taxation countersigned by Deputy Executive Director-Operations.
If corrections/revisions are made by the Deputy Executive Director-Operations on the comments/recommendations on issues involving real property taxation, the same is returned to concerned Division (LASS) for correction/edited/revision, then go back to
472
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
step No. 3.
10. CO-Office of the Deputy Executive Director-Operation records and transmits comments/recommendations on issues involving real property taxation to the Office of the Executive director, for review.
Comments/recommendations on issues involving real property taxation countersigned by the Action Officer, Division Chief and Deputy Executive Director-Operations.
10 minutes Secretary of the Deputy Executive Director-
Operations
Date, time and details of comments/recommendations on the issues involving real property taxation registered in the logbook of the Office of the Deputy Executive Director-Operations.
11. CO-Office of the Executive Director receives and records comments/recommendations on issues involving real property taxation.
Comments/recommendations on issues involving real property taxation countersigned by the Action Officer, Division Chief, PES Service Director and Deputy Executive Director-Operations.
10 minutes Secretary of Executive Director
Date, time and details of comments/ recommendations on issues involving real property taxation registered in the logbook of the Office of the Executive Directors.
Comments/recommendations on issues involving real property taxation forwarded to Executive Secretary of the Executive Director for review.
12. CO-Office of the Executive Director reviews comments/recommendations on issues involving real property taxation.
Comments/recommendations issues involving real property taxation countersigned by the Action Officer,
1 hour Secretary of the Executive
Director
Comments/recommendations on issues involving real property taxation reviewed.
If corrections/revisions are made by the Executive Director on the comments/recommendations on issues
473
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Division Chief, PES Service Director and Deputy Executive Director-Operations.
involving real property taxation, the same is returned to concerned Division (LASS) for corrections/edited/revision, then go back to step No. 3, otherwise comments/recommendations on issues involving real property taxation is forwarded to Executive Director for review and approval.
13. Executive Director reviews comments/recommendations on issues involving real property taxation.
Comments/recommendations on issues involving real property taxation countersigned by the Action Officer, Division Chief, PES Service Director and Deputy Executive Director-Operations.
1 hour Executive Director
Comments/recommendations on issues involving real property taxation reviewed, approved and signed by the Executive Director
Executive Director reviews comments/recommendations on issues involving real property taxation.
14. CO-Office of the Executive Director records and transmits the comments/recommendations on issues involving real property taxation to concerned Division (LASS)
Comments/recommendations on issues involving real property taxation reviewed,
10 minutes Secretary of the Executive
Director
Date, time and details of approved/signed comments/recommendations on
474
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
approved and signed by the Executive Director.
issues involving real property taxation registered in the logbook of the Office of the Executive Directors.
15. CO-LASS Division receives and records the signed/approved comments/recommendations on issues involving real property taxation..
Approved/signed comments/recommendations on issues involving real property taxation
10 minutes Admin Aide Date, time and details of approved/signed comments/recommendations on issues involving real property taxation registered in the logbook of LASS Division.
A photocopy of the approved/signed comments/recommendations on issues involving real property taxation are kept by the Division for file. Original and duplicate copies of approved/signed comments/recommendations on issues involving real property taxation to Records Section.
16. CO-Records Section receives and records signed/approved action to the Record’s Section.
Approved/signed comments/recommendations on issues involving real property taxation.
10 minutes Records Officer (CO
Record Section)
Date, time and details of comments/recommendations on issues involving real property taxation recorded in the logbook of Record Section.
Records Section transmits approved/signed comments/recommendations on issues involving real property taxation to concerned person/party requesting said
475
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
opinions.
End of Process
476
6.2 Provide technical assistance to LGUs/other govt. agencies and the general public re. real property appraisal/
assessment
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-LASS receives and records BLGF
Office/Travel Order
BLGF Office/Travel
Order signed by
the Executive
Director
As stated in
the Order
Admin Aide Date, time and
details of BLGF
Office/Travel
Order recorded in
the logbook of
LASS.
Corresponding CCS
No. attached.
2. CO-LASS conducts actual assessment audit Forms/checklist 5 days Assessment
Audit Team
Facts, findings,
and
recommendations.
3. CO-LASS prepares and finalizes
Assessment Audit Report and Letter to
Local Chief Executive (LCE)
Facts, findings and
recommendations.
2-3 days Assessment
Audit Team
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) are forwarded to
LASS Chief for review.
477
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. CO-LASS reviews Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team
1 hour LASS Chief Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team
countersigned by
LASS Chief
If corrections/revisions
are made by the LASS
Chief on the
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to
Assessment Audit
Team for
editing/finalization
then proceed to step
3, otherwise
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) is forwarded to
the Office of the
Deputy Executive
Director (DED for
Operations for review.
5. CO-LASS records and transmits
Assessment Audit Report and Letter to
Local Chief Executive (LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
10 minutes Admin Aide Date, time and
details of
Assessment Audit
Report and Letter
to Local Chief
478
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Assessment Audit
Team and LASS
Chief
Executive (LCE)
recorded in the
logbook of LASS.
Assessment Audit Report and Letter to Local Chief Executive (LCE) are routed to the Office of the Deputy Executive Director (DED), Operations for review and countersignature and for approval of the Executive Director.
6. Deputy Executive Director (DED),
Operations reviews Assessment Audit
Report and Letter to Local Chief Executive
(LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team and LASS
Chief
1 hour DED for
Operations
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
DED for
Operations.
If corrections/revisions
are made by DED for
Operations on the
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to LASS for
editing/finalization
then proceed to step
3, otherwise
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) is forwarded to
the Office of the
Executive Director
(OED)
479
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. CO-OED proofreads Assessment Audit
Report and Letter to Local Chief Executive
(LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team, LASS Chief
and DED for
Operations
1 hour Executive
Assistant
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
proofread by
Executive
Assistant
If corrections/revisions
are made by the
Executive Assistant on
the Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to LASS for
editing/finalization
then proceed to step
3, otherwise
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) is forwarded to
the Executive Director
(OED) for review
8. Executive Director review and
approves/signs Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team, LASS Chief
and DED for
Operations
1 hour Executive
Director
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
reviewed and
approved/signed
by Executive
Director
If corrections/revisions
are made by the
Executive Assistant on
the Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to LASS for
editing/finalization
480
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to step
3,
Assessment Audit Report and Letter to Local Chief Executive (LCE), after having been reviewed and countersigned by the DED for Operations and approved/signed by the Executive Director, shall be transmitted back to LASS for the next steps.
9. CO-OED records and transmits
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Admin Aide Date, time and
details of
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of OED.
10. CO-LASS receives and records
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Admin Aide Date, time and
details of
approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of LASS.
Xerox copy are kept to
the Division for file.
Approved/signed
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) are forwarded to
Records for transmittal
to the concerned
481
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office.
11. CO-Records Section records and transmits
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Records
Officer (CO
Record
Section)
Date, time and
details of
approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of
Records Section.
Approved/signed
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) are transmitted
to the concerned
Office/person.
End of Process
482
6.3 Provide technical assistance in the conduct of assessment audit
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LASS receives and records BLGF Office/Travel Order
BLGF Office/Travel Order signed by the Executive Director
As stated in the Order
Admin Aide Date, time and details of BLGF Office/Travel order recorded in the logbook of LASS. Corresponding CCS No. attached
2 CO-LASS conducts actual assessment audit Forms/checklist 5 days Assessment Audit Team
Facts, findings, and recommendations
3 CO-LASS prepares and finalizes Assessment Audit Report and Letter to Local Chief Executive (LCE)
Facts, findings, and recommendations
2-3 days Assessment Audit Team
Assessment Audit Report and Letter to Local Chief Executive (LCE) countersigned by Assessment Audit Team
Assessment Audit Report and Letter to Local Chief Executive (LCE are forwarded to LASS Chief for review
4 CO-LASS reviews Assessment Audit Report and Letter to Local Chief Executive (LCE)
Assessment Audit Report and Letter to Local Chief Executive (LCE) countersigned by Assessment Audit Team
1 hour LASS Chief Assessment Audit Report and Letter to Local Chief Executive (LCE) countersigned by LASS Chief
If corrections/revisions are made by the LASS Chief on the Assessment Audit Report and Letter to Local Chief Executive (LCE), the same are returned to Assessment Audit
483
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Team for editing/finalization then proceed to step 3, otherwise Assessment Audit Report and Letter to Local Chief Executive (LCE) is forwarded to the Office of the Deputy Executive Director (DED for Operations for review.
5. CO-LASS records and transmits
Assessment Audit Report and Letter to
Local Chief Executive (LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team and LASS
Chief
10 minutes Admin. Aide Date, time and
details of
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of LASS.
Assessment Audit Report and Letter to Local Chief Executive (LCE) are routed to the Office of the Deputy Executive Director (DED), Operations for review and countersignature and for approval of the Executive Director.
6. Deputy Executive Director (DED),
Operations reviews Assessment Audit
Report and Letter to Local Chief Executive
(LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
1 hour DED for
Operations
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
DED for
If corrections/revisions
are made by DED for
Operations on the
Assessment Audit
Report and Letter to
Local Chief Executive
484
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Team and LASS
Chief
Operations. (LCE), the same are
returned to LASS for
editing/finalization
then proceed to step
3, otherwise
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) is forwarded to
the Office of the
Executive Director
(OED)
7. CO-OED proofreads Assessment Audit
Report and Letter to Local Chief Executive
(LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team, LASS Chief
and DED for
Operations
1 hour Executive
Assistant
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
proofread by
Executive
Assistant
If corrections/revisions
are made by the
Executive Assistant on
the Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to LASS for
editing/finalization
then proceed to step
3, otherwise
Assessment Audit
Report and Letter to
Local Chief Executive
485
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
(LCE) is forwarded to
the Executive Director
(OED) for review
8. Executive Director review and
approves/signs Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
countersigned by
Assessment Audit
Team, LASS Chief
and DED for
Operations
1 hour Executive
Director
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
reviewed and
approved/signed
by Executive
Director
If corrections/revisions
are made by the
Executive Assistant on
the Assessment Audit
Report and Letter to
Local Chief Executive
(LCE), the same are
returned to LASS for
editing/finalization
then proceed to step
3,
Assessment Audit Report and Letter to Local Chief Executive (LCE), after having been reviewed and countersigned by the DED for Operations and approved/signed by the Executive Director, shall be transmitted back to LASS for the next steps.
9. CO-OED records and transmits
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Admin Aide Date, time and
details of
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of OED.
486
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10. CO-LASS receives and records
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Admin Aide Date, time and
details of
approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of LASS.
Xerox copy are kept to
the Division for file.
Approved/signed
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) are forwarded to
Records for transmittal
to the concerned
Office.
11. CO-Records Section records and transmits
approved/signed Assessment Audit Report
and Letter to Local Chief Executive (LCE)
Approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
10 minutes Records
Officer (CO
Record
Section)
Date, time and
details of
approved/signed
Assessment Audit
Report and Letter
to Local Chief
Executive (LCE)
recorded in the
logbook of
Records Section.
Approved/signed
Assessment Audit
Report and Letter to
Local Chief Executive
(LCE) are transmitted
to the concerned
Office/person.
End of Process
487
Operating Procedures for Bureau Operations Local Finance Policy Enforcement Service
Local Government Loans Review Division
488
SERVICE : Local Finance Policy Enforcement Service DIVISION : Local Government Loans And Review Division (LOANS) UNIT NAME : BRIEF DESCRIPTION : The Loans Division is under the Policy Enforcement Service. This Division is the one in-charge
of Processing Loans under the Assessment Loan Revolving Fund (ALRF) PD 1002. It also process/issues certification of Debt Service and Borrowing Capacities of LGUs as stipulated under BSP Circular letter dated May 28, 2002 series of 2002.
CLIENTS : Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
6. Review and process local government applications for loans and other credit facilities provided for under (P.D. 752), including assessment loans under P.D. 1002.
6.1 Collation of Report of Trial Balance, SRE/SIE, Annual Budget of Specific LGU applicant of P.D. 1002
6.2 Review of submitted documentary requirements (See checklist)
6.3 Assess project proposal components and ensure that the cost schedule pertains to the specific project only
6.4 Facilitate signing of contract
In the passing of the R.A. 7160, the function specific to P.D. 752 has been devolved to government/private banks. BLGF role is changed to issuance of debt service ceiling and borrowing capacity certification.
7. Determine financial capability of LGUs to contract loans and the financial viability of proposed projects.
7.1 Issuance of debt service ceiling and borrowing capacity certification
Criteria is set by RA7160 Sec 324 (b) with applicable formula (see formula)
8. Facilitate releases of approve loan proceeds. Monitor the completion stages of on- going projects financed by domestic borrowings on relation with disbursements of
8.1 Collect report and conduct field inspection and evaluation of progress
489
project funds.
9. Enforce/ monitor payments of loan amortizations and apply administrative sanctions or legal remedies in case of defaults on repayments.
9.1 Notify LGU on their loan obligation 9.2 Facilitate receipt of re-payment of loan under ALRF 9.3 Maintenance of Statement of LGU Assessment Loan
Database (Maintenance of LGU accounts)
Payment maybe through registered mail, hand carry or through bank
10. Assessment of socio-economic impact of project (or etc.) Function not being done
490
SPECIFIC PROCEDURES 1.1 Collation of Report of Trial Balance, SRE/SIE, Annual Budget of Specific LGU applicant of P.D. 1002
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division receives and records Letter Request and documents from Records Section
Letter Request and compilations of required documents received for loan application under ALRF
10 minutes Admin Aide Date and details of letter request and required documents recorded in the logbook of the LOANS Division. Corresponding CCS attached.
Letter request and compilation of required documents received for loan application forwarded to the LOANS Chief
2 CO-LOANS Division checks documents/assigns to action officer for appropriate action
Letter Request and compilations of required documents for loan application under ALRF with CCS No. attached
10 minutes LOANS Chief
Letter request and documents checked and assigned to Action Officer
Letter request and compilation of required documents received for loan application forwarded to the Action Officer
3 CO-LOANS Division reviews documents of applicant LGUs
-Checklist of requirements -Request and Loan application with complete required documents
1 hour Loan Examiner
Letter request and loan application together with required documents reviewed
4 CO-LOANS Division prepares and finalizes letter-reply and loan application
-Checklist of requirements -Letter request and loan application with complete required documents
2 days Loan Examiner
Letter-reply countersigned by Loan Examiner (Letter -reply addressed to applicant LGU thru the Local Assessor concerned requesting to submit
Letter-reply and loan application with complete required documents forwarded to the LOANS Chief for review
491
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
additional documents to facilitate the processing of loan application, however, if all of the required documents are complied with, the assessor and treasurer concerned are requested to conform with the project cost estimates and LCE to affix his/her signatures on the contract of loan to be witnessed by the assessor and treasurer concerned)
5 CO-LOANS Division reviews letter-reply and attached requirements
Letter-reply countersigned by Loan Examiner -Checklist of requirements -Letter-request Loan application with complete required documents
1 hour LOANS Chief
Letter-reply countersigned by LOANS Chief; loan application with complete required documents reviewed
If corrections/ revisions are made by the LOANS Chief on the letter-reply, the same is returned to the Loan Examiner for editing/ finalization
6 CO-LOANS Division records and transmits the letter-reply, loan application and required
Letter-reply countersigned by
10 minutes Admin Aide Date, time and details of letter-
Letter-reply and loan application with
492
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
documents to the Office of the PES Director for review
Loan Examiner LOANS Chief -Checklist of requirements -Letter-request Loan application with complete required documents
reply , loan application and required documents recorded in the logbook of LOANS Division. Corresponding CCS attached.
complete required documents forwarded to the Office of the PES Director.
The letter-reply on the request, loan application and required documents are routed to concerned Office Directors for review and countersignature.
7 PES Director reviews the letter-reply, loan application and required documents
Letter-reply countersigned by Loan Examiner LOANS Chief -Checklist of requirements -Letter-request Loan application with complete required documents
1 hour PES Director Letter-reply countersigned by PES Director loan application with complete required documents reviewed
If corrections/ revisions are made by the PES Director on the letter-reply, the same is returned to the LOANS Divisions for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions it is forwarded to the Deputy Executive Director for Operations
8 Deputy Executive Director for Operations reviews the letter-reply, loan application and required documents
Letter-reply countersigned by Loan Examiner LOANS Chief PES Director -Checklist of requirements -Letter-request Loan application
1 hour DED for Operations
Letter-reply countersigned by DED for Operations, loan application with complete required documents reviewed
If corrections/ revisions are made by the DED for Operations on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions it
493
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
with complete required documents
is forwarded to the Executive Director
9 Office of the Executive Director proofreads letter-reply
Letter-reply countersigned by Loan Examiner, LOANS Chief PES Director DED for Operations -Checklist of requirements -Letter-request Loan application with complete required documents
30 minutes Executive Assistant
Letter-reply proofread
If corrections/ revisions are made by the Executive Assistant on the letter-reply, the same is returned to the LOANS Division for editing/finalization, then proceed to step 2, otherwise if there are no corrections/revisions, it is forwarded to the Executive Director
10 Executive Director reviews, approves/signs the letter-reply
Letter-reply countersigned by Loan Examiner, Chief, LOANS PES Director DED for Operations -Checklist of requirements -Letter-request Loan application with complete required documents
1 hour Executive Director
Approved /Signed letter-reply
If corrections are made by the Executive Director on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 3.
The letter-reply, loan application and required documents after reviewed and countersigned by the concerned Office Directors and approved and signed by the
Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
11 Office of the Executive Director records and transmits approved/signed letter-reply, loan application and required documents to the
Approved/Signed letter-reply
10 minutes Admin Aide Date, time and details of approved/signed
494
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
LOANS Division -Checklist of requirements -Letter-request Loan application with complete required documents
letter-reply , loan application and required documents recorded in the logbook of the Office of the Executive Director
12 CO-LOANS Division receives and records approved/signed letter-reply
Approved/Signed letter-reply -Checklist of requirements Letter-request Loan application with complete required documents
10 minutes Admin Aide Date, time and details of approved/signed letter-reply, loan application and required documents recorded in the logbook of the LOANS Division
A photocopy of the approved/signed letter-reply is kept by the Division for file Original and duplicate copies of approved/signed letter-reply are transmitted to the CO- Records Section
13 CO-Records Section receives and records approved/signed letter-reply
10 minutes Records Officer (CO
Record Section)
Date, time and details of approved/signed letter-reply recorded in the logbook of the Records Section
CO-Records Section transmits approved/signed letter-reply to the applicant LGU
End of Process
495
1.3 Assess project proposal components and ensure that the cost schedule pertains to the specific project only
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division receives and records letter request and documents from Records Section
-Checklist of requirements -Letter request with required documents and Project Study and Action Plan (PSAP)
10 minutes Admin Aide Date, time and details of letter request and required documents recorded in the logbook of the LOANS Division. Corresponding CCS attached.
Letter request with required documents and PSAP received for loan application forwarded to the LOANS Chief
2 CO-LOANS Division checks documents/ assigns to Action Officer for appropriate action
-Checklist of requirements -Letter request with CCS attached required documents and PSAP
10 minutes LOANS Chief Letter request with required documents checked and assigned to Action Officer
Letter request with required documents and PSAP received forwarded to the Action Officer
3 CO-LOANS Division reviews documents of applicant LGUs
-Checklist of requirements -Letter request with required documents and PSAP
1 hour Loan Examiner
Letter request with required documents and PSAP reviewed
4 CO-LOANS Division prepares and finalizes letter-reply and loan application
-Checklist of requirements -Letter request with required documents and PSAP
2 days Loan Examiner
Letter-reply with required documents and PSAP countersigned by Loan Examiner (Letter reply addressed to applicant LGU thru the Local Assessor concerned requesting to
Letter-reply with required documents and PSAP forwarded to the LOANS Chief for review
496
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
conform with the project cost estimates and the LCE to affix signatures on contract of loan to be witnessed by the said assessor and treasurer concerned)
5 CO-LOANS Division reviews letter-reply and attached requirements
Letter-reply countersigned by Loan Examiner -Checklist of requirements -Letter request and required documents and PSAP
1 hour LOANS Chief
Letter-reply countersigned by LOANS Chief required documents and PSAP reviewed
If corrections/ revisions are made by the LOANS Chief on the letter-reply, the same is returned to the Loan Examiner for editing/ finalization
6 CO-LOANS Division records and transmits letter-reply and required documents to the Office of the PES Director for review
Letter-reply countersigned by Loan Examiner LOANS Chief -Checklist of requirements -Letter request and required documents and PSAP
10 minutes Admin Aide
Date, time and details of Letter-reply and required documents recorded in the logbook of LOANS Division
Letter-reply and required documents forwarded to the Office of the PES Director.
The letter-reply, loan application and required documents are routed to concerned Office Directors for review and countersignature.
7 PES Director reviews the letter-reply, loan application and required documents
Letter-reply countersigned by
1 hour PES Director Letter-reply countersigned by
If corrections/ revisions are made by the PES
497
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Loan Examiner, LOANS Chief -Checklist of requirements -Letter request and required documents and PSAP
PES Director loan application with complete required documents reviewed
Director on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions it is forwarded to the Deputy Executive Director for Operations
8 Office of the Deputy Executive Director for Operations reviews letter-reply and required documents
Letter-reply countersigned by Loan Examiner, LOANS Chief, PES Director -Checklist of requirements -Letter request and required documents and PSAP
1 hour DED for Operations
Letter-reply countersigned by DED for Operations, request and required documents reviewed
If corrections/ revisions are made by the DED for Operations on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, it is forwarded to the Executive Director
9 Office of the Executive Director proofreads letter-reply
Letter-reply countersigned by Loan Examiner, LOANS Chief PES Director DED for Operations -Checklist of requirements -Letter request and required documents
30 minutes Executive Assistant
Letter-reply proofread
If corrections/ revisions are made by the Executive Assistant on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, it is forwarded to the
498
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and PSAP Executive Director
10 Executive Director reviews, approves/ signs letter-reply
Letter-reply countersigned by Loan Examiner, LOANS Chief PES Director DED for Operations -Checklist of requirements -Letter request and required documents and PSAP
1 hour Executive Director
Approved/ signed letter-reply
If corrections are made by the Executive Director on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 3.
The letter-reply, loan application and required documents after reviewed and countersigned by the concerned Office Directors and approved and signed by the
Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
11 Office of the Executive Director records and transmits approved/signed letter-reply, request and required documents to the LOANS Division
Approved/Signed letter-reply -Checklist of requirements -Letter request and required documents and PSAP
10 minutes Admin Aide
Date, time and details of approved/ signed letter-reply and required documents recorded in the logbook of the Office of the Executive Director
12 CO-LOANS Division receives and records approved/signed letter-reply
Approved/Signed letter-reply -Checklist of requirements -Letter request and required documents and PSAP
10 minutes Admin Aide
Date, time and details of approved/signed letter-reply and required documents recorded in the logbook of the LOANS Division
A photocopy of the approved/signed letter-reply is kept by the Division for file. Original and duplicate copies of approved/signed letter-reply are transmitted to CO- Records.
13 CO-Records Section receives and records approved/signed letter-reply
10 minutes Records Officer of the
Date, time and details of
Records Section transmits approved/
499
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Bureau approved/signed letter-reply on request recorded in the logbook of the Records Section
signed letter-reply to applicant LGU.
End of Process
500
1.4 Facilitate signing of contract The procedure below describes the steps taken when documents submitted by the applicant LGUs under Assessment Loan Revolving Fund (ALRF) are analyzed and checked if they are properly accomplished and in accordance with the prescribed forms under Assessment Regulations 4-77.
Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division receives and records required documents from Records Section
-Letter request -Approved/Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
10 minutes
Admin Aide Date, time and details of letter request and approved/signed contract recorded in the logbook of the LOANs Division. Corresponding CCS attached.
Letter request and approved/signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU forwarded to the LOANS Chief
2 CO-LOANS Division checks documents/assigns to action officer for appropriate action
-Letter request with CCS attached -Approved/Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP with CCS attached.
10 minutes LOANS Chief
Letter request and approved/signed contract of Loan checked and assigned to Action Officer
Letter request and approved/signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU forwarded to the Action Officer
3 CO-LOANS Division reviews documents of applicant LGUs
-Letter request -Approved/Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
4 hours Loan Examiner Memorandum Letter For the Executive Director thru Channels recommending to affix signatures on the space provided on the contract, letter request,
501
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
contract of loan and complete required documents reviewed
4 CO-LOANS Division prepares and finalizes Memorandum Letter
-Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
1 hour Loan Examiner Memorandum Letter countersigned by Loan Examiner, letter request, contract of loan, and complete required documents reviewed
Memorandum letter, letter request contract of loan and complete required documents forwarded to LOANS Chief for review
5 CO-LOANS Division reviews Memorandum Letter and attached requirements
Memorandum Letter countersigned by Loan Examiner -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
1 hour
LOANS Chief
Memorandum Letter countersigned by LOANS Chief, letter request, contract of loan, and complete required documents reviewed
If corrections/ revisions are made by the LOANS Chief on the Memorandum Letter , the same is returned to the Loan Examiner for editing/ finalization
6 CO-LOANS Division records and transmits the memorandum letter and attached requirements to the Office of the Director, PES
Memorandum Letter countersigned by Loan Examiner LOANS Chief -Letter request -Signed contract of Loan by the LCE and witnessed by the
10 minutes
Admin Aide
Date, time and details of memorandum letter and letter request, contract of loan, and complete required documents recorded in the logbook of LOANS Division
Memorandum letter and attached requirements forwarded to the Office of the PES Director
502
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Assessor/Treasurer of applicant LGU -PSAP
The Memorandum Letter and required documents are routed to concerned Office Directors for review and countersignature.
7 PES Director reviews the Memorandum Letter and attached requirements
Memorandum Letter countersigned by Loan Examiner, LOANS Chief -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
30 minutes
PES Director Memorandum Letter countersigned by PES Director request, contract of loan, and complete required documents reviewed.
If corrections/ revisions are made by the PES Director on the Memorandum Letter and complete required documents, the same are returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, the same are forwarded to the Deputy Executive Director for Operations
8 Deputy Executive Director for Operations, PES reviews the Memorandum Letter , request, contract of loan, and complete required documents
Memorandum Letter countersigned by Loan Examiner, LOANS Chief PES Director DED, -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
30 minutes
Deputy Executive
Director for Operations,
PES
Memorandum Letter countersigned by Deputy Executive Director for Operations, PES and letter request, contract of loan, and complete required documents reviewed.
If corrections/ revisions are made by the Deputy Executive Director for Operations, PES on the Memorandum Letter and attached requirements, the same are returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, action forwarded to the
503
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office of the Executive Director
9 Office of the Executive Director proofreads the Memorandum Letter
Memorandum Letter countersigned by Loan Examiner, LOANS Chief, PES Director DED for Operations -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor /Treasurer of applicant LGU -PSAP
30 minutes Executive Assistant
Memorandum Letter proofread
If corrections/ revisions are made by the Executive Secretary on the Memorandum Letter, the same returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, the action forwarded to the Executive Director
10 Executive Director reviews, approves/ signs the Memorandum Letter
Memorandum Letter countersigned by Loan Examiner, LOANS Chief PES Director DED for Operations -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
30 minutes Executive Director
Approved /Signed contract of loan signed by the LCE and witnessed by the Assessor /Treasurer of applicant LGU
If corrections/ revisions are made by the Executive Director on the Memorandum Letter, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 3.
The Memorandum Letter, loan application and required document after reviewed and countersigned by the concerned Office Directors and approved / signed by the
Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
504
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11 CO-Office of the Executive Director (OED) records and transmits the Memorandum Letter to the LOANS Division
Approved /Signed Memorandum Letter -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
10 minutes Admin Aide Date, time and details of approved /signed Memorandum Letter recorded in the logbook of the OED
12 CO-LOANS Division receives and records the approved/ signed Memorandum Letter
Approved/Signed Memorandum Letter -Letter request -Signed contract of Loan by the LCE and witnessed by the Assessor/Treasurer of applicant LGU -PSAP
10 minutes Admin Aide Date and details of approved/signed Memorandum Letter recorded in the logbook of the LOANS Division
A photocopy of the approved and signed Memorandum Letter is kept by the Division for file Original and duplicate copies of approved /signed action is transmitted to CO-Records Section
13 CO-LOANS Division prepares Memorandum Letter and voucher for 1
st release of the loan
proceeds
-Letter request -Signed/ Approved Contract of Loan -PSAP
2 hours Loan Examiner
Memorandum Letter on request countersigned by Loan Examiner (Memorandum Letter For the Executive Director thru Channels recommending approval of the 1
st
Memorandum Letter on request with complete required documents forwarded to the LOANS Chief for review
505
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
release)
14 CO-LOANS Division reviews Memorandum Letter with voucher for 1
st release
and attached requirements
Memorandum Letter with voucher for 1
st release
countersigned by Loan Examiner -Letter request -Signed/Approved Contract of Loan -PSAP
30 minutes LOANS Chief
Memorandum Letter countersigned by LOANS Chief complete required documents reviewed
If corrections/ revisions are made by the LOANS Chief on the action, the same is returned to the Loan Examiner for editing/ finalization
15 CO-LOANS records and transmits the Memorandum Letter with voucher for 1
st release
thru Financial and Management Division to Cash Section
- Memorandum Letter with voucher for 1
st release
countersigned by Loan Examiner Chief, LOANs -Signed/Approved Contract of Loan -PSAP
10 minutes Admin Aide Date, time and details of approved/ signed Memorandum Letter recorded in the logbook of the LOANS Division
Memorandum Letter with complete required documents forwarded thru Financial and Management Division to Cash Section
16 CO-Cash Section prepares check for 1
st release of the loan proceeds
- Memorandum Letter with voucher for 1
st release
countersigned by Loan Examiner -Chief, LOANs -Signed/ Approved Contract of Loan -PSAP
1 hour Cashier Memorandum Letter and attached requirements reviewed check for 1
st release of the
loan proceeds prepared by the Cashier
Check for the 1st
release Memorandum Letter with complete required documents forwarded to the Office of the Executive Director
17 Executive Director proofreads the Memorandum Letter with voucher for 1
st release
and Check
-Check for 1st
release - Memorandum Letter with voucher for 1
st release
30 minutes Executive Assistant
Memorandum Letter and Check for the 1
st release
proofread
If corrections/ revisions are made by the Executive Secretary on the action, the same is
506
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by Loan Examiner Chief, LOANs -Signed/Approved Contract of Loan -PSAP
returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, the action is forwarded to the Executive Director
18 Executive Director reviews, approves/ signs Memorandum Letter with voucher for 1
st release
and Check
- Memorandum Letter with voucher for 1
st release
countersigned by Loan Examiner Chief, LOANs -Check prepared -Signed/Approved Contract of Loan -PSAP
30 minutes Executive Director
Approved /Signed Memorandum Letter with voucher for 1
st release
and Check
If corrections/ revisions are made by the Executive Director on the action, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 3.
The action on the request, loan application and required document after reviewed and countersigned by the concerned Office Directors and approved and signed by
the Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
19
Office of the Executive Director records and transmits the Approved /Signed Memorandum Letter and Check for the 1
st release
to the LOANS Division
Approved /Signed Memorandum Letter and Check for the 1
st release
-Signed/ Approved Contract of Loan -PSAP
10 minutes Admin Aide Date, time and details of approved /signed Memorandum Letter and Check for the 1
st release
recorded in the logbook of the LOANS Division
20 CO-LOANS Division informs applicant LGU/ local treasurer concerned for the approved/signed
- Approved/ Signed Memorandum
10 minutes Loan Examiner Applicant LGU/local treasurer concerned
Photocopies of check and OR are kept by the
507
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
check for 1st
release and bring Official Receipt for the release of the said check from the CO-Cash Section
Letter and Check for the 1
st release
-Signed/ Approved Contract of Loan -PSAP
receipt approved/signed check for 1
st release
of the loan proceeds
Division for file
21 CO-LOANS Division records in the ALRF index card check and OR Numbers and other data/information for 1st release
Photocopies of check and OR
10 minutes Loan Examiner Check and OR Numbers and other data/ information for 1st release recorded in the ALRF index card
End of Process
508
2.1 Issuance of debt service ceiling and borrowing capacity certification
The request for issuance of certification of Net Debt Service Ceiling and Borrowing Capacity of LGUs to be used for application for loan with the banks/lending institutions are computed in accordance with Section 324(b) of the Local Government Code (Attachment “C”).
Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division reviews documents of LGUS requesting issuance of certification of net debt service ceiling and borrowing capacities
Checklist of requirements Letter request for certification and complete documents
1 hour Admin Officer Letter request and complete documents reviewed
2 CO-LOANS Division prepares and finalizes letter-reply and certification
Checklist of requirements Letter request for certification and complete documents
1 hour Admin Officer Letter-reply and certification countersigned by Admin Officer
Letter-reply and certification are forwarded to LOANS Chief for review
3 CO-LOANS Division reviews letter-reply and certification
Letter-reply and certification countersigned by Admin Officer
10 minutes LOANS Chief Letter-reply and certification countersigned by LOANS Chief; letter-reply and certification reviewed
If corrections/ revisions are made by the LOANS Chief on the letter-reply and certification, the same are returned to the Admin Officer for editing/ finalization
4 CO-LOANS Division records and transmits the Letter-reply and certification to CO-Plans Division for certification number
Letter-reply and certification countersigned by Admin Officer LOANS Chief
10 minutes Admin Aide Date, time and details of letter-reply and certification recorded in the logbook of LOANS Division.
Letter-reply and certification forwarded to CO-Plans Division
509
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Corresponding CCS attached.
5 CO-Plans Division PES reviews the letter reply on the request and certification and affix corresponding certification number
Letter-reply and certification countersigned by Admin Officer LOANS Chief
10 minutes PLANS Division Chief
Letter-reply and certification reviewed by the Staff, CO-Plans Division and affixed corresponding certification number.
If corrections/ revisions are made by the Staff, CO-Plans Division on the letter-reply and certification, the same are returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the actions are forwarded to the PES Director.
The letter-reply on the request and certification are routed to concerned Office Directors for review and countersignature.
6 PES Director reviews the letter reply on the request and certification
Letter-reply and certification countersigned by Admin Officer LOANS Chief
10 minutes PES Director Letter-reply and certification countersigned by PES Director
If corrections/ revisions are made by the PES Director on the letter-reply and certification, the same are returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Deputy Executive Director for Operations , PES
7 Deputy Executive Director for Operations reviews the letter reply on the request and
Letter-reply and certification
10 minutes DED for Operations
Letter-reply and certification signed
If corrections are made by the DED for
510
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
certification countersigned by Admin Officer LOANS Chief PES Director
by the DED for Operations
Operations on the letter-reply and certification, the same are returned to LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections / revisions the same are returned to CO-LOANS Division
The letter-reply on the request and certification after reviewed and counter signed by the PES Director and approved and signed by the Deputy Executive
Director, the same are transmitted back to the concerned Division (CO-LOANS) for appropriate action/next step.
8 Office of the DED for Operations records and transmits the letter reply and certification to the CO-LOANS Division
Approved and signed letter-reply on request and certification
10 minutes Admin Aide Date, time and details of Approved and signed letter-reply on request and certification recorded in the logbook of the Office of the DED for Operations
9 CO-LOANS Division receives and records the approved and signed letter-reply on request and certification. Affix BLGF dry seal on the certification.
Approved and signed letter-reply on request and certification
10 minutes Admin Aide Date, time and details of Approved and signed letter-reply on request and certification recorded in the logbook of the CO-LOANS Division. Affixed BLGF dry seal on the certification.
A photocopy of the Approved and signed letter-reply on request and certification are kept by the Division for file. Original and duplicate copies of Approved and signed letter-reply on request and certification are transmitted to CO- Records Section
511
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10 CO- Records Section receives and records Approved and signed letter-reply on request and certification
10 minutes Records Officer of the
Bureau
Date, time and details of Approved and signed letter-reply on request and certification recorded in the logbook of the CO- Records Section
CO- Records Section transmits approved and signed letter-reply on and certification to the LGU who requested the issuance of certification of net debt service ceiling and borrowing capacity.
End of Process
512
3.1 Collect report and conduct field inspection and evaluation progress
Upon receipt of reports of actual expenditures jointly signed by the Assessor and Treasurer and Physical Accomplishment of the duly certified by the Assessor concerned, monitoring and evaluation of the project are required before release of the 2nd and 3rd (final) release of the loan proceeds to validate report submitted to determine the actual expenditures and physical accomplishment of the project. Favorable recommendation by the representatives who evaluated the project in the field are also required as provided for under Assessment Regulations No. 5-78 (Attachment “B”).
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division receives and records letter request and required documents
-Letter request for the 2
nd / 3
rd releases
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
10 minutes Admin Aide Date, time and details of the document recorded in logbook of the LOANS Division. Corresponding CCS attached.
Letter request and compilation of required documents received for the 2
nd/3
rd release of
loan proceeds forwarded to LOANS Chief
2 CO-LOANS Division checks documents/assigns to Action Officer for appropriate action
-Letter request for the 2
nd / 3
rd releases
of loan proceeds with CCS attached -Report of actual expenditure and accomplishment -PSAP -contract with CCS No. attached
10 minutes LOANS Chief
Letter request and documents checked and assigned to Action Officer
Letter request and compilation of required documents received for the 2
nd/3
rd release of
loan proceeds forwarded to the Action Officer
3 CO-LOANS Division reviews documents -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP
1 day Loan Examiner Letter request and required documents reviewed
513
-contract
4
CO-LOANS Division prepares action on the request
-Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
1 day Loan Examiner Letter- reply on request and Memorandum Letter for approval of the Executive Director thru Channel countersigned by Loan Examiner . Disbursement Voucher for 2
nd/3
rd
release prepared . Required documents reviewed. (After evaluation of the on- going project by the representative of the BLGF-CO, evaluation report on the findings noted on the actual expenditures and physical accomplishment and with comments/ recommendations prepared submitted thru the LOANS Chief.
Letter- reply and Memorandum Letter and required documents forwarded to LOANS Chief for review
5 CO-LOANS Division reviews letter- reply, Memorandum Letter , Disbursement Voucher for 2
nd/3
rd release and attached
requirements
Letter- reply and Memorandum Letter countersigned by
1 hour LOANS Chief
Letter- reply , Memorandum Letter and Disbursement
If corrections/ revisions are made by the LOANS Chief on the action, the same is returned to the
514
Loan Examiner -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
Voucher for 2nd
/3rd
release countersigned by Division Chief, required documents reviewed
Action Officer for editing/ finalization
6 CO-LOANS Division records and transmits the Letter- reply, Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release
and required documents to the Office of the PES Director for review
Letter- reply and Memorandum Letter countersigned by Loan Examiner LOANS Chief -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
10 minutes Admin Aide
Date, time and details of Letter- reply, Memorandum Letter and required documents recorded in the logbook of LOANS Division
Action on request and required documents forwarded to the Office of the PES Director.
The action on the request and required documents are routed to concerned Office Directors for review and countersignature.
7 PES Director reviews Letter- reply, Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release and required
documents
Letter -reply and Memorandum Letter countersigned by Loan Examiner LOANS Chief -Letter request for the 2
nd / 3
rd release
1 hour PES Director Letter- reply and Memorandum Letter countersigned by Director with complete required documents reviewed
If corrections/ revisions are made by the PES Director on the action, the same is returned to the LOANS Division for editing/finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions
515
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
the action is forwarded to the Deputy Executive Director for Operations
8 Deputy Executive Director for Operations reviews Letter -reply, Memorandum Letter and Disbursement Voucher for 2
nd/3
rd
release and required documents
Letter -reply and Memorandum Letter countersigned by Loan Examiner LOANS Chief PES Director -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
1 hour DED for Operations
Letter- reply and Memorandum Letter countersigned by DED for Operations with complete required documents reviewed
If corrections/ revisions are made by the DED for Operations on the action, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Executive Director
9 Executive Director proofreads the Letter- reply, Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release
and required documents
Letter- reply , Memorandum Letter countersigned by Loan Examiner LOANS Chief PES Director DED for Operations -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual
30 minutes Executive Assistant
Letter- reply , Memorandum Letter and Disbursement Voucher for 2
nd/3
rd
release and required documents proofread
If corrections/ revisions are made by the Executive Secretary on the Action, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 2, otherwise if there are no corrections/ revisions, the action is forwarded to the Executive Director
516
expenditure and accomplishment -PSAP -contract
10 Executive Director reviews, approves/ signs Letter -reply , Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release
and required documents
Letter -reply , Memorandum Letter countersigned by Loan Examiner LOANS Chief PES Director DED for Operations -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
30 minutes Executive Director
Approved /Signed Letter- reply , Memorandum Letter, complete required documents reviewed
If corrections/ revisions are made by the Executive Director on the action, the same is returned to the LOANS Division for editing/ finalization, then proceed to step 3.
The action on the request and required documents after reviewed and countersigned by the concerned Office Directors and approved and signed by the
Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
11 Office of the Executive Director records and transmits the signed/approved Letter- reply , Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release and required
documents to the LOANS Division
Approved /Signed Letter- reply , Memorandum Letter -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP
10 minutes Admin Aide Date, time and details of Approved /Signed Letter -reply , Memorandum Letter and attached documents recorded in the logbook of the LOANS Division
517
-contract
12 CO-LOANS Division receives and records the approved/ signed Letter reply , Memorandum Letter and Disbursement Voucher for 2
nd/3
rd release and required
documents
Approved and signed Letter reply , Memorandum Letter -Letter request for the 2
nd / 3
rd release
of loan proceeds -Report of actual expenditure and accomplishment -PSAP -contract
10 minutes Admin Aide Date, time and details of approved/ signed Letter reply , Memorandum Letter and Disbursement Voucher for 2
nd/3
rd
release and required documents recorded in the logbook of the LOANS Division
A photocopy of the approved/ signed letter-reply is kept by the Division for file. Original and duplicate copies of approved/signed letter-reply is transmitted to CO-Records Section while the Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd release and
pertinent documents forwarded to Cash Section for preparation of check
13 CO-Records Section receives and records approved/signed letter-reply
10 minutes Records Officer of this
Bureau
Date, time and details of approved/ signed Letter reply recorded in the logbook of the Records Section
Records Section transmits approved/signed letter-reply on the concerned LGU
14 CO-Cash Section prepares check for 2nd
/3rd
release of the loan proceeds
-Approved/Signed Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd
release -Letter request for the Report of actual expenditure and accomplishment -PSAP
1 hour Cashier Memorandum Letter and attached requirements reviewed, check for 2
nd/release prepared
by the Cashier
Check for 2nd
/3rd
release with attached requirements forwarded to the Office of the Executive Director
518
-contract
15 Executive Director proofreads the Memorandum Letter and attached requirements reviewed, check for 2
nd/release
Check for 2nd
/3rd
release Approved/Signed Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd
release -Letter request for the Report of actual expenditure and accomplishment -PSAP -contract
30 minutes Executive Assistant
Memorandum Letter and attached requirements reviewed, check for 2
nd/release
proofread
16 Executive Director reviews, approves/signs check for 2
nd/3
rd release
Check for 2nd
/3rd
release Approved/Signed Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd
release -Letter request for the Report of actual expenditure and accomplishment -PSAP -contract
30 minutes Executive Director
Approved/Signed Check for 2
nd/3
rd
release and attached requirements reviewed
Signed/Approved Check for 2
nd/3
rd release with
attached requirements forwarded to the LOANS Division
17 Office of the Executive Director records and transmits the approved/signed check for 2
nd/3
rd release to the LOANS Division
Approved/Signed Check for 2
nd/3
rd
release Approved/Signed Memorandum Letter together with Disbursement
10 minutes Admin Aide Date, time and details of approved/signed check for 2
nd/3
rd
release recorded in the logbook of the LOANS Division
519
Voucher for 2nd
/3rd
release -Letter request for the Report of actual expenditure and accomplishment -PSAP -contract
18 CO-LOANS Division receives and records the approved/signed check for the 2
nd/3
rd
release
Approved/Signed Check for 2
nd/3
rd
release Approved/Signed Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd
release -Letter request for the Report of actual expenditure and accomplishment -PSAP -contract
10 minutes Admin Aide Date, time and details of approved/signed check for 2
nd/3
rd
release recorded in the logbook of the LOANS Division
A photocopy of the approved/signed check by the Division for file
19 CO-LOANS Division informs applicant LGU/ local treasurer concerned for the approved/signed check for 2
nd/3
rd release
and bring Official Receipt for the release of the said check from CO-Cash Section
Approved/Signed Check for 2
nd/3
rd
release Approved/Signed Memorandum Letter together with Disbursement Voucher for 2
nd/3
rd
release -Letter request for the Report of actual expenditure and accomplishment
10 minutes Loan Examiner Applicant LGU received check for 2
nd/3
rd release from
Cash Section
Photocopies of check and OR are kept by the Division for file
520
-PSAP -contract
20 CO-LOANS Division records in the ALRF index card check and OR Numbers and other data/information for 2
nd/3
rd release
Photocopies of check and OR
10 minutes Loan Examiner Check and OR Numbers and other data/ information for 2
nd/3
rd release
recorded in the ALRF index card
End of Process
521
4.1 Notify LGU on their loan obligation
Loans should be repaid by the LGU concerned in equal amortizations as stipulated in the Loan Agreement on or before the end of December of each year starting with the year next following the year of completion of the project as provided for under Assessment Regulation 4-77.
Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division prepares demand letter to concerned LGU
-Schedule of Annual amortization due for concerned LGU -Contract of Loan -Records of Release and payments of concerned LGU -Certificate of the completion of project
4 hours Admin Officer Demand letter countersigned by Admin Officer, required documents reviewed
Demand Letter and required documents forwarded to the LOANS Chief
2 CO-LOANS Division reviews demand letter and attached requirements
Demand letter countersigned by Admin Officer -Schedule of Annual amortization due for concerned LGU -Contract of Loan -Records of Release and payments of concerned LGU -Certificate of the completion of project
1 hour LOANS Chief Demand letter countersigned by LOANS Chief, required documents reviewed
If corrections/ revisions are made by the LOANS Chief on the demand letter, the same is returned to the Admin Officer for editing/ finalization
3 CO-LOANS Division records and transmits the demand letter to the Office of the PES Director for review
Demand letter countersigned by Admin Officer Chief, LOANS
Admin Aide Date, time and details of demand letter and required documents recorded
Demand Letter forwarded to the Office of PES Director.
522
-Contract of Loan
in the logbook of LOANS Division. Corresponding CCS attached.
The demand letter and required documents are routed to concerned Office Directors for review and countersignature.
4 PES Director reviews demand letter and attached required documents
Demand letter with CCS attached countersigned by Admin Officer Chief, LOANS -Contract of Loan
20 minutes PES Director Demand letter countersigned by PES Director required documents reviewed
If corrections/ revisions are made by the PES Director on the demand letter, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Deputy Executive Director for Operations
5
Deputy Executive Director for Operations reviews demand letter and attached required documents
Demand letter countersigned by Admin Officer Chief, LOANS PES Director -Contract of Loan
20 minutes Deputy Executive
Director for Operations
Demand letter countersigned by DED for Operations -Contract of Loan, required documents reviewed
If corrections/ revisions are made by the Deputy Executive Director for Operations on the demand letter, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Executive Director
6 Office of the Executive Director proofreads the demand letter
Demand letter countersigned by Admin Officer Chief, LOANS
20 minutes Executive Assistant
Demand letter proofread
If corrections/ revisions are made by the Executive Assistant on the demand letter, the
523
PES Director DED for Operations -Contract of Loan
same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Executive Director
7 Executive Director reviews, approves/signs the demand letter
Demand letter countersigned by Admin Officer Chief, LOANS PES Director DED for Operations -Contract of Loan
20 minutes Executive Director
Approved/Signed demand letter
If corrections/ revisions are made by Executive Director on the demand letter, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 3.
Demand letter and required documents after reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, the
same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
8 Office of the Executive Director records and transmits the demand letter and required documents to the LOANS Division
Approved/Signed demand letter Contract of Loan
10 minutes Admin Aide Date, time and details of approved/signed demand letter and required documents recorded in the logbook of the Office of the Executive Director
9
CO-LOANS Division receives and records the approved/signed demand letter
Approved/Signed demand letter Contract of Loan
10 minutes Admin Aide Date, time and details of approved/signed demand letter and required documents recorded in the logbook of the LOANS Division.
A photocopy of the approved/signed demand letter is kept by the Division for file Original and duplicate copies of approved/signed demand letter is
524
transmitted to the CO-Records
10 C0-Records Section receives and records approved/signed demand letter
10 minutes Records Officer (CO
Record Section)
Date, time and details of approved/signed demand letter and required documents recorded in the logbook of the Records Section
Records Section transmits approved/signed demand letter to the LGU concerned.
End of Process
525
4.2 Facilitate receipt repayment of loan under ALRF Check/s receives by the LOANS Division for repayment of loan under Assessment Loan Revolving Fund (ALRF) by the Treasurer of the LGU concerned are forwarded to Cash Section for Official Receipt and prepares letter-reply to acknowledged receipt of payment with the attached Official Receipt. The amount of payment, name of bank/ date, OR No. /date are posted to the ALRF index card to compute the total amount paid made by the LGU.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-LOANS Division receives and records check for repayment of loan and supporting documents
-Transmittal letter -Check payment and supporting documents
10 minutes Admin Aide Date and details of check payment and supporting documents recorded in the logbook of the LOANS Division. Corresponding CCS attached.
Check payment and supporting documents received forwarded to the LOANS Chief
2 CO-LOANS Division reviews /assigns check payment and supporting documents to action officer
-Transmittal letter with CCS attached -Check payment and supporting documents
30 minutes LOANS Chief Check payment and supporting documents reviewed and assigned to Admin Officer
Check payment and supporting documents forwarded to the Action Officer
3 CO-LOANS Division reviews check payment and supporting documents and prepares and finalizes letter –reply
-Transmittal letter -Check payment and supporting documents - Records for repayment of loan (ALRF Index Card) -contract - file copy of demand letter
4 hours Admin Officer Letter-reply acknowledging receipt of payment of loan countersigned by the Admin Officer, check payment for annual amortization and supporting documents reviewed
-Check payment and supporting documents forwarded to the Cash Section for official receipt. -A photocopy of the check payment and official receipt are kept by the Division for file. -Record payment to the ALRF index card of the LGU concerned
526
-Letter reply with attached documents are forwarded to the LOANS Chief for review.
4 CO-LOANS Division reviews letter-reply and attached documents
-letter-reply countersigned by Admin Officer -Official Receipt and supporting documents -Transmittal letter -Records of release and payment -contract - file copy of demand letter
30 minutes LOANS Chief letter-reply countersigned by LOANS Chief attached documents reviewed
If corrections/ revisions are made by the LOANS Chief on the letter-reply the same is returned to the Admin Officer for editing/ finalization.
5 CO-LOANS Division records and transmits the letter-reply to the Office of the PES Director for review
-letter-reply countersigned by Admin Officer LOANS Chief - Official Receipt and supporting documents -Transmittal letter
10 minutes Admin Aide Date, time and details of letter-reply and attached documents recorded in the logbook of LOANS Division.
Letter-reply and attached documents forwarded to the Office of the PES Director.
The letter-reply and required documents are routed to concerned Office Directors for review and countersignature.
6 PES Director reviews letter-reply and attached documents
-letter-reply countersigned by Admin Officer LOANS Chief - Official Receipt and supporting documents
20 minutes PES Director Letter-reply countersigned by PES Director required documents reviewed
If corrections/ revisions are made by the PES Director on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2,
527
-Transmittal letter otherwise if there are no corrections/ revisions the action is forwarded to the Deputy Executive Director for Operations
7 Deputy Executive Director for Operations reviews letter-reply and attached documents
letter-reply countersigned by Admin Officer LOANS Chief PES Director - Official Receipt and supporting documents -Transmittal letter
20 minutes Deputy Executive
Director for Operations
Letter-reply countersigned by DED for Operations, attached documents reviewed
If corrections/ revisions are made by the Deputy Executive Director for Operations on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Executive Director
8 Office of the Executive Director proofreads the letter-reply
letter-reply countersigned by Admin Officer LOANS Chief PES Director DED for Operations - Official Receipt and supporting documents -Transmittal letter
20 minutes Executive Assistant
Letter-reply proofread
If corrections/ revisions are made by the Executive Assistant on the letter-reply, the same is returned to the LOANS Division for editing/ finalization, then proceed to Step 2, otherwise if there are no corrections/ revisions the action is forwarded to the Executive Director
9 Executive Director reviews, approves/signs the letter-reply
letter-reply countersigned by Admin Officer LOANS Chief PES Director DED for Operations
20 minutes Executive Director
Approved/Signed letter-reply
If corrections/ revisions are made by Executive Director on the letter-reply, the same is returned to the LOANS Division for editing/
528
- Official Receipt and supporting documents -Transmittal letter
finalization, then proceed to Step 3.
Letter-reply and attached documents after reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, the same are transmitted back to the concerned Division (LOANS) for appropriate action/next step.
10 Office of the Executive Director records and transmits the letter-reply and attached documents to the LOANS Division
Approved/Signed letter-reply - Official Receipt and supporting documents -Transmittal letter
10 minutes Admin Aide Date, time and details of approved/signed letter-reply and attached documents recorded in the logbook of the Office of the Executive Director
11
CO-LOANS Division receives and records the approved/signed letter-reply and attached documents
Approved/Signed letter-reply - Official Receipt and supporting documents -Transmittal letter
10 minutes Admin Aide Date, time and details of approved/signed signed letter-reply and attached documents recorded in the logbook of the LOANS Division.
A photocopy of the approved/signed letter-reply is kept by the Division for file Original and duplicate copies of approved/signed letter-reply is transmitted to CO-Records
12 C0-Records Section receives and records approved/signed letter-reply
10 minutes Records Officer (CO
Records Section)
Date, time and details of approved/signed letter-reply and attached documents recorded in the logbook of the Records Section
Records Section transmits approved/signed letter-reply to LGU concerned.
End of Transaction
529
4.3 Maintain statement of accounts of LGUs who had availed of loan(s) from the ALRF
Based from the following procedures under item 21, Preparation of loan contract and 1st release of the loan proceeds; under item 20, Recommendation for approval/disapproval of 2nd/3rd release of loan proceeds; and under Item 3, Monitored payments made by the LGUs under the ALRF, the report of status of ALRF are prepare quarterly or as need arises. The list of LGUs who had availed of loan(s) from the ALRF, and with the corresponding approved amount of loan , the actual amount release, the amount to be/(not to be released), the per cent (%)released to the approved amount of loan , the total payment made, and total balance were indicated.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Co-LOANS Division prepares and finalizes the report of status of Assessment Loan Revolving Fund (ALRF)
-ALRF Index card - LGUs ALRF files
3 days Admin Officer Report of Status of ALRF countersigned by Admin Officer
Report of Status of ALRF forwarded to LOANS Chief for review
2 Co-LOANS Division reviews Report of Status of ALRF
- Report of Status of ALRF countersigned by Admin Officer
1 day LOANS Chief Report of Status of ALRF countersigned by LOANS Chief Report of Status of ALRF reviewed
If corrections/ revisions are made by the LOANS Chief on the report , the same is returned to the Admin Officer for editing/ finalization
3 Co-LOANS Division records Report of Status of ALRF
Report of Status of ALRF countersigned by Administrative Officer V LOANS Chief
10 minutes Admin Aide Date, time and details of Report of Status of ALRF recorded in the logbook of LOANS Division. Corresponding CCS attached.
Report of Status of ALRF are filed by the Admin Officer for use/guide and reference.
End of Process
530
Operating Procedures for Bureau Operations Field Operations Group
Real Property Assessment Examination Division
531
SERVICE : Field Operations Group DIVISION : Real Property Assessment Examination Division (PASS)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : LGU Assessor & Assistant Assessor, Treasurer & Assistant Treasurer (Municipal, Province,
Cities), BLGF Central & Regional Office, Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
7. Render technical assistance to the local assessors in gathering sales data for preparation of market values.
8. Monitor the conduct of general revisions of real property assessments of local governments.
8.1 Collect statistical information on LGU SMV preparation;
9. Conduct assessment examination (audit) of local governments.
9.1 Validation of real property appraisal and assessment; 9.2 Prepare comments and recommendations to Assessor and
LCE relative to the result (findings) of validation (examination report);
10. Render opinions and rulings (local finance circulars, BLGF circulars, non-policy issues) on real property appraisal and assessment issues in LGUs (all), conduct of general revision
10.1 Research with regard to decision of the Supreme Court, LBAA;
10.2 Conduct fact-finding investigation (referral, fact-finding); and or Ocular inspection/field verification;
10.3 Prepare opinions/rulings; 10.4 Prepare responses to appeals/reconsiderations;
11. Render comments on legislation initiatives on RP appraisal and assessment issues
11.1 Prepare comments/recommendations on proposed legislatives;
11.2 Conduct research of related initiatives
532
12. Participate as a member of the Technical Committee on Real Property Value (TCRPV) group for BIR zonal values
12.1 Set real property values for BIR purposes 12.2 Participate in public hearings on Zonal Values
13. Review and ensure compliance of LGU SMV to the conduct of the general revision, related laws on real property, guidelines, procedures, etc.
14. Maintain database of assessed value, tax rate, market value, Real Property Unit (RPU)
14.1 Collect quarterly assessment report (BLGF Form 3) 14.2 Prepare statistical report per region, per province 14.3 Prepare analysis report
15. Provide technical assistance and advice to related NGAs, Appeals Board (LBAA, CBAA) on real property appraisal and assessment issues
15.1 Act as expert witness/consultant to investigations, judicial/quasi judicial proceedings
533
SPECIFIC PROCEDURES 3.1 Validation of real property appraisal and assessment
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PASS prepares and finalizes office memorandum to ADMIN. Re: preparation of travel order.
Itinerary of travel, name of personnel assigned for the evaluation/examination.
2 hours Property Appraisers
Memorandum requesting Administrative Division for the preparation of travel order countersigned by Property Appraiser with attached itinerary and names of personnel involved.
Office memorandum forwarded to PASS Chief for review.
2. CO-PASS reviews the office memorandum. Office memorandum countersigned by property appraisal.
10 minutes PASS Chief Office memorandum countersigned by PASS Chief.
If corrections/revisions are made by the PASS Chief on the Office memorandum, the same is returned to property appraiser for editing/finalization, otherwise the Office memorandum is forwarded to the Office of the Deputy Executive Director (DED), Operations.
534
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. CO-PASS records and transmits office memorandum to the Office of the DED for operations, for review/notation.
Office Memorandum countersigned by Property Appraiser and PASS Chief
10 minutes Admin Aide Date, time and details of signed office memorandum is recorded in the logbook PASS Division.
5. Deputy Executive Director (DED), Operations reviews and approves/signs Office Memorandum
Office Memorandum countersigned by Property Appraiser and PASS Chief
1 hour DED for Operations
Office Memorandum reviewed and approved/signed by DED, Operation
If corrections/revisions are made by the DED for Operations on the Office memorandum, the same is returned to PASS for editing/finalization, otherwise the Office memorandum is forwarded to ADMIN Division for preparation of Travel Order.
Please refer to the process of Preparation of Travel Order under ADMIN Division
Please refer to the process of Preparation of Voucher/Check under FMD
8. CO-PASS receives and records BLGF Travel/Office Order from ADMIN with voucher/check
BLGF Travel/Office Order, with Voucher/check
10 minutes Admin Aide Date, time and details of BLGF Travel/Office Order, with Voucher/check recorded in the logbook of PASS.
Travel Order is presented to Assessor on the 1st day of evaluation.
535
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9. CO-PASS conducts actual evaluation:
Meeting with the City Assessor concerned to discuss the evaluation to be conducted.
Checklist and questionnaires to be accomplished by the assessor.
1 day Assigned staff
Accomplished checklist and questionnaires.
10. CO-PASS selects 50 samples of real property units (RPUs) in the Field Appraisal & Assessment Sheets (FAASs).
Lists of RPUs randomly selected in the FAAS.
2 days Assigned staff
Accomplished 50 samples of RPUs.
11. CO-PASS counterchecks data with other assessment records such as, Tax Declaration, Records of Assessment, INDEX Cards and others.
Accomplished samples.
2 days Assigned staff
Verified/counterchecked data vis-à-vis other assessment records.
This is done to check the consistency of data in all the assessment records in the assessor’s office.
12. CO-PASS conducts ocular inspection on selected RPUs per LGU.
Select at least 1 RPU, preferably building.
1 day Assigned staff
Checked/verified RPU in compliance with the law.
This is done to countercheck the consistency of the data in the FAAS as against the actual physical location and feature of the building.
13. CO-PASS conducts exit conference with the assessor and his/her staff.
Accomplished questionnaires, checklist, verified samples & results of the ocular inspection conducted.
1 hour Assigned staff
Initial comments/recommendations by the group.
Written evaluation report shall be prepared by the team addressed to the LCE with the corresponding comments/recommen
536
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
dations for implementation by the LGU concerned.
14. CO-PASS prepares and finalizes evaluation/examination report addressed to the LCE
Proposed evaluation/examination report.
1 day Assigned staff on a particular
LGU.
Evaluation/examination report addressed to the LCE countersigned assigned staff on the particular LGU.
Basis for the implementation of findings.
15. CO-PASS reviews evaluation/examination report.
Evaluation/examination report addressed to the LCE countersigned by the assigned staff on the particular LGU.
1 hour PASS Chief Evaluation/examination report addressed to the LCE countersigned PASS Chief
If corrections/revisions are made by the PASS Chief on the Evaluation/examination report addressed to the LCE, the same are returned to Assigned staff on the particular LGU for editing/finalization then proceed to step 14, otherwise the Evaluation/examination report addressed to the LCE are forwarded to the Office of the Deputy Executive Director (DED), Operations.
537
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
16. CO-PASS records and transmits Evaluation/examination report addressed to the LCE
Evaluation/examination report addressed to the LCE countersigned by the assigned staff and PASS Chief.
5 minutes Admin Aide Date, time and details of BLGF Travel/Office Order, with Voucher/check recorded in the logbook of PASS.
17. DED, Operation reviews evaluation/examination report addressed to LCE
Evaluation/examination report addressed to the LCE countersigned by the assigned staff and PASS Chief.
1 hour DED for Operations
Evaluation/examination report addressed to the LCE reviewed and countersigned by DED for Operations.
If corrections/revisions are made by the DED for Operations on the Evaluation/examination report addressed to the LCE, the same are returned to PASS for editing/finalization then proceed to step 14, otherwise the Evaluation/examination report addressed to the LCE are forwarded to the Office of the Deputy Executive Director (DED), Operations.
18. CO-Office of the Executive Director proofreads the Evaluation/examination report addressed to the LCE.
Evaluation/examination report addressed to the LCE countersigned by assigned staff and PASS Chief and DED for
5 minutes Executive Assistant
Evaluation/examination report proofread by Executive Director
If corrections/revisions are made by the Executive Assistant on the Evaluation/examination report addressed to the LCE, the same are
538
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Operations. returned to PASS for editing/finalization then proceed to step 14, otherwise the Evaluation/examination report addressed to the LCE are forwarded to the Executive Director
19. Executive Director reviews Evaluation/examination report addressed to the LCE.
Evaluation/examination report addressed to the LCE countersigned by assigned staff and PASS Chief and DED for Operations.
1 hour Executive Director
Evaluation/examination report addressed to the LCE reviewed and approved/signed by Executive Director
If corrections/revisions are made by the Executive Director on the Evaluation/examination report addressed to the LCE, the same are returned to PASS for editing/finalization then proceed to step 14,
20. CO-OED records and transmits approved/signed Evaluation/examination report addressed to the LCE.
Approved/signed Evaluation/examination report addressed to the LCE.
10 minutes Admin Aide Date, time and details of approved/signed Evaluation/examination report addressed to the LCE recorded in the logbook of OED.
539
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
21. CO-PASS receives and records approved/signed Evaluation/examination report addressed to the LCE
Approved/signed Evaluation/examination report addressed to the LCE.
10 minutes Admin Aide Date, time and details of Approved/signed Evaluation/examination report addressed to the LCE recorded in the logbook of PASS.
Xerox copy is kept in the division for file. Original and duplicate copies of Approved/signed Evaluation/examination report addressed to the LCE are forwarded to the Records Section for filing and transmittal to concerned office/person.
22. CO-Records records and transmits Approved/signed Evaluation/examination report addressed to the LCE.
Approved/signed Evaluation/examination report addressed to the LCE.
10 minutes Admin Aide Date, time and details Approved/signed Evaluation/examination report addressed to the LCE. Recorded in the logbook of Records Division.
Record section will send the evaluation/examination report to the LGU concerned.
End of Process
540
4.2 Conduct fact-finding investigation and/or ocular inspection of LGU The procedure below defines the steps and necessary requirements needed before rendering opinion/rulings on queries relative thereto.
Step Procedure/Process Input/Requirement
Processing Time
Responsible Person
Output of Decision Point
Remarks
1. CO-PASS Division receives and records letter-request of regional directors, local assessors, property owners or other stakeholders from Records Section.
Letter-request for opinion/ruling, or appeals/request for reconsideration or complaint re: valuation/assessment of real property from Records Section.
10 minutes Admin Aide Date, Time and details of letter request recorded in the logbook. Corresponding CCS attached.
The letter request is forwarded to Division Chief.
2. CO-PASS Division evaluates/assigns to action officer.
Facts/information embodied in the basic communication.
10 minutes Division Chief Letter request with notations of the Division Chief.
3. CO-PASS Division prepares Office Memorandum to ADMIN. Re: preparation of travel/office order.
Letter requests with notations of the Division Chief.
2 hour Property Appraisers
Draft Office Memorandum requesting ADMIN re: preparation of travel/office order. Attached letter-request.
4. CO-PASS Division reviews/revises the draft Office Memorandum.
Draft Office Memorandum.
1 hour Division Chief Draft Office Memorandum reviewed.
5. CO-PASS Division finalizes Office Memorandum.
Reviewed draft Office
20 minutes Property Appraiser
Final Office Memorandum
541
Step Procedure/Process Input/Requirement
Processing Time
Responsible Person
Output of Decision Point
Remarks
Memorandum.
6. CO-PASS Division records and transmits Office memorandum to the Office of the Service Director, for review.
Office Memorandum addressed to Internal and Administration Office Director.
10 minutes Admin Aide Date, time and details of letter request recorded in the logbook of the PASS Division.
The Office Memorandum is routed to Service Director for review and countersignature 7. Director, PES reviews the Office
Memorandum. Office Memorandum countersigned by Action Officer and Division PASS Chief
1 hour PES Director Office Memorandum reviewed and countersigned by the Director, PES
If corrections are made by the Director, PES on the memorandum, the same is returned to PASS Div. for editing/finalization, then proceed to step 3, otherwise if there are no corrections/revisions, the memo is forwarded to Director, IAO.
ADMIN Division will facilitate the preparation of BLGF Travel/Office Order 8. CO-PASS Division receives true copy of the
signed BLGF Travel/Office Order from the Administration Division.
Office Memorandum noted by Service Director.
10 minutes Admin Aide Copy of signed BLGF Travel/Office Order with corresponding number.
Xeroxed copy to be carried in the field.
9. CO-PASS Division conducts fact-finding investigation and/or ocular inspection.
Facts as submitted by the property
2-3 days Division Chief, Property Appraisers,
Findings and recommendations on the
Processing time depending on the extent of work
542
Step Procedure/Process Input/Requirement
Processing Time
Responsible Person
Output of Decision Point
Remarks
owner.
Xeroxed copy of the BLGF Travel/Office Order.
Admin Aide. investigation and/or ocular inspection conducted.
necessary and location of property.
10 CO-PASS prepares necessary report prior to the preparation of an appropriate opinion/ruling.
Findings and recommendations observed in the conduct of the investigation and/or ocular inspection.
2-3 days Division Chief, Property Appraisers, Admin Aide.
Report of the fact-finding investigation/ocular inspection duly signed by the concerned personnel.
Xeroxed copies for file to the Records Section.
Soft copy to MIS.
End of Process
543
4.3 Prepare opinions/rulings
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PASS receives and records letter-request of regional directors, local assessors, property owners or other stakeholders for opinion/ruling, or appeals/request for reconsideration or complaint re: valuation/assessment of real property from Records Section.
Letter-request for opinion/ruling, or appeals/request for reconsideration or complaint re: appraisal/assessment of real property.
10 minutes Admin Aide Date, time and details of letter request recorded in logbook. Corresponding CCS attached.
The letter-request is forwarded to the Division Chief for assignment to action officer.
2. CO-PASS Division evaluates/assigns document/letter request to Property Appraiser I/II/III.
Facts/information embodied in the basic communication.
10 minutes PASS Chief Letter-requests with notations of the Division Chief.
The letter-request is forwarded to property appraiser I/II/III for appropriate action.
Preliminary action shall first be prepared in case of initial (1st time) letter-request for opinion/ruling; appeals/complaint. Research/study and/or fact-finding investigation and/or ocular inspection to be conducted, whenever necessary, in order that appropriate opinion/ruling can be rendered.
3. CO-PASS prepares and finalizes opinion/ruling.
Letter-request/appeal from concerned party.
Comments and/or recommendation of concerned local assessor, if necessary.
Report of fact-finding investigation and/or ocular
5 days Property Appraiser
I/II/III
Opinion/ruling countersigned by Property Appraiser.
544
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
inspection conducted, if necessary.
4. CO-PASS reviews/revises opinion/ruling. Opinion/ruling countersigned by Property Appraiser I/II/III
2 hours PASS Chief Opinion/ruling reviewed and countersigned by the Division PASS Chief
If corrections are made by the Division Chief on the opinion/ruling, the same is returned to Property Appraiser I/II/III for editing and finalization, otherwise the opinion/ruling is forwarded to the Office of the Deputy Executive Director (DED), Operations.
5. CO-PASS Division transmits opinion/ruling to the Office of the Service Director, for review.
Opinion/ruling
10 minutes Admin Aide Date, time and details of opinion/ruling and attached letter-request recorded in logbook.
The opinion/ruling is routed to concerned Directors for review and countersignature
6. Deputy Executive Director (DED), Operations reviews the proposed opinion/ruling.
Opinion/ruling countersigned by Property Appraiser I/II/III and PASS Chief.
1 hour Deputy Executive Director (DED),
Operations
Opinion/ruling countersigned DED for operations.
If corrections are made by the DED Operations on the opinion/ruling, the same is returned to Property Appraiser I/II/III for editing and finalization, otherwise
545
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the opinion/ruling is forwarded to the Office of the Executive Director (ED).
7. CO-Office of the Executive Director proofreads the opinion/ruling
Opinion/ruling countersigned by Property Appraiser I/II/III, PASS Chief and DED for Operations.
1 hour Executive Secretary
Opinion/ruling proofread by Executive Director.
If corrections are made by the Executive Secretary on the opinion/ruling, the same is returned to Property Appraiser I/II/III for editing and finalization, otherwise the opinion/ruling is forwarded to the Office of the Executive Director (ED).
8. Executive Director reviews and signs the opinion/ruling.
Opinion/ruling countersigned by Property Appraiser, Division Chief, Director, PES and DED-operations.
1 hour Executive Director
Opinion/ruling reviewed and signed by the executive Director.
If corrections are made by the Executive Director on the opinion/ruling, the same is returned to Property Appraiser I/II/III for correction/editing then proceed to step 4.
9. CO-Office of the Executive Director records and transmits back the opinion/ruling to PASS Division.
Opinion/ruling signed by the Executive Director
10 minutes Secretary of the Executive
Director
Date, time and details of opinion/ruling and attached letter-request recorded
546
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
in logbook.
10. CO-PASS Division receives and records the approved opinion/ruling.
Approved/signed opinion/ruling
10 minutes Admin Aide Date, time and details of opinion/ruling and attached letter-request recorded in logbook.
A photocopy of the approved/signed opinion/ruling is kept by the Division for file.
Original and duplicate copy of the approved/signed opinion/ruling is forwarded to Records Section, for filing and transmittal to concerned party (refer to process of transmittal of outboard documents under Records Section).
Soft copy of the opinion/ruling is forwarded to MIS for uploading in the BLGF website.
End of Process
547
5.1 Process in the preparation of comments/recommendations on proposed legislatives The procedure below defines the steps in coming up comments with corresponding recommendations on the legislation forwarded by DOF with respect to real property appraisal and assessment matters.
Step Procedure/Process Input/Requirement Processing Time
Responsible Person
Output of Decision Point
Remarks
1. CO-PASS Division receives from DOF and records copy of the proposed legislative measures from the house of Representatives or other National Government Agency’s (NGAs) for comments on real property taxation matters.
Proposed legislative reform.
10 minutes Admin Aide CCS #, date and details of documents recorded in the logbook.
2. CO-PASS Division reviews the proposed legislative reform.
Proposed legislative reform.
2 days Division Chief Comments/recommendations
3. CO-PASS division prepares letter/memo addressed to DOF with corresponding comments/recommendations.
Comments/recommendations.
30 minutes Division Chief Letter/memo with comments/recommendations.
4. CO-PASS Division records and transmits letter/memo to the Office of the Service Director, for review.
Letter/memo with countersigned by Division Chief.
5 minutes Admin Aide Date, time and details of letter/memo recorded in the logbook of PASS Division.
The letter/memo is routed to concerned Office Directors for review and countersignature
5. Director, PES reviews the letter/memo. Letter/memo countersigned by the Division PASS Chief.
30 minutes Deputy Executive Director
Letter/memo reviewed and countersigned by the Director, PES.
If corrections/revisions are made by the Director, PES on the letter/memo, the same is returned to PASS Div. for editing/finalization, then proceed to step 3, otherwise if there are no corrections/revisions, the letter/memo is
548
Step Procedure/Process Input/Requirement Processing Time
Responsible Person
Output of Decision Point
Remarks
forwarded to the DED-Operations.
7. Deputy Executive Director – Operations reviews the letter/memo.
Letter/memo reviewed and countersigned by the Director, PES.
30 minutes Dep. Exec. Director
Letter/memo reviewed and countersigned by DED-Operations.
If corrections/revisions are made by the Director, PES on the letter/memo, the same is returned to PASS Div. for editing/finalization, then proceed to step 3, otherwise if there are no corrections/revisions, the letter/memo is forwarded to the DED-Operations.
8. CO-Office of the Executive Director proofreads the letter/memo.
Letter/memo reviewed and countersigned by Division Chief, Director, PES and DED-Operations.
10 minutes Secretary of the Dep. Exec. Director
Letter/memo proofread
If corrections/revisions are made by the Director, PES on the letter/memo, the same is returned to PASS Div. for editing/finalization, then proceed to step 3, otherwise if there are no corrections/revisions, the letter/memo is forwarded to the DED-Operations.
Tracking of documents by PASS Division
9. Review the letter/memo with corresponding comments/recommendations for approval/signature.
Letter/memo with comments/recommendations.
1 hour Exec. Director Approved/signed letter/memo.
If corrections are made by the Service Director, proposed
549
Step Procedure/Process Input/Requirement Processing Time
Responsible Person
Output of Decision Point
Remarks
opinion/ruling goes back to PASS Div. for revision and repeat steps 1-8.
10. Receive and record approved/signed letter/memo.
Approved/signed letter/memo with comments/recommendations.
10 minutes Admin Aide Approved/signed letter/memo with comments/recommendations.
11. Release of approved signed letter/memo to Records Section.
Approved/signed letter/memo with comments/recommendations.
10 minutes Admin Aide Approved/signed letter/memo. Receiving remarks and initials of records officer on PASS Divisions logbook.
Records Section will send to DOF the approved/signed letter/memo.
Soft copy to MIS.
End of Process
550
5.2 Conduct Research/Study/Analysis if necessary in the formulation of opinion/ruling.
The procedure below describes the steps in conducting a research/study/analysis if necessary in the formulation of opinion/ruling.
Step Procedure/Process Input/Requirement Processing Time
Responsible Person
Output of Decision Point
Remarks
2. CO-PASS Division receives and records letter-request of regional directors, local assessors, property owners or other stakeholders.
Letter-request for opinion/ruling or appeals/request for consideration or complaint re: valuation/assessment of real property from Records Section.
10 minutes Admin Aide Date, time and details of letter-request recorded in the logbook. Corresponding CCS attached.
The letter-request is forwarded to Division chief.
2. CO-PASS Division evaluates/assigns to action officer.
Facts/information embodied in the letter-request.
10 minutes Division Chief Letter-requests with notations of the Division Chief.
The letter-request is forwarded to Action Officer (Property Appraiser)
3. CO-PASS Division prepares Office Memorandum to ADMIN. Re: preparation of travel/office order.
Letter requests with notations of the Division Chief.
2 hour Property Appraisers
Draft Office Memorandum requesting ADMIN re: preparation of travel/office order. Attached letter-request.
4. CO-PASS Division reviews/revises the draft Office Memorandum.
Draft Office Memorandum.
1 hour Division Chief Draft Office Memorandum reviewed.
5. CO-PASS Division finalizes Office Memorandum. Reviewed draft Office Memorandum.
20 minutes Property Appraiser
Final Office Memorandum
6. CO-PASS Division records and transmits Office memorandum to the Office of the Service Director, for review.
Office Memorandum addressed to Internal and
10 minutes Admin Aide Date, time and details of letter request recorded in the logbook of the
551
Administration Office Director.
PASS Division.
The Office Memorandum is routed to Service Director for review and countersignature
7. Director, PES reviews the Office Memorandum. Office Memorandum countersigned by Property Appraiser and Division PASS Chief
1 hour Service Director
Office Memorandum reviewed and countersigned by the Director, PES
If corrections are made by the Director, PES on the memorandum, the same is returned to PASS Div. for editing/finalization, then proceed to step 3, otherwise if there are no corrections/revisions, the memo is forwarded to Director, IAO.
ADMIN Division will facilitate the preparation of BLGF Travel/Office Order
8. CO-PASS Division receives true copy of the signed BLGF Travel/Office Order from the Administration Division.
Office Memorandum noted by Service Director.
10 minutes Admin Aide Copy of signed BLGF Travel/Office Order with corresponding number.
Photocopy to be carried in the field.
9. CO-PASS Division conducts research/study/analysis of the subject matter.
Facts as submitted by the property owner.
Photocopy of the BLGF Travel/Office Order.
1-2 days Division Chief, Property Appraisers, Admin Aide.
Results of the research/study conducted.
Processing time depending on the extent of work necessary.
Next step is the preparation of the corresponding opinion/ruling.
End of Process
552
8.1 Collect Quarterly Assessment Report
Step Procedure/Process Input/Requirement Processing Time
Responsible Person
Output of Decision Point
Remarks
3. CO-PASS Division receives and records quarterly assessment report of real property from Records Section.
Quarterly Assessment report.
5 minutes Admin Aide Quarterly Assessment Report.
Data are needed in the target setting.
2. CO-PASS Division assigns encoding of data to action officer in charge.
Quarterly Assessment report.
10 minutes Division Chief Quarterly Assessment Report.
3. CO-PASS Division encodes the data submitted. Quarterly Assessment report.
10 minutes Property Appraisers
Database of Assessment Report submitted
4. CO-PASS Division makes follow-up calls to LGUs who did not submit the assessment report.
List of LGus who have not submitted reports of assessment.
30 minutes Property Appraisers
Follow-up LGUs who have not submitted their reports.
5. CO-PASS Division analyzes the data. Data 20 minutes Property Appraisers
Percentage increase/decrease in the values against the previous quarter and result of analysis.
6. CO-PASS Division prepares report based on analysis.
Result of analysis 1 day Property Appraisers
Report of analysis
7. CO-PASS Division reviews the Report. Draft report of analysis
30 minutes Division Chief Report of analysis reviewed
8. CO-PASS Division disseminates report to concerned Bureau officials and stakeholders
Report on the result of analysis
1 week Admin Aide Report of analysis disseminated
Xeroxed copy for file to records section.
Soft copy to MIS.
9. CO-PASS Division files data for future references and research purposes of stakeholders.
Quarterly Assessment Report and result of analysis.
10 minutes Admin Aide Final report of analysis with Quarterly Assessment
10. CO-PASS Division records and transmits final report to INFO Division for archive.
Final report 10 minutes Admin Aide Date, Time and details of final Report
For information and future references.
553
of Analysis recorded in the logbook.
End of Process
554
Operating Procedures for Bureau Operations Field Operations Group
Financial Operations Examination Division
555
SERVICE : Field Operations Group DIVISION : Financial Operations Examination Division UNIT NAME : BRIEF DESCRIPTION : CLIENTS : Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Conduct Revenue Performance (Revenue Audit)
1.1 Examination of Books of Accounts of the Treasurers to determine compliance with and/or violation to the existing law, rules and regulations
1.2 Preparation of Revenue Evaluation Performance Report 1.3 Monitoring the implementation of recommendations on
the Performance Evaluation Report
Consensus during the Planning Conference that Central Office (CO) will conduct Revenue Performance (Revenue Audit) exclusively for NCR only. Revenue Performance (Revenue Audit) outside NCR are done on case to case basis dependent on requests Revenue Performance outside NCR are devolve to the BLGF-Regional Offices
2. Monitor audit findings and recommendations on COA and SAO (Special Audit Office) reports and recommends the same to local government units/operations
2.1 Examination of COA & SAO Reports 2.2 Examination of submitted trial balances in determining for the approval or denial of requested certification (that
Cases involving Treasury matters in the COA & SAO reports
556
a particular LGU does not operate on budgetary deficit)
3. Validation of financial reports of LGUs in determining their financial condition and/or existence of cash or fund overdraft
3.1 Analyze/validate financial reports of LGUs to determine their financial condition and/or existence of cash or fund overdraft 3.2 Issuance of certification to LGUs regarding the financial condition and/or existence of cash or fund overdraft
4. Provides assistance to inter-agency activities
4.1 The DOF thru the BLGF attends/participates in public/committee hearings to authenticate the issued certification of income of LGU proposed to be converted/created/divided under existing law
5. Supervise the turn-over of outgoing/incoming Treasurer’s
5.1 Examination of Books of Accounts of the outgoing/incoming Treasurers to determine compliance with and/or violation to the existing law, rules and regulations
5.2 Preparation of turn-over report
557
SPECIFIC PROCEDURES 1.1 Examination of Books of Accounts of the Treasurers to determine compliance with and/or violation to the existing law, rules and regulations.
Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
17. CO-FOED identifies the team who will
conduct Revenue Performance (Revenue
Audit) in LGUs of NCR.
Revenue Audit
Schedule based on
Plans & Programs
1 day Supervising
Local
Treasury
Examiner
(SLTE)/Chief,
FOED
List of Revenue
Audit Team
selected by SLTE
List of Revenue Audit
Team is forwarded to
ADMIN Chief for
review
Note: Team Members
are selected from
other Divisions due to
shortage of staff
18. ADMIN Chief reviews List of Revenue Auditing Team
List of Revenue
Audit Team
selected by SLTE
30 minutes ADMIN Chief Office Order approved by the Executive Director
ADMIN Division
prepares Office Order
Please refer to the steps in the Preparation of Office Order (ADMIN)
19. CO-FOED receives and records Office Order Office Order approved by the
Executive Director
10 minutes Admin Aide Approved Officer Order received/recorded and distributed to the auditing team
Approved Officer
Order
received/recorded and
distributed to the
558
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
auditing team for the
preparation of
Itinerary of Travel
20. C.O.-FOED/Revenue Audit Team prepares itinerary of travel
Approved Officer Order
20 minutes Auditing Team
Itinerary of Travel signed by the Revenue Audit Team Member/Supervisor
If corrections/revisions
are made by the Team
Member’s Supervisor,
the same is returned
to the concerned
Team member for
editing/finalization,
otherwise the Itinerary
of Travel is forwarded
to the Financial
Management Division
(FMD) for the
preparation of
Disbursement Voucher
(DV)
Please refer to the steps in the Preparation of DV and releasing of checks (FMD)
Revenue Performance Team conducts Revenue Performance Audit on target LGU/s
21. CO – Revenue Performance Team proceeds to the Office of the Treasurer of concerned LGU/s informing the purpose of the Revenue Audit Team’s visit showing the approved original office order and furnishing the same with a photo copy of the approved office order
Approved Office Order
30 minutes Revenue Audit Team
Purpose of Audit /Access to the Book of Accounts and other related documents
The Revenue Audit Team will proceed to the Local Chief Executive (LCE) for courtesy call
559
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
22. CO-Revenue Audit Team makes courtesy call to the LCE of the LGU concerned, informing the purpose of the team’s visit showing the approved original office order and furnishing the same with a photo copy of the approved office order
Approved Office Order
30 minutes Revenue Audit Team
Purpose of Audit /Access to the Book of Accounts and other related documents
The Revenue Audit Team will proceed back to the Office of the Treasurer of the LGU concerned to examine the book of accounts and other related documents
23. CO-Revenue Audit Team conducts examination of books of accounts and other related documents of the Treasurers following the procedures contained in the guidelines
Cash books for all funds; Report of Collections and Deposits (RCD); Report of Accountability for Accountable Forms (RAAF); Consolidated Report of Accountability for Accountable Forms (CRAAF); Check Registers; Tax Account Registers for RPT & BT; Report of Taxable Assessed Valuation; Revenue Code or Tax Ordinances; and other related documents/report
5 days
Revenue Audit Team
Cash books for all funds; Report of Collections and Deposits (RCD); Report of Accountability for Accountable Forms (RAAF); Consolidated Report of Accountability for Accountable Forms (CRAAF); Check Registers; Tax Account Registers for RPT & BT; Report of Taxable Assessed Valuation; Revenue Code or Tax Ordinances; and other related documents/report
The Revenue Audit Team will conduct an exit conference with the Treasurer and Staff
560
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
s s checked and validated by the Revenue Performance Team
24. CO-Revenue Audit Team conducts an exit conference
Initial Findings of the Revenue Audit Team
1 hour Revenue Audit Team
Leader
Findings//Observations/Recommendations/Reactions discussed with the Treasurer and staff
Findings//Observations/Recommendations/Reactions discussed with the Treasurer and staff
Note: In case there is a request of revenue audit from LGUs outside NCR, the same procedure/process still applies
End of Process
561
1.2 Preparation of Revenue Evaluation Performance Report
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1.
CO-FOED/Revenue Audit Team prepares
report of Revenue Evaluation Performance
Report
Consolidated
Findings/Observati
ons/Recommenda
tions/Reactions
gathered from
members of the
Revenue Audit
Team
5 days after
end of audit
Revenue Audit Team Members
Evaluation
Performance
Report signed by
members of
Revenue Audit
Team
Evaluation
Performance Report is
forwarded to the
Revenue Audit Team
Leader for review
2. Revenue Audit Team Leader reviews Evaluation Performance Report
Evaluation
Performance
Report signed by
members of
Revenue Audit
Team
30 minutes Team Leader, Revenue Audit Team
Evaluation
Performance
Report signed by
members and
Team Leader of
the Revenue
Audit Team
If corrections/revisions
are made by the Team
Leader, the same is
returned to the
concerned team
member/s, then
proceed to step 1 for
editing/finalization,
otherwise the
Evaluation
Performance Report to
the PES Director for
review
3. PES Director reviews evaluation performance report
Evaluation
Performance
Report signed by
30 minutes PES Director Evaluation
Performance
Report signed by
If corrections/revisions
are made by the
Director PES, the same
562
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
members and
Team Leader of
the Revenue
Audit Team
members, Team
Leader of the
Revenue Audit
Team and noted
by the Director
PES
is returned to the
concerned team
member/s, then
proceed to step 1 for
editing/finalization,
otherwise the
Evaluation
Performance Report to
the DED for
Operations for review
4. DED for Operations reviews evaluation performance report
Evaluation
Performance
Report signed by
members, Team
Leader of the
Revenue Audit
Team and noted
by the Director
PES
30 minutes DED for Operations
Evaluation
Performance
Report signed by
members, Team
Leader of the
Revenue Audit
Team noted by the
Director PES and
DED for
Operations
If corrections/revisions
are made by the DED
for Operations, the
same is returned to
the concerned team
members, then
proceed to step 1 for
editing/finalization,
otherwise the
Evaluation
Performance Report
will be forwarded back
to Chief, FOED/SLTE in
preparation of
memorandum to the
Executive Director
563
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-FOED prepares memorandum to the Executive Director
Memorandum to
the Executive
Director indorsing
the Evaluation
Performance
Report for
transmittal
30 minutes Chief, FOED/SLTE
Memorandum countersigned by the Chief, FOED/SLTE together with the Evaluation Performance Report
Memorandum is
forwarded to the PES
Director for review
6. PES Director reviews memorandum Memorandum countersigned by the Chief, FOED/SLTE together with the Evaluation Performance Report
30 minutes PES Director Memorandum countersigned by the Chief, FOED/SLTE and Director PES together with the Evaluation Performance Report
If corrections/revisions
are made by the
Director PES, the same
is returned to the
Chief, FOED/SLTE,
then proceed to step 4
for editing/finalization,
otherwise the
Memorandum
together with the
Evaluation
Performance Report
will be forwarded
forward to the DED
for Operations for
review
7. DED for Operations reviews memorandum Memorandum countersigned by the Chief,
30 minutes DED for Operations
Memorandum countersigned by the Chief,
If corrections/revisions
are made by the DED
for Operations, the
564
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
FOED/SLTE and Director PES together with the Evaluation Performance Report
FOED/SLTE Director PES and DED for Operations together with the Evaluation Performance Report
same is returned to
the Chief, FOED/SLTE,
then proceed to step 4
for editing/finalization,
otherwise the
Memorandum
together with the
Evaluation
Performance Report
will be forwarded to
the OED for review
8. Executive Director reviews memorandum Memorandum countersigned by the Chief, FOED/SLTE Director PES and DED for Operations together with the Evaluation Performance Report
20 minutes Executive Director
Memorandum countersigned by the Chief, FOED/SLTE Director PES, DED for Operations signed by the Executive Director together with the Evaluation Performance Report
If corrections/revisions
are made by the
Executive Director, the
same is returned to
the Chief, FOED/SLTE,
then proceed to step 4
for editing/finalization,
otherwise the
Memorandum
together with the
Evaluation
Performance Report
will be forwarded back
to FOED for the
preparation of
565
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
transmittal letter to
the Treasurer
concerned copy
furnished the LCE for
their information and
appropriate action
Note: Transmittal letter will go thru channels following steps 4 to 7
9. CO-FOED forwards the memorandum, transmittal letter to Records Section
Transmittal Letter and Memorandum signed by the Executive Director together with the Evaluation Performance Report
15 minutes Records Officer
Date, time and
details of the
approved
Evaluation
Performance
Report, signed
Transmittal Letter
and Memorandum
by the Executive
Director recorded
by the Records
Section
Original copies of Evaluation Performance Report, Transmittal Letter and Memorandum Transmittal Letter and copy of Audit Report are forwarded to Records Section for filing and transmittal to Department of Finance. Note: 2nd copies will be retained at the Records Section while 3rd copies will be retained by FOED
Please refer to process of transmitting outbound documents under Records Section End of Process
566
1.3 Monitoring the implementation of recommendations on the Performance Evaluation Report
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FOED prepares tracer letter to the concerned Treasurer/s requesting information on what actions has been taken on the audit findings and recommendations contained in the Revenue Performance Report
List of LGUs Audited/Performance Evaluation Report
1 hour Chief, FOED/SLTE
Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE.
Tracer letter is
forwarded to the PES
Director for review
Note: LCE will be copy
furnished
2. PES Director reviews tracer letter Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE.
30 minutes PES Director Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE and PES Director
If corrections/revisions
are made by the PES
Director, the same is
returned to the Chief,
FOED/SLTE, then
proceed to step 1 for
editing/finalization,
otherwise the tracer
letter will be
forwarded to the DED
for Operations for
review
3. DED Operations reviews tracer letter Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE
30 minutes DED for Operations
Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE,
If corrections/revisions
are made by the DED
for Operations the
same is returned to
567
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and PES Director PES Director and DED for Operations
the Chief, FOED/SLTE,
then proceed to step 1
for editing/finalization,
otherwise the tracer
letter will be
forwarded to the OED
for review and
approval
4. Executive Director reviews tracer letter Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE, PES Director and DED for Operations
20 minutes Executive Director
Tracer letter to the Treasurer/s concerned countersigned by Chief, FOED/SLTE, PES Director, DED for Operations and signed by the Executive Director
If corrections/revisions
are made by the
Executive Director the
same is returned to
the Chief, FOED/SLTE,
then proceed to step 1
for editing/finalization,
otherwise the tracer
letter will be
forwarded to the
Records Section for
transmittal to the
Treasurer/s
concerned.
5. CO-FOED forwards the tracer letter to Records Section
Tracer letter to the Treasurer/s concerned countersigned by
15 minutes Records Officer
Date, time and
details of the
signed tracer
letter by the
Original copy of tracer letter will be transmitted by the Records Section to the
568
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief, FOED/SLTE, PES Director, DED for Operations and signed by the Executive Director
Executive Director
recorded by the
Records Section
Treasurer/s concerned. Note: 2nd copies will be retained at the Records Section while 3rd copies will be retained by FOED
Please refer to process of transmitting outbound documents under Records Section
End of Process
569
2.1 Examination of COA & SAO Reports
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FOED receives and records COA &
SAO reports
COA & SAO
Reports
10 minutes Admin Aide Date, time and
details of
COA/SAO reports
registered in the
logbook
COA & SAO report is
forwarded to assigned
Action Officer (AO) for
evaluation
2. CO-FOED/AO evaluates COA & SAO
reports
COA & SAO report 20 minutes AO (Senior
Local
Treasury
Examiner/Loc
al Treasury
Examiner II)
COA & SAO Report
evaluated
If there are
pronouncement
related to Treasury
matters, the AO will
prepare a letter to the
concerned Treasurer/s
informing them of the
findings and
corresponding
recommendations
based on the COA &
SAO report
3. CO-FOED/AO prepares letter Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
20 minutes AO (Senior
Local
Treasury
Examiner/Loc
al Treasury
Examiner II)
Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
Letter will be
forwarded to the
Chief, FOED/SLTE for
review
570
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
based on the COA
& SAO report to
be implemented
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II)
4. CO-Chief, FOED/SLTE reviews letter Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II)
20 minutes Chief,
FOED/SLTE
Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) and Chief,
FOED/SLTE
If corrections/revisions
are made by the Chief,
FOED the same is
returned to the AO
(Senior Local Treasury
Examiner/Local
Treasury Examiner II)
and Chief, FOED/SLTE,
then proceed to step 3
for editing/finalization,
otherwise the letter
will be forwarded to
the PES Director for
review.
571
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. PES Director reviews letter Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) and Chief,
FOED/SLTE
20 minutes PES Director Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) , Chief,
FOED/SLTE and
PES Director
If corrections/revisions
are made by the PES
Director the same is
returned to the AO
(Senior Local Treasury
Examiner/Local
Treasury Examiner II)
and Chief, FOED/SLTE,
then proceed to step 3
for editing/finalization,
otherwise the letter
will be forwarded to
the DED for
Operations for review.
6. DED for Operations reviews letter Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
20 minutes DED for
Operations
Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
If corrections/revisions
are made by the DED
for Operations the
same is returned to
the AO (Senior Local
Treasury
Examiner/Local
Treasury Examiner II)
572
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) , Chief,
FOED/SLTE and
PES Director
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) , Chief,
FOED/SLTE PES
Director and DED
for Operations
and Chief, FOED/SLTE,
then proceed to step 3
for editing/finalization,
otherwise the letter
will be forwarded to
the OED for review.
7. Executive Director reviews letter Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
20 minutes Executive
Director
Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
If corrections/revisions
are made by the
Executive Director the
same is returned to
the AO (Senior Local
Treasury
Examiner/Local
Treasury Examiner II)
and Chief, FOED/SLTE,
then proceed to step 3
for editing/finalization,
otherwise the letter
will be forwarded to
the Records Section
for transmittal to the
573
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
II) , Chief,
FOED/SLTE PES
Director and DED
for Operations
II) , Chief,
FOED/SLTE PES
Director, DED for
Operations and
signed by the
Executive Director
Treasurer/s
concerned.
8. CO-FOED forwards letter to Records Section
Letter to the
concerned
Treasurer/s
informing them of
the findings and
corresponding
recommendations
based on the COA
& SAO report to
be implemented
countersigned by
the AO (Senior
Local Treasury
Examiner/Local
Treasury Examiner
II) , Chief,
FOED/SLTE PES
Director, DED for
Operations and
signed by the
15 minutes Records Officer
Date, time and
details of the
letter signed by
the Executive
Director recorded
by the Records
Section
Original copy of letter will be transmitted by the Records Section to the Treasurer/s concerned. Note: 2nd copies will be retained at the Records Section while 3rd copies will be retained by FOED
574
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Director
Please refer to process of transmitting outbound documents under Records Section End of Transaction
If concerned Treasurer/s did not comply within the period of 1 month and tracer letters (2nd & 3rd tracers) will be sent to the Treasurer/s concerned. Same steps as Monitoring the implementation of recommendations on the Performance Evaluation Report
575
2.2 Examination of submitted trial balances in determining for the approval or denial of requested certification (that a
particular LGU does not operate on budgetary deficit)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FOED receives and records letter
request from LGUs for the issuance
of certification that the same does
not operate on budgetary deficit
Letter request
from LGUs, Trial
Balances and
other financial
reports
10 minutes Admin Aide Date, time and
details of Letter
request from
LGUs, Trial
Balances and
other financial
reports registered
in the logbook
Letter request from
LGUs/Trial Balances
and other financial
reports forwarded to
AO (Senior Local
Treasury Examiner/LTE
II) for evaluation
2. C.O-FOED AO (Senior Local Treasury
Examiner/LTE II) evaluates Letter
request from LGUs/Trial Balances
and other financial reports
Trial balances and
other financial
reports
30 minutes AO (Senior
Local
Treasury
Examiner/LT
E II)
Financial
status/condition
of LGUs evaluated
by the AO (Senior
Local Treasury
Examiner/LTE II)
If the financial
status/condition of
LGUs evaluated by the
AO (Senior Local
Treasury Examiner/LTE
II)
are in order,
transmittal letter/s
and certification/s that
the LGU/s does not
operate on budgetary
deficit will be
prepared by the AO
(Senior Local Treasury
576
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Examiner/LTE II) and
forwards the same to
the Chief, FOED/SLTE
for review, otherwise
if the financial
status/condition
shows that the LGU/s
operates on a
budgetary deficit, no
certification will be
issued and the
requesting party will
be informed thru
telegram, likewise if
there are lacking
financial reports, a
telegram will be
prepared requesting
the LGU/s concerned
to submit the same.
Note: preparation of
telegram follows the
same process as
Examination of COA &
SAO Reports, steps 2
to 8
577
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3. C.O-FOED AO (Senior Local Treasury
Examiner/LTE II) prepares
transmittal letter/s and
certification/s that the LGU/s
concerned does not operate on
budgetary deficit
Financial
status/condition
of LGUs evaluated
by the AO (Senior
Local Treasury
Examiner/LTE II)
20 minutes AO (Senior
Local
Treasury
Examiner/LT
E II)
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II)
Transmittal letter/s
and Certification/s
that the LGU/s does
not operate on
budgetary deficit
countersigned by the
AO (Senior Local
Treasury Examiner/LTE
II) is forwarded to the
Chief, FOED/SLTE for
review
4. CO-Chief, FOED/SLTE reviews
transmittal letter/s and
certification/s
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II)
20 minutes Chief,
FOED/SLTE
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II)
and Chief,
FOED/SLTE
If corrections/revisions
are made by the Chief,
FOED/SLTE to the
Transmittal letter/s
and Certification/s, the
same is returned to
the AO (Senior Local
Treasury
Examiner/Local
Treasury Examiner II),
then proceed to step 3
for editing/finalization,
otherwise the same
will be forwarded to
578
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the PES Director for
review.
5. PES Director reviews transmittal
letter/s and certification/s
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II)
and Chief,
FOED/SLTE
20 minutes PES Director Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE
and PES Director
If corrections/revisions
are made by the PES
Director to the
Transmittal letter/s
and Certification/s, the
same is returned to
the AO (Senior Local
Treasury
Examiner/Local
Treasury Examiner II),
then proceed to step 3
for editing/finalization,
otherwise the same
will be forwarded to
the DED for
Operations for review.
6. DED for Operations reviews
transmittal letter/s and
certification/s
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
20 minutes DED for
Operations
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
If corrections/revisions
are made by the DED
for Operations to the
Transmittal letter/s
and Certification/s, the
same is returned to
the AO (Senior Local
Treasury
579
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE
and PES Director
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE,
PES Director and
DED for
Operations
Examiner/Local
Treasury Examiner II),
then proceed to step 3
for editing/finalization,
otherwise the same
will be forwarded to
the OED for review.
7. Executive Director reviews
transmittal letter/s and
certification/s
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE,
PES Director and
DED for
Operations
15 minutes Executive
Director
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE,
PES Director, DED
for Operations and
signed by the
Executive Director
If corrections/revisions
are made by the DED
for Operations to the
Transmittal letter/s
and Certification/s, the
same is returned to
the AO (Senior Local
Treasury
Examiner/Local
Treasury Examiner II),
then proceed to step 3
for editing/finalization,
otherwise the same
will be forwarded to
the Records Section
for transmittal to the
Treasurer/s
concerned.
580
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8. CO-FOED forwards letter to Records Section
Transmittal
letter/s to
concerned LGU/s
and Certification/s
that the LGU/s
does not operate
on budgetary
deficit both
countersigned by
the AO (Senior
Local Treasury
Examiner/LTE II),
Chief, FOED/SLTE,
PES Director, DED
for Operations and
signed by the
Executive Director
15 minutes Records Officer
Date, time and
details of the
transmittal letter/s
and certification/s
signed by the
Executive Director
recorded by the
Records Section
Original copy of transmittal letter/s and certification/s will be transmitted by the Records Section to the LGU/s concerned. Note: 2nd copies will be retained at the Records Section while 3rd copies will be retained by FOED
Please refer to process of transmitting outbound documents under Records Section End of Process
581
3.1 Analyze/validate financial reports of LGUs to determine their financial condition and/or existence of cash or fund
overdraft
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FOED receives and records letter
request for certification for a
conversion/division/creation of
LGU, and trial balances/other
financial reports
Letter request for
certification for a
conversion/divisio
n/creation of LGU,
and trial
balances/other
financial reports
10 minutes Admin Aide Date, time and
details of Letter
request from
LGUs, Trial
Balances and
other financial
reports registered
in the logbook
Letter request for
certification for a
conversion/division/cr
eation of LGU, and
trial balances/other
financial reports
forwarded to AO
(Senior Local Treasury
Examiner/LTE II) for
review/evaluation
Same process as Examination of submitted trial balances in determining for the approval or denial of requested certification (that a particular LGU does not operate on budgetary deficit) refer to steps 2 to 8
End of Process
582
4.1 The DOF thru the BLGF attends/participates in public/committee hearings to authenticate the issued certification of income of LGU proposed to be converted/created/divided under existing law
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-FOED receives and records Letter of
invitation from the House of
Representatives/Senate
Letter of invitation 10 minutes Admin Aide Date, time and
details of Letter of
Invitation from the
House of
Representatives/S
enate
Letter of Invitation
forwarded to the
Chief, FOED/SLTE
2. CO. Chief, FOED/SLTE instruct Admin
Aide/AO to gather from the Central
Records Section of copy/ies of issued
certification/s of income requirement
for LGU/s that are the subject for
deliberation in the public/committee
hearing.
Central Records
Section copy/ies of
issued
certification/s of
income
requirement for
LGU/s that are the
subject for
deliberation in the
public/committee
hearing.
20 minutes Admin Aide Retrieved copy/ies
of
approved/issued
certification/s
Chief, FOED, SLTE,AO
and/or Admin Aide
requests the Records
Section to certify the
retrieved copies of
approved/issued
certification/s
3. Records Section-Records Officer
certifies copies of approved/issued
certification as true and valid
Retrieved copy/ies
of
approved/issued
certification/s
10 minutes Records
Officer
Certified true
copy/ies of
approved/issued
certification/s
Chief, FOED/SLTE and
or Service Director will
submit certified true
copy/ies of
approved/issued
583
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
certification/s in the
House of
Representative/s or
Senate that conducts
public/committee
hearing on
conversion/creation/di
vision of LGUs
4. Service Director, Chief, FOED/SLTE
proceed to the House of
Representatives or Senate.
Letter of invitation
from House of
Representatives or
Senate/certified
true copy of
approved/ issued
certification/s
1 day DED/Chief-
FOED
Authenticate to
the lawmakers the
certification issued
are true and valid
End of Process
584
5.1 Examination of Books of Accounts of the outgoing/incoming Treasurers to determine compliance with and/or violation to the existing law, rules and regulations
Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
Same Process as Examination of Book of Accounts steps 1 to 6
7. Turn-over Team conducts examination of book of accounts and other related documents of the out-going Treasurer/s following the procedures contained in the guidelines
Cash books for all funds; Record/Report of unused/unissued Accountable Forms, Investment Accounts, Supplies/Property accountabilities & other related documents/reports
5 days Turn-over Team
Report of Invoice-Receipt of accountabilities of the Outgoing and Incoming Treasurer
See attached forms/guidelines in the conduct of turnover of the office of the Treasurer (BLGF MC No. 03-2007)
End of Process
585
5.2 Preparation of turn-over report Step Procedure Input or
Requirement Processing Time
Responsible Person
Output or Decision Point
Remarks
Same Process as the Preparation of Revenue Evaluation Performance Report steps 1 to 9
586
Operating Procedures for Bureau Operations Field Operations Group
Local Revenue Enforcement Division
587
SERVICE : Field Operations Group DIVISION : Local Revenue Enforcement Division (REV)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
11. Compile, Process and (Provide accurate, timely), uniform and comparable local government fiscal and financial information.
(Compiles, summarizes and analyses local government financial reports including the Statement of Receipts and Expenditures (SRE) submitted by all local government units (LGU) of the country; (Integrates the LGU financial data to national aggregates including impact to consolidated public sector position)
11.1 Establish reporting formats and data exchange standards
11.2 Collection of fiscal and financial reports from LGU (SRE).
11.3 Consolidate 11.4 Validation (Q.A) Done by the Regional Office. 11.5 Maintenance of LGU fiscal and financial information
database
Establish systems and procedures to develop a unified system of financial statistical services.
12. Prepare and analyze statistical information reports (and regularly publish individual and aggregate LGU performance , summaries, )trends, patterns (and other critical findings in LGU financing).
12.1 Prepare statistical reports, trends, and patterns. Examine and analyze LGU (trial balances, budget operations statements and) financial reports. Publish
13. Design and develop practical methodologies and approaches for forecasting LGU revenues, expenditures, borrowing and surpluses.
13.1 Establish periodically (sound) methodology and approaches in forecasting
13.2 Conduct forecast of LGU revenue (regional and NCR).
Forecast for the purpose of regional and NCR planning and other institutions requirement (such as DOF,IMF, etc).
588
14. Recommend policies and procedures (trends and patterns, and recommend appropriate action) to LGUs, DOF and other oversight agencies relative to findings/analysis.
14.1 Prepare recommendation, Facilitate policy and procedural reforms and Assist in implementation and issuance of policy and procedure.
14.2 (Evaluation and recommendation of Statement of Receipts and Expenditures (SRE) and other financial reports.)
14.3 (Prepare statements of income and expenditures of local governments, determine trends and patterns, and recommend appropriate action)
15. (Compile and analyze (Trial Balance) and financial reports of LGUs to) Determine their financial conditions and/or existence of fund overdrafts.
15.1 Developed parameters benchmarks to assess LGU fiscal financial performance.
15.2 Evaluate financial conditions of LGUs based on sets of benchmarks
15.3 Prepare report on LGU financial conditions and recommendation.
15.4 Assist in developing policies and strategies to improve financial conditions of LGUs.
16. Monitor and coordinate LGU compliance reporting, collection efficiencies, targets (and other revenue generation program (of the statistical activities of the Bureau and its Regional offices).
16.1 Periodically review LGU compliance on submission, deadlines and formats, Monitor of actual collections vis a vis targets and Prepares ranking/status report on collection efficiencies
16.2 Provide assistance to executives on coordination requirement
16.3 (Monitoring and coordination of revenue enforcement by CO to ROs.
16.4 Monitoring and coordinate the statistical activities of the Bureau and its Regional offices)
17. Render technical assistance to LGUs and BLGF Regional Office financial report operations, on financial report preparation, revenue administration, financial management, fund sourcing and credit financing. (Monitor and evaluate tax collection performance of local
17.1 Provides active assistance to BLGF Regional Offices and LGUs on financial report generation revenue administration, financial management, fund sourcing and credit financing
17.2 Training need assessment/trainer’s evaluation form
589
treasury offices)
18. Integrate LGU statistics with national financial reports. 18.1 Comply with national/international reporting and data exchange standards.
18.2 Submit report
590
SPECIFIC PROCEDURES 1.1 Establish reporting formats and data exchange standards
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV Division identifies existing reporting formats and standards
Oversight agencies, NGAs and international institutions reporting requirement
1 month Senior Local Treasury Examiner
Compilation of documents on existing reporting formats and requirements
2. CO-REV Division reviews and evaluates existing reporting formats and requirements of other NGAs and international institutions
Compilation of documents on existing reporting formats and requirements
1 month Senior Local Treasury Examiner
Consolidated report on the different existing reporting formats
3. CO-REV Division prepares and finalizes Memorandum on the recommended enhancement existing reporting formats and requirements of other NGAs and international institutions
Consolidated report on the different existing reporting formats
1 week Senior Local Treasury Examiner
(SLTE)
Memorandum on the recommended enhancement countersigned by SLTE
Memorandum on the recommended enhancement is forwarded to REV Chief for review.
4. CO-REV reviews memorandum on the recommended enhancement
Memorandum on the recommended enhancement countersigned by SLTE
3 days REV Chief Memorandum on the recommended enhancement reviewed and countersigned by the REV Chief
If corrections/revisions are made by the REV Chief on the memorandum on the recommended enhancement, the same are returned to the Senior Local Treasury Examiner for
591
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/finalization, then proceed to step 4, otherwise the Memorandum on the recommended enhancement is forwarded to the Office of the Deputy Executive Director (DED), Operations.
5. CO-REV Division records and transmits memorandum on the recommended enhancement to the Office of the Deputy Executive Director (DED)-Operations
Memorandum on the recommended enhancement countersigned by the Senior Local Treasury Examiner and REV Chief
2 minutes Admin Aide
Date, time and details of the Memorandum on the recommended enhancement recorded in the logbook of REV
The Memorandum on the recommended enhancement is routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director.
6.
Deputy Executive Director (DED)-Operations reviews memorandum on the recommended enhancement
Memorandum on the recommended enhancement countersigned by the Senior Local Treasury Examiner, REV Chief and DED for Operations
1 day DED for Operations
Memorandum on the recommended enhancement countersigned by DED- Operations
If corrections/revisions are made by the DED for Operations on the memorandum on the recommended enhancement , the same is returned to REV Division for correction/ finalization, proceed to step no.3, otherwise the
592
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
memorandum on the recommended enhancement is forwarded to the Office of the Executive Director
7. CO-Office of the Executive Director proofreads the memorandum on the recommended enhancement
Memorandum on the recommended enhancement countersigned by the Senior Local Treasury Examiner, REV Chief and DED- Operations
2 hours Executive Assistant
Memorandum on the recommended enhancement proofread by Executive Assistant
If corrections/revisions are made by the Secretary of the Executive Director on the memorandum on the recommended enhancement , the same is returned to REV Division for correction/finalization, then proceed to step no.4, otherwise the memorandum on the recommended enhancement is forwarded to the Executive Director for review and approval.
8. CO-Executive Director reviews and approves/signs memorandum on the recommended enhancement
Memorandum on the recommended enhancement countersigned by the Senior Local Treasury Examiner, REV
3 days Executive Director
Memorandum on the recommended enhancement reviewed and approved/signed by Executive Director
If corrections/revisions are made by the Executive Secretary on the memorandum on the recommended enhancement , the same is to REV Division
593
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief and DED for Operations
for correction/finalization, then proceed to step no. 4
The memorandum on the recommended enhancement, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the concerned division (REV) for the next steps.
9.
CO-Office of the Executive Director records and transmits approved/signed memorandum on the recommended enhancement to REV Division
Approved/signed memorandum on the recommended enhancement
10 minutes Admin Aide Date, time and details of the approved/signed memorandum on the recommended enhancement recorded in the logbook of the Office of the Executive Director
10.
CO-REV Division receives and records approved/signed memorandum on the recommended enhancement
Approved/signed memorandum on the recommended enhancement
10 minutes Admin Aide
Date, time and details of the approved/signed memorandum on the recommended enhancement recorded in the logbook of REV
Xerox copy kept in the Division for file. Original and duplicate copies of approved/signed memorandum on the recommended enhancement is forwarded to Records Section, for filing and transmittal to concerned LGUs.
594
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO-Records Section records and transmits the approved/signed memorandum on the recommended enhancement
Approved/signed memorandum on the recommended enhancement
2 months Admin Aide
Date, time and details of approved/signed memorandum on the recommended enhancement recorded in the logbook of Records Section
Records Section transmits approved/signed memorandum on the recommended enhancement to concerned LGUs copy furnished the Regional Office. (Refer to process of transmitting outbound documents under Records Section)
End of Process
595
1.2 Collection of fiscal and financial reports from the Local Government Unit
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. RO-Regional staff log in as Regional
Reviewer to the eSRE System
eSRE System
Username and
password
10 minutes Supervising
Local
Treasury
Examiner
Supervising Local
Treasury Examiner
successfully logged
in to the system
The BLGF Regional
Office is tasked to
validate the propriety
and accuracy of the
submitted reports and
to ensure its timely
submission to the
BLGF Central Office for
consolidation.
2. RO-Regional staff search pending reports
submitted by the Provincial Approver
(Provincial Treasurers)
eSRE System using
Tools-Pending SRE
Report Menu
10 minutes Supervising
Local
Treasury
Examiner
List of eSRE
quarterly reports
3. RO-Regional staff views pending reports by
modules and generate report on excel
format
List of pending
eSRE quarterly
reports
10 minutes Supervising
Local
Treasury
Examiner
Approved eSRE
quarterly report in
excel format
Regional Offices
reviews/rejects the
report uploaded by
the provinces and
cities
4. RO-Regional staff reviews pending reports
by modules
Approved eSRE
quarterly reports
on excel format
35 minutes Supervising
Local
Treasury
Approved/reject
ed reports with
discrepancy
596
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Examiner
Approved reports by the Regional Reviewer will be verified by the Regional Approver (Regional Director)
5. RO-Regional Director logs in as Regional
Approver to the eSRE System
eSRE System
Username and
password
10 minutes Regional
Director
Regional Director
successfully logged
in to the system.
6. RO-Regional Director searches pending
reports reviewed by the Regional Reviewer
eSRE System using
Tools-Pending SRE
Report Menu
(Pending Reports
are viewed thru
this Module)
10 minutes Regional
Director
List of eSRE
quarterly reports
reviewed by the
Regional Reviewer
7. RO- Regional Director views pending reports
by modules and generate report on excel
format
List of eSRE
quarterly reports
reviewed by the
Regional Reviewer
1 hour Regional
Director
Approved eSRE
quarterly report in
excel format
Regional Offices
approves/rejects the
report uploaded by
the provinces and
cities
8. RO-Regional Director reviews pending
reports by modules
Approved eSRE
quarterly reports
in excel format
35 minutes Regional
Director
Approved/rejected
reports with
discrepancy
Approved reports by the Regional Approver will be lodged at the Central Database for review and approval by the Central Office
End of Process
597
1.4 Validation (Q.A)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV informs Internal Administration Office (IAO) on the scheduled eSRE Field Validation/Evaluation
Names of selected personnel/Approved Date of Schedule
1 day REV Chief List of team members Submits lists of team to Admin Division for the issuance of an Office Order for the conduct of eSRE Field Valuation/Evaluation
For the preparation of Office Order requesting REV Staff to attend field validation – See process in the preparation of Office Order under Administrative Division
2. CO-IAO records and transmits Office Order to REV Division
Office Order Admin Aide Approved Office Order
3. CO-REV receives and records Office Order from Administration Division
Approved Office Order
30 minutes Local Treasury Examiner II/ Statistician
Date, time and details of Office Order recorded in the logbook of REV
Piggy-backed activity with the revenue audit and assessment audit
4. CO-eSRE Team proceeds to the Office of the Treasurer of concerned LGU informing the purpose of the team’s visit and furnishing him/her copy of office order
Approved Office Order
4 hours eSRE Team Purpose of the eSRE validation/evaluation conveyed
After informing the Treasurer of the purpose of visit, the team will proceed with the conduct of the eSRE validation/evaluation
5. CO- eSRE Team coordinates with the local treasurer for a courtesy call to the LCE and/or any local officials present
Arrival to LGU 1 hour eSRE Team and the local
treasurer
Courtesy Call/Meeting with LCE and other officials
After the courtesy call, the team will proceed immediately in the Conduct of eSRE Field Validation/Evaluation
6. CO- eSRE Team conducts eSRE Field Validation/Evaluation in compliance with regulations under BLGF Memorandum Issuances/Circulars.
Reports generated in the preparation of SRE:
Statement of
2 days Team Findings, comments and recommendations duly noted during the eSRE Field Validation/Evaluation
598
Receipts and Expenditures
Statement of Receipts Sources
Statement of Expenditures
Quarterly Report on the Real Property/Business Tax, Fees and Charges and Economic Enterprise
Statement of Financial Operations
SRE Fund Balance Composition
7. CO-eSRE Team conducts exit conference with the LCE and/or any local official present together with the treasury personnel for the presentation of findings, comments and recommendation.
Findings, comments and recommendations duly noted during the of eSRE Field Validation/Evaluation
4 hours eSRE Team Field Accomplishment Report
End of of eSRE Field Validation/Evaluation Return to office
8. CO-REV Division prepares and finalizes Field Accomplishment Report
Field Accomplishment Report
1 day eSRE Team Field Accomplishment Report countersigned by the eSRE Team
Field Accomplishment Report is forwarded to the REV Chief for review/comment
9. CO-REV Division reviews the Field Accomplishment Report signed by members of eSRE Team
Field Accomplishment Report countersigned by the eSRE Team
1 day REV Chief Field Accomplishment Report countersigned by the REV Chief
If corrections/revisions are made by the REV Chief on the Field Accomplishment Report, the same is returned to the eSRE
599
Team for editing/finalization then proceed to step 8, otherwise the Field Accomplishment Report is forwarded to the DED for Operations
10. CO-REV Division records and transmits the Field Accomplishment Report to the Office of the Deputy Executive Director (DED)-Operations
Field Accomplishment Report countersigned by the eSRE Team and REV Chief
10 minutes Admin Aide
Date, time and details of the Field Accomplishment Report recorded in the logbook of REV
The Field Accomplishment Report is routed to the concerned Office Directors for review and countersigned.
11.
CO-Deputy Executive Director (DED)-Operations reviews the Field Accomplishment Report
Field Accomplishment Report countersigned by the eSRE Team, REV Chief and DED for Operations
1 day DED for Operations
Field Accomplishment Report countersigned by DED- Operations
If corrections/revisions are made by the DED for Operations on the Field Accomplishment Report , the same is returned to REV Division for correction/ finalization, proceed to step no.8, otherwise the Field Accomplishment Report is forwarded to the Executive Director for approval.
12. CO-Office of the Executive Director proofreads the Field Accomplishment Report
Field Accomplishment Report countersigned by the eSRE Team, REV
2 hours Executive Assistant
Field Accomplishment Report proofread by Executive Assistant
If corrections/revisions are made by the Secretary of the Executive Director on the Field
600
Chief and DED for Operations
Accomplishment Report , the same are returned to REV Division for correction/finalization, then proceed to step no.8, otherwise the Field Accomplishment Report is forwarded to the Executive Director for review and approval.
13. CO-Executive Director reviews and evaluates the Field Accomplishment Report
Field Accomplishment Report countersigned by the eSRE Team, REV Chief and DED for Operations
3 days Executive Director
Approved/signed Field Accomplishment Report
If corrections/revisions are made by the Executive Assistant on the approved/signed Field Accomplishment Report, the same are returned to REV Division for correction/finalization, then proceed to step no. 8.
The Field Accomplishment, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the concerned division (REV) for the next steps.
14.
Office of the Executive Director records and transmits approved/signed Field Accomplishment Report to REV Division
Approved/signed Field Accomplishment Report
10 minutes Admin Aide Date, time and details of the approved/signed Field Accomplishment Report recorded in the logbook of the Office of the Executive Director
15. CO-REV Division receives and records the approved/signed Field Accomplishment Report
Approved/signed Field
10 minutes Admin Aide Date, time and details of the
Xerox copy kept in the Division for file.
601
Accomplishment Report
approved/signed Field Accomplishment Report recorded in the logbook of REV
Original and
duplicate
copies of
approved/sign
ed Field
Accomplishme
nt Report is
forwarded to
Records
Section, for
filing and
transmittal to
concerned
LGUs.
17. CO-Records Section records and transmits the approved/signed Field Accomplishment Report
Approved/Signed Field Accomplishment Report
10 minutes Admin Aide
Date, time and details of approved/signed Field Accomplishment Report recorded in the logbook of Records Section
Records Section transmits approved/signed Field Accomplishment Report to concerned LGUs copy furnished the Regional Office. (Refer to process of transmitting outbound)
End of Process
602
1.5 Maintenance of LGU fiscal and financial information database
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV Division monitors new LGUs and/or newly converted LGUs
Copy of Republic Act (RA)
20 minutes
REV Staff Updated list of LGUs in the eSRE System which includes newly created municipalities/provinces
2.
CO-REV Division approves registration of accounts and other information:
City/Municipal Treasurers (Role as approver)
Provincial/Regional/Central Level (Role as Reviewer and Approver)
Public DILG User
eSRE Web System
30 minutes
REV Staff – assignment by
region
Record of approved users
Only registered users can upload and review SRE reports thru the eSRE Web system.
(Refer to Manual on eSRE System for Administrator)
3. CO-REV updates profile of LGUs Population data from NSO
Land Area Data from LMB
Profile of LGU
Classification of LGU from CO-LTOD
30 minutes REV Staff Updated profile of LGUs
End of Process
603
2.1 Prepare statistical reports, trends and patterns, examine and analyze LGU (trial balances, budget operations
statements and) financial reports and publish
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV generates SRE excel report and financial
indicators for the current year by
provinces/cities/municipalities thru the web
system per region
Analysis report by the Regional Offices per region
BLGF SRE Form No. 1 (report in excel format)
Summary of Performance Indicators
5 days
Statistician
Matrix of SRE report
in excel format per
region
For the requirements,
refer to SRE Manual
2. CO-REV analyzes SRE Reports:
CO-REV gathers data for previous years
at least for 5 yrs per region
CO-REV compares the current year data
to previous years data per region
Matrix in excel
format per region
Comparative SRE
report and financial
indicators in excel
format (Aggregate
data for 5 yrs) per
2 days
5 days
Statistician
Statistician
Comparative SRE
report and financial
indicators in excel
format (Aggregate
data for 5 yrs) per
region
Report in excel format
with growth rate
analysis and other
See attached samples
604
CO-REV take notes of erratic trends (e.g.
tremendous increase/decrease in
revenues and expenditures) and
request for justification
region
Report in excel
format with growth
rate analysis and
other analytical
tables per region
10 days
Statistician
analytical tables per
region
Consolidated report
of erratic trends per
region by the Regional
Office
For the requirements,
refer to the Regional
Analysis Manual
The completeness of the analysis of the SRE reports depends on the submitted analysis of the regional offices
3. CO-REV Division evaluates and consolidates
regional analysis per region
SRE Analysis Reports
and other statistical
analysis per region
20 days Senior Local
Treasury
Examiner
SRE consolidated
annual report and
other statistical
analysis
Aggregate
By level
By region
By LGU
Financial
indicators
4. CO-REV Division prepares and finalizes SRE
consolidated annual report and other statistical
analysis
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form)
3 days Senior Local
Treasury
Examiner
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
countersigned by the
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
is forwarded to the REV
605
Senior Local Treasury
Examiner
Chief for
review/comment
5. CO-REV Division reviews the SRE consolidated
annual report and other statistical analysis,
design of report (in book form)
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form) countersigned
by the Senior Local
Treasury Examiner
20 days REV Chief SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
countersigned by the
REV Chief
If corrections/revisions
are made by the REV
Chief on the SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) the same
are returned to the
Senior Local Treasury
Examiner for
editing/finalization,
then proceed to step 4,
otherwise the SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) is
forwarded to the DED
for Operations .
6. CO-REV Division records and transmits the SRE
consolidated annual report and other statistical
analysis, design of report (in book form) to the
Office of the Executive Director (DED) -
Operations
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form) countersigned
by the Senior Local
10 minutes Admin Aide
Date, time and details
of the SRE
consolidated annual
report and statistical
analysis, design of
report (in book form)
recorded in the
606
Treasury Examiner
and REV Chief
logbook of REV
The SRE Consolidated annual report and other statistical analysis, design of report (in book form) are routed to the concerned Office Directors for review and
countersign and for approval of the Executive Director
7.
Deputy Executive Director (DED)-Operations
reviews the SRE consolidated annual report and
other statistical analysis, design of report (in
book form)
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form)
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
1 day DED for
Operations
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
reviewed and
countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
the same are returned
to REV Division for
correction/ finalization,
proceed to step no.4. ,
otherwise the SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) are
forwarded to the Office
of the Executive
Director
8. CO-Office of the Executive Director proofreads
the SRE consolidated annual report and other
statistical analysis, design of report (in
bookform)
SRE consolidated
annual report and
other statistical
analysis, design of
2 hours Executive
Assistant
SRE consolidated
annual report and
other statistical
analysis, design of
If corrections/revisions
are made by Executive
Assistant on the SRE
consolidated annual
607
report (in bookform)
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
report (in bookform)
proofread by
Executive Assistant
report and other
statistical analysis,
design of report (in
bookform) the same
are returned to REV
Division for
correction/finalization,
then proceed to step
no.4, otherwise the
SRE consolidated
annual report and
other statistical
analysis, design of
report (in bookform)
are forwarded to the
Executive Director for
approval.
9. CO-Executive Director reviews and evaluates the
SRE consolidated annual report and other
statistical analysis, design of report (in
bookform)
SRE consolidated
annual report and
other statistical
analysis, design of
report (in bookform)
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
2 days Executive
Director
SRE consolidated
annual report and
other statistical
analysis, design of
report (in bookform)
reviewed and
approved/signed by
the Executive
Director.
If corrections/revisions
are made by Executive
Director on the
approved/signed SRE
consolidated annual
report and other
statistical analysis,
design of report (in
bookform), the same
are returned to REV
Division for
correction/finalization,
then proceed to step
608
no. 4
10.
Office of the Executive Director records and
transmits approved/signed SRE consolidated
annual report and other statistical analysis,
design of report (in book form) to REV Division
Approved/signed
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form)
10 minutes Admin Aide Date, time and details
of the
approved/signed SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) recorded
in the logbook of the
Office of the Executive
Director
11.
CO-REV Division receives and records the
approved/signed SRE consolidated annual
report and other statistical analysis, design of
report (in book form)
Approved/signed
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form)
10 minutes Admin Aide
Date, time and details
of the
approved/signed SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) recorded
in the logbook of REV
A photocopy of the
approved/signed SRE
consolidated annual
report and other
statistical analysis,
design of report (in
book form) is kept by
the Division for file.
12. CO-REV Division records and transmits the
approved/signed SRE consolidated annual report
and other statistical analysis, design of report (in
book form) to Property Section for the printing
of copies (publication)
Approved/signed
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book
form)
10 minutes Admin Aide Date, time and details
of approved/signed
SRE consolidated
annual report and
other statistical
analysis, design of
report (in book form)
recorded in the
609
logbook of REV
For the procurement procedure on the publication of SRE Consolidated annual report – See Procurement Process under Property Section
13. CO-REV Division distributes publish reports to
interested key stakeholders
LGU Financial
Reports and
Performance
Indicators in Book
Form
20 days Senior Local
Treasury
Examiner
Copies distributed to
interested key
stakeholders
14. CO-REV Division advocates the published results
of the SRE consolidated annual report to
interested key stakeholders thru posting in BLGF
website
LGU Financial
Reports and
Performance
Indicators in Book
Form
Senior Local
Treasury
Examiner
Suggestions/comment
s/feedbacks
consolidated
This activity can be
done in conferences,
conventions and
seminars to interested
key stakeholders
End of Process
610
3.1 Establish periodically (sound) methodology and approaches in forecasting
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-REV Division establishes methodology and
approaches in forecasting
Data gathering (at least 5-yr data)
SIE/SRE
GRDP data
GDP projection data
Inflation projection data
RPT Annual Target Setting
LGU financial data (previously examined and analyzed)
Formula-
Annual growth rate by item
Average annual growth rate by item
Average
1 day
1 hour
SLTE
SLTE
Steps/Formula
Tentative Projection
SIE format -Prior to
2009
SRE format – 2009 -
present
Ex: 2011 projection
CY 2010 x AGR=
amount to be added to
the base figure
611
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Target setting on Business tax,
fees/charges and economic enterprise
(by region)
growth rate X base figure
Data on Assess Value and Tax Rate (by prov/cities)
BLGF SRE Form No. 1 – Actual collection to be sourced from Module QBTCol of
the SRE Web System
1 day
1 day
Statistician
Statistician
Matrix in excel format
Matrix in excel format
(Assessed Value and Tax Rate provided by
PASS Division)
End of Process
612
3.2 Conduct forecast of LGU revenue (regional and NCR)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV Division prepares forecast of LGU
revenue (regional and NCR).
10-Year Projection on LGU financial data
Annual Target for RPT, Business Tax,
Fees/Charges and Economic Enterprise
Formula for RPT: Assessed Value X
Tax Rate
Formula for Business Tax & Eco Ent.
= Current Year Coll x GRDP
Fees & Charges = Current Year Coll
x 10%
LGU financial data – Tentative projection (previously examined and analyzed)
Annual Target
1 day
2 days
SLTE
Statistician
Projected Income and
Expenditures of LGUs
(aggregate)
Annual Target to be
assigned to the
Region
Data to be submitted
to IMF, World Bank,
DOF and other
stakeholders
Methodologies set for
target setting may vary
depending on the
economic situation of
the Country
GRDP- Gross Regional
Domestic Product from
NSCB
613
2. CO-REV Division prepares and finalizes Annual
Target and Confirmation Letters assigned to
Region and NCR
Annual Target and
Confirmation Letters
assigned to Region
and NCR
1 day Senior Local
Treasury
Examiner
Annual Target and
Confirmation Letters
assigned by Region
and NCR
countersigned by the
SLTE
Annual Target and
Confirmation Letters
assigned by Region and
NCR are forwarded to
the REV Chief for
review/comment
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3. CO-REV Division reviews the Annual Target and
Confirmation Letters assigned to Region and NCR
Annual Target and
Confirmation Letters
assigned to Region
and NCR
countersigned by
the Senior Local
Treasury Examiner
1 day REV Chief Annual Target and
Confirmation Letters
assigned by Region
and NCR
countersigned by the
REV Chief
If corrections/revisions
are made by the REV
Chief on the Annual
Target and
Confirmation Letters
assigned to Region and
NCR, the same are
returned to the Senior
Local Treasury
Examiner for
editing/finalization,
then proceed to step 3,
otherwise the Annual
Target and
Confirmation Letter are
forwarded to the Office
of the Deputy Executive
Director (DED),
Operations
614
4. CO-REV Division records and transmits the
Annual Target and Confirmation Letters
assigned to Region and NCR
to the Office of the Deputy Executive Director
(DED), Operations
Annual Target and
Confirmation Letters
assigned to Region
and NCR
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
10 minutes Admin Aide Date, time and details
of the Annual Target
and Confirmation
Letters assigned by
Region and NCR
recorded in the
logbook of REV
The Annual Target and Confirmation Letters assigned to Region and NCR are routed to the concerned Office Directors for review and countersign and for approval of the Executive Director
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-REV Division records and transmits the
Annual Target and Confirmation Letters
assigned to Region and NCR
to the Office of the Deputy Executive Director
(DED), Operations
Annual Target and
Confirmation Letters
assigned to Region
and NCR
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
10 minutes Admin Aide Date, time and details
of the Annual Target
and Confirmation
Letters assigned by
Region and NCR
recorded in the
logbook of REV
615
6. CO-Deputy Executive Director (DED)-Operations
reviews the Annual Target and Confirmation
Letters assigned to Region and NCR
Annual Target and
Confirmation Letters
assigned to Region
and NCR
countersigned by
Senior Local
Treasury Examiner
and REV Chief
1 day DED for
Operations
Annual Target and
Confirmation Letters
assigned to Region
and NCR reviewed
and countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
Annual Targets and
Confirmation Letter
assigned to Region and
NCR, the same is
returned to REV
Division for
Editing/finalization,
proceed to step no.3,
otherwise the Annual
Target and
Confirmation Letters
assigned to Region and
NCR are forwarded to
the Office of the
Executive Director
616
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. CO-Office of the Executive Director proofreads the Annual Target and Confirmation Letters assigned to Region and NCR
Annual Target and Confirmation Letters assigned to Region and NCR countersigned by the Senior Local Treasury Examiner, REV Chief and DED for Operations
2 hours Executive Assistant
Annual Target and Confirmation Letters assigned to Region and NCR proofread by Executive Assistant
If corrections/revisions are made by the Executive Assistant on the Annual Target and Confirmation Letters assigned to Region and NCR, the same are returned to REV Division for editing/finalization, then proceed to step no.3, otherwise the Annual Target and Confirmation Letter assigned to Region and NCR are forwarded to the Executive Director for review and approval.
617
8. CO-Executive Director reviews and approves/signs the Annual Target and Confirmation Letters assigned to Region and NCR
Annual Target and Confirmation Letters assigned to Region and NCR countersigned by the Senior Local Treasury Examiner, REV Chief and DED for Operations
1 hour Executive Director
Annual Target and Confirmation Letter reviewed and approved/signed by the Executive Director
If corrections/revisions are made by the Executive Director on the approved/signed Annual Target and Confirmation Letters assigned to Region and NCR, the same are returned to REV Division for editing/finalization, then proceed to step no. 3.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
The Annual Target and Confirmation Letters assigned to Region and NCR, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to REV Division for the next
steps. 8.
Office of the Executive Director (OED) records
and transmits approved/signed Annual Target
and Confirmation Letters assigned to Region and
NCR to REV Division
Approved/signed
Annual Target and
Confirmation Letters
assigned to Region
and NCR
10 minutes Admin Aide Date, time and details of the approved/signed Annual Target and Confirmation Letter recorded in the logbook of OED
618
9.
CO-REV Division receives and records the
approved/signed Annual Target and
Confirmation Letters assigned to Region and NCR
Approved/signed
Annual Target and
Confirmation Letters
assigned to Region
and NCR
10 minutes Admin Aide Date, time and details
of the
approved/signed
Annual Target and
Confirmation Letters
assigned to Region
and NCR recorded in
the logbook of REV
Xerox copy kept in the Division for file. Original and duplicate copies of approved/signed Annual Target and Confirmation Letters assigned to Region and NCR are forwarded to Records Section, for filing and transmittal to concerned L GUs.
10. CO-Records Section records and transmits the
approved/signed Annual Target assigned to
Region and NCR
Approved/signed
Annual Target
assigned to Region
and NCR
10 minutes Records
Officer (CO-
Records
Section)
Date, time and details
of approved/signed
Annual Target
assigned to Region
and NCR recorded in
the logbook of
Records SEction
Records Section
transmits
approved/signed
Annual Target assigned
to Region and NCR to
concerned Regional
Offices
End of Process
619
4.1 Prepare recommendation, facilitate policy and procedural reforms and assist in the implementation and issuance of policy and procedure.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV reviews LGU performance and recommends policies and procedures and facilitates policy and procedural reforms
Consolidated report on the different existing reporting formats
5 days
Statistician
Policies and procedures on how to improve revenue generation
2. CO-REV Division prepares and finalizes policies and procedures on how to improve revenue generation
Policies and procedures on how to improve revenue generation
1 day Senior Local Treasury Examiner
Policies and procedures on how to improve revenue generation countersigned by the Senior Local Treasury Examiner
Policies and procedures on how to improve revenue generation is forwarded to the REV Chief for review/comment
3. CO-REV Division reviews the policies and procedures on how to improve revenue generation
Policies and procedures on how to improve revenue generation countersigned by the Senior Local Treasury Examiner
1 day REV Chief Policies and procedures on how to improve revenue generation countersigned by the REV Chief
If corrections/revisions are made by the Division Chief on the policies and procedures on how to improve revenue generation , the same are returned to the Senior Local Treasury Examiner for editing/finalization, then proceed to step 2, otherwise the policies and procedures on how to improve revenue generation are forwarded to the Office of the Deputy Executive Director (DED), Operations
620
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. CO-REV Division records and transmits the
policies and procedures on how to improve
revenue generation
to the Office of the Executive Director (DED) -
Operations
Policies and
procedures on how
to improve revenue
generation
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
10 minutes. Admin Aide Date, time and details
of the policies and
procedures on how to
improve revenue
generation recorded
in the logbook of REV
The policies and procedures on how to improve revenue generation is routed to the concerned Office Directors for review and countersign and for approval of the Executive Director
5. Deputy Executive Director (DED)-Operations
reviews the policies and procedures on how to
improve revenue generation
Policies and
procedures on how
to improve revenue
generation
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
1 day DED for
Operations
Policies and
procedures on how to
improve revenue
generation
reviewed and
countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
Policies and Procedures
on how to improve
revenue generation,
the same are returned
to REV Division for
editing/ finalization,
then proceed to step
no.2, otherwise Policies
and Procedures on how
to improve revenue
generation is
forwarded to the Office
of the Executive
Director
621
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6. CO-Office of the Executive Director proofreads
the policies and procedures on how to improve
revenue generation
Policies and
procedures on how
to improve revenue
generation
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
1 hour Executive
Assistant
If corrections/revisions
are made by the
Executive Assistant on
the policies and
procedures on how to
improve revenue, the
same are returned to
REV Division for
editing/finalization,
then proceed to step
no.2, otherwise the
policies and procedures
on how to improve
revenue are
forwarded to the
Executive Director for
review and approval.
7. CO-Executive Director reviews and
approves/signs the policies and procedures on
how to improve revenue generation
Policies and
procedures on how
to improve revenue
generation
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
3 days Executive
Director
Policies and
Procedures on how to
improve revenue
generation reviewed
and approved/signed
by the Executive
Director
If corrections/revisions
are made by the
Executive Director on
Policies and Procedures
on how to improve
revenue generation,
the same are returned
to REV Division for
editing/finalization,
then proceed to step
no. 2
622
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
The policies and procedures on how to improve revenue generation, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to REV Division for the next steps.
8.
Office of the Executive Director records and transmits approved/signed policies and procedures on how to improve revenue generation
Approved/signed policies and procedures on how to improve revenue generation
10 minutes Admin Aide Date, time and details of the approved/signed policies and procedures on how to improve revenue generation recorded in the logbook of the Office of the Executive Director
9.
CO-REV Division receives and records the approved/signed policies and procedures on how to improve revenue generation
Approved/signed policies and procedures on how to improve revenue generation
10 minutes Admin Aide
Date, time and details of the approved/signed policies and procedures on how to improve revenue generation recorded in the logbook of REV
Xerox copy kept in the Division for file. Original and duplicate copies of approved/signed policies and procedures on how to improve revenue are forwarded to Records Section, for filing and transmittal to concerned LGUs.
623
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
10. CO-Records Section records and transmits the approved/signed policies and procedures on how to improve revenue generation
Approved/signed policies and procedures on how to improve revenue generation
10 minutes Records Officer (CO
Records Section)
Date, time and details of approved/signed policies and procedures on how to improve revenue generation recorded in the logbook of Records Section
Records Section transmits approved/signed policies and procedures on how to improve revenue generation to concerned LGUs copy furnished the Regional Office. (Refer to process of transmitting outbound documents under Records Section)
11. CO-REV Division facilitate policy and procedural reforms
1 week REV Chief
12. CO-REV Division assist in implementation and issuance of policy and procedure
1 week REV Chief
End of Process
624
6.1 Periodically review LGU compliance on submission, deadlines and formats, monitor of actual collections vis a vis targets, and Prepares ranking/status report on collection efficiencies.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV Division reviews periodically LGU
compliance on submission, deadlines and
formats based on eSRE System to:
Monitor LGU checklist in the SRE system
Monitor actual collections/targets
Notify for non-submission of eSRE Report
Updated Checklist
Quarterly Collection
on RPT, BT,
Fees/Charges, Eco
Ent
Updated Checklist
20 minutes
4 hours
Half day
REV Staff –
assigned
region
REV Staff –
assigned
region
REV Staff –
assigned
region
Updated Checklist on
SRE submission
Revenue Generation
Program Report
Email for LGUs
regarding non-
submission of report
2. CO-REV consolidates and summarizes the quarterly reports
Quarterly Reports 2 hours REV Staff – assigned region
Consolidated report containing the target, actual collection and collection efficiency.
Consolidated Report used for Regional Conference Target Setting
625
3. CO-REV Division prepares ranking/status report on collection efficiencies
Consolidated report containing the target, actual collection and collection efficiency.
2 days
REV Staff – assigned region
Report on Revenue Generation Program
Copy given to PPRD Division for Performance Rating and to ADMIN Division for Performance Standards
End of Process
626
7.1 Provides active assistance to BLGF Regional Offices and LGUs on financial report generation, revenue administration, financial management, fund sourcing and credit financing
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-REV receives and records letter-request from
Regional Offices and LGUs requesting assistance
on financial report operations, revenue
administration, financial management, fund
sourcing and credit financing
Letter-request from
Regional Offices and
LGUs
10 minutes Admin Aide Date, time and details
of letter-request from
Regional Offices and
LGUs recorded in the
logbook.
Corresponding CCS
no. attached
2. CO-REV Division records and transmits the letter-
request from Regional Offices and LGUs to the
Office of the Executive Director
Letter-request from
Regional Offices and
LGUs
10 minutes Admin Aide Date, time and details
of the letter-request
from Regional Offices
and LGUs recorded in
the logbook of REV
Letter-request from
Regional Offices and
LGUs are forwarded to
the Office of the
Deputy Executive
Director (DED),
Operations for review
3. Deputy Executive Director (DED), Operations
reviews Letter-request from Regional Offices and
LGUs
Letter-request from
Regional Offices and
LGUs
1 hour DED for
Operations
Letter-request from
Regional Offices and
LGUs reviewed with
notation by the DED
for Operations
Letter-request from
Regional Offices and
LGUs are forwarded to
the Office of the
Executive Director
(OED
627
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. CO-Office of the Executive Director proofreads
Letter-request from Regional Offices and LGUs
Letter-request from
Regional Offices and
LGUs with notation
by the DED for
Operations
1 hour Executive
Assistant
Letter-request from
Regional Offices and
LGUs proofread by the
Executive Assistant
Letter-request from
Regional Offices and
LGUs are forwarded to
the Executive Director
for review
5. Executive Director reviews the letter-request
from Regional Offices and LGUs
Letter-request from
Regional Offices and
LGUs with notation
by the DED for
Operations
1 hour Executive
Director
Letter-request from
Regional Offices and
LGUs with notation
by the Executive
Director
6. CO-Office of the Executive Director records and
transmits the letter request from Regional
Offices and LGUs with notation to REV Division
Letter-request from
Regional Offices and
LGUs with notation
by the Executive
Director
10 minutes Admin Aide Date, time and details
of the letter-request
from Regional Offices
and LGUs with
notation by the
Executive Director
628
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. CO-REV receives and records Letter-request from
Regional Offices and LGUs with notation by the
Executive Director
Letter-request from
Regional Offices and
LGUs with notation
by the Executive
Director
10 minutes Admin Aide Date, time and details
of the Letter-request
from Regional Offices
and LGUs with
notation by the
Executive Director
8. CO-REV informs Internal Administration Office
(IAO) on the scheduled visit to Regional Office or
LGUs
Names of selected
personnel/Approved
Date of Schedule
1 day REV Chief List of personnel Submits lists of
personnel to Admin
Division for the
issuance of an Office
Order for the
scheduled visit to
Regional Office or LGUs
For the preparation of Office Order requesting REV Staff to a scheduled visit – See process in the preparation of Office Order under Administrative Division
9. CO-IAO records and transmits the
Approved/signed Office Order to REV Division
Approved/signed
Office Order
10 minutes Admin Aide Approved/signed
Office Order
10.
CO-REV receives and records the
Approved/signed Office Order from
Administration Division
Approved/signed
Office Order
10 minutes Admin Aide Date, time and details
of Approved/signed
Office Order recorded
in the logbook of REV
Piggy-backed activity
with the revenue audit
and assessment audit
629
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO- Team proceeds to the Office of the
Treasurer of concerned LGU informing the
purpose of the visit and furnishing him/her copy
of Approved/signed office order
Approved/signed
Office Order
Findings, comments and recommendations duly noted during the visit
1 hours
4 hours
Team
Team
Purpose of the visit
conveyed
Final Report
After informing the
Treasurer of the
purpose of visit, the
team will proceed with
the assistance.
Return to Office
12. CO-REV Division prepares and finalizes the Final
Report
Final Report 1 day Senior Local
Treasury
Examiner
Final Report
countersigned by the
Senior Local Treasury
Examiner
Final Report is
forwarded to the Chief,
Rev for
review/comment
630
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
13. CO-REV Division reviews the Final Report
Final Report
countersigned by
the Senior Local
Treasury Examiner
1 day REV Chief Final Report reviewed
and countersigned by
the REV Chief
If corrections/revisions
are made by the REV
Chief on the Final
Report, the same is
returned to the Senior
Local Treasury
Examiner for
editing/finalization,
then proceed to step 6,
otherwise the Final
Report is forwarded to
the Office of the
Deputy Executive
Director (DED),
Operation.
631
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14. CO-REV Division records and transmits the Final
Report to the Office of the Executive Director
(DED) -Operations
Final Report
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
10 minutes Admin Aide Date, time and details
of the Final Report
recorded in the
logbook of REV
The Final Report is routed to the concerned Office Directors for review and countersign and for approval of the Executive Director
15. Deputy Executive Director (DED)-Operations
reviews the Final Report
Final Report
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
1 day DED for
Operations
Final Report reviewed
and countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
Final Report, the same
is returned to REV
Division for editing/
finalization, then
proceed to step no.6,
otherwise the Final
Report is forwarded to
the Office of the
Executive Director.
632
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
16. CO-Office of the Executive Director proofreads
the Final Report
Final Report
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
2 hours Executive
Assistant
Final Report
proofread by
Executive Assistant
If corrections/revisions
are made by the
Executive Assistant on
the Final Report, the
same is returned to
Division (REV) for
editing /finalization,
then proceed to step
no.6, otherwise the
Final Report is
forwarded to the
Executive Director for
review and approval.
17. CO-Executive Director reviews and
approves/signs the Final Report
Final Report
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
3 days Executive
Director
Final Report reviewed
and approved/signed
by the Executive
Director
If corrections/revisions
are made by the
Executive Director on
the Final Report, the
same is returned to
REV Division for
editing/finalization,
then proceed to step
no. 6.
The Final Report, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to REV Division for the next steps.
633
18.
Office of the Executive Director records and
transmits approved/signed Final Report to REV
Division
Approved/signed
Final Report
10 minutes Admin Aide Date, time and details
of the
approved/signed
Final Report recorded
in the logbook of the
Office of the Executive
Director
19.
CO-REV Division receives and records the
approved/signed Final Report
Approved/signed
Final Report
10 minutes Admin Aide Date, time and details
of the
approved/signed Final
Report recorded in
the logbook of REV
Xerox copy kept in the Division for file. Original and duplicate copies of approved/signed Final Report is forwarded to Records Section, for filing and transmittal to concerned LGUs.
20. CO-Records Section records and transmits the
approved/signed Final Report
Approved/signed
Final Report
10 minutes Records
Officer of CO-
Records
Section
Date, time and details
of approved/signed
Final Report recorded
in the logbook of
Records Section
Records Section transmits approved/signed Final Report to concerned LGUs copy furnished the Regional Office. (Refer to process of
transmitting outbound
documents under
Records Section)
End of Process
634
8.1 Comply with national/international reporting and data exchange.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1.
CO-REV receives and records letter- request for
eSRE reports in compliance with
national/international reporting and data
exchange standard coming from the Department
of Finance
Letter-request for
eSRE reports
10 minutes Admin Aide Date, time and details
of request for
clearance on the
letter-request for
eSRE reports recorded
in the logbook.
Corresponding CCS
no. attached
2. CO-REV Division reviews and evaluates the eSRE
reports in compliance with
national/international reporting and data
exchange standards.
Letter-request for
eSRE reports
15 minutes Statistician Letter-request for
eSRE reports
635
3. CO-REV Division prepares and finalizes Letter-
request for eSRE reports
Letter-request for
eSRE reports
1 day Senior Local
Treasury
Examiner
Letter-request for
eSRE reports
countersigned by the
Senior Local Treasury
Examiner
Letter-request for
eSRE reports is
forwarded to the REV
Chief for
review/comment
4. CO-REV Division reviews the Letter-request for
eSRE reports
Letter-request for
eSRE reports
countersigned by
the Senior Local
Treasury Examiner
1 day REV Chief Letter-request for
eSRE reports
countersigned by the
REV Chief
If corrections/revisions
are made by the
Division Chief on the
Letter-request for eSRE
reports, the same is
returned to the Senior
Local Treasury
Examiner for
editing/finalization,
then proceed to step 3,
otherwise the second
notification is
forwarded to the DED
for Operations .
636
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO-REV Division records and transmits the
Letter-request for eSRE reports to the Office of
the Deputy Executive Director (DED)-Operations
Letter-request for
eSRE reports
countersigned by
the Senior Local
Treasury Examiner
and REV Chief
10 minutes Admin Aide
Date, time and details
of the Letter-request
for eSRE reports
recorded in the
logbook of REV
The Letter-request for eSRE reports is routed to the concerned Office Directors for review and countersign
6.
CO-Deputy Executive Director (DED)-Operations
reviews the Letter-request for eSRE reports
Letter-request for
eSRE reports
countersigned by
the Senior Local
Treasury Examiner,
REV Chief and DED
for Operations
1 day DED for
Operations
Letter-request for
eSRE reports
countersigned by
DED- Operations
If corrections/revisions
are made by the DED
for Operations on the
Letter-request for
eSRE reports, the same
is returned to
concerned Division
(REV) for correction/
finalization, proceed to
step no.3, otherwise
the second notification
is forwarded to the
Executive Director for
approval.
637
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. CO-Office of the Executive Director proofreads the Letter-request for eSRE reports
Letter-request for eSRE reports countersigned by the Senior Local Treasury Examiner, REV-Division Chief, and DED- Operations
2 hours Executive Assistant
Letter-request for eSRE reports proofread by Executive Assistant
If corrections/revisions are made by the Executive Assistant of the Executive Director on the Letter-request for eSRE reports, the same is returned to concerned Division (REV) for correction/finalization, then proceed to step no.3, otherwise the Letter-request for eSRE reports is forwarded to the Executive Director for review and approval.
8. CO-Executive Director reviews and evaluates the Letter-request for eSRE reports
Letter-request for eSRE reports countersigned by the Senior Local Treasury Examiner, REV Chief and DED for Operations
3 days Executive Director
Approved/signed Letter-request for eSRE report
If corrections/revisions are made by the Executive Secretary on the Letter-request for eSRE reports, the same is returned to concerned Division (REV) for correction/finalization, then proceed to step no. 3
The Letter-request for eSRE reports, after having been reviewed and countersigned by the concerned Office Directors and approved/signed by the Executive Director, shall be transmitted back to the concerned division (REV) for the next steps.
638
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9.
Office of the Executive Director records and
transmits approved/signed Letter-request for
eSRE reports to concerned Division (REV)
Approved/signed
Letter-request for
eSRE reports
10 minutes Admin Aide Date, time and details
of the
approved/signed
Letter-request for
eSRE reports
recorded in the
logbook of the Office
of the Executive
Director
10.
CO-REV Division receives and records the
approved/signed second notification
Approved/signed
second notification
10 minutes Admin Aide
Date, time and details
of the
approved/signed
second notification
recorded in the
logbook of REV
Xerox copy kept in the Division for file. Original and duplicate copies of approved/signed second notification is forwarded to Records Section, for filing and transmittal to concerned LGUs.
639
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO-Records Section records and transmits the
approved/signed Letter-request for eSRE reports
Approved/signed
Letter-request for
eSRE reports
2 months Admin Aide
Date, time and details
of approved/signed
Letter-request for
eSRE reports
recorded in the
logbook of Records
Section
Records Section transmits approved/signed Letter-request for eSRE reports to the Department of Finance in preparting the Consolidated Public Sector Financial Report. (Refer to process of
transmitting outbound
documents under
Records Section)
End of Process
640
Operating Procedures for Bureau Operations Special Project Management Service
Plans and Programs Development Division
641
SERVICE : Special Project and Management Service DIVISION : Plans And Programs Development Division (PLANS)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : LGUs (Municipal, Province, Cities), Domestic and International Financial Institution, BLGF
Central & Regional Office, Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
16. (Assist LGUs in the) identification of LGU priority needs and potential investment areas.
16.1 Conduct studies relative to resource mobilization of LGUs.
16.2 Provide technical assistance/advice on available investment opportunities (Provide information on Best Practices, linkages with Foreign Donors, GFIs, and etc., (Linkages of LGUs to foreign donors).
17. Undertake studies on surveys or surveys of available financing from foreign lending institutions.
17.1 Establish linkages/networks with donor agencies (BLGF to Donor Agencies).
17.2 Collate feedbacks. 17.3 Monitor donor agency regional (Asia pacific,
Middle East, Africa, etc.) support thrust. 17.4 Establish confidence and achieve support from
donor agencies on LGU priority needs.
3. (Assist LGUs in the) conduct of feasibility studies to determine socio-economic impact and financial viability
3.1 Prepare feasibility studies based from potential investment areas, and priority needs for donor agency
642
of proposed projects. proposal.
4. Project packaging. Project promotions/marketing. 4.1 Develop approaches and implementation guidelines to include, among others, pre-requisites and conditions for project approval, unit costing, financing arrangements, and measurement tools or yardsticks for evaluation of project outputs and results.
5. Perform as CPMO (admin/finance/capacity building).(Members may come from SPMS Staff).
5.1 Preparation/planning of cost schedules and financial arrangements.
5.2 Fund release processing (Duties of the liaison Officer assigned to FMD).
5.3 Administrative processing (Liaison Officer assigned to ADMIN).
5.4 Training administration (PLANS & EXEC to develop training design, schedules and funding, BLGF-ADMIN to implement).
Preparation of cost schedules and financial arrangements (BLGF Component only). Fund release processing (BLGF Component only). Provide administrative service for MDFO (for MDFO funded project). Preparation of terminal reports for Capacity building training programs.
6. Develop pro-forma project/loan agreements and management /service contracts with standard terms of reference for contractors or consultants.
MDFO for MDFO led projects. BLGF for BLGF led projects.
7. Issuance of certificate of debt service and borrowing capacity of LGUs.
Validate if the function is applicable with the division. LOANS also carries this function
643
SPECIFIC PROCEDURES 1.1 Conduct studies relative to resource mobilization of LGUs.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS Division assists LGUs establish priority needs on local resource mobilization
Survey of LGU
needs
6 months PLANS Staff
in
coordination
w/ EXEC
Division
Priority Needs of
LGUs
2. CO-PLANS Division prepares and finalizes
Concept Paper/Project Proposal on project
addressing the priority needs of the LGUs
Priority Needs of
LGUs
2 months Planning
Officer
Concept
Paper/Project
Proposal on
project addressing
the priority needs
of the LGUs
countersigned by
Planning Officer
The Concept
Paper/Project
Proposal on project
addressing the priority
needs of the LGUs are
forwarded to Division
Chief
644
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3. CO-PLANS reviews Concept Paper/Project
Proposal on project addressing the priority
needs of the LGUs
Concept
Paper/Project
Proposal on
project addressing
the priority needs
of the LGUs
countersigned by
Planning Officer
2 weeks Division Chief Concept
Paper/Project
Proposal on
project addressing
the priority needs
of the LGUs
reviewed and
countersigned by
Division Chief
If corrections/
revisions are made by
the Division Chief on
the Concept
Paper/Project
Proposal on project
addressing the priority
needs of the LGUs, the
same are returned to
Planning Officer for
editing/finalization,
otherwise the Concept
Paper/Project
Proposal on project
addressing the priority
needs of the LGUs are
forwarded to the
Office of the Director
of Project
Management Service
(SPMS).
CO-PLANS Division looks for a donor agency relative to resource mobilization if GRANT and coordinates with them thru series of meetings/conferences. If LOANS, prepares Concept Paper for presentation to Department of Finance (DOF)-International Finance Group (IFG) of the Office of the Secretary of
Finance
The Concept Paper/Project Proposal on project addressing the priority needs of the LGUs is routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director.
645
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. Director, Project Management Service
(SPMS) reviews Concept Paper/Project
Proposal on project addressing the priority
needs of the LGUs
Concept
Paper/Project
Proposal on
project addressing
the priority needs
of the LGUs
countersigned by
Planning Officer
and Division Chief
1 week SPMS
Director
Concept
Paper/Project
Proposal on
project addressing
the priority needs
of the LGUs
reviewed and
countersigned by
SPMS Director.
If corrections/
revisions are made by
the SPMS Director on
the Concept
Paper/Project
Proposal on project
addressing the priority
needs of the LGUs, the
same are returned to
PLANS Division for
editing/finalization
otherwise the Concept
Paper/Project
Proposal on project
addressing the priority
needs of the LGUs are
forwarded to the
Office of the Deputy
Executive Director
(DED), Operations.
5. Deputy Executive Director (DED), Operations reviews Concept Paper/Project Proposal on project addressing the priority needs of the LGUs
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs countersigned by
3 days DED for Operations
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs reviewed and
If corrections/ revisions are made by the DED for Operations on the Concept Paper/Project Proposal on project addressing the priority
646
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Planning Officer, Division Chief and SPMS Director
countersigned by DED for Operations
needs of the LGUs, the same are returned to PLANS Division for editing/finalization, otherwise the Concept Paper/Project Proposal on project addressing the priority needs of the LGUs are forwarded to the Office of the Executive Director.
6. Office of the Executive Director proofreads Concept Paper/Project Proposal on project addressing the priority needs of the LGUs
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs countersigned by Planning Officer, Division Chief, SPMS Director and DED for Operations
1 hour Executive Assistant
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs proofread by the Executive Assistant
If corrections/ revisions are made by the DED for Operations on the Concept Paper/Project Proposal on project addressing the priority needs of the LGUs, the same are returned to PLANS Division for editing/finalization otherwise the Concept Paper/Project Proposal on project addressing the priority needs of the LGUs are forwarded to the Office of the Executive Director.
647
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. Executive Director reviews and approves/signs Concept Paper/Project Proposal on project addressing the priority needs of the LGUs
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs countersigned by Planning Officer, Division Chief, SPMS Director and DED for Operations
1 day Executive Director
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs reviewed and approved/signed by the Executive Director
If corrections/ revisions are made by the Executive Director on the Concept Paper/Project Proposal on project addressing the priority needs of the LGUs, the same are returned to PLANS Division for editing/finalization
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs, after having been reviewed and countersigned by the concerned
Office Director and approved/signed of the Executive Director, shall be transmitted back to PLANS Division for the next steps.
8. Office of the Executive Director(OED) records and transmits Approved/signed Concept Paper/Project on project addressing the priority needs of the LGUs to PLANS Division
Concept Paper/Project Proposal on project addressing the priority needs of the LGUs reviewed and approved/signed by the Executive Director
1 day Admin Aide Date, time and details of Approved/signed Concept Paper/Project Proposal on project addressing the priority needs of the LGUs recorded in the logbook of OED
648
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9. CO-PLANS receives and records Approved/signed Concept Paper/Project on project addressing the priority needs of the LGUs
Approved./signed Concept Paper/Project Proposal on project addressing the priority needs of the LGUs
1 day CO-Records Officer of Records Section
Date, time and details of Approved/signed Concept Paper/Project Proposal on project addressing the priority needs of the LGUs recorded in the logbook of PLANS Division
Xerox copy is kept in the file for Division. Original and duplicate copies approved/signed Concept Paper/Project Proposal on project addressing the priority needs of the LGUs are forwarded to Records Section for filing and transmittal to concerned offices/person. (Refer to Outbound Documents of Records Section)
10. DOF Secretary reviews/approves the Concept Paper/Project Proposal presented
Concept Paper/Project Proposal reviewed and approved by the Executive Director
Secretary of Finance
Concept Paper/Project Proposal approved by the Secretary of Finance
Concept Paper/Project Proposal approved by the Secretary of Finance forwarded to NEDA-ICC for approval. If approved by NEDA, project appraisal/packaging commences
End of Process
649
1.2 Provide technical assistance/advice on available investment opportunities (Provide information on Best Practices,
linkages with Foreign Donors, GFIs, and etc) (Linkages of LGUs to foreign donors).
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS receives and records Letter-request of LGUs for technical assistance
Letter-request of LGUs
1 hour Admin Aide Date, time and details of Letter request of LGUs recorded in the logbook of PLANS Division
2. CO-PLANS Division prepares and finalizes letter-reply to LGUs
Letter-request of LGUs
1 day Planning Officer
Letter-reply to LGUs countersigned by the PO
Letter-reply to LGUs
forwarded to Division
Chief to review.
3. CO-PLANS Division reviews Letter -reply to LGUs
Letter-reply to
LGUs
countersigned by
PO
1 hour Division Chief Letter-reply to LGUs reviewed and countersigned by Division Chief
If corrections/
revisions are made by
Division Chief on the
Letter-reply to LGUs,
the same are returned
to Planning Officer
(PO) for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to LGUs
are forwarded to the
Office of the Director
of Special Project and
Management Service
650
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
(SPMS).
4. CO-PLANS records and transmits Letter-reply to LGUs
Letter-reply to
LGUs
countersigned by
PO and Division
Chief
1hour Admin Aide Date, time and details of Letter-reply to LGUs recorded in the logbook of PLANS
The Letter-reply to LGUs is routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director
5. Director, Special Project and Management Service (SPMS) reviews Letter-reply to LGUs
Letter-reply to LGUs countersigned by PO and Division Chief
1 day SPMS Director
Letter-reply to LGUs reviewed and countersigned by SPMS Director
If corrections/
revisions are made by
the SPMS Director on
the Letter-reply to
LGUs, the same are
returned to PLANS
Division for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to LGUs is
forwarded to the
Office of the Deputy
Executive Director
(DED), Operations
6. Deputy Executive Director (DED), Operations reviews Letter-reply to LGUs
Letter-reply to LGUs countersigned by
1 day DED for Operations
Letter-reply to LGUs reviewed and countersigned
If corrections/
revisions are made by
the DED for
651
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
PO, Division Chief and SPMS Director
by DED for Operations
Operations on the
Letter-reply to LGUs,
the same are returned
to PLANS Division for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to LGUs is
forwarded to the
Office of the Executive
Director (OED)
7. Office of the Executive Director(OED) proofreads Letter-reply to LGUs
Letter-reply to LGUs countersigned by PO, Division Chief, SPMS Director and DED for Operations
1 day Executive Assistant
Letter-reply to LGUs proofread by the Executive Assistant
If corrections/
revisions are made by
the Executive Assistant
on the Letter-reply to
LGUs, the same are
returned to PLANS
Division for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to LGUs is
forwarded to
Executive Director
8. DED for Operations reviews the letters to LGUs
Letter reviewed and countersigned
1 day DED for Operations
Letter to LGUs reviewed and
652
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
by SPMS Director countersigned by DED for Operations
9. Executive Director reviews and approves/signs Letter to LGUs
Letter to LGUs countersigned by Planning Officer, Division Chief,
1 day Executive Director
Letter to LGUs reviewed and approved/signed by the Executive Director
If corrections/
revisions are made by
the Executive Director
on the Letter-reply to
LGUs, the same are
returned to PLANS
Division for
editing/finalization
then proceed to step
2,
10. Office of the Executive Director(OED) records and transmits Approved/Signed Letter to LGUs
Letter to LGUs reviewed and approved/signed by the Executive Director
1 day
Admin Aide Date, time and details of Letter-reply to LGUs recorded in the logbook of OED
11. CO-PLANS receives and records Approved/signed Letter to LGUs
Approved/signed Letter to LGUs
1 day CO-Records Officer of Records Section
Xerox copy is kept in the file for Division. Original and duplicate copies of the approved/signed letter to LGUs are forwarded to Records Section
653
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
for filing and transmittal to concerned offices/person (Refer to Outbound Documents from Records Section)
End Of Process
654
2.1 Establish linkages/networks with donor agencies (BLGF to Donor Agencies).
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS receives and records Letter-request to lending institutions/GFI
Letter-request to lending institutions/GFIs
1 hour Admin Aide Date, time and details of Letter-request to lending institutions/GFIs recorded in the logbook of PLANS Division
2. CO-PLANS Division prepares and finalizes letter-reply to lending institutions/GFIs
Letter-request to lending institutions/GFIs
1 day Planning Officer (PO)
Letter-reply to lending institutions/GFIs countersigned by the PO
Letter-reply to lending
institutions/GFIs is
forwarded to Division
Chief to review.
3. CO-PLANS Division reviews Letter-reply to lending institutions/GFIs
Letter-reply to
lending
institutions/GFIs
countersigned by
PO
1 day Division Chief Letter-reply to lending institutions/GFIs reviewed and countersigned by Division Chief
If corrections/
revisions are made by
Division Chief on the
Letter-reply to lending
institutions/GFIs, the
same are returned to
Planning Officer (PO)
for editing/finalization
then proceed to step
2, otherwise the
Letter-reply to lending
institutions/GFIs are
forwarded to the
Office of the Director
655
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
of Special Project and
Management Service
(SPMS).
4. CO-PLANS records and transmits Letter-reply to lending institutions/GFIs
Letter-reply to
lending
institutions/GFIs
countersigned by
PO and Division
Chief
1 hour Admin Aide Date, time and details of Letter-reply to lending institutions/GFIs recorded in the logbook of PLANS
The Letter-reply to lending institutions/GFIs is routed to the concerned Office Directors for review and countersignature and for approval of the Executive Director
5. Director, Special Project and Management Service (SPMS) reviews Letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO and Division Chief
1 day SPMS Director
Letter-reply to lending institutions/GFIs reviewed and countersigned by SPMS Director
If corrections/
revisions are made by
the SPMS Director on
the Letter-reply to
lending
institutions/GFIs, the
same are returned to
PLANS Division for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to lending
institutions/GFIs is
forwarded to the
Office of the Deputy
656
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Executive Director
(DED), Operations
6. Deputy Executive Director (DED), Operations reviews Letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO, Division Chief and SPMS Director
1 day DED for Operations
Letter-reply to lending institutions/GFIs reviewed and countersigned by DED for Operations
If corrections/
revisions are made by
the DED for
Operations on the
Letter-reply to lending
institutions/GFIs, the
same are returned to
PLANS Division for
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to lending
institutions/GFIs is
forwarded to the
Office of the Executive
Director (OED)
7. Office of the Executive Director (OED) proofreads Letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO, Division Chief, SPMS Director and DED for Operations
1 day Executive Assistant
Letter-reply to lending institutions/GFIs proofread by the Executive Assistant
If corrections/
revisions are made by
the Executive Assistant
on the Letter-reply to
lending
institutions/GFIs, the
same are returned to
PLANS Division for
657
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/finalization
then proceed to step
2, otherwise the
Letter-reply to lending
institutions/GFIs is
forwarded to
Executive Director
9. Executive Director reviews and approves/signs Letter to lending institutions/GFIs
Letter to lending institutions/GFIs reviewed and countersigned by DED for Operations
1 day Executive Director
Letter to lending institutions/GFIs reviewed and approved/signed by the Executive Director
If corrections/
revisions are made by
the Executive Director
on the Letter-reply to
lending
institutions/GFIs, the
same are returned to
PLANS Division for
editing/finalization
then proceed to step
2,
10. CO-PLANS receives and records Approved/signed Letter to lending institutions/GFIs
Approved/signed Letter to lending institutions/GFIs
1 day CO-Records Officer of Records Section
Xerox copy is kept in the file for Division. Original and duplicate copies of the approved/signed letter to lending
658
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
institutions/GFIs are forwarded to Records Section for filing and transmittal to concerned offices/person (Refer to Outbound Documents f Records Section)
End Of Process
659
2.2 Collection of feedbacks
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS Division receives feedbacks/responses of lending institutions/GFIs
Responses of
lending
institutions/GFIs
1 hour Admin Aide Date, time, and
details of letter to
lending
institutions/GFIs
recorded in the log
book of PLANS
Division
2. CO-PLANS Division collates feedbacks or responses of lending institutions/GFIs
Responses of lending institutions/GFIs
1 week
PO Positive response from lending institutions
3. CO-PLANS Division prepares listing of lending institutions/GFIs with responses
Positive response from lending institutions
1 day PO A matrix of lending institutions
Basis for selection
4. CO-PLANS Division submit matrix to Division Chief for review and selection of lending institution
Matrix 1 day Division Chief Choice of lending institution
Supervisors give go-signal for further action
5. CO-PLANS Division prepares communication with the selected lending
Choice of lending institution
1 day Division Chief Letter sent to selected lending institution
6. CO-PLANS records and transmits Letter reply to lending institutions/GFIs
Letter reply to lending
1 hour Admin Aide Date, time and details of Letter-
660
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
institutions/GFIs countersigned by PO and Division Chief
reply to lending institutions/GFIs recorded in the logbook of PLANS
The Letter-reply to lending institutions/GFIs is routed to the concerned Office Directors for review and countersignature and approval of the Executive
Director
7. Director, Special Project and Management Services (SPMS) reviews Letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO and Division Chief
1 day SPMS Director
Letter-reply to lending institutions/GFIs reviewed and countersigned by SPMS Director
If corrections/ revisions are made by the SPMS Director on the Letter-reply to lending institutions/GFIs, the same are returned to PLANS Division for editing/finalization then proceed to Step 5, otherwise the Letter-reply to lending institutions/GFIs is forwarded to the Office of the Deputy Executive Director (DED), Operations
8. Deputy Executive Director (DED), Operations reviews letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO, Division Chief and SPMS Director
1 day DED for Operations
Letter-reply to lending institutions/GFIs reviewed and countersigned by DED for Operations
If corrections/ revisions are made by the DED for Operations on the Letter-reply to lending institutions/GFIs, the same are returned to
661
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
PLANS Division for editing/finalization then proceed to Step 5, otherwise the Letter-reply to lending institutions/GFIs is forwarded to the Office of the Executive Director (OED)
9. Office of the Executive Director(OED) proofreads Letter-reply to lending institutions/GFIs
Letter-reply to lending institutions/GFIs countersigned by PO, Division Chief and SPMS Director and DED for Operations
1 day Executive Assistant
Letter reply to lending institutions/GFIs proofread by the Executive Assistant
If corrections/ revisions are made by the Executive Assistant on the Letter-reply to lending institutions/GFIs, the same are returned to PLANS Division for editing/finalization then proceed to Step 5, otherwise the Letter-reply to lending institutions/GFIs is forwarded to Executive Director
10. Executive Director reviews and approves/signs Letter to lending institutions/GFIs
Letter to lending institutions/GFIs reviewed and countersigned by DED for Operations
1 day Executive Director
Letter to lending institutions/GFIs reviewed and approved/signed by the Executive Director
11. CO-PLANS receives and records Approved/signed 1 day CO-Records Xerox copy is kept
662
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Approved/signed Letter to lending institutions/GFIs
Letter to lending institutions/GFIs
Officer of Records Section
in the file for Division. Original and duplicate copies of the approved/signed letter to lending institutions/GFIs are forwarded to Records Section for filing and transmittal to concerned offices/person (Refer to Outbound Documents f Records Section)
END OF PROCESS
663
3.1 Prepare feasibility studies based from potential investment areas, and priority needs for donor agency proposal
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS Division assists LGUs in the
preparation of feasibility studies to
determine the socio-economic impact and
financial viability of proposed project
1 month Planning
Officer
2. CO-PLANS Division reviews the Draft
Feasibility Study of LGU
Draft feasibility
study of LGU
2 weeks Planning
Officer
Impact and
viability of the
project
The Draft Feasibility
Study of the Proposed
project addressing
the socio-economic
impact and viability of
the project of the LGU
is forwarded to
Division Chief
3. CO-PLANS reviews the Feasibility Study of
the LGU
Impact and
viability of the
project
1 week Division Chief Final Feasibility
Study reviewed
and Division Chief
If corrections/
revisions are made by
the Division Chief on
the Feasibility Study,
the same are returned
to Planning Officer for
editing
4. CO-PLANS prepares transmittal letter with
the reviewed feasibility study of LGU
Edited Feasibility
Study
1 day Planning
Officer
Letter of
Transmittal
The transmittal letter
was countersigned by
the Division Chief
664
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5.
Director, Project Management Service
(SPMS) reviews transmittal letter together
with the feasibility of the LGU
Letter of
Transmittal
1 day SPMS
Director
Transmittal letter
reviewed and
signed by SPMS
Director.
If corrections/
revisions are made by
the SPMS Director on
the transmittal letter,
the same are returned
to PLANS Division for
editing.
6.
CO-PLANS records and transmits Letter of transmittal to Records
Transmittal letter
reviewed and
signed by SPMS
Director.
1 hour Admin Aide Date, time and details of Letter of transmittal recorded in the logbook of PLANS
7. CO-RECORDS OFFICE receives and records signed Transmittal Letter to LGU
Signed Transmittal Letter
1 day CO-Records Officer of Records Section
Xerox copy is kept in the file for Division. Original and duplicate copies of the signed letter are forwarded to Records Section for filing and transmittal to concerned LGU (Refer to Outbound Documents of Records Section)
END OF PROCESS
665
4.1 Develop approaches and implementation guidelines to include, among others, pre-requisites and conditions for
project approval, unit costing, financing arrangements, and measurement tools or yardsticks for evaluation of project
outputs and results.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS Division prepares Project Package to Lending Institution/GFIs
List of LGUs; Financing Arrangement; Timeframe; Budgetary Requirement; Project Management;
6 months Project Development
Officer, Planning
Officer, Loan Examiner
Project Package
2. CO-PLANS Division reviews the Project Package for submission to Division Chief
Project Package 1 month Project Development
Officer
Reviewed Project Package
3. CO-PLANS Division reviews Project Package for submission to SPMS Director
Reviewed Project Package
1 week Division Chief
Reviewed Project Package
4.
CO-PLANS Division reviews and approves
Project Package
Reviewed Project Package
1 week SPMS
Director
Approved
Project
Package
5. CO-PLANS Division prepares transmittal
letter
Approved Project Package
1 day Project
Development
Officer
Prepared Transmittal letter by PDO III
6. SPMS Director reviews transmittal letter Prepared Transmittal letter by PDO III
1 day SPMS
Director
Transmittal letter
reviewed and
countersigned by
If corrections/
revisions are made by
the SPMS Director on
666
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
SPMS Director the transmittal letter,
the same is returned
to PLANS Division for
editing otherwise the
letter is forwarded to
the Office of the DED
for Operations
7. DED for Operations reviews transmittal
letter
Transmittal letter reviewed and countersigned by SPMS Director
1 day DED for
Operations
Transmittal letter
reviewed and
countersigned by
SPMS Director
and DED for
Operations
If corrections/
revisions are made by
the DED for
Operations on the
transmittal letter, the
same is returned to
PLANS Division for
editing otherwise the
letter is forwarded to
the Office of the
Executive Director
8. Office of the Executive Director(OED)
proofreads transmittal letter
Transmittal letter reviewed and countersigned by SPMS Director and DED for Operations
1 day Executive
Assistant
Transmittal letter
proofread by the
Executive
Assistant
If corrections/
revisions are made by
the Executive
Assistant on the
transmittal letter, the
same is returned to
PLANS Division for
editing otherwise the
667
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
letter is forwarded to
the Office of the
Executive Director for
approval.
9. Executive Director signs/approves the
transmittal letter
Transmittal letter proofread by the Executive Assistant
1 day Executive
Director
Signed/approved
transmittal letter
by the Executive
Director
END OF PROCESS
668
5.2 Fund release processing
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO PLANS Division computes funds to be downloaded based on approved project centers, work and financial plan and other criteria.
Work and Financial Plan, Data on Numbers of project center per Region
1 day
Project Manager/Financial Staff
Schedule of Expenditures (Amount to be released per region monthly/ quarterly).
2. CO PLANS Division prepares and finalizes letter of advice to the bank
Schedule of Expenditures
1 day
Project. Bookkeeper
Letters of advice to the bank countersigned by Project Bookkeeper
3. CO PLANS Division reviews letters of advice to the bank
Letters of advice countersigned by Project Bookkeeper
15 minutes
Division Chief Letters of advice to the bank countersigned by Division Chief
If corrections/revision are made by Division Chief on the letters of advice to the bank, the same are returned to the Project Bookkeeper for editing/finalization, then proceed to step 2, otherwise the letters of advice to the bank is forwarded to the Office of the Director of Special Project and Management Service (SPMS).
669
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4. CO PLANS Division records and transmits letters of advice to the bank to the Office of the Director of Special Project and Management Service (SPMS)
Letters of advice to the bank countersigned by Project Bookkeeper and Division Chief
15 minutes
Loan Examiner
Date, time and details of letters of advice to the bank recorded in the logbook of PLANS Division.
The Letter of advice to the bank is routed to the concerned Office Director for review and countersigned and for approval of the Executive Director.
5. Director, Special Project and Management Service (SPMS) reviews Letter of advice to the bank
Letters of advice to the bank countersigned by Project Bookkeeper and Division Chief
1 hour SPMS Director
Letter of advice to the bank reviewed and countersigned by SPMS Director
If corrections/ revision are made by SPMS Director on the Letters of advice to the bank, the same is returned to the PLANS Division for editing/finalization, then proceed to step 2, otherwise the Letters of advice to the bank is forwarded to the Office of the Deputy Executive Director (DED), Operations
6. Deputy Executive Director (DED) for Operations reviews Letters of advice to the bank
Letters of advice to the bank countersigned by Project Bookkeeper, Division Chief and SPMS Director
1 hour
DED for Operations
Letters of advice to the bank reviewed and countersigned by DED for Operations
If corrections/ revision are made by SPMS Director on the Letters of advice to the bank, the same is returned to the PLANS Division for
670
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/finalization, then proceed to step 2, otherwise the Letters of advice to the bank is forwarded to the Office of the Executive Director (OED)
7. Office of the Executive Director proofreads Letters of advice to the bank
Letters of advice to the bank countersigned by Project Bookkeeper, Division Chief, SPMS Director and DED for Operations
1 hour Executive Assistant
Letter of advice to the bank proofread by Executive Assistant
If corrections/ revision are made by Executive Assistant on the Letters of advice to the bank, the same is returned to the PLANS Division for editing/finalization, then proceed to step 2, otherwise the Letters of advice to the bank is forwarded to the Executive Director for review
7. Executive Director reviews and approves/signs letters of advice to the bank
Letters of advice to the bank countersigned by Project Bookkeeper, Division Chief, SPMS Director and DED for Operations
1 hour Executive Director
Letters of advice to the bank reviewed and approved/signed by Executive Director
If corrections/revision are made by Executive Director on the Letters of advice to the bank, the same is returned to the PLANS Division for editing/finalization, then proceed to step
671
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
2, Letters of advice to the bank, after having been reviewed and countersigned by the concerned Office Directors and for approval of the Executive
Director
8. Office of the Executive Director(OED) records and transmits approved/signed letters of advice to the bank
Approved/signed Letters of Advice to the bank
10 minutes Admin Aide Date, time and details of Approved/signed Letters of advice to the bank recorded in the logbook of OED
9. CO PLANS Division receives and records approved/signed letters of advice to the bank
Approved/signed Letters of Advice to the bank
10 minutes Loan Examiner
Date, time and details of Approved/signed Letters of advice to the bank recorded in the logbook of PLANS Division
10. CO PLANS Division returns the letter of advice to Receiving/releasing staff.
Letters of advice with countersign of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier.
5 minutes Project Cashier
Letters of advice with countersign of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier.
672
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO PLANS Division releases the signed letters of advice to the bank and have them received.
Letters of advice with countersign of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier.
30 minutes Loan Examiner
Letters of advice with countersign of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier. Received officially by the bank.
12. CO PLANS Division releases to the Record Division copies of the letters for mailing to the Regional Offices
Letters of advice with countersign of Division Chief, Service Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier. Received officially by the bank.
5 minutes Loan Examiner
Letters of advice with countersign of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier. Received officially by the bank. Mailed to Regional Offices.
13. CO PLANS Division releases the letters of advice to the designated bookkeeper for
Letters of advice with countersign
15 minutes Project Bookkeeper
Duly signed letters of advice filed at
673
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recording and filing. of Division Chief, SPMS Director and Deputy Executive Director for Operations with signature of Executive Director and the designated Project Cashier. Received officially by the bank. Mailed to Regional Offices.
PLANS Division
END OF PROCESS
674
6. Develop pro-forma project/loan agreements and management /service contracts with standard terms of reference
for contractors or consultants.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS Division develops pro-forma Project Loan Agreement (PLA)
Pro-format of Sub-project Loan Agreement (SPLA)
1 day Division Chief Pro-format SPLA in final form
2. CO-PLANS Division accomplishes Project Loan Agreement
Pro-format SPLA in final form
1 hour
Division Chief SPLA to be forwarded to participating LGUs
For conformance/ signature of the Local Chief Executive (LCE)
3. CO-PLANS Division receives the conformed SPLA for approval of the Approving Officer
SPLA conformed by the LCE
5 minutes Records Officer (Loan
Examiner )
Approved SPLA
4. CO-PLANS Division does the notarization and filing of PLA
Approved SPLA 10 minutes Records Officer (Loan
Examiner )
LGU Loan becomes effective
Ready for request of loan proceeds
END OF PROCESS
675
7 Issuance of certificate of debt service and borrowing capacity of LGUs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-PLANS receives and records Application Letter together with documentary requirements CO-PLANS Division records applications/received documents from LGUs requesting for the Certification of Debt Service Ceiling (DSC) and Borrowing Capacity (BC)
Application Letter together with documentary requirements
1 hour Records Officer
(Planning Officer)
Date, time and details of Application Letter together with the documentary requirements recorded in the logbook of PLANS Division.
2. CO-PLANS Division receives and evaluates Application Letter together with the papers/documents as to the completeness of requirements
Checklist of required documents (Annex “A”)
1 hour
Loan Examiner
Completed documents ready for evaluation
If there’s lacking documents, prepare letter/telegram to the Local Chief Executive (LCE) copy furnished the Regional Office for the submission of the lacking documents.
3. CO-PLANS Division analyzes financial reports submitted and compute for the DSC in accordance with Sec 324 (b) of the Local Government Code (LGC) and BC.
Completed documents which includes Financial Reports such as Statement of Income and Expenses for the last 3 years shown and to plot on the Working Table ( Annex “B”)
1 hour Loan Examiner
Ready for Certification of DSC and BC based on the computed DSC and BC as shown on Annex “C” as attachment
676
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Table on DSC (Annex “C”)
4. CO-PLANS Division prepares the certification of DSC and BC with transmittal letter addressed to the LCE of requesting LGUs
Ready for Certification of DSC and BC based on the computed DSC and BC as shown on Annex “C” as attachment
1 hour Loan Examiner
Certification of DSC and BC with transmittal letter and attachment
5. CO-PLANS Division releases certification of DSC and BC with transmittal letter and Annex “C” to the Chief, PLANS for review/countersign/signature
Certification of DSC and BC with transmittal letter and attachment
1 hour Records Officer (Loan
Examiner)
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by Division Chief
6. CO-PLANS Division releases Certification of DSC and BC with transmittal letter and attachment for review/countersign of the SPMS Director
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by Division Chief
1 hour Records Officer (Loan
Examiner)
Date, time and details of transmittal letter, certification and attachment recorded in the logbook of PLANS Division.
7. SPMS Director reviews/countersigns and signs Certification of DSC and BC with transmittal letter and attachment
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by Division Chief
1 hour SPMS Director
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by SPMS Director
677
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8. CO PLANS Division releases Certification of DSC and BC with attachment to DED for Operations for review/countersign/signature
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by SPMS Director
1 hour DED for Operations
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by DED for Operations
9. Office of the Executive Director receives Certification of DSC and BC with transmittal letter and attachment for signature of the Executive Director
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by DED for Operations
1 hour Admin Aide Date, time and details of transmittal letter, certification and attachment recorded in the logbook of Executive Director.
10. Executive Director signs Certification of DSC and BC and transmittal letter with attachment
Certification of DSC and BC with transmittal letter and attachments reviewed/countersigned/signed by DED for Operations
1 hour Executive Director
Certification of DSC and BC with transmittal letter and attachments signed by the Executive Director
11. CO PLANS Division release signed Certification to the Central Records thru the division’s records officer
Certification of DSC and BC with transmittal letter and attachments signed by the Executive Director
1 hour
Records Officer (Loan Examiner)
Central Records sends Certification thru registered mail
Central Records also send copy to the Regional Office
678
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
END OF PROCESS
679
Operating Procedures for Bureau Operations Special Project Management Service
Project Execution and Management Division
680
SERVICE : Special Project and Management Service DIVISION : Project Execution and Management Division (Exec)
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : LGUs (Municipal, Province, Cities), Domestic and International Financial Institution, BLGF
Central & Regional Office, Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
18. Review and evaluation of technical / financial proposals and bids for management and service contracts relative to foreign assisted projects.
18.1 Preparation of procurement plan (PMS) 18.2 Preparation of TOR 18.3 Supervision of the procurement process 18.4 Provide/create TWG to support procurement process 18.5 Preparation of Contract and assist in the Service
Agreement Management
CPMO (Central Project Mgmt Office) should be handling this function; EXEC Is not doing this directly. Assist in Project Promotions.
19. Prepare for approval of proper authority the (draft) project implementation plans and supporting activity schedules, project budgets, manpower complement, equipment and commodity listings, etc.
2.1 Preparation of Project Implementation Plans and facilitate the approval thereof;
2.2 Preparation of MOA between BLGF and LGU (TOR, payment schedule, conditions, etc.)
2.3 Fund releases management (recommendation, endorsement, facilitation etc.)
Actual fund releases will be done by concerned Office. Facilitate fund release based on M&E recommendations.
20. (Assist in) Supervision, and render technical assistance in, project implementation at the local levels.
3.1 Provide technical advise in project management. 3.2 Collation of progress report. 3.3 Assessment of progress/development of project. 3.4 Field inspections. 3.5 Implement revisions based from the M&E
recommendation.
May be transferred to M&E.
681
21. Enforce policy guidelines on disbursements and operating procedures.
4.1 Establish policy guidelines (donor agency and BLGF). 4.2 Monitor compliance. 4.3 Periodic review of policy guidelines.
Periodic review as necessary.
22. (Assist in) Conduct of training components of foreign-assisted projects.
5.1 Preparation of training design (modules, approaches. Etc.) 5.2 Conduct the training base on the design
Monitoring of progress should be done M&E. Training includes sustainability plans and sub-project completion report (SPCR).
682
SPECIFIC PROCEDURES 1.1 Preparation of procurement plan (PMS)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division conducts inventory of existing and required equipment
1 day Admin Aide Inventory of existing and required equipment
2. CO EXEC Division identifies /prepares list of equipment to be purchase for the Sub-Project Management Office (SPMO)
Inventory of existing and required equipment
1 day Admin Aide List of identified equipment to be procured
3. CO EXEC Division prepares and finalizes Procurement Plan and Transmittal Letter
List of equipment to be procured
2 days Development &
Management Officer (DMO
IV)
Procurement Plan and Transmittal Letter
Procurement Plan and Transmittal Letter forwarded to EXEC Division Chief
4. CO EXEC Division reviews Procurement Plan and Transmittal Letter
Procurement Plan and Transmittal Letter
1 day EXEC Division Chief
Procurement Plan reviewed and Transmittal Letter countersigned by EXEC Division Chief
In case corrections/ revisions are made, draft Procurement Plan is transmitted to DMO IV for editing/finalization, then proceed to Step 3
683
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5. CO EXEC Division records and transmits Procurement Plan and Transmittal Letter to office of the SPMS Director
Procurement Plan and Transmittal Letter
10 minutes Admin Aide Date, time and details of Procurement Plan and transmittal letter recorded in the logbook of EXEC Division
6. SPMS Director reviews Procurement Plan and Transmittal Letter
Procurement Plan and Transmittal Letter countersigned by the EXEC Division Chief
1 day SPMS Director
Procurement Plan reviewed and countersigned by the Division Chief EXEC, SPMS Director . Transmittal Letter signed by the SPMS Director
In case corrections/ revisions are made, Procurement Plan and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 3, otherwise the same are forwarded to the Office of the Deputy Executive Director (DED) – Operations for review
7. Deputy Executive Director (DED) for Operations reviews Procurement Plan
Procurement Plan with Transmittal Letter countersigned by the DC, EXEC and SPMS Director
1 day DED for Operations
Procurement Plan reviewed and countersigned by the DED for Operations
In case corrections/ revisions are made, Procurement Plan and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 3, otherwise the same are forwarded to the
684
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Office of the Executive Director for review and approval
8. CO-Office of the Executive Director proofreads the Procurement Plan
Signed Transmittal Letter and Procurement Plan countersigned by the DC EXEC, SPMS Director and DED for Operations
2 hours Executive Assistant
Procurement Plan proofread
In case corrections/ revisions are made, Procurement Plan and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 3, otherwise the same are forwarded to the Executive Director for review and approval
9. Executive Director reviews and approve the Procurement Plan
Signed Transmittal Letter and Procurement Plan countersigned by the DC EXEC, SPMS Director and DED for Operations
1 day Executive Director
Approved Procurement Plan
In case corrections/ revisions are made, Procurement Plan and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 3
10. CO-Office of the Executive Director records and transmit the approved Procurement Plan to the concerned Division (EXEC)
Approved Procurement Plan with signed Transmittal Letter
10 minutes Secretary of the Executive
Director
Date, time and details of approved Procurement Plan and signed Transmittal Letter recorded in the logbook
685
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
11. CO EXEC Division receives and records the approved Procurement Plan and signed Transmittal Letter
Approved Procurement Plan with the signed Transmittal Letter
10 minutes Admin Aide Date, time and details of approved Procurement Plan and signed Transmittal Letter recorded in the logbook
12. CO EXEC Division conduct procurement/bidding process based on the Procurement Plan (Please see Procedure Title: Supervision/Conduct procurement Process)
Approved procurement Plan
Procurement Officer
End of Process
686
1.2 Preparation of TOR
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division identifies/prepares shortlist of technical requirements of consultants for the Project Management Service (PMS)
Qualification of consultant
1 day DMO IV List of Technical requirements of consultants to be hired
2. CO EXEC Division prepares and finalizes Terms of Reference (TOR) and Transmittal Letter
List of technical requirements of consultants to be hired
2 days DMO IV TOR and Transmittal Letter
TOR and Transmittal Letter forwarded to EXEC Division Chief
3. CO EXEC Division reviews TOR and Transmittal Letter
TOR and Transmittal Letter
1 day EXEC Division Chief
TOR reviewed and Transmittal Letter countersigned by EXEC Division Chief
In case correction/revisions are made, TOR is transmitted to DMO IV for editing/finalization, then proceed to Step 2
4. CO EXEC Division records and transmits TOR and Transmittal Letter to the SPMS Director
TOR and Transmittal Letter
10 minutes Admin Aide Date, time and details of TOR and Transmittal Letter recorded in the logbook of EXEC Division
The TOR and Transmittal Letter are routed to concerned Office Directors for review and countersignature and/or approval of Executive Director 5. SPMS Director reviews TOR and sign
Transmittal Letter TOR and Transmittal Letter
1 day SPMS Director
TOR reviewed and countersigned by SPMS Director. Transmittal Letter signed by SPMS Director
In case correction/ revisions are made, TOR and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 2, otherwise the same
687
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
are forwarded to the Deputy Executive Director (DED)-Operations for review
6. Deputy Executive Director (DED)-Operations reviews the TOR
Signed Transmittal Letter and TOR countersigned by EXEC Division Chief and Director SPMS
1 day DED for Operations
TOR reviewed and countersigned by DED for Operations
In case correction/ revisions are made, TOR and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 2, otherwise the same are forwarded to the Office of the Executive Director for review and approval
7. Office of the Executive Director proofreads TOR
Signed Transmittal Letter and TOR countersigned by the DC EXEC, Director SPMS and DED for Operations.
1 day Executive Assistant
TOR proofread In case correction/ revisions are made, TOR and Transmittal Letter are transmitted to EXEC Division for editing/finalization, then proceed to step 2, otherwise the same are forwarded to the Executive Director for review and approval
8. Executive Director reviews and approves TOR
Signed Transmittal Letter and TOR countersigned by the DC EXEC,
1 day Executive Director
Approved Terms of Reference
In case correction/ revisions are made, TOR and Transmittal Letter are transmitted
688
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
SPMS Director and DED for Operations
to EXEC Division for editing/finalization, then proceed to step 2
9. Office of the Executive Director records and transmits the approved TOR to EXEC Division
Approved TOR 10 minutes Secretary of the Executive
Director
Date, time and details of approved TOR and signed Transmittal Letter recorded in the logbook
10. CO EXEC Division receives and records the approved TOR
Approved TOR 10 minutes Admin Aide Date, time and details of approved TOR recorded in the logbook
End of Process
689
1.3 Supervision procurement process
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division prepares and finalizes Bid Documents
Requirements/Specifications of Goods/Services for Bidding
1 day DMO Bid Documents Bid Documents forwarded to EXEC Division Chief
2. CO EXEC Division reviews Bid Documents Bid Documents 1 day EXEC Division Chief
Bid Documents reviewed and countersigned by the EXEC Division Chief
In case corrections/ revisions are made, Bid Documents are transmitted to DMO, EXEC Division for editing/finalization, then proceed to step 1
3. CO EXEC Division records and transmit Bid Documents to the Office of the SPMS Director
Bid Documents 10 minutes Admin Aide Date, time and details of Bid Documents recorded in the logbook of EXEC Division
4. SPMS Director reviews and approves Bid Documents
Bid Documents countersigned by the EXEC Division Chief
1 day SPMS Director
Bid Documents reviewed and approved by the SPMS, Director
In case corrections/ revisions are made, Bid Documents are transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 1
5. CO EXEC Division prepares and finalizes letter of Notice to Bidders
Signed Bid Documents
1 day DMO Letter of Notice to Bidders
Letter of Notice to Bidders forwarded to EXEC Division Chief
6. CO EXEC Division reviews letter of Notice to Bidders
Letter of Notice to Bidders
1 day EXEC Division Chief
Letter of Notice to Bidders
In case correction/ revisions are made,
690
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
countersigned by EXEC Division Chief
Letter of Notice to Bidders is transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 5
7. CO EXEC Division records and transmit Letter of Notice to Bidders to Office of the Director , SPMS
Letter of Notice to Bidders countersigned by the EXEC Division Chief
10 minutes Admin Aide Date, time and details of Letter of Notice to Bidders recorded in the logbook of EXEC Division
8. SPMS Director reviews and approves Letter of Notice to Bidders
Letter of Notice to Bidders countersigned by the EXEC Division Chief
1 day SPMS Director
Letter of Notice to Bidders reviewed and approved by SPMS Director
In case correction/ revisions are made, letter of Notice to Bidders is transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 5
9. CO EXEC Division publish Advertisement for Bidding in leading newspaper for advertisement
Advertisement for Publication
7 days DMO Bid Published
10. CO EXEC Division issue Bid Documents to bidders (with corresponding fee)
Bid Documents 30 days DMO Sale of Bid documents
Sale of Bid Documents;
11. CO EXEC Division Conducts Pre-Bid Conference
Points for Discussions
1 day DMO Bid Conference conducted, list of inquiries from bidders
12. CO EXEC Division Conducts of Bid Opening Submitted Bids 1 day DMO Bid Documents signed by BAC Members, list of Bidders with
691
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
corresponding bid prices, attendance
13. CO EXEC Division Convenes Technical Working Group (TWG) for Bid Evaluation
Bid Documents 1 day DMO Bid Evaluation Reports
14. CO EXEC Division prepares and finalizes Bid Evaluation result
Bid Evaluation Reports
30 days DMO Bid Evaluation Report/finalized TWG Appraisal Report
Bid Evaluation Results forwarded to EXEC Division Chief
15. CO EXEC Division reviews t Bid Evaluation Report
Bid Evaluation Report
1 day EXEC Division Chief
Bid Evaluation Report reviewed countersigned by EXEC Division Chief
In case correction/ revisions are made, Bid Evaluation Report is transmitted to DMO, EXEC Division for editing/finalization, then proceed to step 16
16. CO EXEC Division records and transmit Bid Evaluation Report to Office of the Director , SPMS
Bid Evaluation Report
10 minutes Admin Aide Date, time and details of Bid Evaluation Report recorded in the logbook of EXEC Division
17. SPMS Director reviews and approves Bid Evaluation Report
Bid Evaluation Report countersigned by EXEC Division Chief
1 day SPMS Director
Approved Bid Evaluation Report
In case correction/ revisions are made, Bid Evaluation Report is transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 16
18. CO EXEC Division prepares and finalizes Report of TWG 7 days DMO Resolution to Resolution to Award
692
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Resolution to Award Award forwarded to EXEC Division Chief
19. CO EXEC Division reviews Resolution to Award
Resolution to Award
1 day EXEC Division Chief
Resolution to Award reviewed and countersigned by EXEC Division Chief
In case correction/revisions are made, Resolution to Award is transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 20
20. CO EXEC Division records and transmits Resolution to Award to the Bids and Awards Committee
Resolution to Award countersigned by EXEC Division Chief
10 minutes Admin Aide Date, time and details of Resolution to Award recorded in the logbook of EXEC Division
21. Bids and Awards Committee reviews and approves Resolution to Award
Resolution to Award countersigned by EXEC Division Chief
1 day Committee of Bids and
Awards
Reviewed and approved Resolution to Award; All members of the BAC will sign the resolution
In case correction/ revisions are made, Resolution to Award is transmitted to DMO , EXEC Division for editing/finalization, then proceed to step 20
22. CO EXEC Division prepares and finalizes Notice of Award
Letter to Award 3 days DMO Letter to winning bidder
23. CO EXEC Division review Notice of Award Notice of Award 1 day EXEC Division Chief
Notice of Award reviewed and countersigned by EXEC Division
In case corrections/ revisions are made, Notice of Award is transmitted to DMO
693
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief for editing/finalization, then proceed to step 25
24. CO EXEC Division records and transmits Notice of Award to Office of the SPMS Director
Notice of Award countersigned by EXEC Division Chief
10 minutes Admin Aide Date, time and details of Notice of Award recorded in the logbook of EXEC Division
25. SPMS Director reviews Notice of Award for signature/approval
Notice of Award countersigned by EXEC Division Chief
1 day SPMS Director
Signed/Approved Notice of Award by SPMS, Director
In case corrections/ revisions are made, Notice of Award is transmitted to DMO for editing/finalization, then proceed to step 25
26. CO EXEC Division prepares and finalizes contract to winning bidder
Signed Notice of Award
1 day DMO Contract to winning bidder
Contract to winning bidder forwarded to EXEC Division Chief
27. CO EXEC Division review the contract to winning bidder
Contract to winning bidder
EXEC Division Chief
Contract to winning bidder reviewed by EXEC Division Chief
In case corrections/ revisions are made, Letter of Notice to Proceed transmitted to DMO for editing/finalization, then proceed to step 28
28. Contract Signing and receipt of Performance Security Bond
Contract 7 days DMO Signed contract
29. CO EXEC Division prepares and finalizes letter of Notice to Proceed
Signed Contract 3 days DMO Letter to proceed Letter to proceed forwarded to EXEC Division Chief
694
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
30. CO EXEC Division reviews letter of Notice to proceed
Letter of Notice to Proceed
1 day EXEC Division Chief
Letter of Notice to Proceed reviewed and countersigned by the EXEC Division Chief
In case corrections/ revisions are made, Letter of Notice to Proceed is transmitted to DMO for editing/finalization, then proceed to step 31
31. CO EXEC Division records and transmit letter of Notice to Proceed to Office of the SPMS Director
Letter of Notice to Proceed reviewed and countersigned by the EXEC Division Chief
10 minutes Admin Aide Date, time and details of Letter of Notice to Proceed recorded in the logbook of EXEC Division
32. Director SPMS reviews Letter of Notice to Proceed for signature/approval
Letter of Notice to Proceed reviewed and countersigned by the EXEC Division Chief
1 day SPMS Director
Letter of Notice to Proceed reviewed and signed by the SPMS Director
In case corrections/ revisions are made, Letter of Notice to Proceed is transmitted to DMO for editing/finalization, then proceed to step 31
33. CO EXEC Division release Letter of Notice to Proceed to winning bidder
Signed Letter of Notice to Proceed
10 minutes Admin Aide Released Letter of Notice to Proceed to winning bidder. Date, time and details of Letter of Notice to Proceed recorded in the logbook of EXEC Division
695
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
34. CO EXEC Division inspects and accepts delivered items
Lists of items for delivery/ inspection
7 days DMO Inspection/Acceptance Report
36. CO EXEC Division records and transmits delivery receipt to project cashier for Final Payment
Delivery Receipt 15 days DMO Date, time and details of delivery receipt recorded in the logbook of EXEC Division
End of Process
696
2.1 Prepare PIPs and facilitate approval
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division receives and records letter with Project Implementation Plan (PIP) and Letter of Intent (LOI) from Records Section
RPTA A
RPTA B
BTEP
Letter of LGU with Project Implementation Plan (PIP) and Letter of Intent (LOI)
5 minutes Admin Aide Date, time and details of PIP and LOI recorded in logbook
LOI and PIP forwarded to Action Officer (Tax Mapping Examiner)
2. CO EXEC Division prepares and finalizes Transmittal Letter and PIP
PIP 1 day Tax Mapping Examiner
Transmittal Letter and PIP
Transmittal Letter and PIP forwarded to EXEC Division Chief
3. CO EXEC Division reviews Transmittal Letter and PIP
Transmittal Letter and PIP
1 day EXEC Division Chief
Transmittal Letter and PIP reviewed and countersigned by EXEC Division Chief
In case corrections/ revisions are made, Transmittal Letter and PIP are transmitted to TM Examiner for editing/finalization, then proceed to step 3
4. CO EXEC Division records and transmits Transmittal Letter and PIP to SPMS Director
PIP and Transmittal Letter
10 minutes Admin Aide Date, time and details of the Transmittal Letter and PIP recorded in the logbook of EXEC Division
5.
SPMS Director signs/approves Transmittal Letter and reviews PIP
Transmittal Letter and PIP reviewed and countersigned by EXEC Division Chief
1 day SPMS Director
Signed /Approved Transmittal Letter and PIP reviewed and countersigned by SPMS Director
Incase corrections/revisions are made, Transmittal Letter and PIP are transmitted to TM Examiner for editing/finalization,
697
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
then proceed to step 3, otherwise the same are forwarded to the Office of the Deputy Executive Director (DED) – Operations for review
6. Deputy Executive Director (DED)-Operations reviews and approves PIP
Reviewed PIP and countersigned by EXEC Division Chief and SPMS Director. Signed Transmittal Letter attached.
1 day DED for Operations
PIP approved Incase corrections/revisions are made, Transmittal Letter and PIP are transmitted to TM Examiner for editing/finalization, then proceed to step 3, otherwise the same are forwarded to concern Division
7. CO-Office of the Executive Director (DED)-Operations transmit the approved PIP to the concerned Division (EXEC)
Approved PIP with attached Transmittal Letter
10 minutes Admin Aide Date, time and details of the PIP and Transmittal Letter recorded in the logbook of Office of the DED for Operations
8. CO EXEC Division receives and record the Approved PIP and Transmittal Letter
Approved PIP and Transmittal Letter
10 minutes Admin Aide Date, time and details of the PIP and Transmittal Letter recorded in the logbook of EXEC Division
698
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
9. CO EXEC Division records and transmit approved PIP and Transmittal Letter to the Records Section for mailing to the LGU concerned for conforme of LCE
Signed PIP 10 minutes Admin Aide Signed PIP/Released to concerned LGUs
For transmitting/ mailing to LGUs concerned; See Process for “Outbound Documents” under Records Section.
End of Process
699
2.3 Fund releases management (recommendation, endorsement, facilitation etc.)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO EXEC Division receives and records Letter of Recommendation for fund release from M & E Division.
Recommendation Letter from M & E Division
5 minutes Admin Aide Date, time and details of recommendation letter recorded in the logbook of EXEC Division
2 CO EXEC Division reviews the Letter of Recommendation for fund release from M & E Division.
Letter of Recommendation
1 day DMO Reviewed Letter of Recommendation
3 CO EXEC Division prepares and finalizes letter requesting fund release
Reviewed Letter of Recommendation with Evaluation Summary
1 day DMO Letter Request for Fund Release countersigned by DMO
4 CO EXEC Division reviews Letter Requesting for Fund Release
Letter Request for Fund Release countersigned by DMO
1 day EXEC Division Chief
Reviewed Letter Request for Fund Release countersigned by EXEC Division Chief .
In case corrections/revisions are made, Letter Request for Fund Release is transmitted to DMO for editing/finalization, then proceed to step 3.
5 CO EXEC Division records and transmits Letter Request for Fund Release to the Office of SPMS Director for review and approval.
Reviewed Letter Request for Fund Release countersigned by EXEC Division Chief .
5 minutes Admin Aide Date, time and details of Letter Request recorded in the logbook of EXEC Division
700
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6 CO-Office of the SPMS Director receives and records Letter Request for Fund Release.
Reviewed Letter Request for Fund Release countersigned by EXEC Division Chief .
5 minutes Secretary of SPMS
Director
Date, time and details of Letter Request recorded in the logbook of Office of SPMS Director
7 SPMS Director reviews and approves Letter Request for Fund Release
Reviewed Letter Request for Fund Release countersigned by EXEC Division Chief .
1 day SPMS Director
Reviewed and approved Letter Request for Fund Release
8 CO EXEC Division receives and records approved Letter Request for Fund Release
Approved Letter Request for Fund Release
5 minutes Admin Aide
9 CO EXEC Division records and transmit Letter Request to Project Accountant
Reviewed and signed letter Request for Fund Release
10 minutes Admin Aide Date, time and details of the Letter Request recorded in the logbook of EXEC Division
End of Process
701
3.1 Provide technical advise on project management.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO EXEC Division receives and records request for technical assistance from LGU regarding project implementation
Letter Request from LGU
10 minutes Admin Aide Date, time and details of the request recorded in the logbook of EXEC Division
2 CO EXEC Division reviews/discuss issues/problems of the LGU
Letter request 1 day DMO List of issues /problems of the LGU
3 CO EXEC Division prepares and finalizes recommendations and transmittal letter regarding issues/problems of the LGU
Lists of Issues/problems
1 day DMO Recommendations and Transmittal Letter
4 CO EXEC Division reviews recommendations and approves/signs Transmittal Letter
Recommendations and Transmittal Letter
1 day EXEC Division Chief
Recommendations reviewed and approved/signed Transmittal Letter
In case corrections/ revisions are made, Recommendation Letter is transmitted to DMO for editing/finalization, then proceed to step 4
5 CO EXEC Division releases and records Recommendations and Transmittal Letter to records section for mailing to LCE
Approved/signed Transmittal Letter and Recommendations
10 minutes Admin Aide Date, time and details of approved/signed Transmittal Letter and Recommendations recorded in the logbook of EXEC Division
For mailing to concerned LGU, see process for “Outbound Documents” under Records Section
End of Process
702
3.4 Field inspections.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division assists in the orientation of field inspectors
Field inspectors 1 day DMO Oriented field inspectors
2. CO EXEC Division requests ADMIN Division for Travel Order
List of Employees to go on travel , date and place of field inspection
10 minutes DMO For the Process of Preparation of Office/Travel
3. CO EXEC Division receives and records signed/approved Travel Order
Signed Travel Order
3 minutes Admin Aide Date, time and details of signed/approved Travel Order recorded in the logbook of EXEC Division
4. CO EXEC Division prepares Itinerary of Travel Signed Travel Order
2 hours DMO Itinerary of travel
5. CO EXEC Division reviews Itinerary of Travel Itinerary of travel 1 day EXEC Division Chief
Itinerary of Travel reviewed and countersigned by EXEC Division Chief
If corrections/ revisions are made, Itinerary of Travel is transmitted to DMO for editing/finalization, then proceed to step 4
6. CO EXEC Division records and transmits Itinerary of Travel to Office of SPMS Director
Itinerary of Travel countersigned by EXEC Division Chief
10 minutes Admin Aide Date, time and details of Itinerary of Travel recorded in the logbook of EXEC Division
7. SPMS Director reviews and signs/approves Itinerary of Travel
Itinerary of Travel countersigned by EXEC Division
1 day SPMS Director
Itinerary of Travel Signed/approved by SPMS Director
703
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Chief
8. CO EXEC Division receives and records signed/approved Itinerary of Travel
Signed/approved Itinerary of Travel
3 minutes Admin Aide Signed/approved Itinerary of Travel
9. CO EXEC Division transmits approved Travel Order and Itinerary of Travel to Project Accountant for Cash Advance
Signed/Approved Itinerary of Travel with Approved Travel Order
5 minutes Admin Aide Date, time and details of Itinerary of Travel with Travel Order recorded in the logbook of EXEC Division
10. Assigned Employee proceeds to LGU for inspection
Signed/approved Travel Order
1 day Assigned Employee
Arrived at the LGU
11. Assigned Employee conducts inspection Materials needed for inspection
3 days Assigned Employee
Report of Inspection
12. Assigned Employee returns to Official Station
Report of Inspection
1 day Assigned Employee
Inspection Report
13. Assigned Employee prepares Inspection Report
Findings/recommendations
5 days Assigned Employee
Draft Inspection Report
14. CO EXEC Division reviews Inspection Report Draft Report of Inspection
1 day EXEC Division Chief
Inspection Report reviewed and countersigned by EXEC Division Chief
If corrections/revisions are made, Inspection Report is transmitted to DMO for editing/finalization, then proceed to step 13
15. CO EXEC Division records and transmits Inspection Report to the Office of SPMS Director
Inspection Report countersigned by EXEC Division Chief Division
5 minutes Admin Aide Date, time and details of Inspection Report recorded in the logbook of EXEC Division
704
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
16. SPMS Director reviews and approves /signs Inspection Report
Inspection Report countersigned by EXEC Division Chief Division
1 day SPMS Director
Inspection Report reviewed and approved/signed by SPMS Director
17. CO EXEC Division receives approved/signed Inspection Report
Inspection Report approved/signed by SPMS Director
5 minutes Admin Aide Date, time and details of approved/signed Inspection Report
18. CO EXEC Division prepares Letter to LGU regarding findings and recommendations
Inspection Report approved/signed by SPMS Director
1 day DMO Letter to LGU regarding findings and recommendations
19. CO EXEC Division reviews Letter to LGU regarding findings and recommendations
Letter to LGU regarding findings and recommendations
1 day EXEC Division Chief
Letter reviewed and countersigned by EXEC Division Chief
If corrections/revisions are made, Letter to LGU is transmitted to DMO for editing/finalization, then proceed to step 18
20. CO EXEC Division records and transmits Letter to LGU regarding findings and recommendations to the Office of SPMS Director
Letter reviewed and countersigned by EXEC Division Chief
5 minutes Admin Aide Date, time and details of Letter regarding findings and recommendations recorded in the logbook of EXEC Division
21. SPMS Director reviews and signs/approves Letter to LGU regarding findings and recommendations
Letter reviewed and countersigned by EXEC Division Chief
1 day SPMS Director
Letter reviewed and signed/approved
705
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
22. CO EXEC Division receives and records signed Letter to LGU regarding findings and recommendations
Letter reviewed and signed/ approved
5 minutes Admin Aide Date, time and details of Letter regarding findings and recommendations recorded in the logbook of EXEC Division
23. CO EXEC Division records and transmits signed/approved Letter to LGU regarding findings and recommendations to Records Sections for mailing
Signed/approved letter regarding findings and recommendations
5 minutes Admin Aide Date, time and details of Letter regarding findings and recommendations recorded in the logbook of EXEC Division
For mailing to LGUs, see process for “Outbound Documents” under Records Section
End of Process
706
4.1 Establish policy guidelines (donor agency and BLGF).
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division assess requirements on Policy Guidelines
Requirements on Policy Guidelines
1 day DMO Assessment on requirements on Policy Guidelines
2. CO EXEC Division prepares and finalizes policy guidelines
Requirements on Policy guidelines
3 days DMO Policy Guidelines
3. CO EXEC Division reviews Policy Guidelines Draft Policy Guidelines
1 day EXEC Division Chief
Policy Guidelines reviewed and countersigned by EXEC Division Chief
In case corrections/ revisions are made, Policy Guidelines is transmitted to DMO IV for editing/finalization, then proceed to step 2
4. CO EXEC Division records and transmits Policy Guidelines to the Office of the SPMS Director
Policy Guidelines reviewed and countersigned by EXEC Division Chief
10 minutes Admin Aide Date, time and details of the Policy Guidelines recorded in the logbook of EXEC Division
5. SPMS Director reviews and sign/approve Policy Guidelines
Policy Guidelines reviewed and countersigned by EXEC Division Chief
1 day SPMS Director
Reviewed and signed/approved Policy Guidelines
In case corrections/ revisions are made, Policy Guidelines is transmitted to DMO IV for editing/finalization, then proceed to step 2
6. CO EXEC Division receives and records approved/signed Policy Guidelines from Office of the SPMS Director
Signed/approved Policy Guidelines
5 minutes Admin Aide Date, time and details of the Policy Guidelines recorded in the logbook of EXEC Division
707
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. CO EXEC Division prepares and finalizes Dissemination Letter regarding the approved Policy Guidelines to all project centers
Approved Policy Guidelines
1 day DMO Dissemination Letter with attached approved Policy Guidelines
8. CO EXEC Division reviews Dissemination Letter to all project centers
Dissemination Letter with attached approved Policy Guidelines
1 day EXEC Division Chief
Dissemination Letter reviewed and countersigned by EXEC Division Chief. Attached approved Policy Guidelines
In case corrections/ revisions are made Dissemination Letter is transmitted to DMO IV for editing/finalization, then proceed to step 7
9. CO EXEC Division records and transmits Dissemination Letter to the Office of the SPMS Director
Dissemination Letter reviewed and countersigned by EXEC Division Chief with attached approved Policy Guidelines
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
10. SPMS Director reviews and signs the Dissemination Letter regarding the approved Policy Guidelines
Dissemination Letter reviewed and countersigned by EXEC Division Chief with attached approved Policy Guidelines
1 day SPMS Director
Dissemination Letter reviewed and signed by SPMS Director with attached approved Policy Guidelines
In case corrections/ revisions are made Dissemination Letter is transmitted to DMO IV for editing/finalization, then proceed to step 7
11. CO EXEC Division receives and records Dissemination Letter
Dissemination Letter reviewed and signed by SPMS Director with attached approved Policy
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
708
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Guidelines
12. CO EXEC Division releases Dissemination Letter together with the approve Policy Guidelines to records section for mailing to all project centers
Dissemination Letter reviewed and signed by SPMS Director with attached approved Policy Guidelines
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
Records Section transmits Disseminations Letter to Project Centers, see “Process for Outbound Documents” under Records Section
End of Process
709
4.2 Monitor compliance
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division prepares and finalizes Tracer Letter regarding the adaptation of the revised policy guidelines
Approved Policy Guidelines
1 day DMO Tracer Letter
2. CO EXEC Division reviews Tracer Letter regarding the adaption of the revised policy guidelines
Tracer Letter 1 day EXEC Division Chief
Tracer Letter reviewed and countersigned by the EXEC Division Chief
In case correction/ revisions are made, Tracer Letter is transmitted to DMO IV for editing/finalization then proceed to step 1
3. CO EXEC Division records and transmits Tracer Letter to the Office of the SPMS Director
Tracer Letter reviewed and countersigned by the EXEC Division Chief
10 minutes Admin Aide Date, time and details of the Tracer Letter recorded in the logbook of EXEC Division
4. SPMS Director reviews and signs/approves Tracer Letter regarding the adaptation of the revised policy guidelines
Tracer Letter reviewed and countersigned by the EXEC Division Chief
1 day SPMS Director
Tracer Letter reviewed and signed by the SPMS Director
5. CO EXEC Division receives and records approved Tracer Letter from Office of the SPMS Director
Signed/approved Tracer Letter
10 minutes Admin Aide Date, time and details of the Tracer Letter recorded in the logbook of EXEC Division
6. CO EXEC Division release Tracer Letter to Records Section for mailing to all project centers
Signed/approved Tracer Letter
10 minutes Admin Aide Date, time and details of the Tracer Letter
710
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in the logbook of EXEC Division
7. CO EXEC Division receives and records Letter Response from LGU
Letter Response from LGU
10 minutes Admin Aide Date, time and details of the Letter Response from LGUs recorded in the logbook of EXEC Division
8. CO EXEC Division collates, tabulates/reviews Letter Response from LGU
Letter Response from LGU
2 days DMO IV Letter Response from LGUs collated, tabulated and reviewed
9. CO EXEC Division prepares reports of LGU compliance regarding the adoption of revised Policy Guidelines
Letter Response from LGUs collated, tabulated and reviewed
1 day DMO IV Report of LGU compliance regarding the adoption of revised Policy Guidelines
10. CO EXEC Division reviews and signs/approves Report of LGU Compliance regarding the adoption of revised Policy Guidelines
Report of LGU Compliance
1 day EXEC Division Chief
Report of LGU Compliance reviewed and signed/approved by EXEC Division Chief.
11. CO EXEC Division records and transmits Report of LGU Compliance regarding the adoption of revised policy guidelines to the Office of the SPMS Director for information
Report of LGU Compliance
10 minutes Admin Aide Date, time and details of the Report of LGU Compliance recorded in the
711
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
logbook of EXEC Division
End of Process
712
4.3 Periodic review of policy guidelines.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division reviews/revises existing Policy Guidelines
Existing Policy Guidelines
1 day DMO Existing Policy Guidelines reviewed
2. CO EXEC Division prepares and finalizes reviewed/revised Policy Guidelines
Reviewed Existing Policy Guidelines
3 days DMO Revised Policy Guidelines
3. CO EXEC Division reviews reviewed/revised Policy Guidelines
Revised Policy Guidelines
1 day EXEC Division Chief
Policy Guidelines reviewed/revised and countersigned by EXEC Division Chief
In case corrections/revisions are made, Policy Guidelines is transmitted to DMO IV for editing/finalization, then proceed to step 2
4. CO EXEC Division records and transmits reviewed/revised Policy Guidelines to the Office of the SPMS Director
Policy Guidelines countersigned by EXEC Division Chief
10 minutes Admin Aide Date, time and details of the revised Policy Guidelines recorded in the logbook of EXEC Division
5. SPMS Director reviews and signs/approves Policy Guidelines
Policy Guidelines countersigned by EXEC Division Chief
1 day SPMS Director
Signed/Approved revised Policy Guidelines
In case corrections/ revisions are made, Policy Guidelines is transmitted to DMO IV for editing/finalization, then proceed to step 2
6. CO EXEC Division receives and records Signed/approved 5 mins. Admin Aide Date, time and
713
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
approved/signed revised Policy Guidelines from Office of the SPMS Director
Policy Guidelines details of the Policy Guidelines recorded in the logbook of EXEC Division
7. CO EXEC Division prepares and finalizes Dissemination Letter regarding the approved Policy Guidelines to all project centers
Approved policy guidelines
1 day DMO IV Dissemination Letter with attached approved Policy Guidelines
Dissemination Letter is forwarded to EXEC Division Chief
8. CO EXEC Division reviews Dissemination Letter to all project centers
Dissemination Letter with attached approved Policy Guidelines
1 day EXEC Division Chief
Dissemination Letter reviewed and countersigned by EXEC Division Chief. Attached approved Policy Guidelines
In case corrections/ revisions are made, Dissemination Letter is transmitted to DMO IV for editing/finalization, then proceed to step 7
9. CO EXEC Division records and transmits Dissemination Letter to the Office of the SPMS Director
Dissemination Letter countersigned by EXEC Division Chief with attached approved Policy Guidelines
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
10. SPMS Director reviews and signs the Dissemination Letter regarding the approved Policy Guidelines
Dissemination Letter countersigned by EXEC Division Chief with attached approved
1 day SPMS Director
Dissemination Letter reviewed and signed by SPMS Director with attached approved Policy
In case corrections/ revisions are made, Dissemination Letter is transmitted to DMO IV for editing/finalization,
714
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Policy Guidelines Guidelines then proceed to step 7
11. CO EXEC Division receives and records Dissemination Letter
Dissemination Letter signed by SPMS Director with attached approved Policy Guidelines
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
12. CO EXEC Division releases Dissemination Letter together with the approved revised Policy Guidelines to Records Section for mailing to all project centers
Dissemination letter signed by SPMS Director with attached approved Policy Guidelines
10 minutes Admin Aide Date, time and details of Dissemination Letter recorded in the logbook of EXEC Division
Records Section transmits Dissemination Letter with attached signed/approved Policy Guidelines to all Project Centers, see “Process for Outbound Documents” under Records Section.
End of Process
715
5.1 Preparation of training design (modules, approaches. Etc.)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division conducts training needs assessment to LGUs
Training needs assessment forms
1 day Training Specialist
Training Needs Assessment Report
2. CO EXEC Division prepares Training Needs Assessment (TNA) Report
Training Needs Assessment Report
1 day Training Specialist
Training Needs Assessment Report prepared
3. CO EXEC Division determines training requirements
Assessment report 1 day Training Specialist
Training requirements identified
4. CO EXEC Division prepares and finalizes training design, instructional guide, instructional materials according to Training Needs as embodied under the Training Needs Assessment Report
Training requirements
1 day Training Specialist
Training Design countersigned by Training Specialist
5. CO EXEC Division reviews Training Design Training Design countersigned by Training Specialist
1 day EXEC Division Chief
Training Design reviewed, and countersigned by the EXEC Division Chief
In case correction/ revisions are made, Training Design is transmitted to Training Specialist for editing/finalization, then proceed to step 3.
6. CO EXEC Division records and releases Training Design to SPMS Director
Training Design countersigned by the EXEC Division Chief
10 minutes Admin Aide Date, time and details of Training Design recorded in the logbook of EXEC Division
716
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. SPMS Director reviews and approves/signs Training Design
Training Design countersigned by the EXEC Division Chief
1 day SPMS Director
Approved/signed Training Design
In case correction/ revisions are made, Training Design is transmitted to Training Specialist for editing/finalization, then proceed to step 3.
8. CO EXEC Division receives and records approved /signed Training Design from Office of the Director SPMS
Approved/signed Training Design
10 minutes Admin Aide Date, time and details of Training Design recorded in the logbook of EXEC Division
End of Process
717
5.2 Conduct the training base on the design
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO EXEC Division coordinates with the Project Accountant for funding
Approved Training Design
3 days Training Specialist
Available Funds
2. CO EXEC Division prepares all logistics
Budget
Training Materials
Venue
Transportation
Approved Training Design and Available Funds
5 days Training Specialist
Completed training materials, training venue, schedule of training
3. CO EXEC Division identifies Resource Speakers and Participants of participating LGUs
Qualification of Resource Speakers; No. of Participants
1 day Training Specialist
Name of Resource Speakers and Participants
4. CO EXEC Division prepares and finalizes Invitation Letter to Speakers and Participants of participating LGUs
Name of Speakers and Participants, Date of training
2 days Training Specialist
Invitation Letter countersigned by Training Specialist
5. CO EXEC Division reviews Invitation Letter to Speakers and Participants of participating LGUs
Draft Invitation Letter
1 day EXEC Division Chief
Invitation Letter reviewed and countersigned by EXEC Division Chief
In case corrections/ revisions are made, Invitation Letter is transmitted to Training Specialist for editing/finalization, then proceed to step 3.
6. CO EXEC Division records and transmits Invitation Letter to the Office of the Director SPMS
Invitation Letter countersigned by EXEC Division Chief
5 minutes Admin Aide Date, time and details of the Invitation Letter recorded in the logbook of EXEC Division
718
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7. SPMS Director reviews and signs/approves Invitation Letter
Invitation Letter countersigned by EXEC Division Chief
1 day SPMS Director
Invitation letter reviewed and signed/approved by the SPMS Director
In case corrections/ revisions are made, Invitation Letter is transmitted to Training Specialist for editing/finalization, then proceed to step 3.
8. CO EXEC Division receives and records signed/approved Invitation Letter from the Office of the SPMS Director
Signed/approved Invitation Letter
5 minutes Admin Aide Date, time and details of the signed/approved Invitation Letter recorded in the logbook of EXEC Division
The duplicate copy of the invitation letter is kept by the Division.
9. CO EXEC Division transmits Signed/approved Invitation Letter to Resource Speakers to Records Section for mailing.
Original Copies of Invitation Letter to Resource Speakers
5 minutes Admin Aide Date, time and details of Invitation Letter recorded in the logbook of EXEC Division
Records Section mail Invitation Letter to Resource Speakers, see Process for Outbound Documents under Records Section.
10. Conduct training Training Program Depends on the duration
of the training
Training Specialist
Training Program Conducted; No. of Participants participated
11. CO EXEC Division analyze the evaluation sheet for the amendment/revision or improvement of training program
Accomplished Evaluation Sheet
2 days Training Specialist
Result of training evaluation
Prepare necessary recommendation based on the result of training evaluation
12. CO EXEC Division requires Regional Offices for the submission of Terminal reports
Terminal Reports 15 days Training Specialist
Letter requiring the submission of
Send thru letter or email
719
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
terminal reports
13. CO EXEC Division prepares/Updates database of LGUs who participated the training program
No. of LGUs; participants
1 day Training Specialist
Database updated
End of Process
720
Operating Procedures for Bureau Operations Special Project Management Service
Project Monitoring and Examination Division
721
SERVICE : Special Project Management Service DIVISION : Project Monitoring And Evaluation Division (M&E) UNIT NAME : BRIEF DESCRIPTION : Monitoring and Evaluation Division is under the Special Projects Management Service tasked
to oversee the development/progress of Foreign Assisted Projects implemented by the BLGF
CLIENTS : LGUs (Municipal, Province, Cities), Domestic and International Financial Institution, BLGF Central & Regional Office, Any Government or Private Entity, General Public;
Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
23. Monitor physical work/activities undertaken to determine actual status of projects vis-à-vis fund disbursements.
23.1 Collate progress report 23.2 Conduct site inspection. 23.3 Review progress against PIP. 23.4 Prepare recommendations based on the report
(recommendation on revisions and fund releases). 23.5 (Determine needs for revisions or changes in activity
schedules, staffing, equipment, and commodity support, costing, funds flow, and related matters).
23.6 Determine compliance or conformity of project accomplishments with pre-set, or agreed-upon standards as to qualify, volume, and output.
23.7 Verify/validate project funds expenditures
Progress should conform to fund disbursement. Recommendation forwarded to EXEC.
2. (Determine the needs for revisions or changes in activity schedules, staffing, equipment, and commodity support, costing, funds flow, and related matters)
3. (Determine compliance or conformity of project accomplishments with pre-set, or agreed-upon standards as
722
to qualify, volume, and output.)
4. (Verify/validate project funds expenditures and) certification for project completion.
4.1 Field validation of accomplishments (checklist). Certificate of completion by the LGU Confirmation of the certificate of completion
5. Gather and compile statistics, financial data, and relevant information to determine project impact on revenue generation efforts and overall community development programs of beneficiary or participating LGUs
5.1 Collate impact report, sustainability plan and SPCR on completed projects.
5.2 Prepare analysis of impact report. 5.3 Publication, distribution, knowledge management. 5.4 Facilitate LGU preparation of sustainability progress report. 5.5 Collate and review LGU progress report. 5.6 Recommend compliance on sustainability plan.
6. Prepare recommendations for policy/procedural changes that will enhance LGU participation in foreign-assisted projects.
Task of SPMS PLANS
723
SPECIFIC PROCEDURES
1.1 Collate progress report
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records
Monthly Physical Accomplishment and
Financial reports submitted by the LGUs.
Monthly Physical
Accomplishment
and Financial
Reports (see
attached F1 & F2)
10 minutes Admin Aide Date, time and
details of the
reports submitted
recorded in the
logbook.
Corresponding CCS
attached.
Monthly Physical
Accomplishment and
Financial reports are
forwarded to
concerned Project
Evaluation Officer
(PEO)
2 CO-M&E Division evaluates and validates
the Monthly Physical Accomplishment and
Financial Reports by counter checking and
computing the percentage of accomplished
tasks (see attachment F1 and F2), to
determine whether the project
accomplishment is within the approved
Project Implementation Plan (PIP).
Monthly Physical
Accomplishment
and Financial
Reports
45 minutes Project
Evaluation
Officer
Percentages of
Physical
Accomplishment
and Disbursement
(Financial)
The project is efficient if percentage of disbursement is not 25% higher than the physical accomplishment; Eligible for fund release if the percentage of accomplishment is met and if previous release is fully liquidated (please refer to project policy); Accomplishment
724
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
should conform to the schedule stated in the PIP.
3 CO-M&E Division prepares and finalizes
Monitoring Report Form.
Percentages of
Physical
Accomplishment
and Disbursement
(Financial)
15 minutes Project
Evaluation
Officer
Monitoring Report
Form (Evaluation
Summary)
countersigned by
concerned PEO
4 CO-M&E Division files the Monthly Physical
Accomplishment and Financial Reports
together with the Monitoring Report Form
for reference.
Physical and
Financial Reports;
and Monitoring
Report Form
5 minutes Project
Evaluation
Officer
Docketed reports
of the project
center together
with the
Monitoring Report
Form
If the requirement for release is not met, filed reports together with the monitoring report form for the meantime; In case there discrepancies/findings in the reports submitted, the concerned PEO prepares letter (original action) informing LGU of the project status;
5 CO-M&E Division prepares and finalizes
letter (original action) informing LGU of its
project status.
Monitoring Report
Form
countersigned by
concerned PEO
20 minutes Project
Evaluation
Officer
Letter to LGU
informing of its
project status
countersigned by
concerned PEO
Letter informing LGU
of its project status is
forwarded to M&E
Chief
725
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6 CO-M&E Division reviews and approves the
letter to LGU informing of its project status.
Letter to LGU
informing of its
project status
20 minutes M&E Chief Letter to
concerned LGU
countersigned
M&E Chief
If corrections/revisions
are made by the M&E
Chief on the letter, the
same is returned to
concerned PEO for
editing/finalization,
otherwise is
forwarded to the
SPMS Director.
6 CO-M&E Division records and transmits the
letter to LGU informing of its project status
to the SPMS Director
Letter to LGUs
countersigned by
M&E Chief
5 minutes Admin Aide Date, time and
details of letter
recorded in the
logbook
7 SPMS Director reviews and approves the
letter to concerned LGU informing of its
project status.
Letter to
concerned LGU
together with
Monitoring Report
Form
countersigned and
noted by M&E
Chief
20 minutes SPMS
Director
Letter to LGU
reviewed/approve
d by the SPMS
Director
If corrections/revisions
are made by the SPMS
Director on the letter,
the same is returned
to concerned PEO for
editing/finalization,
then proceed to step
5.
726
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
8 CO-M&E Division records and transmits the
letter to Records Section for mailing to
concerned LGU.
Signed letter to
LGU
5 minutes Admin Aide Date, time and
details of letter to
LGU recorded in
the logbook
For mailing to
concerned LGU (see
process of “Outbound
Documents” under
Records Section)
End of Process
727
1.2 Conduct site inspection
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division informs the Internal
Administration Office (IAO) of the scheduled
project field inspection/validation
Names of selected
personnel/Approv
ed date of travel
schedule
1 day Admin Aide Office Travel
Order
Submits list of team to
Administration
Division for the
issuance of Office
Travel Order
2 CO-M&E Division receives and records
Office Travel Order from Administration
Division
Approved Travel
Order to conduct
project inspection
and validation.
5 minutes Admin Aide Date, time and
details of Travel
order recorded in
the logbook of
M&E Division
3 PMET makes representation with the
Municipal Treasurer showing the travel
authority; inform him/her of the purpose of
the visit.
Approved Travel
Order to conduct
project inspection
and validation.
30 minutes Project
Monitoring &
Evaluation
Team
(PMET)
Representation
with Municipal
Treasurer
undertaken.
4 PMET makes a courtesy call with the
Municipal Mayor (Project Manager)
together with the Assessor/Treasurer and
others involved in the implementation of
the project, if possible, informing the latter
of the authority to conduct project
inspection and validation.
Approved Travel
Order to conduct
project inspection
and validation.
1 hour
PMET Courtesy call with
the Municipal
Mayor
undertaken.
The team proceeds
with the conduct of
validation after
courtesy call with the
Mayor
728
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
5 PMET team examines/validates/verifies the
actual physical outputs against the latest
Physical Accomplishment Reports
submitted.
Latest Physical
Accomplishment
Reports submitted
1 day PMET Validated/verified
physical
accomplishment
report
3 phases of
Taxmapping (TM)
Operations
Pre-field
Field
Post field
Conditions: For Pre-Field Operations go to step 4; For Field Operations go to step 5 and For Post-Field Operations go to step 6.pref
6 Refer to Chapter II, Section 2 (D) (1) of the
Manual on Real Property Appraisal and
Assessment Operations. Physical output
must be in accordance with the said
provision of the manual. (For Pre-Field
Operations)
Base Maps; FAAS;
Pre-TMCR
1 hour PMET Inspected/Verified
/ Validated pre-
field physical
output (Base
Maps; FAAS; Pre-
TMCR)
After step 4 go to step
7
7 Refer to Chapter II, Section 2 (D) (2) of the
Manual on Real Property Appraisal and
Assessment Operations. Physical output
must be in accordance with the said
provision of the manual. (For Field
Operations)
Verified/validated
field output (Base
Maps; FAAS; Pre-
TMCR)
1 hour PMET Inspected/Verified
/ Validated field
physical output
(Base Maps; FAAS;
Pre-TMCR)
After step 5 go to step
7
8 Refer to Chapter II, Section 2 (D) (3) of the
Manual on Real Property Appraisal and
Assessment Operations. Physical output
must be in accordance with the said
provision of the manual. (For Post-Field
Operations)
Base Maps; Tax
Maps (Section
Index Map,
Barangay Index
Map and
Municipality Index
1 hour PMET Inspected/Verified
/ Validated field
physical output
(Base Maps; Tax
Maps and TMCR)
After step 6 go to step
7
729
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Map) and TMCR
9 PMET team conducts exit conference
together with the LCE and others involved in
the project for the presentation of the
findings, comments and recommendations.
Findings,
comments and
recommendations
during the
validation duly
noted.
1 hour PMET Project Inspection
Report (Physical
duly noted
Project Inspection
report to be prepared
upon return to office
10 PMET prepares and finalizes Project
Inspection Report (Physical)
Project Inspection
Report (Physical)
duly noted
1 day PMET Project Inspection
Report (Physical)
countersigned by
PMET
11 CO-M&E Division reviews and noted the
Project Inspection Report (Physical)
countersigned by the PMET
Project Inspection
Report (Physical)
30 minutes M&E Chief Project Inspection
Report (Physical)
reviewed and
countersigned by
M&E Chief
If corrections/
revisions are made by
the M&E Chief on the
Inspection Report, the
same is returned to
the PMET for
editing/finalization,
then proceed to step
10, otherwise is
forwarded to SPMS
Director
12 CO-M&E Division records and transmits
Project Inspection Report (Physical) to the
Project Inspection
Report (Financial)
5 minutes Admin Aide Date, time and
details of Project
730
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
SPMS Director. reviewed and
countersigned by
M&E Chief
Inspection Report
in the logbook.
Corresponding CCS
attached.
13 CO-SPMS Director reviews and countersigns
Project Inspection Report (Physical)
Project Inspection
Report (Physical)
reviewed and
countersigned by
M&E Chief
30 minutes SPMS
Director
Project Inspection
Report (Physical)
reviewed and
countersigned by
SPMS Director
If corrections/revisions
are made by the SPMS
Director on the
Inspection Report , the
same is returned to
the PMET for
editing/finalization,
then proceed to step
10, otherwise is
forwarded to DED for
Operations.
14 CO-DED for Operations reviews and
countersigns Project Inspection Report
(Physical)
Project Inspection
Report (Physical)
reviewed and
countersigned by
SPMS Director
30 minutes DED for
Operations
Project Inspection
Report (Physical)
reviewed and
countersigned
DED- Operations.
If corrections/revisions
are made by the DED
for Operations on the
Inspection Report, the
same is returned to
the PMET for
editing/finalization,
then proceed to step
10, otherwise is
forwarded to ED.
731
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
15 CO-ED Executive Secretary proofreads the
Project Inspection Report (Physical).
Project Inspection
Report (Physical)
reviewed and
countersigned by
DED for
Operations
30 minutes Executive
Secretary
(ES)
Project Inspection
Report (Physical)
proofread by the
ES
If corrections/revisions
are made by the ES on
the Inspection Report,
the same is returned
to the PMET for
editing/finalization,
then proceed to step
10, otherwise is
forwarded to the ED
for approval.
16 CO-ED reviews and approves the Project
Inspection Report (Physical)
Project Inspection
Report (Physical)
proofread by the
ES
45 minutes Executive
Director
Reviewed and
signed Project
Inspection Report
(Physical)
If there is any instruction from the Directors, act accordingly on the matter. Otherwise the Project Inspection Report shall be released to the Records Section for mailing to concerned LGU and Regional Office and secure file copy for future reference.
17 CO-M&E Division receives and records from
the Office of the Executive Director the
signed Project Inspection Report.
Project Inspection
Report (Physical)
reviewed,
concurred and
signed by ED.
5 minutes Admin Aide Reviewed,
concurred and
signed Project
Inspection Report
(Physical)
18 CO-M&E Division records and transmits to
the Records Division the signed Project
Inspection Report for mailing to concerned
Project Inspection
Report (Physical)
reviewed,
concurred and
5 minutes Admin Aide Date, time and
details of the
Project Inspection
Report (Physical)
CO-M&E Division
secured a file copy for
future reference
732
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
RO and LGU. signed by ED. recorded in the
logbook of the
Records Division.
End of Process
733
1.3 Review progress against Project Implementation Plan (PIP)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division evaluates the
accomplishment and implementation of the
project if it is in conformity with the
approved schedule stated in the Project
Implementation Plan (PIP).
Docket of Project
Center (Physical
and Financial
Reports and
Project
Implementation
Plan)
20 minutes Project
Evaluation
Officer
Project monitoring
and evaluation.
If project is not within the implementation schedule advice project center to request the extension of project operation, proceed to step 2. Otherwise, continue monitoring of the project for any possible outcome.
2 CO-M&E Division revises implementation
schedule, and modify completion date to
appropriate time.
Project monitoring
and evaluation.
30 minutes Project
Evaluation
Officer
Revised
implementation
Schedule.
If evaluation warrants
the extension of
project
implementation.
3 CO-M&E Division prepares letter (original
action) to the project manager, stating the
project evaluation findings, requiring
him/her to send letter request for extension
of project implementation.
Revised
implementation
Schedule.
30 minutes
Project
Evaluation
Officer
Letter requiring
project manager
to send request
for extension of
project
implementation
countersigned by
the PEO.
Letter requiring
project manager to
send request for
extension of project
implementation is
forwarded to the
Division Chief.
4 CO-M&E Division reviews the letter Letter requiring 20 minutes M&E Chief Letter requiring If corrections/revisions
734
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
requiring project manager to send request
for project implementation.
project manager
to send request
for extension.
project manager
to send request
for extension of
project
implementation
reviewed and
countersigned by
M&E Chief.
are made by the M&E
Chief on the letter the
same is returned to
the Action Officer (AO)
for editing/
finalization, otherwise,
is forwarded to the
SPMS Director.
5 CO-M&E Division records and transmits to
the Office of the SPMS Director the letter
requiring project manager to send request
for extension of project implementation.
Letter requiring
project manager
to send request
for extension of
project
implementation
reviewed and
countersigned by
M&E Chief.
5 minutes Admin Aide Date, time and
details of the
letter recorded in
the logbook of
M&E Divisions.
6 SPMS Director reviews and approves the
letter requiring project manager to send
request for extension of project
implementation.
Letter requiring
project manager
to send request
for extension of
project
implementation.
30 minutes SPMS
Director
Reviewed and
signed letter
requiring project
manager to send
request for
extension of
project
implementation.
If corrections/revisions
are made by the SPMS
Director on the letter
the same is returned
to the Action Officer
(AO) for editing/
finalization, then
proceed to step 3.
735
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
7 CO-M&E Division records and transmits the
letter requiring project manager to send
request for extension of project
implementation to Records Division for
mailing al delivery.
Signed letter
requiring project
manager to send
request for
extension of
project
implementation.
5 minutes Admin Aide Date, time and
details of the
letter recorded in
the logbook of the
Office of the CO-
Records Division.
Secure file copy of
letter requiring project
manager to send
request for extension
of project
implementation.
When the required letter has been received proceed to step 1 of Procedure Title - Prepare recommendations based on the report.
End of Process
736
1.4 Prepare recommendations based on the report (recommendation on revisions)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records
letter request for extension of project
implementation from participating LGU
signed by the Local Chief Executive (LCE).
Letter request for
extension of
project
implementation
from participating
LGU.
10 minutes Admin Aide Date, time and
details of letter
request recorded
in the logbook.
Corresponding CCS
attached.
The letter request is
forwarded to
concerned PEO
2 CO-M&E Division prepares and finalizes
letter request/recommendation for
extension of project implementation
.together with revised implementation
schedule addressed to CO-EXEC Division.
Letter request for
extension of
project
implementation
from participating
LGU.
1 hour Project
Evaluation
Officer II & III
Letter
request/recomme
ndation for
extension of
project
implementation
with revised
implementation
schedule
countersigned by
concerned PEO;
and letter request
for extension from
LGU.
Letter
request/recommendat
ion for extension of
project
implementation
together with revised
implementation
schedule are
forwarded to M&E
Chief.
3 CO-M&E Division reviews and approves the
letter request/recommendation for
extension of project
implementation.together with revised
Letter
request/recomme
ndation for
extension and
30 minutes M&E Chief Letter
request/recomme
ndation for
extension of
If corrections/
revisions are made by
the M&E Chief on the
letter
737
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
implementation schedule addressed to CO-
EXEC Division.
revised
implementation
schedule
countersigned by
PEO
project
implementation
with revised
implementation
schedule
reviewed/counters
igned/signed by
the M&E Chief;
and letter request
for extension from
LGU
request/recommendat
ion for extension and
revised
implementation
schedule, the same
are returned to
concerned PEO for
editing/ finalization,
otherwise, are
forwarded to CO-EXEC
Division
4 CO-M&E Division records and transmits the
letter request/recommendation for
extension of project
implementation.together with revised
implementation schedule addressed to CO-
EXEC Division.
Letter
request/recomme
ndation for
extension of
project
implementation
with revised
implementation
schedule
reviewed/counters
igned/signed by
the M&E Chief;
and letter request
for extension from
LGU
5 minutes Admin Aide Date, time and
details of
Memorandum,
amended SPLA
and revised
implementation
schedule recorded
in the logbook
Filed copy of letter request/recommendation for extension of project implementation and revised implementation schedule
CO-EXEC Division prepares and finalizes letter request for extension of project implementation schedule
738
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
addressed to concerned Office.
End of Process
739
1.4 Prepare recommendations based on the report (recommendation on fund releases)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records
letter request for fund release from
participating LGU signed by the Local Chief
Executive (LCE).
Letter request for
fund release from
participating LGU.
5 minutes Admin Aide Date, time and
details of letter
request recorded
in the logbook.
Corresponding CCS
attached.
The letter request is
forwarded to
concerned PEO
2 CO-M&E Division prepares and finalizes
letter request/recommendation for fund
release addressed to CO-EXEC Division.
Letter request for
fund release from
participating LGU
1 hour Project
Evaluation
Officer
Letter request/
recommendation
for fund release
countersigned by
PEO; and letter
request for fund
release from LGU.
The letter request/
recommendation for
fund release is
forwarded to M&E
Chief.
3 CO-M&E Division reviews and approves the
letter request/recommendation for fund
release addressed to CO-EXEC Division.
Letter request/
recommendation
for fund release
countersigned by
PEO; and letter
request for fund
release from LGU
30 minutes M&E Chief Letter request/
recommendation
for fund release
reviewed and
signed by M&E
Chief; and letter
request for fund
release from LGU
If corrections/
revisions are made by
the M&E Chief on the
letter request/
recommendation for
fund release, the same
is returned to
concerned PEO for
editing/ finalization,
then proceed to step 2
otherwise, is
740
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
forwarded to CO-EXEC
Division.
4 CO-M&E Division records and transmits the
letter request/recommendation for fund
release to CO-EXEC Division.
Reviewed and
signed letter
request/recomme
ndation for fund
release.
5 minutes Admin Aide Date, time and
details of letter of
request/recomme
ndation for fund
release recorded
in the logbook
Filed copy of letter request/recommendation for fund release; CO-EXEC Division prepares and finalizes letter request for fund release addressed to concerned Office;
End of Process
741
1.6 Determine compliance or conformity of project accomplishments with pre-set, or agreed-upon standards as to
qualify, volume, and output.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Make a representation with the Municipal Assessor, showing the travel authority; inform him/her of the purpose of the visit.
Office Travel Order/Authority
30 minutes Project Evaluation
Team
Authority to conduct a physical inspection/ validation of project output.
This activity shall be conducted during post-field operations.
2 Make a courtesy call with the Municipal Mayor (Project Manager) together with the Assessor and others involved in the implementation of the project. Informing the latter of the authority to conduct project inspection and validation.
Office Travel Order/Authority
1 hour Project Evaluation
Team
Authority to conduct a physical inspection/ validation of project output.
3 Confirms/validates/verifies the latest physical output against the Physical Accomplishment Report submitted. Inspect output based on the latest report.
Latest Physical Accomplishment Report
45 minutes Project Evaluation
Team
Confirmed/Verified/ Validated Physical Accomplishment Report.
4
Examines the output if the same conforms to the standard prescribed in the Manual of Real Property Appraisal and Assessments Operations.
Confirmed/Verified/ Validated Physical Accomplishment Report.
2 hours Project Evaluation
Team
Examined/Verified Physical Accomplishment
Tax Maps – refer to Chapter II, Sec. 2, Figure 1, 1-a, 2, 4, 5, 6, 7, 8 and 9. Sectioning – refer to Chapter II, Sec. 2, 3(A). Forms and Records – refer to Chapter VI, Sections 1, 2 and 3. Data must be in accordance with the
742
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
provisions of the manual, as to the assessment and appraisal, Codes and Numbering system. If outputs are in compliance with the Manual of Operations, sign the Physical Accomplishment Report approving the same (Post-Field Operations).
5 Conducts exit conference and presents all the findings during the field inspection, in case there are adverse findings, recommends immediate mitigating measures to address the problem.
Examined/Verified Physical Accomplishment
45 minutes Project Evaluation
Team
Findings/ recommendations on the conduct of project inspection (physical progress)
Field Inspection report should be prepared upon return to Office.
6 CO-M&E Division prepares and finalizes inspection report one week upon return to Office.
Findings/ recommendations on the conduct of project inspection (physical progress )
45 minutes Project Evaluation
Team
Field Inspection Report countersigns by concerned PEOs.
Field Inspection Report is forwarded to M&E Chief.
7 CO-M&E Division reviews and countersigns Field Inspection Report
Field Inspection Report
30 minutes M&E Chief Field Inspection Report reviewed and countersigned by M&E Chief
If corrections/ revisions are made on the Field Inspection Report by M&E Chief, the same is returned to concerned PEO for
743
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
editing/finalization; otherwise is forwarded to the SPMS Director
8 CO-M&E Division records and transmits Field Inspection Report to the SPMS Director.
Field Inspection Report reviewed and countersigned by M&E Chief.
5 minutes Admin Aide Date, time and details of Field Inspection Report recorded in logbook of M&E Division. CCS attached
9 CO-SPMS Director reviews and countersigns Field Inspection Report.
Field Inspection Report reviewed and countersigned by M&E Chief.
30 minutes SPMS Director
Field Inspection Report reviewed and noted by the SPMS Director
If corrections/ revisions are made on the Field Inspection Report by SPMS Director, the same is returned to concerned PEO for editing/finalization; otherwise is forwarded to the DED for Operations.
10 CO-DED for Operations reviews and countersigns the Field Inspection Report.
Field inspection report reviewed and noted by SPMS Director
30 minutes DED for Operations
Field inspection report reviewed and noted by DED for Operations
If corrections/ revisions are made on the Field Inspection Report by DED for Operations, the same is returned to concerned PEO for editing/finalization; otherwise is
744
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
forwarded to the ED.
11 CO-ED reviews and approves the Field Inspection Report.
Field inspection report reviewed and noted by DED for Operations
30 minutes. ED Field inspection report reviewed, noted and approved the Field Inspection Report.
If there is any instruction from the Directors, act accordingly on the matter. Otherwise the Field Inspection Report shall be released to the Records Section for mailing to concerned LGU and copy furnish concerned RO and likewise secure a copy for future reference.
12 CO-M&E Division receives and transmits the signed Field Inspection Report with notations of the other Directors.
Signed/Noted Field Inspection Report
5 minutes Admin Aide Date, time and details of the report on field inspections recorded in the logbook of the Records Division.
Secure file copy of the field inspection report for future reference; See process of “Outbound documents” under Records Section;
End of Process
745
1.7 Verify/validate project funds expenditures
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. CO-M&E Division examines the total actual expenditures posted in the audited financial reports (Certificate of Status of Funds together with Statement of Expenditures (CSF/SOE) submitted by the project center if the same are in conformity with the Summary of Project Cost indicated in the approved (PIP).
Audited CSF/SOE with supporting documents.
1 hour Project Evaluation
Officer
Audited CSF/SOE Refer to Manual on Financial Management for rules and regulations on disbursement.
2. CO-M&E Division validates the actual expenditures incurred for every component (Tax Mapping, Records Conversion and Tax Collections).
PIP and Audited CSF/SOE with supporting documents.
1 hour PEO Evaluated allocation of project cost and Evaluation summary (financial)
Refer to Manual on Financial Management for rules and regulation on disbursement and the PIP for schedule of costing; The total expenses incurred should not exceed the allocated amount in the summary of project cost indicated in the approved PIP.
If the total actual expenditures exceed the approved allocated amount, the excess amount may be charged against the general fund of the project center. Otherwise, the participating LGU should make a request for realignment of funds.
3. CO-M&E Division receives and records the letter request for realignment of funds from the Office of the Project Manager (Project Center).
Letter request of LGU for the realignment of funds
5 minutes Admin Aide Date, time and details of letter request recorded in the logbook. Corresponding CCS
The letter request is forwarded to concerned PEO
746
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
attached
4. CO-M&E Division revises the summary of project cost in the PIP according to the requested realignment of fund not exceeding the total project cost per component.
Letter request of LGU for the realignment of funds
45 minutes PEO Summary of project cost revised and countersigned by concerned PEO; letter request of LGU for realignment of funds
5. CO-M&E Division prepares letter to the project manager approving the request for realignment of fund together with revised summary of project cost. Informing also that any cost overrun that may be incurred in connection with the project expenses shall be borne fully by the LGU chargeable against its local funds
Revised summary of project cost
45 minutes PEO Letter to the Project Manager approving the realignment of funds countersigned by concerned PEO; and Revised summary of project cost
The letter approving the realignment of funds and revised summary of project cost are forwarded to M&E Chief
6. CO-M&E Division reviews and approves the letter request for the realignment of fund and the revised summary of project cost.
Letter to the Project Manager approving the realignment of funds countersigned by PEO; and revised summary of project cost.
20 minutes M&E Chief Letter to the Project Manager approving the realignment of funds and revised summary of project cost countersigned by M&E Chief
If corrections/ revisions are made by M&E Chief on the letter to the Project Manager approving the realignment of funds and revised summary of project cost, the same are returned to the PEO for editing/
747
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
finalization, otherwise, is forwarded to the SPMS Director.
7. CO-M&E Division records and transmits the letter to Project Manager approving the request for realignment of funds together with revised summary of project cost to the Office of the SPMS Director.
Letter to the Project Manager approving the realignment of funds and revised summary of project cost countersigned by M&E Chief.
5 minutes Admin Aide Date, time and details of the letter to the project manager approving the realignment of fund recorded in the logbook of the M&E Division.
8. CO-SPMS Director reviews and approves the letter to Project Manager approving the request for realignment of funds t.
Letter to the Project Manager approving the realignment of funds and revised summary of project cost countersigned by M&E Chief.
30 minutes
SPMS Director
Letter to the Project Manager relative to the realignment of funds and revised summary of project cost reviewed and approved by the SPMS Director.
If corrections/revisions are made by the SPMS Director on the letter to the Project Manager approving the realignment of funds the and the revised summary of project cost, the same are returned to the PEO for editing/ finalization, then proceed to step 5.
9. CO-M&E Division records and transmits to the Records Division approved letter to the project manager relative to the request for realignment of funds together with revised summary of project cost for mailing to concerned LGU.
Approved letter to the Project Manager relative tot the request for realignment of funds together
5 minutes Admin Aide Date, time and details of letter to LGU recorded in the logbook
For mailing to concerned LGU (see process of “Outbound Documents” under Records Section)
748
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
with revised summary of project cost.
End of Process
749
5.1 Collate impact report, sustainability plan and SPCR on completed projects
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records Sub-Project Completion Report (SPCR), Impact Report and Sustainability Plan (SP) submitted by project centers.
SPCR, Impact Report and SP
10 minutes Admin Aide Date, time and details of the reports recorded in the logbook. Corresponding CCS attached.
Forward to the Project Evaluation Officers the Sub-Project Completion Report (SPCR), Impact Report and Sustainability Plan (SP).
2 CO-M&E Division reviews Sub-Project Completion Report (SPCR) and Sustainability Plan (SP). Evaluate/validate Impact Report.
SPCR, Impact Report and SP
30 minutes Project Evaluation
Officer
Reviewed SPCR and SP. Evaluated Impact Report.
3 CO-M&E Division gathers data from reviewed/evaluated/ validated Sub-Project Completion Report (SPCR), Impact Report and Sustainability Plan (SP).
Reviewed SPCR and SP. Evaluated Impact Report.
30 minutes Project Evaluation
Officer
Data from reviewed SPCR and SP. Evaluated Impact Report.
4 CO-M&E Division files of Sub-Project Completion Report (SPCR), Impact Report and Sustainability Plan (SP) for consolidation with other reports of project centers, in preparation for the Project Completion Report (PCR).
Reviewed SPCR and SP. Evaluated Impact Report.
10 minutes Admin Aide Filed Sub-Project Completion Report (SPCR), Impact Report and Sustainability Plan (SP).
Until the submissions of reports are completed and the data are evaluated, validated and gathered the same must be forwarded to PLANS DIVISION for Project Completion Report (PCR) preparation.
End of Process
750
5.2 Prepare analysis of impact report
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records the
Sub-Project Completion Report (SPCR) and
Impact Report (IR) submitted by project
LGUs.
SPCR and Impact
Report
5 minutes Admin Aide Date, time and
details of SPCR
and IR recorded in
the logbook.
SPCR and IR are
forwarded to
concerned PEO.
2 CO-M&E Division consolidates the data from
Sub-Project Completion Report (SPCR) and
Impact Report submitted by project LGUs.
SPCR and Impact
Report
45 minutes PEO Consolidated data
from SPCR and IR
3 CO-M&E Division prepares data analysis
relative to the impact of the completed
project to Project LGUs.
Consolidated data 45 minutes PEO Analyzed data
prepared by PEO
4 CO-M&E Division prepares and finalizes
analysis report with corresponding
Memorandum relative to the impact of the
completed project to the project LGU.
Analyzed data 45 minute PEO Analysis Report
together with
Memorandum
Analysis Report and
Memorandum are
forwarded to M&E
Chief
5 CO-M&E Divisions reviews and makes
comments on the analysis report.
Analysis Report
together with
Memorandum
30 minutes M&E Chief Analysis Report
and Memorandum
reviewed and
countersigned by
M&E Chief
If corrections/revisions
are made by the M&E
Chief on the Analysis
Report and
Memorandum, the
same are returned to
PEO for editing/
finalization, otherwise,
751
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
are forwarded to the
SPMS Director.
6 CO-M&E Division records and transmits the
Analysis Report together with Memorandum
to the SPMS Director.
Analysis Report
together with
Memorandum
5 minutes Admin Aide Date, time and
details of Analysis
Report and
Memorandum
recorded in the
logbook. CCS
attached.
7 CO-SPMS Director reviews and countersigns
the analysis report and Memorandum.
Analysis Report
together with
Memorandum
30 minutes SPMS
Director
Analysis Report
and Memorandum
reviewed and
countersigned by
SPMS Director
If corrections/revisions
are made by the SPMS
Director on the
analysis report and
Memorandum, the
same are returned to
M&E Division, for
editing/finalization,
then proceed to step
4, otherwise, is
forwarded to the DED
for Operations.
8 CO-DED for Operations reviews and
countersigns analysis report with
Memorandum.
Analysis Report
and Memorandum
reviewed and
countersigned by
30 minutes DED for
Operations
Analysis Report
and Memorandum
reviewed and
countersigned by
If corrections/revisions
are made by the DED
for Operations on the
analysis report with
752
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
SPMS Director DED for
Operations
Memorandum, the
same are returned to
M&E Division, for
editing/finalization,
then proceed to step
4, otherwise, is
forwarded to the ED.
9 CO-ED Executive Secretary proofreads
analysis report with Memorandum.
Analysis Report
and Memorandum
reviewed and
countersigned by
DED for
Operations
30 minutes Executive
Secretary
Proofread analysis
report with
Memorandum
If corrections/revisions
are made by the
Executive Secretary on
the analysis report
with memorandum,
the same are returned
to M&E Division, for
editing/finalization,
then proceed to step
4; otherwise are
forwarded to the ED
10 CO-ED reviews and approves analysis report
with Memorandum.
Proofread analysis
report with
Memorandum
30 minutes ED Reviewed and
signed analysis
report with
Memorandum
If corrections/revisions
are made by the ED on
the analysis report
with Memorandum,
the same are returned
to M&E Division, for
editing/finalization,
then proceed to step
753
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4.
If there are any instructions from the Directors, act accordingly on the matter. Otherwise proceed to next step.
11 CO-M&E Division records and transmits to
the PLANS DIVISION the analysis report in
preparation for the Project Completion
Report (PCR) and for Publication,
distribution and knowledge management
(please see Procedure Title: Publication,
Distribution and Knowledge Management).
Approved analysis
report with
Memorandum
5 minutes Admin Aide Date, time and
details of the
analysis report and
Memorandum
recorded in the
logbook.
Secure file copy of the
analysis report and
Memorandum for
future reference.
End of Process
754
5.3 Publication, distribution, knowledge management.
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
For publication:
1 CO-M&E Division prepares Memorandum requesting the Chief, MIS to publish the analysis report on BLGF website.
Directors reviewed/ commented/concurred/ noted analysis report.
35 minutes PEO Memo requesting MIS Chief to publish analysis report on BLGF website.
The Memorandum requesting for the publication of the analysis report on the BLGF website forwarded to M&E Chief for signature.
2 CO-M&E Division reviews and signs the Memorandum requesting the Chief, MIS to publish the analysis report at BLGF website.
Directors reviewed/ commented/concurred/ noted analysis report.
20 minutes M&E Chief Reviewed and signed Memorandum requesting MIS Chief to publish analysis report at BLGF website.
3 CO-M&E Division records and transmits memorandum requesting Chief, MIS to publish the analysis report at BLGF website.
Signed memo requesting Chief, MIS Chief to publish analysis report at BLGF website.
5 minutes Admin Aide Date, time and details of the Memorandum recorded in logbook of M&E Division.
Signed Memorandum requesting Chief, MIS to publish the analysis report on BLGF website is forwarded/released to MIS Division.
For distribution:
1 CO-M&E Division prepares Memorandum Circular informing all the Regional Directors and Local Treasurers and Assessors of the analysis report relative to the impact of the completed project to the LGUs that participated in the project.
Directors reviewed/ commented/concurred/ noted analysis report.
45 minutes PEO Memorandum Circular countersigned by the PEO
Memorandum Circular is forwarded to M&E Chief.
755
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
2 CO-M&E Division reviews the Memorandum Circular informing all the Regional Directors and Local Treasurers and Assessors of the analysis report.
Memorandum Circular countersigned by the PEO
30 minutes M&E Chief Memorandum Circular reviewed and countersigned by the M&E Chief
If corrections/revisions are made by the M&E Chief on the Memorandum Circular, the same is returned to the PEO for editing/finalization, otherwise, is forwarded to the SPMS Director.
3 CO-M&E Division records and transmits to the SPMS Director the Memorandum Circular for information/comment/ concurrence/ notation.
Memorandum Circular reviewed and countersigned by M&E Chief
5 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook of M&E Division. CCS attached
4 SPMS Director reviews and countersigns he Memorandum Circular informing all the Regional Directors and Local Treasurers and Assessors of the analysis report.
Memorandum Circular reviewed and countersigned by M&E Chief
30 minutes SPMS Director
Memorandum Circular reviewed and countersigned by SPMS Director
If corrections/revisions are made by the SPMS Director on the Memorandum Circular, the same is returned to the PEO for editing/finalization, then proceed to step 2, otherwise, is forwarded to DED for Operations.
5 CO-DED, Operations reviews and countersigns Memorandum Circular informing all the Regional Directors and
Memorandum Circular reviewed and countersigned
30 minutes DED for Operations
Memorandum Circular reviewed and countersigned
If corrections/revisions are made by the DED-Operation
756
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Local Treasurers and Assessors of the analysis report.
by SPMS Director by DED for Operations
Memorandum Circular , the same is returned to the PEO for editing/finalization, then proceed to step 2, otherwise, is forwarded to the ED.
9 CO-ED reviews and signs the Memorandum Circular informing all the Regional Directors and Local Treasurers and Assessors of the analysis report.
Memorandum Circular reviewed and countersigned by DED for Operations
30 minutes Executive Director
Memorandum Circular reviewed and signed by ED
If corrections/revisions are made by the ED on the Memorandum Circular, the same is returned to the PEO for editing/finalization, then proceed to step 2, otherwise, is forwarded to the Records Section.
If there are any instructions from the Directors, act accordingly on the matter. Otherwise proceed to next step. 10 CO-M&E Divisions records and transmits to
the Records Division for mailing the Memorandum Circular informing all the Regional Directors and Local Treasurers and Assessors of the analysis report.
Memorandum Circular reviewed and signed by ED
5 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook of the Records Section.
For knowledge management:
1 CO-M&E Divisions prepares memo requesting Chief, INFO to keep hold of a copy of the analysis report in the library for knowledge sharing.
Analysis report 5 minutes Admin Aide Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in
Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in the library for
757
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
the library for knowledge sharing, countersigned by PEO.
knowledge sharing is forwarded to M&E Chief
2 CO-M&E Division reviews and signs the Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in the library for knowledge sharing.
Memorandum requesting M&E Chief to keep hold of a requesting Info. Division Chief to shelve a copy of the analysis report in the library, for knowledge sharing, countersigned by AO.
30 minutes M&E Chief Reviewed and signed Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in the library for knowledge.
If corrections/revisions are made by the M&E Chief on the Memorandum , the same is returned to the PEO for editing/finalization, otherwise, is forwarded to Chief, INFO for dissemination.
3 CO-M&E Divisions records and transmits Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in the library for knowledge sharing.
Signed Memorandum requesting Chief, INFO to keep hold of a copy of the analysis report in the library for knowledge sharing.
5 minutes Admin Aide Date, time, and details of Memorandum recorded in the logbook of M&E Division.
Secured file copy of the Memorandum
End of Process
758
5.4 Facilitate LGU preparation of sustainability progress report
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 CO-M&E Division receives and records Sustainability Plan (SP) submitted by project center.
Sustainability Plan (SP)
5 minutes Admin Aide Date, time and details of the SP recorded in the logbook. Corresponding CCS attached.
Sustainability Plan (SP) forwarded to Project Evaluation Officer.
2 Review SP submitted by project center. SP must contain: Key Areas (Revenue Generation Program, Internal Administration and Capacity Bldg.); Services (Assessment & Treasury Offices); Strategies by Element (Activities or Possible Solution); Timeframe (How much period is needed to accomplish task); Fund Requirement (Amount and Source); Responsible Person (Point Person in achieving the task); Materials/Equipment (Supplies needed); Expected Output/Outcome (What result wanted to achieve?). Sustainability plan must include: Tax Mapping Maintenance; Maintenance of Assessment Records; Updating of RPT Records; Provision of Assessment records; Identification/discoveries of new real property/ies and others.
Sustainability Plan (SP)
30 minutes Project Evaluation
Officer
Reviewed Sustainability Plan (SP).
3 CO-M&E Division prepares and finalizes letter requiring project center to submit status report relative to the implementation of Sustainability Plan (SP).
Reviewed Sustainability Plan (SP).
30 minutes Project Evaluation
Officer
Letter requiring project center to submit status report countersigned by
Letter is forwarded to the M&E Division Chief.
759
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
concerned PEO.
4 CO-M&E Division reviews and counter signs the letter requiring project center to submit status report on SP.
Letter requiring project center to submit status report countersigned by concerned PEO.
20 minutes M&E Division Chief
Letter requiring project center to submit status report countersigned by Division Chief.
If corrections/revisions are made by the Division Chief on the letter, the same is returned to the AO for editing/finalization, otherwise, is forwarded to the SPMS Director.
5 CO-M&E Division records and transmits to Director, the letter requiring project center to submit status report on SP.
Letter requiring project center to submit status report countersigned by Division Chief.
5 minutes Admin Aide Date, time and details of the letter recorded in logbook of M&E Division.
6 SPMS Director reviews and signs the letter requiring project center to submit status report on SP.
Letter requiring project center to submit status report countersigned by Division Chief.
20 minutes Project Centers
SPMS Director
Letter requiring project center to submit status report signed by SPMS Director
If corrections/revisions are made by the SPMS Director on the letter, the same is returned to the AO for editing/ finalization, then proceed to step 3.
7 CO-M&E Division records and transmits to Records Section the signed letter requiring project center to submit status report on SP for mailing to concerned LGU.
Signed letter requiring project center to submit status report on SP.
5 minutes Admin Aide Copy of signed letter docketed
See process of “outbound documents” under Records Section
End of Process
760
Bureau of Local Government Finance
Operating Procedure for Regional Offices
761
DIVISION : Regional Office
UNIT NAME : BRIEF DESCRIPTION : CLIENTS : BLGF Central & Regional Office, LGU Treasurer & Assistant Treasurer (Municipal, Province,
Cities), Any Government or Private Entity, General Public; Schedule of Service (Time) : 8am-5pm (working days only) UNIT FUNCTION AND SPECIFIC DUTIES
FUNCTION SPECIFIC DUTIES REMARKS
1. Performs Administrative and Operational functions over the local treasury and assessment offices of the provinces, cities and municipalities
1.1 Administration 1.1.1 Appointment of Treasurer and Assistant Treasurer 1.1.2 Designation of ICO/OIC Treasurer and Acting Assistant
Treasurer 1.1.3 Detail of Local Treasurer (Assistant Treasurer) 1.1.4 Transfer of Local Treasurer (Assistant Treasurer) 1.1.5 Authority to Travel Abroad of Local Treasurer
(Assistant Treasurer) 1.1.6 Leave of Absence of Local Treasurer (Assistant
Treasurer) 1.1.7 Appointment of Regional Staff 1.1.8 PTWAR of Regional Office Staff / granting of
Productivity Incentive Bonus 1.1.9 Implementation of CSC Rules and Regulations for
Regional Office Staff 1.1.10 UPES of Local Treasury and Assessment Office
1.2 Operation 1.2.1 Preparation of Plans and Programs of the Regional
Office 1.2.2 Review and Approve Plans and Programs of Provincial
762
and City Treasury /Assessment Offices (Set of collection target, revenue generation plan)
1.2.3 Monitor/evaluate Plans and Programs of Provincial and City Treasury /Assessment Offices
1.2.4 Prepare a Semestral UPES 1.2.5 Evaluate /Validate UPES of Provincial and City Treasury
/Assessment Offices
2. Supervises and coordinate the conduct of local treasury and assessment operations of the provinces, cities and municipalities within the region for proper implementation of laws, decrees, rules and regulations and administrative issuances of the Department.
2.1 Local Revenue Performance Evaluation (with checklist, provide recommendation to LCE, monitor remittances/deposits of collection, compliance COA audit findings, compliance reports)
2.2 Supervise the transfer of accountabilities between outgoing to incoming accountable officers (Provincial and City Treasurer only)
2.3 Dissemination and Implementation of laws, decrees, rules and regulations and administrative issuances of the DOF/BLGF
2.4 Monitor and enforce implementation of laws, decrees, rules and regulations and administrative issuances of the DOF/BLGF (i.e. eSRE, LTOM, Assessment Manual)
2.5 Provide technical assistance, inputs and recommendation to the preparation of LGU tax code, updating of tax code and other revenue generating initiatives/sources.
2.6 Monitor fiscal/financial performance of LGUs (19 financial indicator)
3. Establish liaison and linkage with other regional offices and agencies of the national government in the region for the purpose of closer coordination in the execution of national regional plans or programs in the area.
3.1 Election Duties 3.1.1 Transfer of Treasurers 3.1.2 Supervise the transfer of accountabilities between
outgoing to incoming accountable officers (Provincial and City Treasurer only)
3.2 BIR MOA Implementation 3.3 NEDA,DILG, DBM, BLGF, Joint Memorandum Circular
763
Implementation 3.4 Provide inputs, technical assistance and activity
participation to Regional Development Council and other relevant agencies (DAR, LBP, DENR, etc.)
4. Undertake researches, studies and related activities with central office for the purpose of formulation and execution of policies that would promote the financial stability and growth of local government.
4.1 Determine LGU fiscal management best practices, reforms, standardization, improvements and innovations for promotions and opportunities of replication.
4.2 Recommend to BLGF Central Office best practices, reforms, standardization, improvements and innovations for promotions and opportunities of replication.
5. Supervises and monitor the execution of tax mapping and other real property assessment projects of the local governments units within the region.
5.1 Promotion of tax mapping and other real property assessment projects (LGFSP, LOGOFIND, etc.)
5.2 Evaluate and identify LGUs’ eligibility/capability /qualification
5.3 Supervise and monitor the execution of tax mapping and other real property assessment projects (findings, recommendations, adjustments, etc.)
6. Provide technical assistance in the preparation and approval of schedules of market values of real property prepared by the provincial and city assessors in the region
6.1 Promote general revision to LGUs 6.2 Provide technical assistance in the preparation and
approval of SMVs (workshop, writeshop, etc.) 6.3 Monitor city and municipality thru the provincial assessor,
the conduct of general revision.
7. Coordinate the plans, programs and activities of local treasury and assessment offices in the conduct of tax collections drives and tax information and education campaigns.
7.1 Facilitate coordination between Treasury and assessment office on related tax collections drives and tax information and education campaigns.
8. Subject to the approval of the Department of Finance, conduct regional training programs, seminar-workshops, conferences, and other allied activities designed primarily for the improvement of administrative and technical skills in the local treasury and assessment offices
8.1 Prepare annual training programs 8.2 Facilitate conduct of training provided by Central Office to
LGUs (LTOM, eSRE) 8.3 Implement approved training program
764
SPECIFIC PROCEDURES 1.1.3 Detail of Local Treasurer (Assistant Treasurer) 1.1.4 Transfer of Local Treasurer (Assistant Treasurer)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives and records request from Local Chief Executives (LCEs) thru Provincial Treasurers (PTs) for for the detail of Local Treasurer
Letter request of LCE with with PT's recommendation and documentary require- ments
5 minutes Admin Aide
Date, time and details of the letter request with complete docu- mentary requirements
Forwarded to RD for proper assign- ment to Action Officer concerned
2 Regional Director (RD) routes/assigns letter request together with documentary requirements, to Action Officer for appropriate action
Letter request with PT's recommendation and documentarty requirements
10 minutes RD Letter request with documentary require- ments assigned to ADMIN OFFICER
Letter request assigned to ADMIN OFFICER
3 Evaluates and prepares appropriate action on the letter request of the LCE
Letter request with documentary requirements
30 minutes Admin Officer Letter request routed by ADMIN OFFICER
Letter request evaluated; appropriate action prepared. If documentary require- ments are complete, proceed to next step, if not, return to PT thru PT to submit lacking requirements
In case of detail or transfer of Local Treasurer to another Office or LGU,
765
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
4 Prepares RSPO designating OIC-ICO Local Treasurer, together with Indorse- ment to BLGF CO
Letter request with documentary requirements
20 minutes Admin Officer RSPO prepared RSPO reviewed by ARD; forwards to RD for approval/ signature
5 Approved/signed RSPO for BLGF CO confirmation
RSPO countersigned by ADMIN OFFICER
10 minutes RD RSPO approved/ signed transmitted to BLGF Manila for confirmation
END OF TRANSACTION
766
1.1.5 Authority to Travel Abroad of Local Treasurer (Assistant Treasurer)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives and records the indorsement from the PT forwarding the request for travel authority abroad of local treasurers/assistants supported with LCE's approval on the request and recommendation as to who will take charge of the Office pursuant to DPO 335-03 dated October 1, 2003.
Indorsement from PT, LCE's approval on the request for travel of treasurers and his recommendation as to who will be designated OIC/ ICO and documentary requirements,
15 minutes Admin Aide Date, time and details of Indorsement from PT, LCE's approval on the request for travel of treasurers and his recommendation as to who will be designated OIC/ ICO and documentary requirements recorded in the logbook
Complete set of communications forwarded to RD proper assignment to Action Officer ( ADMIN OFFICER )
2 Assigns the set of communication to the Action Officer concerned
Indorsement from PT, LCE's approval on the request for travel of treasurers and his recommendation as to who will be designated OIC/ ICO and documentary requirements,
10 minutes Regional Director
Set of communications assigned to Administrative Officer IV (ADMIN OFFICER ) for evaluation and/or appropriate action
767
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3 Evaluates completeness/authenticity of supporting documents on the request for travel abroad and on the request of LCE for the designation of an OIC/ICO treasurer/acting assistant
Indorsement from PT, LCE's approval on the request for travel of treasurers and his recommendation as to who will be designated OIC/ ICO and documentary requirements,
2 hours Admin Officer
Completeness/authenticity of documentary requirements and qualification requirements as OIC/ICO treasurer/ acting assistant met by proposed designee
In case there are lacking requirements, ADMIN OFFICER coor dinates with concerned LGU for the immediate submission/ compliance of requirements, proceed to the next step of the process
4 Prepares indorsement to BLGF Manila, recom- mending approval on the request of the treasurer/ assistant to travel abroad, together with RSPO designating an OIC/ICO treasurer/acting assistant for confirmation
Complete/authomatic documentary requirements; as met by proposed designee
1 hour Admin Officer
Indorsement to BLGF Manila on the request for Travel Authority and RSPO prepared
Designation of an OIC/ICO treasurer in case of tempo- rary or permanent vacancy is a MUST, while that of an Acting Assistant Treasurer is optional. Submitted to ARD for review and initial
5 Reviews and initials indorsement to BLGF Manila recommending approval on the request of treasurer/ assistant to travel abroad; RSPO; and application
Indorsement to BLGF, Manila, RSPO designating OIC/ICO/Acting Assistant together
30 minutes ARD Indorsement letter; RSPO reviewed/initialled
Forwarded to RD for approval/signature
768
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
for leave of absence, if applicable will complete/authomatic documentary requirements
6 Reviews documents and if found to be in order, approves/signs
Reviewed/initialed Indorsement and RSPO
30 minutes RD Indorsement to BLGF, Manila and RSPO approved/signed
Return set of communications to ADMIN OFFICER for release by HRMA to BLGF, Manila
7 Records communication to the logbook for outgoing communications
approved/signed Indorsement to BLGF Manila and RSPO
30 minutes
Admin Officer Set of communications sorted out and recorded
8 Releases set of communications to BLGF, Manila
Set of communications
30 minutes
Admin Aide
(HRMA)
Set of communications released and recorded in the logbook for outgoing communications
Distribution: orig and duplicate copies- BLGF, Manila triplicate copies - BLGF, Regional Office files
9 RO - receives and records approved Travel Abroad and confirmed RSPO from BLGF, Manila
Indorsements approving request to travel abroad and application for leave (if personal travel) and confirming the designation of OIC/
10 minutes Admin Aide
(HRMA)
Indorsements approving request abroad and application for leave (if personal travel) and confirming the designation of OIC/ICO treasurer/acting
Set of communications forwarded to RD for proper assignment to Administrative Officer IV
769
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
ICO treasurer/acting assistant
assistant
10 RD assigns Indorsement with supporting documents to AO
Indorsements approving request to travel abroad and application for leave (if personal travel) and confirming the designation of OIC/ ICO treasurer/acting assistant
10 minutes RD Indorsement assigned to ADMIN OFFICER
11 Prepares Indorsement to concerned treasurer, thru PT concerned
Indorsements approving request to travel abroad and application for leave (if personal travel) and confirming the designation of OIC/ ICO treasurer/acting
30 minutes Admin Officer Indorsement prepared
Indorsement and supporting documents forwarded to ARD for review and initial
770
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
assistant
12 Reviews and initials Indorsement Indorsements approving request to travel abroad and application for leave (if personal travel) and confirming the designation of OIC/ ICO treasurer/acting assistant
10 minutes ARD Indorsement together with supporting documents reviewed and initialled
Forwarded to RD for approval/signature
13 Approves/signs Indorsement Indorsements approving request to travel abroad and application for leave (if personal travel) and confirming the designation of OIC/ ICO treasurer/acting assistant
10 minutes RD Indorsement signed
Set of communications returned to ADMIN OFFICER for release of HRMA to Treasurer concerned
771
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
14 Records coomunication to logbook for outgoing communication
Signed Indorsement approving request to travel abroad and application for leave (personal travel) and confirming the designation of OIC/ICO treasurer/acting assistant
10 minutes Admin Officer Set of communications sorted out, leaving file copies for records
Maintained copies of documents received
15 Releases sets of communications to Treasurer concerned
Indorsement letter together with supporting documents
15 minutes Admin Aide
(HRMA)
Set of communications released and recorded in the logbook for outgoing communicaitions
Distribution: Orig and Duplicate copies - MT thru PT Duplicate copy -file at RO
END OF TRANSACTION
772
1.1.6 Leave of Absence of Local Treasurer (Assistant Treasurer)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO-received and records application for Leaves of Absences exceeding fifteen (15) days of Provincial, City and Assistants Treasurers, in case of municipalities thru the PT
Indorsement duly endorsed by the Provincial Treasurer, together with the application for Leaves
5 minutes Admin Aide Date, time and details of Indorsement with documentary requirements relative to the application for leaves
Forwarded to RD for proper assign- ment to Action Officer concerned (Administrative Asst II/ADMIN OFFICER )
2 RD assigns the indorsement letter to the Action Officer
Letter request with documentary requirements
30 minutes Admin Aide Application for Leaves assigned to HRMA/ Administrative Officer IV
3 Evaluates completeness/authenticity of supporting documents on the application for leaves of absences of local treasurers (assistants)
Indorsement duly endorsed by the Provincial Treasurer, together with the application for Leaves
2 hours Admin Aide Completeness/ authenticity of documentary requirements
In case there are lacking requirements, ADMIN OFFICER coor- dinates with concerned LGU for the immediate submission/
4 Prepares Indorsement to BLGF, Manila, recoomending approval on application for Leaves of Absence of Local Treasurers (/Assistants)
Indorsement duly endorsed by the Provincial Treasurer,
2 hours Admin Aide Indorsement to BLGF, Manila, with the recommendation
submitted to ARD for review and initial
773
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
together with the application for Leaves
of the PT and RD in the application for leaves
5 Reviews Indorsement to BLGF, Manila, for approval on the application leaves of absence of Local Treasurers (Assistants)
Indorsement letter to BLGF, Manila, with recommending approval in the application for leaves of absence
1 hour ARD Indorsement to BLGF, Manila, reviewed/ initialled
Forwarded to RD for approval/ signature
6 Reviews Indorsement to BLGF, Manila, for approval on the application leaves of absence of Local Treasurers (Assistants)
Indorsement countersigned by ARD
30 minutes RD Indorsement approved/ Signed by RD
Set of communications returned to ADMIN OFFICER for release by HRMA to BLGF, Manila
7 Records communication to the logbook for outgoing communications
approved/signed Indorsement to BLGF, Manila
30 minutes Admin Officer
Set of communications sorted out and recorded
END OF TRANSACTION
774
1.2.1 Preparation of Plans and Programs of the Regional Office Step Procedure Input or
Requirement Processing
Time Responsible
Person Output or
Decision Point Remarks
Start the preparation of draft office plans on the basis of previous approved plans and programs to facilitate the easy preparation of plans and programs
1 RO- convenes for any suggestive ideas of the Staff in relation to listed priority thrusts or areas of concerned to be adopt in the preparation of office plans and programs.
Lists of priority thrusts/ areas of concerned
3 hours. ARD Consolidated inputs from regional staff
2 RO- prepares and finalizes the final office plans and programs together with the transmittal letter
Consolidated inputs from regional staff
1 hr. Desig. Planning Officer
Plans and Programs together with transmittal letter countersigned by Planning Officer
Final Office Plans and Programs together with transmittal letter forwarded to ARD for review
3 RO- Assistant Regional Director reviews the final office plans and programs
Final Plans and Programs together with transmittal letter
1 hour Asst. Regional Director
(ARD)
Final Plans and Programs together with transmittal letter countersigned by ARD
If corrections/revisions are made by ARD on Final Plans and Programs together with transmittal letter are forwarded to Desig. Planning Officer for editing/finalization, then proceed to step 2, otherwise the plans and programs are forwarded to RD.
4 Regional Director reviews and approves plans and programs
Final office plans and programs together with transmittal letter countersigned by ARD
1 hour Regional Director
Final Plans and Programs together with transmittal letter reviewed and approved/counter
If corrections/revisions are made by RD on Final Plans and Programs together with transmittal letter are forwarded to
775
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
signed by RD Desig. Planning Officer for editing/finalization, then proceed to step 2, otherwise the plans and programs are forwarded to Admin Officer I. Approved Final Office Plans and Programs with transmittal letter forwarded to Admin. Officer I
5 RO- Records and transmits Plans and Programs to BLGF-Central Office approval
Approved Plans and :Programs
3 mins. Admin. Officer
Date, time and details of Final Office Plans and Programs and transmittal letter recorded in the logbook of the Regional Office Documents released with Registry Receipt/ Bill No./ Date/Time of transmittal
Original copy of the office plans and programs together with transmittal letter are forwarded to the BLGF Central Office Duplicate copy of the reports are forwarded to the Admin Officer I for file
End of Transaction
776
1.2.2 Review and Approve Plans and Programs of Provincial and City Treasury /Assessment Offices (Set of collection target, revenue generation plan)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO- Records and receives plans and programs from the Local Government Units
All plans and programs
20 mins. Admin Aide Date, time and details of plans and programs with attached CCs recorded in the logbook of the Regional Office
Plans and Programs are forwarded to concerned LTOOs/LAOOs ( Action Office)
2 RO- Action Officer reviews and evaluates the plans and programs from Local Government Units based on the revenue targets on Real Property Tax, Business Tax, Fees and Charges and Economic Enterprises allocated to the Regional Office and properly assigned/distributed according to the taxable assessed value x the tax rate of the Local Government Units and with regards to Bus Tax, Fees and Charges and Eco. Ent is the actual collections with increment factors (year, GDP Growth @ Current Price)
Plans and Programs
1 hour LTOOs/LAOOs (Action Officer)
Reviewed and evaluated Plans and Programs for approval with allocated targets on Real Property Tax, Business Tax, Fees and Charges and Eco. Enterprises together with transmittal letter countersigned by Action Officer
For approval Plans and Programs together with transmittal letter forwarded to ARD for review
3 RO- Assistant Regional Director reviews the plans and programs from Local Government Units together with transmittal letter
Plans and Programs together with transmittal letter
30 mins. Asst Regional Director
(ARD)
Plans and Programs together with transmittal letter countersigned by
Plans and Programs together with transmittal letter are forwarded to Regional Director for approval
777
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
ARD.
4 Regional Director reviews and approves plans and programs from Local Government Units together with transmittal letter
Plans and Programs of LGUs together with transmittal letter countersigned by ARD.
1 hour Regional Director
Approved Plans and Programs together with transmittal letter
Approved Plans and Programs of LGUs with transmittal letter forwarded to Admin Officer I
5 RO- Records and transmits Plans and Programs to the concerned LGUs
Approved Plans and Programs
5 mins. Admin. Officer
Date, time and details of approved Plans and Programs and transmittal letter recorded in the logbook of the Regional Office Documents released with Registry Receipt/ Bill No./Date/Time of transmittal
Original copy of the approved plans and programs together with transmittal letter are returned to the concerned LGUs Duplicate copy of the reports are forwarded to the Admin. Officer I for file.
End of Transaction
778
1.2.3 Monitor/evaluate Plans and Programs of Provincial and City Treasury /Assessment Offices
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Present the Memorandum Order to the
Municipal Assessor for monitoring and
evaluation of fthe office as mandated by law
Memorandum
Order
1 hour LAOO Representation
with the municipal
assessor
undertaken
Render technical
assistance in the
preparation of
schedule of market
values
2 Make a courtesy call with the local chief
executive and other municipal officials
informing the purpose of the visit
Memorandum
Order
30 minutes1 LAOO Courtesy call with
the Local Chief
Executive and
other municipal
officials
.
3 Determine the appropriate number of real
property units subject for evaluation
Evaluation of real
property units
using the
assessment roll
1 day LAOO No. of real
property units
4 Validate unit value used in arriving at the
market value of the subject properties in
accordance with the approved schedule of
market values
Validation of unit
value against
approved schedule
of market value of
real property units
1 day LAOO Unit values
validated
5 Validate Field Appraisal and Assessment
Sheets, Tax Deeclarations, if it is in
accordance with the approved schedule of
Field Appraisal and
Assessment Sheet,
Tax Declarations
3 days LAOO Validated FAAS
and TD
779
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
market values validated
6. Conduct on site verification of real
properties subject of the
evaluation/validation
Summary of
records/findings
and observations
1 day LAOO Subject RPU’s tied
up and validated
based on the Tax
Maps and FAAs
subject for
validation
7. Records all the findings/observations noted
in the field validation
Obervations and
findings in the
field noted
3 hours LAOO Findings and
obervatins noted
8. Conduct exit conference to Assessor and LCE
citing all the findings with corresponding
recommendations
Findings on the
conduct of on site
verification
45 min. LAOO Exit conference Repot on field
inspection prepared
upon returning to
office
9. Prepare findings/recommendations on field
inspection conducted
Reports on field
inspection
3 hours LAOO Findings and
recommendation
Letter of inspection
report for submission
to RD
10 Prepares Inspection Report for submission
to RD
Inspection Report 2 hours LAOO Inspection Report
11 Transmit the inspection report with
recommendation to the concered Assessor
and Local Chief Executive
Inspection report
with
recommendation
1 hour Admin
Officer
Tme, date and
details of the
inspection report
recorded in the
Transmitted thru FAX,
email or thru mail with
registry receipt
780
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
logbook
END OF TRANSACTION
781
2.1 Local Revenue Performance Evaluation (with checklist, provide recommendation to LCE, monitor remittances/deposits of collection, compliance COA audit findings, compliance reports)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
25. RD issue directives to concerned employees for the conduct of Revenue Performance Evaluation in the LGUs through the issuance of travel order
Approved Travel Order issued to concerned employees as a team
15 min. RD Approved Travel Order with complete details recorded in the logbook for Travel Orders of the Regional Office.
RO conducts local revenue performance evaluation based on plans and programs and in cases of adverse findings in the Annual Audit Report (AAR).
26. RO prepares the documents needed in the conduct of Revenue Performance Evaluation
Approved Travel Order
1 hour Revenue Evaluation
Team
Forms prepared - Refer to
checklist
The team will proceed
to the LGU for
Revenue Performance
Evaluation on the
scheduled date
27. In the LGU, the team coordinate with the local treasurer for a courtesy call to the LCE and/or any elected officials present
Approved travel order issued to the team
1 hour Team Members
and the local treasurer
The team properly introduced themselves and informed/ briefed the LCE or other officials on the purpose of the travel or the Revenue Performance Evaluation to be conducted within the LGU
After the courtesy call,
the team will proceed
immediately in the
Conduct of Revenue
Evaluation
Performance
782
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
28. RO conducts Revenue Evaluation Performance on the following area in compliance with regulations under LTOM, BLF-DOF, COA, DBM, CSC and Other Agency Issuances/Circulars.
The following should be evaluated: Records Management:
- Questionnaire on Revenue Performance Evaluation
Examination of Books:
- Proof of Accountability
- Status of implementation on the COA AAR Findings.
- Cash Count of the Treasurer/Accountable Officers and the Collectors
1.5 to 2 days Team Findings, comments and recommendations duly noted during the revenue performance evaluation. Supporting documents secured, if needed.
If there were shortages found during the cash count of treasurers/liquidating officer/cashier and collectors, a written demand letter should be issued immediately by the team leader to produce the said amount within 24 hours for deposit. A photocopy of the deposit slip will form part of the report.
783
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
- Sampling on
the computation of RPT/BT /FC in conformity with the provincial/municipal ordinances and other issuances or circulars.
Field Validation:
- Verification sheet to validate the collection on business establishments to confirm the computation of taxes and fees being paid (RPT/BT/FC) by the taxpayers.
784
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
- Follow-
up/Monitor the status of implementation on the COA Annual Audit Report (AAR) Findings.
29. RO conducts exit conference with the LCE and/or any elected official present together with the treasury personnel for the presentation of findings, comments and recommendation for the improvement of the treasury operations in the LGU
Findings, comments and recommendations duly noted during the revenue performance evaluation.
1.5 hours Team Findings, Comments and Recommendations on Local Revenue Performance duly presented for the improvement of the treasury operations.
End of Revenue Evaluation. Return to the regional office
30. RO prepares Accomplishment Report Findings, Comments and Recommendations on the Local Revenue Performance Evaluation conducted
Within 10 days from return to station
Team Field Accomplishment Report prepared and signed by the team members for the information of the RD.
Findings were initially presented to the Regional Director (RD) upon return to office.
785
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Same report with indorsement letter to be signed by the RD to be furnished to the LCE, Provincial and Municipal Treasurers concerned.
31. Assistant Regional Director (ARD) reviews indorsement letter and accomplishment report
Accomplishment Report with Indorsement Letter to the LCE, Provincial and Municipal Treasurer concerned
1 hour ARD Accomplishment Report with Indorsement Letter to the LCE, Provincial and Municipal Treasurer concerned countersigned by ARD
If corrections/re …
32. RD signs indorsement letter with the attached accomplishment report of the team on the findings, comments and recommendations
Accomplishment Report with Indorsement Letter to the LCE, Provincial and Municipal Treasurer concerned countersigned by ARD
1 hour RD Signed/Approved Indorsement Letter with the attached Accomplishment Report by RD
Forwarded to the Admin Officer I the indorsement letter with attached Accomplishment Report.
786
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
33. RO records and transmits the accomplishment report with indorsement letter furnished to the concerned field offices
Signed indorsement letter with accomplishment report
20 mins. Admin Officer
Date, time and details of the indorsement letter with accomplishment report recorded in the logbook of the Regional office. Indorsement letter with accomplishment report released thru mail, or other fastest means
Admin. Officer I maintains office file
END OF TRANSACTION
787
2.2 Supervise the transfer of accountabilities between outgoing to incoming accountable officers (Provincial and City Treasurer only)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. RO- receives and records letter request from
local chief executive (LCE)for the designation
of an OIC/ICO local treasurer
Letter request
from LCE with the
attached
documentary
requirements of
the recommendee
2 mins. Admin Aide Date, time and
details of the
letter request
recorded in the
logbook of the
Regional Office
Letter request
including the
documentary
requirements
forwarded to RD for
assignment to action
officer
2. Regional Director (RD)assigns the letter
request to action officer concerned
Letter request
from LCE with the
attached
documentary
requirements of
the recommendee
10 mins RD Letter request
assigned to
ADMIN OFFICER
Letter request
including the
documentary
requirements
forwarded to Admin
Officer IV
3 RO – prepares Regional Special Personnel
Order (RSPO) directing the outgoing
treasurer to turn-over accountabilities
to the incoming treasurer concerned
Letter request
from LCE with the
attached
documentary
requirements of
the recommendee
3 mins. Admin
Officer
RSPO prepared
and countersigned
by Admin Officer
IV
In case there is/are
lacking document/s,
Admin Officer IV shall
contact the concerned
LGU thru telephone or
email for the
submission of the
same. Otherwise, the
letter-request
788
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
together with the
attached documents
are forwarded to ARD
for review
4 ARD reviews the RSPO and documentary
requirements
RSPO with the
attached
documentary
requirements
20mins ARD RSPO
countersigned by
ARD
If corrections/revisions
are made by the ARD,
the RSPO with the
attached documents
are returned to Admin
Officer IV for revision,
otherwise, the same
are forwarded to RD
for review/approval
5 RD reviews and approves the RSPO RSPO countersigned by ARD together with the attached documentary requirements
30 mins RD RSPO approved and signed by RD
If corrections/revisions
are made by the RD,
the RSPO with the
attached documents
are returned to Admin
Officer IV for revision,
otherwise, the same
are forwarded to
Admin Aide IV for
recording and released
6 RO records and releases the approved and signed RSPO
RSPO approved and signed by RD
5 mins Admin AIde Date, time and details of RSPO
Release RSPO to
incoming treasurer
789
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
recorded in the logbook of the Regional Office
copy furnished the
depository banks,
Local Chief Executives
(LCE),Commission on
Audit, and Provincial
Treasurer in case of
Municipal Treasurers
The documentary
requirements for file
Before proceeding to the LGU concerned an office Order shall be issued by the RD for the purpose – see process on the preparation of Office Order
Implementation of RSPO in the LGU concerned
7 RO makes a courtesy call to LCE informing him/her of the transfer of accountabilities between the outgoing and incoming accountable officers and provide a copy of the RSPO and Office Order
RSPO and Office Order from RD
30 mins SLTE/LTOO and other
RO Staff and the out-going and incoming
treasurers
Information of the activities involved on the transfer given to the LCE and a copy of the RSPO duly received by his/her office
In the absence of the
LCE, make a courtesy
call to the OIC
Provincial
Governor/OIC – City/
/Municipal Mayor
8 RO requires the outgoing treasurer to update and close books of accounts including supplies adjustments, as well as reports on accountable forms
RSPO and Office Order from RD and BLGF Memorandum Circular No. 03- 2007 dated March 5, 2007/ Local Treasury Operations
30 mins. SLTE/LTOO and other
RO Staff and COA
representatives
Updated books of accounts including supplies adjustments, as well as reports on accountable forms and cash books
Time for updating
varies depending on
the bulk of unrecorded
transactions
790
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Manual, BLGF,DOF, October 1, 2007
9 RO performs a cash count of all cash, cash items, checks, certificate of time deposits, stock certificates held on hand by the outgoing treasurer/ collecting officers/clerks in the treasury office, Inventory of Properties and Accountable Forms
BLGF Memorandum Circular No. 03- 2007 dated March 5, 2007/ Local Treasury Operations Manual, BLGF,DOF, October 1, 2007
1 day SLTE/LTOO and other
RO Staff and COA
representatives
Cash Count Sheet and Inventory of Properties and Accountable Forms
Time of inventory
depends on the bulk of
accountable forms and
properties.
10 RO witnesses actual turn-over of above accountabilities from outgoing to incoming ICO/OIC-Treasurer
Invoice- Receipt of Transfer of Accountabilities
30 mins SLTE/LTOO and other
RO Staff and COA
representatives
Cashbooks, Inventories and other documents pertaining to the transfer signed by the SLTE,LTOO III and other RO staff and other COA representatives Invoice Receipt of Transfer of Accountabilities certified correct by the outgoing treasurer, duly received by the incoming treasurer
Furnish copies of
Invoice Receipt of
Transfer of
Accountabilities to
BLGF, COA, Incoming
and outgoing
Accountable Officers
Advise the incoming
accountable officer to
secure specimen
signature cards from
the authorized
depository banks and
791
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
and witnessed by the BLGF and COA representatives
apply fidelity bond
with Bureau of the
Treasury
11 RO prepares Memorandum Report for Regional Director
Invoice Receipt of Transfer of Accountabilities certified correct by the outgoing treasurer, duly received by the incoming treasurer and witnessed by the BLGF and COA representatives
At least 5 working days upon return
to office
SLTE/LTOO and other RO Staff
Memorandum Report for RD
Forwarded to RD for
information and/or
appropriate action
Memorandum Report
including turn over
documents for file by
the Admin Officer I
END OF TRANSACTION
792
2.4 Monitor and enforce implementation of laws, decrees, rules and regulations and administrative issuances of the DOF/BLGF (i.e. eSRE, LTOM, Assessment Manual)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. RO – Receives and records required reports from field offices (Provincial/City Municipal Treasury and Assessment Offices) as required by BLGF/DOF issuances
Treasury/Assessment Reports
10 minutes Admin. Aide Date, time and details of reports with attached CCS recorded in the logbook of the Regional office.
Reports is forwarded to the concerned Section (Treasury/Assessment)
2. Employee assigned for the required reports (Treasury/Assessment Section) will receive and record in the monitoring sheet/logbook and to encode and analyze the report if necessary
Required reports from the LGUs
30 minutes SLTE/ LAOO
Monitoring Sheet/Logbook duly updated Reports encoded and analyzed
10 days after the deadline of submission of required reports, 1st tracer should be sent to the LGUs without reports.
3. SLTE/LAOO or concerned staff will prepare tracers to the LGUs without reports
Tracers with complete information
- Lacking reports
- Sanctions - Deadline
for submission
15 minutes SLTE/ LAOO or
concerned staff
Tracers reviewed and initialed by the ARD
If corrections/
revisions are made by the ARD , the same is returned to the concerned employee
Follow-up tracers should be sent after every ten (10) days of deadline set.
- 2nd tracer
793
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
- 3rd and final tracer
Legal action to be initiated after the deadline on the issuance of the 3rd and final tracer. Refer to URACCS for the process.
4. Regional Director reviews and signs the tracer
Tracers initialed by the ARD
15 minutes Regional Director
Tracers reviewed and signed by the Regional Director
If corrections/ revisions are made by the Regional Director, the same is returned to the concerned employee for editing/finalization, otherwise the signed communication is forwarded to the Admin Officer I.
5. RO Admin. Officer I records and transmits the communication to the concerned field offices
Signed communication in reply to the request
10 minutes Admin Officer
Date, time and details of the communication recorded in the outgoing logbook of the Regional office.
Admin. Officer I maintains office files
794
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Communication released thru mail, or other fastest means
END OF TRANSACTION
795
2.5 Provide technical assistance, inputs and recommendation to the preparation of LGU tax code, updating of tax code and other revenue generating initiatives/sources
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. RO - Records and receives letter-request from LGUs for technical assistance in the preparation/updating of tax code
Letter-request from the LGU
10 minutes Admin. Aide Date, time and details of letter-request with attached CCS recorded in the logbook of the Regional office.
Letter-request is forwarded to the Regional Director (RD) for information and notation If verbal request the requesting party will be directed to the RD
2. RD assigns the Treasury Section Chief to prepare appropriate communication depending on the letter-request
Letter-request from the LGU
15 minutes Regional Director
Letter-request with notation of the RD referred to the Treasury Section Chief
Treasury Section Chief
duly acknowledged
the LGU letter-request
in the logbook
3. Treasury Section Chief prepares appropriate communication in reply to the letter-request
Letter-request with notation of the RD
Within 5 days depending
on the request
Local Treasury
Operations Officer (LTOO)/
Supervising Local
Treasury Examiner
(SLTE)
Communication prepared in reply to the letter-request (with attached references, if needed) countersigned by the ARD
If corrections/revisions
are made by the ARD ,
the same is returned
to the concerned
Treasury Section Chief
If the request requires
field assistance,
issuance of travel
796
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
order is necessary.
4. RD reviews and signs the communication in reply to the letter-request (with attached references, if needed)
Communication prepared in reply to the letter-request (with attached references, if needed) countersigned by ARD
1 hour Regional Director
Communication in reply to the letter-request reviewed and signed by the RD
If corrections/revisions are made by the RD, the same is returned to the Treasury Section Chief for editing/finalization, otherwise the signed communication is forwarded to the Admin Officer I.
5. RO Admin. Officer I records and transmits the communication to the concerned field offices
Communication in reply to the letter-request reviewed and signed by the RD
15 minutes Admin Officer
Date and details of the communication recorded in the outgoing logbook of the Regional office. Communication released thru mail, or other fastest means
Admin. Officer I maintains office file
END OF TRANSACTION
797
3.3 NEDA,DILG, DBM, BLGF, Joint Memorandum Circular Implementation
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives and records letter invitation from DILG for the conduct of joint meeting with concerned agencies (DBM, NEDA, BLGF) relative JMC
Letter invitation from DILG
2 minutes Admin Aide Date, time and details of the letter invitation recorded in the logbook of the Regional Office
Letter invitation forwarded to RD for his information
2 RD instructs Admin Aide IV to record the invitation in the RO calendar of activities
Letter invitation from DILG
2 minutes Admin Aide Letter invitation included in the Calendar of Activities of RO
RD may assign Acting ARD to attend the activity if he/she is not available
3 RO confirms attendance to the invitation Letter invitation from DILG
5 minutes Admin Aide Confirmation of attendance
Confirmation by letter-reply, phone or email
4 RO attends the scheduled meeting
Confirmation of attendance; letter-invitation from DILG
2 hours RD/ARD Attendance to the meeting
The four agencies finalize the date,agenda, speakers and participants for the conduct of harmonization roll out
798
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
of JMC
5 RO prepares letter-invitation to speakers, treasurers and local chief executives to attend the Roll-Out of JMC
JMC 1 hour Admin Officer
Letter-invitations countersigned by ARD; signed by RD
Approved invitation-letters recorded in the logbook of outgoing communications by Admin Aide IV The 3 agencies invite their own speakers on the topics assigned to them
6 RO prepares lectures, handouts relative Local Revenue Generation and Administration
JMC 2 days ARD, SLTE, LTOO
Powerpoint lectures
DILG, DBM and NEDA prepare their own handouts on the topics assigned to them
7 RO jointly conducts the Roll-Out with NEDA, DILG, DBM
Agenda of the Roll-Out
3 days BLGF, NEDA, DBM, DILG
Accomplishment/Evaluation Report of the activities which transpired during the Roll-Out
Copy of Reports furnished the 3 agencies concerned
END OF TRANSACTION
799
3.5 Provide inputs, technical assistance and activity participation to Regional Development Council and other relevant
agencies (DAR, LBP, DENR, etc.)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 Receives and records letter-request and or letter of invitation from other national agencies.
Letter request/ invitation with corresponding CCS
20 mins. mins.
Administrativ
e Aide
Date, time and details of communication reflected in the logbook (incoming communications) Corresponding Communication Control Slip (CCS) attached
Letter
request/invitation
forwarded to Assistant
Regional Director
2 Transmit documents to Assistant Regional
Director for his information and action
Letter request/invitation with corresponding CCS
15 mins. Assistant Regional Director
(ARD)
Acted and placed notations on the said letter request/invitation
The letter request is forwarded to Regional Director (RD) for comment
800
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
3 RO- Notations with comments on the letter
request/invitation
Letter request/invitation with corresponding CCS
30 mins. Regional Director (RD)
For confirmation of the attendance subject to the availability of RD depends upon on the scheduled date
Subject to the availability of RD; or if his representative (Assistant Regional Director/LAOO/LTOO will attend the invitation. Preparation of Travel Order undertaken
4 RO Prepares Travel Order to attend based on the cited invitations
Approved Travel Order issued to concerned employee
15 mins. RD Date, Time and Approved Travel Order
Proceed to Step 5
5 RO- Representative attend based on the cited invitations.
Atend meetings based on the invitation with corresponding approved Travel Order (T O )
1 day ARD/LAOO/LTOO
Attended meetings based on the T O
Representative returned to station
6 RO- Prepares report for submission to RD for his information
Report forwarded to RD
20 mins. Representative
(LTOO/LAOOs ARD)
Prepared report forwarded to RD Same report recorded in the logbook of the Regional Office
RD placed Noted for file on said report.. Admin Officer I maintains the said report on- file of the Regional Office
End of Transaction
801
4.1 Determine LGU fiscal management best practices, reforms, standardization, improvements and innovations for promotions and opportunities of replication
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1. RO – Require the LGUs to submit best practices in their localities
Communications with complete details reviewed and initialed by the ARD
30 min. Treasury/Assessment
Section Chief
Communications with complete details, reviewed and signed by the Regional Director
If corrections/
revisions are made by
the RD , the same is
returned to the
concerned employee
for editing and
finalization
2. RO Admin. Officer I records and transmits the communication to the concerned field
Communications with complete
10 min. Admin Officer
Date, time and details of the
Admin. Officer I maintains office file
802
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
offices details reviewed and signed by the Regional Director
communication recorded in the logbook of the Regional office. Communication released thru mail, or other fastest means
Note: Upon receipt of the required best practices from the LGUs.
3. RO - Records and receives the best practices submitted by the LGUs
Best practices submitted by the LGUs
10 min Admin. Aide Date, time and details of letter-request with attached CCS recorded in the logbook of the Regional office.
Best practices from the LGUs is forwarded to the Regional Director (RD) for information and notation If verbal request the requesting party will be directed to the RD
4. RD assigns the Treasury Section Chief to evaluate the best practices
Best practices submitted by the LGUs
15 min. RD Best practices with notation of the RD referred to the Treasury Section Chief
Treasury Section Chief
duly acknowledged
the LGU letter-request
in the logbook
5. Evaluates and study the best practices submitted and determine the most favorable/excellent practices among the best practices submitted
Best practices submitted by the LGUs
2 hours Treasury/Assessment
Section Chief
Best practices evaluated and studied
803
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6 Field Validation and further documentation of the most favorable/excellent best practices
Best practices evaluated and studied
3 days Treasury/Assessment
Section Chief
Favorable/excellent best practices validated
7 Prepare write ups and full documentation for every advantageous/excellent best practice (process/procedures)
Advantageous/excellent best practices validated
3 hours Treasury/Assessment
Section Chief
Advantageous/excellent best practices with full write up and documentation
8 Package all the advantageous/excellent best practices in the region
Advantageous/excellent best practices with full write up and documentation
2 hours Treasury/Assessment
Section Chief
1 package for all the best practices within the region
Best practices will be presented during conferences and trainings within the region for replication by other LGUs
9 Forward to the BLGF Central Office recommending the advantageous/excellent best practices with full write ups and documentations within the region
1 package for all the best practices within the region with indorsement reviewed and initialed by the ARD
20 min. ARD/Treasury/Assessmen
t Section Chief
Indorsement signed by the RD together with the packaged best practices within the region
Office and for replication by other regions.
10 RO Admin. Officer I records and forward to the BLGF CO
Indorsement signed by the RD together with the packaged best practices within the region
15 min. Admin Officer
Date, time and details of the endorsement recorded in the logbook of the Regional office. Communication released thru mail,
Admin. Officer I maintains office file
804
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
or other fastest means
END OF TRANSACTION
805
6.1 Promote general revision to LGUs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives and records letter/Memo Circular from the BLGF Central Office for promotion of general revision to LGU's.
Letter/ Memo Circular
10 minutes Admin Aide Date, time and details of Memorandum Circular recorded in the logbook
Letter/Memo Circular forwarded to LAOO for inventory of LGU's who have not conducted GR
2 Prepare an inventory of all LGU's that have not conducted GR
Inventory of LGU's
1 day LAOO Inventory of LGU's
reviewed
ARD reviews or render comment on the inventory of LGU's
3 RO prepares and finalizes Memorandum Circular to all LGU's that have not conducted GR
Inventory of LGU's
30 minutes LAOO Memorandum Circular countersigned by the
LAOO
Memorandum Circular forwarded to ARD for review/comment
4 ARD reviews and renders comment on the Memorandum Circular
Memorandum Circular countersigned by LAOO
1 hour ARD Memorandum Circular countersigned by
the ARD
In case of corrections MC is returned to LAOO for editing/retyping
5 RD approves the Memorandum Circular
Memorandum Circular countersigned by ARD
30 minutes RD Memo Circular signed by RD
In case of corrections MC is returned to LAOO for editing/retyping
806
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
6 RC records and transmits approved and signed Memorandum Circular
Approved Memo
Ciruclar
30 minutes Admin Aide Date, time and details of approved Memorandum Circular recorded in the logbook
Registry Receipt/ Date time of transmittal
END OF TRANSACTION
807
6.2 Provide technical assistance in the preparation and approval of SMVs (workshop, writeshop, etc.)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives and records letter request from LGU's that needs technical assistance in the preparation of SMV
Letter-request
from LGU
5 minutes Admin Aide Date, time and details of letter request recorded in the logbook
Letter request forwarded to Regional Director (RD) for review and Instructions
2 RD assigns letter request to LAOO
Letter-request
from LGU
10 minutes RD Letter request with instructions/notations of Regional Director (RD)
Letter forwarded to
LAOO
3 RO prepares and finalizes Memo Order for technical assistance in the conduct of GR
Memo Order for LAOO's based on their area of responsibilities
1 hour LAOO Memorandum Circular countersigned by LAOO
Memorandum Circular forwarded to ARD for comment/ review
4 ARD reviews and renders comment on the Memo Order
Memorandum Circular countersigned by LAOO
1 hour ARD Memo Order reviewed and countesigned by ARD
If corrections/revisions are made by the ARD, the Memo Order is returned to LAOO IV for revision, otherwise MO is forwarded to RD for review/approval
5 RD approve/signs the Memo Order
Memo Order and countesigned
10 minutes RD Memo Order signed by
If corrections/revisions are made by the RD,
808
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
by ARD
the RD the Memo Order is returned to AO for revision
6 RO records and forwarded the Memo Order to LAOO for implementation
Signed Memo
Order
15 minutes Admin Aide Date, time and details of Memo Order received by the LAOO
7 RO renders technical assistance to LGU's in the preparation of SMV
Technical
assistance
3 days LAOO Technical assistance rendered based on LAR 1-92
See process of LAR 1-92
END OF TRANSACTION
809
8.1 Prepare annual training programs
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO prepares survey questionnaire to determine the needs of RO personnel and treasury/assessment officials
Capability Building Program specified in the Annual Plans and Programs
1 day ARD Survey questionnaire
Draft survey-questionnaire forwarded to RD for review If corrections/revisions are made by the RD, the draft survey questionnaire are returned to ARD for revision
2 RO prepares transmittal of the survey questionnaire to treasury/assessment officials
Survey Questionnaire
2 min Admin Officer
Transmittal letter for the survey
RO staff returns the accomplished survey questionnaire to ARD
3 RO analyzes accomplished survey questionnaires from treasury/assessment offices
Accomplished survey questionnaires
1 day ARD Consolidated analysis of the survey questionnaire
ARD may instruct SLTE/LTOO III/ADMIN OFFICER to assist him/her in the said activity
4 RO prepares Annual training programs Consolidated Analysis of the survey questionnaire
1 day ARD/SLTE/LTOO /Admin
Officer
Draft the Annual training program
If corrections/revisions are made by the RD, the draft annual training program is returned to ARD for revision
5 RD approves the annual training program Annual Training 10 min RD Approved Annual RO is now ready to
810
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Program Training Program implement the Annual Training Program
END OF TRANSACTION
811
8.2 Facilitate conduct of training provided by Central Office to LGUs (LTOM, eSRE)
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
1 RO receives letter/memorandum from BLGF C.O. to conduct training to LGUs
Letter/memorandum from BLGF C.O.
5 min Admin Aide Date, time and details of the letter/memorandum recorded in the logbook
Letter/memorandum forwarded to RD for proper assignment to concerned action officer
2 RD assigns preparation of list of participants and required budget for the proposed training program
Letter/memorandum from BLGF C.O.
10 min RD Letter/memorandum with instruction from RD
3 RO prepares and finalizes list of participants, letter-request for funding and transmittal letter to BLGF C.O. for the conduct of training
Letter/memorandum from BLGF C.O.
1 hour ARD List of participants, letter-request for funding and transmittal letter to to BLGF C.O. countersigned by ARD
List of participants, letter-request for funding and transmittal letter to to BLGF C.O. forwarded to RD for review and approval
4 RD reviews list of participants, letter-request for funding and transmittal letter to BLGF C.O.
List of participants, letter-request for funding and transmittal letter to BLGF C.O. countersigned by ARD
15 min. RD List of participants, letter-request for funding and transmittal letter to BLGF C.O. approved by RD
5 RO records and transmits approved list of participants, letter-request for funding and transmittal letter to BLGF C.O.
Approved List of participants, letter-request for funding and
10 min. Admin Aide Date, time and details of the approved list of participants,
812
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
transmittal letter to BLGF C.O. approved by RD
letter-request for funding and transmittal letter to BLGF C.O. recorded in the logbook
BLGF C.O. approves the list of participants and request for funding and the same to the RO concerned 6 RO receives and records approved list of
participants from BLGF C.O. and funding credited to the trust fund account of RO
Approved List of Participants and funding
10 min. Admin Aide Date, time and details of the approved list of participants and letter advice about fund transfer of the funding from BLGF C.O.LBP credit advice recorded in the logbook
RO should open a trust fund account (if not available) with LBP where funding from BLGF C.O.will be credited
7 RO prepares letter-invitations to speakers and participants to attend the training
Approved List of Participants and funding
1 hour Admin Officer
IV/SLTE/LTOO /LAOO
Letter-invitations countersigned by ARD
Letter-invitations to speakers and participants forwarded to RD for review and approval
8 RD reviews letter-invitations to speakers and participants
Letter-invitations to speakers and participants countersigned by ARD
15 min. RD Letter-invitations to speakers and participants signed by RD
9 RO records and transmits approved letter-invitations to speakers and participants
Letter-invitations to speakers and participants
10 min. Admin Aide Date, time and details of Letter-invitations to
813
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
speakers and participants recorded in the logbook
10 RO prepares lectures, handouts relative the said training
Approved Training Design
2 days ARD, SLTE, LTOO, LAOO,
Admin Officer
Powerpoint lectures
All lectures, handouts relative to training are reviewed by concerned speakers/lecturers
11 RO coordinates with venue personnel for food and accommodation of speakers, participants and technical staff
Approved Training Design
2 days ARD, SLTE, LTOO, LAO,
Admin Officer
Hotel and accommodation within the approved budget
Refer to the process in the procurement of goods and services relative to training expenses in the Regional Office
12 RO conducts the training to LGUs
Agenda of the Training
3 days RD, ARD, SLTE, LTOO,
LAOO, Admin Officer
Training Activities fully implemented; Evaluation Report of Training and Speakers
13 RO prepares and finalizes Terminal Report of the Training, Liquidation Report and transmittal Letter to BLGF C.O.
Evaluation Report of Training and Speakers, documentation of the activities
2 days ARD, SLTE,LTOO
,LAOO , Acting
Accountant
Terminal Report of the Training. Liquidation Report and transmittal letter countersigned by ARD
Terminal Report, Liquidation Report and transmittal letter forwarded to RD for review and approval Liquidation Report composed of the Monthly Certificate of Status of Funds (CSF) and Statement of Receipts and
814
Step Procedure Input or Requirement
Processing Time
Responsible Person
Output or Decision Point
Remarks
Disbursements (SORD) prepared and certified correct by the Acting Accountant
14 RD reviews Terminal Report, Liquidation Report and transmittal letter to BLGF C.O.
Terminal Report of the Training, Liquidation Report and transmittal letter countersigned by ARD
15 min. RD Terminal Report of the Training, Liquidation Report countersigned by ARD approved by RD
Liquidation Report approved by RD forwarded to Resident Auditor for verification If corrections/revisions are made by the Auditor, the Liquidation Report with the attached documents are returned to Acting Accountant for revision, otherwise, the same are forwarded to Admin Aide IV for recording and release
15 RO records and transmits Terminal Report of the Training, Liquidation Report and transmittal letter to BLGF C.O.
Terminal Report of the Training, Liquidation Report verified by Auditor and transmittal letter approved by RD
10 min. Admin Aide Date, time and details of Terminal Report. Liquidation Report and transmittal letter to BLGF C.O. recorded in the logbook
End of transaction