1. This report lays out performance against the Integrated Development Plan (IDP) and Service
Delivery and Budget Implementation Plan (SDBIP) for the 3rd quarter period of 2014/15 financial
year, i.e. 01 January to March 31, 2015. Performance is accounted based on the delivery of
projects and/or services in the IDP and SDBIP for which the Mangaung Council is responsible.
2. The Service Delivery and Budget Implementation Plan (SDBIP) for 2014/15 identifies 290 perfor-
mance measures with key projects and/or services that need to be implemented during the fi-
nancial year. Each department has its number of performance measures to be implemented as
depicted below:
Departments
Perfor-
mance
Measures
Q3
Performance
Measures for Q4
2014/15
Total Perfor-
mance
Measures im-
plemented in
Q3
Planning and Economic Development 23 0 23
Engineering Services 81 1 80
Strategic Projects 10 0 10
Social Service 79 2 77
Finance 20 1 19
Human Settlement 25 1 24
OCM 18 1 17
Corporate Services 34 0 34
Total 290 6 284
3. At the beginning of the 3rd quarter, 284 of the total 290 annual projects and services have been
identified for implementation. At the end of the 3rd quarter period 57 (20%) of the projects and/ser-
vices are progressing excellently beyond expectation; 79 (27%) of the projects and services are
on track as planned and have met the set target; 60 (21%) of projects and/or services are in
progress and 88 (30%) of projects indicate unacceptable performance.
4. Corrective measures and/or action plans have been developed for those indicators, targets or
projects and/or services where performance is lower than anticipated and not fully effective.
3
PURPOSE OF THE REPORT
5. This report on service delivery and budget implementation sets out performance against the Mu-
nicipality’s Integrated Development Plan as well as Service Delivery and Budget Implementation
Plan for the 3rd quarter of the 2014/15 financial year, i.e. 01 January to 31 March, 2015.
BACKGROUND
6. The Integrated Development Plan is the key strategic, inclusive, and responsive performance
driven document for the Municipality which extends over a five-year period. The Integrated
Development Plan is focused on delivering the Council’s eight delivery agenda points or stra-
tegic objectives, namely
a) poverty reduction,
b) job creation, rural and economic development;
c) financial sustainability;
d) spatial development and the built environment;
e) eradication of bucket system, VIP toilets in Mangaung, Botshabelo and ThabaNchu, roads,
ageing infrastructure, focus on the basics; human settlements;
f) public transport;
g) environmental management and climate change; and
h) Social and community services.
7. The Integrated Development Plan 2014/15 identifies projects and services which contribute to
the achievement of the Municipality’s objectives over the remaining term of Council. These pro-
jects and services are delivered using the approved SDBIP, which has been used successfully
to improve performance in the previous financial years in strategic areas of Council’s work.
The Integrated Development Plan also contains a series of performance targets, projects and
services, and measures to monitor the success in delivering improved outcomes for residents
and stakeholders in Mangaung municipal area.
8. Quarterly SDBIP reports have been produced by each of the departments separately and con-
solidated into the third quarter organizational report. This report will be processed through the
Executive Management Team, Mayoral Committee, and Section 80 Committee en-route to
Council. The third quarter SDBIP progress report outlines the performance on the key perfor-
mance indicators, the actual performance on the measurable performance target set achieved
by Departments during the third quarter period of 2014/15 as well as performance rating.
4
REPORT OVERVIEW
The report provides information covering the following areas:
9. The Council’s progress in delivering the 290 projects and/or services identified in the Service
Delivery and Budget Implementation Plan for 2014/15.
10. The Council’s achievement against targets that can be measured on a quarterly, mid-year or an
annual basis at this point in time.
11. Intervention mechanisms or correction actions for lower than expected and/or unsatisfactory/un-
acceptable performance have been identified and will be implemented by the Executive Manage-
ment Team in the next quarter (April–June2015).
KEY PROJECTS AND/OR SERVICES OVERVIEW
This section looks at the performance of the projects and/or services at the end of the 3rd Quarter
period ending March 31, 2014.
12. In order to manage and account on projects and/or services of Council, Heads of Departments
were requested to submit their 3rd Quarter performance progress reports in implementing the IDP
and SDBIP. The format for submission is in line with the approved SDBIP which fundamentally
actualizes the Integrated Development Plan as well as the 2014/15 to 2016/17 Medium Term
Revenue and Expenditure Framework (MTREF)
13. The report provides description on the work carried out during the 3rd Quarter period, what
achievements were expected and recorded in the form of actual performance targets as well as
variance if any, and what corrective actions will be implemented to improve performance.
14. If the projects or services are not going as planned and the 3rd Quarter targets are not achieved,
then the Heads of Departments’ attention is drawn to the need of developing and implementing
corrective measures.
15. The table below shows the overall performance of the projects and/or services.
5
Summary of Projects/Services for the 3rd Quarter (Jan to Mar 2014)
16. PROJECTS AND/OR SERVICES IDENTIFIED AS PERFORMANCE EXCEEDS EXPECTA-
TION
This section indicates that the municipality is succeeding in providing the following ser-
vices:
SMMEs support
Attaining the blue drop status;
Building of bulk sanitation infrastructure;
Upgrading of VIP and bucket toilets into waterborne sanitation;
Conducting operations and maintenance of electricity infrastructure;
Provision of municipal health, fire and emergency services
Consumer account and accurate billing
Housing opportunity provided
A detailed account of these projects and services is provided below
PLANNING
Level %Score Terminology Total %
- - Performance targets not imple-
mented
6 2%
4 91-100% Performance Exceeds Expecta-
tions
58 20%
3 86-90% Target Met 79 27%
2 75-85% In progress 60 21%
1 0-74% Unacceptable Performance 87 30%
Total 290 100%
6
1. Number of viable and sustainable SMMEs
ENGINEERING DEPARTMENT:
1. Length of main water supply line installed
2. % improved on blue drop status
3. Length of water mains replaced
4. Number of valves replaced/refurbished within the water network
5. Expansion of Sterk-Water Waste Water Treatment Work capacity
6. Number of formal stands with waterborne toilet to eradicate VIP and pit toilets (7500 formal
stands)
7. No. of households with weekly kerb-side waste removal services in formal areas
8. Number of education and awareness sessions undertaken
9. Number of clean-up campaigns conducted
10. Number of high mast lights installed with certificates of compliance
11. Number of distribution Centres visually inspected (l protection equipment once every 6
months
12. Number of primary and secondary substations Visually inspected (all protection equipment)
13. Number of routine maintenance and tests performed on all Distribution Centre protection
equipment 1
14. Number of routine maintenance and tests performed on all Distribution Centre protection
equipment 2
15. Number of routine maintenance and tests performed on all protection equipment situated in
primary substations every two years
16. Number of routine maintenance and tests performed on all protection equipment situated in
secondary substations
SOCIAL SERVICES
1. Number of new library books acquired (new children’s books acquired)
2. Number of new library books acquired (new non-fiction books acquired)
3. Number of new library books acquired (new adult fiction books acquired)
4. Number of Library campaigns conducted
5. Number of Library outreach programmes conducted to communities.
6. Number of arts and cultural programmes supported and implemented.
7. Number of condoms distributed.
8. Number of community members encouraged to test and know their status.
9. Number of HIV/Aids Counselling and outreach programmes conducted
10. Number of t Home Based Care Organizations and OVC (orphan and vulnerable
7
11. Number of inspections conducted on ECDs.
12. Number of inspection on medical waste generators’ premises conducted as per the provi-
sions of the NEMA
13. Number of drinking water samples conducted and monitored according to SANS to 241
14. Number of health and hygiene (H&H) awareness programmes conducted
15. Number of children and destitute families supported
16. Number of sporting code programmes supported
17. Number of fire safety inspections at Low Risk Premises to determine level of compliance
with statutory fire safety measures and approved building plans
18. Number of Fire Safety Compliance Certificates inspections conducted within 2 working
days after receipt of request.
19. Number of fire safety public awareness contact sessions with MMM Commerce and Indus-
try Institutions
20. Number of Health Care Facility staff members trained in fire safety and evacuation proce-
dures
21. Number of public outreach events aimed at creating public awareness in respect of Fire
safety
22. Number of persons from the industrial and commercial community trained in fire safety
23. Number of Fines successfully finalised and payment received
24. Number of crime awareness campaigns conducted within the municipality
25. Number of notices issued for speeding transgression per annum
26. Number of notices issued to motorists driving un-roadworthy vehicles within MMM
27. Number of notices issued to motorists not wearing seatbelts
28. Number of notices issued to motorists using cell phones
29. Number of warrant of arrests executed
30. Number of CCTV cameras identified incidents attended to within 25 minutes
31. Park developed
32. Number of trees planted
FINANCE
1. Number of customers receiving accurate Bills
2. % on consumer accounts details on the system accurate
HUMAN SETTLEMENT
1. Number of housing opportunities provided
2. Number of households provided consumer education in GAP housing
3. Percentage review of sundry and commercial property lease agreement
8
OFFICE OF THE CITY MANAGER
1. Municipal Public Accounts fully operational
2. Number of strategic and operational risk registers reviewed
CORPORATE SERVICE
1. Providing learner-ships approved by LGSETA
2. Placement and re-design of organisation structure
17. PROJECTS AND/OR SERVICES IDENTIFIED AS PERFORMING FULLY EFFECTIVE (TAR-
GET MET)
This section indicates that the municipality is succeeding in providing the following ser-
vices:
Achieving set turnaround times for Land Use Applications
Upgrading of roads
Training courses on HIV/AIDS
Conducting of fire safety inspections at premises
Development of a Park at Botshabelo Section C
Functioning Internal audit activity operating according to the IIA Standards and approved
risk based three year rolling strategic audit plan
Reduction on irregular expenditure
Completion of implementation of designs Brandkop 702
MOUs entered into with other cities
IT strategy developed
A detailed account of these projects and services is provided below
PLANNING DEPARTMENT
1. Percentage improvement in turnaround times for Land Use Applications
2. No of days taken to effect action from date of identification
3. 100% redevelopment of Hoffman Square
4. Formalization of Brandkop 702
5. Number of Environmental Impact Assessment conducted on development applications and
correspondence provided to the applicant
6. Number of environmental awareness campaigns conducted
9
ENGINEERING DEPARTMENT:
1. Kilometres of paved roads
2. % increase in the number of informal households provided with communal taps (200m ra-
dius)
3. Number of new Pump Station Monitoring equipment installed
4. Number of new Flow meter Monitoring equipment installed
5. Number of new applications (MIS)
6. Reduction of weekly backlog within 07 days after scheduled collection day
7. Number of Audits performed at landfill sites(internal and external)
8. No of permitted landfill sites maintained and upgraded
9. Roll-out and managing Smart Meters System
10. 100% GMM system implemented and managed
11. Percentage of new fleet procured as per request from the various departments
STRATEGIC PROJECT AND SERVICE DELEVERY REGULATION
1. 100%Compliance to grant conditions (USDG & NDG)
2. 100% Implementation of NDPG funded project
3. 100% administrative oversight of Municipal Entity
4. Number of key Strategic Events as allocated, on need basis, by the Executive Mayor and
City manager managed and executed successfully
5. Number of projects done in partnership with provincial SACR
SOCIAL SERVICES
1. Number of training courses on HIV/AIDS
2. Number of seminars hosted to intensify education and awareness on HIV/AIDS
3. ECD Database updated
4. Number of inspections conducted on all mortuaries as per the provisions of the Public Health
act
5. Number of building plans inspected for health related compliance
6. Number of reported communicable diseases attended to
7. Number of samples taken at all Major Functions as per the received applications in accord-
ance with the Foodstuffs, Cosmetics and Disinfectants Act 54 1972
8. Number of Burials done within 2 weeks after issuing of the official order
9. Number of non -compliance of Sulphur Dioxide emissions responded to ensure Air Quality
control
10. Number of l Emission Licence applications submitted and processed
10
11. Number of environmental pollution related complaints responded to within 48hrs
12. Approved and updated indigent register
13. Number of the burials of the indigent facilitated within 2 weeks
14. Updated database of child headed households within the municipality
15. Number of poverty alleviation projects facilitated and supported
16. Number of fire and rescue emergency responded to in compliance with SANS 10090 in
respect of:- a) Weight of response b) Turn out time
17. Number of fire safety inspections at High Risk Premises to determine level of compliance
with statutory fire safety measures and approved building plans
18. Number of fire safety inspections at Moderate Risk Premises to determine level of compli-
ance with statutory fire safety measures and approved building plans
19. Number of building plans submitted that are scrutinized for compliance with statutory fire
safety measures within 5 working days after receipt of the plans
20. Number of e Street Trading operation conducted per annum.
21. Park developed (Botshabelo - B section)
22. An open range zoo developed at Kwaggafontein
23. Percentage of JOC attendance at public events
24. Number of fire and rescue calls to which resources were dispatched within 3 minutes.
25. Number [percentage] of callers polled indicating their satisfaction with the service rendered
by the Control Centre.
FINANCE
1. Number of SCM implementation reports submitted to the Mayor and Council
2. Reduce irregular expenditure for the Directorate report irregular expenditure.
3. Number of employees undergoing training programmes to comply with Minimum
Competency Regulations
4. Fixed Asset Register is compiled and updated monthly
5. Asset Management procedure is compiled in line with legislation and Council policy
6. Report on the annual asset count submitted to council
7. Report on the annual asset count submitted to council (Ad hoc)
HUMAN SETTLEMENT
1. Number of meeting and engagements held with different stakeholders in the city rental hous-
ing market
2. Number of hostel redevelopment initiatives promoted
3. 100% implementation designs of Cecelia Park
4. 100% implementation designs of Brandkop 702
5. Quarterly Advertisement of land for sale
11
OFFICE OF THE CITY MANAGER
1. Number of MOUs entered into with other cities
2. Audit Committee fully operational and meeting at least 4 times annually
3. Percentage increase in the number of concluded cases on irregular, fruitless and wasteful
expenditure
CORPORATE SERVICE
1. 100% implementation of formal IT Governance Maturity Model
2. Overall IT Strategy developed
3. ITMSP Developed and monitored
4. 100% fully fledged and updated intranet
5. Audited information systems to determine redundancy and obsoleteness
6. Stable operation of newly procured servers
7. Service desk reports indicating turnaround time
8. Software license management system in place
9. Conducting a skills needs analysis
10. Compilation of work skills plan
11. Compiling an annual implementation report by January each year
12. Migration from manual document circulation to electronic document management system
(share point system)
13. Provide efficient secretarial service
14. Decisions of Council are implemented
15. Records and Archives Implementation plan in place and adhered to by all directorates
16. Number of new office block in Manguang
17. Number of sport and social amenities upgraded
18. PROJECTS AND/OR SERVICES IDENTIFIED AS PERFORMANCE IN PROGRESS
This section has been split into two to provide an account of projects where work has com-
menced and sufficient progress is being attained towards realising the set performance targets
as well as providing an account where there is no progress or negligible progress.
Kilometres of roads resurfaced/rehabilitated
Implementation of Water Demand Management especially the reduction of non-revenue
water
Provision of electricity services and provision of Free Basic Electricity;
Provision of municipal health services;
12
Development of Hillside View Phase 1
PERFORMANCE WITH PROGRESS BEING MADE
PLANNING
1. Percentage improvement in turnaround times for processing of Building Plans
2. Implementation of a development node at the Airport intersection
3. Formalization of Cecelia Park
4. 20% implementation of phase 1 of IPTN
5. No. of marketing events initiated, attended and implemented
ENGINEERING DEPARTMENT:
1. Total number of jobs generated by the investment, both direct and induced, formal, informal
and self-employed
2. Number of women (and comparable pay) and disadvantaged groups employed
3. Kilometers of roads resurfaced/rehabilitated
4. Percentage reduction in non-revenue water
5. Number of additional households (RDP) provided with sewer connections
6. Number of informal settlements with access to refuse removal services
7. 100% Transfer station developed in Thaba Nchu
8. All registered indigents receive Free basic Electricity
9. 100% installation of Automated Meter Reading (AMR) system
STRATEGIC PROJECT AND SERVICE DELEVERY REGULATION
1. Number of post filled as per approved and funded staff establishment
2. Percentage spending of Grant expenditure on the approved projects
3. 100% establishment of national Training Centre programme
SOCIAL SERVICES
1. Number of Heritage sites, monuments, and public art researched and recorded on the
SAHIS data base
2. Number of food premise inspections conducted as per provisions of the Foodstuffs, Cos-
metics and Disinfectants Act 54 1972
3. Number of samples recreational water monitored according SANS to 241
4. Number of food samples taken annually in accordance with the foodstuffs, Cosmetics and
disinfectants
13
5. Developed Air Quality Management Plan (AQMP)
6. Number of elderly shelters inspected
7. Assigned ambulance service to MMM by the provincial department of Health
8. 1 Fire Station established in the South Eastern Area (Ward 45-46)
9. 100% completion of Phase 2 of Developed Thaba Nchu Regional Park Development
10. Length of fencing installed at Phahameng cemetery
11. Km of access roads upgraded at Kwaggafontein
12. Disaster Management plan for MMM
HUMAN SETTLEMENT
1. Number of informal settlements upgraded (services provided): In Situ
2. Number of Title Deeds transferred to eligible beneficiaries
3. Number of households allocated affordable rental/social housing units
4. Approved level 2 and 3 accreditation business plan
5. Number of Strategic Human Settlements Policy documents reviewed
6. 80% development of Hillside View phase1
FINANCE
1. Percentage of consumers accounts details on the system accurate (Reduction in the
number of returned undelivered accounts)
2. Percentage improvement in Collection rate
3. % operation and capital expenditures against the budget (from 80% )
4. Cost Coverage (NKPI)
5. 100% Implementation of Procedure Manuals and improvement in internal controls
6. Amount of externally sourced funds increasing revenue base by accounting for unac-
counted services
7. Percentage recovery of rental income
CITY MANAGER
1. Number of Donor funding agreement entered into
2. Number of Cooperation agreements entered into
3. Reviewed 2015/16 Integrated Development Planning, SDBIP and business plans
4. Service delivery and budget implementation plan (SDBIP) compiled annually
5. Functional Internal audit activity operating according to the IIA Standards and approved risk
based three year rolling strategic audit plan
6. Review , development and Implementation of Policy, Strategy, whistle Blowing and Pre-
vention Plan
14
CORPORATE SERVICE
1. Number of IT Policies reviewed to be in line with IT Strategy and ITMSP
2. IT related equipment, systems and software procured and utilized as outlined in ITMSP
3. Number of municipal buildings that are Wi-Fi enabled
4. New VoIP system operational
5. Identification of critical positions and development of critical positions
6. Development of career planning and pathing
7. Providing Accredited training courses in line with skills needs identified within WSP
8. Number of old order by-laws reviewed
9. Number of new by-laws developed and approved
10. Uniformity in document management system
11. Number of buildings maintained according to maintenance plan
12. Number of building refitted with energy saving bulbs
19. PROJECTS AND/OR SERVICES IDENTIFIED AS PERFORMANCE UNACCEPTABLE
Also included in the SDBIP table are the projects and/or services identified as performing at
unacceptable level against performance measures and indicators as specified for the third quar-
ter targets ending March 2015.
This provides an early warning that the projects and/or services are not fully effective and im-
provement and corrective measures should be implemented in the next quarter. The following
projects and/or services constitute the list of those that are performing at unsatisfactory level.
15
PLANNING DEPARTMENT
1. Number of hectares of land proclaimed (township establishment completed)
2. No of small scale agricultural enterprises supported and empowered
3. Number of agricultural camps fenced at various villages and municipal farms
4. Number of municipal pound established
5. Number of broilers established
6. Number of egg-layers established
7. Number of piggeries established
8. Number of departments provided with GIS services
9. Formalization of the Botshabelo / ThabaNchu Economic Node
10. 100% of detailed designs for Park road Pedestrianisation
11. Developed Environmental Management and Implementation Plan (IEMP)
ENGINEERING DEPARTMENT
1. Number of people trained through construction projects of the municipality
2. Km of gravel roads tarred
3. Km of Storm-water drainage installed
4. Number of Formal stands provided with water connections
5. Number of water service points installed for informal settlement dwellers within a 200m
radius
6. Backlog in the number of consumer units with access to a free basic level of potable water
7. Number of water meters (replaced &installed)
8. Expansion of NE Waste Water Treatment Work capacity
9. Backlog in the provision of basic sanitation services (above RDP standards)
10. New landfill site developed
11. Number of sites accessing basic electricity service in Khayelisha
12. Number of sites accessing basic electricity service in Grassland
13. Number of sites accessing basic electricity service in Caleb Motshabi
14. Number of Public connections installed as and when required
15. 100% Completed 132/11kV Fichardtpark Distribution Centre
16. 100% Completed 132/11kV Cecilia Distribution Centre
17. 100% Completed Botshabelo: 132kv Eskom connection & extensions to substation
18. 100% Completed BOTSHABELO: 132KV/33/11KV DC SUB
19. Number of routine maintenance and tests performed on all protection equipment situated
in primary substations every two years
20. Number of existing Protection panels and schemes upgraded
21. Percentage evaluation of all existing protection schemes once every 3 years in order to
determine if the schemes used are effective and efficient.
16
22. Number of l the Rotating Disc kWh meter(s) replaced at least once every 20 years with a
calibrated meter(s)
23. Number of l the Electronic kWh meter(s) (prepaid and other) replaced at least once every
10 years with a calibrated meter(s)
24. Number of routine maintenance performed on all the meter boxes
25. Number of routine maintenance on all the meter boards in the meter rooms (blocks of
flats/large buildings)performed
26. Percentage of Restoration of supply after unplanned interruptions
27. Number of Medium Voltage Bulk kWh/kVA Meter Installations inspected
28. Number of Low Medium Voltage Bulk kWh/kVA Meter Installations inspected
29. Number of routine checks at least once every 5 years to verify the total integrity of all the
platinum bulk metering installations (key customers) performed
30. Number of routine checks at least once every 10 years to verify the total integrity of all the
other bulk kWh/kVA metering installations performed
31. Number of routine earth loop tests performed at least once every 20 years to verify the
earth impedance to the source of the power supply at each individual metering installation
32. Replace the bulk kWh/kVA meter(s) at all the 10 MVA _ Medium Voltage Installations at
least once every 5 years with a calibrated meter
33. Number of Quality of Supply instruments replaced
34. Number of fully functional customer contact centres established in the geographical ser-
vice areas
35. Number of meter reading conducted with a customer with a supply size of less than 50
kVA
36. Number of account queries and disputes responded to within five working days
37. Number of credit meter accuracy queries managed
38. Access to vending stations for selling of electricity tokens
39. Time taken to issue a notice of planned interruptions
40. Time taken to respond to incoming calls (within 30min)
41. Time taken to respond to incoming calls (within 5min)
42. Percentage of key customers required to fill in customer satisfaction questionnaire
43. 100% availability of electricity supply to customers essential loads
44. Development and implementation of Consolidated customer queries system
STRATEGIC PROJECT AND SERVICE DELEVERY REGULATION
1. Developed Monitoring and evaluation toolkit on service delivery
2. Compiled Built Environment Performance Plan(BEPP 2015/16)
SOCIAL SERVICES
17
1. Number of t food premise inspections conducted as per provisions of the Foodstuffs, Cos-
metics and Disinfectants Act 54 1972
2. Number of supporting activities implemented for disabled persons
3. Number of training courses in relation to the fire Fighting and/or rescue and/or hazardous
materials presented
4. An established metro police
5. Number of road safety campaigns conducted
6. Number of road blocks conducted in high risk areas
7. Length of Fencing installed at community park in U section (Botshabelo)
8. Kwaggafontein Km of access roads upgraded at Kwaggafontein
HUMAN SETTLEMENT
1. Number of informal settlements with upgrading plans
2. Number of sites serviced
3. Number of informal settlements upgraded (services provided): Relocated
4. Number of households relocated from floodplains and other servitudes
5. Number of households allocated affordable GAP housing
6. Number of households provided consumer education in Rental housing
7. Number of households provided consumer education in Social housing
8. Number of comprehensive housing demand studies conducted
9. Number of Inner City High Density mixed use developments promoted
10. Percentage Increase rental housing revenue collection
FINANCE
1. Developed and implemented revenue enhancement strategies
2. 100% implementation of operation “Pay – up” Strategy.
3. Compilation of Interim Valuation roll
OFFICE OF THE CITY MANAGER
1. Knowledge Management Strategy developed and updated
2. Number of Case Studies developed
3. A customer satisfaction survey conducted
4. Reviewed and implemented Risk management Policy, Strategy, implementation plan
5. Number of clustered ward based plans approved by council
6. Number of officials trained in CBP
18
CORPORATE SERVICE
1. Reduction of labour disputes
2. Number of consultative meetings held with organised labour
3. Training on labour legislation and HR Management
20. PROJECTS AND/OR SERVICES TO BE IMPLEMENTED IN THE NEXT QUARTERS.
ENGINEERING DEPARTMENT
1. Percentage of waste diverted from the landfill sites
SOCIAL SERVICES
1. Number of all known Initiation Schools inspected, to ensure compliance with the Initiation
Schools Public Policy
2. Number of wellness programmes for the elderly developed and implemented
HUMAN SETTLEMENT
1. Number of rental property officials attended Property Management Training
FINANCE
1. 100% Implementation of audit action plan to address issues raised by the auditors
OFFICE OF THE CITY MANAGER
1. Mid-year budget and performance assessment report developed
21. CONCLUSION
The performance in the Third quarter report shows that the Council is progressing at 47% (136
projects/services) in the Third quarter in relation to set performance targets.
Furthermore, 21% (60 projects / services) are in progress and there is worrying performance in
relation to 30% (88 projects/ services) that registered an unacceptable performance.
The remaining 2% (6 projects /services) were planned to be implemented in the next quarter.
19
20
6.5 QUARTERLY PROJECTIONS OF SERVICE DELIVERY TARGETS AND PERFORMANCE INDICATORS
6.5.1 PLANNING
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Establish-
ment of Ac-
countable
and Pro Ac-
tive Manage-
ment of
Change in
Land Use
Effective
Management
of Planning
and the Build
Environment
Percentage
improvement
in turnaround
times for
Land Use
Applications
Approved land
use applications
35 days Applications to
be tabled to
planning room
within 35 days of
receipt
All lodged Appli-
cations to be ta-
bled to planning
room within 35
days of receipt
14 applica-
tions re-
ceived and 8
processed/ 6
more than 35
days
none none
Percentage
improvement
in turnaround
Approved build-
ing plans
< 500m² = 20
days
< 500m² = 20
days
All building plans
< 500m² = 20
days
482 applica-
tions re-
ceived, 264
218 not pro-
cessed with
time frame
appointment
of additional
staff
21
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
and Develop-
ment pat-
terns
times for pro-
cessing of
Building
Plans
> 500m² = 40
days
> 500m² = 40
days
All building plans
> 500m² = 40
processed
within time
frame
21 applica-
tions re-
ceived, 11
processed
within time
frame
10 not pro-
cessed within
time frame
22
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
No of days
taken to ef-
fect action
from date of
identification
Notices issued
855 notices is-
sued
All notices is-
sued within 30
days from date
of identification
of the transgres-
sion
All notices issued
within 30 days
from date of iden-
tification of the
transgression
65 notices
and 8 court
cases
none
Economic
development
Support
SMME devel-
opment
Number of vi-
able and sus-
tainable
SMMEs
Performance of
GGP
397 SMMEs
Supported
100 new
SMME’s sup-
ported
25 SMME’s sup-
ported
792
+767
23
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Inner City
Rejuvenation
100% Rede-
velopment of
Hoffman
Square
Project Comple-
tion Certificates
40% complete 100% Comple-
tion of the Rede-
velopment of
Hoffman Square
100% completion
of the Redevelop-
ment of Hoffman
Square
100%
none none
24
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Number of
hectares of
land pro-
claimed
(township
establish-
ment com-
pleted)
One township
Establishment
completed
None
Botshabelo
West Exten-
sion’s Township
Establishment
opened
Submission for
approval at Town-
ships
Pegging
of sites
Approval of Gen-
eral Plan by Of-
fice of the Sur-
veyor General
not submitted
Submission
for approval
at Townships
Marketing the
municipality
as premier
No. of mar-
keting events
Participation at
marketing
events;
8 Events At-
tended
12 Events at-
tended and im-
plemented
3 Events attended
and implemented
2 Event: At-
tended Meet-
ings Africa
The target of
3 could not
be achieved
Notwith-
standing, the
annual target
25
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
destination
for invest-
ment and
tourism
initiated, at-
tended and
implemented
Marketing bro-
chures and exhi-
bition developed
Exhibition;
and Hosted
one Local
Tourism &
Hospitality
Expo in
Bloemfon-
tein.
will still be
achieved
Rural Devel-
opment
Small scale
agricultural
enterprises
No of small
scale agricul-
tural enter-
Performance of
GGP
449 20 small scale
agricultural en-
terprises sup-
ported
5 small scale agri-
cultural enter-
prises supported
10% still in
SCM
-90%
26
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
prises sup-
ported and
empowered
Number of
agricultural
camps
fenced at
various vil-
lages and
municipal
farms
Completion Cer-
tificates
None
12 agricultural
camps fenced
3 agricultural
Camps fenced
10% still in
SCM
-90% SCM process
to be fast
tract
27
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Number of
municipal
pound estab-
lished
Completion Cer-
tificate
None
1 Municipal
Pound
70% completion 10%
-60%
SCM process
to be fast
tract
Number of
broilers es-
tablished
Completion Cer-
tificates
None
4 units con-
structed and es-
tablished
60% completion 10%
-50%
SCM process
to be fast
tract
Number of
egg-layers
established
Completion Cer-
tificates
None
4 units con-
structed and es-
tablished
60% completion 10%
-50%
SCM process
to be fast
tracked
28
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Number of
piggeries es-
tablished
Completion
Certificates
None
4 units con-
structed and es-
tablished
60% completion SCM PRO-
CESSES
-60% scm process
to be accel-
erated
Establish-
ment of Cor-
porate Geo-
Effective cor-
porate Geo-
graphic Infor-
mation sys-
tem
Number of
departments
provided with
GIS services
Functional de-
partmental GIS
and generation
of maps
System Design
completed em-
anating from
User Needs
One (1) depart-
ment provided
with GIS appli-
60% development
of GIS and rele-
vant spatial infor-
mation
10%
-50%
Project to be
completed in
first quarter
of new finan-
cial year.
29
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
graphic Infor-
mation Ser-
vices
Analysis en-
gagement re-
port.
cations and rele-
vant spatial in-
formation.
Spatial inte-
gration
Unlock N8
Nodal devel-
opment
Implementa-
tion of a de-
velopment
node at the
Airport inter-
section
Functional eco-
nomic and resi-
dential node
Release of
hectares of
land
Completion of
Implementation
designs
Final implementa-
tion design
70% com-
pleted
-30%
township es-
tablishment
to be ap-
proved by
township
board
30
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Formalization
of the Bot-
shabelo/
ThabaNchu
Economic
Node
Township estab-
lishment
Concept De-
signs com-
pleted
100% Comple-
tion of Imple-
mentation De-
signs
50% Completion
of Implementation
Designs
SCM PRO-
CESSES
-50%
approval of
Township
Establish-
ment
7 Land Par-
cel Develop-
ment
Formalization
of Cecelia
Park
Lodged applica-
tion for formali-
sation of Cecelia
Park
Concept De-
signs 100%
completed
100% Comple-
tion of Imple-
mentation De-
signs
60% Completion
of Implementa-
tion Designs
40%
-20%
engage ser-
vice provider
to fasttrack
designs
31
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Formalization
of Brandkop
702
Lodged applica-
tion for formali-
sation of Brand-
kop 702
Concept De-
signs 100%
completed
100% Comple-
tion of Imple-
mentation De-
signs
60% Completion
of Implementa-
tion Designs
60%
none
none
Integrated
Public
Transport
Network
(IPTN)
20% imple-
mentation of
phase 1 of
IPTN
Phase 1 of IPTN
operational
Conceptual
IPTN Plan
20% Implemen-
tation designs
of Phase 1 of
IPTN
15%
10%
-5%
accelerate
appointment
of consult-
ants
32
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
100% of de-
tailed de-
signs for
Park road
Pedestriani-
sation
Detail designs None
100% of detailed
designs for Park
road Pedestria-
nisation
Final Detailed de-
sign
10%
-90%
SCM to give
service pro-
vider ap-
pointment
letter
Environmen-
tal sustaina-
bility
Developed
Environmen-
tal Manage-
ment and Im-
plementation
Plan (IEMP)
EIMP devel-
oped and ap-
proved
None
Final and
adopted EIMP
60% developed
EIMP
SCM PRO-
CESSES
-60%
Accelerate
the SCM pro-
cess
33
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Number of
Environmen-
tal Impact
Assessment
conducted on
f develop-
ment applica-
tions and cor-
respondence
provided to
the applicant
EIA reports de-
veloped
None Submitted EIA
applications as-
sessed within 30
days
All submitted
EIA applications
assessed
100%
All submitted EIA
applications as-
sessed
100%
none
none
34
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal KPA Poverty eradication, rural and economic development and job creation
Public transport
Environmental Management
Spatial development and the built environment
STATUS Performance
Exceeds
Expectation Target Met
In Progress
Unacceptable
Performance
Target not Implemented
IDP Objec-
tive
Strategies KPI Unit of Meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective
Action
Increase the
environmen-
tal literacy
level of
stakeholders
Learners
reached
through envi-
ronmental
awareness
Number of
environmen-
tal aware-
ness cam-
paigns con-
ducted
Attendance reg-
isters;
Meeting notices;
Awareness ma-
terials devel-
oped
Pictures and re-
ports
None 20 environment
awareness cam-
paigns con-
ducted
5 environment
awareness cam-
paigns conducted
project co-or-
dinated bhy
social ser-
vices
none
none
35
6.5.2 ENGINEERING SERVICES
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Jobs creation
Create jobs
using the Ex-
panded Pub-
lic Works
Programme
Total number of
jobs generated
by the invest-
ment, both direct
and induced, for-
mal, informal
and self-em-
ployed
Reports of contrac-
tors
1687 3373 850 280
-570
Will concen-
trate more on
maintenance
projects for job
creation
Number of
women (and
comparable pay)
Reports of contrac-
tors
573 1248
314 113
-201
Will concen-
trate more on
maintenance
36
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
and disadvan-
taged groups
employed
projects for job
creation
Skills upgrad-
ing, training
provided
Number of peo-
ple trained
through con-
struction projects
of the municipal-
ity
Reports of contrac-
tors
150
200 50 0
-50
Projects
started late,
training will still
be done.
Address roads
conditions
Tar gravel
roads
Km of gravel
roads tarred
Completion certifi-
cates for roads
tarred
10 km 11 km 5 km 0
-5
Will catch up
in fourth quar-
ter & new fin
year
37
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
KMs of paved
roads
Completion certifi-
cates for roads
paved
2.3 km 1 km 1,635
0,6
Resurfaced
roads
Km of roads re-
surfaced / reha-
bilitated
Completion certifi-
cates for roads re-
surfaced / rehabili-
tated
387 754 Sqm 20 km 10 km 3,1
-6,9
Will catch up
in 4th quarter
as soon as
tenders is
awarded
Install storm-
water drain-
age
Km of Storm-wa-
ter drainage in-
stalled
Completion certifi-
cates for storm-wa-
ter drainage in-
stalled
45.63 km 7 km 3km 0,67
-2,33
Will catch up
in fourth quar-
ter & new fin
year
38
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Eradicate wa-
ter services
backlog
Expand bulk
water infra-
structure
Length of main
water supply line
installed
Completion certifi-
cate of the water
supply line
Expand main wa-
ter supply lines
(12,1 km on Lon-
gridge, Naval Hill
and Botshabelo)
Expand main
water supply
lines
(10,2 km on
Longridge, Na-
val Hill and
Botshabelo - %
completed)
2.55 km
of water line
expanded
Longridge:
4.2km
None
Longridge:
Contractor to
employ 2nd
pipelaying
team
Stands pro-
vided with
water con-
nections
Number of For-
mal stands pro-
vided with water
connections
Numbrer of Formal
stands with water
connections
(7500 stands*)
Formal stands
provided with wa-
ter connections
(1500 stands)
Formal stands
provided with
water connec-
tions
(4500 stands**
- % completed)
1125 stands
completed
0
None: Cur-
rent work
on stands
with water
None
39
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
% increase in
the number of
informal house-
holds provided
with communal
taps (200m ra-
dius)
Percentage of in-
formal households
provided with com-
munal taps (200m
radius)
At least 90% of in-
formal households
provided with
communal taps
(200m radius)
At least 90% of
informal
households
provided with
communal taps
(200m radius –
cumulative %
complete)
90% 90%
None
Number of water
service points in-
stalled for infor-
mal settlement
dwellers within a
200m radius
Completion certifi-
cates of services
points
None 24 962 house-
holds
2 497 commu-
nal standpipes
625 commu-
nal stand-
pipes
-
-625 -
40
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Backlog in the
number of con-
sumer units with
access to a free
basic level of po-
table water
Indigent register 20 000 30 000 (actual
backlog 10 000
indigent for the
year) house-
holds
27 500 (in-
crease of
2500 indi-
gents from
Q2) house-
holds
-
-27 500 -
Update the de-
liverables in re-
lations to blue
drop
compliance
with drinking
water quality
standards
% improved on
blue drop status
Blue Drop Certifica-
tion > 95%
86% performance
assessment ob-
tained
Upgrading of
Masselspoort
Treatment
Plant.
60% Upgrad-
ing of Mas-
selspoort
Treatment
plant
83%
+23%
Reduce level
of Non- Reve-
nue Water and
Replace wa-
ter meters s,
and metering
Number of water
meters (replaced
&installed)
Number of meters
replaced
16029 meters in-
stalled/replaced
4000 meters 1400 meters 312
-1088
Increase num-
ber of teams
41
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
improve water
security
of unmetered
sites.
Refurbish-
ment of water
supply sys-
tems: Real
loss Reduc-
tion Pro-
gramme
(Water)
% reduction in
non-revenue wa-
ter
Completion certifi-
cates
Job cards
Reduction in the
amount of re-
sources used to
purchase raw water
34.8 mega litres
per day
768.4 mega li-
tres per annum
(732ml/d leak
detection,
36.4ml/d pres-
sure manage-
ment)
222.4ml 1.0ml
- -
42
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Refurbish-
ment of water
supply sys-
tems: Telem-
etry and
Scada
Number of new
Pump Station
Monitoring
equipment in-
stalled
Completion certifi-
cates
6 6 2 2
none
none
Number of new
Flow meter Mon-
itoring equip-
ment installed
Completion certifi-
cates
30 30 10 10
none
none
Number of new
applications
(MIS)
Number of new ap-
plication lodged on
MIS;
5 5 1 1
none
none
43
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
MIS report
Replace-
ment/
Refurbish-
ment old wa-
ter mains in
BFN.
Length of water
mains replaced
Completion certifi-
cates
4.7km 8km 3km 6.5km
+3.5km
none
Replace-
ment/
Refurbish-
ment of
valves in
Number of
valves re-
placed/refur-
bished within the
water network
Completion certifi-
cates
180 90 150
+60
none
44
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
BFN, Bot-
shabelo and
ThabaNchu,
and
Eradicate sani-
tation backlogs
Expand bulk
sanitation in-
frastructure
Expansion of NE
Waste Water
Treatment Work
capacity
Completion Certifi-
cates
Expand Waste
Water Treatment
Work capacity
(20 Ml/day on
NE WWTW Ph1 &
Expand Waste
Water Treat-
ment Work ca-
pacity
(NE WWTW
Ph 1&2 and
75%
completion
-
-75% -
45
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Expansion of
Sterk-Water
Waste Water
Treatment Work
capacity
Completion Certifi-
cates
Expand Sterkwa-
ter WWTW capac-
ity Phase 1 80 %
complete)
Sterkwater
WWTW Ph 2:
15 Ml/day - %
complete)
75%
completion
100%
+25%
Completion re-
port to be sub-
mitted to MMM
Provide formal
stands with
waterborne toi-
let to eradicate
VIP and Pit toi-
lets
Provide for-
mal stands
with water-
borne toilet to
eradicate VIP
and pit toilets
Number of for-
mal stands with
waterborne toilet
to eradicate VIP
and pit toilets
(7500 formal
stands)
Completion Certifi-
cates
Provide formal
stands with water-
borne toilet to
eradicate VIP and
pit toilets (4500
stands** - % com-
plete)
25%
3 000 VIP and
Bucket toilets
eradicated
750 VIP and
Bucket toilets
eradicated
839
+89
Accelerate
work
46
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of addi-
tional house-
holds (RDP) pro-
vided with sewer
connections
Completion certifi-
cates
1800 additional
households (RDP)
provided with
sewer connec-
tions
1492 additional
households
(RDP) pro-
vided with
sewer connec-
tions
373 addi-
tional house-
holds (RDP)
provided with
sewer con-
nections
330
-73
Accelerate
work
Backlog in the
provision of
basic sanitation
services (above
RDP standards)
Completion certifi-
cates
53 259 house-
holds serviced
with waterborne
sanitation (back-
logs eradicated)
3 000 house-
holds serviced
with water-
borne sanita-
tion.
750 house-
holds ser-
viced with wa-
terborne sani-
tation.
0
-750
Accelerate
work
47
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Accelerate
waste removal
Provide
households
with weekly
kerb-side
waste re-
moval ser-
vices in for-
mal areas
No. of house-
holds with
weekly kerb-side
waste removal
services in for-
mal areas
Number of house-
holds with weekly
kerbside waste re-
moval service
165 464 house-
holds with weekly
kerb-side waste
removal services
in formal areas
165 464
households
with weekly
kerb-side
waste removal
services in for-
mal areas
165 464
house-holds
with weekly
kerb-side
waste re-
moval ser-
vices in for-
mal areas
178 367
house-holds
with weekly
kerb-side
waste removal
services in for-
mal areas
positive
variance
N/A
Informal set-
tlement
dwellings
with access
Number of infor-
mal settlements
with access to
refuse removal
services
Number of informal
settlements with
access to refuse re-
moval
23 130 informal
settlement dwell-
ings with access
to refuse removal
36 000 of infor-
mal settle-
ments dwelling
have access to
refuse removal
36 000 of in-
formal settle-
ments dwell-
26 688 of infor-
mal settlement
dwellings have
access to re-
fuse removal
Negative
variance
Extend service
through lever-
aging addi-
tional re-
sources
48
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
to refuse re-
moval
ing have ac-
cess to refuse
removal
Reduction of
weekly kerb
side refuse
removal
backlog to
consumer
units within
14 days
Reduction of
weekly backlog
within 07 days
after scheduled
collection day
100% waste re-
moval backlog
eradicated in con-
sumer units
within 07 days after
scheduled collec-
tion day
100% waste re-
moval backlog
eradicated in con-
sumer units within
14 days
100% waste
removal back-
log eradicated
in consumer
units
within 07 days
after sched-
uled collection
day
100% waste
removal back-
log eradicated
in consumer
units
within 07 days
after sched-
uled collection
day
100% waste
removal back-
log eradicated
in consumer
units
positive
variance
N/A
49
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Ensure a
waste man-
agement lit-
erate commu-
nity in Man-
gaung Metro
Municipality
Provide edu-
cation and
awareness
on waste
management
issues
Number of edu-
cation and
awareness ses-
sions under-
taken
Attendance regis-
ters
Awareness training
programmes devel-
oped
34 education and
awareness ses-
sions undertaken
10 education
and awareness
sessions un-
dertaken
3 education
and aware-
ness sessions
undertaken
6 Education
and aware-
ness sessions
undertaken
positive
variance
N/A
Organise
clean- up
campaigns
Number of
clean-up cam-
paigns con-
ducted
Number of clean up
campaigns
8 clean up cam-
paigns
4 clean up
campaigns
1 clean up
campaign
20 clean up
campaigns
positive
variance
N/A
50
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Ensure waste
is managed in
an integrated
manner
Permitted
Landfill sites
comply with
legislation
Number of Au-
dits performed at
landfill sites(in-
ternal and exter-
nal)
Audit Reports
0 2 internal and
1 external au-
dit performed
1 internal au-
dit performed
1 internal audit
has been per-
formed
N/A
N/A
No of permitted
landfill sites
maintained and
upgraded
Completion certifi-
cates
3 permitted landfill
sites maintained
and upgraded
3 permitted
landfill sites
upgraded and
maintained
3 permitted
landfill sites
upgraded and
maintained
3 landfill sites
upgraded and
maintained
N/A
N/A
51
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Promote re-
use, recy-
cling and re-
covery of
waste
% of waste di-
verted from the
landfill sites
Recyclable waste
diverted from the
landfill sites for re-
use, recycling or re-
covery
New KPI 10% of recy-
clable waste
diverted from
the landfill
sites for re-
use, recycling
or recovery at
the Buy-back
Centre at the
ThabaNchu
Transfer Sta-
tion
- N/A
- -
52
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
New landfill site
developed
Completion Certifi-
cates;
Licence permit
New KPI 2. Initiation of
the process for
the establish-
ment of a re-
gional landfill
site
Landfill classi-
fication report
available
acquisition of
land not yet fi-
nalised
consultant
not ap-
pointed
land acquisi-
tion to be final-
ised first
100% Transfer
station devel-
oped in Tha-
baNchu
Completion Certifi-
cates;
Licence permit
New KPI 1.Construction
of a transfer
station in
Thaba ‘Nchu
First phase of
the transfer
station with
complete con-
crete works
and steel
structure
there was very
slow progress
in the 3rd
quarter
concrete
works and
steel struc-
ture not
complete
yet
the contractor
has requested
for an exten-
sion of time
53
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
CENTLEC
ELECTRICITY
To ensure Op-
timal Service
Delivery
Provide
100% access
to electricity
Number of sites
accessing basic
electricity service
in Khayelisha
Completion certifi-
cates
N/A 500 sites have
access to
basic electricity
services
125 house-
hold connec-
tions
15
-110
A target of 500
households
has been
reached. Fif-
teen house-
holds deliv-
ered in this
quarter as-
sisted to
achieve the
yearly target of
500 sites.
54
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of sites
accessing basic
electricity service
in Grassland
Completion certifi-
cates
N/A 347 sites have
access to
basic electricity
services
87 sites 0
-87 -
Number of sites
accessing basic
electricity service
in Caleb Mot-
shabi
Completion certifi-
cates
N/A 1880 sites
have access to
basic electricity
services
470 Sites 0
-470
Yearly target
of 1880 house-
holds has
been achieved
with access to
basic electric-
ity service
Number of Pub-
lic connections
Completion certifi-
cates
N/A Number of ap-
plications re-
ceived, paid
All applica-
tions re-
ceived, paid
-
All applica-
tions re-
ceived, paid
-
55
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
installed as and
when required
and installa-
tions com-
pleted.
and installa-
tions com-
pleted.
and instal-
lations
completed
Provide relia-
ble public
lighting in ar-
eas as re-
quired by
MMM
Number of high
mast lights in-
stalled with cer-
tificates of com-
pliance
Completion certifi-
cates
40 high mast
lights Mangaung
26 energized
high mast
lights with cer-
tificate of com-
pliance
7 energized
high mast
lights with
certificate of
compliance.
9
+3
Project is still
underway and
progress is
satisfactory
provide a reli-
able supply
of electricity
100% Com-
pleted 132/11kV
Fichardpark
Distribution Cen-
tre
Completion certifi-
cates
N/A 100% com-
pleted distribu-
tion Centre
commissioned.
70% of com-
pletion
10%
-60%
Designs has
been approved
and the con-
sultant has to
start with the
56
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
procurement
processes
100% Com-
pleted 132/11kV
Cecilia Distribu-
tion Centre
Completion Certifi-
cate
N/A 100% com-
pleted distribu-
tion Centre
commissioned.
70% of com-
pletion
10%
-60%
Designs has
been approved
and the con-
sultant has to
start with the
procurement
processes
57
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
100% Com-
pleted Bot-
shabelo: 132kv
Eskom connec-
tion &extensions
to substation
Completion Certifi-
cate
N/A 100% com-
pleted distribu-
tion Centre
commissioned.
70% of com-
pletion
0
-70%
Funds has
been reallo-
cated to other
projects during
mid-year re-
view
100% Com-
pleted BOT-
SHABELO:
132KV/33/11KV
DC SUB
Completion Certifi-
cate
N/A 100% com-
pleted distribu-
tion Centre
commissioned
70% of com-
pletion
0
-70%
Funds has
been reallo-
cated to other
projects during
mid-year re-
view
58
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of distri-
bution Centres
visually in-
spected (l pro-
tection equip-
ment once every
6 months.
Inspection report N/A Protection of
39 Distribution
Centres fully
inspected
10 Distribu-
tion Centres
110 panels
were inspected
+100
258 panels
were targeted
but insufficient
Personnel and
other work
load not re-
flected in this
score card pri-
oritised. Ad-
justed plan-
ning will ena-
ble 258 panels
59
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
to be done in
Q4
Number of pri-
mary and sec-
ondary substa-
tions Visually in-
spected (all pro-
tection equip-
ment)
Inspection report N/A Inspect at least
once every
year 370 sub-
stations
substations
93 Substa-
tions
98 panels
were inspected
+5 281 panels
were targeted
but insufficient
Personnel and
other work
load not re-
flected in this
score card pri-
oritised. Ad-
justed plan-
60
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
ning will ena-
ble 281 panels
to be done in
Q4
Number of rou-
tine maintenance
and tests per-
formed on all
Distribution Cen-
tre protection
equipment
Maintenance re-
ports
N/A 39 Distribution
Centres - 39
Inspections per
year
10 DC’s 13 panels
were tested
+3
127 panels
were targeted
but insufficient
Personnel and
other work
load not re-
flected in this
score card pri-
oritised. Ad-
61
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
justed plan-
ning will ena-
ble 127 panels
to be done in
Q4. All of the
panels are in
good working
order to date.
Number of rou-
tine maintenance
and tests per-
formed on all
Maintenance re-
ports
N/A 39 Distribution
Centres - 39
Inspections per
year
10 DC’s 13 panels
tested
+3
62
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Distribution Cen-
tre protection
equipment
Number of rou-
tine maintenance
and tests per-
formed on all
protection equip-
ment situated in
primary substa-
tions every two
years
Maintenance re-
ports
N/A 142 substa-
tions in total -
71 sub stations
per year
18 SS 27 panels
were tested
+9
82 panels
were targeted
but insufficient
Personnel and
other work
load not re-
flected in this
score card pri-
oritised. Ad-
justed plan-
63
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
ning will ena-
ble 82 panels
to be done in
Q4. All of the
panels are in
good working
order to date.
Number of rou-
tine maintenance
and tests per-
formed on all
protection equip-
ment situated in
Maintenance re-
ports
N/A 230 substa-
tions in total -
77 sub stations
per year
20 SS 31 +11 39 panels
were targeted
but insufficient
Personnel and
other work
load not re-
flected in this
64
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
secondary sub-
stations every
three years
(468 panels to
be tested in
substations)
score card pri-
oritised. Ad-
justed plan-
ning will ena-
ble 82 panels
to be done in
Q4. All of the
panels are in
good working
order to date.
Number of exist-
ing Protection
panels and
Completion certifi-
cates
N/A Distribution
Centre protec-
tion panels: 12
per year.
3 0
-3 -
65
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
schemes up-
graded
Percentage eval-
uation of all ex-
isting protection
schemes once
every 3 years in
order to deter-
mine if the
schemes used
are effective and
efficient.
Evaluation report This will be
performed on a
percentage ba-
sis. 100% of
network to be
completed in a
three years cy-
cle
20% -
-20% -
66
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of l the
Rotating Disc
kWh meter(s) re-
placed at least
once every 20
years with a cali-
brated meter(s)
Completion certifi-
cates
N/A 2 420 Rotating
Disc Meters -
replaced
610 0
-610 -
Number of l the
Electronic kWh
meter(s) (pre-
paid and other)
replaced at least
once every 10
Completion certifi-
cates
N/A 30 000 Prepaid
Electronic Me-
ters -
7500 0
-7500 -
67
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
years with a cali-
brated meter(s)
Number of rou-
tine maintenance
performed on all
the meter boxes
Maintenance report N/A Maintenance
performed on 1
800 Meters
Boxes - ±
450 0
-450 -
Number of rou-
tine maintenance
on all the meter
boards in the
meter rooms
(blocks of
Maintenance report N/A Maintenance
performed on
80 Meters
20 0
-20 -
68
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
flats/large build-
ings)performed
Percentage of
Restoration of
supply after un-
planned interrup-
tions
Restoration reports N/A Restoration:
a 100% within
a week
100% within a
week
0
-100%
To ensure Op-
timal Service
Delivery
To provide a
reliable sup-
ply of elec-
tricity
All registered in-
digents receive
Free Basic Elec-
tricity
Indigent register 100% of the regis-
tered indigent re-
ceive Free basic
electricity as per
MMM approved
list
100% of the
registered indi-
gent receive
Free basic
electricity as
100% of the
registered in-
digent receive
Free basic
electricity
90%
-10%
69
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
per MMM ap-
proved list
Number of Me-
dium Voltage
Bulk kWh/kVA
Meter Installa-
tions inspected
Inspection report N/A 120 Medium
Voltage Bulk
kWh/kVA Me-
ter Installations
inspected
30 0
-30
Number of Low
Voltage Bulk
kWh/kVA Meter
Installations in-
spected
Inspection report N/A 440 Low Volt-
age Bulk
kWh/kVA Me-
ter Installations
inspected
110 0
-110
70
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of rou-
tine checks at
least once every
5 years to verify
the total integrity
of all the plati-
num bulk meter-
ing installations
(key customers)
performed
Inspection report N/A 20 Platinum
Bulk Metering
Installations -
inspected
5 0
-5
Number of rou-
tine checks at
least once every
10 years to verify
Inspection report N/A 40 routine
maintenance
completed on
10 0
-10
71
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
the total integrity
of all the other
bulk kWh/kVA
metering installa-
tions performed
Bulk Metering
Installations
Number of rou-
tine earth loop
tests performed
at least once
every 20 years
to verify the
earth impedance
to the source of
the power supply
Maintenance report N/A 6800 loop
tests on Indi-
vidual Metering
Installations
completed
1700 0
-1700
72
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
at each individ-
ual metering in-
stallation
Replace the bulk
kWh/kVA me-
ter(s) at all the
10 MVA _ Me-
dium Voltage In-
stallations at
least once every
5 years with a
calibrated meter
Completion certifi-
cates
N/A 5 Medium Volt-
age Bulk In-
stallations 10
MVA -
1 0
-1
73
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Number of
Quality of Supply
instruments re-
placed
Completion certifi-
cates
N/A 20 Instruments
per year
5 0
-5
Number of fully
functional cus-
tomer contact
centres estab-
lished in the ge-
ographical ser-
vice areas
Customer contract
centres established
Establish four (4)
new customer
contact centres
Four contract
centres estab-
lished and
monitored
Assess per-
formance
Plan for more
centres in-
cluding in
SFS
0
Assess per-
formance
Plan for
more cen-
tres includ-
ing in SFS
Number of me-
ter reading con-
ducted with a
Meter reading re-
ports
N/A Customer with
a supply size
of less than 50
29,000 0
-29,000
74
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
customer with a
supply size of
less than 50 kVA
kVA should be
read at least
once in every
three months.
Number of ac-
count queries
and disputes re-
sponded to
within five work-
ing days
Account query re-
ports
N/A account que-
ries that can-
not be re-
solved on first
contact, at
least 95% of
these account
queries should
be responded
As received 0
As received
75
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
to within five
working days
Number of credit
meter accuracy
queries man-
aged
N/A All Meter accu-
racy checks
shall be per-
formed within
15 working
days of the re-
ceipt of the
prescribed fee.
All Meter ac-
curacy checks
shall be per-
formed within
15 working
days of the
receipt of the
prescribed
fee.
0
All Meter
accuracy
checks
shall be
performed
within 15
working
days of the
receipt of
the pre-
scribed fee.
76
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Access to vend-
ing stations for
selling of elec-
tricity tokens
N/A Vending sta-
tions should
sell tokens dur-
ing normal
shopping
hours on
weekdays, and
from 08:00 to
12:00 on
weekends and
public holi-
days.
100% 0
-100%
77
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
Time take to re-
connect faulty
Prepayment me-
ters
Job card N/A Faulty Prepay-
ment meters
should be re-
connected
within 48 work-
ing hours of re-
ceiving a re-
quest and the
payment of the
reconnection
fee
48 working
hours
0
48 working
hours
Time taken to is-
sue a notice of
Notices issues N/A , At least 48
hours advance
notification
48 hours ad-
vance notifi-
cation
0
48 hours
advanced
notification
78
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
planned interrup-
tions
should be
given of any
planned inter-
ruption.
Time taken to re-
spond to incom-
ing calls
Call logs N/A 80% of incom-
ing calls
should be re-
sponded to
within 30 sec-
onds
100% of calls
responded
within 30 sec-
onds v
0
100% of
calls re-
sponded
within 30
seconds v
Call logs N/A 90% of all in-
coming calls
should be dealt
90% of all in-
coming calls
should be
0
90% of all
incoming
calls should
be dealt
79
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
with within 5
min
dealt with
within 5 min
with within
5 min
Percentage of
key customers
required to fill in
customer satis-
faction question-
naire
Customer satisfac-
tion questionnaire
Customer Satisfac-
tion Report
N/A At least 10 %
of key custom-
ers are re-
quired to fill in
the customer
satisfaction
questionnaire
15% 0
-15%
100% availability
of electricity sup-
ply to customers
essential loads
N/A 100% availabil-
ity of electricity
100% availa-
bility of elec-
tricity supply
to customers
0
-100%
80
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
supply to cus-
tomers essen-
tial loads
essential
loads
100% installation
of Automated
Meter Reading
(AMR) System
Completion Certifi-
cate
System migrated
to Centlec net-
work
Assess
Centlec LAN
capacity and
upgrade ac-
cordingly
Start the mi-
gration
ICT Panels ap-
pointed
Panel sub-
missions
being as-
sessed
Spec given to
the panel for
request of pro-
posals
Roll-out and
managing Smart
Meters System
Completion certifi-
cate
Fully operational
control room
All installed
meters are vis-
ible at the Sys-
tem Master
Station
Expand the
system
Activate other
value add ser-
vices of the
system and
Additional
functions
added to
the system.
Additional
functions
added to the
system
81
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
add more con-
centrators to
the system
More con-
centrators
added
100% GMM sys-
tem imple-
mented and
managed
Completion certifi-
cate
System migrated
to Centlec net-
work
Ensure that the
system is inte-
grated into all
affected func-
tions
Determine if
the system
needs to be
migrated to
Centlec net-
work
system being
used
system be-
ing used
Determine if
the system
needs to be mi-
grated to
Centlec net-
work
Development
and implementa-
Completion certifi-
cate
Develop the sys-
tem
Develop the
functional
specifications
Continue sys-
tem develop-
ment
Not started
Not started Tenders re-
ceived and are
in SC process
82
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
Municipal KPA Eradication of bucket system, VIP toilets in Bots, Mangaung and TN, focus on the basics, building solar farming, power plant feasibility
study, safety & security
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual per-
formance
Q3
Status Variance Corrective
Action
tion of Consoli-
dated customer
queries system
System test-
ing
To ensure Op-
timal Service
Delivery
.
To provide a
reliable sup-
ply of elec-
tricity
Percentage of
new fleet pro-
cured as per re-
quest from the
various depart-
ments
Additions to the as-
set register
100% Completed
Procure new
fleet as per re-
quest from the
various depart-
ments
75% of re-
quired fleet
procured
Two (2) Trucks
were acquired.
N/A N/A
83
6.5.3 STRATEGIC PROJECTS AND SERVICE DELIVERY REGULATIONS
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Filling of
budgeted
positions
through
placement
and recruit-
ment
Number of
post filled as
per approved
and funded
staff estab-
lishment
Approved staff es-
tablishment
20%
Filling of va-
cant funded
and approved
positions
100%
Fill budgeted po-
sitions
90%
3 Data Analyst, 3
SD Monitors and
3 SD Managers
positions adver-
tised and inter-
views held for the
3 Data Analyst
10%
Conclude ap-
pointments of
advertised posi-
tions
84
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
and 3 SD Moni-
tors with the SD
Managers sched-
uled for April
Service deliv-
ery regula-
tory, monitor-
ing and eval-
uation
Developed
Monitoring
and evalua-
tion toolkit on
service deliv-
ery
Approved Moni-
toring and evalua-
tion toolkit on ser-
vice delivery
0
Monitoring
System imple-
mented at all
regions
Service delivery
Toolkit complete
and imple-
mented in Re-
gion 1 (Tha-
baNchu)
0% design has
not commenced
100%
Corporate GIS
consultants ap-
pointment and
meeting by
Planning divi-
sion and meet-
ing scheduled to
fast track imple-
mentation
85
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Develop-
ment, man-
agement and
custodian of
all grant
funding
Compiled
Built Environ-
ment Perfor-
mance
Plan(BEPP
2015/16)
BEPP 2015/16
approved by
Council
Approved
BEPP 2014/15
Final
BEPP2015/16
Draft BEPP
2015/16
N/A
N/A N/A
100%Compli-
ance to grant
conditions
(USDG &
NDG)
Compliance report
developed and
transmitted to
transferring de-
partments
100% 100%
100% 100%
N/A N/A
Percentage
spending of
Close out reports
and developed
70%
95.0% 70% 47.24%
22.76%
Implement the
USDG recovery
86
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Grant ex-
penditure on
the approved
projects
compliance re-
ports
plan and accel-
erate progress
on projects un-
der construction
Implementa-
tion of key
strategic pro-
jects
100% Imple-
mentation of
NDPG
funded pro-
ject
Report approved
by Council
Compliance re-
ports
0 Completed de-
sign plan as
per NDPG
framework
70%
Completed con-
ceptual plan for
Waaihoek pre-
cinct
70%
Conceptual plan
for Waaihoek
precinct devel-
oped and pre-
sented to National
Treasury (NDPG
Unit)
N/A N/A
87
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
100% estab-
lishment of
National
Training Cen-
tre pro-
gramme
Completion Certif-
icates
0 Detailed for the
National Train-
ing Centre
75%
Detailed design
planning
40%
Budget for design
approved through
adjustment
budget, currently
in the process to
appoint the Con-
sultant for detailed
design
35%
Conclude the
design and ad-
vertise tender
for the appoint-
ment of the con-
tractor
100% admin-
istrative over-
sight of Mu-
nicipal Entity
Compliance re-
ports
Draft Service
Delivery
Agreement
with Centlec
Approved 5
year business
plan
Draft Business
plan compiled
Draft Business
plan compiled
N/A N/A
88
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Monitoring of
SDA
Execute
and/or man-
age strategic
events of
Council
Number of
key Strategic
Events as al-
located, on
need basis,
by the Exec-
utive Mayor
and City
manager
managed
and executed
successfully
Reports Hosting of
2014 CHAN
100% imple-
mentation of
key Strategic
Events
100% implemen-
tation of key
Strategic Events
No events held
during the 3rd
Quarter
N/A N/A
89
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Municipal KPA Municipal Transformation and Good Governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not im-
plemented
IDP Objec-
tive
Strategy KPI Unit of meas-
urements
Past Year
Perfor-
mance
(2013/14)
Annual Tar-
get
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Number of
projects done
in partnership
with provin-
cial SACR
100% compliance
to agreed pro-
gramme of action
Revival of the
Civic Theatre
Delivery as per
signed pro-
gramme of ac-
tion
60% progress as
per checklist
60%
N/A N/A
90
6.5.4 SOCIAL SERVICES
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Promoting a
comprehensive
Library service
Promote lit-
eracy in
communities
Number of new
library books
acquired
new books
acquired
2110 New
Books
1 000 new chil-
dren`s books ac-
quired
250 new chil-
dren`s books ac-
quired
433 Positive +183 None Required
91
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
new non-fic-
tion books
acquired
3289 New Fic-
tion books
2 000 new non-
fiction books ac-
quired
500 new non-
fiction books ac-
quired
561 Positive +61 None Required
new adult fic-
tion books
acquired
4050 Adult
Books
1 000 new adult
books acquired
.250 new adult
books acquired
293 Positive +43 None Required
Number of Li-
brary cam-
paigns con-
ducted
Attendance
registers
65 Library cam-
paigns
50 library cam-
paigns conducted
per annum
15 library cam-
paigns con-
ducted per an-
num
27 Positive +12 None Required
92
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Number of Li-
brary outreach
programmes
conducted to
communities
outreach pro-
grammes
conducted
814 Outreach
programmes
400 outreach pro-
grammes con-
ducted
150 outreach
programmes
conducted
170
Positive +20 None Required
Promote arts
and cultural
programmes
Promote cul-
tural pro-
grammes
Number of
arts and cul-
tural pro-
grammes sup-
ported and im-
plemented
programmes 5 Supported, 1
Implemented
Implement or sup-
port 8 cultural
programmes
Implement or
support 2 pro-
grammes
3
Positive +1 None Required
Researched
heritage sites
and record
Number of
Heritage sites,
monuments,
and public art
Develop and
update City`s
database
None Inspection of 20
existing heritage
sites
5 heritage sites
inspected
1
None Target already
met for year
93
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
on SAHIS
data base
researched
and recorded
on the SAHIS
data base
Ensure com-
pliance with
Initiation
Schools pol-
icy
Number of all
known Initia-
tion Schools
inspected, to
ensure compli-
ance with the
Initiation
Schools Public
Policy
Initiation
schools to be
inspected
109 Schools All known initia-
tion schools in-
spected
0 "off season"
for initiation
schools
Inspections will
resume during
winter months:
June & July
2015
94
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Promote HIV
/AIDS
prevention
measures
Prevent new
HIV/ AIDS in-
fections
Number of
training
courses on
HIV/AIDS
Training
courses to be
conducted
23 Courses 12 courses to be
conducted
3 courses to be
conducted
4
Positive +1 None Required
Number of
seminars
hosted to in-
tensify educa-
tion and
awareness on
HIV/AIDS
seminars
hosted
8 Seminars 4 Seminars 1 seminar to
conducted
2
Positive +1 None Required
Number of
condoms dis-
tributed
Units of con-
doms distrib-
uted
1850 000 Con-
doms
1 600 000 Con-
doms distributed
400 000 con-
doms distributed
796 956 Positive +396
956
None Required
95
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Number of
community
members en-
couraged to
test and know
their status
members of
the commu-
nity tested
1065 Persons
tested
300 persons
tested
80 persons
tested
667 Positive +587 None Required
Number of
HIV/Aids
Counselling
and outreach
programmes
conducted
HIV/AIDS
sessions held
46 Sessions
held
25 sessions held 6 sessions held 11 Postive +5 None Required
Number of t
Home Based
HBC assisted 45 HBC assisted 45 HBC assisted 10 HBC assisted 26 Positive +16 None Required
96
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Care Organi-
zations and
OVC (orphan
and vulnerable
children) as-
sisted, trained,
referred to
other Govern-
ment Depart-
ments and in-
formation dis-
semination
97
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Promote Early
Childhood de-
velopment
(ECD)
Update ECD
database
ECD Database
updated
All ECDs
captured in
database
737 ECD’s on
updated data-
base
On-going updat-
ing of database
and ensuring that
unregistered
ECDs are mini-
mised
On-going updat-
ing of database
and ensuring
that unregistered
ECDs are mini-
mised
Database is up-
dated although no
additions were
made
None None Required
Conduct in-
spections on
ECD prem-
ises
Number of in-
spections con-
ducted on
ECDs.
All inspec-
tions con-
ducted
228 Inspections
conducted
150 inspections
conducted
40 inspections
conducted
123 Positive +83 None Required
Promote Envi-
ronmental
Health
Inspect food
premises
Number of t
food premise
inspections
conducted as
per provisions
All food
premise in-
spected
16063 Inspec-
tions
16 000 food prem-
ise inspections
4000 food prem-
ise inspections
3414
Negative -
586
None Required
98
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
of the Food-
stuffs, Cos-
metics and
Disinfectants
Act 54 1972
Inspect dairy
farms
Number of
food premise
inspections
conducted as
per provisions
of the Food-
stuffs, Cosmet-
ics and Disin-
fectants Act 54
1972
All dairy
farms in-
spected
54 Inspections 80 dairy farms in-
spected
20 dairy farms
inspected
3
Negative -
17
Shortfall will be
address in 4th
quarter due to
renewal of reg-
istrations.
99
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Inspect mor-
tuaries
Number of in-
spections con-
ducted on all
mortuaries as
per the provi-
sions of the
Public Health
act
All mortuar-
ies inspected
33 Inspected 40 mortuaries in-
spected
10 mortuaries in-
spected
11
Positive +1 None Required
Inspect med-
ical waste
generators
Number of in-
spection on
medical waste
generators’
premises con-
ducted as per
All medical
generator
premises in-
spected
325 Inspections 110 medical
waste generator
premises in-
spected
25 medical
waste generator
premises in-
spected
152 Positive +127 None Required
100
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
the provisions
of the NEMA
Ensuring
health re-
lated compli-
ance of
buildings
Number of
building plans
inspected for
health related
compliance
All Building
plans re-
ceived to be
scrutinized
2113 Received
and scrutinised
All Building plans
received to be
scrutinized
All Building
plans received
to be scruti-
nized for health
compliance
574
None None Required
Conduct
drinking and
recreational
water sam-
pling accord-
ing SANS to
241
Number of
drinking water
samples con-
ducted and
monitored r ac-
cording SANS
to 241
drinking wa-
ter samples
conducted
and moni-
tored
1033 Drinking
water samples
1 300 drinking wa-
ter samples
350 drinking wa-
ter samples
411 Positive +61 None Required
101
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Number of
samples f rec-
reational water
monitored ac-
cording SANS
to 241
recreational
water sam-
ples
70 Recreational
samples
60 recreational
water samples
20 recreational
water samples
8
Negative -
12
Drinnking water
samples were
prioritized.
Shortfall will be
addressed in
4th quarter.
Surveillance
of diseases
Number of re-
ported com-
municable dis-
eases at-
tended to
All communi-
cable dis-
eases re-
ported and
attended to
8 Cases re-
ported and at-
tended to
All communicable
diseases reported
attended to
All communica-
ble diseases re-
ported attended
to
None reported for
January - March
2015
None None Required
Conduct food
sampling
Number of
food samples
taken annually
in accordance
food samples
taken
706 Food sam-
ples
850 food samples
taken
200 food sam-
ples taken
140
Negative -60 New sampling
schedule has
been imple-
mented and the
102
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
with the Food-
stuffs, Cosmet-
ics and Disin-
fectants Act
54 1972
target will be
reached in the
4th quarter
Number of
samples taken
at all Major
Functions as
per the re-
ceived applica-
tions in accord-
ance with the
Foodstuffs,
Cosmetics and
Samples
taken at all
major func-
tions where
applications
have been
received
107 samples All Samples taken
at all major func-
tions where appli-
cations have been
received
All Samples
taken at all ma-
jor functions
where applica-
tions have been
received
13
None None Required
103
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Disinfectants
Act 54 1972
Ensure dis-
posal of
dead (burials
of unidenti-
fied persons)
Number of
Burials done
within 2 weeks
after issuing of
the official or-
der
All Burials
done within 2
weeks after
issuing of the
official order
73 Burials All Burials done
within 2 weeks af-
ter issuing of the
official order
All 0 requests re-
ceived for months
January - March
2015
None None Required
Manage Air
Quality
Number of
non -compli-
ance of Sul-
phur Dioxide
All non- com-
pliance at-
tended too
within 2 days
No Non compli-
ances
All non -compli-
ance attended too
within 2 days
All non -compli-
ance attended
too within 2 days
No non-compli-
ance reported for
months January -
March 2015
None None Required
104
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
emissions re-
sponded to en-
sure Air Qual-
ity control
Number of l
Emission Li-
cence applica-
tions submitted
and processed
All AEL appli-
cations han-
dled
4 AEl Applica-
tions handled
All AEL applica-
tions handled
All AEL applica-
tions handled
2
None None Required
Developed Air
Quality Man-
agement Plan
(AQMP)
Adopt and
Implement
AQMP
New KPI Develop Air Qual-
ity By laws
Prepare draft Air
Quality Manage-
ment Plan
Received the
AQMP of the pre-
vious Motheo Dis-
trict thus prepara-
tion of such will
commence
None None Required
105
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Handling En-
vironmental
pollution
complaints
Number of en-
vironmental
pollution re-
lated com-
plaints re-
sponded to
within 48hrs
Environmen-
tal pollution
related com-
plaints re-
sponded to
within 48hrs
133 Environ-
mental pollution
complaints
All Environmental
pollution related
complaints re-
sponded to within
48hrs
All Environmen-
tal pollution re-
lated complaints
responded to
within 48hrs
0 complaints per-
taining to air, sur-
face and water
polllutions re-
ported
None None Required
Provide
Health Edu-
cation
Number of
health and hy-
giene (H&H)
awareness
programmes
conducted
H&H pro-
grammes
conducted
6 H&H pro-
grammes
10 H&H pro-
grammes con-
ducted
3 H&H pro-
grammes con-
ducted
5 Positive +2 None Required
106
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Improved lives
of the indigent
households
Provision of
social safety
net for the in-
digent
Approved and
updated indi-
gent register
Indigent reg-
ister updated
30 400 Entries
on Indigent Reg-
ister
Update indigent
register to comply
with provisions of
policy
Update indigent
register to com-
ply with provi-
sions of policy
No updates re-
ceived during the
3rd quarter
None A service pro-
vider should be
appointed by
SCM to update
the register.
Number of the
burials of the
indigent facili-
tated within 2
weeks
All indigent
burials suc-
cessfully fa-
cilitated
within 2
weeks
558 Indigent
Burials
All indigent burials
successfully facili-
tated within 2
weeks
All indigent buri-
als successfully
facilitated within
2 weeks
271
None None Required
Improve ser-
vices to ame-
liorate the
Wellness
programmes
for the aged
including bio
Number of
wellness pro-
grammes for
outreach Pro-
grammes tar-
geting the
aged
2 Outreach pro-
gramme
2 wellness h Pro-
grammes target-
ing the aged
0 0 None None Required
107
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
plight of vul-
nerable groups
such as street
children, peo-
ple with disa-
bility, the el-
derly
kinetics,
healthy life
style etc.
the elderly de-
veloped and
implemented
Ensure el-
derly shelters
are properly
regulated
and well gov-
erned
Number of el-
derly shelters
inspected
All elderly
shelters vis-
ited
13 Inspections 20 inspections on
elderly shelters
5 inspections on
elderly shelters
3
Negative -2 Shortfall to be
made up in re-
maining quar-
ter. Vacant po-
sitions and staff
constraints
caused vari-
ance.
108
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Work with in-
dividual peo-
ple with disa-
bility to ad-
dress their
needs
Number of
supporting ac-
tivities imple-
mented for dis-
abled persons
All organiza-
tions/ centres
responsible
for people
with disabili-
ties reached
through vari-
ous organiza-
tions
Database com-
piled
5 Registered
Centres identi-
fied for support,
Hosted Disability
Sport Festival
Implement 3 sup-
porting activities
to address needs
of people with dis-
abilities
Implement 1
(one) supporting
activities
0
Negative -
1
Compilation of
activity pro-
gram for 4th
quarter in order
to reach target.
109
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Assist Or-
phans, Child
headed
households
(CHH) and
street chil-
dren
Updated data-
base of child
headed house-
holds within
the municipal-
ity
Compilation
of database
20 New child
Headed House-
holds added and
48 CHHs sup-
ported
Update database
and ensure sus-
tainability
Database 100%
updated as per
new cases iden-
tified
4 new registrants
on the database.
Total Number of
entries: 596
None None Required
because it is
"demand
based"
Number of chil-
dren and desti-
tute families
supported
Support or-
phans, street
kids, CHHs
and destitute
families
Supported:
= 150 children
(- 109 Orphans,
- 1 Street child
admitted to
Eden Interna-
tional Place of
safety
200 children and
all destitute fami-
lies supported
50 children and
destitute families
supported
173 Positive +123 None Required
110
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
- 40 Street Kids
for a two weeks
Camp)
= 1 family in
ThabaNchu
(shack burnt
down),
= 12 blankets
distributed
Empowerment
of civic groups
to improve
good citizen-
ship
Facilitate and
support the
development
Number of
poverty allevia-
tion projects
facilitated and
supported
projects fa-
cilitated or
supported
Database for
community pro-
jects finalised for
all regions
2 Projects sup-
ported and ensure
sustainability
Monitor and
evaluate poverty
alleviation pro-
jects
3
Positive +1 None Required
111
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
of poverty al-
leviation pro-
jects
Promote and
support sports
and recreation
in the Metro
Promote and
support
sports and
recreation
Number of
sporting code
programmes
supported
programmes
of sporting
codes imple-
mented and
supported
Hosted 12 pro-
gramme,
6 supported and
6 implemented
Supporting 7
sports codes ac-
tivities.
2 activities im-
plemented or
supported
Sport pro-
grammes sup-
ported: 6 & Sport-
ing activities sup-
ported: 7
Positive +4
Sport pro-
grammes &
Positive +5
Sporting ac-
tivities sup-
ported
None Required
To provide pre-
hospital emer-
gency medical
services to
Rendering of
ambulance
service in ac-
cordance
Assigned am-
bulance ser-
vice to MMM
Fully opera-
tional ambu-
lance service
No response to
request submit-
ted to MEC for
Health received
Conclusion of
Service Level
agreement with
FSPG subject to
Negotiating /
Concluding of
Service Level
Assignment of
funciton to MMM
by MEC Health
still being awaited
Function not
yet assigned
Corrective ac-
tion not within
the power of
MMM
112
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
people in
MMM area of
jurisdiction
with national
norms
by the provin-
cial depart-
ment Health
rendered by
MMM
assigning of func-
tion to MMM
Agreement sub-
ject to assigning
of function to
MMM
To limit the
number of fire
deaths result-
ing from acci-
dental fires in
residential
buildings
Delivery of
Operational
Fire and
Rescue Ser-
vices in the
entire MMM
area comply-
ing to SANS
10090
Number of fire
and rescue
emergency re-
sponded to in
compliance
with SANS
10090 in re-
spect of:-
Weight of
response
Fire and Res-
cue calls at-
tended
benchmarked
against
SANS 10090
8.9 out of 10 7.5 out
of 10
7.5 out 8.5 out of 10
Positive +1 None Required
113
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Turn out
time
114
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Delivery of a
pro-active
Fire Safety
Service to
MMM
through reg-
ular inspec-
tions and
scrutiny of
building
plans
Number of fire
safety inspec-
tions at High
Risk Premises
to determine
level of compli-
ance with stat-
utory fire
safety
measures and
approved
building plans
Fire safety in-
spections at
high risk
premises
127 Inspections 90inspections 30 30
None None Required
115
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Delivery of a
pro-active
Fire Safety
Service to
MMM
through reg-
ular inspec-
tions and
scrutiny of
building
plans
Number of fire
safety inspec-
tions at Moder-
ate Risk Prem-
ises to deter-
mine level of
compliance
with statutory
fire safety
measures and
approved
building plans
Fire safety
inspections
at moderate
risk premises
290 Inspections 250 Inspection 70 72
Positive +2 None Required
116
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Delivery of a
pro-active
Fire Safety
Service to
MMM
through reg-
ular inspec-
tions and
scrutiny of
building
plans
Number of fire
safety inspec-
tions at Low
Risk Premises
to determine
level of compli-
ance with stat-
utory fire
safety
measures and
approved
building plans
Fire safety in-
spections at
low risk
premises
1870 Inspec-
tions
1800 Inspection 450 509 Positive +59 None Required
117
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Delivery of a
pro-active
Fire Safety
Service to
MMM
through reg-
ular inspec-
tions and
scrutiny of
building
plans
Number of
building plans
submitted that
are scrutinized
for compliance
with statutory
fire safety
measures
within 5 work-
ing days after
receipt of the
plans
Approved
building
plans
10 out of 10 8 out
of 10
8 out
of 10
10 out of 10
Positive +2 None Required
118
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Delivery of a
pro-active
Fire Safety
Service to
MMM
through reg-
ular inspec-
tions and
scrutiny of
building
plans
Number of Fire
Safety Compli-
ance Certifi-
cates inspec-
tions con-
ducted within 2
working days
after receipt of
request.
Fire Safety
Compliance
Certificate in-
spections
9.4 out of 10 7 out of 10 7 out of 10 9.5 out of 10 Positive +2.5 None Required
119
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Educating
key target
groups such
as health
care work-
ers, learners
at school and
vulnerable
members of
the commu-
nity in fire
safety and
disaster
management
Number of fire
safety public
awareness
contact ses-
sions with
MMM Com-
merce and In-
dustry Institu-
tions
Fire safety
public aware-
ness contact
sessions
19 Public aware-
ness contact
sessions
6 2 6 Positive +4 None Required
120
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Educating
key target
groups such
as health
care work-
ers, learners
at school and
vulnerable
members of
the commu-
nity in fire
safety and
disaster
management
Number of
Health Care
Facility staff
members
trained in fire
safety and
evacuation
procedures
Health care
facility staff
members
trained
201 Staff mem-
bers trained
250 Staff mem-
bers trained
70 111 Positive +41 None Required
121
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Educating
key target
groups such
as health
care work-
ers, learners
at school and
vulnerable
members of
the commu-
nity in fire
safety and
disaster
managemen
Number of
public outreach
events aimed
at creating
public aware-
ness in respect
of Fire safety
Public out-
reach events
conducted
7 Outreach
events
6 Outreach event 1 6 Positive +5 None Required
122
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Provide for-
mal fire train-
ing persons
from the in-
dustrial and
commercial
community
that
Number of per-
sons from the
industrial and
commercial
community
trained in fire
safety
Persons
from the in-
dustrial and
commercial
community
trained
160 Persons
trained
200 Persons
trained
50 117 Positive +67 None Required
123
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Skills en-
hancement
and mainte-
nance of Fire
Fighting staff
Number of
training
courses in re-
lation to the
fire Fighting
and/or rescue
and/or hazard-
ous materials
presented
Training
courses pre-
sented to
Fire and Res-
cue staff
3 Training
courses pre-
sented
3 Training
courses pre-
sented
1 Swift Water
Rescue course
0
-1 Courses will be
rescheduled
when staff situ-
ation improves
after appoint-
ment of addi-
tional fire fight-
ers.
To limit the
number of fire
deaths result-
ing from acci-
dental fires in
Responding
to emergen-
cies.
1 Fire Station
established in
the South-
Eastern Area
(Ward 45-46)
Fire Station
established
Design com-
pleted and Bids
for construction
invited
1 Fire Station Construction of
roof and com-
mencement
with interior fin-
ishing off
*Sewer installed
and connected to
main line
* Trench for water
connection dug
*Groundworks
Construction
has com-
menced but
has not
reached roof
level
Construction is
logical process
with each step
taking a certain
time. Comple-
tion scheduled
124
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
residential
buildings
preparing area for
concrete slab
completed *Exca-
vations for raft
foundation com-
pleted *Laying of
plastic waterproof-
ing and steel rein-
forcing com-
menced
for mid June
2015.
Improve reve-
nue collection
Payment of
traffic fines
Number of
Fines success-
fully finalised
and payment
received
Section 71
report
17032 Traffic
fines paid
20 000 Traffic
fines paid
5 000 Fines paid 5256 Positive +256 None Required
125
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Law enforce-
ment
measures
Establish-
ment of
metro police
An established
metro police
Metro police
established
New KPI Develop strategy
and process plan
for establishment
of Metro Police
Progress Report
to Council
No progress
Negative Issue will be
pursued in the
4th quarter
Law enforce-
ment
measures
Enforcement
of the By-
Laws
Number of e
Street Trading
operation con-
ducted per an-
num.
Street trading
operations
conducted
30 Street trading
operations
12 Street Trading
Operations con-
ducted per annum
Three (3)
Street Trading
Operations con-
ducted
3
None None Required
Evolve institu-
tional excel-
lence through
a thoroughgo-
ing institutional
Ensure safe
and secure
environment
to residents
of Mangaung
Number of
crime aware-
ness cam-
paigns con-
ducted within
Crime aware-
ness cam-
paigns oper-
ations con-
ducted
16 Crime pre-
vention opera-
tions
12 Crime preven-
tion activities con-
ducted targeting
known hotspots
3 Hotspots tar-
geted
(1 per
region per quar-
ter)
5
Positive +2 None Required
126
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
re-engineering,
effective lead-
ership and ef-
fective long
range develop-
ment planning
the municipal-
ity
Number of
road safety
campaigns
conducted
road safety
campaigns
conducted
12 safety cam-
paigns con-
ducted
12 safety cam-
paigns conducted
3 safety cam-
paigns con-
ducted
Not in our SDBIP
Not in our
SDBIP
Not in our
SDBIP
Number of
road blocks
conducted in
high risk areas
road blocks
conducted in
high risk ar-
eas
26 road blocks
conducted in
high risk areas
72 road blocks
conducted in high
risk areas
18 road blocks
conducted in
high risk areas
Not in our SDBIP
Not in our
SDBIP
Not in our
SDBIP
127
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
To create a
safe and se-
cure road envi-
ronment for all
road users
Implement
operational
programmes
to reduce
speeding vio-
lations
Number of no-
tices issued for
speeding
transgression
per annum
speed fines
issued
121 796 Notices
issued
100 000 Notices
issued to speed-
ing transgressors
per annum
25 000 44 715 Positive +19
715
None Required
To create a
safe and se-
cure road envi-
ronment for all
road users
Implement
operational
programmes
to reduce the
number of
un-roadwor-
thy vehicles
Number of no-
tices issued to
motorists driv-
ing un-road-
worthy vehi-
cles within
MMM
Notices is-
sued to Mo-
torists driving
un-roadwor-
thy vehicles
3480 Notices is-
sued
2 500 Notices is-
sued to motorists
driving un-road-
worthy vehicles
750 2 306
Positive +1
556
None Required
128
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
To create a
safe and se-
cure road envi-
ronment for all
road users
Implement
operational
programmes
to reduce
seat belt vio-
lations
Number of no-
tices issued to
motorists not
wearing seat-
belts
notices is-
sued to mo-
torists not
wearing seat-
belts
2957 Notices is-
sued
2 200 Notices is-
sued to motorists
not wearing seat
belts
550 2 556
Positive +2
006
None Required
To create a
safe and se-
Implement
operational
programmes
to reduce
Number of no-
tices issued to
motorists using
cell phones
notices is-
sued to mo-
torists using
cell phones
745 Notices is-
sued
600 Notices is-
sued to motorists
using cell phones
150
533
Positive +383 None Required
129
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
cure road envi-
ronment for all
road users
cell phone
violations
To create a
safe and se-
cure rod envi-
ronment for all
road users
To track of-
fenders with
outstanding
Warrants of
arrests
Number of
warrant of ar-
rests executed
Warrants of
arrest exe-
cuted
1096 warrants 1000 warrant of
arrest to be exe-
cuted
250 x warrants
to be executed
438
Positive
+188
None Required
To reduce
crime in the
municipal area
Enhance en-
forcement of
the by-laws
through the
use of the
Number of
CCTV cam-
eras identified
incidents at-
tended to
All incidents
identified by
CCTV cam-
eras at-
tendant
43 Identified in-
cidents
7 out of 10 CCTV
identified inci-
dents attended to
within 25 minutes
7 out of 10
CCTV identified
incidents at-
tended to within
25 minutes
10 out of 10
[100%]
None None Required
130
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
CCTV cam-
eras
within 25
minutes
Improve ser-
vice delivery
by providing
recreation fa-
cilities and
public ameni-
ties to all resi-
dents of Man-
gaung
Provision of
recreational
facilities to all
residents of
Mangaung
Create a
clean and
green envi-
ronment
100% comple-
tion of Phase 2
of Developed
Tha-
baNchuRegion
a Park Devel-
opment
Regional
park devel-
oped
Phase 1 imple-
mentation
1. Completion of
Phase 1
(Construction
of park)
2. Second (2)
Phase of Re-
gional Park
development
(Bidding and
construction)
Implementation
of Phase 2
1. Phase 1 has
been completed
2. Bid Evaluation
for Phase 2 of
projet took place
on 4 March 2015
None
None
None Required
None Required
131
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Developed
new park in
Bloemfontein
(Kagisanong)
Park devel-
oped
Phase 1 imple-
mentation
Completion of
Phase 1 (Con-
struction of park)
0 Park completed
None None Required
Developed
new park in
Botshabelo (B
section)
Park devel-
oped
A Contractor has
been appointed
for the develop-
ment of the Park
Completion of
Phase 1 (Con-
struction of park)
0 Park 95% com-
plete with the wa-
ter feauture, ablu-
tion and paving to
be finalized
Negative -5% Project to be
completed by
end of April
2015
Length of
Fencing in-
stalled at com-
munity park in
U section
(Botshabelo)
Fence in-
stalled in
community
park
None Fencing of park in
U Section (Bot-
shabelo)
Implementation
of project
None, the ptoject
will not realize
during the finan-
cial year
2014/2015
None The specifica-
tions could not
be concluded
as the bounda-
ries for the two
Wards were
132
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
not determined
on time.
Greening
plan planting
of trees
Number of
trees planted
Trees
planted
413 550 Trees Planted 100 178 Positivie +78 None Required
Ensure that
cemetery is
properly se-
cured
Length of
Fencing in-
stalled at Pha-
hameng ceme-
tery
Fence in-
stalled at
Phahameng
cemetery
None Fencing of the
Phahameng Cem-
etery
Implementation
of the project
Bid was adver-
tised and closed
on 20 March 2015
None Project will be
completed be-
fore end of
June 2015
Relocation of
the Zoo to
Kwaggafon-
tein Game
Farm
An open range
zoo developed
at Kwag-
gafontein
Entire Zoo to
be relocated
Development of
the master Plan
Upgrading of
fencing - Kwag-
gafontein
Continue with
erection of fenc-
ing
Contractor for
fencing is on site.
±8km has been
temporarily
erected.
None None Required
133
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Length of fenc-
ing upgraded
at Kwaggafon-
tein
Km of access
roads up-
graded at
Kwaggafontein
100%of de-
tailed designs
for the facility
completed
Upgrading of ac-
cess roads to
Kwaggafontein
Continuing of
Bidding process
and commence
with upgrading
of roads
Upgrading of
roads not yet
commenced
Negative Project will be
done in the
next financial
year
2015/2016
Commence with
detailed designs
of facility
Continue with
design phase
LTE started with
prelimenary de-
signs for entrance
point.
None Designs will be
ready by end of
financial year
2014/2015
134
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Prevent or re-
duce losses
that occur due
to natural or
man-made dis-
aster through
preparedness,
mitigation, re-
sponse and re-
covery
Preventing
Disasters
Percentage of
JOC attend-
ance at public
events
JOC attend-
ance at pub-
lic events
100 % 90% 90% 100%
Positive
+10%
None Required
Preventing
Disasters
Number of fire
and rescue
calls to which
resources
Call logs 9.2 Out of 10 8 out
of 10
8 out Assignment of
funciton to MMM
by MEC Health
still being awaited
Positive +1.4 None Required
135
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
were dis-
patched within
3 minutes.
Preventing
Disasters
Number [per-
centage] of
callers polled
indicating their
satisfaction
with the ser-
vice rendered
by the Control
Centre.
Customer
satisfaction
survey report
10 out of 10 9 out
of 10
9 out 10 out of 10
Positive +1 None Required
136
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Basic Service Delivery
MTAS Indicator Promote awareness and education on environmental issues
Municipal KPA Social and community services
STATUS Performance
Exceeds Expecta-
tion
Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI Unit of
measure-
ments
Past Year
Performance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance
Corrective Ac-
tion
Compilation
of City wide
Disaster
Management
plan
Disaster Man-
agement plan
for MMM
Completed
Disaster
Management
plan for
MMM
Draft submitted
to HoD Social
Services
Disaster Manage-
ment Plan ap-
proved by Council
Finalisation of
Disaster Man-
agement Plan
Revised plan to
be discussed at
the bilateral meet-
ing with Provincial
Disaster Manage-
ment on the 22nd
April 2015
None None Required
137
6.5.5 FINANCE
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Improve
customer
satisfaction
Improve
billing sys-
tem
Number of
customers
receiving
accurate
bills
Monthly billings
statistics
85%
Reduce the in-
terim meter read-
ings to 15%
(excluding faulty
meters)
Reduce the in-
terim meter
readings to 18%
22% 4% New meters that
were not rec-
orded on the
system have
have been
added and that
has increased
the total number
of meters, these
meters have
138
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
now been allo-
cated routes and
will be read from
May 2015, also
the meters that
were replaced
were not up-
dated on the
system due to
the delay from
Engineering Ser-
vices on provid-
ing the installa-
tion dates.
139
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Percentage
of consumer
accounts
details on
the system
accurate
Reduction in the
number of re-
turned undeliv-
ered accounts
86% of con-
sumer accounts
95% of consumer
accounts are is-
sued to correct
addresses
93% of con-
sumer accounts
are issued to
correct ad-
dresses
97,20% n/a n/a
Percentage
of consumer
accounts
details on
the system
accurate
Reduction in the
number of re-
turned undeliv-
ered accounts
Update to 70% of
customer details
on the financial
system
60% of customer
details updated
17% updated
(2873 of 16337)
-43% Majority of Re-
turned to Sender
mails are the re-
cently formalised
areas in the
Grassland area
Phase 3,4,6
without street or
postal addresses
140
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Improve
revenue
collection
Percentage
improve-
ment in Col-
lection rate
Collection statisti-
cal
93% 94%
93% 91%
-2% Full implementa-
tion of credit
control, debt in-
centive scheme.
Litigation of de-
faulting busi-
nesses and gar-
nish defaulting
domestic cus-
tomers.
Prudent fis-
cal man-
agement
Quality and
frequent fi-
nancial re-
porting
% operation
and capital
expendi-
tures
against the
Section 71 report
±86% 95%
75% Opex - 64.06%
Capex - 42.56%
11% None
Accellerate
spending during
the last quarter
141
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
budget
(from 80% )
to reach at least
85%
Implement
clean audit
initiatives
100% imple-
mentation of
f Audit Ac-
tion Plan to
address is-
sues raised
by the Audi-
tors
Audit Report
Qualified audit
report
Financially Un-
qualified audit re-
port
-
- -
To ensure
procure-
ment pro-
cesses
Number of
SCM imple-
mentation
reports sub-
mitted to the
SCM quarterly re-
ports submitted to
the Mayor and
Council
Four (4) SCM
quarterly Re-
ports submitted
to the Mayor and
Council.
Four (4) SCM
quarterly Reports
to be submitted to
the Mayor and
Council.
1 Quartely report for
January - March
2015 was sub-
mited to Council
n/a
n/a
142
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
which com-
plies fully
with the
SCM policy
Mayor and
Council.
Reduce ir-
regular ex-
penditure
for the Di-
rectorate
Report irreg-
ular ex-
penditure
Quarterly reports
Irregular expendi-
ture registers
Irregular ex-
penditure regis-
ters for 12
months period.
Irregular expendi-
ture registers for
12 months period.
3 Quartely irregular
expenditure regis-
ter for January -
March 2015 was
reported to CFO
n/a
n/a
143
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Prudent fis-
cal man-
agement
Cost Cover-
age (NKPI)
Cost Cover-
age (NKPI)
Section 71 >3.61 months > 3 months >2 months 1.24 months
0.76 months Strict enforce-
ment of the Debt
& Credit Control
Policy and sup-
ported by the en-
forcement of
cost control
measures
Prudent fis-
cal man-
agement
Develop
and review
out-dated
procedure
manuals in
the direc-
torate
100% Imple-
mentation of
Procedure
Manuals
and im-
provement
Procedure Manual SCM manuals
developed
100% Implemen-
tation of Proce-
dure Manuals and
improvement in
internal controls
Procedure Man-
ual for Customer
Care Division
developed
System descrip-
tions documented
Procedure
manual not
completed
Finalization of
Customer Care
Procedure Man-
ual and review of
Service Stand-
ards Framework
144
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
in internal
controls
Number of
employees
undergoing
training pro-
grammes to
comply with
Minimum
Competency
Regulations
Attendance regis-
ters;
Certificates ac-
quired
90 employees
are currently en-
rolled in the Mu-
nicipal Finance
Management
Programme.
All enrolled em-
ployees
Training of em-
ployees to com-
ply with Mini-
mum Compe-
tency Regula-
tions
90 employees en-
rolled on MFMP to
comply with Mini-
mun Competency
Regulations
n/a n/a
145
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Revenue
Enhance-
ment
Collect all
collectable
revenue
and Lever-
age alterna-
tive sources
of funding
Amount of
externally
sourced
funds
Increasing
revenue
base by ac-
counting for
unac-
counted ser-
vices
Section 71 report N/A R 321 million
Planning and
bookings for Mu-
nicipal Bonds
road show
Credit Rating pro-
cess completed.
Advert for ap-
pointment of Lead
Arrangers placed
in national news-
papers
Municipal
bond road
show plans
and booking
not done
Finalization of
lead arranger
appointment. In-
clusion of R50
million Standard
Bank borrowing
as part of the
2015-16 Budget
Process
Revenue
Enhance-
ment
Identifica-
tion of addi-
Developed
and imple-
Section 71 re-
ports;
Implementation
of the short term
Implementation of
the medium to
long term revenue
Quarterly report. Debt Incentive
Scheme road
shows conducted.
Quarterly re-
port not pre-
pared
Quarterly report
to be prepared
and submitted
146
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
tional reve-
nue
streams
mented rev-
enue en-
hancement
strategies
revenue en-
hancement strat-
egies
enhancement
strategies
Businesses liti-
gated.
100% Imple-
mentation of
Operation
“Pay-up”
Strategy
Hearings Con-
ducted
Presentation
made;
Attendance regis-
ters
Draft Operation
“Pay-up” Strat-
egy Developed
Implementation of
Operation “Pay-
up” Strategy
Implementation
of the action
plan
Debt Incentive
Scheme road
shows conducted.
Businesses liti-
gated.
Quarterly re-
port not pre-
pared
Quarterly report
to be prepared
and submitted
147
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Recovery/
collection of
Rental In-
come
Percentage
recovery of
rental in-
come
Section 71 re-
ported
22% 50% 50% 41% and 43%
-9% and
-7%
Implementation
of the credit pol-
icy, and Human
Settlement de-
partment should
send termination
of Heidedal
schemes that
are being demol-
ished.
Revenue
Enhance-
ment
Implemen-
tation of in-
terim valua-
tion roll
based on
Compilation
of Interim
Valuation
roll
Compiled interim
Valuation Roll
Four (4) supple-
mentary valua-
tion rolls imple-
mented
Implementation of
at least one (1)
supplementary
valuation roll in or-
der to incorporate
1 Supplemen-
tary Valuation
Roll
-
Supplemen-
tary roll 8
has been re-
ceived. Sec-
n/a
148
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
the site and
any im-
provements
made
new develop-
ments in the exist-
ing valuation roll
tion 49 no-
tices issued
and the Sup-
plementary
roll was
opened for
inspections in
line with the
Municipal
Property
Rates Act.
Implementa-
tion starts
from 1st of
April 2015
149
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Develop an
effective
asset man-
agement
programme
Develop a
Fixed Asset
Register
which rec-
ords all mu-
nicipal As-
sets
Fixed Asset
Register is
compiled
and updated
monthly
Fixed Asset Reg-
ister
Immovable and
Movable assets
-100% compli-
ance with appli-
cable accounting
standards
100% compliance
with applicable
accounting stand-
ards
Update register
with movements,
acquisitions and
disposals
"- Movable Assets
updated on Hard-
cat
- Immovable asset
registers trans-
ferred to SAM.
- Delphi sessions
commenced to
verify complete-
ness of registers"
Unbundling of In-
frastructure pro-
jects commenced
- Parks
n/a
n/a
n/a
n/a
150
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Develop an
Asset Man-
agement
Policy and
Procedure
Manual to
cover the
acquisition,
mainte-
nance and
disposal of
assets
Asset Man-
agement
procedure is
compiled in
line with leg-
islation and
council pol-
icy
Asset Manage-
ment Procedure
Manual
Development
and implementa-
tion
Annual review of
Asset Manage-
ment Policy and
procedure manual
Workshop oper-
ating proce-
dures
"- Procedures de-
veloped and work-
shopped with offi-
cials
- Documentation
published on Info"
Delphi sessions
commenced on
Friday 27/03/2015
with Parks and
Cemeteries
n/a
n/a
n/a
n/a
Periodic
physical as-
set counts
Report on
the annual
asset count
Fixed Asset Reg-
ister
At least one
complete count
of all movable
At least one com-
plete count of all
25% of Popula-
tion
16000 movable
assets verified
n/a n/a
151
ALIGNMENT AND
LINKAGE No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
MTAS Indicator Good Governance Public Participation
Municipal KPA Financial Management
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive Strategy KPI
Units of meas-
urements
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
and impair-
ment tests
submitted to
council
and immovable
assets
movable and im-
movable assets
during the 3rd
Quarter
Ad hoc asset
counts of se-
lected locations
Ad hoc asset
counts of selected
locations
10 locations per
directorate
Offices verified on
a sample basis in
BF, Civic theatre
and Gabriel
Dichabe building
n/a n/a
152
6.5.6 HUMAN SETTLEMENTS
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Address
housing
backlog
Provide
housing
opportuni-
ties
Number of
housing oppor-
tunities pro-
vided
Units built;
Permission to oc-
cupy Issued;
Title deeds issued
(2923 Q1 ONLY) 4 000 housing
opportunities pro-
vided
1 250
TOT.=2199)
BNG HOUSES
COMPLETED :
69; BNG FORMS
COMPLETED:08;
EMERGENCY
HOUSING PRO-
VIDED: 03;
PTO: 303, NEW
ALLOCATIONS:
238, ESTATES:
50, CHANGE OF
153
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
OWNERSHIP 32;
; TITLE DEEDS
ISSUED: 193;
SITE VERIFIED:
1215
Incremen-
tal Up-
grade in-
formal set-
tlements
Number of in-
formal settle-
ments with up-
grading plans
Land develop-
ment pro-
cess(including
Services plans
developed and
approved
3 (Q1 ONLY)
PLANNING AND
SURVEY FI-
NALIZED
8 informal settle-
ments planned
2 informal settle-
ments planned
0
154
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
security of
tenure)
Infrastructure
Top Structure
Socio Eco-
nomic Ameni-
ties
Number of
sites serviced
Services provided 0
490 sites serviced
with water at MK
Square
Appointment of
Contractor
0
Number of in-
formal settle-
Informal settle-
ment upgraded in
Situ
19
1 Informal Settle-
ments upgraded
-
155
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
ments up-
graded (ser-
vices pro-
vided): In Situ
Number of in-
formal settle-
ments up-
graded (ser-
vices pro-
vided): Relo-
cated
Informal settle-
ment upgraded
(Services pro-
vided): Relocated
10
8 4 0
Number of Ti-
tle Deeds
transferred to
Title Deeds trans-
ferred to eligible
beneficiaries
6 438 2 000 500 180
Title deed
beneficiaries
deceased
Encourage
rightfullbenefi-
156
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
eligible benefi-
ciaries
transferred to el-
igible beneficiar-
ies
and mstly Es-
tate proper-
ties.
ciaires to do re-
port the Estate
to that succes-
sion can be im-
plemented.
House-
holds relo-
cated from
floodplains
and other
servitudes
Number of
households re-
located from
floodplains and
other servi-
tudes
All households af-
fected
70 households
10 0
Awaiting land
development
processes to
unfold
Implement
ISUS
157
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
House-
holds allo-
cated af-
fordable
rental/so-
cial hous-
ing units
Number of
households al-
located afford-
able rental/so-
cial housing
units
Rental Social
Housing Tenants
Register4
178 (Q1,Q3,Q4) 350 households
150 58
-92 Speed up the
construction
process look
further down on
a waiting list in
terms of alloca-
tion
Accelerate
accredita-
tion to im-
plement
national
housing
Approved level
2 and 3 ac-
creditation
business plan
Level metro ac-
creditation
Level 3 accredi-
tation business
plan submitted.
approval
awaited
Programmes for
level 2 granted by
Provincial Human
Settlements
100% implemen-
tation of Level 2
accreditation
Awaiting comple-
tion of implemen-
tation protocol
-1 Service Pro-
vider is ap-
pointed to facili-
tate the road
map and con-
solidated pro-
cesses leading
158
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
pro-
grammes
to the assig-
ment
House-
holds allo-
cated af-
fordable
GAP hous-
ing
Number of
households al-
located afford-
able GAP
housing
households allo-
cated affordable
GAP housing
- 30 households 10 0
10 Awitingfanaliza-
tion of the sup-
ply chain man-
agement pro-
cesses for the
appointment of
Service Pro-
vider
Consumer
education
provided to
Number of
households
provided con-
households pro-
vided consumer
education in
Rental housing
300 household 500 households 150 43
-107 Annual target
already
achieved
159
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
House-
holds in
Rental
housing
sumer educa-
tion in Rental
housing
Consumer
education
provided to
House-
holds in
GAP hous-
ing
Number of
households
provided con-
sumer educa-
tion in GAP
housing
households pro-
vided with con-
sumer education
in GAP housing
200 household 500 household 150 218
160
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Consumer
education
provided to
House-
holds in
Social
housing
Number of
households
provided con-
sumer educa-
tion in Social
housing
households pro-
vided consumer
education in So-
cial housing
200 household 500 household 150 20
-130 1st-3rd quarter
acutual perfor-
mance still in
target
Property
Manage-
ment
Training for
rental
property
officials
Number of
rental property
officials at-
tended Prop-
erty Manage-
ment Training
officials attended
Property Manage-
ment Training
- 10 - 0 0
161
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Stake-
holder
manage-
ment and
engage-
ment in the
City rental
housing
market to
improve
rent collec-
tion
Number of
meetings and
engagement
held with differ-
ent stakehold-
ers in the City
rental housing
market
meetings and en-
gagement with dif-
ferent stakehold-
ers in the City
rental housing
market
2 3 1 1
162
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Conduct
compre-
hensive
housing
study to
determine
tenure de-
mand
Number of
comprehensive
housing de-
mand studies
conducted
comprehensive
housing demand
studies conducted
- 1 1 0
-1 Draft report
submitted by
the service pro-
vider
Promote
Inner City
High Den-
sity mixed
use devel-
opment
Number of In-
ner City High
Density mixed
use develop-
ments pro-
moted
Inner City High
Density mixed use
developments
promoted
1 Appointment of
developer for in-
ner City High
Density mixed
use develop-
ment
0
1 Awaiting finali-
zation of the
Supply chain
Management
processes for
the appointment
163
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
of service pro-
vider
Promote
hostel re-
develop-
ment initia-
tives
Number of
hostel redevel-
opment initia-
tives promoted
Hostel redevelop-
ment initiatives
promoted
- 1 Appointment of
contractor to
construct 20
hostel units
Two contractors
on site busy with
earth works
Review
Strategic
Human
Settle-
ments Pol-
icy docu-
ments
Number of
Strategic Hu-
man Settle-
ments Policy
documents re-
viewed
Reviewed Strate-
gic Human Settle-
ments Policy doc-
uments
2 200 Service provider
appointed for the
review of the
housing policy
0
164
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
Imple-
mentation
of Seven
Land Par-
cels
Mixed use
land devel-
opment
100% imple-
mentation de-
signs of Ce-
celia Park
Formalization of
Cecelia Park
Lodged applica-
tion for formali-
sation of Cecelia
Park
Concept De-
signs 100%
completed
30% Comple-
tion of Imple-
mentation De-
signs
30% completion
of implementation
designs achieved
100% imple-
mentation de-
signs of
Brandkop 702
Formalization of
Brandkop 702
Lodged applica-
tion for formali-
sation of Brand-
kop 702
Concept De-
signs 100%
completed
30% Comple-
tion of Imple-
mentation De-
signs
30% completion
of implementation
designs achieved
0
80% develop-
ment of
Hillside View
phase1
Development of
Hillside View
NEW TARGET
2014/2015
80% development
of Hillside View
Phase 1
30% develop-
ment of Hillside
View Phase 1
Contractor was
appointed and
currently busy
0
165
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
with super struc-
ture in section 1
and section 2 of
the buildings
Revenue
Enhance-
ment
Review of
revenue
agree-
ments
Percentage re-
view of sundry
and commer-
cial property
lease agree-
ments
Lease agree-
ments reviewed
40% Lease agree-
ments reviewed
10% 15% (25 of the to-
tal of 163 leases )
0
Percentage In-
crease rental
collection of rental
housing revenue
40% increase in
revenue collection
30% 0
-30%
166
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participatio
MTAS Indicator
Municipal KPA Human settlements
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Ob-
jective
Strategy KPI
Unit of measure-
ments
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual perfor-
mance Q3
Status Variance Corrective Ac-
tion
housing reve-
nue collection
Sale of
Land
Quarterly Ad-
vertisement of
land for sale
Erven /Land par-
cels advertised
40 Erven 10 erven 10 erven
0
167
6.5.7 OFFICE OF THE CITY MANAGER
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Provide stra-
tegic leader-
ship and
planning
with well-de-
fined targets
aligned to
the budget
Provide
strategic
leadership,
involve-
ment and
planning
Reviewed
2015/16 Inte-
grated Devel-
opment Plan-
ning, SDBIP
and business
plans
2015/16 Re-
viewed IDP ap-
proved by council
Approved IDP
2014/15
Review IDP and
SDF for 2015/16
Approved Draft
IDP 2015/16
Finilised but
not yet ap-
proved
To be tabled to
council
168
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Service deliv-
ery and
budget imple-
mentation
plan (SDBIP)
compiled an-
nually
l SDBIP devel-
oped and ap-
proved
Approved SDBIP
2013/14
2014/15 SDBIP de-
veloped and ap-
proved by the Exec-
utive Mayor 28 days
after the approval of
the IDP and budget
Draft SDBIP for
2015/2016 de-
veloped
In progress
To be finilised
30 April 2015
169
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Mid-year
budget and
performance
assessment
report devel-
oped
mid-year perfor-
mance report ap-
proved
2014/15 mid-year
budget and perfor-
mance assessment
report developed and
approved by Council
l and submitted to
Provincial and Na-
tional Treasury
2014/15 mid-year
budget and perfor-
mance assessment
report
2014/15 mid-
year budget and
performance as-
sessment report
developed and
approved by
Council l and
submitted to
Provincial and
170
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
National Treas-
ury
Strengthen-
ing Interna-
tional rela-
tions
Liaison
with for-
eign diplo-
mats
Number of
MOUs en-
tered into
with other cit-
ies
MOU with BRICS
Cities and African
city
Initiated discussions
with Sol Plaatjie and
2 MOU’s with BRICS
Cities , 1 European
city and 1African city
Chinese city China week
171
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Acquisition
and reten-
tion of do-
nor fund-
ing to sup-
port pro-
grammes
Number of
Donor fund-
ing agree-
ment entered
into.
Donor funding
agreements en-
tered into
Ghent Partnership
revised
1 additional Donor
funding sourced
Comprehensive
report on addi-
tional donor
funding
In progress
172
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Strengthen-
ing Intergov-
ernmental
Relations
Start col-
laborating
on plan-
ning of
projects
Number of
Cooperation
agreements
entered into.
Cooperation
agreements en-
tered into.
Nil 2 MoU’s with provin-
cial departments and
Tertiary Institutions
25%implementa-
tion of MOUs
Draft MOU
with DETEA
has been de-
veloped
strengthen
and reacti-
vate the
knowledge
develop a
knowledge
manage-
ment ac-
tion plan
Knowledge
Management
Strategy de-
veloped and
updated
Approved
Knowledge Man-
agement Strategy
and workshop on
Knowledge Manage-
ment Strategy and
action plan devel-
oped in 2006
Implementation of a
knowledge manage-
ment action plan
100% implemen-
tation of KM ac-
tion plan
0
173
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
manage-
ment pro-
gramme in
the city
knowledge man-
agement con-
ducted
Number of
Case Studies
developed
case studies de-
veloped
Nil 2 case studies A workshop/
learning event to
share best prac-
tices
0
174
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Enhancing
interface
with Citi-
zen
A customer
satisfaction
survey con-
ducted
customer satis-
faction survey Re-
port
Nil 1 customer satisfac-
tion survey
Publishing the
report
0
Maintaining
strong and
effective
oversight
structures
Establish-
ment of ef-
fective,
functioning
Audit
Committee
Audit Com-
mittee fully
operational
and meeting
at least 4
Fully operational
Audit Committee
Six (6) meetings held At least four (4)
meetings held
1 1
25/02/15
175
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
consisting
of knowl-
edgeable
persons
times annu-
ally
Establish-
ment of ef-
fective,
functioning
Municipal
Municipal
Public Ac-
counts fully
operational
and meeting
at least 4
Fully functional
Municipal Public
Accounts commit-
tee
At least four (4)
meetings held
1 7 +6A
176
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Public Ac-
counts
Committee
consisting
of knowl-
edgeable
persons
times annu-
ally
Functional
Internal Au-
dit Activity,
Fully ca-
pacitated
Internal
Functional In-
ternal audit
Fully staffed and
functional internal
audit activity
Twenty four (24) Au-
dit Projects com-
pleted.
100% implementa-
tion of the approved
internal audit plan
Number of com-
pleted projects
for Q3 as per
5 of the 9 pro-
jects for Q3
completed
-4 Projects to be
completed dur-
ing the 4th
177
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Audit Ac-
tivity con-
sisting of
competent
and knowl-
edgeable
staff
activity oper-
ating accord-
ing to the IIA
Standards
and ap-
proved risk
based three
year rolling
strategic au-
dit plan
approved
2014/15 Internal
Audit Plan
quarter.
The 4 projects
not completed
were due to
delays by man-
agement to
avail them-
selves for entry
meetings and
178
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
the unavailabil-
ity of infor-
mation to be
audited.
Compliance
to good gov-
ernance
through En-
terprise
Wide Risk
Pro Active
Risk Man-
agement
govern-
ance
framework
Reviewed
and imple-
mented Risk
management
Policy, Strat-
Reduce and Man-
age Risks to ac-
ceptable appetite
Approved strategy,,
policy and imple-
mentation plan of
Risk Management
and action plan
100% implemen-
tation of the
strategy and pol-
icy
0
179
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Manage-
ment
and pro-
cesses
egy, imple-
mentation
plan
Number of
strategic and
operational
risk registers
reviewed
Reviewed strate-
gic and opera-
tional risk register
One Strategic Regis-
ter
8 registers reviewed
(1 strategic and 7
departments)
1 quarterly re-
port implementa-
tion of risk regis-
ters
3 finance
registers re-
viewed
2
180
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Effective
Anti Fraud
and Cor-
ruption
prevention
and re-
sponse
Review , de-
velopment
and Imple-
mentation of
Policy, Strat-
egy, whistle
Blowing and
Prevention
Plan
Zero tolerance to
Fraud and Corrup-
tion
14 cases reported 12 reports devel-
oped and approved
on all reported alle-
gations of fraud and
corruption inci-
dences
3 2 reports
-1
181
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Percentage
increase in
the number
of concluded
cases on ir-
regular, fruit-
less and
wasteful ex-
penditure
100% investigations
of all reported cases
of irregular, fruitless
and wasteful ex-
penditure
70% investiga-
tions of all re-
ported cases of
irregular, fruit-
less and waste-
ful expenditure
4 reports fi-
nalized
182
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Strengthen
community
involvement
to participate
in the affairs
of the munic-
ipality and
influence re-
source allo-
cation
Enhance
public par-
ticipation
in the af-
fairs of the
municipal-
ity
Number of
clustered
ward based
plans ap-
proved by
council
Develop and ap-
prove clustered
wards base plans
Nil 11 clustered wards
base plan
5 clustered
wards base
plans
0
183
ALIGNMENT AND
LINKAGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome
9 A responsive, accountable, effective and efficient local government system
National KPA
Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA
Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable
Performance
Target not Im-
plemented
IDP Objec-
tive
Strategy KPI
Unit of Measure-
ment
Past Year Perfor-
mance (2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Number of
officials
trained in
CBP
Trained officials
in CBP
Nil 20 officials trained in
CBP training
- 0
6.5.8 CORPORATE SERVICES
184
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Enhance IT
governance
and strategy
and formulate
governance
plans and
strategies, as
well as accom-
panying poli-
cies and pro-
cedures, to
concurrently
Develop
and monitor
an IT Gov-
ernance
Maturity
Model
100% im-
plementation
of formal IT
Governance
Maturity
Model
Monthly status re-
port
ITGMM has
been developed
as part of the
ICT Strategy
document.
100% implemen-
tation of ITGMM
25% Implemen-
tation
Completed as
part of IT
Strategy
None
None
185
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
enable the mu-
nicipality to
achieve its
strategic vi-
sion, support
audit
requirements,
manage risk,
and exhibit re-
sponsible fi-
nancial man-
agement
186
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Develop-
ment of an
overall IT
Strategy
Overall IT
Strategy de-
veloped
Monthly status re-
port
IT Strategy de-
veloped and ap-
proved
100% implemen-
tation of IT Strat-
egy
Monitoring of It
Strategy
On-going
None None
Develop-
ment of IT
Master Sys-
tems Plan
ITMSP De-
veloped and
monitored
Monthly status re-
port
ITMSP devel-
oped and ap-
proved as part of
the IT Strategy
Implementation of
ITMSP
25% IT Strategy
still adequate
None None
Review of
IT Policy
Framework
Number of
IT Policies
reviewed to
be in line
Policies and BCP
approved
IT Password
Control Policy
and Cellular
Phone Policy
4 ICT policies re-
viewed
1 Policy revised User Access
Management
Policy Drafted
Not submit-
ted for ap-
proval
To be submitted
for approval
187
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
and Busi-
ness Conti-
nuity Plan
with IT Strat-
egy and
ITMSP
developed and
approved
Proper rec-
ord keeping
of all ICT
and related
equipment,
systems
and soft-
ware
IT related
equipment,
systems and
software
procured
and utilized
as outlined
in ITMSP
Assets recorded
on Assets data-
base regarding
assets information
and user.
Manage Engine
Service Desk
Plus application
procured.
100% deployment
of Service Desk
Plus application
Monitoring 80% of all
equipment
captured on
system. This
is due to un-
der-staffing of
unit and lack
of proper
training on us-
Other mod-
ules for the
software
need to pur-
chased and
training pro-
vided for end
users for ef-
additional Mod-
ule to be pro-
cured
188
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
age of Man-
age Engine
Service Desk
fective utli-
lisation of the
system
Redevelop-
ment of
MMM Intra-
net
100% fully
fledged and
updated in-
tranet
Fully fledged and
updated intranet
MMM Intranet
redeveloped and
launched. Up-
dates are made
as needed
On-going monitor-
ing of Intranet traf-
fic as well as on-
going mainte-
nance and up-
grading of site as
and when re-
quired
On-going moni-
toring of Intranet
traffic as well as
on-going mainte-
nance and up-
grading of site as
and when re-
quired
Departmental
information
updated on an
ongoing basis
Departmental
information
still outstand-
ing from
some depart-
ments
Content is pub-
lished as and
when received
from stakehold-
ers
189
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Analysis of
all current
information
systems
used by
MMM
Audited in-
formation
systems to
determine
redundancy
and obso-
leteness
Redundancy and
obsoleteness de-
termined by the
information sys-
tem
eVenus system
in the process of
being migrated
to SOLAR.
Other systems
to be migrated to
additional SO-
LAR modules
have been iden-
tified.
Traffic system
replaced
On-going monitor-
ing of all MMM in-
formation systems
On-going moni-
toring of all
MMM infor-
mation systems
On-going
None None
190
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Upgrade
current In-
ternet/e-
mail/system
lines
Number of
municipal
buildings
that are Wi-
Fi enabled
All municipal
buildings enabled
with Wi-Fi.
Completed. On-going monitor-
ing of bandwidth
for possible up-
grades
Awarding of ten-
der
Awaiting
finilisation of
Tender by
Supply Chain
Specification
criteria not
met by bid-
ders
Bidders rein-
vited to submit
documentation
according to
specifications
Replace-
ment of ob-
solete serv-
ers
Stable oper-
ation of
newly pro-
cured serv-
ers
Expansion of
server capacity
Completed as
part of SOLAR
migration pro-
ject. Triangle so-
lution with 3 x
different server
sites have been
built.
% increase in
server capacity
Triangular
server envi-
ronment in-
stalled and
SOLAR mi-
gration in
progress
None None
191
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Finalising of
Bram
Fischer tel-
ephone
system
New VoIP
system op-
erational
On-going monitor-
ing of telephone
system
99% Complete.
Currently await-
ing on Telkom to
perform final cut-
over
New telephone
system fully oper-
ational
On-going moni-
toring of tele-
phone system
Telephone
system not
migrated due
to non-stand-
ardisation of
infrastructure
between
Bram Fischer,
Regional Of-
fice and Me-
chanical
Workshop
and lack of
Telephone
system not
fully VoIP
Deviation for an
immediate solu-
tion to rectify
non-standard
infrastructure
and lack of
mainte-
nance/service
level agree-
ments for the
VoIP service
192
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
maintanance
for the PABX
Maintain 2-
hour turna-
round time
on support
calls
Service desk
reports indi-
cating turna-
round time
Maintain 2-hour
turnaround time
on support calls
On-going pro-
cess
Maintain 2-hour
turnaround time
on support calls
Maintain 2-hour
turnaround time
on support calls
On-going
None None
Develop
system for
software li-
cense man-
agement
Software li-
cense man-
agement
system in
place
System to be re-
viewed and li-
censes to be pro-
cured and man-
aged effectively
Manage Engine
Service Desk
Plus application
procured.
100% implemen-
tation of license
management sys-
tem
On-going moni-
toring of licenses
and review of li-
cense manage-
ment system
On-going
None None
193
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Improved la-
bour relations
management
% labour
disputes re-
solved in-
ternally
Reduction of
labour dis-
putes
Development of
communication
model to
strengthen rela-
tions with organ-
ised labour
Strategic Em-
ployee Relations
Management
Implementation
and extensive
consultation with
organized La-
bour
None
The commu-
nication
model has
not yet ap-
proved by
Council.
-
Foster good
relationship
with organ-
ised labour
and con-
clude all
Number of
consultative
meetings
held with or-
ganised la-
bour
Meetings with or-
ganised labour
4 meetings 12 meetings
3 meetings None
Meeting
schedule ap-
proved and
we will en-
sure compli-
ance.
194
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
outstanding
labour dis-
putes
Training on labour
legislation and HR
Management
40 officials trained
in labour relations
15 (GMs) 0
Call for Quat-
ation made
by SCM but
no suitable
providers ap-
plied.
The tender to
be re-advertised
as the where no
suitable provid-
ers for the pro-
grammee
Retention
of skills
Identification
of critical po-
sitions and
development
critical positions
and development
of critical positions
identified
None 5 critical position
identified and
3 critical position
identified and
skills and
Policy is still
at LLF Sub-
committee.
195
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
of critical po-
sitions
knowledge trans-
fer plan devel-
oped
knowledge docu-
mented on the
Knowledge
Transfer Plan
Develop-
ment of ca-
reer plan-
ning and
pathing
To develop career
plans and paths
for all occupations
Draft Career
Pathing policy is
in place
Approved and im-
plemented career
pathing policy
Piloting imple-
mentation of ca-
reer pathing pol-
icy at engineer-
ing section
Draft Policy
developed
Policy to be
submitted to
EMT and LLF
Work Place
Skills Plan
Conducting
a skills
needs analy-
sis
Conducting an
skills audit
--
Skills audit report
Data Analysis
and Draft Skills
Audit Report
Skills ques-
tionnaire
memo send to
all Staff for
NA NA
196
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
training
Needs Analy-
sis
Compilation
of a work
skills plan
Compiling a work
place skills plan
by July each year
Submitted WSP
for 2014/15 fi-
nancial year
Approved work
skills plan
Compilation of
Draft WSP.
Draft WSP is
being com-
pleted.
LGSETA only
released the
electronic
WSP in March
hence the de-
lay.
N/A N/A
197
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Compiling
an annual
implementa-
tion report
by January
each year
WSP annual im-
plementation re-
port
80% implemen-
tation of the
workplace skills
plan
Work skills plan
implementation
report
Quarterly report
submitted to
LGSETA
Quarterly Re-
port Submit-
ted to
LGSETA
N/A N/A
Providing
Accredited
training
courses in
line with
skills needs
Employees
trained (Reported
by means of a
monthly report)
5 training pro-
grammes ap-
proved by
LGSETA
12 Training Pro-
grammes Imple-
mented
6 5
-1 3 x more pro-
grammes will be
implemented in
the 4th quarter
198
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
identified
within WSP
Providing
learner-
ships ap-
proved by
LGSETA
learner-ships ap-
proved and
funded by
LGSETA
None 4 learner-ships
approved and
funded by
LGSETA
2 4 +2
Institutional
transfor-
mation and
re-design
Placement
and re-de-
sign of or-
ganisation
structure
Functional organ-
ogram in place
Top Structure
reviewed and
approved by
Council
Review of organi-
sational structure
to access effec-
tiveness
Placement
was finalised
except for
Planning and
Centlec
Structure of
Planning and
Centlec to be
approved by
LLF before
199
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
placement can
be concluded.
Review of Old
Order By-laws
& Policies
Update old
bylaws and
policies
with legisla-
tion
Number of
old order by-
laws re-
viewed
All old order by-
laws reviewed
- Review of 18 by-
laws
Public participa-
tion + processing
of inputs
Section 80
Noted 10 Ex-
isting Draft
By-laws on 09
April 2015
Two Drafts to
be handled
by Finance &
Speaker's Of-
fice.
Preparations for
Public Participa-
tion Underway
Development
of New By-
Laws
Protect Mu-
nicipality’s
interests
and keep
Municipality
Number of
new by-laws
developed
and ap-
proved
New by-laws de-
veloped and ap-
proved
- 10 new by-laws
developed, ap-
proved and prom-
ulgated
Public participa-
tion + processing
of inputs
Section 80
Noted 12 New
Draft By-laws
on 09 April
2015
One Draft re-
moved from
List.
Preparations for
Public Participa-
tion Underway
200
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
complying
with legisla-
tion
Provision of ef-
ficient corpo-
rate secretariat
to Council,
MAYCO,
Council com-
mittees and
management
Efficient
and func-
tional com-
mittee man-
agement
system
Migration
from manual
document
circulation to
electronic
document
manage-
ment system
(share point
system)
Functional share
point system
Start-up pro-
gram of stag-
gered ap-
proach, i.e
agenda circu-
lated in two
ways electroni-
cally and manu-
ally
(ICT to install
wireless system in
the Council
Chamber)
Gradual phase-in
of electronic sys-
tem: Council
Implementation
program to be
submitted to
EMT
Electronic dis-
tribution of
Council,
MAYCO and
EMT docu-
ments imple-
mented
- -
201
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Improve inter-
nal govern-
ance systems
Synergy
and interde-
partmental
coordina-
tion
Provide effi-
cient secre-
tarial service
Council taking de-
cisions based on
qualitative provi-
sion of information
by administration
14 Council
meetings, 12
Mayco meet-
ings, 36 Bid
committees, 15
section 80 com-
mittees, 16
MPAC meetings
& 2 other section
79; 40 EMT
meetings
Meetings held as
per schedule (9
Council meetings
scheduled)
3 Council meet-
ings
3MAYCO
18 Bid Commit-
tee
3 Council
meetings
4 MAYCO
6 BEC Meet-
ings
9 BSC Meet-
ings and 2
BAC Meetings
10 Section 79
Meetings
held, 2 Sec-
tion 80 Meet-
ings and 9
SECTION 80
MEETINGS
CUR-
RENTLY
NOT SIT-
TING AC-
CORDING
TO SCHED-
ULE. RE-
QUEST TO
ADHERE TO
APPROVED
SCHEDULE
None. Targets
are achieved
202
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
EMT meet-
ings held. 1
EPWP and 2
CSD meet-
ings held.
HAS BEEN
FOR-
WARDED
TO
SPEAKER.
Tracking of
decisions
Decisions of
Council are
implemented
Electronic tracking
system in place
274 Execution
letters issued to
Directorates
100% tracking of
council decisions
Quarterly report
to EMT and
Council
16 Execution
letters issued
to directorates
25 Reports
received sent
to EMT
Mayco and
Council
Improve and
Strengthen
management
Full compli-
ance to na-
tional and
Records and
Archives Im-
plementation
Implementation of
e-filling across the
municipality
Compliance to the
Records Imple-
mentation plan
Quarterly report
to EMT
Training 10
staff members
in computer
203
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
of Records and
Archives
provincial
legislation
including
adherence
to archives
and records
policy
plan in place
and adhered
to by all di-
rectorates
skills in prepa-
ration for im-
plementation
of e-filing
Establish
and link op-
erational
modules
throughout
Uniformity in
document
manage-
ment system
functional opera-
tional modules
Total of 546 Or-
bit users from
298 users
254 additional Or-
bit users
60 new users Marked re-
duction in Or-
bit users due
to removal of
Centlec staff
from system
Currently
downgrading
application of
Orbit system
204
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
the munici-
pality
due to finan-
cial con-
straints
Improve ser-
vice delivery
by providing
recreation fa-
cilities and
public ameni-
ties to all resi-
dents of Man-
gaung
Maintaining
Municipal
facilities
and public
amenities
Number of
buildings
maintained
according to
maintenance
plan
Buildings main-
tained
20
15
6 Five (4) pro-
jects com-
pleted: Moroto
hall, Strong
room at SCM,
Complete new
cabinets, Up-
grading of
R501
Delays in fi-
nanlising
specifications
More projects
scheduled for
advertisement
on formal qou-
tation
205
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Number of
building refit-
ted with en-
ergy saving
bulbs
All buildings refit-
ted with energy
saving bulbs
15
2
1 Awaiting for
the delivery
and installa-
tion of EE
Bulbs
N/A N/A
Number of
new office
block in
Mangaung
New office block
in Mangaung
0 1 0 Item served at
the BEC and
referred back
due to tech-
nical function-
ality
N/A N/A
206
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
Promote and
support sports
and recreation
in the Metro
Upgrade
existing
sports facili-
ties
Number of
sport and
social amen-
ities up-
graded
Sport and social
amenities up-
graded
3
7
2
Upgrading of
Botsh S/ Pool:
98% com-
plete. (2) Up-
grading of
Johnson
Bendile 95%
complete. (3)
Upgrading of
Billy Murison
95% com-
Delays in
construction
phase: In-
crease in
Scope
N/A
207
ALIGNMENT AND LINK-
AGE
No OBJECTIVES AND INDICATORS PERFORMANCE TARGETS
National Outcome 9 A responsive, accountable, effective and efficient local government system
National KPA Municipal Institutional Development and Transformation
Good Governance Public Participation
MTAS Indicator Public participation
Governance
Municipal KPA Good governance
STATUS Performance
Exceeds Expectation Target Met In Progress
Unacceptable Per-
formance
Target not Im-
plemented
IDP Objective Strategy KPI Unit of Measure-
ment
Past Year Per-
formance
(2013/14)
Annual Target
2014/15
Target Q3
31 Mar 15
Actual per-
formance Q3
Status Variance Corrective Ac-
tion
plete. (4) Tha-
baNchu
S/Pool: WIP.
(5) Commu-
nity hall in
Grassland:
Contractor
Appointed.