Trevor Harrison 14 Killerton Green Clifton Nottingham NG11 9ES 0115 9748198 07910916742 [email protected] Profile I have over 35 years’ experience in the construction industry as a joiner and as a Site Project Manager. In these roles I have worked on a number domestic, commercial and large civil engineering projects throughout the UK and Europe. I have also gained a broad knowledge of electrical and mechanical trades during my career including repairs to computer systems. I have excellent communication skills and can competently follow instructions. I enjoy working as a team player sharing and building on individual skills. Key Skills I have experience of working as a supervisor and am able to confidently use my own initiative I have the proven experience of forward planning and time management Strong communication skills having led a team of workers to completion of a specified deadline and target Accuracy having shown proven ability to work to plans and drawings Electrical , Plumbing & Mechanical skills Time served Joiner/Carpenter & Qualified Electrician Education/Training HSE First Aid at Work 2013 Health and Safety – Method Statement and Risk Assessment 2007 CITB Site Manager Safety Certificate 2013 Asbestos Awareness 2013 Fire Marshall 2014 PASMA (Tower) 2014 Ipath 3a & 3b 2012 Part P Registered 2011 City and Guilds 17 th Edition (BS7671) 2010 City and Guilds PAT Testing and Inspection 2010 Honeywell Fire alarm training 2013 CompTIA A+ course 2009 Computer Literacy and Information Technology Level 1 and 2 2009 CRB Checked 2015

Upload: trevor-harrison

Post on 08-Feb-2017

38 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: MAIN CV Trevor Harrison16 - Copy[4762] - Copy

Trevor Harrison14 Killerton Green

CliftonNottinghamNG11 9ES

0115 974819807910916742

[email protected]

ProfileI have over 35 years’ experience in the construction industry as a joiner and as a Site Project Manager. In these roles I have worked on a number domestic, commercial and large civil engineering projects throughout the UK and Europe. I have also gained a broad knowledge of electrical and mechanical trades during my career including repairs to computer systems. I have excellent communication skills and can competently follow instructions. I enjoy working as a team player sharing and building on individual skills. Key Skills

I have experience of working as a supervisor and am able to confidently use my own initiative

I have the proven experience of forward planning and time management Strong communication skills having led a team of workers to completion of a specified

deadline and target Accuracy having shown proven ability to work to plans and drawings Electrical , Plumbing & Mechanical skills Time served Joiner/Carpenter & Qualified Electrician

Education/TrainingHSE First Aid at Work 2013Health and Safety – Method Statement and Risk Assessment 2007CITB Site Manager Safety Certificate 2013Asbestos Awareness 2013Fire Marshall 2014PASMA (Tower) 2014Ipath 3a & 3b 2012Part P Registered 2011City and Guilds 17th Edition (BS7671) 2010City and Guilds PAT Testing and Inspection 2010Honeywell Fire alarm training 2013CompTIA A+ course 2009Computer Literacy and Information Technology Level 1 and 2 2009CRB Checked 2015 Employment HistoryHARRON HOMESRelief site manager November2016 -

SITE MANAGER (SERVACCOMM REDHALL)Installation of 2 modular classroom blocks at a School in StAlbans. Finshed a school installation in Hitchin.. April 2016-November

SITE MANAGER (IDEAL BUILDING SYSTEMS)Installation of modular buildings, Multi sites…. January 2016-April 2016SITE SUPERVISOR(davlyn construction) ….November – January 2016Refurbishment of car showroomSITE MANAGER(ASHE CONSTRUCTION)

Page 2: MAIN CV Trevor Harrison16 - Copy[4762] - Copy

Refurbishment of schools………SEPTEMBER - NovemberSITE MANAGER ( IDEAL BUILDING SYSTEMS)Installation of modular buildings including Kitchen/ canteen dinning are& classrooms running up to 5 sites, Responsible for the delivery installation &Fit out of interiors ,including M& E ………..APRIL2015-SEPTEMBER 2015SITE MANAGER(ROBERT WOODHEAD)SCHOOL REFURBISHMENT PROJECT AUGUST 2014 /MARCH 2015Asbestos removal from main building & boiler house, Damp course,Re felting of flat roofs, 90 new windows, new ceilings, and various other works.Overall responsibility for Co ordination of subcontractors, Site Health & Safety ,Liaise with school & Client Solve site construction issues, Plan and co-ordinate the work,SITE MANAGER (ELITE SYSTEMS)REMOVE 17 EXISTING MODULES FROM A CONTAMINATED BROWN FIELD SITE AND REPLACE WITH A NEW MODULER PURPOSE BUILT OFFICE FOR NATIONAL GRID GAS.02/06/14 TO PRESENTSITE MANAGER(GRESWOLDE CONSTUCTION) 03/14 to 05/14Construction of new access road & various installationsSite Manager (ASHE CONSTRUCTION) August 13 to March 14Supervision of various school refurbishment projectsPython Hill School (Rainworth)Installation of New fire alarm system, New emergency Lighting, & Electrical Condition report remedial work.Beaufort school (Derby) Replacement of classroom windows & doorsArnovale Vale school (NOTTINGHAM)Lining repairs to sewer & rainwater drainsBerridge school (Nottingham)Installation of new playground and new electric gates & addition to Fire alarm..Section Manager (HAYS CONSTRUCTION)Caledonian ,Clifton ,Nottingham July 13 to August 13Section Manager , Final snagging works

Site Supervisor (HAYS CONSTRUCTION)Axiom Flooring, Mansfield 2008-2008

Supervising a team , laying floor screed, vinyl and carpet at Derby Hospital Ensuring accuracy and efficiency on the job and I was required to calculate the correct

amount of materials used.

Project Manager (HAYS CONSTRUCTION)McCarthy and Stone, Coventry 2008-2008

Responsible for the daily running of 44 new build assisted living apartments as a # 1 Supervising subcontractors Ensuring all materials and plant hire needed were ordered and on time Implementing Health & Safety and safe practices of work Identifying technical issues and moving the job forward on program.

Section Manager (HAYS CONSTRUCTION)Marriott Construction, Nottingham 2007-2008

Working on refurbishment of old library Ensuring all work was completed to the highest standard possible to be signed off Supervising diamond drillers, dry-liners and painters

Project Manager

Page 3: MAIN CV Trevor Harrison16 - Copy[4762] - Copy

Davlyn Construction, Derby 2007-2007 Managing a new build project of 4 shops and 20 apartments as a #1 Supervising and overseeing subcontractors Implementing Health & Safety and safe practices of work Finding solutions to technical issues

Section Manager (HAYS CONSTRUCTION)Jessop Construction, Lincolnshire 2006-2006 Took over contract to ensure work was signed off to a satisfactory manner

Controlled the daily running of the project overseeing subcontractors on 3 apartment blocks

Project managerBodhill Construction, Nottingham 2006-2006

Managing a warehouse conversion into apartments &new build houses. Supervising and overseeing subcontractors

Project ManagerJ & S Seddon, Stoke 2003-2006Refurbishment of the Belgrave Family Centre, Removal of Asbestos, and Interior fit out….Refurbishment of Coventry Magistrates CourtNew build Brownlow Primary School Sports pavilionNew Build Library at Markfield LeicestershireVarious other maintenance contracts Project Manager/ForemanVarious shop fitting projects including Woolworths ,Holiday World ,Bonmarche ,

Site OperativeVarious commercial and Civil Engineering projects, Europe 1990-2003InterestsMy main passion is all aspects of computer hardware and electronics which I have a great deal of experience in. My other hobbies include photography, travel and watching motor sport.

References