m0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project...

10
M0 HVAC LEGEND, SCHEDULES & SPECIFICATIONS ISSUE DATE: 04-15-2016 PROJECT NO: 16-023 COPYRIGHT 2012 QUIRK DESIGNS 2931 BERRY HILL DRIVE SUITE 200 NASHVILLE, TN 37204 Phone: (615) 269-9248 Fax: (615) 627-1298 email: [email protected] QUIRK DESIGNS REVISION 4/15/16 TEFC MOTOR WALL CAP / ROOF JACK SPEED CONTROLLER ROOF CURB INTERNAL DIS. SWITCH INLET DAMPER-TYPE OUTLET DAMPER-TYPE OUTLET SCREEN INLET SCREEN ACCESSORIES VOLTAGE MAX TIP SP/FAN RPM E.S.P. IN. H20 MOTOR AIRFLOW DIRECTION SERVICE CFM DRIVE TYPE MODEL # MANUFACTURER UNIT NO. FAN SCHEDULE NO NO YES YES PLUG NO B'DRAFT YES NO 120-1-60 3200/1485 0.25 1/5 HP EXHAUST RESTROOMS/JAN 150 DIRECT UPBLAST CUE-065-D GREENHECK EF-1 AC ROOF TOP UNIT SCHEDULE UNIT NO. MANUFACTURER MODEL # COOLING CAPACITY TOTAL CAPACITY B.T.H. SENS. CAPACITY B.T.H. E.A.D.B./E.A.W.B. O.A.D.B. CFM MIN. OUTSIDE AIR EXT. S.P. IN. H2O EVAPORATOR FAN H.P. HEATING CAPACITY FUEL INPUT B.T.H. OUTPUT B.T.H. STAGES L.A.D.B. @ 70 deg EAT GAS PRESSURE VOLTAGE UNIT F.L.A. MCA MCOP OPERATING WEIGHT-LBS. ACCESSORIES FILTER KIT/FILTERS ROOF CURB THERMOSTAT UNFUSED DISCONNECT LOW AMB CONTROL TEMP. THRU BASE ELECTRICAL HOT GAS REHEAT STAINLESS STEEL HX HIGH EFF UNIT TRANE YSC-043 95 1430 230 0.60 1 NAT. GAS 80000 65600 1 108 7" w.c. 208-3-60 2" PLEATED YES 22 25.4 35 700 YES YES 78 / 65 NO 45500 36000 NO NO NO MOTORIZED OUTSIDE AIR DAMPER NO MINIMUM SEER 13.0 EVAP FAN DRIVE TYPE DIRECT RTU-1 ECONOMIZER CONCENTRIC SUPPLY DIFF KIT NO SMOKE DETECTORS (RETURN DUCT) YES THERMOSTAT - UNIT # AVERAGING TEMPERATURE SENSORS SUPPLY DIFFUSER: SIZE-CFM RETURN GRILLE: SIZE-CFM EXHAUST GRILLE: SIZE-CFM SUPPLY DUCT (UP/DOWN) RETURN/EXHAUST DUCT (UP/DOWN) SIDEWALL SUPPLY DIFFUSER SIDEWALL RETURN GRILLE DUCT OR PIPE REDUCER FITTING FIRE DAMPER MANUAL VOLUME DAMPER GAS PRESSURE REGULATING VALVE GAS LINE: DIA & NG/LPG (NAT GAS/LIQ. PROPANE) SA-100 RTU-1 T RA-100 250 CFM 660 CFM RTU-1 TS EGG-CRATE RETURN & EXHAUST REGISTER SCHEDULE UNIT NO. MANUFACTURER MODEL # ADAPTOR TO NECK SIZE CUT-IN FRAME SIZE LAY-IN FRAME SIZE CFM S.P. IN. H20 MAX. NC RUNOUT SIZES RA / EA "80" 6"rd>6"x6" 8" x 8" - 75 0.03 28 6"rd/8"x4" RB / EB 8"rd>8"x8" 10" x 10" - 190 0.05 28 8"rd/10"x6" RC / EC 10"rd>10"x10" 12" x 12" - 300 0.05 27 10"rd/14"x6" RD / ED 12"rd/12"x12" 14" x 14" - 500 0.06 27 12"rd/16"x8" RE / EE PRICE 14" x 14" 16" x 16" - 700 0.06 27 14"rd/16"x10" RF / EF 16" x 16" 18" x 18" - 950 0.06 27 16"rd/18"x10" RG / EG 18" x 18" 20" x 20" - 1200 0.06 27 16"rd/22"x10" RH / EH 21.5" x 21.5" - 23.75"x23.75" 2000 0.08 27 18"rd/26"x12" "80" PRICE "80" PRICE "80" PRICE "80" PRICE "80" PRICE "80" PRICE "80" PRICE CEILING DIFFUSER SCHEDULE UNIT NO. MANUFACTURER MODEL # ADAPTOR TO NECK SIZE LAY-IN FRAME SIZE CFM S.P. IN. H20 MAX. NC RUNOUT SIZES SA PRICE "SCD" 6"rd 24" x 24" 120 0.05 12 6"rd/8"x6" SB 8"rd 24" x 24" 230 0.06 20 8"rd/10"x6" SC 10"rd 24" x 24" 400 0.08 27 10"rd/12"x8" SD 12"rd 24" x 24" 500 0.10 28 12"rd/16"x8" PRICE PRICE PRICE "SCD" "SCD" "SCD" *INSTALL MANUAL VOLUME DAMPERS AT ALL MAIN DUCT TAPS *INSTALL MANUAL VOLUME DAMPERS AT ALL MAIN DUCT TAPS AC INVERTER SPLIT SYSTEM SCHEDULE UNIT NO. MANUFACTURER INDOOR FAN UNIT MODEL # CFM INDOOR UNIT FLA HEATING CAPACITY TOTAL CAPACITY B.T.H. AUX HEAT VOLTAGE COOLING CAPACITY TOTAL CAPACITY B.T.H. SENS. CAPACITY B.T.H. E.A.D.B./E.A.W.B. O.A.D.B. CONDENSING UNIT MODEL # VOLTAGE UNIT F.L.A. MIN. CIR. AMPS HACR BREAKER SIZE ACCESSORIES FILTERS THERMOSTAT LOW AMB CONTROL TEMP. AHU-1 399 0.76 10900/8700@17F NO 95 7400 N/A 9000 80 / 67 MIN. CIR. AMPS INDOOR POWERED FROM OUTDOOR 1.0 MITSIUBISHI YES MSZ-GE09NA-8 CONDENSATE LIFT PUMP WASHABLE WIRELESS YES REFRIGERANT R-410A MUZ-GE09NA 208-1-60 12.0 9.0 15 VOLTAGE 208-1-60 HACR BREAKER SIZE -- HEAT PUMP UNIT NO. CU-1 GAS FIRED RADIANT HEATER SCHEDULE UNIT NO. MANUFACTURER MODEL # HEATING CAPACITY FUEL INPUT B.T.H. OUTPUT B.T.H. GAS PRESSURE VOLTAGE UNIT F.L.A. ACCESSORIES ELECTRONIC IGNITION THERMOSTAT VOLTAGE 4.8 DETROIT RADIANT PROD. HL3-20-75 NAT. GAS 75,000 60,000 7" w.c. GFRH-1&2 HOT SURF DIRECT IGN. MOISTURE PROOF 24VAC 120-1-60 YES EXHAUST FLUE WALL CAP GAS FIRED UNIT HEATER SCHEDULE UNIT NO. MANUFACTURER MODEL # HEATING CAPACITY FUEL INPUT B.T.H. OUTPUT B.T.H. GAS PRESSURE VOLTAGE UNIT F.L.A. ACCESSORIES ELECTRONIC PILOT IGNITION THERMOSTAT VOLTAGE 2.7 UH-30 NAT. GAS 30,000 24,000 7" w.c. GUH-1 YES MOISTURE PROOF 24VAC 120-1-60 YES SEPARATED COMBUSTION DETROIT RADIANT PROD. CONCENTRIC INTAKE/EXH KIT CVK-3 7-DAY PROG, AUTO CHANGEOVER, SETBACK YES / ENTHALPY DIFFERENTIAL CTRL 2-STAGE BURNER DOWN TO 0ーF BURNER STAGES COMMON EXH FLUE KIT RTVP-6, B-VENT BVP-6 INTAKE WALL CAP WIV-4 MECHANICAL SPECIFICATIONS AND NOTES GENERAL WHERE DISCREPANCIES OCCUR BETWEEN THE PLANS AND THE SPECIFICATIONS, OR WITHIN EITHER DOCUMENT ITSELF, THE ITEM OR ARRANGEMENT OF BETTER QUALITY OR HIGHER COST SHALL BE INCLUDED IN THE BASE BID. THE DRAWINGS SHOW THE VARIOUS PIPING, ELECTRICAL AND DUCT SYSTEMS SCHEMATICALLY. NO ADDED COMPENSATION WILL BE PERMITTED FOR VARIATIONS DUE TO FIELD CONDITIONS. INSTALLATION SHALL FOLLOW DRAWINGS WHERE PRACTICABLE AND NOT BE IN CONFLICT WITH OTHER TRADES INSTALLATION. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE ADOPTED INTERNATIONAL MECHANICAL CODE AND ALL LOCAL MECHANICAL CODES. CONTRACTOR SHALL PAY FOR ALL FEES AND PERMITS. THESE CONTRACT DOCUMENTS (DRAWINGS, PLANS AND SPECIFICATIONS) DESCRIBE THE MECHANICAL WORK FOR THIS PROJECT AND FORM A GUIDE FOR A COMPLETE INSTALLATION. COMPLY WITH APPLICABLE REQUIREMENTS OF RECOGNIZED INDUSTRY ASSOCIATIONS WHICH PROVIDE STANDARDS FOR THE VARIOUS TRADES. SUPERVISE ALL WORK WITH SPECIFICALLY QUALIFIED PEOPLE IN THE VARIOUS DISCIPLINES. VISIT THE SITE AND BE INFORMED OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. RESOLVE INTERFERENCES BETWEEN WORK OF VARIOUS CONTRACTORS PRIOR TO INSTALLATION. NOTIFY GENERAL CONTRACTOR OF SIZE AND LOCATION OF ALL RECESSES AND OPENINGS REQUIRED FOR HVAC WORK. PROVIDE SUBMITTALS FOR APPROVAL ON ALL EQUIPMENT AND DEVICES. CONTRACTOR SHALL AND HEREBY DOES GUARANTEE THAT ALL WORK INSTALLED UNDER THESE DOCUMENTS SHALL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FORM THE DATE OF SUBSTANTIAL USAGE OR FINAL ACCEPTANCE UNLESS A LONGER PERIOD IS NOTED. ALL REFRIGERATION COMPRESSORS TO HAVE A 5 YEAR WARRANTY. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE CLEAR. PRODUCTS THE CONTRACTOR SHALL COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING ANY EQUIPMENT. ALL AC UNITS TO BE LENNOX, TRANE, RUUD, DAIKEN OR JCI (YORK) ONLY. AIR DISTRIBUTION TO BE TITUS, PRICE OR METALAIRE ONLY. FANS TO BE COOK OR GREENHECK ONLY. PROVIDE FLEXIBLE CONNECTIONS FOR ALL AC UNIT DUCT CONNECTIONS. PROVIDE RETURN AIR DUCT SMOKE DETECTORS FOR ALL SYSTEMS 2000 CFM (OR 5 TONS) OR GREATER. PROVIDE SUPPLY AIR DUCT SMOKE DETECTORS WHERE SHOWN. PROVIDE REMOTE SUPERVISORY INDICATION FOR ALL DUCT SMOKE DETECTORS. ALL DUCTWORK SHALL BE SHEETMETAL IN ACCORDANCE WITH THE LATEST SMACNA HVAC DUCT, IMC AND LOCAL CODES. ALL ROUND DUCT ABOVE CEILINGS MAY BE SNAPLOCK TO 14" ROUND. 16" ROUND AND ABOVE TO BE SPIRAL. EXPOSED DUCT OF ANY SIZE, THAT IS NOT DOUBLE WALL, TO BE SPIRAL. PROVIDE HANGERS, BRACES, INTERMEDIATE FRAMING SUPPORTS, ANCHORS AND MISCELLANEOUS DEVICES REQUIRED FOR DUCT AND EQUIPMENT INSTALLATIONS PER MANUFACTURER AND CODE REQUIREMENTS. REFRIGERANT PIPING TO BE TYPE "L" COPPER, SILVER SOLDER JOINTS AND 1" THICK AP ARMAFLEX INSULATION ON SUCTION PIPING ONLY FOR PIPE SIZES 1-1/2" AND SMALLER, 1-1/2" THICK AP ARMAFLEX INSULATION FOR PIPE SIZES 2" AND LARGER. MOISTURE CONDENSATE PIPING TO BE PEX PIPING AND FITTINGS WITH 1/2" AP ARMAFLEX INSULATION FOR INSIDE INSTALLATONS. SLOPE CONDENSATE PIPING AT A MINIMUM OF 1/8" PER FOOT OF HORIZONTAL RUN. ALL GAS PIPING AND FITTINGS SHALL BE SCH. 40 A106 SEAMLESS BLACK PIPE WITH 150# MALLEABLE T&C FITTINGS SCREWED OR WELDED JOINTS. PIPING WITH PRESSURES OVER 2 PSI AND 1" OR LARGER IN SIZE SHALL BE WELDED ONLY. TEST ALL GAS PIPING WITH NITROGEN AT 100 PSI FOR TWO HOURS WITH NO LEAKS. ALL EXPOSED GAS LINES TO BE PAINTED AND STENCILED WITH THE WORD "GAS" AND THE PRESSURE. ALL UG GAS PIPING TO BE DRISCOPLEX 6500 PE 2406 YELLOW GAS PIPING, 2" AND SMALLER. PROVIDE FUSION FITTINGS AS REQUIRED BY MANUFACTURER. EXECUTION FINAL LOCATION OF DIFFUSERS AND GRILLES SHALL BE IN ACCORDANCE WITH THE ARCHITECT'S REFLECTED CEILING PLAN. ALL DUCT AND PIPING PENETRATIONS THROUGH FIRE RATED ASSEMBLIES (I.E. FLOORS, WALLS, CEILING, ETC.) SHALL BE INSTALLED WITH A U.L. LISTED FIRE STOP SYSTEM AND PER CODE REQUIREMENTS. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING. MAINTAIN 12 FEET BETWEEN ALL OUTSIDE AIR INTAKES AND ANY EXHAUST OUTLETS AND PLUMBING VENTS. RUN ALL DUCTWORK LEVEL UNLESS OTHERWISE NOTED. PROVIDE AIRTIGHT ACCESS DOORS ADJACENT TO ALL FIRE DAMPERS, SMOKE DAMPERS, AUTOMATIC DAMPERS AND TEMPERATURE CONTROL DEVICES. ALL MAJOR EQUIPMENT TO BE LABELED WITH NAME PLATES, RIGID PLASTIC BAKELITE WITH MACHINE ENGRAVED 1" HIGH LETTERING. ENGRAVED LETTERING TO BE A PERMANENT COLORING MATERIAL WHICH CONTRASTS WITH TAG COLOR. EXECUTION CONTINUED PROVIDE NON-CONDUCTING DIELECTRIC CONNECTIONS WHEREVER DISSIMILAR METALS ARE JOINED. ISOLATE ALL COPPER FROM STEEL SUPPORTS WITH PLASTIC SEPARATORS DESIGNED FOR PIPE ISOLATION. ALL RECTANGULAR BRANCH DUCTS TO HAVE 45ー TAPS IN THE DIRECTION OF FLOW FROM THE MAIN DUCT. DIFFUSER/GRILLE TAPS TO INCLUDE VOLUME DAMPERS AT MAIN DUCT AND SHALL BE RIGID ROUND DUCT SIZED AS NOTED ON SCHEDULES TRANSITIONING TO FLEX DUCT WITH MAXMUM LENGTHS OF 5 FT. ALL ROUND TAPS SHALL BE MADE USING SPIN-IN METAL COLLARS WITH DAMPER OR STICK-ON AIRTIGHT COLLARS WITH NEOPRENE GASKET. WHERE THERE IS NO ACCESS TO DAMPERS, END DEVICES MUST HAVE AN OPPOSED BLADE DAMPER FOR BALANCING. INSTALL BALANCING DAMPERS WHERE SHOWN AND ALSO WHERE REQUIRED FOR PROPER AIR DISTRIBUTION AND BALANCING. SEAL ALL SHEETMETAL DUCT SEAMS AND JOINTS WITH HARDCAST WATER BASED SEALANT AND/OR HARDCAST TAPE LISTED AND LABELED IN ACCORDANCE WITH UL 181A/B. APPLY WITH THE ENVIRONMENT IS BETWEEN 50 ーF TO 95 ーF. DUCT TAPE IS NOT ACCEPTABLE INCLUDING FOR VAPOR BARRIER SEAMS. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT LOCATED IN CONDITIONED ENVELOPES TO BE EXTERNALLY INSULATED WITH 2" THICK, 3/4 PCF DENSITY, FLEXIBLE, MINIMUM INSTALLED (25% COMPRESSION) "R" VALUE OF 5.5, FACTORY-REINFORCED GLASS FIBER BLANKET WITH FOIL-FACED VAPOR BARRIER EQUAL TO JOHN MANVILLE MICROLITE DUCT WRAP. INSULATE THE LAST 5 FT OF EXHAUST DUCT EXISTING THE BUILDING ENVELOPE. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT LOCATED IN UNCONDITIONED SPACES OR ATTICS TO BE EXTERNALLY INSULATED WITH 3" THICK, 3/4 PCF DENSITY, FLEXIBLE, MINIMUM INSTALLED (25% COMPRESSION) "R" VALUE OF 8.7, FACTORY-REINFORCED GLASS FIBER BLANKET WITH FOIL-FACED VAPOR BARRIER EQUAL TO JOHN MANVILLE MICROLITE DUCT WRAP. THE BACKS OF ALL SUPPLY DIFFUSERS TO BE INSULATED AND TAPED COMPLETELY WITH NO EXPOSED METAL WITH INSULATION THICKNESS OF DUCT ABOVE. INSULATE THE BACKS OF RETURN GRILLE CONNECTIONS IF RETURN DUCT IS INDICATED TO BE INSULATED. MECHANICAL CONTRACTOR TO PROVIDE AND MOUNT THERMOSTATS. MECHANICAL CONTRACTOR TO PROVIDE, ROUTE AND TERMINATE THERMOSTAT WIRE. LOCATE ADJUSTABLE ROOM THERMOSTATS 4'-0" ABOVE FINISHED FLOOR. WIRE ROUTED IN CEILING RETURN AIR PLENUMS TO BE PLENUM RATED TYPE OR RUN IN RATED METAL CONDUIT. PROVIDE HANGERS, BRACES, INTERMEDIATE FRAMING SUPPORTS, ANCHORS AND MISCELLANEOUS DEVICES REQUIRED FOR PIPE AND EQUIPMENT INSTALLATIONS PER MANUFACTURER AND CODE REQUIREMENTS. PIPE HANGERS FOR ALL PIPING SHALL BE GRINNELL OR EQUAL WITH HANGER TYPE MATCHING SYSTEM REQUIREMENT. MAXIMUM ALLOWABLE SPACING SHALL BE AS FOLLOWS: PEX 1” AND SMALLER 32 IN O.C. SPACING ALL OTHER PEX & PVC 4 FT O.C. SPACING METALLIC PIPING: 3/4" to 1-1/4" DIA. 8 FT O.C. SPACING 1-1/2" to 2-1/2" dia.10 FT O.C. SPACING 3" dia. 12 FT O.C. SPACING 4" to 6" dia. 14 FT O.C. SPACING COMMISSIONING PERFORM TEST AND BALANCE / UNIT SET-UP ACCORDING TO PLANS AND SPECIFICATIONS IN ACCORDANCE WITH THE NATIONAL BALANCING COUNCIL (NBC) OR NEBB PRACTICAL STANDARDS, FORMS AND PROCEDURES. KEY ITEMS INCLUDE: SET AHU DISCHARGE TEMPERATURE TO DESIGN CONDITIONS OR AS DIRECTED BY ENGINEER. VERIFY MINIMUM AND MAXIMUM AIRFLOW SETTINGS AT EACH TERMINAL BOX. BALANCE ALL DIFFUSERS AND REGISTERS TO WITHIN 10% OF VALUES SHOWN ON DRAWINGS. RECORD ENTERING AND LEAVING AIR TEMPERATURES FOR EACH UNIT ON BOTH HEATING AND COOLING. RECORD OUTSIDE AIR TEMPERATURE WHEN TESTING AC UNITS. PROVIDE 3 COPIES OF WRITTEN REPORT WITH DATA. THE FOLLOWING ITEMS ARE TO BE COMPLETED BEFORE FINAL ACCEPTANCE: SYSTEM BALANCING SYSTEM STARTUP AND CONTROL SYSTEM FUNCTIONAL TESTING FURNISH OWNER ALL O&M MANUALS (3 COPIES), WITH WIRING AND ELECTRIC CONTROL DIAGRAMS. EQUIPMENT CONTROL SEQUENCE OF OPERATION AC UNIT CONTROL EACH UNIT SHALL BE CONTROLLED LOCALLY BY A 7-DAY PROGRAMMABLE THERMOSTAT WITH TEMPERATE SET-BACK FUNTIONS FROM THE MANUFACTURER. THE THERMOSTAT SHALL AUTOMATICALLY CHANGE BETWEEN COOLING AND HEATING MODES AS NEEDED TO MAINTAIN SPACE CONDITIONS. FOR RTU-1 AND DMS-2 OCCUPPIED MODE SHALL BE PROGRAMMED FOR DAILY HOURS OF NORMAL OPERATION AND THE DESIRED COOLING AND HEATING TEMPERATURE SET-POINTS. THE SUPPLY FAN SHALL BE ENABLED AND/OR FAN CYCLING UTILIZED DURING THIS MODE TO MAINTAIN PROPER CIRCULATION OF AIR IN THE SPACE EVEN IN TIMES OF LOW DEMAND. THE OUTDOOR AIR DAMPER/ECONOMIZER SHALL BE MODULATED TO OBTAIN THE DESIGN VENTILATION RATE. (EXCLUDES DMS-2) UNOCCUPPIED MODE SHALL BE PROGRAMMED SUCH THAT THE THERMOSTAT ASSUMES SET-BACK COOLING AND HEATING TEMPERATURE SET-POINTS FOR HOURS OTHER THAN NORMAL OPERATION. THE OUTDOOR AIR DAMPER SHALL BE MAINTAIN THE MINIMUM VENTILATION RATE DURING UN-OCCUPPIED MODE UN-LESS FREE COOLING IS BEING USED. (EXCLUDES DMS-2) Economizer Control (rTU-1 0NLY) If the enthalpy of the outdoor air is appropriate to use free cooling the economizer shall be used to satisfy the supply air setpoint. If more cooling is then required, mechanical cooling shall be staged on as necessary. The minimum economizer position SHALL BE SET TO to maintain THE DESIGN VENTILATION RATE FOR THE UNIT DURING OCCUPPIED TIMES. At outdoor air conditions above the enthalpy control setting, mechanical cooling only shall be used and the OUTDOOR air dampers shall remain at minimum position. DMS-1 SHALL BE PROGRAMMED TO MAINTAIN PRIMARY TEMPERATURE SET-POINTS AT ALL TIMES. THE FAN SHALL BE PROGRAMMABLE TO MAINTAIN AIRFLOW AT ALL TIMES. EXHAUST FAN CONTROL EF-1 AND EF-2 SHALL BE OPERATED CONTINUOUSLY. GAS-FIRED HEATER CONTROL GUH-1 SHALL BE CONTROLLED BY A ROOM MOUNTED THERMOSTAT WITH ADJUSTABLE SET-POINT AND SUMMER VENTILATION-ONLY MODE. GFRH-1&2 SHALL BE CONTROLLED BY A SINGLE ROOM MOUNTED THERMOSTAT WITH ADJUSTABLE SET-POINT. THE DESIGN INTENT IS THAT BOTH UNITS SHALL ONLY OPERATION SIMULTANEOUSLY AS THEY UTILIZE A COMMON EXHAUST FLUE DESIGN PER THE MANUFACTURER. EA-100 HVAC LEGEND NO WALL CAP YES NO PLUG NO B'DRAFT YES NO 120-1-60 - 0.15 18 WATTS EXHAUST WAITING R.R. 50 DIRECT CEILING SP-B80 GREENHECK EF-2 1-1/4" NG AHU-2 350 0.76 13600/9000@17F NO 95 8600 N/A 11500 80 / 67 1.0 MITSIUBISHI YES SEZ-KD12NA4 WASHABLE WIRELESS YES R-410A SUZ-KA12NA 208-1-60 12.0 9.0 15 208-1-60 -- HEAT PUMP CU-2 DOWN TO 0ーF

Upload: others

Post on 11-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

M0

HVAC LEGEND, SCHEDULES &

SPECIFICATIONS

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

TEFC MOTOR

WALL CAP / ROOF JACK

SPEED CONTROLLER

ROOF CURB

INTERNAL DIS. SWITCH

INLET DAMPER-TYPE

OUTLET DAMPER-TYPE

OUTLET SCREEN

INLET SCREEN

ACCESSORIES

VOLTAGE

MAX TIP SP/FAN RPM

E.S.P. IN. H20

MOTOR

AIRFLOW DIRECTION

SERVICE

CFM

DRIVE

TYPE

MODEL #

MANUFACTURER

UNIT NO.

FAN SCHEDULE

NO

NO

YES

YES

PLUG

NO

B'DRAFT

YES

NO

120-1-60

3200/1485

0.25

1/5 HP

EXHAUST

RESTROOMS/JAN

150

DIRECT

UPBLAST

CUE-065-D

GREENHECK

EF-1

AC ROOF TOP UNIT SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

COOLING CAPACITY

TOTAL CAPACITY B.T.H.

SENS. CAPACITY B.T.H.

E.A.D.B./E.A.W.B.

O.A.D.B.

CFM

MIN. OUTSIDE AIR

EXT. S.P. IN. H2O

EVAPORATOR FAN H.P.

HEATING CAPACITY

FUEL

INPUT B.T.H.

OUTPUT B.T.H.

STAGES

L.A.D.B. @ 70 deg EAT

GAS PRESSURE

VOLTAGE

UNIT F.L.A.

MCA

MCOP

OPERATING WEIGHT-LBS.

ACCESSORIES

FILTER KIT/FILTERS

ROOF CURB

THERMOSTAT

UNFUSED DISCONNECT

LOW AMB CONTROL TEMP.

THRU BASE ELECTRICAL

HOT GAS REHEAT

STAINLESS STEEL HX

HIGH EFF UNIT

TRANE

YSC-043

95

1430

230

0.60

1

NAT. GAS

80000

65600

1

108

7" w.c.

208-3-60

2" PLEATED

YES

22

25.4

35

700

YES

YES

78 / 65

NO

45500

36000

NO

NO

NO

MOTORIZED OUTSIDE AIR DAMPER NO

MINIMUM SEER 13.0

EVAP FAN DRIVE TYPE DIRECT

RTU-1

ECONOMIZER

CONCENTRIC SUPPLY DIFF KIT NO

SMOKE DETECTORS (RETURN DUCT) YES

THERMOSTAT - UNIT #

AVERAGING TEMPERATURE SENSORS

SUPPLY DIFFUSER: SIZE-CFM

RETURN GRILLE: SIZE-CFM

EXHAUST GRILLE: SIZE-CFM

SUPPLY DUCT (UP/DOWN)

RETURN/EXHAUST DUCT (UP/DOWN)

SIDEWALL SUPPLY DIFFUSER

SIDEWALL RETURN GRILLE

DUCT OR PIPE REDUCER FITTING

FIRE DAMPER

MANUAL VOLUME DAMPER

GAS PRESSURE REGULATING VALVE

GAS LINE: DIA & NG/LPG (NAT GAS/LIQ. PROPANE)

SA-100

RTU-1T

RA-100

250CFM

660CFM

RTU-1TS

EGG-CRATE RETURN & EXHAUST REGISTER SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

ADAPTOR TO NECK SIZE

CUT-IN FRAME SIZE

LAY-IN FRAME SIZE

CFM

S.P. IN. H20

MAX. NC

RUNOUT SIZES

RA / EA

"80"

6"rd>6"x6"

8" x 8"

-

75

0.03

28

6"rd/8"x4"

RB / EB

8"rd>8"x8"

10" x 10"

-

190

0.05

28

8"rd/10"x6"

RC / EC

10"rd>10"x10"

12" x 12"

-

300

0.05

27

10"rd/14"x6"

RD / ED

12"rd/12"x12"

14" x 14"

-

500

0.06

27

12"rd/16"x8"

RE / EE

PRICE

14" x 14"

16" x 16"

-

700

0.06

27

14"rd/16"x10"

RF / EF

16" x 16"

18" x 18"

-

950

0.06

27

16"rd/18"x10"

RG / EG

18" x 18"

20" x 20"

-

1200

0.06

27

16"rd/22"x10"

RH / EH

21.5" x 21.5"

-

23.75"x23.75"

2000

0.08

27

18"rd/26"x12"

"80"

PRICE

"80"

PRICE

"80"

PRICE

"80"

PRICE

"80"

PRICE

"80"

PRICE

"80"

PRICE

CEILING DIFFUSER SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

ADAPTOR TO NECK SIZE

LAY-IN FRAME SIZE

CFM

S.P. IN. H20

MAX. NC

RUNOUT SIZES

SA

PRICE

"SCD"

6"rd

24" x 24"

120

0.05

12

6"rd/8"x6"

SB

8"rd

24" x 24"

230

0.06

20

8"rd/10"x6"

SC

10"rd

24" x 24"

400

0.08

27

10"rd/12"x8"

SD

12"rd

24" x 24"

500

0.10

28

12"rd/16"x8"

PRICE PRICE PRICE

"SCD" "SCD" "SCD"

*INSTALL MANUAL VOLUME DAMPERS AT ALL MAIN DUCT TAPS

*INSTALL MANUAL VOLUME DAMPERS AT ALL MAIN DUCT TAPS

AC INVERTER SPLIT SYSTEM SCHEDULE

UNIT NO.

MANUFACTURER

INDOOR FAN UNIT

MODEL #

CFM

INDOOR UNIT FLA

HEATING CAPACITY

TOTAL CAPACITY B.T.H.

AUX HEAT

VOLTAGE

COOLING CAPACITY

TOTAL CAPACITY B.T.H.

SENS. CAPACITY B.T.H.

E.A.D.B./E.A.W.B.

O.A.D.B.

CONDENSING UNIT

MODEL #

VOLTAGE

UNIT F.L.A.

MIN. CIR. AMPS

HACR BREAKER SIZE

ACCESSORIES

FILTERS

THERMOSTAT

LOW AMB CONTROL TEMP.

AHU-1

399

0.76

10900/8700@17F

NO

95

7400

N/A

9000

80 / 67

MIN. CIR. AMPS

INDOOR POWERED FROM OUTDOOR

1.0

MITSIUBISHI

YES

MSZ-GE09NA-8

CONDENSATE LIFT PUMP

WASHABLE

WIRELESS

YES

REFRIGERANT R-410A

MUZ-GE09NA

208-1-60

12.0

9.0

15

VOLTAGE 208-1-60

HACR BREAKER SIZE --

HEAT PUMP

UNIT NO. CU-1

GAS FIRED RADIANT HEATER SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

HEATING CAPACITY

FUEL

INPUT B.T.H.

OUTPUT B.T.H.

GAS PRESSURE

VOLTAGE

UNIT F.L.A.

ACCESSORIES

ELECTRONIC IGNITION

THERMOSTAT

VOLTAGE

4.8

DETROIT RADIANT PROD.

HL3-20-75

NAT. GAS

75,000

60,000

7" w.c.

GFRH-1&2

HOT SURF DIRECT IGN.

MOISTURE PROOF

24VAC

120-1-60

YESEXHAUST FLUE WALL CAP

GAS FIRED UNIT HEATER SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

HEATING CAPACITY

FUEL

INPUT B.T.H.

OUTPUT B.T.H.

GAS PRESSURE

VOLTAGE

UNIT F.L.A.

ACCESSORIES

ELECTRONIC PILOT IGNITION

THERMOSTAT

VOLTAGE

2.7

UH-30

NAT. GAS

30,000

24,000

7" w.c.

GUH-1

YES

MOISTURE PROOF

24VAC

120-1-60

YESSEPARATED COMBUSTION

DETROIT RADIANT PROD.

CONCENTRIC INTAKE/EXH KIT CVK-3

7-DAY PROG, AUTO CHANGEOVER, SETBACK

YES / ENTHALPY DIFFERENTIAL CTRL

2-STAGE BURNER

DOWN TO 0°F

BURNER STAGES

COMMON EXH FLUE KIT RTVP-6, B-VENT BVP-6

INTAKE WALL CAP WIV-4

MECHANICAL SPECIFICATIONS AND NOTES

GENERAL

WHERE DISCREPANCIES OCCUR BETWEEN THE PLANS AND THE SPECIFICATIONS, OR WITHIN EITHER DOCUMENT ITSELF, THE ITEM OR ARRANGEMENT OF BETTER QUALITY OR HIGHER COST SHALL BE INCLUDED IN THE BASE BID.

THE DRAWINGS SHOW THE VARIOUS PIPING, ELECTRICAL AND DUCT SYSTEMS SCHEMATICALLY. NO ADDED COMPENSATION WILL BE PERMITTED FOR VARIATIONS DUE TO FIELD CONDITIONS. INSTALLATION SHALL FOLLOW DRAWINGS WHERE PRACTICABLE AND NOT BE IN CONFLICT WITH OTHER TRADES INSTALLATION.

ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE ADOPTED INTERNATIONAL MECHANICAL CODE AND ALL LOCAL MECHANICAL CODES.

CONTRACTOR SHALL PAY FOR ALL FEES AND PERMITS. THESE CONTRACT DOCUMENTS (DRAWINGS, PLANS AND SPECIFICATIONS) DESCRIBE THE MECHANICAL WORK FOR THIS PROJECT AND FORM A GUIDE FOR A COMPLETE INSTALLATION. COMPLY WITH APPLICABLE REQUIREMENTS OF RECOGNIZED INDUSTRY ASSOCIATIONS WHICH PROVIDE STANDARDS FOR THE VARIOUS TRADES.

SUPERVISE ALL WORK WITH SPECIFICALLY QUALIFIED PEOPLE IN THE VARIOUS DISCIPLINES. VISIT THE SITE AND BE INFORMED OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. RESOLVE INTERFERENCES BETWEEN WORK OF VARIOUS CONTRACTORS PRIOR TO INSTALLATION. NOTIFY GENERAL CONTRACTOR OF SIZE AND LOCATION OF ALL RECESSES AND OPENINGS REQUIRED FOR HVAC WORK. PROVIDE SUBMITTALS FOR APPROVAL ON ALL EQUIPMENT AND DEVICES.

CONTRACTOR SHALL AND HEREBY DOES GUARANTEE THAT ALL WORK INSTALLED UNDER THESE DOCUMENTS SHALL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FORM THE DATE OF SUBSTANTIAL USAGE OR FINAL ACCEPTANCE UNLESS A LONGER PERIOD IS NOTED. ALL REFRIGERATION COMPRESSORS TO HAVE A 5 YEAR WARRANTY.

DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE CLEAR.

PRODUCTS

THE CONTRACTOR SHALL COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING ANY EQUIPMENT.

ALL AC UNITS TO BE LENNOX, TRANE, RUUD, DAIKEN OR JCI (YORK) ONLY. AIR DISTRIBUTION TO BE TITUS, PRICE OR METALAIRE ONLY. FANS TO BE COOK OR GREENHECK ONLY.

PROVIDE FLEXIBLE CONNECTIONS FOR ALL AC UNIT DUCT CONNECTIONS.PROVIDE RETURN AIR DUCT SMOKE DETECTORS FOR ALL SYSTEMS 2000 CFM (OR 5 TONS)

OR GREATER. PROVIDE SUPPLY AIR DUCT SMOKE DETECTORS WHERE SHOWN. PROVIDE REMOTE SUPERVISORY INDICATION FOR ALL DUCT SMOKE DETECTORS.

ALL DUCTWORK SHALL BE SHEETMETAL IN ACCORDANCE WITH THE LATEST SMACNA HVAC DUCT, IMC AND LOCAL CODES.

ALL ROUND DUCT ABOVE CEILINGS MAY BE SNAPLOCK TO 14" ROUND. 16" ROUND AND ABOVE TO BE SPIRAL. EXPOSED DUCT OF ANY SIZE, THAT IS NOT DOUBLE WALL, TO BE SPIRAL.

PROVIDE HANGERS, BRACES, INTERMEDIATE FRAMING SUPPORTS, ANCHORS AND MISCELLANEOUS DEVICES REQUIRED FOR DUCT AND EQUIPMENT INSTALLATIONS PER MANUFACTURER AND CODE REQUIREMENTS.

REFRIGERANT PIPING TO BE TYPE "L" COPPER, SILVER SOLDER JOINTS AND 1" THICK AP ARMAFLEX INSULATION ON SUCTION PIPING ONLY FOR PIPE SIZES 1-1/2" AND SMALLER, 1-1/2" THICK AP ARMAFLEX INSULATION FOR PIPE SIZES 2" AND LARGER.

MOISTURE CONDENSATE PIPING TO BE PEX PIPING AND FITTINGS WITH 1/2" AP ARMAFLEX INSULATION FOR INSIDE INSTALLATONS. SLOPE CONDENSATE PIPING AT A MINIMUM OF 1/8" PER FOOT OF HORIZONTAL RUN.

ALL GAS PIPING AND FITTINGS SHALL BE SCH. 40 A106 SEAMLESS BLACK PIPE WITH 150# MALLEABLE T&C FITTINGS SCREWED OR WELDED JOINTS. PIPING WITH PRESSURES OVER 2 PSI AND 1" OR LARGER IN SIZE SHALL BE WELDED ONLY. TEST ALL GAS PIPING WITH NITROGEN AT 100 PSI FOR TWO HOURS WITH NO LEAKS. ALL EXPOSED GAS LINES TO BE PAINTED AND STENCILED WITH THE WORD "GAS" AND THE PRESSURE. ALL UG GAS PIPING TO BE DRISCOPLEX 6500 PE 2406 YELLOW GAS PIPING, 2" AND SMALLER. PROVIDE FUSION FITTINGS AS REQUIRED BY MANUFACTURER.

EXECUTION

FINAL LOCATION OF DIFFUSERS AND GRILLES SHALL BE IN ACCORDANCE WITH THE ARCHITECT'S REFLECTED CEILING PLAN.

ALL DUCT AND PIPING PENETRATIONS THROUGH FIRE RATED ASSEMBLIES (I.E. FLOORS, WALLS, CEILING, ETC.) SHALL BE INSTALLED WITH A U.L. LISTED FIRE STOP SYSTEM AND PER CODE REQUIREMENTS.

LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.

MAINTAIN 12 FEET BETWEEN ALL OUTSIDE AIR INTAKES AND ANY EXHAUST OUTLETS AND PLUMBING VENTS.

RUN ALL DUCTWORK LEVEL UNLESS OTHERWISE NOTED. PROVIDE AIRTIGHT ACCESS DOORS ADJACENT TO ALL FIRE DAMPERS, SMOKE DAMPERS, AUTOMATIC DAMPERS AND TEMPERATURE CONTROL DEVICES.

ALL MAJOR EQUIPMENT TO BE LABELED WITH NAME PLATES, RIGID PLASTIC BAKELITE WITH MACHINE ENGRAVED 1" HIGH LETTERING. ENGRAVED LETTERING TO BE A PERMANENT COLORING MATERIAL WHICH CONTRASTS WITH TAG COLOR.

EXECUTION CONTINUED

PROVIDE NON-CONDUCTING DIELECTRIC CONNECTIONS WHEREVER DISSIMILAR METALS ARE JOINED. ISOLATE ALL COPPER FROM STEEL SUPPORTS WITH PLASTIC SEPARATORS DESIGNED FOR PIPE ISOLATION.

ALL RECTANGULAR BRANCH DUCTS TO HAVE 45° TAPS IN THE DIRECTION OF FLOW FROM THE MAIN DUCT.

DIFFUSER/GRILLE TAPS TO INCLUDE VOLUME DAMPERS AT MAIN DUCT AND SHALL BE RIGID ROUND DUCT SIZED AS NOTED ON SCHEDULES TRANSITIONING TO FLEX DUCT WITH MAXMUM LENGTHS OF 5 FT.

ALL ROUND TAPS SHALL BE MADE USING SPIN-IN METAL COLLARS WITH DAMPER OR STICK-ON AIRTIGHT COLLARS WITH NEOPRENE GASKET.

WHERE THERE IS NO ACCESS TO DAMPERS, END DEVICES MUST HAVE AN OPPOSED BLADE DAMPER FOR BALANCING.

INSTALL BALANCING DAMPERS WHERE SHOWN AND ALSO WHERE REQUIRED FOR PROPER AIR DISTRIBUTION AND BALANCING.

SEAL ALL SHEETMETAL DUCT SEAMS AND JOINTS WITH HARDCAST WATER BASED SEALANT AND/OR HARDCAST TAPE LISTED AND LABELED IN ACCORDANCE WITH UL 181A/B. APPLY WITH THE ENVIRONMENT IS BETWEEN 50 °F TO 95 °F. DUCT TAPE IS NOT ACCEPTABLE INCLUDING FOR VAPOR BARRIER SEAMS.

ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT LOCATED IN CONDITIONED ENVELOPES TO BE EXTERNALLY INSULATED WITH 2" THICK, 3/4 PCF DENSITY, FLEXIBLE, MINIMUM INSTALLED (25% COMPRESSION) "R" VALUE OF 5.5, FACTORY-REINFORCED GLASS FIBER BLANKET WITH FOIL-FACED VAPOR BARRIER EQUAL TO JOHN MANVILLE MICROLITE DUCT WRAP. INSULATE THE LAST 5 FT OF EXHAUST DUCT EXISTING THE BUILDING ENVELOPE.

ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT LOCATED IN UNCONDITIONED SPACES OR ATTICS TO BE EXTERNALLY INSULATED WITH 3" THICK, 3/4 PCF DENSITY, FLEXIBLE, MINIMUM INSTALLED (25% COMPRESSION) "R" VALUE OF 8.7, FACTORY-REINFORCED GLASS FIBER BLANKET WITH FOIL-FACED VAPOR BARRIER EQUAL TO JOHN MANVILLE MICROLITE DUCT WRAP.

THE BACKS OF ALL SUPPLY DIFFUSERS TO BE INSULATED AND TAPED COMPLETELY WITH NO EXPOSED METAL WITH INSULATION THICKNESS OF DUCT ABOVE. INSULATE THE BACKS OF RETURN GRILLE CONNECTIONS IF RETURN DUCT IS INDICATED TO BE INSULATED.

MECHANICAL CONTRACTOR TO PROVIDE AND MOUNT THERMOSTATS. MECHANICAL CONTRACTOR TO PROVIDE, ROUTE AND TERMINATE THERMOSTAT WIRE. LOCATE ADJUSTABLE ROOM THERMOSTATS 4'-0" ABOVE FINISHED FLOOR. WIRE ROUTED IN CEILING RETURN AIR PLENUMS TO BE PLENUM RATED TYPE OR RUN IN RATED METAL CONDUIT.

PROVIDE HANGERS, BRACES, INTERMEDIATE FRAMING SUPPORTS, ANCHORS AND MISCELLANEOUS DEVICES REQUIRED FOR PIPE AND EQUIPMENT INSTALLATIONS PER MANUFACTURER AND CODE REQUIREMENTS.

PIPE HANGERS FOR ALL PIPING SHALL BE GRINNELL OR EQUAL WITH HANGER TYPE MATCHING SYSTEM REQUIREMENT. MAXIMUM ALLOWABLE SPACING SHALL BE AS FOLLOWS:

PEX 1” AND SMALLER 32 IN O.C. SPACINGALL OTHER PEX & PVC 4 FT O.C. SPACING

METALLIC PIPING:3/4" to 1-1/4" DIA. 8 FT O.C. SPACING1-1/2" to 2-1/2" dia.10 FT O.C. SPACING3" dia. 12 FT O.C. SPACING4" to 6" dia. 14 FT O.C. SPACING

COMMISSIONING

PERFORM TEST AND BALANCE / UNIT SET-UP ACCORDING TO PLANS AND SPECIFICATIONS IN ACCORDANCE WITH THE NATIONAL BALANCING COUNCIL (NBC) OR NEBB PRACTICAL STANDARDS, FORMS AND PROCEDURES.

KEY ITEMS INCLUDE:SET AHU DISCHARGE TEMPERATURE TO DESIGN CONDITIONS OR AS DIRECTED BY ENGINEER. VERIFY MINIMUM AND MAXIMUM AIRFLOW SETTINGS AT EACH TERMINAL BOX. BALANCE ALL DIFFUSERS AND REGISTERS TO WITHIN 10% OF VALUES SHOWN ON DRAWINGS. RECORD ENTERING AND LEAVING AIR TEMPERATURES FOR EACH UNIT ON BOTH HEATING AND COOLING. RECORD OUTSIDE AIR TEMPERATURE WHEN TESTING AC UNITS. PROVIDE 3 COPIES OF WRITTEN REPORT WITH DATA.

THE FOLLOWING ITEMS ARE TO BE COMPLETED BEFORE FINAL ACCEPTANCE:SYSTEM BALANCINGSYSTEM STARTUP AND CONTROL SYSTEM FUNCTIONAL TESTINGFURNISH OWNER ALL O&M MANUALS (3 COPIES), WITH WIRING AND ELECTRIC CONTROL

DIAGRAMS.

EQUIPMENT CONTROL SEQUENCE OF OPERATION

AC UNIT CONTROLEACH UNIT SHALL BE CONTROLLED LOCALLY BY A 7-DAY PROGRAMMABLE THERMOSTAT WITH TEMPERATE SET-BACK FUNTIONS FROM THE MANUFACTURER. THE THERMOSTAT SHALL AUTOMATICALLY CHANGE BETWEEN COOLING AND HEATING MODES AS NEEDED TO MAINTAIN SPACE CONDITIONS.

FOR RTU-1 AND DMS-2OCCUPPIED MODE SHALL BE PROGRAMMED FOR DAILY HOURS OF NORMAL OPERATION AND THE DESIRED COOLING AND HEATING TEMPERATURE SET-POINTS. THE SUPPLY FAN SHALL BE ENABLED AND/OR FAN CYCLING UTILIZED DURING THIS MODE TO MAINTAIN PROPER CIRCULATION OF AIR IN THE SPACE EVEN IN TIMES OF LOW DEMAND. THE OUTDOOR AIR DAMPER/ECONOMIZER SHALL BE MODULATED TO OBTAIN THE DESIGN VENTILATION RATE. (EXCLUDES DMS-2)

UNOCCUPPIED MODE SHALL BE PROGRAMMED SUCH THAT THE THERMOSTAT ASSUMES SET-BACK COOLING AND HEATING TEMPERATURE SET-POINTS FOR HOURS OTHER THAN NORMAL OPERATION. THE OUTDOOR AIR DAMPER SHALL BE MAINTAIN THE MINIMUM VENTILATION RATE DURING UN-OCCUPPIED MODE UN-LESS FREE COOLING IS BEING USED. (EXCLUDES DMS-2)

Economizer Control (rTU-1 0NLY)If the enthalpy of the outdoor air is appropriate to use free cooling the economizer shall be used to satisfy the supply air setpoint. If more cooling is then required, mechanical cooling shall be staged on as necessary. The minimum economizer position SHALL BE SET TO to maintain THE DESIGN VENTILATION RATE FOR THE UNIT DURING OCCUPPIED TIMES. At outdoor air conditions above the enthalpy control setting, mechanical cooling only shall be used and the OUTDOOR air dampers shall remain at minimum position.

DMS-1 SHALL BE PROGRAMMED TO MAINTAIN PRIMARY TEMPERATURE SET-POINTS AT ALL TIMES. THE FAN SHALL BE PROGRAMMABLE TO MAINTAIN AIRFLOW AT ALL TIMES.

EXHAUST FAN CONTROL

EF-1 AND EF-2 SHALL BE OPERATED CONTINUOUSLY.

GAS-FIRED HEATER CONTROLGUH-1 SHALL BE CONTROLLED BY A ROOM MOUNTED THERMOSTAT WITH ADJUSTABLE SET-POINT AND SUMMER VENTILATION-ONLY MODE.

GFRH-1&2 SHALL BE CONTROLLED BY A SINGLE ROOM MOUNTED THERMOSTAT WITH ADJUSTABLE SET-POINT. THE DESIGN INTENT IS THAT BOTH UNITS SHALL ONLY OPERATION SIMULTANEOUSLY AS THEY UTILIZE A COMMON EXHAUST FLUE DESIGN PER THE MANUFACTURER.

EA-100

HVAC LEGEND

NO

WALL CAP

YES

NO

PLUG

NO

B'DRAFT

YES

NO

120-1-60

-

0.15

18 WATTS

EXHAUST

WAITING R.R.

50

DIRECT

CEILING

SP-B80

GREENHECK

EF-2

1-1/4" NG

AHU-2

350

0.76

13600/9000@17F

NO

95

8600

N/A

11500

80 / 67

1.0

MITSIUBISHI

YES

SEZ-KD12NA4

WASHABLE

WIRELESS

YES

R-410A

SUZ-KA12NA

208-1-60

12.0

9.0

15

208-1-60

--

HEAT PUMP

CU-2

DOWN TO 0°F

Page 2: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

WASH BAY

CPU

BREAK RM

WAITING AREA

EQUIPMENT ROOM

CUSTOMERWAITING

WOMENS MENS

exREF

R/R

BRANCH MGR

MOPSINK

M1

FIRST FLOORHVAC

SCALE: 1/4" = 1'-0"1st FLOOR - HVAC1

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

NORTH

AHU-2

AHU-1 SA-40SA-40

SB-130

SA-110

SB-230

RC-230

RA-100

EA-50

SB-200 SB-200 SB-200

SB-200

RD-435RD-435

20X14 RETURN18X14 SUPPLY DOWN FROM RTU-1

RTU-1T

EA-50

EA-50

GFRH-1

MOUNT GFRH-1&2 BELOW THE OVERHEAD DOOR HORIZONTAL TRACKS PER MANUFACTURER'S REQUIREMENTS. CLEARANCES SHOWN ARE FOR THE DESIGN BASIS MODEL. MAINTAIN MINIMUM CLEARANCES TO ALL SURFACES INCLUDING OVERHEAD DOORS WHEN IN OPEN POSITIONS

GUH-130 CFH

GUH-1T

GFRH-1&2T

TOP6"

BELOW60"

FRONT29"

HEATER MOUNTED AT 0° DEFLECTION AND WITH 1 SIDE SHIELD AGAIN WALL

BEHIND8"

10 FT AFFMINIMUM

OVERHEADDOOR

A SECTION "A"SCALE: NO SCALE

KEYNOTES

1. 1/2" GAS DOWN FROM ROOF.2. 3/4" GAS DOWN FROM ROOF.3. 4"Ø WALL CAP AND PVC PIPE AS INTAKE DUCT.4. 6"Ø COMMON EXHAUST VENT KIT WITH DOUBLE WALL B-VENT (SEE SCHEDULE)5. CONCENTRIC INTAKE / EXHAUST KIT (SEE SCHEDULE)6. INSTALL MAIN SUPPLY AND RETURN DUCT INSIDE TRUSSES PERPENDICULAR TO RUNS.7. INSTALL SPACE THERMOSTAT WITH SUMMER VENTILATION MODE FOR GUH-1.8. GFRH-1&2 SHALL RUN SIMULTANEOUSLY WITH SINGLE THERMOSTAT CONTROL.9. ROUTE CONDENSATE FROM AHU-1 TO MOP SINK IN ADJACENT ROOM.

GFRH-275 CFH 75 CFH

1

2 2

3 3

4

5

6

7

8

SA-80

EF-2

WALL CAP

6X8 EXHAUSTUP TO EF-1

A

12"Ø 14"Ø 14"Ø 12"Ø

14"Ø 14"Ø 14"Ø

9

ROUTE CONDENSATEFROM AHU-2 TO EQUPMENT FLOOR DRAIN THIS AREA

SC-300SA-40

RD-340

34X12 SAPLENUM

AHU-2T

Page 3: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

M2

ROOF PLANHVAC

SCALE: 1/4" = 1'-0"ROOF PLAN - HVAC1

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

NORTH

1-1/4" NG

RTU-1

EF-1

CU-1

CU-2

GENERAL NOTES

1. MAINTAIN MINIMUM CLEARANCE OF 12'-0" BETWEEN ALL OUTDOOR AIR INTAKES AND EXHUAST/PLUMBING VENTS2. CONFIRM WITH GAS UTILITY COMPANY NEW METER SIZING AND COORDINATE INSTALLATION3. MAINTAIN MINIMUM 10'-0" DISTANCE BETWEEN ALL ROOF MOUNTED EQUIPMENT AND PARAPET/EDGE OF ROOF.

NEW GAS METERMINIMUM SUPPLY OF 260 GFH AT 7"-10" W.C.1-1/4" GAS UP TO ROOF.

80 CFH

1/2"

NG

1-1/

4" N

G3/4" NG

3/4" CONDENSATE TO NEAREST GUTTEROR DOWNSPOUT

1/2" NG DOWN

3/4" NG DOWN

3/4" NG DOWN

1-1/

4" N

G

Page 4: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

M3

HVAC DETAILS

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

Page 5: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P0

PLUMBING LEGEND, SCHEDULES &

SPECIFICATIONS

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16P-6: WATER CLOSET (A.D.A., FLUSH TANK,)

P-21: LAVATORY (A.D.A., WALL HUNG)

TIE TO EXISTING AT APPROXIMATELY THIS LOCATION

GAS LINE: PIPE DIA. & NG OR LPG (NAT. GAS OR LIQ. PROPANE GAS)

SANITARY SEWER LINE AT CEILING OF FLOOR BELOW

HOT WATER LINE

SANITARY SEWER LINE BELOW GRADE

VENT LINE

CLEAN - OUT

COLD WATER LINE

PLUMBING LEGEND

COLD WATER LINE UNDER SLAB

ELECTRICAL PANEL OR EQUIPMENT CLEARANCE SPACE

Zurn ZN-1400-Z adj. clean-out w/ nickel bronze top recessed forterrazzo floors.FCO

FCO

WCO

ECO

FCO

FCO

linoleum or composition floors.

Zurn ZN-1400 adj. clean-out w/ nickel bronze top for concrete floors.

Zurn ZN-1400-X adj. clean-out w/ nickel bronze top recessed for tile,

Zurn ZN-1400-CM adj. clean-out w/ nickel bronze top, carpet marker.

FCO = Floor clean-out, ECO = Exterior clean-out, WCO = Wall clean-out

SANITARY SEWER CLEAN-OUT COVER SCHEDULE

Zurn Z-1441 wall clean-out no-hub tee w/ ABS plug, S.S. access cover.

Zurn ZN-1400-HD adj. clean-out w/ heavy duty nickel bronze top.

UNDERGROUND SEPARATOR TANK SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

G.P.M.

CAPACITY - GALLONS

JARRETT

OWS-1

500

1000 OIL SEP

1000

EXTENSION N/A

MATERIAL CONSTRUCTION CONCRETE

AIR COMPRESSOR SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

SERVICE

CFM @ 90 PSI

STORAGE TANK CAP

COMPRESSOR STAGES

MAX PRESSURE (PSI)

NOMINAL POWER

UNIT F.L.A.

LENGTH

WIDTH

HEIGHT

WEIGHT

ACCESSORIES

PRESSURE REGULATOR

INGERSOLL RAND

2340N5-V.200-3

175

5 HP

208/3/60

17.5

48"

40"

76"

505 LB

YES

YES

2

14

80 GAL VERTICAL

CA-1

CAR WASH EQUIP

VOLTAGE

OPERATING PRESSURE (PSI) 90

NOTES:REFER TO DETAILS FOR TANK CONFIGURATIONS

ELECTRIC WATER HEATER SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

INPUT kW

VOLTAGE

EEMAX

WH-1

3.6

MT005240T

208-1-60

STORAGE (GAL) N/A

TYPE POINT OF USE

FLOW RECOVERY (GPH) N/A

E.W.T./L.W.T. 50/99

TANK DIAMETER (IN.) N/A

TANK HEIGHT (IN.) N/A

ACCESSORIES

INTEGRAL MIX. VALVE TO MEET ASSE 1070

EXPANSION TANK

DRAIN PAN AND STAND

17AMPS

YES

NO

NO

INLINE FLOW LIMITER/FAUCET AERATOR 0.5 GPM

EEMAX

WH-2

4.1

EX4208T

208-1-60

N/A

POINT OF USE

N/A

50/106

N/A

N/A

20

NO

NO

NO

0.5 GPM

EEMAX

WH-3

10.1

HA013240

208-1-60

N/A

POINT OF USE

N/A

50/96

N/A

N/A

46

NO

NO

NO

1.5 GPM

EEMAX

WH-4

4.9

MT007240T

208-1-60

N/A

POINT OF USE

N/A

50/105*limited

N/A

N/A

24

YES

NO

NO

0.5 GPM EACH LAV

SERVICE WAITING REST RM. BREAK SINK MOP SINK REST ROOMS

TK-1&2

JARRETT

2-TANK RECLAIM

CONCRETE

60

1000

N/A

HWCWWASTE

4"

PLUMBING FIXTURE SCHEDULE

DESIGNATION, DESCRIPTION AND SPECIFICATIONS

1/2" -

1-1/2" 1/2" 1/2"

A.S. 2998.012, KOHLER K-3427, 1.6 GAL. FLUSH, VIT. CHINA, ELONG. FLOOR MTD.CENTOCO 500CCSS WHITE ELONGATED OPEN FRONT SEATWITH CHECK HINGE.TWO 5/16 IN. CLOSET BOLTS, NUTS, WASHERS AND BOLT CAPS. NO SEEP BOWL WAX.ONE ZURN Z-8804-CR 1/2 IN. NOM X 3/8 IN. FLEX RISER, WHEEL HANDLE STOP.TANK TO BE LEFT-HAND LEVER TRIP.

A.S. 0355.012, KOHLER K-2032, VIT. CHINA, 20 IN. X 18 IN.DELTA 501WFHGMHDF FAUCET, 4 IN. CENTER, LEVER HANDLE AND 0.5 GPM FLOW.TWO ZURN Z-8804-LR 1/2 IN. NOM X 3/8 IN. FLEX RISER, WHEEL HANDLE STOP.ONE ZURN Z-8746, 1-1/4 IN. GRID DRAIN, TAILPIECE, OFFSET WHEELCHAIR.ONE ZURN Z-8700-8, 1-1/4 IN. SEMI-CAST BRASS P-TRAP, ESCUTCHEON.MOUNT RIM MAXIMUM 34 IN. ABOVE FINISHED FLOOR.MINIMUM CLEARANCE, FLOOR TO BOTTOM FRONT APRON, 29 IN.TRUEBRO HANDI LAV-GUARD MODEL #102W, #105W ACCESSORY FOR HOT, COLD AND WASTE.LAVATORY BRACKET.

P-30: SINK (SINGLE COMPARTMENT, S.S.)JUST SLF-2125-A-GR, 21x25x8 18 GA, SS, SELF RIM SINK,DELTA 100 SWING SPOUT FAUCET, 8" CENTER, 3-HOLE AND SINGLE LEVER HANDLE.ZURN Z8740 BASKET STRAINER WITH 1-1/2" TAILPIECE.ZURN Z8702-9 1-1/2" SEMI-CAST BRASS P-TRAP, ESCUTCHEON.ZURN Z8804LR TWO 1/2 NOM X 3/8 OD STD STOPS WI FLEX RISER

1-1/2" 1/2" 1/2"

P-48: SERVICE SINK (FLOOR BASIN)MUSTEE #63, 24X24X10, ONE PIECE POLYESTER FLOOR BASIN W/ 3 IN. BRASS DRAIN.HOSE AND HOSE BRACKET #65.700 WITH MOP HANGER #65.600.ZURN Z-841M1 SERVICE SINK FAUCET, SWIVEL INLET, WALL BRACE, INTEGRAL VAC. BKR.MOUNT CENTER LINE OF FAUCET 36 INCHES A.F.F.

4" 1/2" 1/2"

P51: FLOOR DRAIN (EQUIPMENT ROOM)ZURN ZN-541-P-1/2-CAST IRON, SEDIMENT BUCKET, 12" DIAMETERPOLISHED NICKEL BRONZE TOP, 1/2" TRAP PRIMER

6" - -

P60: HOSE BIBB (INDOOR EQUIPMENT ROOM)ZURN Z-875L7 FAUCET WITH VACUUM BREAKER, POLISHED BRONZE FACE.3/4" HOSE INLET, 3/4" FLANGED INLET, MOUNTING HEIGHT 36" AFF.

- 3/4" -

P61: HOSE BIBB (NON-FREEZE)ZURN Z-1310 NON-FREEZE, INTEGRAL VACUUM BREAKER, SS FACE.MOUNTING HEIGHT 18" CENTER LINE OF HYDRANT TO FINISHED GRADE.

- 3/4" -

P-74: BI-LEVEL ELECTRIC WATER COOLER (WALL MTD,A.D.A.)SUNROC ADA8ACB-STN, DUAL BI-LEVEL, S.S., DRINKING FOUNTAIN SYSTEM.TWO ZURN Z-8700, 1-1/4 IN. SEMI-CAST BRASS P-TRAPS, ESCUTCHEON.TWO ZURN Z-8804-LR 1/2 IN. NOM X 3/8 IN. FLEX RISER, WHEEL HANDLE STOP.SPOUT OUTLETS SHALL BE A MAXIMUM OF 36 IN. ABOVE FINISHED FLOOR.MINIMUM CLEARANCE, FLOOR TO BOTTOM FRONT APRON, 27 IN.

1-1/2" 1/2" -

P-100: REFRIGERATOR ICEMAKER CONNECTIONOATEY #38807, WHITE POLYSTRENE BOX, FACEPLATE, MALE IP VALVE, FExMA ADAPTER.3/8" COPPER ROLL CONNECTION TO EQUIPMENT.

- 1/2" -

REDUCED PRESS. B'FLOW PREV. SCHEDULE

UNIT NO.

MANUFACTURER

MODEL #

SERVICE

QUANITY

G.P.M.

W.P.D.-PSI

SIZE

ACCESSORIES

STRAINER

AIR GAP

RPBP-1

ZURN

975XLUS

BUILDING

1

25

15

3/4"

YES

YES

GENERAL

WHERE DISCREPANCIES OCCUR BETWEEN THE PLANS AND THE SPECIFICATIONS, OR WITHIN EITHER DOCUMENT ITSELF, THE ITEM OR ARRANGEMENT OF BETTER QUALITY OR HIGHER COST SHALL BE INCLUDED IN THE BASE BID.

THE DRAWINGS SHOW THE VARIOUS PIPING, ELECTRICAL AND DUCT SYSTEMS SCHEMATICALLY. NO ADDED COMPENSATION WILL BE PERMITTED FOR VARIATIONS DUE TO FIELD CONDITIONS. INSTALLATION SHALL FOLLOW DRAWINGS WHERE PRACTICABLE AND NOT BE IN CONFLICT WITH OTHER TRADES INSTALLATION.

ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE ADOPTED INTERNATIONAL PLUMBING CODE AND ALL LOCAL PLUMBING CODES.

CONTRACTOR SHALL PAY FOR ALL FEES AND PERMITS. THESE CONTRACT DOCUMENTS (DRAWINGS, PLANS AND SPECIFICATIONS) DESCRIBE THE PLUMBING WORK FOR THIS PROJECT AND FORM A GUIDE FOR A COMPLETE INSTALLATION. COMPLY WITH APPLICABLE REQUIREMENTS OF RECOGNIZED INDUSTRY ASSOCIATIONS WHICH PROVIDE STANDARDS FOR THE VARIOUS TRADES.

SUPERVISE ALL WORK WITH SPECIFICALLY QUALIFIED PEOPLE IN THE VARIOUS DISCIPLINES. VISIT THE SITE AND BE INFORMED OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. RESOLVE INTERFERENCES BETWEEN WORK OF VARIOUS CONTRACTORS PRIOR TO INSTALLATION. PROVIDE SUBMITTALS FOR APPROVAL ON ALL EQUIPMENT AND FIXTURES.

CONTRACTOR SHALL AND HEREBY DOES GUARANTEE THAT ALL WORK INSTALLED UNDER THESE DOCUMENTS SHALL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FORM THE DATE OF SUBSTANTIAL USAGE OR FINAL ACCEPTANCE UNLESS A LONGER PERIOD IS NOTED.

PRODUCTS

ALL PRODUCTS USED FOR DISPENSING POTABLE DOMESTIC DRINKING WATER MUST BE LEAD FREE AND MEET THE REQUIREMENTS OF NSF 61 AND NSF 372 TEST STANDARDS VIA THIRD PARTY TESTING AND CERTIFICATION.

ALL DOMESTIC WATER PIPING SHALL BE TYPE "L" COPPER WITH LEAD-FREE SOLDER JOINTS. INSULATION SHALL BE PRE MOLDED, 4LB. DENSITY REINFORCED FIBERGLASS WITH ALL SERVICE JACKET CONSISTING OF WHITE KRAFT PAPER AND ALUMINUM FOIL VAPOR BARRIER. INSULATE COLD WATER PIPING WITH 1/2" FIBERGLASS AND HOT WATER PIPING WITH 1" FIBERGLASS.

PEX MAY BE USED AS AN ALTERNATE TO COPPER, HOT WATER PIPING INSULATED WITH 3/4" CLOSED CELL FOAM TYPE INSULATION.

SANITARY & STORM PIPING ABOVE AND BELOW GRADE SHALL BE TYPE SCHEDULE 40 DWV PVC WITH GLUED FITTINGS. PROVIDE COMPATIBLE PVC PRIMER AND SOLVENT CEMENTS FOR THE APPLICATION.

ALL MAJOR PLUMBING FIXTURES SHALL BE KOHLER, ZURN, AMERICAN STANDARD, OR ELJER ONLY. FIXTURES SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED. STAINLESS STEEL SINKS SHALL BE JUST OR ELKAY ONLY. FLOOR DRAINS, HAMMER ARRESTORS, CARRIERS, AND TRAPS SHALL BE BY ZURN, J.R. SMITH OR JOSAM. WATER COOLERS SHALL BE OASIS, SUNROC OR ELKAY.

ALL GAS PIPING AND FITTINGS SHALL BE SCH. 40 BLACK STEEL WITH SCREWED OR WELDED JOINTS. PIPING WITH PRESSURES OVER 2 PSI AND 1" OR LARGER IN SIZE SHALL BE WELDED ONLY. TEST ALL GAS PIPING WITH NITROGEN AT 100 PSI FOR TWO HOURS WITH NO LEAKS. ALL EXPOSED GAS LINES TO BE PAINTED AND STENCILED WITH THE WORD "GAS" AND THE PRESSURE. ALL UG GAS PIPING TO BE DRISCOPLEX 6500 PE 2406 YELLOW GAS PIPING, 2" AND SMALLER. PROVIDE FUSION FITTINGS AS REQUIRED BY MANUFACTURER.

MODELS AND PART NUMBERS LISTED AS BASIS OF DESIGN ARE FOR DESIGN INTENT ONLY. VERIFY WITH MANUFACTURERS PRIOR TO PURCHASE AND INSTALLATION.

EXECUTION

PROVIDE NON-CONDUCTING DIELECTRIC CONNECTIONS WHEREVER DISSIMILAR METALS ARE JOINED. ISOLATE ALL COPPER FROM STEEL SUPPORTS WITH PLASTIC SEPARATORS DESIGNED FOR PIPE ISOLATION.

PROVIDE ONLY MATERIALS RATED FOR USE IN RETURN AIR PLENUMS WHERE APPLICABLE.ALL HORIZONTAL GRAVITY PIPING SHALL BE RUN BELOW FLOOR ON THE PLAN ON WHICH

SHOWN UNLESS OTHERWISE INDICATED. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FLOOR ON THE PLAN ON WHICH SHOWN UNLESS OTHERWISE INDICATED.

THE LOCATION OF FLOOR DRAINS SHALL BE COORDINATED WITH THE LOCATION AND SIZE OF EQUIPMENT BEING SERVED PRIOR TO INSTALLATION.

COORDINATE EQUIPMENT CONNECTIONS WITH EQUIPMENT DRAWINGS AND MANUFACTURER REQUIREMENTS. INSTALL EQUIPMENT AND MAKE FINAL CONNECTIONS FURNISHING ISOLATION VALVES, P-TRAPS, CLEAN OUTS, AND PIPING AS REQUIRED FOR A FULLY FUNCTIONING AND SERVICEABLE SYSTEM.

COORDINATE PIPE ROUTING WITH ALL TRADES TO MAXIMIZE AVAILABLE CLEARANCES AND AVOID FIELD CONFLICTS. PROVIDE COORDINATION DRAWINGS IN AREAS WHERE HIGH POTENTIAL OF CONFLICTS EXIST. IN ALL CASES, ROUTE EXPOSED PIPING AS CLOSE AS POSSIBLE TO STRUCTURE.

FURNISH AND INSTALL HAMMER ARRESTORS ON ALL LINES SERVING QUICK CLOSING VALVES OR AS RECOMMENDED BY THE MANUFACTURER AND AS REQUIRED BY THE PLUMBING CODES.

EXECUTION CONTINUED

INSTALL FIXTURES, EQUIP. & PIPING SHOWN ON THESE DRAWINGS IN ACCORDANCE WITH ALL STATE AND LOCAL CODE REQUIREMENTS.

MAINTAIN ACCESSIBILITY OF VALVES, ARRESTORS, CLEANOUTS, ..ETC. AND OTHER COMPONENTS REQUIRING PERIODIC UTILIZATION, INSPECTION OR REPAIR. PROVIDE ACCESS PANELS WHERE NECESSARY.

COORDINATE PIPING INSTALLATION WITH ELECTRICAL EQUIPMENT. MAINTAIN WORKING CLEARANCES AS SPECIFIED IN NATIONAL ELECTRICAL CODE AND AS REQUIRED BY STATE AND LOCAL CODES. NO PIPING SHALL BE INSTALLED OVER ELECTRICAL PANELS.

HORIZONTAL SANITARY BRANCHES SHALL CONNECT TO THE BASES OF STACKS AT A POINT LOCATED NOT LESS THAT 10 TIMES THE DIAMETER OF THE DRAINAGE STACK, DOWNSTREAM FROM THE STACK AND PER 2012 IPC.

CLEANOUTS SHALL BE PROVIDED PER 2012 IPC SECTION 708.3 AND LOCAL CODE REQUIRMENTS EVEN IF NOT SHOWN ON DRAWINGS. FLOOR CLEANOUT TYPE IS TO MATCH FINISHED FLOOR MATERIAL APPLICATION. FLOOR CLEANOUT FINISH TO BE POLISHED BRONZE. WALL CLEANOUT FINISH TO BE CHROME UNLESS OTHERWISE NOTED.

SLOPE WASTE PIPING SMALLER THAN 3" AT 1/4" PER FOOT AND PIPING 3" AND LARGER AT 1/8" PER FOOT UNLESS OTHERWISE NOTED.

PROVIDE AUTOMATIC TRAP PRIMERS AND NECESSARY PIPING FOR CONNECTION TO FLOOR SINKS, FLOOR DRAINS AND OTHER WASTE DRAIN RECEPTORS SUBJECT TO INFREQUENT USE PER IPC. LOCATIONS OF TRAP PRIMERS SHOWN ON PLANS ARE BASED UPON ENGINEER'S JUDGMENT ONLY AND ARE SUBJECT TO APPROVAL BY THE LOCAL BUILDING INSPECTOR.

PROVIDE SLEEVING, CUTTING, CORING AND PATCHING OF WALLS, FLOORS, ROOFS, FOOTINGS AND GRADE BEAMS(AFTER RECEIVING APPROVAL) WHERE REQUIRED FOR INSTALLATION OF WORK. PROVIDE SCANIING OF ALL EXISTING FLOORS/SLABS PRIOR TO CUTTING OR CORING.

PIPING AND CONDUIT PENETRATIONS THRU ALL FIRE AND/OR SMOKE RATED ASSEMBLIES (I.E. FLOORS, WALLS, CEILINGS, ETC.) SHALL BE INSTALLED WITH U.L. LISTED FIRE-STOP SYSTEMS PER CODE REQUIREMENTS.

PIPING SHALL HAVE ALL BURRS REMOVED, PIPE ENDS REAMED, AND CHIPS REMOVED. PLASTIC PIPING INSTALLED ON PRESSURIZED SYSTEMS SHALL BE CUT WITH PROPER TOOL CUTTERS PER THE MANUFACTURERS INSTRUCTIONS. SAW CUTTING OF PIPE PRODUCING SHAVINGS AND BURRS IS NOT ACCEPTABLE.

THE CONTRACTOR SHALL OBTAIN AND PAY ALL FEES RELATED TO PERMITTING, INSPECTIONS, TAPS, ETC.

CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRING SHUTDOWN WITH THE OWNER 48 HOURS IN ADVANCE.

THE ENTIRE DOMESTIC WATER SYSTEM SHALL BE DISINFECTED IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE.

RUN ALL PIPING LEVEL AND INLINE WITH BUILDING STRUCTURE EXCEPT FOR WHERE SLOPES ARE REQUIRED FOR DRAINING AND VENTING.

PROVIDE TRENCHING, EXCAVATION AND BACK FILLING NECESSARY FOR THE INSTALLATION OF PLUMBING WORK. TRENCHING AND EXCAVATION OF ROCK TO BE IN ACCORDANCE WITH GENERAL CONTRACTOR'S REQUIREMENTS. EXCAVATION TO BE 6" BELOW BOTTOM OF PIPE. FILL AROUND PIPE WITH SAND OR CLASS "B" CRUSHED STONE, WITH NO ROCK ABOVE.

TEST DRAINAGE AND VENTING SYSTEM BEFORE COVERAGE, WITH NECESSARY OPENINGS PLUGGED TO PERMIT SYSTEM TO BE FILLED WITH WATER AND SUBJECTED TO A WATER PRESSURE OF 10 FOOT HEAD. SYSTEM TO HOLD WATER FOR 30 MINUTES WITHOUT A WATER LEVEL DROP GREATER THAN 4" IN A 4" STANDPIPE AND WITHOUT VISIBLE LEAKAGE.

TEST THE HOT AND COLD WATER PIPING SYSTEM ON COMPLETION OF ROUGH-IN AND BEFORE CONNECTION TO FIXTURES AT A HYDROSTATIC PRESSURE OF 125 PSIG FOR ONE HOUR WITH NO LEAKS.

ALL PLUMBING VENTS SHALL BE PLACED A MINIMUM OF 12 FEET FROM OUTDOOR AIR INTAKES AND OPERABLE WINDOWS.

PROVIDE HANGERS, BRACES, INTERMEDIATE FRAMING SUPPORTS, ANCHORS AND MISCELLANEOUS DEVICES REQUIRED FOR PIPE AND EQUIPMENT INSTALLATIONS. PIPE HANGERS FOR ALL PIPING SHALL BE GRINNELL OR EQUAL WITH HANGER TYPE MATCHING SYSTEM REQUIREMENT. MAXIMUM ALLOWABLE SPACING SHALL BE AS FOLLOWS:

PEX 1” AND SMALLER 32 IN O.C. SPACINGALL OTHER PEX & PVC 4 FT O.C. SPACING

METALLIC PIPING:3/4" TO 1-1/4" DIA. 8 FT O.C. SPACING1-1/2" TO 2-1/2" DIA. 10 FT O.C. SPACING3" DIA. 12 FT O.C. SPACING4" TO 6" DIA. 14 FT O.C. SPACING

PLUMBING SPECIFICATIONS AND NOTES

FILTER / DRYER

DISCONNECT YES

1-1/4" NG

Page 6: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P1

FIRST FLOORPLUMBING

SCALE: 1/4" = 1'-0"1st FLOOR - PLUMBING1

WASH BAY

CPU

BREAK RM

WAITING AREA

EQUIPMENT ROOM

CUSTOMERWAITING

WOMENS MENS

exREF

R/R

BRANCH MGR

MOPSINK

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

NORTH

TRENCH DRAIN SYSTEMZURN MODEL 886TRENCH N0 8601 THROUGH 8607.BOTTOM OUTLET TRENCH CONNECTION.WITH TRAFFIC RATED DUCTILE IRON SLOTTED GRATE, GALVANIZED OR EPOXY COATED.

OWS-1

WASH BAY COLLECTION/RECLAIM TANKS.REFER TO CIVIL DRAWINGS FOR EXACT LOCATION.REFER TO SHEETS P2 AND P3 FOR DETAILS.

GENERAL NOTES

1. VERIFY ALL INVERTS - MAY VARY DEPENDING ON ACTUAL CONSTRUCTION AND FIELD CONDITIONS.2. WH-4 SERVICES BOTH MEN AND WOMEN RESTROOMS.3. SLOPE OFFICE SAN 1/8" PER LINEAR FT AND 1/4" PER LINEAR FT ALL REMAINING.

WH-2

WH-4

WH-1

APPROX INV 16" BFF

RPBP-1

6" SS

6" SS

4" SS 4" SS

6" SS

4" SS

4" SS

6" SSTO SITE SAN SEWER.REFER TO CIVIL DRAWINGS.

6" SS

P-51

1-1/2" CW FROM SITE.REFER TO CIVIL DRAWINGS.

1-1/2" CW FROM SITE.REFER TO CIVIL DRAWINGS.

6" SS

4" SS 6" SS

APROX INV 36" BFF

APPROX INV 66" BFF OF WASH BAY, 18" BFF OF OFFICE.

APROX INV 37" BFF

APROX INV 51" BFF

APROX INV 54" BFF OF WASH BAY

SLOPE APPROX 1/8" PER LINER FOOT

APPROX SLOPE 1/4" PER LINER FOOT-REFER TO CIVIL DRAWINGSFOR FINAL.

APPROX INV 70" BFF OF WASH BAY,22" BFF OF OFFICE.

4" SS

P-51 P-51

P-61

P-61

ECO

ECOECO

FCO

P-48P-74

P-6 P-6

P-21 P-21P-31

P-100

P-6

P-21

WH-3

TK-1 TK-2

2" SS 4" SS

1-1/2" CW 1-1/2" CW

1" CW1" CW

1-1/4" CW

A BRISER RISER

ECO (2-WAY)

Page 7: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P2

WASH BAY PROCESS PIPING PLAN

EQUIPMENT ROOM

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

6" INLET FROM TRENCH DRAIN IN WASH BAY

6" DRAIN TO OSW-1

FLOW DIRECTION

SCALE: 1/2" = 1'-0"WASH BAY PROCESS PIPING PLAN1

RECLAIM SYSTEM(BY OWNER)

ICC CONTROL CENTER(BY OWNER)

R.O. SYSTEM(BY OWNER)

1" CW LINE TO R.O. SYSTEM, 15 GPM @45 PSI, FROM MAIN WATER HEADER. LINE TO HAVE BALL VALVE.

1" CW LINE TO R.O. SYSTEM, 30 PSI, FROM MAIN WATER HEADER. LINE TO HAVE BALL VALVE.

CA-1

R.O. WATER FROM PRESSURIZATION PUMP UNIT TO ICC

R.O. REJECT WATER TO FLOOR DRAIN

PIPING FROM ICC TO EQUIPMENT IN WASH BAY TO BE MADE BY EQUIPMENT INSTALLER

(2) 2" RECLAIM SUCTION LINE WITH FULL FLAPPER CHECK VALVES AND UNIONS. ONE LINE FOR USE AND ONE FOR SPARE. FLAPPER VALVES SUPPLIED BY PURWATER.(1) LINE FOR USE AS CONDUIT FOR LOW FLOAT WIRING. REFER TO ELECTRICAL DRAWINGS.

1" RECIRCULATION LINE FROM RECLAIM SYSTEM

1" UNDER FLOW LINE FROM RECLAIM CYCLONIC SEPARATOR

1-1/2" CW LINE UP FROM SITE UTILITY

KEYNOTES

1. ROUTE PIPING AT EQUIPMENT LEVEL TO FLOOR STUB-UPS FROM UNDERGROUND RECLAIM TANKS2. 2" PRODUCT LINE FROM RECLAIM CYCLONIC SEPARATOR TO ICC3. INSTALL (2) 1" CW LINES TO ICC.4. INSTALL 1" CW LINE TO RECLAIM SYSTEM5. 3/4" COMPRESSED AIR DROP TO 72" AFF AT ICC WITH 3/8" FNPT BALL VALVE.6. 3/4" COMPRESSED AIR DROP TO 40" AFF WITH BALL VALVE AND FITTING FOR FUTURE TIRE INFLATION STATIONS.

1

UNDERGROUNDRECLAIM TANKS*REFER TO CIVIL DRAWINGS FOR EXACT LOCATIONS

2

5

6

3

GENERAL NOTES

1. ALL FINAL CONNECTIONS TO BE MADE BY EQUIPMENT INSTALLER.2. INSTALL BALL VALVE AND NTP THREADED FEMALE FITTING AT ALL EQUIPMENT TERMINATIONS BOTH PROCESS AND CW.3. ALL WATER PIPING TO BE SCH 80 PVC. ALTERNATE PIPING: SCH 80 PVC AT U/G TANKS, PEX FOR U/G AND IN EQUIPMENT ROOM.4. AIR PIPING BLACK STEEL THREADED OR WELDED CONNECTIONS.5. ROUTE ALL OVERHEAD PIPING TIGHT TO STRUCTURE.

P-60

P-60

INSTALL 6" BACKWATER/FLAPPER STYLE SEWAGE CHECKVALVE, TOP HINGE, DEEP BURY EXTENSION TUBE, FULLY SERVICABLE FROM GRADE LEVEL ABOVE.

FLOW

C

D

IN OUT

FLOW

OUT

R.O. SYSTEM(BY OWNER)

RECLAIM SYSTEM(BY OWNER)

ICC CONTROL CENTER(BY OWNER)

DETAILS PROVIDED FOR REFERENCE ONLY. OWNER PROVIDED EQUIPMENT IS EXISTING - ALL INFORMATION MUST BE VERIFY WITH ACTUAL.

1-1/2" CW 1-1/2" CW

4

3/4" CA

3/4" CA 3/4" CA

WAX SOAP PRE-SOAK

(BY OWNER)

Page 8: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P3

WASH BAY COLLECTION TANK

DETAIL

SCALE: NO SCALEWASH BAY UNDER GROUND COLLECTON TANK DETAIL1

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

WASH BAY COLLECTION/RECLAIM - 2 TANK CONFIGURATION

6" INLET FROM TRENCH IN CAR WASH BAY

6" DRAIN TO SEWERBACK FLOW PREVENTION IS REQUIRED

FLOW DIRECTION

INSTALL UNION IN HORIZONTAL BEFORE ELBOW WITH ACCESS TO MANWAY SUFFICIENT TO SERVICE FROM ABOVE

CLARIFICATION:DRAWING IS FOR REFERENCE ONLY AND IS TO BE USED FOR PLUMBING REFERENCE. CONSULT WITH TANK MANUFACTURER FOR TANK LOADS. CONSULT WITH CIVIL ENGINEER FOR SOIL PREPARATION AND TANK PLACEMENT. SEAL ALL TANK PENETRATIONS TO PROVIDE WATER TIGHT SEAL TO PREVENT TANK LEAKAGE INTO SOIL. LINE TO SEWER TO HAVE BACK FLOW PREVENTION. APPROXIMATE SYSTEM EFFLUENT 600 GPD. OIL-WATER SEPARATOR IS REQUIRED TO MEET DISCHARGE PERMIT.APPROXIMATE TANK VOLUME IS 1000 GALLONS PER TANK. EACH TANK IS DIVIDED BY INTERNAL BAFFLE. TOTAL WATER STORAGE IS APPROXIMATELY 2000 GALLONS.

1. TO PURWATER RECOVERY SYSTEM ROUTE (2) 2" SCH 80 PVC SUCTION LINES, ONE TO SERVE AS A SPARE. LINES ARE STRAPPED TO THE TANK WALL. INSTALL SCH 80 UNIONS ABOVE THE WATERLINE TO ALLOW SERVICING OF EACH SUCTION LINE. TERMINATE SUCTION LINES WITH FULL FLOW FLAPPER CHECK VALVES (PURWATER SUPPLIED). NO SPRING LOADED FOOT VALVES.

2. PURWATER PROVIDED (1) LOW-LOW SAFETY LEVEL FLOAT SHOULD BE MOUNTED SO THAT IT WILL BE IN THE DOWN POSITION 8" ABOVE THE BOTTOM OF THE FLAPPER CHECK. THIS FLOAT CONTROLS THE SAFETY FUNCTION TO PROTECT THE PUMP FROM A LOW WATER SITUATION.

3. (1) 1" SCH 80 AIR SPARGER OR OZONE RECIRCULATION LINE. FOR AIR SPARGER SYSTEMS, ALLOW THE SPARGER TO BE 6-12" ABOVE THE WATER LINE. MOUNT IN THE MANWAY, IF POSSIBLE, TO ALLOW ACCESS FOR MAINTENANCE. FOR OZONE SYSTEMS, PLUMB THE LINE WITH A TEE, ON THE WET END, 24" UP FROM THE BOTTOM OF THE TANK.

4. (1) 1" SCH 80 PVC LINE TO SERVE AS A CONDUIT FOR (4) 14 GAUGE WIRES (TWO ARE SPARES) TERMINAITED IN A WATER TIGHT JUNCTION BOX ABOVE THER WATER LINE TO PURWATER RECLAIM SYSTEM FOR FLOAT CONTROLS. FOR REFERENCE HERE ONLY - SEE ELECTRICAL DRAWINGS.

5. (1) 1" SCH 80 UNDERFLOW LINE FROM THE BOTTOM OF THE RECLAIM SYSTEM CYCLONE SEPARATOR. THIS LINE SHOULD BE LEVEL, OR PREFERRABLY, SLOPE FROM THE RECLAIM SYSTEM TO THE CAR WASH CATCH BASIN OR THE FIRST COMPARTMENT OF TANK 1.

6. USE 6" PIPE AS INTERCONNECT PIPING BETWEEN COMPARTMENTS AND BETWEEN TANKS. ELEVATION DIMENSIONS SHOWN ARE TO PIPE INVERTS.

7. (1) 6" SCH 80 PVC PIPE TO BE ROUTED TO OIL WATER SEPARATOR. NOTE: BACK FLOW PREVENTION FROM THE SEWER IS REQUIRED.

KEYNOTES:

PLANVIEW

ELEVATIONVIEW

Page 9: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P4

PLUMBING DETAILS

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

INLET

CO

NC

RET

E B

AFF

LE

OUTLET

ALL PIPING SCH 40 OR BETTER PVC

Page 10: M0 · 2016-04-25 · m0 hvac legend, schedules & specifications issue date: 04-15-2016 project no: 16-023 copyright 2012 quirk designs 2931 berry hill drive suite 200 nashville, tn

P5

PLUMBING RISERDIAGRAMS

ISSUE DATE: 04-15-2016

PROJECT NO: 16-023

COPYRIGHT 2012 QUIRK DESIGNS

2931

BER

RY

HIL

L D

RIV

ESU

ITE

200

NAS

HVI

LLE,

TN

372

04Ph

one:

(615

) 269

-924

8 Fa

x: (6

15) 6

27-1

298

emai

l: qu

irkde

sign

s@co

mca

st.n

etQ

UIR

K D

ESIG

NS

REVISION

4/15/16

OWS-1

WH-2

WH-4

WH-1

RPBP-1

6" SS

6" SS

4" SS

6" SS4" SS

4" SS

P-51

6" SS

4" SS

6" SS

P-51

P-51

P-61

P-61

ECO

ECO

ECO

FCO

P-48

P-74 P-6

P-6P-21

P-21

P-31

P-100

P-6P-21

WH-3

TK-1

TK-2

2" SS

4" SS

1-1/2" CW

1-1/2" CW

1" CW

1" CW

1-1/4" CW

VTR

VTR

VTR

P-31

P-48

P-74

P-21P-21

P-6

P-6

P-21P-6

A WATER RISER DIAGRAMSCALE: NO SCALE

B WASTE RISER DIAGRAMSCALE: NO SCALE

2" V2" V

4" V

2" V

4" V

2" V4" V

4" V

2" V

2" V

2" V

2" V

ECO(2-WAY)