LST Mechanical Design Review. Mechanical Installation Preparation H. James Krebs October 21, 2003. Mechanical Installation Preparation. IR-12 will be the location of most mechanical preparation work during 2004 & 2005 Why IR-12? IR-12 Hall is very similar to IR-2 Hall Same floor plan - PowerPoint PPT PresentationTRANSCRIPT
October 22, 2003 H.J. Krebs 1
LST Mechanical Design Review
Mechanical Installation Preparation
H. James KrebsOctober 21, 2003
October 22, 2003 H.J. Krebs 2
Mechanical Installation Preparation• IR-12 will be the location of most mechanical
preparation work during 2004 & 2005• Why IR-12?
– IR-12 Hall is very similar to IR-2 Hall• Same floor plan• Identical 50/10 ton crane combination
– We need space• IR-12 is empty• IR-2 is presently occupied with BaBar related items
– Present status• 3 technical support staff now housed at IR-12• Engineering offices are under construction
– Estimated completion November 1– Jim Krebs & Zohrab Vassilian move to IR-12 immediately after
completion of this review
October 22, 2003 H.J. Krebs 3
IR-2
October 22, 2003 H.J. Krebs 4
IR-12
October 22, 2003 H.J. Krebs 5
IR-12 Activities• Pre-installation preparation of brass plates
– Radius corners– Drill & tap threaded holes for slide screws and swivel
shackles– Adjust camber if necessary– Stage plates for assembly
• BaBar model– Build a fairly crude but full scale mock-up of the
forward end of BaBar including:• Barrel assembly simulating corner blocks removed• FWD end doors• FWD PEP pier• FWD PEP beam line
October 22, 2003 H.J. Krebs 6
October 22, 2003 H.J. Krebs 7
October 22, 2003 H.J. Krebs 8
12” Thick (Z) Sextant Prototype
October 22, 2003 H.J. Krebs 9
Sextant Iron Cable Channel
October 22, 2003 H.J. Krebs 10
October 22, 2003 H.J. Krebs 11
October 22, 2003 H.J. Krebs 12
October 22, 2003 H.J. Krebs 13
IR-12 Activities• Purpose of Model
– Construct elevator platform• Test function• Check for interferences with end doors, beamline and PEP
pier• Load test• Modify as necessary for corrections or improvements
– Brass installation preparation• Test installation hardware• Load test• Practice brass plate installation• Brass push/pull test (see talk by Allen Constable)
– LST detector installation preparation• Test installation hardware• Practice LST detector installation
– A full Z length (3750mm) gap model exists for this
October 22, 2003 H.J. Krebs 14
Full Z Length (Layer 17) Gap Model
October 22, 2003 H.J. Krebs 15
Full Z Length (3750mm) Gap Model
October 22, 2003 H.J. Krebs 16
IR-12 Activities• Steel handling fixtures
– Train technical support staff– Check centers of gravity– Determine appropriate rigging– Load test– Function test, if possible– Modify as needed
October 22, 2003 H.J. Krebs 17
Test of End Plug Fixture
October 22, 2003 H.J. Krebs 18
Test of End Plug Fixture (Cont’d)
October 22, 2003 H.J. Krebs 19
Test of End Plug Fixture (Cont’d)
October 22, 2003 H.J. Krebs 20
Conclusions and Comments• The full scale model will be a valuable tool for
installation preparation– Earthquake bracing must be designed for this model– EQ committee approval approximately mid November– Construction of model shall commence end of
November• All support personnel will be trained using actual
hardware• Hardware will be tested to assure fit function and
safe operation• Brass absorber will be prepared and staged for
installation