load following wind at golden valley electric association priorities for...oct 31, 2018  · steam...

15
Load Following Wind at Golden Valley Electric Association October 31, 2018 1

Upload: others

Post on 26-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Load Following Wind atGolden Valley Electric Association

October 31, 2018

1

Page 2: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

GVEA is seeking to optimize:• Efficiency ($ & footprint) when regulating or load following wind and solar.

• Or: cost of using power generation we can control to balance the output from power generation we cannot entirely control or predict.

2

Page 3: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Load Regulation Requirement• Load only regulation:  ±5MW• Wind: 0‐25MW• Net Load‐Wind:  35MW?• 15‐minute variation: 

3

Page 4: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

4

Page 5: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Generation Hierarchy – Least Cost First

• Delta Plant Frame 5 Gas Turbine• Zehnder Plant Frame 5 Gas Turbines• North Pole Frame 7 Gas Turbines• Eva Creek Wind (requires load following)• North Pole Combined Cycle Plant• Purchased gas power over Intertie• Healy Coal Plant• Bradley Lake Hydro

More cost

Less cost

5

Page 6: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

LM6000 (747 engine) used for load following

6

Page 7: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Conceptual Fairbanks 24 Hour Load CurveM

ega

Wat

ts

Power EstimatedAnd Purchased 24 Hours Earlier

Grid Load

WindGeneration

7

Page 8: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Conceptual Fairbanks 24 Hour Load CurveM

ega

Wat

ts

Power EstimatedAnd Purchased 24 Hours Earlier

Grid Load

WindGeneration

Curtail WindStart another gas turbine

8

Page 9: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

-50 MW NominalHighest Efficiency

-0 MW – Lowest Efficiency

-40 MW

-30 MW

-20 MW

-10 MW

0% Fuel

30% Fuel

100% FuelFlow

Cost ofOperation

-25 MW, 50% load, 65% fuel

Gas Turbine(44% max efficiency in simple cycle)

Steam Turbine

-12 MW Nominal

Combined Cycle Plant (aka NPEP)

-3 MW

-6 MW

-9 MW

Efficiency

52%

24%

39%

0%

GT

44%

22%

11%

33%

With STBASE LOAD >

4.2 MW steam

9

Page 10: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

10

Page 11: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

11

Page 12: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

12

Page 13: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

LEA

ST C

OST

HIG

HES

T C

OST

13

Page 14: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

• 1: Store wind energy and dispatch it like any other resource• Stored hydro, compressed air, batteries

• 2: Sell wind power on the market at a loss.  • 3: Add generation that works much better for regulation

• Diesel recip units 40+% efficient• Convert the NPEP to 2x1 combined cycle

• 4: Distributed load management• Demand Response to shut down hot water heaters and high loads at the member’s premises

• Store power in customers electric vehicle batteries

Concepts for load following, basically 4 choices:

14

Page 15: Load Following Wind at Golden Valley Electric Association Priorities for...Oct 31, 2018  · Steam Turbine-12 MW Nominal Combined Cycle Plant (aka NPEP)-3 MW-6 MW-9 MW Efficiency 52%

Q & A Dan BishopGolden Valley Electric Association

Engineering ManagerFairbanks, Alaska

Eva Creek in February, -20F up the hill, -50F down the hill