lloyds register rail era emc study phil bebbington head of t & rs systems
TRANSCRIPT
LLOYD’S REGISTER RAIL
ERA EMC Study
Phil BebbingtonHead of T & RS Systems
LLOYD’S REGISTER RAIL
Legislation
28 Member Countries In the European Rail Area
“Competence” for transport policy is shared between European Union and member states – shifting toward EU
Concern in EU about fall in rail market share prompting drive for commonality.
LLOYD’S REGISTER RAIL
Compatibility in Railways:
Since July 2010 all vehicle authorisations are required to conform to the Interoperability Directive.”
•which exists•has many millions of man years cumulative experience and tradition•has components that are expected to last at least another 30 years
It does not tell you how to get from a system
But it does allow for a transition
The ultimate goal of one common commercially acceptable vision of a trans European Railway
To
LLOYD’S REGISTER RAIL
EMC Standards
However
Only two applicable European Norm EMC Standards exist
Standard EN 50121:2006
has five parts and although mentioning that they should be considered it
largely ignores low frequency effects
Standard EN50238:2004 currently has only 1 part
the other two parts will be issued as technical addenda rather than full standards
Neither cover the whole spectrum and both are still open to ‘interpretation’ with no clear definitions of ‘compatibility’
The essential requirements mandate ‘compatibility’ between all parts of the railway.
Electromagnetic compatibility is implied for both safety and operational aspects
LLOYD’S REGISTER RAIL
Compatibility in Railways: The project
This project aimed to determine the starting point for Electromagnetic Compatibility in railways
•Who determines EMC
•What current standards are being applied
•How they are implemented
•What other considerations affect the acceptance
LLOYD’S REGISTER RAIL
European Directive
Electrical/electronic equipment must be constructed to ensure:
‘the EM disturbance it generates does not exceed a level allowing radio and telecommunications equipment and other apparatus to operate as intended’,
‘it has a level of intrinsic immunity which is adequate to enable it to operate as intended’
‘Has been designed and constructed with regard to the state of the art’
When it is –Properly installed and maintained, andUsed for the purpose for which it was intended
LLOYD’S REGISTER RAIL
Physical Agents Directive
Intent adds another consideration to EMC as railways have sources of both high voltage and current in close proximity to humans
Physical Agents Directive 2004/40/EC-Electromagnetic Fields & Human Health
This should have been implemented in UK Law by April 2008.Not yet in force due to considerations of NMR workers. Currently due in 2012
LLOYD’S REGISTER RAIL
Remit
• Study to collect and document rules, processes and procedures to verify the Electromagnetic Compatibility (EMC) of railway vehicles in Member States of the European Rail Area
• Identify the (different) levels of compliance required for various equipment types e.g. signalling, rolling stock, trackside interfaces etc.
• Identify test procedures and limits.• Clarify and document the process for the demonstration of compliance in
each of the countries.• Identify the appropriate authorities concerned with EMC compliance and
their roles and responsibilities.• Estimate the timescales and budget costs involved in EMC compliance.
This included both documentation requirements and testing/trial costs.
LLOYD’S REGISTER RAIL
Understand the drivers : Technical Perception
Commercial Imperative to get widest acceptance (Cross acceptance) because market for train equipment is small.
Must be driven by available technology: it can’t drive the technology
COTS equipment in an EXISTING railway environment.
Standards equivalence……….the devil is in the detail
System Issues CE+CE=CE????
LLOYD’S REGISTER RAIL
Understand the drivers : Information QualityDifferent Organisations need different degrees of detail. Commercial confidentiality for proprietary InformationBurden of Proof can be open ended where no standards existPeer Review, Mutual Recognition and Verification for non-testable situationsDefinitions open to interpretation e.g. Part B safety certificateThe safety certificate shall comprise:…………and certification confirming acceptance of the provisions adopted by the railway undertaking to meet specific requirements necessary for the safe operation of the relevant network. The requirements may include application of TSIs and national safety rules…………….The certification shall be based on documentation submitted by the railway undertaking ……………The following documents must be submitted to enable the safety authority to deliver the network-specific part of the safety certificate…………………………. — documentation from the railway undertaking on the different types of rolling stock used for the operation, including evidence that they meet requirements of TSIs or national rules and have been duly certified.
LLOYD’S REGISTER RAIL
Understand the drivers : Safety
It is almost impossible to divorce technical compatibility from safety
National attitudes and to safety vary widely.
Penalties in law make everyone err on the side of caution
How safe is safe?
Lowest Common Denominator
Highest Possible Principle
LLOYD’S REGISTER RAIL
Initial ApproachTop Down
Less prone to get bogged down in the detail
Assume that the highest level methods used by the individual countries are in accord with the directives
Assumption:Each of the parties involved had roles and responsibilities defined by the procedures and had or would create processes to fulfil the responsibilities in terms of compliance demonstration to the rules.
Each party was initially contacted via a tree-branch questionnaire that tried to avoid yes/no answers
LLOYD’S REGISTER RAIL
Initial Approach
Define
Role The activity of an organisation or individual with a responsibility towards compliance demonstration
Procedure The formal interaction required between Infrastructure Managers, Railway Undertakings and Safety Authorities. It may include mandatory and non-mandatory parts.
Rule The criterion whereby a compliance demonstration is assessed. Again this may include mandatory and non-mandatory components.
Process The methods used within each separate organisation that are used in compliance demonstration. It may include mandatory and non-mandatory methods.
LLOYD’S REGISTER RAIL
Initial Approach
The ends of each question branch were always aimed at being a rule which may be applied.
It was envisaged that rules may well be different for safety and for operational conformity.
e.g. a non-moving train may be safe but does not serve any purpose
LLOYD’S REGISTER RAIL
The Desired Result
EMC Compliance
Role Role Role
Pro c e d urePro c e d ure
Ro le : RUDe live r Physic a l Pro o f
Pro c e d ure : Sub m it a na lysis d o c um e nt
Pro c e ss Pro c e ss
Evidence from Test Analyse test
Process : Test
Plan TestResultThre sho ld Lim it
EMC Compliance
Role Role Role
ProcedureProcedure
Evidence from Test
Perform Test
Analyse test
Plan TestResult
Process Process
LLOYD’S REGISTER RAIL
Implementation
Multilingual
Used commonly available software
Mixed answer formats
Branching structure
Simple questions: Machine translation augmented by local office native speakers
MS Office ,Email or Web based
Not a simple, fixed, structure: needs question trees that react to answer types
Only those branches which are actively needed are created.Developed in MS Excel
LLOYD’S REGISTER RAIL
Questionnaire Flow
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Concept
LLOYD’S REGISTER RAIL
Modified Approach
Top Down approach had limitations:•NSA recently set up in 2009.•NSA divorced from actual compatibility assessment process.•NSA often didn’t have relevant EMC experts “on tap”.
Result: Information from questionairres and follow-up clarification requests was not enough…
Thus, combined approach: Top Down AND Bottom Up•Convocation of NSA and EMC experts held.•Interviews with NSA and EMC experts held to gain both sides of “story”.
Result:•Marriage of information from many sources at once.•Much more complete set of information obtained.•Resolution of “gaps” between sides was sometimes necessary.
LLOYD’S REGISTER RAIL
ApproachTop Down approach had limitations:
•NSA recently set up in 2009.•NSA divorced from actual compatibility assessment process.•NSA often didn’t have relevant EMC experts “on tap”.
Result: Information from questionairres and follow-up clarification requests was not enough…
Thus, combined approach: Top Down AND Bottom Up
•Convocation of NSA and EMC experts held.•Structured Interviews with NSA and EMC experts held around graphical interface representations to gain both sides of “story”.Result:
•Marriage of information from many sources at once.
•Much more complete set of information obtained.•Resolution of “gaps” between sides was sometimes necessary.
ERA PresentationLLOYD’S REGISTER Rail
The Lloyd’s Register Group works to enhance safety and approve assets and systems at sea, on land and in the air – because life matters.
For more information, please contact:
Lloyd’s Register RailPreston Technology CentreMarsh LanePrestonPR1 8UQ
T +44 (0)1772 272719F +44 (0)1772 888673E [email protected]