  • Department of EnergyEmpowering the Filipinos

    Linking Power-RelatedDEVELOPMENT PLANS

    IRMA C. EXCONDEAssistant Director, EPIMB

    Energy Consumers and Stakeholders ConferenceE-Power Mo!12 July 2017

    Philippine International Convention Center (PICC)

  • Department of EnergyEmpowering the Filipinos

    I. Overview of the Philippine Power System

    II. Development PlansA. Distribution Development Plan (DDP)B. Transmission Development Plan (TDP)C. Missionary Electrification Development Plan

    (MEDP)D. Household Electrification Development Plan

    (HEDP)E. Power Development Plan (PDP)

    Presentation Outline

  • Department of EnergyEmpowering the Filipinos

    Philippine Power System

    Power System

  • Department of EnergyEmpowering the Filipinos

    Philippine Power System

    Grid Luzon, Visayas

    and Mindanaogrids

    Connected to main transmission backbone

    Power System

    Interconnection Line Capacity

    Leyte-Luzon (440 MW) Leyte-Cebu (400 MW) Cebu-Negros (200 MW) Negros Panay (200 MW) Leyte-Bohol (100 MW)

  • Department of EnergyEmpowering the Filipinos

    Philippine Power System

    Off-Grid Missionary areas Also known as

    Small Islands and Isolated Grid (SIIG)

    Power supplied by NPC SPUG and Private Sector (New Private Provider and Qualified Third Party)

    Power System

  • Department of EnergyEmpowering the Filipinos

    Philippine Power System

    Grid Off-Grid Luzon, Visayas

    and Mindanao grids

    Connected to main transmission backbone

    Power System

    Missionary areas Also known as

    Small Islands and Isolated Grid (SIIG)

    Power supplied by NPC SPUG and Private Sector (New Private Provider and Qualified Third Party)

  • Department of EnergyEmpowering the Filipinos

    Grid Power System

    Transmission

    Distribution

    Load

    Sources of Data: DOE; NGCP

    34%

    29%

    33%

    4%

    2016Electricity

    Sales

    Residential Commercial

    Industrial Others

    23 PIOUs

    100 ECs

    2 LGUOUs 20,053 ckt-km

    31,501 MVA

    199 GenCos

    21.42 GW

    Installed Capacity

    90,798 GWh

    GrossGeneration

    48% 22%

    24%

    Generation

    74,154 GWh

    Peak Demand: 13.272 GW

    Coal Nat Gas

    RE6%

    Oil-based

    PIOUs - Private-Investor Owned Utilities

    ECs - Electric Cooperatives

    LGUOUs - LGU-Owned Utilities

  • Department of EnergyEmpowering the Filipinos

    GrossGeneration

    56%24%

    8%12%

    2015Electricity

    Sales

    Residential Commercial

    Industrial Others

    Off-Grid Power System

    64.3%*

    Transmission

    Distribution

    Load

    Source of Data: DOE; NPC

    Generation

    21 ECs

    2 MPCs

    3 LGUOUs

    1 QTP

    Energized

    *excluding ARMM areas

    770 ckt-km

    170 MVA

    4%96%

    1,020.1GWh

    45%55%

    TotalInstalledCapacity

    NPC Non-NPC

    406.1MW

    291 NPC

    30 Non-NPC

    Diesel Hydro

    1,075 GWh

    ECs - Electric Cooperatives

    MPCs - Multi-Purpose Cooperatives

    LGUOUs - LGU-Owned Utilities

    QTP - Qualified Third Parties

  • Department of EnergyEmpowering the Filipinos

    DOEs Mandate

    Prepare and update annually a Power Development Program (PDP) and integrate the same into the Philippine Energy Plan. The PDP shall consider and integrate the individual or

    joint development plans of the transmission, generation, and distribution sectors of the

    electric power industry, which are submitted to the Department

    EPIRA, Sec. 37(c):

  • Department of EnergyPowering the Nation

    Philippine Power Sector Roadmap Towards ..

    Quality, Reliable, Affordable and Secured

    Supply

    Electricity Access for All

    Filipinos

    Transparent and Fair Playing Field in the

    Power Industry

  • Department of EnergyEmpowering the Filipinos

    Power-Related Development Plans Linked

    PDP TDP

    DDP

    HEDP

    MEDP

    Grid Off-Grid

    Generation

    DistributionLoad

    Transmission

    Directly-Connected Customers

  • Department of EnergyEmpowering the Filipinos

    Demand Number of Customers Demand (MW) and Energy (MWh) Accounting of unserved energy

    Supply Power Supply Sources Uncontracted supply requirement

    for CSP

    Household ElectrificationBarangay Sitio Electrification Program (BSEP)Household Electrification Development Plan (HEDP)

    Capital Expenditure (CAPEX) Program Infrastructure Projects Investment Requirements

    Potential RE resources within the franchise area

    RCOA Customers List of all Existing and Potential

    Contestable Customers in each DU

    Off-Grid AreasDemand per area

    Operating Hours

    Key Elements of the DDP

  • Department of EnergyEmpowering the Filipinos

    Retail Competition and Open Access (RCOA)

    Competitive Selection Process (CSP) Renewable Portfolio Standard (RPS)

    Resilient infrastructuresNet Metering

    Policy Integration in the DDP

    WESM

  • Department of EnergyEmpowering the Filipinos

    Conduct of DDP Deliberations

  • Department of EnergyEmpowering the Filipinos

    ACTIONS/UPDATES

    Major Issues identified during the DDP Deliberations

    CAPITAL EXPENDITURES On-going coordination among DOE, NEA and ERC

    Mindanao Modular Genset Program

    Proposed Amendment of Executive Order to include LuzonAnd Visayas

    ISSUES

  • Department of EnergyEmpowering the Filipinos

    Major Issues identified during the DDP Deliberations

    Relocationof Poles

    ISSUES ACTIONS/UPDATES

    Signed DOE-DPWH Joint Circularon July 10

    Info on Entry of Large Loads Coordination of DUs and LGUs

  • Department of EnergyEmpowering the Filipinos

    Major Issues identified during the DDP Deliberations

    BACK

    Island Interconnection

    ACTIONS/STATUSISSUES

    Distribution Line Rehabilitation for Calamity-Stricken Areas Explore Sources of Funding Support

    On-going studies

  • Department of EnergyEmpowering the Filipinos

    Transmission Development Plan

    Major Network Development

    Operations and Maintenance

    SystemOperations

    Major Contents

    Volume 1 Volume 2.1 Volume 2.2 Volume 3

  • Department of EnergyEmpowering the Filipinos

    Transmission Master Plan (Volume 1)

    500 kV

    350 kV (HVDC) 230 kV

    138 kV

    1

    23

    4

    5

    6

    7

    1 Northern Luzon 230 kV Backbone (2023)

    2

    3 Metro Manila 500 kV Backbone Loop

    4 Batangas-Mindoro Interconnection (2021)

    5 Cebu-Negros-Panay 230 kV Backbone (2020)

    6 Visayas-Mindanao Interconnection (2020)

    7 Energization of the Mindanao Backbone to 230 kV (2018)

    Western Luzon 500 kV Backbone (2024)

    Small Island Interconnection Projects

    BACK

    Ideal Location of Power Plants

    Identified Area for Bulk Load Growth

  • Department of EnergyEmpowering the Filipinos

    Northern Luzon 500kV Backbone (2023)

    BACK

  • Department of EnergyEmpowering the Filipinos

    Western Luzon 500kV Backbone (2024)

    BACK

  • Department of EnergyEmpowering the Filipinos

    Batangas-Mindoro Interconnection (2021)

    Batangas-Mindoro Interconnection(Mar 2021)

    BACK

  • Department of EnergyEmpowering the Filipinos

    Cebu-Negros-Panay 230 kV Backbone (2020)

    BACK

  • Department of EnergyEmpowering the Filipinos

    Visayas-Mindanao Interconnection Project (2020)

    For ERC Approval

    Western Route

    Cebu-Zamboanga

    BACK

  • Department of EnergyEmpowering the Filipinos

    Energization of the Mindanao Backbone to 230kV (2018)

    BACK

  • Department of EnergyEmpowering the Filipinos

    Ideal Location of Power Plants - Luzon

    Note: Ideal Location of Power Plants without the need for any

    significant transmission reinforcement.

  • Department of EnergyEmpowering the Filipinos

    Ideal Location of Power Plants - Visayas

    Note: Ideal Location of Power Plants without the need for any

    significant transmission reinforcement.

  • Department of EnergyEmpowering the Filipinos

    Ideal Location of Power Plants - Mindanao

    BACK

    Note: Ideal Location of Power Plants without the need for any

    significant transmission reinforcement.

  • Department of EnergyEmpowering the Filipinos

    Identified Sites for Bulk Load Growth

    BACK

    GridAreas where bulk load growth is

    recommended to absorb excess generation

    Luzon Ilocos Norte (250 MW), Ilocos Sur (30 MW), La Union (100 MW), Benguet (70 MW),

    Cagayan Valley (100 MW), Isabela (150 MW), Nueva Vizcaya (50 MW), Quirino (20 MW),

    Pangasinan (100 MW), Bataan (100 MW), Zambales (40 MW), SBMA (50 MW), Tarlac

    (100 MW), Nueva Ecija (50 MW), Batangas (150 MW), Laguna (200 MW), Quezon

    Province (250 MW) and Bicol Region (Camarines Norte to Sorsogon) (170 MW)

    Visayas Panay Island (130 MW), Negros Island (225 MW), Cebu Island (85 MW), Leyte (150 MW)

    Mindanao Zamboanga del Sur (170 MW), Zamboanga del Norte (25 MW), Lanao del Norte (8 MW),

    Misamis Oriental (60 MW), Bukidnon (8 MW), Surigao del Norte (60MW), Surigao del Sur

    (2 MW), Agusan del Sur (30 MW), Agusan del Norte (55 MW), Davao del Sur (20 MW),

    Compostela Valley (50 MW), Cotabato (40 MW), South Cotabato (65 MW), Sultan

    Kudarat (75 MW)

  • Department of EnergyEmpowering the Filipinos

    Potential Small Island Interconnections:

    Island

    Interconnection Point

    (Town)Length (kms) 2015 Peak

    Demand (MW)

    2040 Peak

    Demand (MW)Submarine Overhead

    LUZON

    Palawan San Jose 252 173 43.7 261.42

    Masbate San Jacinto 16 16 15.51 37.04

    Catanduanes Presentacion 32 17 9.13 33.74

    Tablas San Jose 61 36 6.14 26.96

    Marinduque General Luna 23 11 8.57 23.71

    Busuanga San Jose 84 52 3.93 16.96

    Ticao Abuyog 20 35 1.71 2.58

    Lubang Calaca 54 20 0.73 1.54

    Small Island Interconnection Projects

  • Department of EnergyEmpowering the Filipinos

    Island

    Interconnection Point

    (Town)Length (kms) 2015 Peak

    Demand (MW)

    2040 Peak

    Demand (MW)Submarine Overhead

    VISAYAS

    Siquijor Bacong 20 24 4.56 16.58

    Bantayan Medellin 21 24 4.5 12.56

    Camotes Isabel 18 8 3 11.83

    Semirara San Jose 33 0

    Siasi Parang 43 32 0.66 1.84

    Small Island Interconnection Projects

    Potential Small Island Interconnections:

  • Department of EnergyEmpowering the Filipinos

    Island

    Interconnection Point

    (Town)Length (kms) 2015 Peak

    Demand (MW)

    2040 Peak

    Demand (MW)Submarine Overhead

    Mindanao

    Tawi-Tawi Pagatpat 84 60 4.92 31.93

    Basilan Pitogo 27 12 8.3 29.04

    Sulu Taberlongan 100 34 7.87 20.11

    Samal Lasang 9 21 5.96 14.81

    Dinagat Canlanipa 30 15 3.06 13.22

    Siargao Cagdiano 13 7 4.29 11.28

    Camiguin Esperanza 30 37 4.02 8.95

    Siasi Parang 43 32 0.66 1.84

    Small Island Interconnection Projects

    Potential Small Island Interconnections:

  • Department of EnergyEmpowering the Filipinos

    Transmission Development Plan (Volume 2)

    Major Contents

    Operation and Maintenance

    Installation, Replacement, Rehabilitation of High Voltage Equipment's1

    Installation, Replacement & Acquisition of Spares for Protection & Secondary Device2

    Rehabilitation and Acquisition of Spares for transmission lines3

    Replacement and Acquisition of Test & Measuring Equipment, Tools and Service Vehicles4

    Construction and Rehabilitation of Substation and Support Facilities5

    Programmed Acquisition, Replacement, and Upgrading of Metering Assets6

  • Department of EnergyEmpowering the Filipinos

    Transmission Development Plan (Volume 3)

    System Operations

    Improvement of Telecommunication Backbone1

    Improvement of Automation in Supervisory Control2

    Energy Management System Enhancement Plan3

    Major Contents

    BACK

  • Department of EnergyEmpowering the Filipinos

    Missionary Electrification Development Plan

    Major Contents Status of Missionary Electrification in the

    Philippines

    Remote and Unviable Electrification

    Demand and Supply Outlook

    Plans and Programs

  • Department of EnergyEmpowering the Filipinos

    Missionary Electrification Development Plan

    Major Contents

    Maps of Different Categories of

    Missionary Areas

    Large Areas Medium Areas

    Small Areas PRES

  • Department of EnergyEmpowering the Filipinos

    Missionary Electrification Development Plan

    Major Contents

    Demand and Supply Outlook

    0.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    2016 2017 2018 2019 2020

    NPP Indicative Capacity,

    MW

    NPC Contracted Capacity

    IPP/DU Contracted

    Capacity, MW

    NPP Contracted Capacity,

    MW

    Peak Demand, MW

  • Department of EnergyEmpowering the Filipinos

    Missionary Electrification Development Plan

    Major Contents

    Plans and Programs

    Improvement of the Private Sector Participation Program1

    Improvement of Operations and Services in Missionary Areas2

    Rationalization of the Universal Chargefor Missionary Electrification3

    Implementation of NPC Missionary Electrification Plan4

    Island Interconnection Programs Integration with Transmission Development Plan5

    BACK

  • Department of EnergyPowering the Nation

    Household Electrification Development Plan

    Major Contents Status of Household Electrification in the

    Philippines

    Off-Grid Household Electrification

    Plan and Programs

    Grid Household Electrification

    Plan and Programs

  • Department of EnergyEmpowering the Filipinos

    Distribution

    Utilities

    (in Millions HH)

    HH Population

    Projected C2010 Served HH

    Unserved

    HH

    HH

    Electrification

    Level (%)

    119 Electric

    Cooperatives13.34 11.72 1.61 87.92%

    MERALCO 7.09 6.92 0.17 97.64%

    Other

    Distribution

    Utilities

    2.29 1.95 0.34 85.05%

    Philippines 22.72 20.59 2.12 90.65%

    Percentage of households and barangaysthat have power per island

    95.5%

    LUZONVISAYAS

    MINDANAO

    100%Households

    Barangays

    94.0%

    100%

    Households

    Barangays

    74.1%

    99.9%

    Households

    Barangays

    Notes: The 2016 Household Population Number was projected and provided by

    NSO based from the 2010 Census Served Household figure was sourced from the consolidated Distribution

    Development Plan (DDP) 2017-2026 of all the Distribution Utilities (DU) and National Electrification Administrations (NEA) Status of EnergizationReports (December 2016) except for the MERALCO which is based from its DDP 2016-2025

    NPC-SPUG Electrification Efforts are assumed to be included in concern Electric Cooperatives Household Energization Report

    Philippine Rural Electrification Situationer

    Household Electrification Development Plan (HEDP) Target: 90% HH Electrification by 2017

    BACK

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Major Contents Philippine Electricity Profile

    Five-Year Performance Assessment,

    2011-2015

    Demand and Supply Outlook,2016-2040

    Power Sector Roadmap

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Major Contents

    Philippine Electricity Profile

    43

    20

    53

    37

    21

    7

    1

    10

    4

    0

    1

    24

    65

    25

    49

    33

    95

    12

    3

    79

    41

    13

    41

    0

    0

    5

    04

    0

    7

    0 14

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Philippines Thailand Indonesia* Malaysia Vietnam Singapore

    Imports

    OtherRE

    Geo

    Hydro

    NatGas

    Oil-Based

    Coal

    ASEAN Power Generation Mix

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Major Contents

    Five-Year Performance Assessment,

    2011-2015

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    18,000

    20,000

    INST

    ALL

    ED

    DE

    PE

    ND

    AB

    LE

    AV

    AIL

    AB

    LE

    INST

    ALL

    ED

    DE

    PE

    ND

    AB

    LE

    AV

    AIL

    AB

    LE

    INST

    ALL

    ED

    DE

    PE

    ND

    AB

    LE

    AV

    AIL

    AB

    LE

    INST

    ALL

    ED

    DE

    PE

    ND

    AB

    LE

    AV

    AIL

    AB

    LE

    INST

    ALL

    ED

    DE

    PE

    ND

    AB

    LE

    AV

    AIL

    AB

    LE

    2011 2012 2013 2014 2015

    Geothermal Coal Biomass Natural Gas Hydro Oil-based Wind Solar

    Installed, Dependable and Available Capacity

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Philippines Demand and Supply Outlook, 2016-2040

    CapacityAddition

    MW

    Baseload 25,265

    Midmerit 14,500

    Peaking 4,000

    Total 43,765

    Philippines will need 43,765 MW additional

    capacity by 2040

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Luzon Demand and Supply Outlook, 2016-2040

    Luzon will need 24,385 MW additional capacity by 2040

    CapacityAddition

    MW

    Baseload 13,635

    Midmerit 8,300

    Peaking 2,450

    Total 24,385

  • Department of EnergyEmpowering the Filipinos

    Luzon Committed Power Projects

    150 MW SMC Limay Coal (2017)

    420 MW Pagbilao Coal-Fired Power Project (2017)

    500 MW San Buenaventura

    Coal Power Project (2019)

    300 MW Masinloc Expansion (2019)

    1200 MW GNPower

    Dinginin Coal (2019)

    670 MW GLEDC Coal Fired Power Project (2022)

    650 MW EWC

    Combined Cycle Gas-

    Fired Power Plant

    (2018)

    1.5 MW Tubao HEPP (2017)

    3 MW Majayjay HEPP (2018)

    3 MW Labayat River

    Upper Cascade (2021)

    18 MW Bataan Solar (2017)

    1.675 MW CW Home Depot Solar (2017)

    4 MW San Rafael Solar (2017)

    5 MW Morong Solar (2017)

    1 MW Sarrat Solar (2017)

    93 MW Sta. Rita Solar (2017)

    12 MW Maibarara 2 Geothermal

    Power Project (2017)

    5 MW Isabela La Suerte

    Rice Husk-Fired Power

    Project (2017)

    12 MW SJCiPower Rice Husk-Fired Power Plant Project Phase 2 (2017)

    32 MW Central

    Azucarera Bagasse-

    Fired Power Project

    (2017)

    10 MW AES Battery Storage (2017)

    31 MW Bacman 3 Geothermal

    Power Project (2022)

    2 MW ACNPC WTE Biomass Power Plant Project (2017)

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    LUZON COMMITTED

    CAPACITY = 4,264 MW*

    *Excluding Battery Energy Storage

  • Department of EnergyEmpowering the Filipinos

    Luzon Committed Power Projects

    150 MW SMC Limay Coal (2017)

    420 MW Pagbilao Coal-Fired Power Project (2017)

    500 MW San Buenaventura

    Coal Power Project (2019)

    300 MW Masinloc Expansion (2019)

    1200 MW GNPower

    Dinginin Coal (2019)

    670 MW GLEDC Coal Fired Power Project (2022)

    650 MW EWC

    Combined Cycle Gas-

    Fired Power Plant

    (2018)

    1.5 MW Tubao HEPP (2017)

    3 MW Majayjay HEPP (2018)

    3 MW Labayat River

    Upper Cascade (2021)

    18 MW Bataan Solar (2017)

    1.675 MW CW Home Depot Solar (2017)

    4 MW San Rafael Solar (2017)

    5 MW Morong Solar (2017)

    1 MW Sarrat Solar (2017)

    93 MW Sta. Rita Solar (2017)

    12 MW Maibarara 2 Geothermal

    Power Project (2017)

    5 MW Isabela La Suerte

    Rice Husk-Fired Power

    Project (2017)

    12 MW SJCiPower Rice Husk-Fired Power Plant Project Phase 2 (2017)

    32 MW Central

    Azucarera Bagasse-

    Fired Power Project

    (2017)

    10 MW AES Battery Storage (2017)

    31 MW Bacman 3 Geothermal

    Power Project (2022)

    2 MW ACNPC WTE Biomass Power Plant Project (2017)

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    COAL =3,390 MW

    NATURAL GAS =650 MW

    HYDRO =7.5 MW

    SOLAR =122 MW

    BIOMASS =51 MW

    GEOTHERMAL =43 MW

    BATTERY STORAGE =10 MW

  • Department of EnergyEmpowering the Filipinos

    Luzon Indicative Power Projects

    TOTAL LUZON INDICATIVE

    CAPACITY = 15,970 MW

    Coal Nat Gas Oil Geothermal Hydro Biomass Solar Wind

    RenewableEnergy

    5,964 MW37%

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    Coal7,760 MW

    49%

    Natural Gas2,050 MW

    13%

    Oil-based196 MW

    1%

    Hydro3,140 MW

    20%

    Solar1,428 MW

    9%

    Wind1,275 MW

    8%

    Biomass70 MW0.4%

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Visayas Demand and Supply Outlook, 2016-2040

    Visayas will need 9,180 MW additional capacity by 2040

    CapacityAddition

    MW

    Baseload 5,330

    Midmerit 3,000

    Peaking 850

    Total 9,180

  • Department of EnergyEmpowering the Filipinos

    Visayas Committed Power Projects

    135 MW PCPC Coal Fired

    Power Project (2018)

    8 MW Calumangan Diesel Fired Power Project

    (2017)

    50 MW Biliran Geothermal

    Power Project (2023)

    5.1 MW Igbulo

    HEPP (2018)

    8 MW Cantakoy HEPP (2018)

    18 MW Timbaban

    HEPP (2018)

    5.67 MW Cosmo Solar

    (2017)

    60 MW FTSEC Solar

    (2017)

    40 MW VMC Cogeneration Power Project (2017)

    20 MW HPC Cogeneration Power

    Project (2017)

    48 MW BISCOM Cogeneration Power

    Project (2017)

    25 MW Bais Baggasse-Fired Power

    Project (2017)

    20 MW SCBI Multi-Feedstock

    Biomass Power Project (2017)

    25 MW SNBI Cane trash-Fired

    Biomass Power Project (2019) Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    TOTAL VISAYAS COMMITTED

    CAPACITY = 468 MW

  • Department of EnergyEmpowering the Filipinos

    Visayas Committed Power Projects

    135 MW PCPC Coal Fired

    Power Project (2018)

    8 MW Calumangan Diesel Fired Power Project

    (2017)

    50 MW Biliran Geothermal

    Power Project (2023)

    5.1 MW Igbulo

    HEPP (2018)

    8 MW Cantakoy HEPP (2018)

    18 MW Timbaban

    HEPP (2018)

    5.67 MW Cosmo Solar

    (2017)

    60 MW FTSEC Solar

    (2017)

    40 MW VMC Cogeneration Power Project (2017)

    20 MW HPC Cogeneration Power

    Project (2017)

    48 MW BISCOM Cogeneration Power

    Project (2017)

    25 MW Bais Baggasse-Fired Power

    Project (2017)

    20 MW SCBI Multi-Feedstock

    Biomass Power Project (2017)

    25 MW SNBI Cane trash-Fired

    Biomass Power Project (2019) Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    COAL =135 MWOIL-BASED =8 MWSOLAR =66 MWGEOTHERMAL =50 MWHYDRO =31 MWBIOMASS =178 MW

  • Department of EnergyEmpowering the Filipinos

    Visayas Indicative Power Projects

    TOTAL VISAYAS INDICATIVE

    CAPACITY = 3,497 MW

    Coal Oil Hydro Biomass Solar Wind Geothermal

    RenewableEnergy

    2,517 MW72%

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    Coal900 MW

    26%

    Oil Based80 MW

    2% Hydro705 MW

    20%

    Solar540 MW

    15%

    Wind1,218 MW

    35% Geothermal40 MW

    1%

    Biomass15 MW0.4%

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Mindanao Demand and Supply Outlook, 2016-2040

    Mindanao will need 10,200 MW additional capacity by 2040

    CapacityAddition

    MW

    Baseload 6,300

    Midmerit 3,200

    Peaking 700

    Total 10,200

  • Department of EnergyEmpowering the Filipinos

    Mindanao Committed Power Projects

    150 MW SMC Malita Coal

    Fired Power Project (2017)

    135 MW FDC Misamis

    Coal Fired Power Project

    (2017)

    165 MW Minergy Balingasag

    Coal Fired Power Project (2017)

    540 MW GNPower Kauswagan

    Coal Fired Power Project (2018)

    100 MW SEC Coal Fired

    Power Project (2019)

    13.94 MW PSI Diesel Fired

    Power Project (2017)

    5.2 MW PSFI Diesel Fired

    Power Project (2017)

    10.4 MW PBI Diesel Fired

    Power Project (2017)

    2.4 MW New

    Bataan HEPP (2017)

    43.4 MW & 25.4

    MW Manolo Fortich

    HEPP 1 & 2 (2017)

    25 MW Lake Mainit

    HEPP (2017)

    30 MW Puyo

    HEPP (2018)

    8 MW Asiga

    HEPP (2019)

    23 MW Bubunawan

    HEPP (2019)

    3.5 MW GEEC Biomass Cogeneration

    Power Project (2017)

    3 MW PTCI Rice Husk-Fired Biomass

    Cogeneration Power Project (2017)

    5.5 MW LPC Rice Husk-Fired

    Biomass Power Project (2017)

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    TOTAL MINDANAO COMMITTED

    CAPACITY = 1,289 MW

  • Department of EnergyEmpowering the Filipinos

    Mindanao Committed Power Projects

    150 MW SMC Malita Coal

    Fired Power Project (2017)

    135 MW FDC Misamis

    Coal Fired Power Project

    (2017)

    165 MW Minergy Balingasag

    Coal Fired Power Project (2017)

    540 MW GNPower Kauswagan

    Coal Fired Power Project (2018)

    100 MW SEC Coal Fired

    Power Project (2019)

    13.94 MW PSI Diesel Fired

    Power Project (2017)

    5.2 MW PSFI Diesel Fired

    Power Project (2017)

    10.4 MW PBI Diesel Fired

    Power Project (2017)

    2.4 MW New

    Bataan HEPP (2017)

    43.4 MW & 25.4

    MW Manolo Fortich

    HEPP 1 & 2 (2017)

    25 MW Lake Mainit

    HEPP (2017)

    30 MW Puyo

    HEPP (2018)

    8 MW Asiga

    HEPP (2019)

    23 MW Bubunawan

    HEPP (2019)

    3.5 MW GEEC Biomass Cogeneration

    Power Project (2017)

    3 MW PTCI Rice Husk-Fired Biomass

    Cogeneration Power Project (2017)

    5.5 MW LPC Rice Husk-Fired

    Biomass Power Project (2017)

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    COAL =1,090 MW

    OIL-BASED =30 MW

    HYDRO=157 MW

    BIOMASS =12 MW

  • Department of EnergyEmpowering the Filipinos

    Mindanao Indicative Power Projects

    TOTAL MINDANAO INDICATIVE

    CAPACITY = 2,538 MW

    Coal Oil Hydro Biomass Solar Geothermal

    RenewableEnergy

    1,250 MW49%

    Source: DOE List of Private Sector-Initiated

    Power Projects as of 31 May 2017

    Coal1,243 MW

    49%

    Oil Based45 MW

    2%

    Hydro750 MW

    30%

    Solar385 MW

    15%

    Geothermal30 MW

    1%

    Biomass84 MW

    3%

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan to 2040

    Major Contents

    Power Sector Roadmap

    Generation1

    Transmission2

    Distribution and Supply3

    Market Development4

    Missionary Electrification6

    Institutional and Support Mechanism5

    Electrification7

  • Department of EnergyEmpowering the Filipinos

    Power Development Plan

    Express grant of

    business permits and

    licenses to operate

  • Department of EnergyEmpowering the Filipinos

    DOE Endorsements for Power Projects

    Articles of Incorporation Amendment of the Article of Incorporation

    Conduct of System Impact Study (SIS)

    Certificate of Non-Overlap (CNO) -attesting that the project does not overlap with ancestral domain

  • Department of EnergyEmpowering the Filipinos

    DOE Endorsements for Power Projects

    Registration to BOI for the availment of tax incentives

    Land Conversion from agricultural toindustrial land

    Environmental Compliance Certificate

    Certificate of Compliance - requirement prior to commissioning of the Power Plant

  • Department of EnergyEmpowering the Filipinos

    Timely and synchronized completion of energy projects and implementation of

    development plans at the different levels of the power sector chain towards

    Energy Security

  • Department of EnergyEmpowering the Filipinos

    E-SECURE Mo, E-SECURE Natin,Para sa Kinabukasan ng Lahat

  • (+632) 479-2900

    [email protected]

    www.doe.gov.ph

    //doe.gov.ph

    @doe_ph

    Department of EnergyEmpowering the Filipinos

    Thank You!