Mike Lamontfor the LHC team

Page 2: LHC beam operation past , present, future

LHC status

75 ns 50 ns

2011 – recap

Increase number of bunches

Reduce beam size from injectors

Squeeze further

Increase bunch intensity

Initialcommissioning

Scru

bbin

g

11/3/2012

Page 3: LHC beam operation past , present, future

LHC status

Starting out • Efficient commissioning leading into 75 ns

operation• Intermediate energy run • Scrubbing rocky but successful– Dynamic effects: synchrotron radiation, e-cloud

Scrubbing reduction of the LHC pressure

Decision: go with 50 ns

11/3/2012

Page 4: LHC beam operation past , present, future

LHC status

Number of bunches++• End April: “fabulous performance”• A little bit of caution – extended period at 1092

bunches• Pushing 1.3e11 ppb but high beam intensity

issues starting to show1033

• Blow-up of some bunches at injection• E-cloud solenoids, triplet vacuum, beam screen cooling• 108 b injection sort of OK, worry about scraping in the SPS• Injection kicker heating, vacuum kicking off in IR 8• RF arc detectors – false dumps• Abort gap population• SEUs starting to show• Collimator heating

11/3/2012

Page 5: LHC beam operation past , present, future

LHC status

LHC machine breaks 3 new world records at 10h41 Sunday 29 May: 2 x 1092 bunches colliding, luminosity above 1.2 x 10^33, and a

beam energy of 73 MJ.11/3/2012

Page 6: LHC beam operation past , present, future

LHC status

• Strong emittance blow-up at injection• Chromaticity stability, persistent current decay compensation• Eventually suppressed by octupoles at 450 GeV

• Bunch length control in ramp• Satellite collisions tested• RF versus intensity versus trips – worrying about couplers – dump

on cavity trip deployed• Vacuum at 2&8 - instabilities • Instrumentation issues • UFO storms • High losses at collimators • 1 SEU dump per day• Trim quad circuits tripping during squeeze

Looking towards 1380 bunches

15th June: 1 fb-111/3/2012

Page 7: LHC beam operation past , present, future

LHC status

Summer - now what do we do?

• July: starting to look encouraging…• August: getting so worried about SEUs we had a

brainstorming • and a mini-Chamonix

11/3/2012

Decision to push:• beam from the injectors• squeeze

Page 8: LHC beam operation past , present, future

LHC status

Beam from injectors

11/3/2012

Excellent performance – years in the preparation

Best in 2011 with 50 ns:• ~1.45 x 1011 ppb• ~2.3 microns into collision

Design with 25 ns:• 1.15 x 1011 ppb• Normalized emittance 3.75 microns

Page 9: LHC beam operation past , present, future

LHC status

IR1 and IR5 aperture at 3.5 TeV

2011’s “platinum mine”

We got 4-6 sigmas more than the expected 14 sigma Triplet aperture compatible with a well-aligned machine, a well centred orbit and a ~ design mechanical aperture (small tolerance)

Stefano Redaelli11/3/2012

~600 m

~3 cm

Page 10: LHC beam operation past , present, future

LHC status

Squeeze• Beta* = 1 m – big success – 3.3e33 cm-2s-1

• Pushing bunch intensities to 1.35e11• Collimator interlocks, PADs/MADs, injection

quality, vacuum, collimator heating, Alice background, b2 instability, RF de-bunching, tune feedback in squeeze

11/3/2012

Page 11: LHC beam operation past , present, future

LHC status

Impressive final run inMirko Pojer

11/3/2012

Page 12: LHC beam operation past , present, future

LHC status

Very positive ending

Ion man11/3/2012

Page 13: LHC beam operation past , present, future

LHC status

2011• Another remarkable year• It was nearly always a battle…• Remarkably no real show stoppers

• Successfully took on:– Total intensity– Bunch spacing– Bunch intensity– Emittance– Beta* & aperture

11/3/2012

Page 14: LHC beam operation past , present, future

LHC status

Of note• Operational robustness– Precycle, injection, 450 GeV, ramp & squeeze &

collisions• Machine protection– Unpinned by superb performance of machine

protection and associated systems– Rigorous machine protection follow-up, qualification

and monitoring (Post Mortem analysis, MPP, rMPP)• Routine collimation of 110 MJ LHC beams

without a single quench from stored beams.

11/3/2012

Page 15: LHC beam operation past , present, future

LHC status

Operation efficiency• Overall efficiency – Pretty good considering that this is the LHC – Overall time in stable beams 34%

• Premature dumps– 50% of all STABLE BEAMS fills lasted less than 3

hours

34%

11/3/2012

Page 16: LHC beam operation past , present, future

LHC status

Radiation to electronics (R2E)

xMas-Mitigation crucial: patch, shielding, relocat.Patches to continue during 2012Particular emphasis (analysis) of ‘new’ failures

11/3/2012

Page 17: LHC beam operation past , present, future

LHC status11/3/2012

Concerted program of investigations, simulations, tests with beam …Tobias Baer

Page 18: LHC beam operation past , present, future

LHC status

Vacuum

11/3/2012

LSS2

CMS

• Unexpected pressure rise (10-6 mbar) observed in LSS2-LSS8 (D1) and close to CMS: bad RF contact (x-rays inspection) interventions done in 2 & 8 & CMS to resolve RF finger issues - shouldn't be a problem in 2012.

Page 19: LHC beam operation past , present, future

LHC status

TDI – beam screen heating

11/3/2012

Page 20: LHC beam operation past , present, future

LHC status

2011 to 2012• Well organized, productive Xmas technical stop

– Lot of R2E related work– Plus consolidation and improvements of many systems

• Vacuum consolidation to address successfully diagnosed causes of instabilities in 2011

• Injection collimators issues diagnosed and understood - spare in preparation - fingers crossed in the meantime

• Cool-down of machine exactly on schedule - cryogenics demonstrating full mastery…

• Very smooth hardware commissioning including careful quench-less commissioning of main circuits to 4 TeV

• Machine checkout proceeding well - good for beam next Tuesday afternoon

11/3/2012

Page 21: LHC beam operation past , present, future

LHC status

2012 strategy4 TeV

50 ns

p-Pb: 3.5 TeV or 4 TeV

β*=0.6m→0.7m→0.9m

∫Ldt = 15-19 fb-1

Lpeak=5-6.8 1033 cm-2s-1

SPS Np= 1.6 1011SPS ε= 2 μm

Pile-Up=26-35

∫Ldt = 5 fb-1 in June?

β*=(0.6,0.6,0.6,3)m

TCP gap=2.2mm

LHCb ∫Ldt=1.5 fb-1

IP1 β*=500m

Dumps=30-50

∫Ldt = 15- 23 nb-1

11/3/2012 Rogelio Tomas

Page 22: LHC beam operation past , present, future

LHC status

Collimator settings 2012

Collimation hierarchy has to be respected in order to achieve satisfactory protection and cleaning

11/3/2012

σTCP 7 4.3TCSG 7 6.3TCLA 7 8.3TCSG 6 7.1TCDQ 6 7.6TCT 9.0Aperture 10.5

2012: tight settings

Page 23: LHC beam operation past , present, future

LHC status

How tight?

11/3/2012

Intermediate settings (2011):~3.1 mm gap at primary collimator

Tight settings:~2.2 mm gap at primary collimator

Norway

Iberianpeninsula

Page 24: LHC beam operation past , present, future

LHC status

2012 run configuration• Energy – 4 TeV– Low number of quenches (as in 2011) assumed

• Bunch spacing - 50 ns• Collimator settings – tight– As discussed – NB not yet proven operationally

• Atlas and CMS beta* - 60 cm– with 70 cm and 90 cm as fallbacks

• Alice and LHCb beta* - 3 m– Natural satellites versus main bunches in Alice

11/3/2012

Page 25: LHC beam operation past , present, future

LHC status

Bunch spacingPerformance from injectors

Bunch spacing

FromBooster

Protons per bunch (ppb)

Emittance H&V[mm.mrad]

150 Single batch 1.1 x 1011 1.6

75 Single batch 1.2 x 1011 2.0

50 Single batch 1.45 x 1011 3.5

50 Double batch 1.6 x 1011 2.0

25 Double batch 1.2 x 1011 2.7

11/3/2012

Page 26: LHC beam operation past , present, future

LHC status

2012 LHC schedule Q1/Q2

1

4

32

11/3/2012

Page 27: LHC beam operation past , present, future

LHC status

2012 LHC schedule Q3/Q4

5

6

11/3/2012

High beta* runs for ALFA and TOTEMVan der Meer scans

Page 28: LHC beam operation past , present, future

LHC status

2012 - breakdown

11/3/2012

DaysMachine check-out 2Commissioning with beam 21Machine development 22Technical stops 20Scrubbing (25 ns) 3Technical stop recovery 6Initial intensity ramp-up ~21Proton running ~126Special runs ~8Ion setup 4Ion run 24

~150 days

Page 29: LHC beam operation past , present, future

LHC status

50 ns performance estimate4 TeV, 50 ns, 1380 bunches, 1.6e11, 2.5 microns150 days of proton physics (assuming similar efficiencies to 2011)

Beta*[cm]

Collimators Peak Lumi[cm-2s-1]

Int. Lumi[fb-1]

Pile-up Increase in peak

90 Intermediate 5.1e33 12.1 – 14.5 2670 Tight 6.2e33 14.7 – 17.6 31 +22%60 Tight 6.8e33 16.2 – 19.3 35 +10%

11/3/2012

Page 30: LHC beam operation past , present, future

LHC status

25 ns performance estimate4 TeV, 25 ns, 1380 bunches, 1.6e11, 2.5 microns140 days of proton physics (extra scrubbing required)

Beta*[cm]

Collimators Peak Lumi[cm-2s-1]

Int. Lumi[fb-1]

Pile-up

80 Tight 3.8e33 8.3 10

11/3/2012

Conclusion: 25 ns not competitive with 50 ns

Page 31: LHC beam operation past , present, future

LHC status11/3/2012

Page 32: LHC beam operation past , present, future

LHC status

Conclusions• Good performance in 2011 from working on all available

parameters • Very definitely exploring the effects of high intensity beams

– SEUs, beam induced heating, vacuum instabilities…– Operational efficiency suffering as a result

• Main gain in 2012 is use of tight collimator settings and reduced beta*– 5 to 6 x 1033 cm-2s-1 and 15 fb-1 should be possible

• Hope for improved operational efficiency– R2E mitigation measures– but partially countered by increased peak performance

• Another long, interesting year in prospect…