Page 1: Lecture12   Abutments ( Highway Engineering )

Lecture 17

Sub-structure:Design of the Abutments

Page 2: Lecture12   Abutments ( Highway Engineering )
Page 3: Lecture12   Abutments ( Highway Engineering )
Page 4: Lecture12   Abutments ( Highway Engineering )
Page 5: Lecture12   Abutments ( Highway Engineering )
Page 6: Lecture12   Abutments ( Highway Engineering )

A counter-fort retaining wall.

Page 7: Lecture12   Abutments ( Highway Engineering )
Page 8: Lecture12   Abutments ( Highway Engineering )
Page 9: Lecture12   Abutments ( Highway Engineering )
Page 10: Lecture12   Abutments ( Highway Engineering )
Page 11: Lecture12   Abutments ( Highway Engineering )
Page 12: Lecture12   Abutments ( Highway Engineering )
Page 13: Lecture12   Abutments ( Highway Engineering )
Page 14: Lecture12   Abutments ( Highway Engineering )
Page 15: Lecture12   Abutments ( Highway Engineering )

The next step is to calculate the dead weight value w(x) from the superstructure and part of the sub-structure. It can also include some live load if the bridge is in a heavily traveled urban area. From these two values, vs and w(x), we can find the fundamental period T of the bridge and the seismic force pe(x).

Page 16: Lecture12   Abutments ( Highway Engineering )
Page 17: Lecture12   Abutments ( Highway Engineering )
Page 18: Lecture12   Abutments ( Highway Engineering )
Page 19: Lecture12   Abutments ( Highway Engineering )
Page 20: Lecture12   Abutments ( Highway Engineering )
Page 21: Lecture12   Abutments ( Highway Engineering )

12'-0

"

5'-6

"12"

12"

3'-0

"

2 '-6" 12" 3'-6"

1'-6

"

7 '-0"

4'-0

" 6'-0

"

9"

12"

A

5

72

8

4

1

3

6

3.88'

L =5.26 k

L =0.24 kv

h

Page 22: Lecture12   Abutments ( Highway Engineering )

e

P

BackfillGirder

aa

Abutment

Approach slabNormal pavement

Bridge slab

Wheel load

Page 23: Lecture12   Abutments ( Highway Engineering )

31

12"

16'-6

"

2'1'

-6"

3' 1'-6" 5'-6"

Ver

t. ba

rs,

Ver

t. ba

rs, b

ack

face

back

face

#6 @

5"

#6 @

10"

Provide 3" clear to all bars except 11

2 " clear to bars in front face of stem

#4 @ 2'-0"

6" drains @ 10'-0"

#6 @ 6" 2"x6" key

#6 @ 6"

#4 @ 12"

#4@ 9" front face #4@18" back face

Page 24: Lecture12   Abutments ( Highway Engineering )

Preparing the foundations of an abutment for a high-speed rail overpass (AVE, St, Sadurniu, Barcelona. The AVE is the high-speed rail connection between Paris-Barcelona).

Page 25: Lecture12   Abutments ( Highway Engineering )

The almost finished abutment for a high-speed rail overpass (AVE, St, Sadurniu, Barcelona. The AVE is the high-speed rail connection between Paris-Barcelona).

Page 26: Lecture12   Abutments ( Highway Engineering )

Abutments damaged by seismic forces

Page 27: Lecture12   Abutments ( Highway Engineering )

San Fernando Earthquake, on February 9, 1971. Settlement of the abutment fill.

Page 28: Lecture12   Abutments ( Highway Engineering )

Wing-wall damage at abutment

Interchange 210 – RoxfordStreet Undercrossing at Foothill Boulevard.

Single-span, variable depth, prestressed box girder, slightly skewed and supported on pile diaphragm abutments. The structure was supported entirely on fill. All eight wingwall-to-diaphragm connections were badly damaged.

Page 29: Lecture12   Abutments ( Highway Engineering )
Page 30: Lecture12   Abutments ( Highway Engineering )

Failure in Shear of Superstructure and End Diaphragm at Soffit.

Balboa Boulevard Over-crossing –South Abutment

Seven-span, reinforced concrete box girder with Class II piles and spread footings. Abutments were diaphragm type.

The south abutment was in original ground and soil supported, while the north abutment was upon fill and supported on concrete piles.

Page 31: Lecture12   Abutments ( Highway Engineering )

Abutment Fill Settlement

Page 32: Lecture12   Abutments ( Highway Engineering )

Eureka Earthquake –November 8, 1980.

Epicenter – 30 miles northwest of Eureka, CA

Magnitude – 6.6 to 7.1 on the Richter Scale

Damage – Collapse of Fields Landing Overhead located on Highway 101

Page 33: Lecture12   Abutments ( Highway Engineering )

Aerial View of Fields Landing showing Collapse of Two Spans. Failure caused by earthquake factors which can be attributed to the failure caused by severe skew, rocker bearings at the abutments, hinges at each bent, narrow hinge seats, simply-supported median slab between tan not connected to left and right bridge.

Page 34: Lecture12   Abutments ( Highway Engineering )

Abutment 1.

All of the pedestals were severely shattered, and most of the steel bearings were ripped from their anchorages.

Page 35: Lecture12   Abutments ( Highway Engineering )

Steel rocker bearings were torn out of their anchors.

Page 36: Lecture12   Abutments ( Highway Engineering )

Damage to abutment and to the wingwall.

Page 37: Lecture12   Abutments ( Highway Engineering )

Route 14/5 Separation & Overhead Route 14/5 Separation & Overhead –– Collapsed Spans at South AbutmentCollapsed Spans at South Abutment

Page 38: Lecture12   Abutments ( Highway Engineering )

Higashi-Kobe Bridge – Vertical Movement of 0.5 Meter at the Top Roadway.

Page 39: Lecture12   Abutments ( Highway Engineering )

Failure of Reinforcing Concrete Pier Wall

Page 40: Lecture12   Abutments ( Highway Engineering )

Hanshin Expressway – Failure of single-column bents