    Foreword

    Over the last 12 months the fruits of this relationship have been realised. We have

    continued to strive to deliver service excellence. We have engaged with the City Council

    to ensure that we meet the needs of the; communities, organisations, stakeholders,

    schools and businesses we serve. At the same time, reduce the annual cost of the

    services to Liverpool City Council by 4.5 million per annum with no reduction in

    service.

    Despite the current financial climate and the pressures and challenges this brings

    Liverpool Direct Limited has delivered a solid financial performance evidenced by

    growing the order value of the Company. This could not have been achieved without the

    commitment of all the stakeholders and most importantly the staff of Liverpool Direct

    Limited. Service performance continues to excel and all Service Level Agreements have

    again been met or exceeded their targets. For 2013/2014 these will be further

    enhanced.

    2012/2013 has witnessed a number of key

    achievements. This has required new approaches

    to the way we work. We said last year that we

    had set new standards in public service

    performance, thinking and innovation. And, we

    have but there is always more we can do and

    more that can be done. We are committed to

    continuing to lead and help to shape the delivery

    of services and keeping the customer at the

    heart of the organisation.

    We are pleased to be able to reflect on, and

    acknowledge the achievements and successes

    over 2012/2013 and have set the continued

    standard of excellence we will meet and exceed

    during 2013/2014.

    The agreement by all Partners to a comprehensive Contract Review in 2011

    provided an ideal opportunity to re-invigorate and refresh the partnership

    between Liverpool City Council and BT delivered by Liverpool Direct Limited.

    Neil Rogers President, Global Government, BT. Chairman of Liverpool Direct Limited.

    Joe Anderson Mayor of Liverpool. Director of Liverpool Direct

    Limited. .

  • 4

  • 5

    1. Review of 2012/2013

    Liverpool Direct Limited has had a

    solid financial year in 2012/2013 and

    its staff again has delivered excellent

    services on behalf of its customers. It

    has been a challenging year with our

    customers facing growing budget

    constraints and increasing customer

    expectations. Our staff have excelled

    in delivering first class services under

    what are difficult trading conditions.

    Financial Review

    With the current economic climate, and the pressures this places on both current and

    prospective customers, 2012/2013 has been a challenging year. However staff have

    responded positively to these challenges and once again exceeded expectations by

    delivering excellent customer service and overcoming the increase in the levels of

    demand (especially within the area of Careline and Benefit Services).

    In 2012/2013 Liverpool Direct Limited reduced its price of service to Liverpool City

    Council by 4.5 million per year with no direct impact on services. This follows on from

    a price reduction in 2007 of nearly 2 million per year. There has been significant

    investment in the business also.

    The key measures of financial performance set by the Board. The outturn against

    targets for 2012/2013 are; revenue was 86.1 million. The total sales order value (iTOV)

    of the company has grown by over 36 million during 2012/2013. The iTOV position has

    been helped substantially by; securing two contract extensions for the Security Industry

    Authority and the delivery of several significant projects (eg. Desktop Refresh, Equal Pay

    and Job Evaluation Projects). These latter projects also impacted on a strong revenue

    performance.

  • 6

    In 2012/2013 Liverpool Direct Limited committed over 8.5 million in investment into

    the business. The Investment Plan included a fundamental review and planned

    implementation of:

    Investments Value ( million)

    Desktop refresh 2.0

    ICT Infrastructure Projects 1.8

    Storage Network Upgrade 1.7

    Next Generation Data Centre 1.5

    Expansion IVR / Automation Self Service 0.5

    Adults Social Care system Replacement 0.5

    Internet Upgrade 0.2

    E-recruitment System 0.2

    Total 8.5

    Table 1.1: Investments 2012/2013.

    In 2012/2013 Liverpool Direct Limited delivered over 6.1 million of added value to

    Liverpool City Council through initiatives and improvements across all Service Areas.

    Added value can be a combination of; avoidable costs, additional services, additional

    performance and service developments:

    Added Value Value ( million)

    ICT Service 3.5

    Customer Access Service 1.0

    Benefits Service 1.0

    Revenues Service 0.5

    Human Resource and Payroll Service 0.1

    Total 6.1

    Table 1.2: Added Value to Liverpool City Council 2012/2013.

  • 7

    The SIA Service answered

    100% of calls all received within 30 seconds.

    Real examples of this added value across all service include:

    ICT successfully deleted a total of 3436 legacy Active Directory (AD) user accounts

    across the period of March to July

    2012. This work resulted in 638

    Gigabytes (GB) of saved data space.

    Careline exceeded the contractual

    target for percentage of calls

    answered during 2012/2013; with an

    achievement of 90%. This exceeds

    the contractual target by 3%.

    Contact Centre has exceeded the contractual target for percentage of calls

    answered during 2012/2013 with an achievement of 95%. This is 3% above the

    contractual target at no additional cost to Liverpool City Council.

    The One Stop Shops exceeded the contractual target for percentage of customers

    seen within 15 minutes (without an appointment), with an achievement of 97%. This

    exceeds the contractual target by 7%.

    The Benefits Service implemented the Northgate ICT Landlord Portal is a secure on-

    line application that allows access to limited data by landlord representatives to the

    Northgate Benefits System, via a web portal. This is restricted to claims which are in

    payment to a landlord and provides only that data to which the landlord is legally

    entitled in these cases. This facility is now live.

    The Payroll Team continues to

    administer the Childcare Voucher

    Scheme. This is a salary sacrifice

    scheme where employees can reduce

    their gross pay and benefit from tax

    and National Insurance savings. As a

    result of employees participating in

    this scheme the employer's National

    Insurance liability is reduced.

  • 8

    Performance Review

    Performance excellence remains a key priority of the business. To maintain a strong

    culture of performance excellence (across the entire business) remains a constant

    challenge. Liverpool Direct Limited has set performance excellence as its competitive

    advantage and to give it distinctiveness within a crowded market space.

    A review of some of the key successes and highlights of 2012/2013 help to demonstrate

    the progress made and the dedication of all staff engaged. Performance is key to the

    success of the business but by itself this is simply not enough. Success depends on both

    performance and value. It is also about dealing with customer priorities, concerns and

    expectations. A lot happened in 2012/2013 and it was a good year in this respect.

    Some of the key highlights and achievements across the Partnership include:

    Benefits Service

    The Benefit Service handled over 82,000 cases in 2012/2013 and administered over

    328 million of benefit to Liverpool City Council and also delivered:

    A campaign around Free School Meals, which are a vital source of nutrition for

    children, and a revenue source to individual schools. Each child entitled to free

    school meals generates a Pupil Premium to the school of 900 per annum. In

    2011/2012 Liverpool Direct Limited completed a campaign to ensure every child

    entitled to a free school meal was

    registered. Through a programme

    of data matching (Housing Benefit

    Records and Schools Rolls) and

    deploying a model of implied

    consent, the Benefit Service delivered

    over 1,200 extra free school meals

    entitlements generating 0.72 million

    additional revenue to schools via the Pupil Premium. From 2012/2013 claims

    without Free School Meals data are reviewed each month and updated; ensuring

    that under claiming is addressed on a continuous basis. Processing of free school

    meals has continued to be performed quickly with over 99% of applications

    processed within six weeks.

    Over 50 Apprentices have

    been recruited through

    Liverpool Direct Limited.

  • 9

    Attendance Allowance is a major form of benefit entitlement to the elderly. Again

    deploying data matching techniques the Benefit Service ensured in 2011/2012 that

    an additional 516 people received

    their entitlement and generated, to

    them, 1 million in cash. This

    campaign has continued during

    2012/2013 by contacting and advising

    individual customers to support them

    in claiming Attendance Allowance;

    this has contributed to record levels

    of benefit gains through benefit

    maximisation checks.

    The Benefit Maximisation Service generated over 8.6 million in Liverpool who were

    entitled to benefits not claimed. The Service handled over 4,500 benefit

    maximisation checks and over 2,000 people gained income they were entitled too.

    In 2012/2013 the Benefits Service Counter Fraud team has continued to direct its

    efforts at detecting serious fraud based on the Services strategy of targeting the

    most serious forms of fraud. It had applied 67 legal sanctions, identified 2.5 million

    in fraudulently overpaid benefits and prevented 0.65 million in fraudulent

    payments.

    Benefit Applications reached a record 22,000 however processing times remained at

    top quartile levels of 25 days.

    Benefit Subsidy Clawback is effectively a cost on poor performance by Local

    Government. It is paid back to

    Government by the Local

    Authority. In 2005/2006 it was over

    5 million. For the last four years it

    has been nil. A massive saving to

    Liverpool City Council. Indeed the

    last three years the City Council has

    received effectively a performance bonus of over 1 million each year for the

    performance of the Benefit Service.

    Revenues Services collected over

    15 million in corporate

    debt during 2012/2013.

  • 10

    Revenues Service

    The Revenue Service collected over 300 million in 2012/2013. It collected; debt, Council

    Tax and non-Domestic Rates due and also delivered:

    A barcode solution to replace payment cards. All Council Tax bills and recovery

    documents now incorporate the barcode solution. This has particular benefits for

    44,700 customers who will have to pay

    8.5% Council Tax for the first time

    under the Governments Welfare

    Reforms. Customers will be able to

    make their payment free in any Post

    Office or Paypoint outlet.

    The Council Tax Net Debit contractual

    collection rate outturn for 2012/2013

    was 92.82% which is 2.82% above

    target. In relation to Council Tax

    arrears, the reduction outturn for 2012/2013 exceeded the annual target by

    4.5million.

    The target for processing Council Tax correspondence is 90% within 14 days and it is

    pleasing to report that this challenging target was achieved for the first time ever in

    2012/2013. The take up of e-billing has also improved by over 35% during 2012/2013

    with over 35,500 customers now enjoying the benefits of receiving a paperless bill.

    The collection of Non Domestic Rates exceeded the annual target at 97%. The

    reduction in arrears has also exceeded the target by 1 million.

    Implementing the National Non-Domestic Rates (NNDR) Deferral Scheme which now

    means 386 ratepayers successfully deferred part of their increased rates liability.

    Implementing the extension to the Small Business Rates Relief scheme which

    benefited over 4,200 ratepayers in the City.

    Piloting a scheme to improve collection under attachment to earnings. In 2012/2013

    this scheme identified 10.7% of cases issued resulting in over 12,000 being

    collected. Introducing a scheme for improving collection in 203 probate cases by

    over 9,000.

  • 11

    Contact Centre Service

    The Contact Centre again exceeded its contractual target for percentage of calls

    answered. Achieving an exceptional rate of 95% calls answered. This is 2% above

    2011/2012. This is now 10% ahead of performance in 2001 with regard to calls

    answered. It remains the only 24 x 7 x 365 local government contact centre and also

    delivered:

    In April 2012 the Library telephony service for; Childwall, Speke, Garston and Walton

    Libraries transferred into the Contact Centre (as part of the phased service take on

    for all the library calls). This continued throughout 2012/2013 with all Libraries

    telephony transferring into the Contact Centre. The Contact Centre received over

    17,000 calls during 2012/2013. Customers can now access the service 24 x 7 x 365.

    The Service was successful in its bid to

    run the Liverpool Mutual Homes Out of

    Hours Service. The contract with

    Liverpool Mutual Homes commenced

    on the 1 August 2012. The contract is

    for three years and has helped to

    protect jobs.

    Two Interactive Voice Recognition (IVR) Services were launched during 2012/2013.

    IVR was launched on 30 May 2012 for customers wishing to make a Revenues and

    Benefits appointment at a One Stop Shop. An IVR Forms Request Service was

    launched on 15 September 2012 giving customers the opportunity to request forms

    in respect of; Revenues, Benefits, Elections and Educational services without the

    requirement to speak to a Customer Service Advisor.

    In September 2012, the Contact Centre started to handle the Cruise Liner Terminal

    Telephony transferred into the Contact Centre. The Contact Centre can now offer

    customers a wealth of advice and guidance in support of the Cruise schedule

    providing information about the Ship, Cruise berth and surrounding area as well as

    signposting about job opportunities and public transport links.

    The Contact Centre maintained a strong performance for all its customers not just

    the City Council. Liverpool Mutual Homes and London and Quadrant both achieved

    96% of all calls answered. The percentage of calls received and answered by

    Interactive Voice Recognition (IVR) Automation was over achievement of 10%.

    During 2012/2013, 99% of

    One Stop Shop customers were

    offered an appointment within

    five working days.

  • 12

    During 2012/2013 the number of Automated Services customer transactions

    completed without the need to speak to a Customer Service Advisor totalled over

    130,000. The new automated service launched in 2012/2013 and now includes:

    o Making a Revenues and Benefits appointment at a One Stop Shop.

    o Request a form for Revenues, Benefits, Elections and Education.

    o Merseyside Waste Tip opening times.

    The Careline Service

    The Careline Service is a critical service and acts as a first point of contact for both

    residents and professionals seeking advice, support or referrals for both children and

    adults. It operates 24 x 7 x 365 and also delivered:

    In 2012/2013 exceeded the contractual

    target for percentage of calls answered

    with 90%. This is 17% above the

    comparison when the Careline Service

    transferred into Liverpool Direct

    Limited. Referrals in Careline were up

    by 13% in 2012/2013 compared against

    same period 2011/2012.

    Careline generated a total number of 15,869 Referrals in 2012/2013, an increase of

    15% compared to 13,788 Referrals in 2011/2012. Adult Referrals increased by 29%

    to 8,404 Referrals in 2012/2013 compared to 6,516 Referrals in 2011/2012. Children

    Referrals increased by 3% to 7,465 Referrals in 2012/2013 compared to 7,272

    Referrals in 2011/2012.

    A Hillsborough Family Support Helpline was launched in Careline on 12 September

    2012. An agreement between the Home Office Independent Hillsborough Panel and

    Liverpool City Council determined that a support network is to be made available for

    families of the bereaved, survivors and those who may need emotional support on

    the disclosure of information relating to the Hillsborough Disaster by the

    Hillsborough Independent Panel on the 12 September 2012.

    The Careline Service maintained a strong performance for Knowsley Borough Council

    Out of Hours Service throughout 2012/2013. The Careline Service exceeded its target

  • 13

    of calls answered by 12%. The Contract was renewed in 2012/2013 by Knowsley

    Borough Council.

    One Stop Shops Service

    The network of eleven One Stop Shops exceeded all their targets during 2012/2013. This

    face to face service acts as a front line for Liverpool residents to interact with the City

    Council and also delivered:

    The management of a merged Library and One Stop Shop service at three library

    sites; Garston, Speke (Parklands) and Walton. The opening times of the three sites

    changed to incorporate the library

    customer demand which includes

    Saturday opening at the Garston site.

    Six Library staff transferred into

    Liverpool Direct Limited and have

    been trained to become Customer

    Service Advisors. One Stop Shop

    Customer Service Advisors have also been trained in Library Services. This has saved

    Liverpool City Council over 115K per year with extended hours.

    Achievement of 99% for an appointment to be offered 5 working days from the date of the request.

    Over 96% of customers were seen within 15 minutes with an appointment and 97% of customers seen within 15 minutes, without an appointment.

    Web Services

    Web Services provides a wide variety of services focused on delivering solutions which

    give the best end user experience possible, working closely with clients focusing on

    simple solutions for both end customers and service areas and it delivered:

    In the last twelve months Web Services have worked closely with Liverpool City Council to enhance the already industry recognised Liverpool.gov.uk website. The website has been further developed focusing on the ease of access to services for the end user. The delivered website is now being acknowledged as an example of

    Benefits Service has generated over

    8.6 million in addition benefits for

    Liverpool residents.

  • 14

    best practice for local government websites and focusing on the needs of the residents, businesses and visitors of Liverpool.

    In 2012 Web Services provided services for a number of the public sector

    organisations; strategic consultancy for Gloucestershire County Council during their

    website redevelopment. This

    included detailed user task analysis

    and content training for the staff of

    the County Council. Gloucestershire

    launched their new website in April

    2012, and have seen a 28%

    reduction in calls on key service

    lines due to the new tasks-focused

    approach of the website. In

    September 2012, Web Services

    developed the digital services

    strategy for North Ayrshire Council and is continuing to aid in the redevelopment of

    their website and associated digital services with the aim of producing a more

    customer focused website. A new website design for the Northumbria Police was

    completed in January 2013. The new look gives the Police an increased ability to

    communicate with residents in neighbourhoods and raise awareness of campaigns

    across the force region. The Redesign is part of the continuous support that Web

    Services offer Northumbria Police.

    ICT Service

    The ICT Service met or exceeded all its targets in 2012/2013 and there were no Major

    Incidents and also delivered:

    The average resolution times for all categories were significantly improved

    compared to targets. For example, our Category Three Internal SLA is 20 hours. For

    the year, ICT has achieved an average resolution time of three hours and 20 minutes

    for this particular Service Level Agreement.

    A Desktop Refresh programme commenced and is seeing all of the City Council's

    4,000 aged PCs and monitors replaced with state-of-the-art ICT equipment. The new

    computers are much faster, smaller and more energy efficient, with 4GB of memory.

    They run on Windows 7 with Microsoft Office Suite 2010 (Word, Excel, PowerPoint

    and Outlook 2010) and each one is installed with a new tool called 'Appsense', which

  • 15

    gives you a 'virtual profile' so you can log on quickly to any PC on the Council's

    network and access all your personal files/applications.

    A total of 15,615 Access Databases were successfully deleted resulting in 570GB of

    saved data space and reducing levels of risk.

    As part of Continuous Service Improvement, ICT introduced two new, high powered

    servers into the Solaris infrastructure. As a direct result of this work new hardware

    has been introduced at no cost to the customer while saving cost in investment in

    memory upgrades and in supplier installation charges as ICT Specialists planned and

    implemented the change internally.

    The ICT Service successfully completed the migration of 150 databases from the

    previous legacy equipment to a new

    Structured Query Language (SQL)

    cluster environment. This extensive

    piece of work ensures the platform

    is fully supported and introduces

    improved resiliency for customers.

    The ICT Service has upgraded the

    ageing e-mail system to the latest

    version of Microsoft Exchange 2010. This offers enhanced capabilities in an industry

    standard communication suite. This work involved the migration of the existing

    email system, users and mailboxes onto a new Exchange 2010 platform. The

    programme refreshed all hardware and software. The new platform is resilient

    across two Data Centres and provides enhanced Business Continuity over the old

    solution. Exchange 2010 also offers improved collaboration, greater security and

    improved business intelligence capabilities. During the seven month

    implementation from February to August over 13,000 mailboxes were migrated and

    rationalised.

    Human Resources and Payroll Service

    The Human Resource and Payroll Service provide advice and guidance on the nature,

    interpretation and application of all employment policies, procedure and related

    processes. The service provides employee relations and employment law advice whilst

    facilitating consultation and negotiation with recognised trade unions. The Payroll

    Over 40,000 customers applying

    Housing and Council Tax Benefit had

    their application, as per the Benefits

    Service Ten Day Promise.

  • 16

    service provides transactional HR and payroll processing using powerful software from a

    market leader. This enables the service to complete a payroll and pension function and

    produce a range of standard report to inform follow on processes and also delivered:

    The Payroll Service has consistently met the contractual performance target for

    contractor errors relating to payments made outside the payroll cycle. The target

    level for contractor errors is currently less than 0.5% of payments made in the year.

    In 2012/2013 the Payroll Service performance was less than 0.1%. Due to the

    consistently positive performance the target has been stretched to less than 0.2% in

    2013/2014.

    The Service has consistently produced 100% performance in its contractual

    indicator for ensuring BACS payments are made on the due date. In 2012/2013 over

    200,000 BACS transactions were

    processed with a value of over

    265 million for customers and third

    party organisations.

    Payroll has consistently exceeded the

    target of 90% of pension requests for

    estimate of benefits processed

    within ten full working days. The Service has processed 100% of the 589 estimates

    completed in 2012/2013 within ten working days.

    Implementation of the e-recruitment system has already yielded saving since its

    introduction in June 2012. Since the implementation of e-recruitment the numbers

    of electronically submitted applications has increased to 98% in 2012/2013 from

    91% in 2011/2012 with a reduction in paper applications from 9% in 2011/2012 to

    just 2% in 2012/2013. This has reduced postage and paper usage to customers.

    Learning and Development Service

    The service has been re-engineered with its processes and practices realigned to ensure

    that e-learning is a core service option to reduce costs to the user and introduce high

    levels of risk management. It delivered:

    Over 2000 staff to date within the City Council have undertaken a piece of development with the Learning and Development team and 97% of staff were satisfied with their development. In 2012/2013 the Learning and Development team

    During 2012/2013 Liverpool Direct

    Limited continued to financially

    support the Duke of Edinburgh

    Award in schools across Liverpool.

  • 17

    worked closely with the City Council to provide a piece of learning; Managing Council Projects. This worked to a City Council Project Management Framework with the aim of ensuring that all projects being managed across the City could be managed to the same consistent level. The Pilot was a great success and this has just started to be rolled out across the authority. Over 60 City Council staff have completed this in the last three months. Also:

    Investment was made in the Atlantic link e-learning software during 2012/2013. This

    has provided the team with new

    functionality to enhance the learner

    experience. There have been 35

    new interactive pieces of e-learning

    developed which includes a New

    Information Security awareness

    course created to support the City

    Council. There were 20 new

    apprentices and trainees recruited

    across the City Council. All these

    new recruits came from the greater

    Merseyside area and their skills are benefiting both organisations and boosting the

    local economy.

    Security Industry Authority Service

    The Security Industry Authoritys Service received over 200,000 applications and

    handled over 360,000 calls during 2012/2013.

    The Security Industry Authority (SIA) Service exceeded all their stretched targets

    during 2012/2013. These targets were enhanced in 2011 and formed part of a

    significant reduction in the price of the Service. These include; answering 99% of all

    calls offered to the Contact Centre, 100% of calls were answered within 30 seconds

    against a target of over 99%. Achieving an average of 1.67 days to process an SIA

    application against a target of nine days. Achieving over 99% system availability

    against a target of 98%.The Security Industry Authority (SIA) Service exceeded all

    their stretched targets during 2012/2013. These targets were enhanced in 2011 and

    formed part of a significant reduction in the price of the Service. These include;

    answering 99% of all calls offered to the Contact Centre, 100% of calls were

    answered within 30 seconds against a target of over 99%. Achieving an average of

  • 18

    1.67 days to process an SIA application against a target of nine days. Achieving over

    99% system availability against a target of 98%.

    Other 2012/2013 Key Developments

    Corporate Social Responsibility

    Liverpool Direct Limited is committed to continuing to conduct its business responsibly.

    We recognise and embrace the responsibilities we have on the environment, to our

    people, customers and the local community and we are working to make sure Corporate

    Social Responsibility is an integral part of all our business operations to ensure we fulfil

    our commitments. Highlights in the

    last twelve months in the area of

    Corporate Social Responsibility (and

    targets for 2013/2014) include:

    As part of its commitment to the

    community, Liverpool Direct Limited

    launched a successful

    Apprenticeship and Traineeship Programme in 2011. Since its inception, the

    programme has given opportunities to over 50 young people in a range of areas

    across Liverpool Direct Limited and Liverpool City Council.

    In 2012/2013 staff selected and supported two local charities; The Lily Centre and

    The Newborn Appeal. Staff also continue to support and take part in fundraising

    days for national charities such as; Comic Relief, Jeans for Genes and Children in

    Need. In total during 2012/2013 over 17,000 was raised.

    During 2012/2013, Liverpool Direct Limited continued to support the personal

    development of young people within the community through the partnership with

    the Duke of Edinburghs (DofE) Award. The Partnership witnessed hundreds of

    pupils from schools across the city achieve the award at varying levels, enriching

    their development and providing them with valuable skills and experiences. In

    addition to supporting local schools in delivering the scheme, we have also funded a

    number of our own employees to complete the Duke of Edinburgh Gold Award, with

    five members of staff enrolling onto the Award during 2012/2013 and a further

    In the last 12 months, over 2,000 employees completed a

    development programme with

    Learning and Development.

  • 19

    seven embarking on a Leadership Programme which provides them with training and

    supports them in mentoring young people through various levels of the Award.

    During 2012/2013, Liverpool Direct Limited has made significant achievements in the

    area of environmental management, including;

    Improved recycling facilities have been provided for staff to use, such as colour

    coded bins for recycling paper, card,

    plastic and batteries.

    Launched Cycle to Work Scheme

    which enables staff to purchase a

    bicycle through a salary sacrifice

    scheme. Over 80 staff successfully

    applied for the scheme and have

    now purchased bicycles.

    Expanded Save the Planet intranet

    pages were provided with information and tips for staff to be more environmentally

    friendly in the workplace.

    Further audio conferencing facilities were provided to avoid unnecessary travelling.

    Having achieved certification to ISO 14001 Environmental Management Systems

    Standard in 2007 for the whole Partnership, Liverpool Direct Limited will maintain

    and continue to develop its environmental management system and adhere to our

    environmental policy to ensure continued compliance to the requirements of the

    standard.

    Quality

    Quality is at the heart of everything Liverpool Direct Limited does and plays an integral

    role in achieving our vision to deliver excellence and to place the customer at the heart

    of everything we do. During 2012/2013 Liverpool Direct Limited successfully

    maintained the quality framework in place. The framework consists of over ten national

    quality standards and accreditations.

    These standards provide a proven business improvement framework that can

    significantly improve financial performance, profitability, productivity and increase

    employee involvement and focus.

  • 20

    Whilst Liverpool Direct Limiteds quality agenda is fully implemented, work will continue

    to ensure compliance to the requirements of the standards/accreditations across the

    organisation. Work is on-going to strengthen the internal audit process and an internal

    reviewer development programme is being established to up-skill and improve the

    knowledge of our internal auditors. The resulting improved internal audit process will be

    supplemented by ad hoc third party audits, undertaken bi-annually across the business,

    to ensure adherence and continual improvement.

  • 21

  • 22

    2. Looking Ahead 2013/2014

    In 2010, Liverpool Direct Limited developed

    a Strategic Framework based around the

    European Foundation for Quality

    Management (EFQM) Model. This is

    successfully applied across Europe and

    beyond as a rigorous structure to examine

    an organisations current capability. The

    framework sets out our purpose and the

    processes we have put in place to deliver

    service excellence. This is kept under review to ensure it continues to meet the needs of

    all the stakeholders.

    Strategic Priorities

    To help give Liverpool Direct Limited a clearly defined sense of direction and focus, a set

    of four strategic priorities are in place supported by a set of agreed aims. They help to

    give shape to service delivery and to embed innovation and excellence across the

    business and provide a platform for growth. They underpin the Companys core

    processes.

    Strategic Priority One: Customer at the Heart

    To place the customer at the heart of the organisation.

    Aims:

    Challenging, transforming and continuously improving the way services are

    delivered; and only accepting performance excellence.

    Adopting new approaches to service planning and delivery, effecting real change

    in ways that create opportunities now and for the future.

    Bringing together knowledge, expertise, experience and customer feedback to

    positively build a customer service excellence culture.

  • 23

    Strategic Priority Two: Service Excellence

    Delivery of sustainable service excellence.

    Aims:

    Using excellence as a benchmark to inspire innovation and encourage each other

    and our customers to achieve beyond our ambitions.

    Exploiting the opportunities of data, metadata analysis and the gift of contact to

    plan and sustain organisational performance and act as a catalyst for

    improvement, innovation and transformation.

    Understanding our customers ambitions to shape and define strategies to

    deliver customer centred and intelligence led solutions.

    Strategic Priority Three: Workforce Matters

    A committed, trained and developed workforce that matters.

    Aims:

    Ensuring people are living the values and behaviours of the business; and

    engaging in meaningful consultations and communications to capture our

    employees perspectives and feedback.

    Enhancing and investing in learning and development, apprenticeships and

    training opportunities across the Partnership to enable and encourage our

    people to excel and develop their individual skills, knowledge and confidence.

    Developing leaders who have the capacity, skills and vision to lead, transform

    and continuously improve services and people.

  • 24

    Strategic Priority Four: A Socially Responsible Partnership

    Committed to our people, the local community and economy

    and the environment. Aims:

    Creating growth through harnessing the power and leverage of Liverpool Direct

    Limited, the City Council and BT.

    Developing our business with an awareness of the environment, optimising the

    use of resources to eliminate waste and deliver value for money services.

    Ensuring corporate and social responsibility is part of the culture of the

    Partnership

    Financial Targets

    The following financial target for Liverpool Direct Limited have been set for 2013/2014

    as:

    Description Target

    2013/2014 (million)

    Revenue 80.0

    Table 2.1: Financial Target 2013/2014.

    A key priority will remain the creation of new jobs and the protection of existing jobs.

    Investments will also continue to be made into areas of business activity during

    2013/2014. Potential investments and will include:

  • 25

    Investments

    Desktop Refresh Completion

    Next Generation Computing Platform

    Adults System Replacement

    Childrens System Replacement Completion

    Corporate Wireless extension

    Leisure Services System Replacement Completion

    Total

    Table 2.2: Planned Investments 2013/2014.

    These investments will support Liverpool City Council and protect future performance

    and help deliver immediate (and in year) savings for Liverpool City Council (eg. energy

    costs) and reduce risks. It is the belief of Liverpool Direct Limited that further real and

    significant savings can be delivered to Liverpool City Council through the hard work of

    both sets of staff and managers, and councillors.

    In plain terms if we continue to work more

    closely and collaboratively the Partnership

    can simply do more to support Liverpool City

    Council. There are many opportunities.

    Examples include: additional revenue and

    debt collection, reduced accommodation

    costs, increased productivity (i.e. home

    working) and standardisation of processes

    and services.

    The next twelve months are a real opportunity to build on this successful Partnership

    and help to continue to generate real value to the City and to create real and

    sustainable job opportunities. The targets set for 2013/2014 will be kept under

    constant review and reported to meetings of the Board. They will also form part of our

    Annual Review.

  • 26

    Enhanced Performance Targets

    As part of the Refresh Agreement in 2011, we reviewed our contractual and non-

    contractual service level agreements. The review recognised that a culture of

    performance excellence is firmly embedded across the business. Performance targets

    were regularly being met or exceeded.

    A further review has now been completed for 2013/2014 which has agreed a revised set

    of Service Level Agreements of 57 targets that will be applied in 2013/2014. These will

    of course continue to be kept under review and refreshed as required. The enhanced

    contractual performance targets are as follows:

    Service Level Agreement Target

    2012/2013

    Target

    2013/2014

    Contact Centre

    % of all calls received answered by IVR 5% 10%

    Careline

    Total calls answered 87.5% 90%

    Revenues

    Checks on void properties twice a year for Council Tax. 95% 97.5%

    Checks on void properties twice a year for National

    Non Domestic Rates 95% 97.5%

    ICT

    Severe Business Disruption: Business Unit 99% 99%

    Major Business Disruption: Critical User or User Group External: 99% Internal: 95%

    99%

    Minor Business Disruption: Single User or User Group External: 99%

    Internal: 95% 97%

    Minor Disruption: Single User or User Group 95% 98%

  • 27

    Service Level Agreement Target

    2012/2013

    Target

    2013/2014

    Advice and Guidance offered to users via

    Connect2ICT 100% 100%

    HRP

    DBS requests completed within two working days 95% 97.5%

    % of payroll errors attributable to the Service < 0.5% < 0.25%

    ICT

    % Customer Satisfaction with ICT 96% 97%

    Business Critical Service Availability New 97%

    ADM5 Requests* within five working days 99% 95%

    Asset Management updated within five working days New 95%

    % of calls resolved at First Time Resolution New 60%

    % of invalid links on www.liverpool.gov.uk

  • 28

    Planned Developments

    2012/2013 witnessed a lot of performance and service improvement. Many new

    developments were delivered. Plans for 2013/2014 are well underway and include:

    Benefits Service

    The Benefits Maximisation Service was formed in 2006 to bring together and

    improve the quality of advice and support provided to Liverpool citizens. In its first

    year this specialist team received 3,500 referrals for advice and helped customers

    claim 2.8million in additional benefits. By developing and improving its ways of

    working it has been able to support

    more and more customers each

    year. Last year the service received

    6,000 referrals and helped

    customers claim an extra 8.2million

    in benefits. As the Governments

    welfare reform programme takes

    effect even greater levels of demand

    for advice and support can be

    expected. In 2013/2014 Liverpool

    Direct Limited has invested in a new

    ICT case management system for the Benefit Maximisation Service to streamline the

    work of the team. This new system has opened up opportunities to further

    modernise and extend the service. By rolling out the new casework system to

    customer services staff it will be possible to provide casework information and

    advice to customers more quickly and comprehensively. This will also free up

    resources to provide additional benefits advice.

    The Benefits Service has delivered financial assessment and benefits maximisation

    advice for around 7,000 customers receiving non-residential care since 2006. During

    the last year the service has also assisted with the management of closely-related

    functions including assessments and advice for residential care (a further 4,000

    customers) and customers receiving direct payments to manage their personal care.

    This will now total over 12,300 customers. In 2013/2014 these teams will be

    combined to ensure that there is a single process for benefits advice, financial

    assessment and charging, including providing benefit maximisation and ensuring that

    Careline operates 24 hours a day,

    7 days a week, 365 days a year.

    90% of all calls received were answered

    during 2012/2013.

  • 29

    all appropriate benefits are awarded. By bring together these teams it will be

    possible to develop and implement a common approach to the way customers

    access advice and services, underpinned by common ICT platforms and processes.

    The service will be built around the needs of the customer and their advice and

    entitlement needs rather than the historic split of functions and teams.

    Although a detailed timetable for converting the benefits system to Universal Credit

    is still being finalised by the Government it is anticipated that the first stage will be

    go live for certain new claimants of Job Seekers Allowance in October 2013. This will

    be key focus of work in

    2013/2014 for the service.

    Roll out to additional

    groups will commence in

    April 2014 and the aim is

    to transfer all new and

    existing claims by the end

    of 2017. It is important

    that services prepare plans

    for how customers will be

    affected by these changes.

    This will include providing

    assistance and advice to customers who need support making or transferring claims

    under the new arrangements. As the Government provides further details of the

    planned transfer of claims, the Service will develop a detailed programme of work

    for aligning its information, processes and systems to the new national system,

    which will gradually be implemented between 2013 and 2017.

    The Benefits Service administers Housing Benefits and Council Tax Support for

    around 82,000 customers at any one time. The Housing Benefit Regulations oblige

    Local Authorities to provide written notices of decisions to customers claiming

    Housing Benefit. These regulations also specify the detail that needs to be included

    in the decision letters. Because the letters are formal legal notifications they can only

    be partially amended by the Local Authority and this can result in customers having

    difficulty understanding the content. Many customers have to contact the service for

    an explanation of what the letters mean. The Services key software provider is

    working to provide a simplified summary letter that will be meaningful and

    understandable to customers. This does not replace the legal notification letter,

    which is still required to be produced, but will provide a simplified version to help

  • 30

    customers. The Benefits Service will be implementing this new arrangement in the

    summer of 2013.

    Revenues Service

    The Radius Recoup ICT System (which currently houses Community Charge and

    archived Council tax, along with

    Radius Arms which supports Sundry

    Debts) will be replaced with a new

    Civica Legal system which will provide

    increased functionality. The system

    will enable the service to proactively

    collect debts and increase collection

    rates. The greater recovery functionality will enable us to develop an enhanced

    single view of debt. Additional user licenses will allow for the transfer of all calls to

    the contact centre which will in turn improve the customer experience. The

    introduction of a Debt Prioritisation module will assist in developing a process that

    uses the latest data available about customers. Collection rates will improve through

    identifying and targeting debts which are collectable whilst writing off those deemed

    to be uncollectable.

    Northgate e-Revenues allow certain liability amendments to be automatically

    uploaded into our core system. E-Serve brings all the core system electronic services

    together and implementation will allow customers to view their account. There will

    also the facility to allow customers to make basic updates. In 2013/2014 these

    enhancements will achieve the following; increased first point of contact resolution,

    improve the customer experience, reduce the number of service requests to the

    back office, reduce costs, reduction in calls/ visits/ correspondence being received.

    There are currently 30,923 customers signed up to receive an electronic bill. The

    Office for National Statistics has recently revealed that over 21 million households

    (80%) in the UK have internet access. In 2013/2014 a targeted mailshot campaign

    will identify owners of more than one property and those customers who contact

    the service by email. This will be supported by colleagues in customer access who

    will promote the advantages of e-billing. By promoting e-billing the service will see

    the following benefits of; reduction in printing and postage costs, support the green

    agenda, and reduce calls/ visits.

    Benefits Service administered

    over 328 million in Benefits

    to Liverpool residents.

  • 31

    Customer Access Service

    The Contact Centre, Careline and One Stop Shop and Web Services make up the

    Customer Access Service. The planned developments for the Customer Access Service

    include:

    Enhancing the options of self-service for basic transactions through Instant Voice Recognition (IVR) Auto Attendants and the web. It is anticipated the number of basic transactions planned for automation will reduce call volumes by over 55,000 pa and in doing so widen customer choice through alternative forms of contact. Automation and self-serve is the most cost effective way of providing Customer Access therefore transferring basic transactions to automation will create efficiencies and free up advisors time to deal with more complex enquiries.

    Customer Access will be working closely

    with colleagues within ICT during 2013/2014 to upgrade the current Telephony

    Infrastructure. This planned upgrade will provide a multi-media environment with

    the capability to ensure service excellence with improved accessibility for customers

    into the future. The enhanced infrastructure once in place will enable Liverpool

    Direct Limited to meet the requirements of the changing customer contact channels

    over the next four years and beyond.

    During 2013/2014 Customer Access will be looking to enhance self-Serve options for

    Careline Services for both Professionals and Service Users. By again transferring basic

    enquiries to self-serve options will reduce call volumes by over 7,000 pa and help

    create efficiencies for the service. The enhancements to self-serve for Careline will

    also ensure service excellence is retained for both service users and professionals

    and increase customer choice by providing more via automation without the need of

    Customer Service Advisors intervention. Again allowing more complex queries to be

    dealt with.

    Customer Access will be working closely with colleagues from the Benefit Service

    during early 2013/2014 to enhance the frontline service provided on behalf of the

  • 32

    Benefit Maximisation Service. Teams across both One Stop Shops and Contact

    Centre will be given access to view cases within IIZUKA the case management system

    used by the Benefit Maximisation Service. This will enable more queries to be dealt

    with at First Point of Contact Resolution which will significantly reduce the

    production of unnecessary hand off enquiries and service requests. It is anticipated

    the quantity of service requests generated by Customer Access teams will reduce by

    50%. This will free up specialised resources within the Benefit Maximisation Service

    to focus.

    ICT Service

    The introduction of 4000 new small form factor tiny PCs and 20 Monitors to

    replace the current Liverpool City Council estate. New toolsets will allow a more

    efficient utilisation and centralisation of applications, reducing desktop complexity,

    and will provide a more enhanced service. The new PC solution will deliver a

    minimum 60% power reduction saving money and supporting the environment with

    the associated Green Energy Star award. Through centralised software

    management, applications can be deployed

    without a visit to the workplace or disruption

    to the user. Major operating and system

    software upgrades and rollouts or security

    patches can be undertaken almost instantly

    across the whole estate.

    In 2013/2014 delivery of a new virtualised

    Next Generation Compute Platform VBlock

    will take place. This is scalable platform that

    will replace a vast majority of the aged;

    servers, storage and networking devices in

    the Data Centres. Allowing it to host all the

    current services on a smaller more efficient

    footprint. The new VBlock system will release up to 30% more space in the Data

    Centre avoiding the need for expansion. Power savings will be reduced by at least

    25% saving an estimated 26,000 per annum. The server provision time from point

    of request into the Platform Support Team will reduce from 14 hours to two hours

    using enhanced provisioning and management tools.

  • 33

    Delivery in 2013/2014 of a Self-Service Password Reset (SSPR) system across the City

    Council and Liverpool Direct

    Limited to reduce the current load

    of 750 calls per month. SSPR

    functionality allows users to

    authenticate with their known

    username and password and

    register themselves with the

    system. The system then requires

    the users to register answers to a number of questions. When the user then requires

    their own password to be reset, instead of calling Connect2ICT, the user can access

    the Password Reset portal via the internet or the logon client on their PC or laptop.

    The benefits are reduced administration effort, reduction in help desk calls and

    reduced down time for users waiting for system access.

    Following the agreement of a contract with security industry leading McAfee,

    Liverpool Direct Limited now has access to 72 McAfee security products rather than

    just four previously available (at no extra cost). ICT Security will be implementing

    the three most beneficial of these security products to increase our delivery of pro-

    active security to the desktop. Rather than responding reactively to security, a

    hacking attempt or Zero-Day virus infection as it happens, early warning and

    control will be enabled through the implementation of McAfee Risk Advisor and

    Policy Auditor and a new, real-time security protection service will be delivered

    through McAfees Global Threat Intelligence platform, taking advantage of threat

    analysis from millions of computers around the world. All three of these products

    will introduce a shift in our security capability and protection.

    Human Resource and Payroll Service

    The second phase of the electronic recruitment system will provide assistance to

    managers linked to the payroll system. This will remove the current manual

    processes. It will introduce customer branding presenting a more professional image

    to users and potential new business customers. There will be a redeployment area

    that will support the current redeployment process and provide at risk employees

    with direct access to the vacancy system. Whilst this phase will not provide a

    financial saving it will improve the overall application of the system through a more

    streamlined approach.

    In 2012/2013 Liverpool Direct Limited

    successfully retained the

    Gold Investors in People Standard

    across all service areas.

  • 34

    Introducing the facility to access the Human Resource and Payroll system via the

    internet will provide access to

    Employee and Manager Self Service

    all year round and will help remove

    paper payslips. This development

    will allow users of smart mobile

    phones to access payslip

    information on the mobile phone

    removing the need to produce over

    100,000 paper payslips per annum

    making savings of printing and postage of approximately 12,000 yearly and

    reducing over 1300 unnecessary related calls per annum.

    Extended Oracle system development will provide an improved service and system

    access for managers, employees and external customers. The introduction of a new

    starter process through manager self-service for organisations who do their own

    recruitment will streamline payroll new starters and reduce emails by over 1200 per

    annum. The development will enable managers to track their submissions via a

    single route and reduce an estimated 400 calls per annum to Connect2HRP.

    There will be a review of

    employment related policies and

    procedures to standardise the

    documents. This will provide

    managers and employees with a

    consistent understanding of the

    employment framework. Each

    policy will follow an agreed format

    and, where appropriate, a

    procedure will follow. Online

    learning will be developed for both managers and employees to understand of the

    reasons and use of such policies. Standardising the policies will ensure that queries

    and requests for information are dealt with at the first point of contact. They will be

    more user friendly and will reduce the need for staff to contact HRP as the

    documents will be easy to navigate through the intranet. This should reduce the

    numbers of calls to Connect2HRP by approximately one third.

    Learning and Development Service

    Human Resource and Payroll Service

    launched a new e-recruitment portal.

    Over 4,000 a year of printing and

    photocopying costs has been saved.

  • 35

    The upgrade to the Epstein Training Centre will improve the learning environment

    and reduce space. This will enable much more responsive, efficient use of

    technologies which supports our investment in people development. Combined

    with the conversion to more efficient means of learning to aid cost efficiencies by

    reviewing learning/eLearning to ensure it is accurate and fit for purpose and cost

    effective.

    Establish a new Learning Management System that will improve the customer

    journey; provide greater and more accurate reporting and cost analysis; enable a

    platform which will house e learning in order to aid consistency or message and

    minimise cost.

    To support the transition from the

    former social care system (ISSIS) to

    a more robust and up to date social

    care system (Liquid Logic)

    incorporating greater financial

    controls. The training planned is

    aimed to minimise down time for

    staff concerned with a just in time

    approach so that learning can be

    undertaken directly prior to the go

    live date of the system. Post go

    live support and floor walking is built in to aid stoppage time and maximise benefits

    of the system to the user and subsequently provide a more streamlined service to

    the customer.

    2013/2014 will be a challenging year however plans are in place (and will be

    continuously reviewed and evaluated) to ensure targets; are met, expectations

    exceeded and real service improvements are made.