Page 1: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LCG Service Challenges Plan

Jamie Shiers, CERN-IT-GD

22 March 2005

Page 2: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Introduction

Draws heavily on draft Service Challenge chapter for the LCG TDR

And recent presentations by various people (POB, GDB, SC, …)

Some high level (but worrying…) comments on SC1 and SC2

Main focus is planning for future challenges (mainly SC3…)

Main difference wrt previous presentations is emphasis on Main difference wrt previous presentations is emphasis on different aspects of the challengesdifferent aspects of the challenges

i.e. not just raw transfer rates…

Draft milestones presented at February SC meeting well understood

Planning is an iterative, continuous process…

Page 3: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Key Principles

Service challenges results in a series of services that exist in parallel with baseline production service

Rapidly and successively approach production needs of LHC

Initial focus: core (data management) services

Swiftly expand out to cover full spectrum of production and analysis chain

Must be as realistic as possible, including end-end testing of key experiment use-cases over extended periods with recovery from glitches and longer-term outages

Necessary resources and commitment pre-requisite to success!

Should not be under-estimated!

Page 4: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Overall Schedule

SC2SC3

LHC Service OperationFull physics run

2005 20072006 2008

First physicsFirst beams

cosmics

June05 - Technical Design Report

Sep05 - SC3 Service Phase

May06 –SC4 Service Phase starts

Sep06 – Initial LHC Service in stable operation

SC4

Apr07 – LHC Service commissioned

Apr05 – SC2 Complete

Jul05 – SC3 Throughput Test

Apr06 – SC4 Throughput Test

Dec05 – Tier-1 Network operational

preparationsetupservice

SC2SC2SC3SC3

LHC Service OperationLHC Service OperationFull physics run

2005 20072006 2008

First physicsFirst beams

cosmicsFull physics run

2005 20072006 20082005 20072006 2008

First physicsFirst beams

cosmics

June05 - Technical Design Report

Sep05 - SC3 Service Phase

May06 –SC4 Service Phase starts

Sep06 – Initial LHC Service in stable operation

SC4SC4

Apr07 – LHC Service commissioned

Apr05 – SC2 Complete

Jul05 – SC3 Throughput Test

Apr06 – SC4 Throughput Test

Dec05 – Tier-1 Network operational

preparationsetupservice

preparationsetupservice

Page 5: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC1 / SC2

SC1 did not successfully complete its goals Dec04 - Service Challenge I complete

mass store (disk) - mass store (disk) 3 T1s (Lyon, Amsterdam, Chicago) (others also participated…) 500 MB/sec (individually and aggregate) 2 weeks sustained Software; GridFTP plus some scripts

We did not meet the milestone of 500MB/s for 2 weeks We need to do these challenges to see what actually goes wrong

A lot of things do, and did, go wrong We need better test plans for validating the infrastructure before the

challenges (network throughput, disk speeds, etc…) SC2: Mar05 - Service Challenge II should be complete

Software: reliable file transfer service mass store (disk) - mass store (disk), BNL, CNAF, FNAL, FZK, IN2P3, NIKHEF, RAL (more than originally

planned) 100MB/s per T1, 500MB/s aggregate out of CERN, push 2+ sites to ~500MB/s 1 month sustained

Page 6: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC2 – Current Status

Page 7: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC1/2 - Conclusions

Setting up the infrastructure and achieving reliable transfers, even at much lower data rates than needed for LHC, is complex and requires a lot of technical work + coordination

Even within one site – people are working very hard & are stressed. Stressed people do not work at their best. Far from clear how this scales to SC3/SC4, let alone to LHC production phase

Compound this with the multi-site / multi-partner issue, together with time zones etc and you have a large “non-technical” component to an already tough problem (example of technical problem follows…)

But… the end point is fixed (time + functionality)

We should be careful not to over-complicate the problem or potential solutions

And not forget there is still a humungous amount to do…

(much much more than we’ve done…)

Page 8: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC2 – Sample Network Problem

Q: Since Tuesday 15 of March at 1pm (more or less) we are experiencing very low performance for data stream originated at Karlsruhe (192.108.46.0/24) and at CNAF (192.135.23.0/24) and reaching CERN (192.16.160.0/24) via the backup 10G connection: data flow that were running at 1Gbps now are at 5-10Mbps from Karlsruhe and ~500Mbps from CNAF. There is no problem on the other way (from CERN to the two locations). (Reported March 17)

A: Following tests between our NOC and DFN, a faulty connection on the patch panel has been detected as the origin of these errors. It has been fixed and no errors appear now. (Solved March 21)

Who / how is this going to be debugged (and fixed) during Service Phase at 00:15 Sunday morning when expt framework detects something is wrong?

Page 9: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC2 – “Production problems”

For well understood reasons, we are currently trying to move away from ‘R&D’ style h/w (machines + network)

We need a stop-gap solution for SC2 and another for SC3

We are along way from “production mentality”

Don’t play with things whilst we’re running Don’t play with things whilst we’re running production unless change request signed in blood.production unless change request signed in blood.

All these issues can – and will – be solved but doesn’t any feel a case of Deju Vu?

Page 10: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

(Some) Meetings

SC2 Meetings Phone Conference Monday Afternoon Daily call with different sites

Post SC2 Meetings Tuesday 4pm (starting April)

Storage Management Workshop 5-7 April @ CERN

T0/T1 network meeting 8 April in NIKHEF/SARA

Pre-SC3 Meeting June 13th – 15th at CERN

Taipei SC Meeting 26th April

Hepix @FZK 9-13 May

There are also others:• Weekly SC meetings at CERN;• T2 discussions with UK

• next meeting: June in Glasgow• T2 INFN workshop in Bari

• 26-27 May• T1 site visits

• PIC / BNL / FNAL / Triumf / ASCC• etc. etc.

IMHO: meetings are needed but not everyone needs to go to all.Nor do we need same style. I want “stand-up” or “face-to-face”

Page 11: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 Preparation Workshop

This (proposed) workshop will focus on very detailed technical planning for the whole SC3 exercise.

It is intended to be as interactive as possible, i.e. not presentations to an audience largely in a different (wireless) world.

There will be sessions devoted to specific experiment issues, Tier1 issues, Tier2 issues as well as the general service infrastructure.

Planning for SC3 has already started and will continue prior to the workshop.

This is an opportunity to get together to iron out concerns and issues that cannot easily be solved by e-mail, phone conferences and/or other meetings prior to the workshop.

Is there a better way to do it? Better time?

Page 12: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 on

SC3 is significantly more complex than previous challenges It includes experiments s/w, additional m/w, Tier2s etc

Proving we can transfer dummy files from A-B proves nothing Obviously need to show that basic infrastructure works…

Preparation for SC3 includes: Understanding experiments’ Computing Models Agreeing involvement of experiments’ production teams Visiting all (involved) Tier1s (multiple times) Preparing for the involvement of 50-100 Tier2s

Short of resources at all levels: “Managerial” – discussing with experiments and Tier1s (visiting) “Organizational” – milestones, meetings, workshops, … “Technical” – preparing challenges and running CERN end – 24 x

7 ???

Page 13: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Prepare for the next service challenge (SC3) -- in parallel with SC2 (reliable file transfer) –

Build up 1 GByte/s challenge facility at CERN The current 500 MByte/s facility used for SC2 will become the testbed from

April onwards (10 ftp servers, 10 disk servers, network equipment)

Build up infrastructure at each external centre Average capability ~150 MB/sec at a Tier-1 (to be agreed with each T-1)

Further develop reliable transfer framework software Include catalogues, include VO’s

2005 Q1 - SC3 preparation

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmicsSC3SC2

disk-network-disk bandwidths

Page 14: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 - 50% service infrastructure Same T1s as in SC2 (Fermi, NIKHEF/SARA, GridKa, RAL, CNAF, CCIN2P3) Add at least two T2s “50%” means approximately 50% of the nominal rate of ATLAS+CMS

Using the 1 GByte/s challenge facility at CERN - Disk at T0 to tape at all T1 sites at 60 Mbyte/s Data recording at T0 from same disk buffers Moderate traffic disk-disk between T1s and T2s

Use ATLAS and CMS files, reconstruction, ESD skimming codes(numbers to be worked out when the models are published)

Goal - 1 month sustained service in July 500 MBytes/s aggregate at CERN, 60 MBytes/s at each T1 end-to-end data flow peaks at least a factor of two at T1s network bandwidth peaks ??

2005 Q2-3 - SC3 challenge

SC3SC2

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

tape-network-disk

bandwidths

Page 15: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

2005 Q2-3 - SC3 additional

centres

In parallel with SC3 prepare additional centres using the 500 MByte/s test facility

Test Taipei, Vancouver, Brookhaven, additional Tier-2s

Further develop framework software Catalogues, VO’s, use experiment specific solutions

SC2SC3

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

Page 16: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

2005 Sep-Dec - SC3 Service

50% Computing Model Validation Period

The service exercised in SC3 is made available to experiments as a stable, permanent service for computing model tests

Additional sites are added as they come up to speed

End-to-end sustained data rates – 500 Mbytes/s at CERN (aggregate) 60 Mbytes/s at Tier-1s Modest Tier-2 traffic

SC2SC3

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

Page 17: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Milestone Decomposition

File transfer goals: Build up disk – disk transfer speeds to 150MB/s

SC2 was 100MB/s – agreed by site Include tape – transfer speeds of 60MB/s

Tier1 goals: Bring in additional Tier1 sites wrt SC2

PIC and Nordic most likely added later: SC4?

Tier2 goals: Start to bring Tier2 sites into challenge

Agree services T2s offer / require On-going plan (more later) to address this via GridPP, INFN etc.

Experiment goals: Address main offline use cases except those related to analysis

i.e. real data flow out of T0-T1-T2; simulation in from T2-T1

Service goals: Include CPU (to generate files) and storage Start to add additional components

Catalogs, VOs, experiment-specific solutions etc, 3D involvement, … Choice of software components, validation, fallback, …

Page 18: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Milestone Decomposition

File transfer goals: Build up disk – disk transfer speeds to 150MB/s

SC2 was 100MB/s – agreed by site Include tape – transfer speeds of 60MB/s

Tier1 goals: Bring in additional Tier1 sites wrt SC2

PIC and Nordic most likely added later: SC4?

Tier2 goals: Start to bring Tier2 sites into challenge

Agree services T2s offer / require On-going plan (more later) to address this via GridPP, INFN etc.

Experiment goals: Address main offline use cases except those related to analysis

i.e. real data flow out of T0-T1-T2; simulation in from T2-T1

Service goals: Include CPU (to generate files) and storage Start to add additional components

Catalogs, VOs, experiment-specific solutions etc, 3D involvement, … Choice of software components, validation, fallback, …

Page 19: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Experiment Goals

Meetings on-going to discuss goals of SC3 and experiment involvement

Focus on: First demonstrate robust infrastructure; Add ‘simulated’ experiment-specific usage patterns; Add experiment-specific components; Run experiments offline frameworks but don’t preserve data;

Exercise primary Use Cases except analysis (SC4) Service phase: data is preserved…

Has significant implications on resources beyond file transfer services Storage; CPU; Network… Both at CERN and participating sites (T1/T2) May have different partners for experiment-specific tests (e.g. not all T1s)

In effect, experiments’ usage of SC during service phase = data challenge

Must be exceedingly clear on goals / responsibilities during each phase!

Page 20: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Experiment Involvement

Cont.

Regular discussions with experiments have started ATLAS: at DM meetings ALICE+CMS: every ~2 weeks LHCb: no regular slot yet, but discussions started…

Anticipate to start first with ALICE and CMS (exactly when TDB) ATLAS and LHCb around October

T2 sites being identified in common with these experiments More later…

List of experiment-specific components and the sites where they need to be deployed being drawn up

Need this on April timeframe for adequate preparation & testing

Page 21: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ALICE vs. LCG Service

Challenges

We could: Sample (bunches of) “RAW” events stored at T0 from our

Catalogue Reconstruct at T0 Ship from T0 to T1’s Reconstruct at T1 with calibration data Store/Catalogue the output

As soon as T2’s start to join SC3: Keep going with reconstruction steps

+ Simulate events at T2’s Ship from T2 to T1’s Reconstruct at T1’s and store/catalogue the output

Page 22: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ALICE vs. LCG Service Challenges

What would we need for SC3? AliRoot deployed on LCG/SC3 sites - ALICE Our AliEn server with: - ALICE

task queue for SC3 jobs catalogue to sample existing MC events and mimic raw data generation

from DAQ UI(s) for submission to LCG/SC3 - LCG WMS + CE/SE Services on SC3 - LCG Appropriate amount of storage resources - LCG Appropriate JDL files for the different tasks - ALICE Access to the ALICE AliEn Data Catalogue from LCG

Page 23: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ALICE vs. LCG Service

Challenges

Last step: Try the analysis of reconstructed data

That is SC4: We have some more time to think about it

Page 24: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ATLAS & SC3

July: SC3 phase 1 Infrastructure performance demonstration Little direct ATLAS involvement ATLAS observes performance of components and services

to guide future adoption decisions

Input from ATLAS database group

Page 25: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ATLAS & SC3

September: SC3 phase 2 Experiment testing of computing model Running

'real' software production and data management systems but working with throw-away data. ATLAS production involvement Release 11 scaling debugging Debug scaling for distributed conditions data access,

calibration/alignment, DDM, event data distribution and discovery

T0 exercise testing

Page 26: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

ATLAS & SC3

Mid-October: SC3 phase 3 Service phase: becomes a production facility Production, adding more T2s Operations at SC3 scale producing and distributing useful

data New DDM system deployed and operating Conduct distributed calibration/align scaling test Conduct T0 exercise Progressively integrate new tier centers into DDM

system. After T0 exercise move to steady state operations for T0

processing and data handling workflows

Page 27: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

CMS & SC3

Would like to use SC3 ‘service’ asap

Are already shipping data around & processing it as foreseen in SC3 service phase

More details in e.g. FNAL SC presentation Next…

Page 28: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

CMS & Service Challenge III

Service Challenge III - stated Goal by LCG: Achieve 50% of the nominal data rate Evaluating tape capacity to achieve challenge while still supporting

the experiment Add significant degrees of additional complexity file catalogs

OSG currently has only experiment supported catalogs, CMS has a prototype data management system at the same time, so exactly what this means within the experiment needs to be understood

VO management software Anxious to reconcile VO management infrastucture in time for

the challenge. Within OSG we have started using some of the more advanced functionality of VOMS that we would clearly like to maintain.

Uses the CMS’s offline frameworks to generate the data and drive the data movement.

Requirements are still under negotiation

Page 29: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

LHCb

Would like to see robust infrastructure before getting involved

Timescale: October 2005

Expecting LCG to provide somewhat more than other experiments

i.e. higher level functionality that file transfer service

Page 30: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Experiment plans - Summary

SC3 phases Setup and config - July + August Experiment software with throwaway data - September Service phase

ATLAS – Mid October ALICE – July would be best… LHCb – post-October CMS – July (or sooner)

Tier-0 exercise Distribution to Tier-1 …

Page 31: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Milestone Decomposition

File transfer goals: Build up disk – disk transfer speeds to 150MB/s

SC2 was 100MB/s – agreed by site Include tape – transfer speeds of 60MB/s

Tier1 goals: Bring in additional Tier1 sites wrt SC2

PIC and Nordic most likely added later: SC4?

Tier2 goals: Start to bring Tier2 sites into challenge

Agree services T2s offer / require On-going plan (more later) to address this via GridPP, INFN etc.

Experiment goals: Address main offline use cases except those related to analysis

i.e. real data flow out of T0-T1-T2; simulation in from T2-T1

Service goals: Include CPU (to generate files) and storage Start to add additional components

Catalogs, VOs, experiment-specific solutions etc, 3D involvement, … Choice of software components, validation, fallback, …

Page 32: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

A Simple T2 Model

N.B. this may vary from region to region

Each T2 is configured to upload MC data to and download data via a given T1

In case the T1 is logical unavailable, wait and retry MC production might eventually stall

For data download, retrieve via alternate route / T1 Which may well be at lower speed, but hopefully rare

Data residing at a T1 other than ‘preferred’ T1 is transparently delivered through appropriate network route

T1s are expected to have at least as good interconnectivity as to T0

Each Tier-2 is associated with a Tier-1 who is responsible for getting them set up

Services at T2 are managed storage and reliable file transfer DB component at T1; user agent also at T2

1GBit network connectivity – shared (less will suffice to start with, more maybe needed!)

Page 33: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Prime Tier-2 sites

For SC3 we aim for DESY FZK (CMS + ATLAS) Lancaster RAL (ATLAS) London RAL (CMS) Scotgrid RAL (LHCb) Torino CNAF (ALICE) US sites FNAL (CMS)

Responsibility between T1 and T2 (+ experiments) CERN’s role limited

Develop a manual “how to connect as a T2” Provide relevant s/w + installation guides Assist in workshops, training etc.

Other interested parties: Prague, Warsaw, Moscow, .. Also attacking larger scale problem through national / regional

bodies GridPP, INFN, HEPiX, US-ATLAS, US-CMS

Site Tier1 Experiment

Bari, Italy CNAF, Italy CMS

Turin, Italy CNAF, Italy Alice

DESY, Germany FZK, Germany ATLAS, CMS

Lancaster, UK RAL, UK ATLAS

London, UK RAL, UK CMS

ScotGrid, UK RAL, UK LHCb

US Tier2s BNL / FNAL ATLAS / CMS

Page 34: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Tier2 Region Coordinating Body Comments

Italy INFN A workshop is foreseen for May during which hands-on training on the Disk Pool Manager and File Transfer components will be held.

UK GridPP A coordinated effort to setup managed storage and File Transfer services is being managed through GridPP and monitored via the GridPP T2 deployment board.

Asia-Pacific ASCC Taipei The services offered by and to Tier2 sites will be exposed, together with a basic model for Tier2 sites at the Service Challenge meeting held at ASCC in April 2005.

Europe HEPiX A similar activity will take place at HEPiX at FZK in May 2005, together with detailed technical presentations on the relevant software components.

US US-ATLAS and US-CMS Tier2 activities in the US are being coordinated through the corresponding experiment bodies.

Canada Triumf A Tier2 workshop will be held around the time of the Service Challenge meeting to be held in Triumf in November 2005.

Other sites CERN One or more workshops will be held to cover those Tier2 sites with no obvious regional or other coordinating body, most likely end 2005 / early 2006.

Page 35: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Milestone Decomposition

File transfer goals: Build up disk – disk transfer speeds to 150MB/s

SC2 was 100MB/s – agreed by site Include tape – transfer speeds of 60MB/s

Tier1 goals: Bring in additional Tier1 sites wrt SC2

PIC and Nordic most likely added later: SC4?

Tier2 goals: Start to bring Tier2 sites into challenge

Agree services T2s offer / require On-going plan (more later) to address this via GridPP, INFN etc.

Experiment goals: Address main offline use cases except those related to analysis

i.e. real data flow out of T0-T1-T2; simulation in from T2-T1

Service goals: Include CPU (to generate files) and storage Start to add additional components

Catalogs, VOs, experiment-specific solutions etc, 3D involvement, … Choice of software components, validation, fallback, …

Page 36: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Service Goals

Expect relatively modest increase in ‘service’ components

File catalog based on agreement from Baseline Services WG

Other services agreed by BSWG

Experiment-specific components and impact on other services, e.g. Distributed Database Services, need to be clarified as soon as possible

Similarly, requirements for processing power and storage at all sites involved (T0, T1, T2)

(This is for both Service and Challenge phases: where we run the experiments’ s/w and store the output!)

Page 37: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

SC3 – Milestone Decomposition

File transfer goals: Build up disk – disk transfer speeds to 150MB/s

SC2 was 100MB/s – agreed by site Include tape – transfer speeds of 60MB/s

Tier1 goals: Bring in additional Tier1 sites wrt SC2

PIC and Nordic most likely added later: SC4?

Tier2 goals: Start to bring Tier2 sites into challenge

Agree services T2s offer / require On-going plan (more later) to address this via GridPP, INFN etc.

Experiment goals: Address main offline use cases except those related to analysis

i.e. real data flow out of T0-T1-T2; simulation in from T2-T1

Service goals: Include CPU (to generate files) and storage Start to add additional components

Catalogs, VOs, experiment-specific solutions etc, 3D involvement, … Choice of software components, validation, fallback, …

Page 38: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Ramp-up of FTS and T1s

As expected, this is proving to be a significant amount of work!

Need to keep up momentum:

Increasing file transfer performance; Adding tape; Building up network links; Bringing additional T1s into the challenges…

Page 39: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

File Transfer Milestones

Need to understand how infrastructure at CERN will build up to address file transfer goals of SC3

Internal / External network infrastructure File transfer Server nodes Access to Experiment files

For each Tier1 need to understand how local infrastructure and network connectivity will be build up to meet requirements

For Tier2s, assume “Minimal Usable Model” (see earlier slide)…

Assume DB for FTS will run at T1 with “client” also at T2 Transfers can be initiated from both ends

Page 40: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

2005 Sep-Dec - SC4 preparation

In parallel with the SC3 model validation period,in preparation for the first 2006 service challenge (SC4) –

Using 500 MByte/s test facility test PIC and Nordic T1s and T2’s that are ready (Prague, LAL, UK, INFN, ..)

Build up the production facility at CERN to 3.6 GBytes/s

Expand the capability at all Tier-1s to full nominal data rate

SC2SC3

SC4 Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

Page 41: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

2006 Jan-Aug - SC4

SC4 – full computing model services - Tier-0, ALL Tier-1s, all major Tier-2s operational at full target data rates (~2 GB/sec at Tier-0)- acquisition - reconstruction - recording – distribution, PLUS ESD skimming, servicing Tier-2s

Goal – stable test service for one month – April 2006

100% Computing Model Validation Period (May-August 2006)

Tier-0/1/2 full model test - All experiments- 100% nominal data rate, with processing load scaled to 2006 cpus

SC2SC3

SC4 Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

Page 42: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

2006 Sep – LHC service available

The SC4 service becomes the permanent LHC service – available for experiments’ testing, commissioning, processing of cosmic data, etc.

All centres ramp-up to capacity needed at LHC startup TWICE nominal performance Milestone to demonstrate this 3 months before first physics

data April 2007

SC2SC3

SC4LHC Service Operation

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

Page 43: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Key dates for Connectivity

SC2SC3

SC4LHC Service Operation

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

June05 - Technical Design Report Credibility Review by LHCC

Sep05 - SC3 Service – 8-9 Tier-1s sustain - 1 Gbps at Tier-1s, 5 Gbps at CERN

Extended peaks at 10 Gbps CERN and some Tier-1s

Jan06 - SC4 Setup – AllTier-1s 10 Gbps at >5 Tier-1s, 35 Gbps at CERN

July06 - LHC Service – All Tier-1s 10 Gbps at Tier-1s, 70 Gbps at CERN

Page 44: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Key dates for Services

SC2SC3

SC4LHC Service Operation

Full physics run

2005 20072006 2008

First physicsFirst beams

cosmics

June05 - Technical Design Report

Sep05 - SC3 Service Phase

May06 –SC4 Service Phase

Sep06 – Initial LHC Service instable operation

Page 45: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Additional threads started to address:

Experiment involvement; Bringing T2s in SC3; Longer-term goals of bringing all T2s into the LCG Service

(Challenges)

The enthusiasm and support provided to these new activities is much appreciated

We have a lot of work ahead…

…but the problem is beginning to become tractable(?)

Page 46: LCG Service Challenges Plan Jamie Shiers, CERN-IT-GD 22 March 2005

LC

G P

roje

ct, G

rid

Dep

loym

ent G

rou

p, C

ER

N

Conclusions

To be ready to fully exploit LHC, significant resources need to be allocated to a series of Service Challenges by all concerned parties

These challenges should be seen as an essential on-going and long-term commitment to achieving production LCG

The countdown has started – we are already in (pre-)production mode

Next stop: 2020