PACKER PERMEABILITY TEST IS 5529 (Part 2): 2006Project : Geotechnical Investigation for sea water intake structure for FBR 1 & 2 at BHAVINIElevation : 9.665 m. Ground Level wrt RL Bore hole No. 3Date : 5/24/2015 Depth of bore hole (m) 35.50Coordinate : N 112.00 E 100.00 Diameter of bore hole (mm) 1.5Inclination : Depth of water table (m) 9.00
Test section(m) : 28.50 To 30.00 1.65
1.5 9.00Type of test: Double Packer TestTest condition: Saturated
P t Q Lugeon k Remark
(min) (lit) (lit/min) (lit/min/m) (lit/min/m) (cm/sec)
1 0.50 1.565 10 13.80 1.380 0.920 5.879 5.879E-052 1.00 2.065 10 28.20 2.820 1.880 9.104 9.104E-053 1.50 2.565 10 41.60 4.160 2.773 10.812 1.081E-044 1.00 2.065 10 28.50 2.850 1.900 9.201 9.201E-055 0.50 1.565 10 15.50 1.550 1.033 6.603 6.603E-05
Sample Calculation :
As per IS-5529
1.565
1.38 lit/min
0.920 lit/min/m
Lugeon=Q X 1.0Mpa
= 5.879 lit/min/m
Result
Group= C
Classification: Dilation
Lugeon = 5.879
Test condition : Saturated Test condition : Unsaturated
A typical arrangement of "Double Packer" Method
1:Water inlet / pump2: Water meter
3: Pressure gauge
4: Pressure release valve
5: Drill hole t: Injection time
6: Outer packer pipe 7: Inner packer pipe k: Permeability in cm/sec
L: Length of test section8: Upper packer sleeve d: Diameter of test section (Borehole)
900 with horizontal
H1 (m)
Length of test section(L in m.) : H2 (m)
Sl. No.
Po Qt Qo
(Kg/cm2) (Kg/cm2)
P=Po+H1+H2= Kg/cm2
Qo=Qt/t =
Q=Qo/L =
Test pressure(MPa)
Po: Applied pressure / observed pressureH1: Height of pressure gauge above GL
H2: Depth of GWT or mid of test section from GL
P: Effective pressure = Po+(H1+H2)/10
Qt: Volume of water in time t
7/: Perforated inner packer pipe
8/: Lower packer sleeve
Po
Qt
Po
Qt
H1
H2
VGWT
L L
H2
H1
1
2
3
4
GL GL
5
6
12
8
8/
4
7/
7
L/2
L/2
d d
1.565
2.065
2.565
2.065
1.565
Lugeons Value
Pre
ss
ure
(K
g/c
m2
)